A method and device for constructing a large-span steel structure factory building

By obtaining weld cross-section data and welding gun behavior information, combined with defect information in the welding heat-affected area, the welding cost is calculated and the welding trajectory is adjusted, which solves the problem of insufficient welding trajectory interaction capabilities in large-span steel structure workshops and improves welding quality and stability.

CN118578027BActive Publication Date: 2024-10-18THE SECOND CONSTRUCTION ENGINEERING CO LTD CCSEB
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411065307.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-18
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

In the construction of large-span steel structure factory buildings, changes in welding behavior and posture affect the welding quality, resulting in a decrease in the welding trajectory interaction ability, making it difficult to achieve adaptive welding, and thus reducing the dynamic fusion ability of the weld.

Method used

By obtaining the weld cross-section data, determining the weld contour boundary and groove filling value, obtaining the welding gun movement and posture information, determining the welding swing characteristics, combined with the defect information of the welding heat-affected area, the welding cost is calculated, and the welding trajectory is adjusted to achieve automatic Adapting welding trajectory interactions.

Benefits of technology

It improves the dynamic fusion ability of welding in the construction of large-span steel structure factory buildings, ensures welding quality and structural stability, reduces the risk of deformation and cracks, and optimizes construction efficiency and process control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118578027B_ABST
    Figure CN118578027B_ABST
Patent Text Reader

Abstract

The present application provides a method and device for the construction of a large-span steel structure plant. The method determines the groove filling value at the plate welding point through the weld contour boundary; determines the welding swing characteristics of the welding gun when welding the plate to be butted according to the path posture information, and then determines the segmented compensation degree of welding in the plant construction through the welding swing characteristics and the groove filling value; synchronizes the weld defect information with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determines the directional shrinkage degree at the interface after welding according to the interface eccentricity distance; determines the welding cost of plate welding during the construction of a large-span steel structure plant according to the segmented compensation degree and the directional shrinkage degree, and then adjusts the welding trajectory during the plate welding process. The above scheme adjusts the welding trajectory during the plate welding process based on the welding cost, which can improve the dynamic fusion ability of the butt weld in the construction of a large-span steel structure plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel structure construction, and more specifically, to a method and device for constructing a large-span steel structure factory building. Background Art

[0002] Steel structure construction refers to the use of steel as the main structural material, through prefabricated components or on-site welding, assembly and other processes, in accordance with design requirements and construction standards (the standards involved are "Ultrasonic Flaw Detection and Quality Grading Method for Steel Structures" JG / T203-2007; "Code for Construction of Steel Structures" GB 50755-2012; "Quality Acceptance Standard for Construction of Steel Structures" GB50205-2020; "Code for Welding of Steel Structures" GB 50661-2011; "Technical Code for Anti-Corrosion Painting of Steel Structures" CECS 343-2013;), to build various industrial and civil building structural systems. This construction method usually includes the installation of components such as steel beams, steel columns, and steel frames, as well as related connection, support and protection measures to ensure the safety, stability and durability of the building. Steel structure construction includes the manufacture of steel components, prefabrication or on-site welding assembly processes, and related construction methods and safety measures.

[0003] The construction of large-span steel structure workshops refers to the use of steel to build industrial workshops with large spans. Welding technology plays a key role in this. Welding technology involves connecting steel structure components into an integral structure through arc welding, gas shielded welding and other methods to ensure that the quality and strength of the welds meet the design requirements, and by controlling welding parameters and construction processes, the stability, durability and safety of the structure are achieved, thereby meeting the requirements of the workshop for bearing capacity and structural integrity. However, in the existing large-span steel structure workshop construction, the changes in the welding posture have a great impact on the construction of the steel structure workshop, for example: the welding posture Faster welding speed helps to reduce the size of the molten pool and shorten the cooling time, which can effectively reduce the probability of incomplete fusion. Too fast welding speed during welding may cause the shape of the welding molten pool to be irregular, resulting in reduced weld surface quality, which in turn leads to reduced dynamic fusion ability of butt welds in large-span steel structure plant construction, and inability to achieve adaptive welding trajectory interaction during welding in large-span steel structure plant construction. Therefore, how to achieve adaptive welding trajectory interaction during welding in large-span steel structure plant construction and improve the dynamic fusion ability of butt welds in large-span steel structure plant construction is a problem faced by the industry. Summary of the invention

[0004] The present application provides a method and device for constructing a large-span steel structure factory building, which can realize adaptive welding trajectory interaction during welding in the construction of a large-span steel structure factory building, and effectively improve the dynamic fusion ability of the butt weld in the construction of a large-span steel structure factory building.

