A method and system for acquiring load spectrum of main bearing of tunnel boring machine

By establishing a finite element model and fitting load response matrix, and correcting the load calculation based on actual measured data, the problem of calculation deviation of the load spectrum of the main bearing of the tunnel boring machine was solved, a more accurate load spectrum preparation was achieved, and the design and operation and maintenance were optimized.

CN118551633BActive Publication Date: 2024-10-15HUAZHONG UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411030265.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-15
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The existing technology is difficult to accurately capture the dynamic load of the main bearing of the tunnel boring machine during underground construction, resulting in large deviations in the calculation of the load spectrum and the inability to effectively predict the service life of the main bearing.

Method used

Establish a finite element model of the main driving structure of the tunnel boring machine, determine the stress-sensitive areas and select target nodes. Obtain the load response matrix through fitting, modify the load calculation formula based on the measured data, and collect strain values ​​to compile a more accurate load spectrum.

Benefits of technology

It achieves a more accurate capture of the dynamic load of the main bearing of the tunnel boring machine, and the compiled load spectrum can better reflect the actual working conditions, provides more accurate input to optimize design and operation and maintenance, and significantly improves the design and analysis accuracy of the main bearing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551633B_ABST
    Figure CN118551633B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for acquiring a load spectrum of a main bearing of a tunnel boring machine, and belongs to the field of underground engineering equipment. The method utilizes the advantages of structural strain signals, such as a more sensitive response to changes in load conditions and a higher sampling frequency. The transient impact load conditions in the process of tunneling and rock breaking can be more accurately captured through load inverse technology. The main bearing load spectrum compiled on this basis can more truly reflect the changes in the load conditions of the main bearing during the actual construction of the tunnel boring machine, and provide more accurate input for the design, optimization and status evaluation of the main bearing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of underground engineering equipment, and more specifically, relates to a method and system for acquiring a load spectrum of a main bearing of a tunnel boring machine. Background Art

[0002] The tunnel boring machine is a complex underground engineering equipment that integrates multiple disciplines such as electromechanical and hydraulics. It is an important equipment that cannot be obtained in the construction of national infrastructure in the fields of subways, railways, highways and national defense. The main bearing is the core component of the tunnel boring machine. It directly plays the role of power conversion and supporting the shield cutter head to rotate and break rocks. Its structure is complex and often faces high-risk and variable working conditions. It is subjected to huge random impact loads. Its service life often determines the actual tunneling mileage of the product. If the main bearing is damaged, it is not only extremely difficult to repair, but also the loss caused by shutdown is unbearable. Therefore, it is very important to ensure the safe and reliable operation of the main bearing. Due to the complexity of the geological environment and the customization of equipment, the current design of the main bearing of the tunnel boring machine is generally based on experience or experimental models. There is a large difference between the design input working conditions and the actual service environment load, which makes it very difficult to accurately predict the service life of the main bearing, which brings severe challenges to product design optimization, operation and maintenance, and remanufacturing. Therefore, obtaining the service data of the main bearing of the tunnel boring machine and compiling the load spectrum are of great significance for equipment design optimization, intelligent operation and maintenance, etc.

[0003] At present, the method of obtaining the service data of the main bearing of the roadheader and compiling the load spectrum is mainly based on the data of the thrust cylinder pressure and stroke routinely collected during the roadheader excavation process, and using these data to calculate the main bearing axial force, overturning moment, radial force and other loads, and then compiling the main bearing load spectrum on this basis. However, the above method has the following shortcomings:

[0004] (1) During the actual excavation process of the tunnel boring machine, the sampling frequency of the propulsion cylinder pressure, stroke and other data is relatively low, generally 1 Hz or greater, that is, the cylinder pressure and stroke data are collected once a second. The impact load caused by the cutterhead cutting the rock and soil often lasts for a short time and changes very quickly. The too low sampling spectrum cannot capture the impact load amplitude, resulting in a large deviation between the main bearing load data calculated by the cylinder pressure and stroke and the actual working conditions. The high-amplitude impact load often causes a greater loss in the life of the main bearing than the stable working condition load.

