Power maximization consumption method, device and equipment applicable to wind, solar and energy storage power stations

By judging the changes in the maximum power generation value of the wind and solar power storage station, the power allocation dispatching instructions are updated, and the power is allocated based on the preset multiple, which solves the power generation loss caused by the untimely update of the frequency of dispatching instructions issued by the wind and solar power storage station in the free power generation state. problem, improving power generation efficiency and stability.

CN118572758BActive Publication Date: 2024-10-18THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411047353.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-18
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

When a wind-solar-storage integrated power station is in a free power generation state, due to the volatility, randomness and intermittent characteristics of wind and solar energy, the maximum power generation value changes at any time, causing the frequency of dispatching instructions to be updated untimely, resulting in power generation losses and affecting power generation efficiency.

Method used

By judging whether the wind and solar power storage station has entered the free power generation state, determine the maximum update status word based on the change of the maximum power generation value within the preset update period, update the power allocation scheduling instructions, and perform power management based on the maximum power generation value of the preset multiple. Distribution ensures that the maximum power generation value of the wind and solar power storage station is consistent with the power distribution dispatching instructions to avoid power generation losses caused by communication delays.

Benefits of technology

It improves the power generation efficiency of wind and solar power storage stations, reduces the cumulative power loss caused by untimely update of the frequency of dispatching instructions, enhances the timeliness and stability of power generation equipment, and avoids problems caused by communication delays and calculation delays. Generation loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118572758B_ABST
    Figure CN118572758B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of new energy stations, and discloses a method, device and equipment for maximizing power consumption of wind, solar and storage power stations, the method comprising: judging whether the wind, solar and storage power station has entered a free power generation state; if entering a free power generation state, determining the maximum transmittable update status word of the wind, solar and storage power station according to the change of the maximum transmittable power value of the wind, solar and storage power station within a preset update cycle; updating the power allocation and scheduling instructions of the wind, solar and storage power station based on the maximum transmittable update status word, and determining the maximum transmittable power value of the wind, solar and storage power station based on the power allocation and scheduling instructions; and allocating power to the wind, solar and storage power station based on the preset multiple of the maximum transmittable power value. The present invention solves the problem of accumulated power loss caused by untimely update of power station allocation instructions and the maximum transmittable power value of power generation equipment in the free power generation state of the wind, solar and storage power station, and timely adjusts the power allocation and scheduling instructions of the wind, solar and storage power station by setting the update status word, thereby improving the timeliness of updating the scheduling instructions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy stations, and in particular to a method, device and equipment for maximizing power consumption in wind, solar and energy storage power stations. Background Art

[0002] The installed capacity of new energy sources is increasing rapidly, and a large number of new energy sources are connected to the power grid. When the wind, solar and storage integrated power station is in a free power generation state, the wind, solar and storage integrated power station uses the maximum power generation capacity fed back by the wind and solar energy management platform as a command to send to the wind and solar energy management platform for execution.

[0003] At present, when the wind, solar and storage integrated power station is in the free power generation state, the maximum power generation value changes at any time due to the volatility, randomness and intermittent characteristics of wind and solar. However, the allocation instructions of the wind, solar and storage integrated power station roll out the dispatch instructions at the same frequency with the maximum power generation. When the maximum power generation of the wind turbine has been updated upward, but the allocation instructions issued by the wind, solar and storage integrated power station still maintain the previous maximum power generation value, it causes short-term power generation loss. After long-term accumulation, the power loss is very large, affecting the power generation efficiency of the wind, solar and storage integrated power station. Therefore, there is an urgent need for a method to overcome the power generation loss caused by the untimely update of the dispatch instruction frequency. Summary of the invention

[0004] In view of this, the present invention provides a method, device and equipment for maximizing power consumption of wind, solar and energy storage power stations, so as to solve the problem of power generation loss caused by untimely frequency update of dispatching instructions.

[0005] In a first aspect, the present invention provides a method for maximizing power consumption of a wind, solar and energy storage power station, the method comprising:

[0006] Determine whether the wind, solar and storage power station has entered the free power generation state;

[0007] If the free power generation state is entered, the maximum power generation update state word of the wind, solar and storage power station is determined according to the change of the maximum power generation value of the wind, solar and storage power station within the preset update cycle;

[0008] Based on the maximum transmittable update status word, the power allocation dispatching instruction of the wind, solar and storage power station is updated, and based on the power allocation dispatching instruction, the maximum power generation value of the wind, solar and storage power station is determined;

[0009] Power is allocated to wind, solar and energy storage power stations based on preset multiples of the maximum power generation value.

