A sealing test fixture for metal accessories production

By using a combination of a sealing air bag and an observation chamber in a sealing test fixture for metal parts production, the sealing problem in sealing testing is solved, achieving more accurate testing results and higher sealing maintenance efficiency.

CN118565726BActive Publication Date: 2024-10-01青岛华安金属制品有限公司
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411034991.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-01
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The existing waterproof test fixture has poor sealing performance, resulting in a decrease in detection accuracy, and the sealing status of the fixture itself cannot be conveniently observed, affecting maintenance and testing results.

Method used

A sealing test fixture for the production of metal parts including an upper sealing cylinder and a lower sealing cylinder is designed. Through the combination of the sealing air bag and the observation chamber, the interaction between water and gas is used to display the sealing condition of the sealing ring. If the seal is not tight, Bubbles are generated to help staff detect air leaks in time and perform maintenance.

Benefits of technology

It improves the accuracy of detection and the service life of seals, reduces the error rate caused by poor sealing, and ensures the reliability of the sealing test results of the fixture.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118565726B_ABST
    Figure CN118565726B_ABST
Patent Text Reader

Abstract

The present invention relates to a sealing detection jig for metal fittings production applied in the field of metal fittings production, comprising a base, an operation terminal fixed on one side of the base, a cylinder fixedly mounted on the base through a mounting plate, an upper sealing cylinder and a lower sealing cylinder mounted on the base, an accommodating cavity and a second observation cavity being provided on the upper end surface of the lower sealing cylinder, a sealing airbag being fixedly embedded on the upper end of the lower sealing cylinder, and a first observation cavity being provided on the lower end of the upper sealing cylinder. By adopting the above-mentioned sealing airbag, first observation cavity and second observation cavity and other structures, it is convenient for staff to determine whether there is air leakage and pressure relief in the jig itself during the sealing detection process, thereby avoiding misjudgment caused by the loss of sealing function of the jig itself, and at the same time enabling staff to understand the sealing condition of the jig, timely perform maintenance and replace the sealing components of the jig, and reduce the increase in the error rate caused by poor sealing during the detection process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a sealing detection jig, in particular to a sealing detection jig for metal accessories production, which is applied in the field of metal accessories production. Background Art

[0002] Nowadays, the use of fixtures is more popular in industrial production. Many fixtures are produced because of business needs. Because there are many types of fixtures, they are customized, some of which are designed to improve productivity, repeat specific actions, or make work more precise.

[0003] At present, the existing waterproof test fixtures are prone to poor sealing during use, and cannot effectively perform waterproof testing. Moreover, when performing waterproof testing, the equipment cannot be raised or lowered according to needs, which makes it inconvenient to use.

[0004] To solve the above problems, the specification of Chinese patent CN217111337U discloses a pneumatically controlled lifting, highly sealed, detachable waterproof detection fixture, comprising a fixed seat frame and a control button arranged on the outside of the fixed seat frame; a fixed mounting plate is arranged on the upper end of the fixed mounting plate, a bottom bracket is fixedly installed on the upper end of the fixed mounting plate, and a lower mold assembly is arranged on the upper end of the bottom bracket. The pneumatically controlled lifting, highly sealed, detachable waterproof detection fixture only needs to push the upper mold assembly downward by starting the cylinder, and the upper mold assembly is limited and moved by the limiting assembly, and the upper mold assembly is matched with the lower mold assembly, thereby realizing the lifting and high sealing processing of the equipment.

[0005] The above-mentioned detection fixture itself also needs to be sealed. Most of the existing fixtures form a seal through two corresponding sealing rings. After multiple uses and pressurized testing, the sealing rings may be worn or fatigued, resulting in sealing problems, thereby causing internal pressurized gas leakage, affecting the accuracy of the test and reducing the accuracy of the test. Summary of the invention

[0006] In view of the above-mentioned prior art, the technical problem to be solved by the present invention is how to provide a sealing detection jig for metal accessories production that allows workers to easily observe whether the jig itself is sealed, thereby enabling timely maintenance and improving detection accuracy.

