A comprehensive system for managing renewable resources big data
By using the variable component database and the change time series in the comprehensive renewable resources big data management system to record the change rules of variable components, the problem of low traceability accuracy in the existing technology is solved, and the variable component is realized. Accurate traceability and improvement of traceability accuracy.
Patent Information
- Application Number
- CN202411004281.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-25
AI Technical Summary
Variable component change factors are not considered in the existing technology, resulting in a low accuracy of traceability of renewable resources and the inability to achieve accurate traceability.
A comprehensive big data management system for renewable resources is designed, including a component analysis module, a data warehousing building module, a traceable vector generation module and a source determination module. The changing rules of variable components are recorded through the variable component database and change time series. , generate variable similarity and improve traceability accuracy.
By setting up a variable component database and a change time series, accurate traceability of variable components is achieved, and the traceability accuracy and precision are improved.
Smart Images

Figure CN118552216B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a comprehensive system for managing renewable resource big data. Background Art
[0002] Renewable resources refer to various wastes generated in the process of social production and life consumption that have lost all or part of their original use value and can regain their use value after recycling and processing. Among them, processing is limited to simple processing such as cleaning, sorting, crushing, cutting, disassembling, and packaging to change the physical properties of renewable resources such as density, humidity, length, thickness, softness and hardness. In the current use of renewable resources, it is impossible to count whether they are recycled and reused, and it is impossible to trace the source of renewable resources. Traceability of renewable resource management refers to the process of tracing and managing the source, production, processing, distribution, and use of renewable resources (such as renewable materials, renewable energy, etc.). This traceability management aims to ensure the legal, sustainable and efficient use of renewable resources, and also helps to supervise the overall operation of the renewable resource industry chain and promote the development of resource recycling.
[0003] The Chinese invention patent with publication number CN115936736B provides a renewable resource recycling traceability and evidence storage system and method, the method comprising: collecting information and analyzing components of renewable resources to obtain resource information data and resource component data; constructing a renewable resource database to store standard component data of all renewable resources in the renewable resource database; dividing the resource component data according to the type of renewable resources to generate basic component vectors and variable component vectors; generating standard basic vectors and standard variable vectors based on the standard component data, calculating vector similarity, and determining the source of renewable resources.
[0004] However, in the prior art patents, the similarity between the variable component vector and the standard variable vector is directly calculated. When renewable resources are recycled, the variable components will change due to the influence of time and environment. The existing patent technology does not take into account the changing factors of the variable components, resulting in low traceability accuracy and inability to achieve accurate traceability. Summary of the invention
[0005] The present application provides a comprehensive system for the management of big data of renewable resources, thereby solving the problem in the prior art of not considering the factors of variable component changes, which leads to reduced traceability accuracy, and achieves the technical effect of tracing the variable components and further improving the traceability accuracy.
[0006] The present application provides a comprehensive system for managing renewable resource big data, the system comprising:
[0007] The component analysis module is used to collect information and analyze the components of renewable resources to obtain resource information data and resource component data;
[0008] A data storage construction module is used to construct a renewable resource database, and store standard component data of all renewable resources in the renewable resource database; the standard component data includes basic component data and variable component data;
[0009] The module for generating vectors to be traced is used to divide the resource component data according to the type of renewable resources and generate basic component vectors and variable component vectors;
[0010] A source determination module is used to generate a standard basic vector and a standard variable vector according to the standard component data, calculate the vector similarity, and determine the source of the renewable resources;
[0011] Among them, the renewable resource database includes a basic component database and a variable component database. The variable component database establishes a change time series table for storage according to the change law of the variable component; the change time series table is used to record the specific component change data of the variable component under different time and different environment.
[0012] Furthermore, the change time series table includes two change lines: a time change line under normal environment and a time change line under adverse environment; the time change line under adverse environment includes several branches; the change time series table is verified by experiments to fill in specific component change data at each time node.
[0013] Furthermore, the change time series table is annotated at each time node of obvious change to form an annotated node; the time node of obvious change refers to the time node when a new component is generated or an old component disappears.