[0005] In a first aspect, the present application provides a method for constructing a large-span steel structure factory building, comprising the following steps:

[0006] Obtain weld cross-section data at the plate interface during the construction of large-span steel structure workshops;

[0007] Determine the weld contour boundary of the plate during plant construction according to the weld cross-section data, and determine the groove filling value at the plate welding location through the weld contour boundary;

[0008] Acquire the path posture information of the welding gun during the plant construction, determine the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information, and then determine the segmented compensation degree of welding during the plant construction according to the welding swing characteristics and the groove filling value;

[0009] Determine the weld defect information of the welding heat affected zone during the plant construction, synchronize the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance;

[0010] The welding cost of plate welding during the construction of a large-span steel structure plant is determined according to the segmented compensation degree and the directional shrinkage degree, and then the welding trajectory during the plate welding process is adjusted according to the welding cost.

[0011] In some embodiments, determining the weld contour boundary of the plate during plant construction according to the weld cross-section data specifically includes:

[0012] Determine the weld characteristic quantity when the plate is welded according to the weld cross-section data;

[0013] Determine a plurality of contour point sets of weld contours by using the weld feature quantities;

[0014] The weld contour boundary of the plate during plant construction is determined by all contour point sets.

[0015] In some embodiments, determining the groove filling value at the plate welding location by the weld contour boundary specifically includes:

[0016] Generate groove point cloud data at the plate welding location according to the weld contour boundary;

[0017] Fitting the groove point cloud data to obtain the groove filling fitting amount;

[0018] The groove filling value at the plate welding location is determined by the groove filling fitting amount.

[0019] In some embodiments, determining the welding swing characteristics of the welding gun when welding the plates to be butted according to the path posture information specifically includes:

[0020] Extracting the motion trajectory of the welding gun during welding from the path posture information;

[0021] Reconstructing the motion trajectory to obtain a trajectory evaluation index of the weld;

[0022] Determine a swing amplitude dynamic data segment according to the movement posture information;

[0023] The welding swing amplitude characteristics are determined by the trajectory evaluation index and the swing amplitude dynamic data segment.

[0024] In some embodiments, determining the segmented compensation degree of welding in factory construction by the welding swing amplitude characteristic and the groove filling value specifically includes:

[0025] The welding swing amplitude characteristic and the groove filling value are merged to obtain a welding fusion compensation amount;

[0026] Determine the starting and ending points of the welding section during the welding process;

[0027] The welding fusion compensation amount is segmented according to the starting and ending points of the welding section to obtain the segmented compensation degree of welding in the plant construction.

[0028] In some embodiments, synchronizing the weld defect information with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone specifically includes:

[0029] Determine the welding deviation intersection at the interface according to the weld defect information;

[0030] Obtain welding trajectory deviation in welding path;

[0031] Extracting the trajectory difference center in the welding path according to the welding trajectory deviation;

[0032] The welding deviation intersection point and the trajectory difference center are mutually verified to obtain the interface eccentricity distance of the weld in the welding heat affected zone.

[0033] In some embodiments, determining the welding cost of plate welding during the construction of a large-span steel structure plant according to the segmented compensation degree and the directional shrinkage degree specifically includes:

[0034] Determining first welding loss information according to the segmented compensation degree;

[0035] Determining second welding loss information according to the shrinkage degree;

[0036] The welding cost of plate welding during the construction of a large-span steel structure factory building is determined by the first welding loss information and the second welding loss information.