[0007] In order to solve the above problems, the present invention provides a sealing detection jig for metal fittings production, comprising a base, an operation terminal is fixed on one side of the base, a cylinder is fixedly installed on the base through a mounting plate, an upper sealing cylinder and a lower sealing cylinder are installed on the base, the lower end of the lower sealing cylinder is fixed to the upper end surface of the base, the upper end of the upper sealing cylinder is fixed to the lower end of the piston rod of the cylinder through a connecting piece, the upper sealing cylinder is located above the lower sealing cylinder, and sealing rings for sealing are installed at the ends of the upper sealing cylinder and the lower sealing cylinder close to each other;

[0008] The upper end surface of the lower sealing cylinder is provided with a receiving chamber and a second observation chamber, the receiving chamber is provided below the sealing ring and is separated from the sealing ring, the second observation chamber is annular and provided outside the lower sealing cylinder, and the second observation chamber is connected with the receiving chamber;

[0009] A sealing airbag is fixedly embedded at the upper end of the lower sealing cylinder, a channel communicating with the inner side of the lower sealing cylinder is arranged on one side of the sealing airbag, and the lower end of the sealing airbag is located in the accommodating cavity;

[0010] A first observation cavity is provided at the lower end of the upper sealing cylinder. The first observation cavity corresponds to the second observation cavity in position and has the same shape and size. After the upper sealing cylinder and the lower sealing cylinder are closed, the first observation cavity and the second observation cavity are closed to form a cavity.

[0011] The accommodating cavity is filled with water, and transparent observation walls are fixed on the outside of the first observation cavity and the second observation cavity. After the upper sealing cylinder and the lower sealing cylinder are closed, the two transparent observation walls also form a seal;

[0012] When the closed cavity formed by the upper sealing cylinder and the lower sealing cylinder is pressurized, the lower end of the sealing airbag expands and squeezes the water in the accommodating cavity into the first observation cavity and the second observation cavity.

[0013] In the above-mentioned sealing inspection jig for metal accessories production, when the upper sealing tube and the lower sealing tube are closed and pressurized inside, part of the pressurized gas enters the sealing airbag from the channel, causing the lower end of the sealing airbag to expand and squeeze the water in the accommodating chamber into the first observation chamber and the second observation chamber. At this time, if the sealing ring is not tightly sealed, the internal pressurized gas enters the water in the first observation chamber and the second observation chamber from the gap between the two sealing rings to generate bubbles. The staff can use this to determine whether there is any air leakage and pressure relief in the jig itself during the sealing inspection, thereby avoiding misjudgment caused by the loss of the jig's own sealing function. At the same time, the staff can understand the sealing condition of the jig, promptly perform maintenance and replace the seals of the jig, and reduce the increase in the error rate caused by poor sealing during the inspection process.

[0014] As a further supplement to the present application, the channel includes a diverter hole and an air inlet, the diverter hole penetrates the inner wall of the lower sealing tube, and the air inlet is opened in the middle of the sealing airbag and communicates with the diverter hole.

[0015] As a further supplement to the present application, an air pressure balance channel is opened at the upper end of the first observation cavity, and the upper end opening of the air pressure balance channel extends to the outside of the upper sealing tube and penetrates the outer wall of the upper sealing tube to communicate with the outside.

[0016] As a further supplement to the present application, a communication channel is provided on the lower sealing cylinder, and two ends of the communication channel are respectively connected to the accommodating chamber and the second observation chamber.

[0017] As a further supplement to the present application, a second air flow groove is provided at the upper end of the lower sealing cylinder and located outside the sealing ring, and one end of the second air flow groove is connected to the second observation chamber;

[0018] A first air flow groove mirroring the second air flow groove is provided at the lower end of the upper sealing cylinder. After the upper sealing cylinder and the lower sealing cylinder are closed, the first air flow groove and the second air flow groove form a through hole.

[0019] As a further supplement to the present application, an installation cavity is provided between the accommodating cavity and the diversion hole, and the sealing airbag is fixedly embedded in the installation cavity, and the sealing airbag includes a first expansion bag and a second expansion bag;

[0020] The first expansion bag is fixedly embedded in the upper end of the lower sealing cylinder and one end thereof abuts against the inner side of the sealing ring, and the second expansion bag is fixedly embedded in the installation cavity and one end thereof extends into the accommodating cavity;

[0021] The air inlet is located between the first expansion bladder and the second expansion bladder and is communicated with the first expansion bladder and the second expansion bladder respectively;

[0022] The lower end of the upper sealing cylinder is provided with a receiving groove for receiving the first expansion bag, and the upper part of the first expansion bag abuts against the inner side wall of the sealing ring on the upper sealing cylinder.