[0014] Furthermore, the source determination module includes:
[0015] A standard vector generating unit, used for querying and retrieving standard component data, and generating a standard basic vector based on the standard component data;
[0016] A preliminary selection set generating unit is used to calculate the basic similarity between the standard basic vector and the basic component vector, and record the standard component data with similarity higher than a threshold value to form a preliminary selection set;
[0017] The variable component tracing unit is used to trace the variable components in the primary set and generate variable similarities;
[0018] The source determination unit is used to determine the source of the renewable resource based on the variable similarity.
[0019] Further, the data storage construction module includes: a partition establishment unit, which is used to partition and block store the variable component database according to the change time series table, and set a spatiotemporal component anchor point for each block;
[0020] The data record sorting unit is used to record the number of times the spatiotemporal component anchor points are extracted and compared and the comparison result data, and sort the blocks according to the access frequency and the result data.
[0021] Furthermore, the system further comprises: a verification module for independently verifying the renewable resources to obtain a more accurate traceability result; the verification module comprises:
[0022] The control preparation unit is used to obtain relevant data and determine the initial and final nodes as well as the experimental time;
[0023] The verification and determination unit is used to conduct independent verification experiments and recalculate variable similarities to determine the source.
[0024] Furthermore, the control preparation unit obtains the number of times and comparison result data of all renewable resources in the data record sorting unit using the time-space component anchor point extraction comparison, and selects the renewable resource data information that reaches the maximum number threshold according to the set maximum number threshold; selects two standard renewable resources with the highest similarity from the comparison results, obtains the positions of the most similar marked nodes as the initial nodes, and obtains the time period and environmental conditions corresponding to the nodes; obtains the data information of the next marked node as the final node, and calculates the time difference between the two marked nodes as the experimental time.
[0025] Furthermore, the verification and determination unit selects the same renewable resources located at the initial node position from the two standard renewable resources with the highest similarity as control samples, and places the renewable resources to be traced and the two control samples under the same environmental conditions for experiments. The experimental time lasts until the time point indicated by the final node. After the experiment, the variable component data of the renewable resources to be traced and the two control samples are extracted, the variable similarity is recalculated, and the source is determined.
[0026] Furthermore, the verification module also includes a multi-factor experimental unit, which is used to obtain the judgment result of the verification judgment unit, search for corresponding block information according to the judgment result, obtain multiple environmental influencing factors according to the variable component data information in the block, design a multi-factor cross experiment and generate an experimental analysis report.
[0027] Furthermore, the multi-factor crossover experiment refers to obtaining experimental factors that have a significant impact on the experiment from the change time series table, determining different levels of each experimental factor, determining different experimental times, obtaining multiple groups of experimental data to generate an experimental analysis report; the experimental analysis report compares and analyzes the experimental data of the resource samples to be traced with the data of standard recycled resources, and further evaluates the source data information of the recycled resources to be traced based on the experimental results and change trends.
[0028] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0029] By setting up a variable component database and a variable component traceability unit, the variable components in the preliminary set are traced and variable similarities are generated. A change time series table is set to record the changes of each variable component over time in different environments, thereby achieving traceability of the variable components and improving the traceability accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a diagram of the architecture of a comprehensive system for managing renewable resource big data in an embodiment of the present invention;
[0031] Figure 2 This is a schematic diagram of a source determination module of a comprehensive system for managing renewable resource big data in an embodiment of the present invention;
[0032] Figure 3 This is a schematic diagram showing the time sequence of changes in a comprehensive system for managing renewable resource big data in an embodiment of the present invention;
[0033] Figure 4 This is a determination flow chart of a comprehensive system for managing renewable resource big data in an embodiment of the present invention;
[0034] Figure 5 This is a schematic diagram of a data warehouse construction module of a comprehensive system for managing big data of renewable resources in an embodiment of the present invention. DETAILED DESCRIPTION
[0035] To facilitate the understanding of the present invention, the present application will be described more comprehensively below with reference to the relevant drawings; the drawings show preferred embodiments of the present invention, but the present invention can be implemented in many different forms and is not limited to the embodiments described herein; on the contrary, the purpose of providing these embodiments is to enable a more thorough and comprehensive understanding of the disclosed content of the present invention.
