A visual transparent soil model test box with adjustable surrounding rock pressure and its manufacturing method
By designing an adjustable transparent soil model test chamber, using threaded rods and nuts to adjust the surrounding rock pressure, the problem that the existing technology cannot adjust the surrounding rock pressure is solved, and visual observation of the internal strain state of the surrounding rock is achieved, which is suitable for studying tunnel opening. The deformation mechanism of surrounding rock during excavation.
Patent Information
- Application Number
- CN202411034497.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-31
AI Technical Summary
The existing transparent soil model test chamber cannot achieve autonomous regulation of surrounding rock pressure, making it difficult to observe the internal displacement and strain state of the soil, which brings obstacles to tunnel excavation research.
An adjustable transparent soil model test chamber including pressure plate, force transfer plate, bolt assembly and pressure box is designed to adjust the surrounding rock pressure by tightening or loosening of threaded rod and nut, allowing replacement of left and upper sides Press plate thickness to adjust a wider range of surrounding rock pressure.
It realizes the autonomous adjustment of surrounding rock pressure, which is convenient for observing the strain state inside the soil, which is safe and reliable, has low cost, and has good application prospects.
Smart Images

Figure CN118565999B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of surrounding rock deformation, and in particular to a visual transparent soil model test box with adjustable surrounding rock pressure and a manufacturing method thereof. Background Art
[0002] As tunnels develop towards "long, large, and deeply buried", the problem of squeezing surrounding rock becomes more and more prominent. Indoor testing is one of the important means to study the deformation mechanism of squeezing surrounding rock. Generally, similarity theory is used to configure rock and soil materials to simulate the original rock and soil. However, due to the lack of transparency of conventional materials, the internal stress and strain state of the surrounding rock after tunnel excavation is difficult to be fully observed, which brings certain obstacles to scientific research. In recent years, due to the rapid development of transparent soil technology, the visualization of internal deformation of soil has been realized. However, if the traditional steel plate model test box is still used for testing, the displacement inside the soil cannot be observed, and the existing transparent soil model test box cannot realize the autonomous adjustment of surrounding rock pressure. Therefore, it is necessary to design a visual transparent soil model test box that can adjust the surrounding rock pressure. Summary of the invention
[0003] The purpose of the present invention is to provide a visual transparent soil model test box with adjustable surrounding rock pressure and a manufacturing method thereof, so as to solve the problems existing in the above-mentioned prior art and to study the changing laws of surrounding rock displacement, strain, etc. with factors such as tunnel excavation step length and closure distance. Moreover, by changing the thickness of the left, right and upper pressure relief plates, a greater surrounding rock pressure can be adjusted, thereby further revealing the deformation mechanism of deeply buried extrusive surrounding rock.
[0004] To achieve the above-mentioned purpose, the present invention provides the following scheme: The present invention provides a visual transparent soil model test box with adjustable surrounding rock pressure, including a pressure release plate, a force transmission plate, a bolt assembly and a pressure box, wherein the pressure release plate includes an upper pressure release plate, a left pressure release plate and a right pressure release plate, and the force transmission plate includes an upper force transmission plate, a lower force transmission plate, a left force transmission plate and a right force transmission plate, wherein the lower force transmission plate is placed on a pad, and the left force transmission plate and the right force transmission plate are connected by a bolt assembly, and the upper force transmission plate and the lower force transmission plate are connected by a bolt assembly, and the left force transmission plate and the right force transmission plate are connected by a bolt assembly. The front tunnel section plate and the rear tunnel section plate are respectively arranged at the two ends of the force transmission plate; the upper force transmission plate, the lower force transmission plate, the left force transmission plate, the right force transmission plate, the front tunnel section plate and the rear tunnel section plate constitute a model test box, the upper yield plate, the left yield plate and the right yield plate are respectively arranged on the inner sides of the upper force transmission plate, the left force transmission plate and the right force transmission plate, transparent soil is placed in the model test box, and the pressure box is arranged between the transparent soil and the upper yield plate, the left yield plate and the right yield plate; a pressure box is also arranged inside the transparent soil.