[0010] The present invention provides a method for maximizing power consumption applicable to a wind, solar and storage power station. If the power generation state is entered into freely, the maximum transmittable update status word of the wind, solar and storage power station is determined according to the change of the maximum transmittable power value of the wind, solar and storage power station within a preset update cycle; the power allocation dispatching instruction of the wind, solar and storage power station is updated based on the maximum transmittable update status word, and the maximum transmittable power value of the wind, solar and storage power station is determined based on the power allocation dispatching instruction; the power of the wind, solar and storage power station is allocated based on the preset multiple of the maximum transmittable power value, which solves the problem of cumulative power loss caused by untimely update of the power station allocation instruction and the maximum transmittable power value of the power generation equipment in the free power generation state of the wind, solar and storage power station. The power allocation dispatching instruction of the wind, solar and storage power station is adjusted in time by setting the update status word, which improves the timeliness of updating the dispatching instruction. The power allocation of the wind, solar and storage power station by the preset multiple of the maximum transmittable power value can avoid the power generation loss caused by communication delay.

[0011] In an optional implementation, determining whether the wind-solar-storage power station enters a free power generation state includes:

[0012] Get the maximum installed capacity of the wind, solar and storage power station;

[0013] Determine whether a power distribution dispatching instruction issued by a power grid dispatching center has been received;

[0014] When a power allocation scheduling instruction is received and the power value in the power allocation scheduling instruction is equal to the maximum installed capacity, it is determined that the wind, solar and energy storage power station enters the free power generation state.

[0015] In an optional implementation, determining whether the wind-solar-storage power station enters a free power generation state further includes:

[0016] When no power allocation dispatching instruction is received and the dispatching communication link between the wind, solar and energy storage power station and the power grid dispatching center operates normally, it is determined that the wind, solar and energy storage power station enters the free power generation state.

[0017] The power maximization consumption method applicable to wind, solar and storage power stations provided by the present invention determines that the wind, solar and storage power stations have entered the free power generation state by receiving a power allocation scheduling instruction and the power value in the power allocation scheduling instruction is equal to the maximum installed capacity or by not receiving a power allocation scheduling instruction and the scheduling communication link between the wind, solar and storage power stations and the power grid scheduling center is operating normally. This provides a power generation environment basis for the subsequent entry into the free power generation state by determining the maximum power generation update status word of the wind, solar and storage power stations according to the change of the maximum power generation value of the wind, solar and storage power stations within a preset update period.

[0018] In an optional implementation, the wind-solar-storage power station includes a photovoltaic power station and a wind turbine power station, and the power allocation scheduling instruction of the wind-solar-storage power station is updated based on the maximum transmittable update status word, and the maximum power generation value of the wind-solar-storage power station is determined based on the power allocation scheduling instruction, including:

[0019] The power distribution dispatching instruction of the photovoltaic power station and the power distribution dispatching instruction of the wind power station are updated based on the maximum transmittable update status word, and the maximum power generation value of the photovoltaic power station and the maximum power generation value of the wind power station are determined respectively based on the power distribution dispatching instruction of the photovoltaic power station and the power distribution dispatching instruction of the wind power station.

[0020] The power maximization consumption method applicable to wind, solar and storage power stations provided by the present invention updates the power allocation scheduling instructions of the photovoltaic power station and the power allocation scheduling instructions of the wind turbine power station based on the maximum transmittable update status word, and determines the maximum power generation value of the photovoltaic power station and the maximum power generation value of the wind turbine power station based on the power allocation scheduling instructions of the photovoltaic power station and the power allocation scheduling instructions of the wind turbine power station, respectively, and updates the power allocation scheduling instructions of the wind, solar and storage power stations in time according to the updated status word, so that the maximum power generation value of the wind, solar and storage power stations is consistent with the power issued in the power allocation scheduling instructions, thereby overcoming the defect of accumulated power loss caused by untimely update of the allocation instructions of the wind, solar and storage power stations and the maximum power generation value of the power generation equipment when the wind, solar and storage power stations are in the free power generation state.

[0021] In an optional implementation, allocating power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value includes:

[0022] Power is allocated to the photovoltaic power station and the wind power station respectively based on the preset multiple of the maximum power generation value of the photovoltaic power station and the preset multiple of the maximum power generation value of the wind power station.