[0036] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs; the terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the term "and / or" used herein includes any and all combinations of one or more related listed items.
[0037] In order to solve the problem that the prior art does not consider the factors of variable component changes, resulting in reduced traceability accuracy, the present application adopts a variable component database and establishes a change time series table, thereby achieving an accurate understanding of the change rules of variable components and improving the traceability accuracy.
[0038] Embodiment 1: Figure 1 As shown, a comprehensive system for managing renewable resource big data includes:
[0039] The component analysis module is used to collect information and analyze the components of renewable resources to obtain resource information data and resource component data;
[0040] Specifically, the component analysis module is used to collect information and perform component analysis on the renewable resources. Information collection refers to directly collecting the source of the renewable resources. The renewable resources can be scrap metal materials. During the information collection process, their direct sources are collected, and the source of the renewable resources can be directly determined at this time. Secondly, if the source of the renewable resources cannot be directly known, a chemical composition analysis is performed on them to determine their chemical composition. For different types of renewable resources, the content of the analysis is different to obtain resource composition data.
[0041] A data storage construction module is used to construct a renewable resource database, and store standard component data of all renewable resources in the renewable resource database; the standard component data includes basic component data and variable component data;
[0042] Specifically, the data warehouse construction module is used to construct a renewable resource database. In the resource database, the sources of various renewable resources and their circulation information are recorded. For example, if a batch of renewable resources comes from Company A, flows to Company B, and then flows to Company C, the above circulation information is recorded in the renewable resource database, so that the source of the renewable resources can be easily traced. Secondly, the composition of the renewable resources is recorded, that is, when Company A produces this batch of renewable resources, it is tested and its chemical composition is analyzed to obtain standard composition data, which is stored in the renewable resource database. There is a one-to-one correspondence between the standard composition data and the renewable resources.
[0043] The module for generating vectors to be traced is used to divide the resource component data according to the type of renewable resources and generate basic component vectors and variable component vectors;
[0044] A source determination module is used to generate a standard basic vector and a standard variable vector according to the standard component data, calculate the vector similarity, and determine the source of the renewable resources;
[0045] Among them, the renewable resource database includes a basic component database and a variable component database. The variable component database establishes a change time series table according to the change law of the variable component; the change time series table is used to record the specific component change data of the variable component under different time and different environment.
[0046] The basic component database includes all basic component data, and the variable component database includes all variable component data.
[0047] like Figure 3 As shown, the change time series table includes two change lines: a time change line under normal environment and a time change line under adverse environment; the time change line under adverse environment includes several branches; the change time series table is verified by experiments to fill in specific component change data at each time node.
[0048] The change time series table marks each time node of obvious change to form a marked node; the time node of obvious change refers to a time node when a new component is generated or an old component disappears.
[0049] like Figure 2 As shown, the source determination module includes: a standard vector generation unit, which is used to query and retrieve standard component data and generate a standard basic vector based on the standard component data;
[0050] A preliminary selection set generation unit is used to calculate the basic similarity between the standard basic vector and the basic component vector, and record the standard component data with similarity higher than a threshold value to form a preliminary selection set;
[0051] The variable component tracing unit is used to trace the variable components in the primary set and generate variable similarities;
[0052] The source determination unit is used to determine the source of the renewable resource based on the variable similarity.
[0053] Specifically, the variable component traceability unit is used to trace the variable components in the preliminary set, use the change time series table in the variable component database to trace the source, and calculate the variable similarity; the source determination unit makes a determination based on the variable similarity and a set threshold. Preferably, the threshold can be set to 95%. If it is higher than the threshold, the source of the renewable resources can be determined; if it is not higher than the threshold, it returns to the variable component traceability unit for re-verification.