[0005] (2) The change of the cutter head cutting rock and soil load is reflected in the oil pressure change through the main drive structure, cylinder structure, oil, etc. The transmission path is long, and the oil pressure responds slowly to the dynamic load, which is not as sensitive as the load response of the structure. Therefore, there will be a certain error between the dynamic load calculated by the cylinder pressure and the actual working condition. Summary of the invention

[0006] In view of the above defects or improvement needs of the prior art, the present invention provides a method and system for obtaining the load spectrum of the main bearing of a tunnel boring machine, which can better capture the dynamic load of the main bearing of the tunnel boring machine during underground construction and thus obtain a more accurate load spectrum.

[0007] To achieve the above object, according to a first aspect of the present invention, a method for obtaining a load spectrum of a main bearing of a roadheader is provided, comprising:

[0008] S1, establishing a finite element model of the main drive structure of the roadheader; inputting the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtaining the stress value and strain value of each node in the finite element model under each combined working condition;

[0009] S2, determining the stress sensitive area of ​​the finite element model under each combined working condition, and determining a target node in each stress sensitive area;

[0010] Wherein, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and the stress value of each node in the stress sensitive area does not exceed the yield strength of the material under the rated working condition; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the number of load components;

[0011] S3, fitting the strain values ​​of each target node under each combined working condition with the load corresponding to each combined working condition to obtain a load response matrix K , to determine the load calculation formula;

[0012] Wherein, the load calculation formula is: , , is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition;

[0013] S4, taking the points on the main drive structure of the tunnel boring machine corresponding to the target nodes as the measured points, calculating the loads corresponding to the static thrust conditions according to the stress values ​​of the measured points under the static thrust conditions and the load calculation formula obtained in step S3, and comparing the loads with the loads calculated according to the pressure and stroke data of each propulsion cylinder under the static thrust conditions, so as to B Correction B `; Among them, the propulsion force of the top-pushing cutter disc is different under different static pushing conditions;

[0014] S5, collecting the strain values ​​of each measured point during the tunneling process of the tunnel boring machine, according to the formula The loads during the tunneling process are determined and a load spectrum of the main bearing of the tunneling machine is compiled.

[0015] According to a second aspect of the present invention, a device for acquiring a load spectrum of a main bearing of a tunnel boring machine is provided, comprising:

[0016] The first processing module is used to establish a finite element model of the main drive structure of the roadheader; input the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtain the stress value and strain value of each node in the finite element model under each combined working condition;

[0017] A second processing module determines the stress sensitive area of ​​the finite element model under each combination of working conditions, and determines a target node in each stress sensitive area;

[0018] Wherein, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and the stress value of each node in the stress sensitive area does not exceed the yield strength of the material under the rated working condition; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the number of load components;

[0019] The third processing module is to fit the strain value of each target node under each combined working condition with the load corresponding to each combined working condition to obtain a load response matrix K , to determine the load calculation formula;

[0020] Wherein, the load calculation formula is: , , is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition;

[0021] The fourth processing module takes the points on the main drive structure of the tunnel boring machine corresponding to each of the target nodes as measured points, calculates the load corresponding to each static thrust condition according to the stress value of each measured point under each static thrust condition and the load calculation formula obtained in step S3, and compares it with the load calculated according to the pressure and stroke data of each propulsion cylinder under each static thrust condition to determine the load of each static thrust condition. B Correction B `; Among them, the propulsion force of the top-pushing cutter disc is different under different static pushing conditions;

[0022] The fifth processing module collects the strain values ​​of each measured point during the excavation of the tunnel boring machine, and calculates the strain values ​​according to the formula F = B `C The loads during the tunneling process are determined and a load spectrum of the main bearing of the tunneling machine is compiled.