[0023] The power maximization absorption method applicable to wind, solar and energy storage power stations provided by the present invention distributes power to photovoltaic power stations and wind power stations respectively based on preset multiples of the maximum power generation value of photovoltaic power stations and preset multiples of the maximum power generation value of wind power stations, so as to avoid power generation losses caused by communication delays and operation delays, and prevent excessive reactive power consumption at the grid connection point, causing excessive grid breakdown voltage, and causing the wind, solar and energy storage power stations to be disconnected from the grid as a whole.

[0024] In an optional implementation, the wind-solar-storage power station also includes an energy storage power station, and the power maximization consumption method applicable to the wind-solar-storage power station also includes:

[0025] When the wind, solar and energy storage power station enters the free power generation state, the output power or storage power of the energy storage power station is controlled according to the preset single control mode power value.

[0026] The present invention provides a method for maximizing power consumption applicable to wind, solar and energy storage power stations. When the wind, solar and energy storage power stations enter a free power generation state, the output power or stored power of the energy storage power station is controlled according to a preset single control mode power value. The output or input of electric energy of the energy storage power station is flexibly controlled as needed. That is, according to the electricity price forecast of the electricity market, the charging of the energy storage power station is supported, and the energy storage is discharged when the electricity price is higher, thereby increasing the power generation efficiency of the wind, solar and energy storage power stations.

[0027] In an optional implementation, after allocating power to the wind-solar-storage power station based on the preset multiple of the maximum power generation value, the power maximization consumption method applicable to the wind-solar-storage power station further includes:

[0028] Obtain update instructions issued by the superior power grid dispatching center;

[0029] Update the maximum power generation value of the wind, solar and energy storage power station based on the update instruction.

[0030] The power maximization consumption method applicable to the wind, solar and battery power station provided by the present invention updates the maximum power generation value of the wind, solar and battery power station according to the update instruction issued by the power grid dispatching center, so as to ensure the daily power generation of the wind, solar and battery power station under the power limited state.

[0031] In a second aspect, the present invention provides a power maximization consumption device applicable to a wind, solar and storage power station, the device comprising:

[0032] A judgment module is used to judge whether the wind, solar and energy storage power station has entered a free power generation state;

[0033] The maximum consumption module is used to determine the maximum power generation update status word of the wind-solar-storage power station according to the change of the maximum power generation value of the wind-solar-storage power station within the preset update cycle if the free power generation state is entered;

[0034] An update module, used to update the power allocation dispatching instruction of the wind, solar and energy storage power station based on the maximum transmittable update status word, and determine the maximum power generation value of the wind, solar and energy storage power station based on the power allocation dispatching instruction;

[0035] The allocation module is used to allocate power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

[0036] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the power maximization method for wind, solar and storage power stations according to the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0037] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the power maximization method applicable to a wind, solar and energy storage power station according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0039] Figure 1 It is a schematic flow chart of a method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention;

[0040] Figure 2 It is a flow chart of another method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention;

[0041] Figure 3 It is a flow chart of another method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention;

[0042] Figure 4 is a network topology diagram of the connection between the wind, solar and energy storage power station and the power grid dispatching center according to an embodiment of the present invention;

[0043] Figure 5 It is a structural block diagram of a power maximization consumption device applicable to a wind, solar and energy storage power station according to an embodiment of the present invention;

[0044] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0045] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0046] According to an embodiment of the present invention, an embodiment of a method for maximizing power consumption applicable to a wind, solar and energy storage power station is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0047] In this embodiment, a method for maximizing power consumption applicable to a wind-solar-storage power station is provided, which can be used in a wind-solar-storage power station. Figure 1is a flow chart of a method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0048] Step S101, determining whether the wind-solar-storage power station has entered a free power generation state.

[0049] Specifically, the wind, solar and battery power station is connected to the power grid dispatching center and receives dispatching instructions from the power grid dispatching center. The free power generation state means that the wind, solar and battery power station generates as much electricity as it can, that is, it generates electricity according to the maximum power generation value of the wind, solar and battery power station and is not affected by the power dispatching instructions of the power grid dispatching center. It is judged whether the wind, solar and battery power station generates electricity according to the maximum power generation value. When the wind, solar and battery power station generates electricity according to the maximum power generation value, it is determined that the wind, solar and battery power station enters the free power generation state.