[0054] Specifically, the basic component database is used to store component data in renewable resources that are stable in nature and not easily changed; the variable component database is used to store component data in renewable resources that are unstable in nature and easily changed; in the renewable resource database, the name of the renewable resource corresponds to the basic component data and the variable component data one by one.
[0055] In this embodiment, if Figure 4 As shown, the specific process is as follows: Step 1, perform component analysis on the recycled resources whose sources cannot be directly determined, and obtain the basic component data and variable component data of the recycled resources; Step 2, use the basic component data and the standard basic vectors in the renewable resource database to make judgments, and screen out components with similarities higher than the set threshold to form a preliminary selection set; Step 3, perform secondary verification based on the standard variable vectors in the preliminary selection set, compare the component data in the variable component data one by one according to the change time series table, calculate the variable similarity, and use the one with the highest variable similarity as the traceability result.
[0056] The secondary verification is to trace the variable components separately, because the variable components will produce different changes under the influence of time and environment. In the existing patent technology, the variable component data in the initial state and the standard variable components of the renewable resources to be traced are used to calculate the similarity, which is easy to cause misjudgment. For example, the standard variable vector of source A is abc, and the standard variable vector of source B is acdf. However, after the influence of time and environment, the variable components of source A are more acdf. After similarity calculation, the renewable resources to be traced will be judged as source B. After tracing the variable components separately, the change process of the variable components can be clearly understood, and the accuracy of tracing can be improved.
[0057] For example, the data of the variable components in the renewable resources to be traced are abcd, which are compared one by one with the standard variable vectors in the preliminary set, and the variable components are verified according to the change time series table. If the standard variable vector of source A is abef, in the change time series table, after half a year in a humid environment, the standard variable vector is abcd, then it can be determined that the source of this renewable resource is A.
[0058] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages:
[0059] The present application sets up a variable component database and a variable component traceability unit, which are used to trace the variable components in the preliminary set and generate variable similarities. A change time series table is set to record the changes of each variable component over time in different environments, thereby achieving the effect of tracing the variable components and improving the traceability accuracy.
[0060] Embodiment 2: In embodiment 1, a variable component database and a variable component traceability unit are set up, and the changes of variable components over time in different environments are obtained according to the change time series table. However, when using the change time series table for comparative calculation, a large number of similar variable components will be screened out at the same time, affecting the accuracy of the traceability judgment.
[0061] like Figure 5 As shown, the data warehouse construction module includes:
[0062] A partition establishment unit is used to partition and block store the variable component database according to the change time sequence table, and set a spatiotemporal component anchor point for each block;
[0063] The data record sorting unit is used to record the number of times the spatiotemporal component anchor points are extracted and compared and the comparison result data, and sort the blocks according to the access frequency and the result data.
[0064] Specifically, a partition establishment unit is provided in the data warehouse construction module. The partition establishment unit partitions and blocks the variable component data according to the change time series table, generates a space-time component anchor point according to the marked nodes in the change time series table and the time period and environment. Each block corresponds to a space-time component anchor point, and each space-time component anchor point includes a specific time period, environmental conditions and component type combination. The variable component elements of each block are associated with the corresponding space-time component anchor point; the variable component traceability unit uses the space-time component anchor point to quickly locate a specific partition and retrieve all relevant variable component data in the partition. Each time a variable component comparison is performed, the number of comparisons will be recorded.
[0065] Specifically, the data recording unit is used to record the number of times the space-time component anchor point is extracted and compared and the comparison results, and sort the blocks according to the access frequency and the result data; the access frequency is the proportion of the number of times the space-time component anchor point is extracted and compared in all comparison times within a certain period of time, and the certain period of time is pre-set, for example, set to one week; the result data is used to record the results of the space-time component anchor point comparison, whether the traceability source is accurately found, and if not, the reason is recorded, and the overall success rate is calculated based on the total number of visits and the number of successes, and comprehensive sorting is performed according to the access frequency and success rate.