[0037] In a second aspect, the present application provides a large-span steel structure factory building construction device, which includes a construction control unit, and the construction control unit includes:

[0038] The acquisition module is used to obtain the weld cross-section data at the plate interface during the construction of a large-span steel structure plant;

[0039] A processing module, used to determine the weld contour boundary of the plate during the plant construction according to the weld cross-section data, and determine the groove filling value at the plate welding location through the weld contour boundary;

[0040] The processing module is further used to obtain the path posture information of the welding gun during the plant construction, determine the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information, and then determine the segmented compensation degree of welding during the plant construction according to the welding swing characteristics and the groove filling value;

[0041] The processing module is also used to determine the weld defect information of the welding heat affected zone during the factory construction, synchronize the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance;

[0042] The execution module is used to determine the welding cost of plate welding during the construction of a large-span steel structure factory building according to the segmented compensation degree and the directional shrinkage degree, and then adjust the welding trajectory during the plate welding process according to the welding cost.

[0043] In a third aspect, the present application provides a computer device, comprising a memory and a processor, wherein the memory stores codes, and the processor is configured to obtain the codes and execute the above-mentioned large-span steel structure factory building construction method.

[0044] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned large-span steel structure factory building construction method is implemented.

[0045] The technical solution provided by the embodiments disclosed in this application has the following beneficial effects:

[0046] The present application provides a method and device for constructing a large-span steel structure plant. First, the weld cross-section data at the interface of the plate in the construction of the large-span steel structure plant is obtained; secondly, the weld contour boundary of the plate in the plant construction is determined according to the weld cross-section data, and the groove filling value at the plate welding is determined by the weld contour boundary; then, the path posture information of the welding gun in the plant construction is obtained, and the welding swing characteristics of the welding gun when welding the plate to be butted are determined according to the path posture information, and then the segmented compensation degree of welding in the plant construction is determined by the welding swing characteristics and the groove filling value; then, the weld defect information of the welding heat affected zone in the plant construction is determined, and the weld defect information is synchronized with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone, and the directional shrinkage at the interface after welding is determined according to the interface eccentricity distance; finally, the welding cost of the plate welding in the construction of the large-span steel structure plant is determined according to the segmented compensation degree and the directional shrinkage, and then the welding trajectory in the plate welding process is adjusted according to the welding cost.

[0047] It can be seen that the present application adjusts the welding trajectory during the plate welding process according to the welding cost, which effectively improves the dynamic fusion ability of the butt weld in the construction of large-span steel structure factories. First, in order to accurately control the heat-affected zone and weld filling during the welding process, the segmented compensation degree of welding in the factory construction is determined by the welding swing characteristics and the groove filling value, so as to improve the welding quality and structural stability, reduce the risk of welding deformation and cracks, and optimize the construction efficiency and process control; then, in order to accurately control the shrinkage direction and degree of the weld after welding, the directional shrinkage at the interface after welding is determined according to the eccentricity distance of the interface, from And optimize the dynamic fusion ability of welding joints in the construction of large-span steel structure workshops, reduce the deformation and internal stress that may be caused during the welding process, and improve the quality stability of welds and the durability of joints; finally, in order to ensure the stability of welding quality and the precise adjustment of welding trajectory, the welding cost of plate welding in the construction of large-span steel structure workshops is determined according to the segmented compensation degree and the directional shrinkage degree, and then the welding trajectory in the plate welding process is adjusted. In summary, adaptive welding trajectory interaction during welding in the construction of large-span steel structure workshops can be realized, and the dynamic fusion ability of butt welds in the construction of large-span steel structure workshops can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 is an exemplary flow chart of a large-span steel structure factory building construction method according to some embodiments of the present application;

[0049] Figure 2 is a schematic diagram of an exemplary process for determining the weld contour boundary of a plate in plant construction according to some embodiments of the present application;

[0050] Figure 3 is a schematic diagram of an exemplary process for determining welding swing characteristics when a welding gun welds plates to be butted according to some embodiments of the present application;

[0051] Figure 4 is a schematic diagram of exemplary hardware and / or software of a construction control unit according to some embodiments of the present application;