[0050] Step S102, if entering the free power generation state, determine the maximum power generation update state word of the wind, solar and battery power station according to the change of the maximum power generation value of the wind, solar and battery power station within the preset update cycle.

[0051] Specifically, Figure 4 As shown, the wind-solar-storage power station includes a wind-solar-storage coordination controller, and the maximum transmittable update status word can be represented by 0 or 1. In the free power generation state, the wind-solar-storage coordination controller will issue dispatch instructions to photovoltaic and wind power within the preset update cycle. Assuming that the preset update cycle is 3 seconds, the wind-solar-storage coordination controller will issue dispatch instructions to photovoltaic and wind power every 3 seconds, so that photovoltaic and wind power generate electricity according to the dispatch instructions. When the maximum transmittable power value of the wind-solar-storage power station changes within 3 seconds, for example, the maximum transmittable power value of photovoltaic and / or wind power changes compared with the previous update cycle at 2 seconds, the maximum transmittable update status word of the wind-solar-storage power station is determined according to the change of the maximum transmittable power value of the wind-solar-storage power station within the update cycle. For example, the maximum transmittable update status word of the previous update cycle is 0. If the maximum transmittable power value in the current update cycle is greater than that in the previous update cycle, it is determined that the maximum transmittable update status word in the current update cycle changes from 0 to 1.

[0052] Step S103, updating the power allocation scheduling instruction of the wind, solar and energy storage power station based on the maximum power that can be generated update status word, and determining the maximum power generation value of the wind, solar and energy storage power station based on the power allocation scheduling instruction.

[0053] Specifically, according to the maximum transmittable update status word determined in step S102, the power allocation scheduling instruction of the wind-solar-storage coordination controller in the wind-solar-storage power station is updated at 2 seconds in the current update cycle, and the maximum power generation value of the wind-solar-storage power station is re-determined based on the power allocation scheduling instruction, that is, the next update cycle starts from the current 2 seconds as the starting point, and the new update cycle time is re-determined in the time period of the preset update cycle. For example, the time corresponding to the current 2 seconds is 15:00, and the next update cycle is 15:03.

[0054] Step S104, allocating power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

[0055] Specifically, power generation by wind, solar and storage power stations under extreme weather conditions will have an impact on the safety of grid connection. In order to avoid excessive reactive power consumption between the wind, solar and storage power stations and the grid connection point when the wind, solar and storage power stations are generating electricity, resulting in excessive grid breakdown voltage and causing the wind, solar and storage power stations to be disconnected from the grid as a whole, and other unsafe situations, the preset multiple of the maximum power generation value can be set to 1.2 times the maximum power generation value, and sent to photovoltaic and / or wind power based on 1.2 times the maximum power generation value, so that photovoltaic and / or wind power can generate electricity according to 1.2 times the maximum power generation value.

[0056] The present embodiment provides a method for maximizing power consumption applicable to wind, solar and storage power stations. If the power generation state is entered into freely, the maximum power generation update status word of the wind, solar and storage power station is determined according to the change of the maximum power generation value of the wind, solar and storage power station within a preset update cycle; the power allocation dispatching instruction of the wind, solar and storage power station is updated based on the maximum power generation update status word, and the maximum power generation value of the wind, solar and storage power station is determined based on the power allocation dispatching instruction; the power of the wind, solar and storage power station is allocated based on the preset multiple of the maximum power generation value, which solves the problem of cumulative power loss caused by untimely update of the power station allocation instruction and the maximum power generation value of the power generation equipment in the free power generation state of the wind, solar and storage power station. The power allocation dispatching instruction of the wind, solar and storage power station is adjusted in time by setting the update status word, which improves the timeliness of updating the dispatching instruction. The power allocation of the wind, solar and storage power station by the preset multiple of the maximum power generation value can avoid the power generation loss caused by communication delay.

[0057] In this embodiment, a method for maximizing power consumption applicable to a wind-solar-storage power station is provided, which can be used in a wind-solar-storage power station. Figure 2 is a flow chart of a method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:

[0058] Step S201, determine whether the wind-solar-storage power station has entered a free power generation state.

[0059] Specifically, the above step S201 includes:

[0060] Step S2011, obtain the maximum installed capacity of the wind, solar and storage power station, and determine whether the power allocation scheduling instruction issued by the superior power grid dispatching center is received. When the power allocation scheduling instruction is received and the power value in the power allocation scheduling instruction is equal to the maximum installed capacity, it is determined that the wind, solar and storage power station enters the free power generation state.