[0023] According to a third aspect of the present invention, there is provided a system for acquiring a load spectrum of a main bearing of a roadheader, comprising: a computer-readable storage medium and a processor;

[0024] The computer-readable storage medium is used to store executable instructions;

[0025] The processor is used to read the executable instructions stored in the computer-readable storage medium and execute the method as described in the first aspect.

[0026] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to execute the method described in the first aspect.

[0027] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0028] The method provided by the present invention establishes a finite element model of the main drive structure of the tunnel boring machine, simulates the stress condition of the main drive during the tunneling process of the tunnel boring machine by applying axial force and overturning moment, sets different axial force and overturning moment combination working conditions, performs structural simulation analysis, selects the stress sensitive area of ​​the main drive structure and extracts the strain data of the simulation model node in combination with the actual operation space of the strain gauge installation; uses the load data and the simulation model strain data under the corresponding working condition to establish a load calibration matrix, and uses the measured data of the tunneling process to verify and correct the load calibration matrix; refers to the strain data extraction node of the stress sensitive area of ​​the simulation model, arranges strain sensors at the corresponding positions of the main drive structure of the tunnel boring machine, sets a suitable frequency (such as 1000Hz) to collect the strain data of each measuring point during the tunneling process, and uses the load calibration matrix to inversely calculate the axial force and overturning moment of the main bearing, thereby obtaining the dynamic load of the main bearing of the tunnel boring machine during the underground construction process, and compiles a more accurate load spectrum. Provide accurate actual working condition input for the design, analysis and optimization of key components such as the main bearing of the tunnel boring machine. It has obvious advantages in accurately obtaining the load spectrum of the actual working condition of the main bearing of the tunnel boring machine. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A flow chart of a method for acquiring a main bearing load spectrum of a tunnel boring machine provided in an embodiment of the present invention.

[0030] Figure 2A simplified schematic diagram of the main drive (main bearing) loading of a shield machine provided in an embodiment of the present invention.

[0031] Figure 3 A schematic diagram of load mean, amplitude and frequency after rain flow counting provided in an embodiment of the present invention.

[0032] Figure 4 A schematic diagram of the mean value fitting of the axial force of the main bearing provided in an embodiment of the present invention.

[0033] Figure 5 A schematic diagram of the main bearing axial force amplitude fitting provided in an embodiment of the present invention.

[0034] Figure 6 A schematic diagram of a two-dimensional 8×8 level load spectrum of the axial force of a main bearing throughout its life cycle obtained based on the measured strain signal provided in an embodiment of the present invention.

[0035] Figure 7 A schematic diagram of a one-dimensional 8-level load spectrum of the axial force of a main bearing throughout its life cycle obtained based on the measured strain signal provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0037] The prior art usually calculates the main bearing axial force, overturning moment, radial force and other loads based on the data of propulsion cylinder pressure, stroke and structural component gravity routinely collected during the tunneling process of the tunnel boring machine, and adopts the rain flow counting method to obtain the main bearing load spectrum. However, during the construction of the tunnel boring machine, due to the complex and changeable geological environment, the load is extremely unstable during the cutterhead cutting rock and soil, which is often accompanied by huge instantaneous impact conditions. The impact conditions cause great damage to the tunnel boring machine's main bearings and other structures, while the sampling frequency of sensors such as the tunnel boring machine's propulsion cylinder pressure is relatively low (generally 1Hz or greater), and cannot effectively capture the impact condition signal, resulting in the obtained load spectrum being difficult to accurately reflect the actual working condition of the tunnel boring machine. Based on this, an embodiment of the present invention provides a method for obtaining the load spectrum of the tunnel boring machine main bearing, such as Figure 1 As shown, including:

[0038] S1, establish a finite element model of the main drive structure of the tunnel boring machine; input the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtain the stress value and strain value of each node in the finite element model under each combined working condition.

[0039] Specifically, a finite element model of the main drive structure of the tunnel boring machine was established, and different axial force and overturning moment combination working conditions were set as the input of the finite element model of the main drive structure to obtain the stress and strain results of the main drive structure under different working conditions.