[0052] Figure 5 It is a structural schematic diagram of a computer device for implementing a method for constructing a large-span steel structure factory building according to some embodiments of the present application. DETAILED DESCRIPTION

[0053] The core of the present application is to obtain the weld cross-sectional data at the interface of the plate in the construction of a large-span steel structure plant, determine the weld contour boundary of the plate in the construction of the plant according to the weld cross-sectional data, and determine the groove filling value at the plate welding place through the weld contour boundary; then, obtain the path posture information of the welding gun in the construction of the plant, determine the welding swing characteristics of the welding gun when welding the plate to be butted according to the path posture information, and then determine the segmented compensation degree of welding in the construction of the plant through the welding swing characteristics and the groove filling value; secondly, determine the weld defect information of the welding heat affected zone in the construction of the plant, synchronize the information of the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance; then, determine the welding cost of plate welding in the construction of a large-span steel structure plant according to the segmented compensation degree and the directional shrinkage, and then adjust the welding trajectory during the plate welding process according to the welding cost. The above scheme adjusts the welding trajectory during the plate welding process based on the welding cost, which can improve the dynamic fusion ability of the butt weld in the construction of large-span steel structure workshops.

[0054] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 , which is an exemplary flow chart of a large-span steel structure factory building construction method according to some embodiments of the present application. The large-span steel structure factory building construction method 100 mainly includes the following steps:

[0055] In step 101, the weld cross-section data at the plate interface during the construction of a large-span steel structure factory building is obtained.

[0056] In specific implementation, in order to ensure the welding quality during the construction of large-span steel structure workshops, it is necessary to obtain the weld cross-sectional data at the plate interface, which can be achieved in the following ways: using non-destructive testing technologies such as ultrasonic testing and X-ray testing to obtain the cross-sectional data inside the weld, or using laser scanning or optical scanning technology to obtain accurate three-dimensional contour data outside the weld.

[0057] It should be noted that the weld cross-sectional data at the plate interface in this application represents the geometric and physical properties of the weld in the cross section. These data are used to evaluate and control the welding quality and ensure the strength, integrity and reliability of the weld. Among them, the weld cross-sectional data at the plate interface includes weld width, weld coverage, weld root thickness and groove angle, etc.

[0058] In addition, it should be noted that the construction of large-span steel structure factories refers to the construction process of building factories with large spans (usually more than 30 meters) by using steel as the main load-bearing structural material. Such factories are generally used for industrial production, warehousing, logistics and other purposes. They require open internal space and no intermediate support columns to meet the needs of large equipment installation and production line layout. Welding is usually used in the process of steel installation. The construction of large-span steel structure factories is widely used in various construction projects that require large spaces due to its fast, efficient and flexible characteristics.

[0059] In step 102, the weld contour boundary of the plate during plant construction is determined according to the weld cross-section data, and the groove filling value at the plate welding location is determined by the weld contour boundary.

[0060] In some embodiments, reference Figure 2 As shown, this figure is an exemplary process diagram of determining the weld contour boundary of the plate in the factory building construction according to some embodiments of the present application. In this embodiment, the weld contour boundary of the plate in the factory building construction can be determined according to the weld cross-section data by using the following steps:

[0061] In step 1021, the weld characteristic quantity during plate welding is determined according to the weld cross-section data;

[0062] In step 1022, a plurality of contour point sets of weld contours are determined by using the weld feature quantity;

[0063] In step 1023, the weld contour boundary of the plate during the plant construction is determined by all contour point sets.

[0064] In some embodiments, determining the groove filling value at the plate welding location by the weld contour boundary may be achieved by the following steps:

[0065] Generate groove point cloud data at the plate welding location according to the weld contour boundary;

[0066] Fitting the groove point cloud data to obtain the groove filling fitting amount;

[0067] The groove filling value at the plate welding location is determined by the groove filling fitting amount.

[0068] In step 103, the path posture information of the welding gun in the factory construction is obtained, and the welding swing characteristics of the welding gun when welding the butted plates are determined according to the path posture information, and then the segmented compensation degree of welding in the factory construction is determined according to the welding swing characteristics and the groove filling value.