[0061] Specifically, the installed capacity of a wind, solar and storage power station refers to the sum of the rated powers of all photovoltaic power stations and wind turbines installed in the power station, and is one of the main indicators that characterize the power production capacity of a wind, solar and storage power station. When the power grid dispatching center issues a power allocation dispatching instruction, the power allocation dispatching instruction is sent to the wind, solar and storage coordination controller. When the power value in the power allocation dispatching instruction received by the wind, solar and storage coordination controller is equal to the maximum installed capacity of the wind, solar and storage power station, it is determined that the wind, solar and storage power station has entered a free power generation state.

[0062] Step S2012, when no power allocation dispatching instruction is received and the dispatching communication link between the wind-solar-storage power station and the power grid dispatching center is working normally, it is determined that the wind-solar-storage power station enters a free power generation state.

[0063] Specifically, when the superior power grid dispatching center does not issue the power allocation dispatching instruction, the wind, solar and storage coordination controller also does not receive the power allocation dispatching instruction. In order to avoid the failure to receive the instruction due to the failure of the communication link between the power grid dispatching center and the wind, solar and storage coordination controller in the wind, solar and storage power station, it is also necessary to determine whether the dispatching communication link between the wind, solar and storage coordination controller in the wind, solar and storage power station and the power grid dispatching center is in normal working state. When the wind, solar and storage coordination controller does not receive the power allocation dispatching instruction and the dispatching communication link between the wind, solar and storage coordination controller in the wind, solar and storage power station and the power grid dispatching center is working normally, it can also be determined that the wind, solar and storage power station has entered the free power generation state.

[0064] Step S202: If the free power generation state is entered, the maximum power generation update state word of the wind, solar and battery power station is determined according to the change of the maximum power generation value of the wind, solar and battery power station within the preset update cycle. Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.

[0065] Step S203, updating the power allocation scheduling instruction of the wind, solar and energy storage power station based on the maximum power generation update status word, and determining the maximum power generation value of the wind, solar and energy storage power station based on the power allocation scheduling instruction.

[0066] Specifically, the wind-solar-storage power station includes a photovoltaic power station and a wind turbine power station, and the above step S203 includes:

[0067] The power distribution dispatching instruction of the photovoltaic power station and the power distribution dispatching instruction of the wind power station are updated based on the maximum transmittable update status word, and the maximum power generation value of the photovoltaic power station and the maximum power generation value of the wind power station are determined respectively based on the power distribution dispatching instruction of the photovoltaic power station and the power distribution dispatching instruction of the wind power station.

[0068] Specifically, when the wind, solar and storage collaborative controller receives the maximum transmittable update status word, it immediately sends the photovoltaic power station power allocation scheduling instructions and the wind power station power allocation scheduling instructions to the photovoltaic power station and the wind power station respectively, and redetermines the maximum transmittable power generation value of the photovoltaic power station and the maximum transmittable power generation value of the wind power station based on the photovoltaic power station power allocation scheduling instructions and the wind power station power allocation scheduling instructions.

[0069] Step S204, allocating power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

[0070] Specifically, the above step S204 includes:

[0071] Power is allocated to the photovoltaic power station and the wind power station respectively based on the preset multiple of the maximum power generation value of the photovoltaic power station and the preset multiple of the maximum power generation value of the wind power station.

[0072] Specifically, Figure 4 As shown, the photovoltaic power station includes a photovoltaic energy management platform and a photovoltaic inverter, and the wind turbine power station includes a wind turbine energy management platform and a wind turbine set.

[0073] The preset multiple is set to 1.2 times, and the wind-solar-storage collaborative controller sends a power allocation and dispatching instruction of 1.2 times the maximum power generation value of the photovoltaic power station to the photovoltaic energy management platform, so that the photovoltaic inverter generates electricity at 1.2 times the maximum power generation value of the photovoltaic power station. The wind-solar-storage collaborative controller sends a power allocation and dispatching instruction of 1.2 times the maximum power generation value of the wind turbine power station to the wind turbine energy management platform, so that the wind turbine unit generates electricity at 1.2 times the maximum power generation value of the wind turbine power station.