[0005] Preferably, the bolt assembly includes a threaded rod, a nut and a pressure gasket. The left force transmission plate and the right force transmission plate are connected by four transverse threaded rods, and the four transverse threaded rods are respectively arranged near the four corners of the left force transmission plate and the right force transmission plate. The two ends of the transverse threaded rods respectively extend out of the left force transmission plate and the right force transmission plate and are tightened or loosened by nuts, and a pressure gasket is arranged between the end of the transverse threaded rod and the left force transmission plate or the right force transmission plate; the upper force transmission plate and the lower force transmission plate are connected by four vertical threaded rods, and the four vertical threaded rods are respectively arranged near the four corners of the upper force transmission plate and the lower force transmission plate. The two ends of the vertical threaded rods respectively extend out of the upper force transmission plate and the lower force transmission plate and are tightened or loosened by nuts, and a pressure gasket is arranged between the end of the vertical threaded rod and the upper force transmission plate or the lower force transmission plate.
[0006] Preferably, it also includes four rectangular steel tubes, which are respectively used to abut and support the two ends of the front tunnel section panel and the two ends of the rear tunnel section panel; the two ends of the transverse threaded rod respectively pass through the rectangular steel tubes and then extend from the left force transfer plate and the right force transfer plate.
[0007] The present invention also provides a method for manufacturing a visualized transparent model test box with adjustable surrounding rock pressure, which is applied to the above-mentioned visualized transparent soil model test box with adjustable surrounding rock pressure, and comprises the following steps:
[0008] First, place the lower force transfer plate on the pad, connect the left force transfer plate and the right force transfer plate through threaded rods, rectangular steel pipes, pressure washers and nuts, then insert the front tunnel section panel and the rear tunnel section panel into the front and rear sides of the left force transfer plate and the right force transfer plate respectively, tighten the nuts so that the left force transfer plate and the right force transfer plate clamp the front tunnel section panel and the rear tunnel section panel to keep the device stable, then insert the left pressure plate and the right pressure plate into the inner sides of the left force transfer plate and the right force transfer plate respectively, loosen the nuts at the ends of the transverse threaded rods after inserting the left pressure plate and the right pressure plate, and now the model test box is assembled;
[0009] Then, while pouring transparent soil inside the model test box, pressure boxes are buried inside the soil, inside the left yield plate, inside the right yield plate and on the upper side of the transparent soil. After the transparent soil is consolidated, an upper yield plate is placed above the transparent soil, and an upper force transfer plate is placed above the upper yield plate. The upper force transfer plate and the lower force transfer plate are connected by vertical threaded rods, nuts and pressure washers. The distance of squeezing the soil is adjusted by rotating the nut, and the degree of rotating the nut is controlled by observing the pressure box reading, thereby realizing controllable adjustment of the surrounding rock pressure.
[0010] Compared with the prior art, the present invention has achieved the following technical effects:
[0011] The visual transparent soil model test box with adjustable surrounding rock pressure and the manufacturing method of the present invention include a pressure plate, a force transmission plate, a bolt assembly and a pressure box. First, the model box is assembled by the bolt assembly, and then transparent soil is poured in the box. While pouring the transparent soil, pressure boxes are buried inside the transparent soil and inside the left, right and upper pressure plates. After the transparent soil is consolidated, the pressure gasket pushes the force transmission plate and the pressure plate to move inward to squeeze the soil by twisting the nut, and the pressure is controlled by the pressure box reading, thereby realizing the self-regulation of the surrounding rock pressure. The device can conveniently adjust the surrounding rock pressure, is safe and reliable, has low cost, and has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0013] Figure 1 A three-dimensional image of a visual transparent soil model test box with adjustable surrounding rock pressure;
[0014] Figure 2 This is a schematic diagram of the internal structure of the model test box without the upper force transmission plate;
[0015] Figure 3 It is a structural schematic diagram of the left and right side pressure plates;
[0016] Figure 4 It is a structural schematic diagram of the left and right force transmission plates;
[0017] Figure 5 It is a structural schematic diagram of the tunnel section panel;
[0018] Figure 6 It is a structural schematic diagram of the upper side yield plate;
[0019] Figure 7 It is a structural schematic diagram of the upper and lower force transmission plates;
[0020] Figure 8 It is a structural schematic diagram of a rectangular steel tube;
[0021] Among them, 1. Upper yield plate; 2. Right yield plate; 3. Right force transmission plate; 4. Front tunnel section plate; 5. Lower force transmission plate; 6. Nut; 7. Threaded rod; 8. Rectangular steel pipe; 9. Pressure gasket. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] The purpose of the present invention is to provide a visual transparent soil model test box with adjustable surrounding rock pressure and a manufacturing method thereof, so as to solve the problems existing in the above-mentioned prior art and to study the changing laws of surrounding rock displacement, strain, etc. with factors such as tunnel excavation step length and closure distance. Moreover, by changing the thickness of the left, right and upper pressure relief plates, a greater surrounding rock pressure can be adjusted, thereby further revealing the deformation mechanism of deeply buried extrusive surrounding rock.