[0023] As a further supplement to the present application, the sealed airbag also includes an extension bladder, which is formed at the upper end of the first expansion bladder and is an annular bladder body extending vertically upward, and an extension groove for accommodating the extension bladder is formed at the upper end of the accommodating groove.

[0024] As another improvement of the present application, a balloon is detachably installed at the connecting port between the air pressure balance channel and the outside, and the balloon expands after accommodating gas exceeding the gas in the first observation cavity and the second observation cavity.

[0025] To summarize, when the upper sealing tube and the lower sealing tube are closed and pressurized inside, part of the pressurized gas enters the sealing airbag from the channel, causing the lower end of the sealing airbag to expand and squeeze the water in the accommodating chamber into the first observation chamber and the second observation chamber. At this time, if the sealing ring is not tightly sealed, the internal pressurized gas enters the water in the first observation chamber and the second observation chamber from the gap between the two sealing rings to produce bubbles. The staff can use this to determine whether there is air leakage and pressure relief in the fixture itself during the sealing test, thereby avoiding misjudgment caused by the loss of the seal of the fixture itself. At the same time, the staff can understand the sealing condition of the fixture, promptly perform maintenance and replace the seals of the fixture, and reduce the increase in the error rate due to poor sealing during the detection process. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the three-dimensional structure of the first embodiment of the present application;

[0027] Figure 2 This is a cross-sectional view of the lower sealing cylinder of the first embodiment of the present application;

[0028] Figure 3 for Figure 2 A magnified view of the structure at center;

[0029] Figure 4 This is a cross-sectional view of the upper sealing cylinder of the first embodiment of the present application;

[0030] Figure 5 for Figure 4 A magnified view of the structure at B in the middle;

[0031] Figure 6 This is a partial cross-sectional view of the connection between the upper sealing cylinder and the lower sealing cylinder when they are closed in the first embodiment of the present application;

[0032] Figure 7 This is a schematic diagram of the balloon installation position of the second embodiment of the present application.

[0033] Description of the numbers in the figure:

[0034] 1. Base; 101. Mounting plate; 2. Operation terminal; 3. Cylinder; 4. Balloon; 5. Upper sealing cylinder; 501. Receiving groove; 502. First air flow groove; 503. First observation chamber; 504. Air pressure balance channel; 6. Lower sealing cylinder; 601. Diverter hole; 602. Receiving chamber; 603. Mounting chamber; 604. Connecting channel; 605. Second observation chamber; 606. Second air flow groove; 7. Sealing airbag; 701. First expansion bag; 702. Second expansion bag; 703. Air inlet; 704. Extension bag; 8. Sealing ring; 9. Transparent observation wall. DETAILED DESCRIPTION

[0035] The following describes two implementation modes of the present application in detail with reference to the accompanying drawings.

[0036] The first implementation method:

[0037] The present invention provides a sealing test fixture for metal fittings production, please refer to Figure 1-Figure 5 , including a base 1, an operation terminal 2 is fixed on one side of the base 1, a cylinder 3 is fixedly installed on the base 1 through a mounting plate 101, an upper sealing cylinder 5 and a lower sealing cylinder 6 are installed on the base 1, the lower end of the lower sealing cylinder 6 is fixed to the upper end surface of the base 1, the upper end of the upper sealing cylinder 5 is fixed to the lower end of the piston rod of the cylinder 3 through a connecting piece, the upper sealing cylinder 5 is located above the lower sealing cylinder 6, and sealing rings 8 for sealing are installed at the ends of the upper sealing cylinder 5 and the lower sealing cylinder 6 that are close to each other;

[0038] The upper end surface of the lower sealing cylinder 6 is provided with a receiving chamber 602 and a second observation chamber 605. The receiving chamber 602 is provided below the sealing ring 8 and is separated from the sealing ring 8. The second observation chamber 605 is annular and provided outside the lower sealing cylinder 6. The second observation chamber 605 is communicated with the receiving chamber 602.

[0039] A sealing airbag 7 is fixedly embedded at the upper end of the lower sealing cylinder 6, and a channel communicating with the inner side of the lower sealing cylinder 6 is provided on one side of the sealing airbag 7, and the lower end of the sealing airbag 7 is located in the accommodating cavity 602;

[0040] A first observation cavity 503 is provided at the lower end of the upper sealing cylinder 5. The first observation cavity 503 and the second observation cavity 605 correspond in position and have the same shape and size. After the upper sealing cylinder 5 and the lower sealing cylinder 6 are closed, the first observation cavity 503 and the second observation cavity 605 are closed to form a cavity.