[0074] The power maximization consumption method applicable to the wind, photovoltaic and storage power station provided in this embodiment determines that the wind, photovoltaic and storage power station enters the free power generation state by receiving the power value in the power allocation scheduling instruction and the power allocation scheduling instruction is equal to the maximum installed capacity or by not receiving the power allocation scheduling instruction and the dispatching communication link between the wind, photovoltaic and storage power station and the power grid dispatching center is working normally, and provides a power generation environment basis for the subsequent entry into the free power generation state and determining the maximum transmittable update status word of the wind, photovoltaic and storage power station according to the change of the maximum transmittable power value of the wind, photovoltaic and storage power station within the preset update cycle. The photovoltaic power station power allocation scheduling instruction and the wind turbine power station power allocation scheduling instruction are updated based on the maximum transmittable update status word, and the photovoltaic power station power allocation scheduling instruction and the wind turbine power station power allocation scheduling instruction are respectively determined based on the photovoltaic power station power allocation scheduling instruction and the wind turbine power station power allocation scheduling instruction. The wind, photovoltaic and storage power station power allocation scheduling instruction is updated in time according to the update status word, so that the maximum transmittable power value of the wind, photovoltaic and storage power station is consistent with the power issued in the power allocation scheduling instruction, and the defect of cumulative power loss caused by the untimely update of the wind, photovoltaic and storage power station allocation instruction and the maximum transmittable power value of the power generation equipment in the free power generation state of the wind, photovoltaic and storage power station is overcome.

[0075] In this embodiment, a method for maximizing power consumption applicable to a wind-solar-storage power station is provided, which can be used in a wind-solar-storage power station. Figure 3 is a flow chart of a method for maximizing power consumption applicable to a wind, solar and energy storage power station according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:

[0076] Step S301, determine whether the wind-solar-storage power station has entered the free power generation state. Figure 2 Step S201 of the illustrated embodiment will not be described in detail here.

[0077] Step S302: If the free power generation state is entered, the maximum power generation update state word of the wind, solar and battery power station is determined according to the change of the maximum power generation value of the wind, solar and battery power station within the preset update cycle. Figure 2 Step S202 of the illustrated embodiment will not be described in detail here.

[0078] Step S303: Update the power allocation and dispatching instructions of the wind, solar and battery power station based on the maximum power that can be generated and update the status word, and determine the maximum power that can be generated by the wind, solar and battery power station based on the power allocation and dispatching instructions. Figure 2 Step S203 of the illustrated embodiment will not be described in detail here.

[0079] Step S304: Allocate power to the wind, solar and energy storage power station based on the preset multiple of the maximum power generation value. Figure 1 Step S204 of the illustrated embodiment will not be described in detail here.

[0080] Step S305, when the wind, solar and energy storage power station enters the free power generation state, the output power or storage power of the energy storage power station is controlled according to the preset single control mode power value.

[0081] Specifically, the wind-solar-storage power station also includes an energy storage power station, and the energy storage power station includes an energy storage coordination controller and multiple energy storage units. When the wind-solar-storage power station enters the free power generation state, the wind-solar-storage coordination controller controls the energy storage coordination controller alone. For example, according to the electricity market price forecast, the energy storage coordination controller charges multiple energy storage units under the control of the wind-solar-storage coordination controller during the day, and at night when the electricity price is higher, the energy storage coordination controller discharges multiple energy storage units under the control of the wind-solar-storage coordination controller. Control the output power or storage power of the energy storage power station as needed to increase the power generation efficiency of the wind-solar-storage power station.

[0082] Step S306, obtaining an update instruction issued by the superior power grid dispatching center; and updating the maximum power generation value of the wind, solar and energy storage power station based on the update instruction.

[0083] Specifically, after the maximum power generation value is updated, that is, after exiting the free power generation state, in the daily power generation mode, the wind, solar and storage coordination controller obtains the update instruction issued by the superior power grid dispatching center, and based on the update instruction, issues the power allocation dispatching instruction of the maximum power generation value to the photovoltaic power station and / or wind power station, so that the photovoltaic power station and / or wind power station generates electricity according to the power allocation dispatching instruction of the maximum power generation value issued.

[0084] It should be noted that under daily power generation conditions, when photovoltaic power stations and wind turbine power stations are generating electricity, the photovoltaic energy management platform is also used to provide real-time feedback to the wind, solar and storage coordination controller on the maximum power generation value of the photovoltaic inverter, and the wind turbine energy management platform is also used to provide real-time feedback to the wind, solar and storage coordination controller on the maximum power generation value of the wind turbine. When the energy storage power station is charging and discharging, the energy storage coordination controller is also used to provide real-time feedback to the wind, solar and storage coordination controller on the remaining power value of the energy storage unit.