[0066] Specifically, the space-time component anchor point is a data combination with obvious distinguishing characteristics within the partition. Preferably, the specific data form of the space-time component anchor point is a brief list form, each column includes variable component data, special time periods and environmental conditions, representing new variable component data that will definitely be generated when the variable components of the source experience the same time in the environment. When comparing, if the variable components of the renewable resources to be traced do not contain the variable component data in the space-time component anchor point, it means that the renewable resources to be traced must not belong to the block corresponding to the space-time component anchor point.
[0067] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages:
[0068] This application sets a spatiotemporal component anchor point as a quick positioning data, representing a significant feature combination of a block, and can quickly and accurately narrow the data retrieval scope to a specific partition. In the comparison process, data that does not conform to the spatiotemporal component anchor point must not belong to the block, thereby improving the accuracy of traceability and avoiding the problem of using a change time series table to search one by one, which easily leads to a large amount of similar component data and interferes with the accuracy of traceability; the component database is partitioned and stored, and different partitions can be managed and optimized differently according to the characteristics and importance of the data. The spatiotemporal component anchor point serves as an identifier for the partition, which helps to centrally manage and analyze data in a specific time period and environment, further improving the speed and accuracy of data queries, and achieving the effect of improving traceability accuracy and retrieval speed.
[0069] Embodiment 3: In the above embodiment, by setting the spatiotemporal component anchor point as a quick positioning data, the data retrieval scope can be quickly and accurately narrowed to a specific partition, thereby improving the accuracy of tracing. This embodiment makes further limitations on the basis of the above embodiment.
[0070] In this embodiment, for some renewable resources to be traced, the number of comparisons between their data record sorting units and the space-time component anchor points may be abnormally large, and although the variable similarity of the source finally selected is higher than the threshold, the result is not ideal. If the threshold value is simply increased, the data range will be reduced, the risk of misscreening will increase, and the comprehensiveness of traceability will be reduced. Under reasonable threshold settings, special renewable resources to be traced are independently verified to ensure the accuracy of traceability.
[0071] The system further includes: a verification module for independently verifying the renewable resources to obtain more accurate traceability results; the verification module includes:
[0072] The control preparation unit is used to obtain relevant data and determine the initial and final nodes as well as the experimental time;
[0073] The verification and determination unit is used to conduct independent verification experiments and recalculate variable similarities to determine the source.
[0074] The control preparation unit obtains the number of times and comparison results data of all renewable resources in the data record sorting unit using the time-space component anchor point extraction comparison, and selects the renewable resource data information that reaches the maximum number threshold according to the set maximum number threshold; selects two standard renewable resources with the highest similarity from the comparison results, obtains the positions of the most similar marked nodes as the initial nodes, and obtains the time period and environmental conditions corresponding to the nodes; obtains the data information of the next marked node as the final node, and calculates the time difference between the two marked nodes as the experimental time.
[0075] Specifically, the data record sorting unit records the number of times the time-space component anchor point is used to extract and compare the renewable resources to be traced, and a maximum number threshold is set in advance, and the renewable resources whose comparison times reach the maximum number threshold are selected. The comparison number is the number of times the renewable resources to be traced are compared with the time-space component anchor point. If the variable component data does not match, other time-space component anchor points are selected for comparison; two standard renewable resources with the highest similarity are selected from the comparison results as the control group of the experiment, and when comparing, the corresponding specific blocks are selected according to the time-space component anchor points, and the marked nodes in the change time series table are screened within the blocks to obtain the position of the most similar marked node as the initial node, and the time period and environmental conditions corresponding to the node are obtained at the same time, and the renewable resources of the control group are selected according to the marked nodes, and the data information of the next marked node is obtained as the final node, and the time difference between the two marked nodes is calculated, and the time difference is the time for the control experiment.
[0076] The verification and determination unit selects the same renewable resources located at the initial node position from the two standard renewable resources with the highest similarity as control samples, and places the renewable resources to be traced and the two control samples under the same environmental conditions for experiments. The experimental time lasts until the time point indicated by the final node. After the experiment, the variable component data of the renewable resources to be traced and the two control samples are extracted, the variable similarity is recalculated, and the source is determined.