[0041] The accommodating chamber 602 is filled with water, and transparent observation walls 9 are fixed to the outside of the first observation chamber 503 and the second observation chamber 605. After the upper sealing cylinder 5 and the lower sealing cylinder 6 are closed, the two transparent observation walls 9 also form a seal;

[0042] When the closed cavity formed by the upper sealing cylinder 5 and the lower sealing cylinder 6 is pressurized, the lower end of the sealing airbag 7 expands and squeezes the water in the accommodating cavity 602 into the first observation cavity 503 and the second observation cavity 605 .

[0043] Based on the above structure, when the upper sealing tube 5 and the lower sealing tube 6 are closed and pressurized inside, part of the pressurized gas enters the sealing airbag 7 from the channel, causing the lower end of the sealing airbag 7 to expand and squeeze the water in the accommodating chamber 602 into the first observation chamber 503 and the second observation chamber 605. At this time, if the sealing ring 8 is not tightly sealed, the internal pressurized gas enters the water in the first observation chamber 503 and the second observation chamber 605 from the gap between the two sealing rings 8 to generate bubbles. The staff can use this to determine whether there is any air leakage and pressure relief in the fixture itself during the sealing test, thereby avoiding misjudgment caused by the loss of the seal of the fixture itself. At the same time, the staff can understand the sealing condition of the fixture, promptly perform maintenance and replace the seals of the fixture, and reduce the increase in the error rate caused by poor sealing during the detection process.

[0044] Figure 2-Figure 6 The channel includes a diverter hole 601 and an air inlet 703. The diverter hole 601 penetrates the inner wall of the lower sealing tube 6. The air inlet 703 is opened in the middle of the sealing airbag 7 and communicates with the diverter hole 601, so that the pressurized gas in the lower sealing tube 6 can enter the sealing airbag 7 to cause the sealing airbag 7 to deform, so as to squeeze the water in the accommodating cavity 602 into the first observation cavity 503 and the second observation cavity 605.

[0045] An air pressure balance hole 504 is provided at the upper end of the first observation chamber 503. The upper end opening of the air pressure balance hole 504 extends to the outer side of the upper sealing cylinder 5 and penetrates the outer side wall of the upper sealing cylinder 5 to communicate with the outside, so that the internal and external air pressures of the first observation chamber 503 are balanced, and the internal air can be discharged when water enters, so that the water in the accommodating chamber 602 can more easily enter the first observation chamber 503 and the second observation chamber 605;

[0046] A communication channel 604 is provided on the lower sealing cylinder 6, and both ends of the communication channel 604 are respectively connected to the accommodating chamber 602 and the second observation chamber 605. A second air flow groove 606 is provided on the upper end of the lower sealing cylinder 6 outside the sealing ring 8, and one end of the second air flow groove 606 is connected to the second observation chamber 605.

[0047] The lower end of the upper sealing cylinder 5 is provided with a first air flow groove 502 which is arranged in a mirror image with the second air flow groove 606. After the upper sealing cylinder 5 and the lower sealing cylinder 6 are closed, the first air flow groove 502 and the second air flow groove 606 form a through hole;

[0048] By setting the first air flow groove 502 and the second air flow groove 606, the two sealing rings 8 are directly connected to the first observation chamber 503 and the second observation chamber 605. Therefore, if gas leakage occurs, the gas can be conducted to the first observation chamber 503 and the second observation chamber 605 in time, so as to facilitate the guidance of the leaked gas and timely reflect the gas leakage status.

[0049] Figure 3 and Figure 6 It is shown that a mounting cavity 603 is provided between the accommodating cavity 602 and the diverter hole 601, and the sealing airbag 7 is fixedly embedded in the mounting cavity 603. The sealing airbag 7 includes a first expansion bladder 701 and a second expansion bladder 702;

[0050] The first expansion bladder 701 is fixedly embedded in the upper end of the lower sealing tube 6 and one end thereof abuts against the inner side of the sealing ring 8. The second expansion bladder 702 is fixedly embedded in the installation cavity 603 and one end thereof extends into the accommodation cavity 602.