[0085] The present embodiment provides a method for maximizing power consumption applicable to wind, solar and energy storage power stations. Based on preset multiples of the maximum power generation value of the photovoltaic power station and the maximum power generation value of the wind turbine power station, power is allocated to the photovoltaic power station and the wind turbine power station respectively to avoid power generation losses caused by communication delays and calculation delays, and to prevent excessive reactive power consumption at the grid connection point, which causes excessive grid breakdown voltage and causes the wind, solar and energy storage power station to be disconnected from the grid as a whole. When the wind, solar and energy storage power station enters a free power generation state, the output power or stored power of the energy storage power station is controlled according to a preset single control mode power value, and the output or input of the energy storage power station is flexibly controlled as needed, that is, according to the electricity market price forecast, the charging of the energy storage power station is supported, and the energy storage is discharged during a period with higher electricity prices, thereby increasing the power generation efficiency of the wind, solar and energy storage power station, and the maximum power generation value of the wind, solar and energy storage power station is updated according to the update instruction issued by the grid dispatching center to ensure daily power generation of the wind, solar and energy storage power station under power limit state.

[0086] In this embodiment, a power maximization consumption device suitable for a wind, solar and storage power station is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and will not be repeated hereafter. As used below, the term "module" can implement a combination of software and / or hardware with a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0087] This embodiment provides a power maximization consumption device suitable for a wind, solar and storage power station, such as Figure 5 As shown, including:

[0088] The judgment module 501 is used to judge whether the wind-solar-storage power station has entered a free power generation state.

[0089] The maximization consumption module 502 is used to determine the maximum power generation update state word of the wind, solar and battery power station according to the change of the maximum power generation value of the wind, solar and battery power station within a preset update cycle if the free power generation state is entered.

[0090] The first update module 503 is used to update the power allocation scheduling instruction of the wind, solar and energy storage power station based on the maximum power that can be generated update status word, and determine the maximum power generation value of the wind, solar and energy storage power station based on the power allocation scheduling instruction.

[0091] The allocation module 504 is used to allocate power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

[0092] In some optional implementations, the determination module 501 includes:

[0093] The first judgment unit is used to obtain the maximum installed capacity of the wind, solar and storage power station; judge whether the power allocation scheduling instruction issued by the power grid dispatching center is received; when the power allocation scheduling instruction is received and the power value in the power allocation scheduling instruction is equal to the maximum installed capacity, it is determined that the wind, solar and storage power station has entered a free power generation state.

[0094] The second judgment unit is used to determine that the wind-solar-storage power station enters a free power generation state when no power allocation dispatching instruction is received and the dispatching communication link between the wind-solar-storage power station and the power grid dispatching center operates normally.

[0095] The power maximization consumption devices suitable for wind, solar and storage power stations also include:

[0096] The single control module is used to control the output power or storage power of the energy storage station according to the preset single control mode power value when the wind, solar and energy storage station enters the free power generation state.

[0097] The second update module is used to obtain the update instruction issued by the upper power grid dispatching center; based on the update instruction, the maximum power generation value of the wind, solar and storage power station is updated. The further functional description of each of the above modules and units is the same as that of the above corresponding embodiment, and will not be repeated here.

[0098] The power maximization consumption device suitable for wind, solar and energy storage power stations in this embodiment is presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.

[0099] The embodiment of the present invention also provides a computer device having the above Figure 5 The power maximization consumption device suitable for wind, solar and energy storage power stations is shown.

[0100] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.

[0101] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0102] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0103] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0104] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0105] The computer device also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 6 The example of connecting through bus is taken in the following.

[0106] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator bar, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device can be a touch screen.

[0107] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0108] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for maximizing power consumption in a wind, solar and energy storage power station, characterized in that: The method comprises: Determine whether the wind-solar-storage power station has entered a free power generation state; If the free power generation state is entered, the maximum transmittable update status word of the wind, solar and storage power station is determined according to the change of the maximum transmittable power value of the wind, solar and storage power station within the preset update cycle; the wind, solar and storage power station includes a wind, solar and storage coordination controller, and the maximum transmittable update status word is represented by 0 and 1; in the free power generation state, the wind, solar and storage coordination controller issues dispatching instructions to photovoltaic and / or wind power within the preset update cycle, so that photovoltaic and wind power generate electricity according to the dispatching instructions; when the maximum transmittable power value of the wind, solar and storage power station changes within the preset update cycle, the maximum transmittable update status word of the wind, solar and storage power station is determined according to the change of the maximum transmittable power value of the wind, solar and storage power station within the preset update cycle; Based on the maximum transmittable update status word, the power allocation scheduling instruction of the wind, solar and battery power station is updated, and based on the power allocation scheduling instruction, the maximum power generation value of the wind, solar and battery power station is determined; Power is allocated to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