[0077] Specifically, the time difference between the marked node and the next marked node in the change timing table used in traceability verification is used as the experimental time, and the recycled resources to be traced and two control samples are placed under the same environmental conditions for observation. After the experiment, the variable component data of the recycled resources to be traced and the two control samples are extracted, the variable similarity is recalculated, and the source is determined.
[0078] For example, for a waste plastic sample to be traced, the time and space component anchor points recorded in its data record sorting unit were compared multiple times and reached the maximum number threshold. During the multiple comparisons, the standard recycled resources A and B had the highest similarity. The data information of the marked node and the next marked node during the traceability comparison were determined as the initial node and the final node respectively, and the time difference (such as three months) was calculated. The standard recycled resources A and B in the initial node state were selected as control samples respectively, and the recycled resources to be traced and the two control samples were placed in the environment corresponding to the initial node respectively, A was located in a humid environment, and B was located in a low temperature environment. After the time difference between the initial node and the final node, part of the recycled resources to be traced was placed in the same humid environment as A for three months, and part of the recycled resources to be traced was placed in the same low temperature environment as B for three months. After the experiment, the variable component data of the three samples were extracted and compared and analyzed. After the comparison and analysis, it was found that the similarity between the sample to be traced and the control sample A was increased to 99%, while the similarity with the control sample B remained unchanged. Then it can be determined that the traceability result of the recycled resource to be traced is the standard recycled resource A.
[0079] In this embodiment, two standard renewable resources with the greatest similarity and the renewable resources to be traced are placed in the same environment for experimental observation. In this embodiment, only two standard renewable resources with the greatest similarity are used. When conducting specific experimental observations, more than two can be selected, and the specific number is not limited. By selecting a control group for a control experiment, more solid data support is provided for the traceability results. By further determining and recalculating the similarity, the scheme can more accurately determine the source of the renewable resources and further improve the accuracy of traceability. Through the same environmental control experiment combined with the change time series table, the generation time of the renewable resources to be traced can be clearly determined, providing more accurate analysis data for the traceability of the renewable resources.
[0080] This embodiment introduces a verification module for some renewable resources to be traced that have many comparisons and unsatisfactory similarities. This module further improves the accuracy of traceability by obtaining data information of the initial node and the final node, setting up control experiments, and recalculating the similarity; through independent verification experiments, combined with the impact of actual environmental changes on variable components, it can more accurately determine the source of renewable resources and improve the accuracy of traceability; through the data support obtained from the control experiment, the credibility of the traceability results is enhanced; for some special or complex renewable resources, the verification module provides a more flexible and comprehensive traceability solution.
[0081] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages:
[0082] This application introduces a verification module, which obtains data information of the initial node and the final node, sets up a control experiment, and recalculates the similarity to further improve the traceability accuracy.
[0083] Embodiment 4: A verification module is introduced in the above embodiment. By obtaining data information of the initial node and the final node, setting a control experiment, and recalculating the similarity, this embodiment makes further improvements on the basis of the above content.
[0084] In the above-mentioned embodiment, a verification module and a control experiment are set up. Two different standard renewable resources are selected as controls. However, in the specific control experiment, the environmental factor is single and further verification cannot be done from multiple factors. Therefore, this embodiment is further improved.
[0085] The verification module also includes a multi-factor experiment unit, which is used to obtain the determination result of the verification determination unit, search for corresponding block information according to the determination result, obtain multiple environmental influencing factors according to the variable component data information in the block, design a multi-factor cross experiment and generate an experimental analysis report;
[0086] The multi-factor crossover experiment refers to obtaining experimental factors that have a significant impact on the experiment from the change time series table, determining the different levels of each experimental factor, determining different experimental times, obtaining multiple groups of experimental data to generate an experimental analysis report; the experimental analysis report compares and analyzes the experimental data of the resource samples to be traced with the data of standard recycled resources, and further evaluates the source data information of the recycled resources to be traced based on the experimental results and change trends.