[0051] The air inlet 703 is located between the first expansion bladder 701 and the second expansion bladder 702 and is communicated with the first expansion bladder 701 and the second expansion bladder 702 respectively;

[0052] A receiving groove 501 for receiving the first expansion bladder 701 is formed at the lower end of the upper sealing cylinder 5 , and the upper portion of the first expansion bladder 701 abuts against the inner wall of the sealing ring 8 on the upper sealing cylinder 5 .

[0053] By providing the first expansion bladder 701 and the second expansion bladder 702, the first expansion bladder 701 can press against the inner sides of the two sealing rings 8 when expanded, forming a second layer of sealing structure, thereby further improving the sealing between the two sealing rings 8, and improving the sealing between the upper sealing cylinder 5 and the lower sealing cylinder 6, to achieve a better sealing effect;

[0054] When the second expansion bladder 702 expands, the water in the accommodating chamber 602 is squeezed into the first observation chamber 503 and the second observation chamber 605, so as to facilitate the observation of whether the upper sealing tube 5 and the lower sealing tube 6 are sealed, thereby achieving the dual effects of improving the sealing performance and facilitating the observation of whether the sealing is achieved, making the actual use effect of the sealing detection fixture for metal accessories production better.

[0055] Figure 3 , Figure 5 Figure 6 It is shown that the sealing airbag 7 also includes an extension bag 704, which is formed at the upper end of the first expansion bag 701, and the extension bag 704 is an annular bag body extending vertically upward. An extension groove for accommodating the extension bag 704 is formed at the upper end of the accommodating groove 501. The setting of the extension bag 704 can expand the deformation of the sealing airbag 7, thereby accommodating more pressurized gas, making it easier for the first expansion bag 701 and the second expansion bag 702 to fully expand and deform, and playing a certain compensatory role for the first expansion bag 701 and the second expansion bag 702, thereby avoiding excessive expansion of the first expansion bag 701 and the second expansion bag 702 during expansion, thereby causing fatigue damage to the sealing airbag 7.

[0056] Second implementation method:

[0057] Figure 7It is shown that a balloon 4 is detachably installed at the connecting port between the air pressure balance channel 504 and the outside. The balloon 4 expands after accommodating gas exceeding the first observation chamber 503 and the second observation chamber 605. Through the arrangement of the balloon 4, when the gas leaks from between the two sealing rings 8, the gas enters the first observation chamber 503 and the second observation chamber 605 through the first air flow groove 502 and the second air flow groove 606, and is discharged from the air pressure balance channel 504 to the balloon 4 after rising in the water, so that the balloon 4 expands, so that the observer can judge whether the fixture has a leak by observing whether the balloon 4 is expanded, thereby providing another observation method, making the observation method more diverse and reliable, and can also be combined with the observation of bubbles in the water body to make a joint judgment, thereby reducing the probability of misjudgment.

[0058] In view of current practical needs, the above-mentioned implementation mode adopted in this application is not limited to the scope of protection. Various changes made within the knowledge scope of technical personnel in this field without departing from the concept of this application still fall within the scope of protection of the present invention.

Claims

1. A sealing test jig for metal fitting production, comprising a base (1), an operating terminal (2) fixed to one side of the base (1), a cylinder (3) fixedly mounted on the base (1) via a mounting plate (101), an upper sealing cylinder (5) and a lower sealing cylinder (6) mounted on the base (1), the lower end of the lower sealing cylinder (6) being fixed to the upper end surface of the base (1), the upper end of the upper sealing cylinder (5) being fixed to the lower end of the piston rod of the cylinder (3) via a connecting piece, the upper sealing cylinder (5) being located above the lower sealing cylinder (6), and sealing rings (8) for sealing are mounted on the mutually adjacent ends of the upper sealing cylinder (5) and the lower sealing cylinder (6), characterized in that: The upper end surface of the lower sealing cylinder (6) is provided with a receiving chamber (602) and a second observation chamber (605), the receiving chamber (602) is provided below the sealing ring (8) and is separated from the sealing ring (8), the second observation chamber (605) is annular and provided outside the lower sealing cylinder (6), and the second observation chamber (605) is in communication with the receiving chamber (602); A sealing airbag (7) is fixedly embedded in the upper end of the lower sealing cylinder (6), a channel communicating with the inner side of the lower sealing cylinder (6) is provided on one side of the sealing airbag (7), and the lower end of the sealing airbag (7) is located in the accommodating cavity (602); A first observation cavity (503) is provided at the lower end of the upper sealing cylinder (5); the first observation cavity (503) and the second observation cavity (605) correspond in position and have the same shape and size; after the upper sealing cylinder (5) and the lower sealing cylinder (6) are closed, the first observation cavity (503) and the second observation cavity (605) are closed to form a cavity; The accommodating cavity (602) is filled with water, and transparent observation walls (9) are fixed to the outsides of the first observation cavity (503) and the second observation cavity (605). After the upper sealing cylinder (5) and the lower sealing cylinder (6) are closed, the two transparent observation walls (9) also form a seal; When pressure is applied to the closed cavity formed by the upper sealing cylinder (5) and the lower sealing cylinder (6), the lower end of the sealing airbag (7) expands and squeezes the water in the accommodating cavity (602) into the first observation cavity (503) and the second observation cavity (605).