[0040] S2, determining the stress sensitive area of ​​the finite element model under each combination of working conditions, and determining a target node in each stress sensitive area;

[0041] Among them, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and under the rated working condition, the stress value of each node in the stress sensitive area does not exceed the yield strength of the material; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the load classification number.

[0042] Specifically, the stress sensitive areas of the finite element model of the main drive structure under each combined working condition are selected, and a target node is determined in each stress sensitive area.

[0043] The stress sensitive area meets the following requirements: 1) The stress or strain of each node in the node area (i.e., stress sensitive area) is sensitive to loads such as axial force or overturning moment, that is, when the load amplitude changes, the stress or strain value of each node in the area changes significantly (for example, the range of change of stress or strain value at each point is greater than 50MPA); or directly take the area where the average stress or strain value is in the top A% (A is a real number greater than 0, which can be set according to actual conditions) as the stress sensitive area; 2) The stress in the node area does not exceed the yield strength of the material at the maximum working condition (i.e., rated working condition, designed maximum load-bearing working condition) at the maximum working condition.

[0044] The target nodes in the stress sensitive area are selected according to the following principles: 1) The nodes are selected to avoid stress concentration points; 2) The total number of selected nodes is not less than the number of load classifications, and multiple nodes cannot be selected in the same stress sensitive area. 3) The difference in stress or strain data between nodes in the surface area of ​​the structure near the target node (i.e., the adjacent preset area) is not greater than the stress difference threshold or strain difference threshold. For example, the difference in stress / strain data between nodes is not greater than 30%.

[0045] It can be understood that the load components on the main drive structure include axial force, overturning moment, radial force, propulsion force, etc. The present application gives priority to axial force and overturning moment, that is, the number of load components is preferably 2.

[0046] S3, according to the relation , the load response matrix is ​​obtained by fitting the strain value of each target node under each combined working condition with the load corresponding to each combined working conditionK , to determine the load calculation formula; wherein the load calculation formula is: , , is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition.

[0047] Specifically, the strain data of each target node under each combined working condition and the combined working condition data of different axial forces and overturning moments are extracted to establish the strain and load linear equations under multiple working conditions, and the following equations are obtained:

[0048] ;

[0049] is the strain matrix, , N is the number of target nodes, are the strain values ​​of target nodes 1, 2, and N respectively; is the load matrix, , is the axial force, is the overturning moment; K is the load response matrix.

[0050] Since the number of nodes for load and strain extraction is often not equal, K The inverse matrix of often does not exist. Therefore, the least squares method is used to solve it and we get:

[0051] ;

[0052] In the formula, for The conjugate transposed matrix of , which is the load calibration matrix.

[0053] The strain data of each target node under each combined working condition and the combined working condition data of different axial forces and overturning moments are fitted to obtain the K ,according to Calculated B , thus obtaining F The calculation formula for .

[0054] S4, taking the points on the main drive structure of the tunnel boring machine corresponding to each of the target nodes as measured points, obtaining the stress values ​​of each of the measured points under different static pushing conditions, and the pressure and stroke data of each propulsion cylinder under each of the static pushing conditions, then calculating the load corresponding to each static pushing condition according to the strain value of each measured point under each static pushing condition and the load calculation formula obtained in step S3, and comparing it with the load calculated according to the pressure and stroke data of each propulsion cylinder under each static pushing condition, so as to B Correction B` ; Among them, the propulsion force of the top push cutter disc is different under different static push conditions.

[0055] The strain value of each measured point can be collected by any stress collection device, such as a strain gauge, a strain meter, etc. Considering the collection cost, the embodiment of the present invention preferably uses a strain gauge to collect the strain value. Based on this, preferably, each of the target nodes has an actual operating space for setting a strain gauge, and the strain value at each measured point is collected by the strain gauge set at each measured point. The patch direction of each strain gauge is consistent with the direction of extracting the strain value of each target node in the finite element model.