[0087] Specifically, in the above-mentioned embodiment, the source of the renewable resources can be further accurately obtained through the verification experiment, but accurate data information cannot be obtained for the change process of the renewable resources from production to the current state. The variable component data information under different environments is set in the change time series table. According to different environmental factors, the factors that have a significant impact on the standard renewable resources can be judged. The significant impact is the environmental factor that generates the marked node. It is identified which environmental factors in the change time series table generate the marked nodes, and these environmental factors are classified and analyzed. The influencing factors with the largest proportion are selected for multi-factor crossover experiments. Preferably, the selected influencing factors should be greater than three; preferably, the influencing factors with a significant impact can also be obtained by analyzing the spatiotemporal component anchor points, which is a second method for selecting influencing factors.
[0088] Specifically, experimental factors with significant effects, such as temperature, humidity, light, pH value, etc., are obtained, and different levels of each experimental factor are determined according to actual conditions. For example, the temperature can be set to three levels: low temperature, medium temperature, and high temperature; the humidity can be set to three levels: low humidity, medium humidity, and high humidity.
[0089] Specifically, design a multi-factor crossover experiment and adopt a full factorial design method to ensure that the level of each factor can be fully considered in the experiment; determine the total number of experimental groups according to the number of levels of the experimental factors. For example, if there are three factors and three levels of each factor, then the full factorial design will produce 27 groups of experiments. For each group of experiments, clearly set specific experimental conditions, determine the time point and frequency of data collection, ensure that the changes in the variable components during the experiment can be fully recorded, and perform each group of experiments one by one according to the experimental plan to ensure accurate control of experimental conditions and avoid interference from external factors. During the experiment, record the change data of the variable components according to the predetermined data collection points and frequencies to ensure the accuracy and completeness of data collection and avoid omissions or errors; organize the collected experimental data to ensure the accuracy and availability of the data, and use statistical analysis methods to analyze the experimental data to analyze the degree and significance of the influence of different factors and their interactions on the changes in the variable components.
[0090] The full factorial design method is an experimental design strategy used to study the effects of two or more factors on the results, as well as the interactions between these factors. Data is collected by systematically testing all possible combinations of factor levels, so that the effects of each factor and its interaction on the corresponding variables can be fully evaluated. Taking the effects of temperature (A) and pressure (B) on the reaction rate of renewable resources as an example, assuming that each factor has three levels (low temperature A1, medium temperature A2, high temperature A3 and low pressure B1, medium pressure B2, high pressure B3), the design matrix will contain 9 experimental combinations. After performing these experiments, the reaction rate value of each combination can be obtained. Then, the main effects and interaction effects can be calculated using the above formula to evaluate the effects of temperature and pressure on the chemical reaction rate and their interactions. The full factorial design method is a prior art familiar to people in the relevant field.
[0091] In this embodiment, on the basis of the above experimental verification, a multi-factor cross-validation experiment is added to obtain the content, type and change trend of variable components of the renewable resources to be traced under different experimental conditions; the stability and adaptability of renewable resources under different environmental conditions can be accurately identified, and the change law of variable components in renewable resources under the influence of different factors can be clarified; by simulating the changes under different combinations of environmental factors, the multi-factor cross-experiment can more accurately reflect the change process of the resources to be traced in the actual environment, thereby improving the accuracy of traceability; data on the environmental adaptability, component change law and other data of the resources to be traced are obtained, so as to provide more comprehensive information support for the tracing and management of renewable resources, and help provide a scientific basis for the rational utilization and management of renewable resources.
[0092] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages:
[0093] This application has added a multi-factor cross-validation experiment to obtain the content, type and change trend of variable components of the recycled resources to be traced under different experimental conditions; it can accurately identify the stability and adaptability of recycled resources under different environmental conditions, and clarify the changing laws of variable components in recycled resources under the influence of different factors; by simulating the changes under different combinations of environmental factors, the multi-factor cross-validation experiment can more accurately reflect the changing process of the resources to be traced in the actual environment, thereby improving the accuracy of traceability.