2. The sealing test jig for metal fittings production according to claim 1, characterized in that: The channel comprises a diverter hole (601) and an air inlet (703), wherein the diverter hole (601) passes through the inner wall of the lower sealing cylinder (6), and the air inlet (703) is opened in the middle of the sealing airbag (7) and communicates with the diverter hole (601).

3. The sealing test jig for metal fitting production according to claim 2, characterized in that: An air pressure balance channel (504) is provided at the upper end of the first observation chamber (503), and the upper end opening of the air pressure balance channel (504) extends toward the outside of the upper sealing cylinder (5) and penetrates the outer wall of the upper sealing cylinder (5) to communicate with the outside.

4. The sealing test jig for metal fitting production according to claim 3, characterized in that: A communication channel (604) is provided on the lower sealing cylinder (6), and two ends of the communication channel (604) are respectively connected to the accommodating chamber (602) and the second observation chamber (605).

5. The sealing test jig for metal fitting production according to claim 3, characterized in that: The upper end of the lower sealing cylinder (6) is located outside the sealing ring (8) and is provided with a second air flow groove (606), and one end of the second air flow groove (606) is connected to the second observation chamber (605); The lower end of the upper sealing cylinder (5) is provided with a first air flow groove (502) which is arranged in a mirror image with the second air flow groove (606); after the upper sealing cylinder (5) and the lower sealing cylinder (6) are closed, the first air flow groove (502) and the second air flow groove (606) form a through hole.

6. The sealing test jig for metal fitting production according to claim 5, characterized in that: An installation cavity (603) is provided between the accommodating cavity (602) and the diversion hole (601), and the sealing airbag (7) is fixedly embedded in the installation cavity (603). The sealing airbag (7) comprises a first expansion bag (701) and a second expansion bag (702); The first expansion bladder (701) is fixedly embedded in the upper end of the lower sealing cylinder (6) and one end thereof abuts against the inner side of the sealing ring (8); the second expansion bladder (702) is fixedly embedded in the installation cavity (603) and one end thereof extends into the accommodating cavity (602); The air inlet (703) is located between the first expansion bladder (701) and the second expansion bladder (702) and is in communication with the first expansion bladder (701) and the second expansion bladder (702) respectively; The lower end of the upper sealing cylinder (5) is provided with a receiving groove (501) for receiving the first expansion bag (701), and the upper part of the first expansion bag (701) abuts against the inner side wall of the sealing ring (8) on the upper sealing cylinder (5).

7. The sealing test jig for metal fitting production according to claim 6, characterized in that: The sealing airbag (7) further comprises an extension bag (704), wherein the extension bag (704) is formed at the upper end of the first expansion bag (701), and the extension bag (704) is an annular bag body extending vertically upward, and the upper end of the accommodating groove (501) forms an extension groove for accommodating the extension bag (704).

8. The sealing test jig for metal fitting production according to claim 5, characterized in that: A balloon (4) is detachably mounted at the communication port between the air pressure balance channel (504) and the outside. The balloon (4) expands after accommodating gas exceeding the gas in the first observation cavity (503) and the second observation cavity (605).

Citation Information

Patent Citations

  • Pneumatic control lifting high-sealing detachable waterproof detection jig

    CN217111337U

  • Gas leakage detection system

    CN115112309A

  • A device for detecting cement seal for pipe joints nature

    CN204514550U

  • Tightness tester

    CN204944774U

  • Pressure vessel sealing performance detection device

    CN220322655U