[0056] Therefore, when selecting the target node, in addition to meeting the above-mentioned target node selection principles, the target node should also have actual operating space for installing the strain gauge. Considering that the area of ​​the strain gauge is generally 1 square centimeter, the area of ​​the adjacent preset area can be set to 1 square centimeter.

[0057] With reference to the position of the strain extraction node of the simulation model, strain gauges are arranged at the corresponding positions of the main drive structure of the tunnel boring machine. The direction and number of strain gauge patches should be consistent with the strain extraction direction of the simulation model and the number of target nodes respectively. Different thrust forces are set to push the cutterhead at the construction site, and they are maintained for a certain period of time to ensure that the cylinder pressure value is stable. Then, the pressure and stroke data of each thrust cylinder and the strain data of each measured point under the static pushing condition of the tunnel boring machine (the cutterhead does not rotate) are extracted, and the strain data and load calibration matrix are used to calibrate the pressure. B Calculate the axial force and overturning moment, and compare them with the axial force and overturning moment calculated based on the measured data of cylinder pressure and stroke, verify and correct the load calibration matrix obtained by the above calculation B get B` .

[0058] Any existing fitting method can be used to B Correction B` , such as the least squares method.

[0059] S5, collecting the strain values ​​of each measured point during the tunneling process of the tunnel boring machine, according to the formula The load during the tunneling process is determined and a load spectrum of the main drive structure of the tunneling machine, that is, a load spectrum of the main bearing of the tunneling machine, is compiled.

[0060] Preferably, before drawing the load spectrum of the main bearing of the tunnel boring machine, the method further comprises:

[0061] The load in the excavation process is filtered, such as pre-processed with a low-pass filter, to improve the signal-to-noise ratio of the load data.

[0062] Preferably, in step S5, the strain value of each of the measured points during the tunneling process of the tunnel boring machine is collected at a preset sampling frequency; the preset frequency is not less than 256 Hz.

[0063] Specifically, first, set an appropriate sampling frequency (not less than 256 Hz) to collect strain data at each measuring point during the excavation process, and use the corrected load calibration matrix B Reverse the time history data of the main bearing axial force, overturning moment and other working loads during the construction of the tunnel boring machine:

[0064] ;

[0065] In the formula, B` is the corrected load calibration matrix. It can be understood that since the loads calculated at this time are the main bearing axial force, overturning moment and other working loads during the construction of the tunnel boring machine, C It is the strain data of each measured point during the construction process of the tunnel boring machine.

[0066] Secondly, the load time history data is preprocessed using a low-pass filter to improve the data signal-to-noise ratio.

[0067] Then, the load spectrum of the main bearing of the tunnel boring machine is drawn according to the preprocessed load time history data. The present invention adopts the existing method to draw the load spectrum of the main bearing of the tunnel boring machine, and uses the rain flow counting method to count the time history data of the axial force and overturning moment of the main bearing to obtain the load mean, amplitude and frequency, and further uses the statistical principle to establish a distribution function (such as a three-parameter Weibull distribution) to obtain the load extreme value and load spectrum (generally using an eight-level spectrum) of the main bearing during the service life. Specifically, it includes the following steps:

[0068] (1) Perform counting processing on the load time history data to obtain the load characteristics in the load time history data, namely, the load amplitude, load mean and corresponding load frequency in the load time history data.

[0069] The processed load time history data are analyzed by rain flow counting method to remove the time domain information and obtain the load mean, amplitude and frequency.

[0070] (2) The distribution function is established using statistical principles. The three-parameter Weibull distribution is used to fit the load amplitude and frequency, and the normal distribution is used to fit the load mean and frequency:

[0071] ;

[0072] P is the probability of the occurrence of an extreme value of the mean, ε, β, α are the fitting parameters of the three-parameter Weil distribution, μp is the standard normal deviation, σ and μ are the standard deviation and mean of the normal distribution, respectively.