[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0025] like Figure 1-Figure 8 As shown, the present invention provides a visual transparent soil model test box with adjustable surrounding rock pressure, including a pressure plate, a force transmission plate, a bolt assembly and a pressure box, the pressure plate including an upper pressure plate 1, a left pressure plate and a right pressure plate 2, the force transmission plate including an upper force transmission plate, a lower force transmission plate 5, a left force transmission plate and a right force transmission plate 3, the lower force transmission plate 5 is placed on a pad, the left force transmission plate and the right force transmission plate 3 are connected by a bolt assembly, the upper force transmission plate and the lower force transmission plate 5 are connected by a bolt assembly, the left force transmission plate and the right force transmission plate are connected by a bolt assembly, The front tunnel section plate 4 and the rear tunnel section plate are respectively arranged at the two ends of the plate 3; the upper force transmission plate, the lower force transmission plate 5, the left force transmission plate, the right force transmission plate 3, the front tunnel section plate 4 and the rear tunnel section plate constitute a model test box, and the upper pressure plate 1, the left pressure plate and the right pressure plate 2 are respectively arranged on the inner sides of the upper force transmission plate, the left force transmission plate and the right force transmission plate 3. Transparent soil is placed in the model test box, and pressure boxes are arranged between the transparent soil and the upper pressure plate 1, the left pressure plate and the right pressure plate 2.
[0026] In one embodiment, the bolt assembly includes a threaded rod 7, a nut 6 and a pressure gasket 9. The left force transmission plate and the right force transmission plate 3 are connected by four transverse threaded rods 7, and the four transverse threaded rods 7 are respectively arranged near the four corners of the left force transmission plate and the right force transmission plate 3. The two ends of the transverse threaded rod 7 extend out of the left force transmission plate and the right force transmission plate 3 respectively and are tightened or loosened by the nut 6. A pressure gasket 9 is arranged between the end of the transverse threaded rod 7 and the left force transmission plate or the right force transmission plate 3; the upper force transmission plate and the lower force transmission plate 5 are connected by four vertical threaded rods 7, and the four vertical threaded rods 7 are respectively arranged near the four corners of the upper force transmission plate and the lower force transmission plate 5. The two ends of the vertical threaded rod 7 extend out of the upper force transmission plate and the lower force transmission plate 5 respectively and are tightened or loosened by the nut 6. A pressure gasket 9 is arranged between the end of the vertical threaded rod 7 and the upper force transmission plate or the lower force transmission plate 5.
[0027] In one of the embodiments, it also includes four rectangular steel tubes 8, and the four rectangular steel tubes 8 are respectively used to abut and support the left and right ends of the front tunnel section panel 4 and the left and right ends of the rear tunnel section panel; the two ends of the transverse threaded rod 7 respectively pass through the rectangular steel tubes 8 and then extend from the left force transmission plate and the right force transmission plate 3.
[0028] In one of the embodiments, a pressure box is also provided inside the transparent soil.