[0094] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A comprehensive system for managing renewable resource big data, characterized in that: The system comprises: The component analysis module is used to collect information and analyze the components of renewable resources to obtain resource information data and resource component data; A data storage construction module is used to construct a renewable resource database, and store standard component data of all renewable resources in the renewable resource database; the standard component data includes basic component data and variable component data; The module for generating vectors to be traced is used to divide the resource component data according to the type of renewable resources and generate basic component vectors and variable component vectors; A source determination module is used to generate a standard basic vector and a standard variable vector according to the standard component data, calculate the vector similarity, and determine the source of the renewable resources; The renewable resource database includes a basic component database and a variable component database. The variable component database establishes a change time series table for storage according to the change law of the variable component; the change time series table is used to record the specific component change data of the variable component under different time and different environment; The change time series table includes two change lines: a time change line under normal environment and a time change line under adverse environment; the time change line under adverse environment includes several branches; the change time series table is verified by experiments to fill in specific component change data at each time node; The change time series table marks each time node of obvious change to form a marked node; the time node of obvious change refers to the time node when a new component is generated or an old component disappears; The source determination module comprises: A standard vector generating unit, used for querying and retrieving standard component data, and generating a standard basic vector based on the standard component data; A preliminary selection set generating unit is used to calculate the basic similarity between the standard basic vector and the basic component vector, and record the standard component data with similarity higher than a threshold value to form a preliminary selection set; The variable component tracing unit is used to trace the variable components in the primary set and generate variable similarities; A source determination unit, used to determine the source of the renewable resource based on the variable similarity; The data storage construction module includes: a partition establishment unit, which is used to partition and block the variable component database according to the change time series table, and set a spatiotemporal component anchor point for each block; A data record sorting unit is used to record the number of times the spatiotemporal component anchor points are extracted and compared and the comparison result data, and sort the blocks according to the access frequency and the result data; The system further includes: a verification module for independently verifying the renewable resources to obtain more accurate traceability results; the verification module includes: The control preparation unit is used to obtain relevant data and determine the initial and final nodes as well as the experimental time; A verification and determination unit, used to conduct independent verification experiments and recalculate variable similarities to determine the source; Among them, the control preparation unit obtains the number of times and comparison results data of all renewable resources in the data record sorting unit using the time-space component anchor point extraction comparison, and selects the renewable resource data information that reaches the maximum number threshold according to the set maximum number threshold; selects two standard renewable resources with the highest similarity from the comparison results, and obtains the positions of the most similar marked nodes as the initial nodes, and obtains the time period and environmental conditions corresponding to the nodes; obtains the data information of the next marked node as the final node, and calculates the time difference between the two marked nodes as the experimental time.
2. A comprehensive renewable resource big data management system as claimed in claim 1, characterized in that: The verification and determination unit selects the same renewable resources located at the initial node position from the two standard renewable resources with the highest similarity as control samples, and places the renewable resources to be traced and the two control samples under the same environmental conditions for experiments. The experimental time lasts until the time point indicated by the final node. After the experiment, the variable component data of the renewable resources to be traced and the two control samples are extracted, the variable similarity is recalculated, and the source is determined.
3. A comprehensive renewable resource big data management system as claimed in claim 1, characterized in that: The verification module also includes a multi-factor experimental unit, which is used to obtain the determination result of the verification determination unit, search for corresponding block information according to the determination result, obtain multiple environmental influencing factors according to the variable component data information in the block, design a multi-factor cross experiment and generate an experimental analysis report.
4. A comprehensive renewable resource big data management system as claimed in claim 3, characterized in that: The multi-factor crossover experiment refers to obtaining experimental factors that have a significant impact on the experiment from the change time series table, determining the different levels of each experimental factor, determining different experimental times, obtaining multiple groups of experimental data to generate an experimental analysis report; the experimental analysis report compares and analyzes the experimental data of the resource samples to be traced with the data of standard recycled resources, and further evaluates the source data information of the recycled resources to be traced based on the experimental results and change trends.
Citation Information
Patent Citations
System and Method for Traceability and Evidence Preservation of Recyclable Resources
CN115936736B
Renewable resource cyclic utilization traceability evidence storage system and method
CN115936736A