[0073] (3) After obtaining the extreme values ​​of the mean and amplitude, the mean is divided into 8 levels using the equal interval grading method, and the amplitude is divided into 8 levels (1, 0.95, 0.85, 0.725, 0.575, 0.425, 0.275, 0.125) using the unequal interval grading method. Then, the two-dimensional density distribution function is used for integration to obtain the two-dimensional load spectrum of the corresponding frequency under different mean amplitudes.

[0074] (4) Based on the excavation time or mileage corresponding to the measured data, the load spectrum in step (3) is extrapolated to the entire life cycle (usually 10,000 hours or 10 kilometers of excavation) using a two-dimensional probability density function. The number of load cycles is expanded to the number of cycles over the entire life cycle. The amplitude is fixed, and the 8-level mean is calculated based on the cumulative counts of each frequency and finally divided by the total number of times to obtain a new average value (i.e., weighted mean). This forms a one-dimensional 8-level load spectrum for the entire life cycle of the main bearing with a fixed mean and a variable amplitude.

[0075] In summary, the method provided by the present invention compiles a main bearing load spectrum based on the measured strain signal of the structure, and utilizes the phenomenon that changes in load conditions such as actual axial force and overturning moment during the tunneling process of the tunneling machine will synchronously bring about stress changes in the sensitive area of ​​the main drive structure. The load-strain mapping relationship (i.e., the load calibration matrix) is obtained through simulation calculation, and different thrust forces are set at the construction site to support the cutterhead. The pressure, stroke and strain data of each thrust cylinder under the static thrust condition of the tunneling machine (the cutterhead does not rotate) and each measured point strain data meter are used to correct the load calibration matrix (i.e., correction is performed using the measured data). Through the load-strain mapping relationship, the main bearing load time history data can be inversely obtained based on the measured strain signal and the main bearing load spectrum can be compiled.

[0076] The method provided by the present invention is further illustrated by taking a specific example as follows.

[0077] Taking a certain type of shield machine as an example, the forces on the cutter head during excavation can be simplified into loads such as axial force, overturning moment, torque, etc. (such as the attached Figure 2 As shown in the figure, these loads are transmitted to the main drive structure through the cutterhead and act on the main bearing. The axial force and overturning moment fluctuate greatly during the process of the cutterhead cutting rock and soil, and are the main loads that affect the service life of the main bearing (the radial force of the main bearing generated by the gravity of the main drive and other structures is relatively stable and can be calculated using empirical formulas).

[0078] (1) A finite element model of the main drive structure of the shield machine was established. The boundary conditions were set according to its constraint state. The range of axial force and overturning moment values ​​was determined based on the maximum bearing load. Sample data (3-5) were selected for each load within the range to form different loading combination schemes for simulation calculation.

[0079] (2) According to the principle of stress-sensitive area node selection, the stress-sensitive nodes of the simulation model under each working condition are determined, and the principal strain data at each node under different calculation conditions are extracted. The strain data and the combined working condition data of different axial forces and overturning moments are used to establish the strain and load linear equations. The 2×6 calibration matrix is ​​obtained by using the least squares method as follows, which corresponds to 2 load variables and 6 principal strain variables of the nodes;

[0080] .

[0081] (1) According to the stress-sensitive nodes obtained by finite element simulation, strain gauges are installed at the corresponding positions of the main drive structure of the shield machine to collect strain signals during the tunneling process. The calibration matrix is ​​corrected using the static thrust condition of the shield machine (the thrust cylinder pushes forward, the cutterhead does not rotate, and the cylinder pressure, stroke, strain and other data are recorded for 1-2 minutes). Then, the strain data of each measuring point collected during the actual tunneling process are input into ( B` is the corrected calibration matrix, C The time-varying matrix is ​​established by using the measured strain data of each measuring point to calculate the load time history data such as axial force and overturning moment.