[0029] Embodiment 1
[0030] The following is a description of the relationship:
[0031] After the device is installed, it becomes a model test box with an internal space of 60×60×60cm. The upper pressure plate 1 is a transparent tempered glass of 50×50×3cm, and the thickness of 3cm is the distance of the upper compressed soil. The upper side of the pressure plate 1 leaves a 5cm deformation on each side, so that the upper side of the pressure plate 1 can move downward while the left and right sides of the pressure plate can be compressed and moved at the same time. If the upper side of the pressure plate 1 is also made into 60×60×60cm, it is impossible to pressurize the upper side and the left and right sides at the same time. When applying pressure to the upper side of the pressure plate 1, some soil will be squeezed out from the gap. In fact, it was found in the experiment that this squeezed soil can be basically ignored, because with the pressure, the gap is gradually reduced. During the test, no soil in the gap was found to be squeezed out. Considering the size of the model box, the internal size is 60×60×60cm, the opening diameter is 8cm, and the distance from the hole edge to either side is 26cm, which is greater than 3 times the hole diameter. According to the theory of elastic mechanics, the influence of this boundary on the change of the internal state of the soil can be ignored, so it will not affect the test results. The left side pressure plate and the right side pressure plate 2 are both transparent tempered glass of 60×60×3cm, and the thickness of 3cm is the distance of the compressed soil on the left and right sides. The left force transfer plate and the right force transfer plate 3 are both made of 80×60×3cm transparent tempered glass, and holes with a diameter of 2cm are opened at the four corners of the left force transfer plate and the right force transfer plate 3, and the distance between the circular hole and the edge is 5cm; the front tunnel section panel 4 and the rear tunnel section panel are both made of 61×60×3cm transparent tempered glass, and a hole with a diameter of 8cm is opened in the center to simulate the tunnel. The front tunnel section panel 4 and the rear tunnel section panel can be replaced according to the specific research tunnel section. The upper force transfer plate and the lower force transfer plate 5 are both made of 84×61×3cm transparent tempered glass, and holes with a diameter of 4cm are opened at the four corners of the upper force transfer plate and the lower force transfer plate 5. The distance between the center of the hole and the short side is 4cm, and the distance from the long side is 10cm.
[0032] The method for making a visual transparent soil model test box with adjustable surrounding rock pressure is as follows:
[0033] Place the lower force transfer plate 5 on the pad, first connect the left force transfer plate and the right force transfer plate 3 through the threaded rod 7, rectangular steel pipe 8, pressure gasket 9 and nut 6, then insert the front tunnel section panel 4 and the rear tunnel section panel on the front and rear sides respectively, tighten the nut 6 so that the left force transfer plate and the right force transfer plate 3 clamp the front tunnel section panel 4 and the rear tunnel section panel to keep the device stable, then insert the left pressure plate and the right pressure plate 2 on the left and right sides, and loosen the horizontal threads after inserting the left pressure plate and the right pressure plate 2 The nut 6 at the end of the rod 7 allows the left and right pressure plates 2 to move outward by a distance of 2 / 3 of the thickness of the pressure plates. The distance of 2 / 3 of the thickness of the pressure plates is the distance that the soil on the left and right sides can be compressed. At this time, the model test box frame is assembled. When the transparent soil is poured inside the model test box, pressure boxes should be buried inside the soil, inside the left and right pressure plates, and on the upper side of the transparent soil. After the transparent soil is consolidated, the upper pressure plate 1 is placed above the transparent soil. The thickness of the upper pressure plate 1 is the compression distance of the upper soil. Then, the upper force transfer plate (the upper and lower force transfer plates have the same size) is placed above the upper pressure plate 1. The upper and lower force transfer plates are connected by the vertical threaded rod 7, nut 6, and pressure gasket 9. The distance of the soil being squeezed is adjusted by rotating the nut 6. The pressure box reading is observed to control the degree of rotating the nut 6, thereby realizing the controllable adjustment of the surrounding rock pressure. The solution adopted during the test is that two people rotate the nut 6 diagonally at the same time and observe the reading of the pressure box. It is not that one person rotates only one nut 6 at a time. Moreover, it takes time to apply pressure and transmit it. It is not that the pressure applied at the boundary will be transmitted to the center of the model box immediately. Generally speaking, it takes several hours to wait after applying the boundary pressure before the tunnel can be excavated, so there is enough time to control the pressure of the side panel by adjusting the nut 6. When rotating the nut 6, a wrench is used to rotate it. The wrench is a conventional device in the prior art. If electric mechanical measures are used, the applied pressure will fluctuate and be difficult to control. At the moment when the switch is turned on or off, the side panel may have generated a large amount of compression, which is difficult to control. Finally, the wrench was used to achieve the desired effect.