[0069] In specific implementation, the following methods can be used to obtain the movement and posture information of the welding gun during factory construction: first, by installing an inertial measurement unit, a laser displacement sensor and an optical tracking system on the welding gun and calibrating them, the accuracy of the data can be ensured; second, the sensor data is collected in real time and the accurate posture and position of the welding gun are obtained through data fusion algorithms such as Kalman filtering; finally, the three-dimensional posture and position of the welding gun are displayed in real time through a visual interface, and the data is recorded and abnormal detection and alarm are performed at the same time to ensure precise control and quality assurance of the welding process.

[0070] It should be noted that the path and posture information in this application represents the position coordinates (X, Y, Z axes) and posture angles (roll angle, pitch angle, yaw angle) of the welding gun in three-dimensional space during the welding process, as well as the dynamic behaviors such as the motion trajectory, speed, acceleration and swing characteristics of the welding gun. The path and posture information plays a key role in the welding construction of large-span steel structure workshops, such as accurately controlling the welding process, real-time monitoring and ensuring welding quality, optimizing welding parameters, ensuring construction safety, supporting automated and intelligent welding operations, and providing data recording and analysis, so as to improve welding efficiency and quality.

[0071] In some embodiments, reference Figure 3 As shown, this figure is an exemplary flow chart of determining the welding swing characteristics of the welding gun when welding the butted plates according to some embodiments of the present application. In this embodiment, determining the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information can be implemented by the following steps:

[0072] In step 1031, the motion trajectory of the welding gun during welding is extracted from the path posture information;

[0073] In step 1032, the motion trajectory is reconstructed to obtain a trajectory evaluation index of the weld;

[0074] In step 1033, a swing amplitude dynamic data segment is determined according to the movement posture information;

[0075] In step 1034, the welding swing amplitude characteristics are determined by using the trajectory evaluation index and the swing amplitude dynamic data segment.

[0076] In some embodiments, determining the segmented compensation degree of welding in factory construction by the welding swing amplitude characteristics and the groove filling value can be achieved by the following steps:

[0077] The welding swing amplitude characteristic and the groove filling value are merged to obtain a welding fusion compensation amount;

[0078] Determine the starting and ending points of the welding section during the welding process;

[0079] The welding fusion compensation amount is segmented according to the starting and ending points of the welding section to obtain the segmented compensation degree of welding in the plant construction.

[0080] In step 104, the weld defect information of the welding heat affected zone during the factory construction is determined, the weld defect information is synchronized with the welding trajectory deviation in the welding path, the interface eccentricity distance of the weld in the welding heat affected zone is obtained, and the directional shrinkage at the interface after welding is determined according to the interface eccentricity distance.

[0081] In specific implementation, the following methods can be used to determine the weld defect information in the welding heat affected zone during factory construction: select the most suitable non-destructive testing method according to the welding material and weld structure. For example, for thick plate welding, ultrasonic testing can be selected, and for thin plate welding, X-ray testing can be selected; real-time collection of weld and heat affected zone test data, use signal processing and defect recognition algorithms to perform data analysis, accurately locate and quantitatively evaluate the specific location, size and type of defects, and finally comprehensively evaluate and generate a welding inspection report to ensure welding quality and construction safety, and obtain the weld defect information in the welding heat affected zone during factory construction by analyzing the welding inspection report.

[0082] It should be noted that the weld defect information in the heat-affected zone of welding during factory construction in this application indicates various defects that may exist in the welding materials or welding joints due to heat effects during the welding process, such as cracks, pores, slag inclusions, etc. These defects may affect the strength, sealing and corrosion resistance of the welding joints.

[0083] In some embodiments, the weld defect information is synchronized with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone, which can be achieved by the following steps:

[0084] Determine the welding deviation intersection at the interface according to the weld defect information;

[0085] Obtain welding trajectory deviation in welding path;

[0086] Extracting the trajectory difference center in the welding path according to the welding trajectory deviation;

[0087] The welding deviation intersection point and the trajectory difference center are mutually verified to obtain the interface eccentricity distance of the weld in the welding heat affected zone.