2. The method according to claim 1, characterized in that Determining whether the wind-solar-storage power station has entered a free power generation state includes: Obtaining the maximum installed capacity of the wind, solar and energy storage power station; Determine whether the power distribution dispatching instruction issued by the superior power grid dispatching center has been received; When the power allocation scheduling instruction is received and the power value in the power allocation scheduling instruction is equal to the maximum installed capacity, it is determined that the wind, solar and energy storage power station enters a free power generation state.

3. The method according to claim 1, characterized in that Determining whether the wind-solar-storage power station has entered a free power generation state also includes: When no power allocation dispatching instruction is received from the superior power grid dispatching center and the dispatching communication link between the wind, solar and energy storage power station and the power grid dispatching center operates normally, it is determined that the wind, solar and energy storage power station enters a free power generation state.

4. The method according to claim 1, characterized in that: The wind-solar-storage power station includes a photovoltaic power station and a wind turbine power station, and the power allocation scheduling instruction of the wind-solar-storage power station is updated based on the maximum transmittable update status word, and the maximum power generation value of the wind-solar-storage power station is determined based on the power allocation scheduling instruction, including: The photovoltaic power station power allocation scheduling instruction and the wind power station power allocation scheduling instruction are updated based on the maximum transmittable update status word, and the maximum power generation value of the photovoltaic power station and the maximum power generation value of the wind power station are determined based on the photovoltaic power station power allocation scheduling instruction and the wind power station power allocation scheduling instruction.

5. The method according to claim 4, characterized in that The power distribution of the wind-solar-storage power station based on the preset multiple of the maximum power generation value includes: Power is allocated to the photovoltaic power station and the wind power station respectively based on a preset multiple of the maximum power generation value of the photovoltaic power station and a preset multiple of the maximum power generation value of the wind power station.

6. The method according to claim 1, characterized in that The wind-solar-energy storage power station also includes an energy storage power station, and the method further includes: When the wind, solar and energy storage power station enters a free power generation state, the output power or stored power of the energy storage power station is controlled according to a preset single control mode power value.

7. The method according to claim 1, characterized in that After allocating power to the wind, solar and energy storage power station based on the preset multiple of the maximum power generation value, the method further includes: Obtain update instructions issued by the superior power grid dispatching center; The maximum power generation value of the wind, solar and energy storage power station is updated based on the update instruction.

8. A power maximization consumption device suitable for a wind, solar and energy storage power station, characterized in that: The device comprises: A judgment module, used to judge whether the wind-solar-storage power station has entered a free power generation state; The maximization absorption module is used to determine the maximum transmittable update status word of the wind, solar and storage power station according to the change of the maximum transmittable power value of the wind, solar and storage power station within the preset update cycle if the free power generation state is entered; the wind, solar and storage power station includes a wind, solar and storage coordination controller, and the maximum transmittable update status word is represented by 0 and 1; in the free power generation state, the wind, solar and storage coordination controller issues dispatching instructions to photovoltaic and / or wind power within the preset update cycle, so that photovoltaic and wind power generate electricity according to the dispatching instructions; when the maximum transmittable power value of the wind, solar and storage power station changes within the preset update cycle, the maximum transmittable update status word of the wind, solar and storage power station is determined according to the change of the maximum transmittable power value of the wind, solar and storage power station within the preset update cycle; An updating module, used to update the power allocation scheduling instruction of the wind-solar-storage power station based on the maximum transmittable update status word, and determine the maximum power generation value of the wind-solar-storage power station based on the power allocation scheduling instruction; An allocation module is used to allocate power to the wind, solar and energy storage power station based on a preset multiple of the maximum power generation value.

9. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the power maximization consumption method applicable to a wind, solar and storage power station as described in any one of claims 1 to 7 by executing the computer instructions.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the power maximization consumption method applicable to a wind, solar and energy storage power station as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Active support type wind and light storage integrated power control system and energy distribution method thereof

    CN113224843A

  • Multi-mode coordination control method applied to wind and light storage new energy power station

    CN114389272A