[0082] (2) The calculated load time history data is processed by low-pass filtering to improve the data signal-to-noise ratio. Then, the load data is statistically analyzed using rain flow counting to obtain the mean, amplitude and frequency of the load during the excavation process, such as Figure 3 shown.

[0083] (3) Fit the load mean and amplitude with normal distribution and Weibull distribution density functions respectively (e.g. Figure 4-5 As shown in the figure, the mean and amplitude of the axial force are fitted), and the two-dimensional density distribution function can be obtained from the joint distribution density function of the two, and the mean and amplitude are graded respectively to obtain a two-dimensional 8×8 level load spectrum; further, the two-dimensional probability density function is used to extrapolate the load spectrum to the entire life cycle to obtain an extrapolated two-dimensional 8×8 level load spectrum.

[0084] (4) The two-dimensional 8×8 level load spectrum of the axial force of the main bearing throughout its life cycle is obtained based on the measured strain signal. Figure 6 shown.

[0085] (5) In practical applications, the one-dimensional load spectrum is more suitable as the input for the main bearing design analysis. The 8-level mean is divided by the total number of times according to the cumulative count of each frequency to obtain a new average value, and the final one-dimensional 8-level load spectrum is obtained by fixing the mean.

[0086] The one-dimensional 8-level load spectrum of the axial force of the main bearing throughout its life cycle based on the measured strain signal is as follows: Figure 7 As shown, the mean is 2.55×10 6 N.

[0087] An embodiment of the present invention provides a device for acquiring a load spectrum of a main bearing of a tunnel boring machine, comprising:

[0088] The first processing module is used to establish a finite element model of the main drive structure of the roadheader; input the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtain the stress value and strain value of each node in the finite element model under each combined working condition;

[0089] A second processing module determines the stress sensitive area of ​​the finite element model under each combination of working conditions, and determines a target node in each stress sensitive area;

[0090] Wherein, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and the stress value of each node in the stress sensitive area does not exceed the yield strength of the material under the rated working condition; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the number of load components;

[0091] The third processing module is to fit the strain value of each target node under each combined working condition with the load corresponding to each combined working condition to obtain a load response matrix K , to determine the load calculation formula;

[0092] Wherein, the load calculation formula is: , , is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition;

[0093] The fourth processing module takes the points on the main drive structure of the tunnel boring machine corresponding to the target nodes as measured points, calculates the loads corresponding to the static thrust conditions according to the stress values ​​of the measured points under the static thrust conditions and the load calculation formula obtained in step S3, and compares the loads calculated according to the pressure and stroke data of each propulsion cylinder under the static thrust conditions to obtain the loads corresponding to the static thrust conditions.B Correction B `; Among them, the propulsion force of the top-pushing cutter disc is different under different static pushing conditions;

[0094] The fifth processing module collects the strain values ​​of each measured point during the excavation of the tunnel boring machine, and calculates the strain values ​​according to the formula The loads during the tunneling process are determined and a load spectrum of the main bearing of the tunneling machine is compiled.

[0095] An embodiment of the present invention provides a system for acquiring a load spectrum of a main bearing of a roadheader, comprising: a computer-readable storage medium and a processor;

[0096] The computer-readable storage medium is used to store executable instructions;

[0097] The processor is used to read the executable instructions stored in the computer-readable storage medium and execute the method described in any of the above embodiments.

[0098] An embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to execute the method described in any of the above embodiments.