[0034] It should be noted that it is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
[0035] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A visual transparent soil model test box with adjustable surrounding rock pressure. Features: It includes a yield plate, a force transmission plate, a bolt assembly and a pressure box, the yield plate includes an upper yield plate, a left yield plate and a right yield plate, the force transmission plate includes an upper force transmission plate, a lower force transmission plate, a left force transmission plate and a right force transmission plate, the lower force transmission plate is placed on a pad, the left force transmission plate and the right force transmission plate are connected by a bolt assembly, the upper force transmission plate and the lower force transmission plate are connected by a bolt assembly, and the two ends of the left force transmission plate and the right force transmission plate are respectively provided with a front tunnel section panel and a rear tunnel section panel; the upper force transmission plate, the lower force transmission plate, the left force transmission plate, the right force transmission plate, the front tunnel section panel and the rear tunnel section panel constitute a model test box, the inner sides of the upper force transmission plate, the left force transmission plate and the right force transmission plate are respectively provided with the upper yield plate, the left yield plate and the right The transparent soil is placed in the model test box, and the pressure boxes are arranged between the transparent soil and the upper yield plate, the left yield plate and the right yield plate; the bolt assembly includes a threaded rod, a nut and a pressure gasket; while pouring the transparent soil inside the model test box, pressure boxes are buried inside the soil, inside the left yield plate, inside the right yield plate and on the upper side of the transparent soil; after the transparent soil is consolidated, the upper yield plate is placed above the transparent soil, and the upper force transfer plate is placed above the upper yield plate; the upper force transfer plate and the lower force transfer plate are connected by vertical threaded rods, nuts and pressure gaskets; the distance of squeezing the soil is adjusted by rotating the nut, and the degree of rotating the nut is controlled by observing the pressure box reading; a pressure box is also arranged inside the transparent soil; a 5 cm deformation is left on each side of the upper yield plate.
2. The visual transparent soil model test box with adjustable surrounding rock pressure according to claim 1, Features: The left force transmission plate and the right force transmission plate are connected by four horizontal threaded rods, and the four horizontal threaded rods are respectively arranged near the four corners of the left force transmission plate and the right force transmission plate, and the two ends of the horizontal threaded rods respectively extend out of the left force transmission plate and the right force transmission plate and are tightened or loosened by nuts, and pressure gaskets are arranged between the ends of the horizontal threaded rods and the left force transmission plate or the right force transmission plate; the upper force transmission plate and the lower force transmission plate are connected by four vertical threaded rods, and the four vertical threaded rods are respectively arranged near the four corners of the upper force transmission plate and the lower force transmission plate, and the two ends of the vertical threaded rods respectively extend out of the upper force transmission plate and the lower force transmission plate and are tightened or loosened by nuts, and pressure gaskets are arranged between the ends of the vertical threaded rods and the upper force transmission plate or the lower force transmission plate.
3. The visual transparent soil model test box with adjustable surrounding rock pressure according to claim 2, Features: It also includes four rectangular steel tubes, which are respectively used to abut and support the two ends of the front tunnel section panel and the two ends of the rear tunnel section panel; the two ends of the transverse threaded rod respectively pass through the rectangular steel tubes and then extend from the left force transmission plate and the right force transmission plate.
4. A method for manufacturing a visual transparent model test box with adjustable surrounding rock pressure, applied to the visual transparent soil model test box with adjustable surrounding rock pressure as claimed in any one of claims 1 to 3, It is characterized in that The following steps are involved: First, place the lower force transfer plate on the pad, connect the left force transfer plate and the right force transfer plate through threaded rods, rectangular steel pipes, pressure washers and nuts, then insert the front tunnel section panel and the rear tunnel section panel into the front and rear sides of the left force transfer plate and the right force transfer plate respectively, tighten the nuts so that the left force transfer plate and the right force transfer plate clamp the front tunnel section panel and the rear tunnel section panel to keep the device stable, then insert the left pressure plate and the right pressure plate into the inner sides of the left force transfer plate and the right force transfer plate respectively, loosen the nuts at the ends of the transverse threaded rods after inserting the left pressure plate and the right pressure plate, and now the model test box is assembled; Then, while pouring transparent soil inside the model test box, pressure boxes are buried inside the soil, inside the left yield plate, inside the right yield plate and on the upper side of the transparent soil. After the transparent soil is consolidated, an upper yield plate is placed above the transparent soil, and an upper force transfer plate is placed above the upper yield plate. The upper force transfer plate and the lower force transfer plate are connected by vertical threaded rods, nuts and pressure washers. The distance of squeezing the soil is adjusted by rotating the nut, and the degree of rotating the nut is controlled by observing the pressure box reading, thereby realizing controllable adjustment of the surrounding rock pressure.