[0099] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for obtaining the load spectrum of the main bearing of a tunnel boring machine. It is characterized in that include: S1, establishing a finite element model of the main drive structure of the roadheader; inputting the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtaining the stress value and strain value of each node in the finite element model under each combined working condition; S2, determining the stress sensitive area of ​​the finite element model under each combined working condition, and determining a target node in each stress sensitive area; Wherein, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and the stress value of each node in the stress sensitive area does not exceed the yield strength of the material under the rated working condition; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the number of load components; S3, fitting the strain values ​​of each target node under each combined working condition with the load corresponding to each combined working condition to obtain a load response matrix K , to determine the load calculation formula; wherein the load calculation formula is: F = BC , B is the load calibration matrix, B =( K H K ) -1 K , F is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition; S4, taking the points on the main drive structure of the tunnel boring machine corresponding to the target nodes as the measured points, calculating the loads corresponding to the static thrust conditions according to the stress values ​​of the measured points under the static thrust conditions and the load calculation formula obtained in step S3, and comparing the loads with the loads calculated according to the pressure and stroke data of each propulsion cylinder under the static thrust conditions, so as to B Correction B `; Among them, the propulsion force of the top-pushing cutter disc is different under different static pushing conditions; S5, collecting the strain values ​​of each measured point during the tunneling process of the tunnel boring machine, according to the formula F = B`C The loads during the tunneling process are determined and a load spectrum of the main bearing of the tunneling machine is compiled.

2. The method according to claim 1, It is characterized in that Each of the target nodes has an actual operating space for setting a strain gauge. The strain value at each measuring point is collected by a strain gauge set at each measuring point. The patch direction of each strain gauge is consistent with the direction of extracting the strain value of each target node in the finite element model.

3. The method according to claim 1 or 2, It is characterized in that In step S5, before compiling the load spectrum of the main bearing of the tunnel boring machine, the method further includes: The load in the excavation process is filtered.

4. The method according to claim 1, It is characterized in that In step S4, the least squares method is used B Correction B `.

5. The method according to claim 1, It is characterized in that In step S5, the strain value of each of the measured points during the excavation process of the tunnel boring machine is collected at a preset sampling frequency; the preset sampling frequency is not less than 256 Hz.

6. A device for acquiring load spectrum of main bearing of tunnel boring machine, It is characterized in that include: The first processing module is used to establish a finite element model of the main drive structure of the roadheader; input the combined working conditions including different axial forces and overturning moments into the finite element model respectively, and obtain the stress value and strain value of each node in the finite element model under each combined working condition; A second processing module determines the stress sensitive area of ​​the finite element model under each combination of working conditions, and determines a target node in each of the stress sensitive areas; Wherein, the stress value or strain value of each node in the stress sensitive area is greater than the stress threshold or strain threshold, and the stress value of each node in the stress sensitive area does not exceed the yield strength of the material under the rated working condition; the target node is a non-stress concentration point, and the stress difference or strain difference between each node in the adjacent preset area of ​​the target node is not greater than the stress difference threshold or strain difference threshold, and the total number of the target nodes is not less than the number of load components; The third processing module is to fit the strain value of each target node under each combined working condition with the load corresponding to each combined working condition to obtain a load response matrix K , to determine the load calculation formula; wherein the load calculation formula is: F = BC , B is the load calibration matrix, B =( K H K ) -1 K , F is the load matrix, including the axial force and overturning moment corresponding to the same combined working condition, C is a strain matrix, including the strain values ​​of each target node under the same combined working condition; The fourth processing module takes the points on the main drive structure of the tunnel boring machine corresponding to each of the target nodes as measured points, calculates the load corresponding to each static thrust condition according to the stress value of each measured point under each static thrust condition and the load calculation formula obtained in step S3, and compares it with the load calculated according to the pressure and stroke data of each propulsion cylinder under each static thrust condition to determine the load of each static thrust condition. B Correction B `; Among them, the propulsion force of the top-pushing cutter disc is different under different static pushing conditions; The fifth processing module collects the strain values ​​of each measured point during the excavation process of the tunnel boring machine, and calculates the strain values ​​according to the formula F = B`C The loads during the tunneling process are determined and a load spectrum of the main bearing of the tunneling machine is compiled.

7. A system for acquiring load spectrum of main bearing of tunnel boring machine, It is characterized in that include: A computer readable storage medium and a processor; The computer-readable storage medium is used to store executable instructions; The processor is used to read the executable instructions stored in the computer-readable storage medium and execute the method according to any one of claims 1 to 5.

8. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to execute the method according to any one of claims 1 to 5.