[0088] In some embodiments, determining the directional shrinkage at the interface after welding according to the interface eccentricity distance can be achieved by the following steps:

[0089] Determine the dynamic fusion data at the interface after welding;

[0090] Determine the directional shrinkage factor at the interface after welding according to the dynamic fusion data;

[0091] The directional shrinkage degree at the interface after welding is determined by the directional shrinkage factor and the interface eccentricity distance.

[0092] In step 105, the welding cost of plate welding during the construction of a large-span steel structure factory building is determined according to the segmented compensation degree and the directional shrinkage degree, and then the welding trajectory during the plate welding process is adjusted according to the welding cost.

[0093] In some embodiments, the welding cost of plate welding during the construction of a large-span steel structure factory building can be determined according to the segmented compensation degree and the directional shrinkage degree by the following steps:

[0094] Determining first welding loss information according to the segmented compensation degree;

[0095] Determining second welding loss information according to the shrinkage degree;

[0096] The welding cost of plate welding during the construction of a large-span steel structure factory building is determined by the first welding loss information and the second welding loss information.

[0097] In specific implementation, the welding trajectory in the plate welding process can be adjusted according to the welding cost in the following manner: first, by collecting and analyzing the cost data in the welding process, the cost-effectiveness and quality risk of each welding section are determined. Then, an optimization strategy is formulated based on the evaluation results, including optimizing the welding path and parameters, adjusting parameters such as welding speed, current and welding angle, so as to minimize the overall welding cost and improve the welding quality. Finally, the adjusted welding trajectory is implemented, and its impact on welding effect and cost is evaluated through real-time monitoring and feedback mechanism, so as to ensure that the dual goals of economic benefit and technical feasibility are achieved while ensuring the quality of the project.

[0098] In addition, in another aspect of the present application, in some embodiments, the present application provides a large-span steel structure factory building construction device, the device includes a construction control unit, reference Figure 4, which is a schematic diagram of exemplary hardware and / or software of a construction control unit according to some embodiments of the present application, the construction control unit 400 includes: an acquisition module 401, a processing module 402 and an execution module 403, which are described as follows:

[0099] Acquisition module 401, in this application, acquisition module 401 is mainly used to obtain weld cross-section data at the interface of the plate in the construction of a large-span steel structure factory;

[0100] Processing module 402, in this application, processing module 402 is mainly used to determine the weld contour boundary of the plate in the factory construction according to the weld cross-section data, and determine the groove filling value at the plate welding location through the weld contour boundary;

[0101] The processing module 402 is further used to obtain the path posture information of the welding gun during the factory construction, determine the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information, and then determine the segmented compensation degree of welding during the factory construction according to the welding swing characteristics and the groove filling value;

[0102] The processing module 402 is also used to determine the weld defect information of the welding heat affected zone during the factory construction, synchronize the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance;

[0103] Execution module 403, in this application, execution module 403 is mainly used to determine the welding cost of plate welding during the construction of a large-span steel structure factory building according to the segmented compensation degree and the directional shrinkage degree, and then adjust the welding trajectory during the plate welding process according to the welding cost.

[0104] In addition, the present application also provides a computer device, which includes a memory and a processor, the memory stores a code, and the processor is configured to obtain the code and execute the above-mentioned large-span steel structure factory building construction method.

[0105] In some embodiments, reference Figure 5 , which is a schematic diagram of the structure of a computer device for implementing a method for constructing a large-span steel structure factory building according to some embodiments of the present application. The method for constructing a large-span steel structure factory building in the above embodiment can be Figure 5 The computer device 500 shown in the figure is implemented, and the computer device 500 includes at least one processor 501, a communication bus 502, a memory 503 and at least one communication interface 504.

[0106] Processor 501 can be a general-purpose central processing unit (CPU), or an application-specific integrated circuit (ASIC) or one or more for controlling the execution of the large-span steel structure factory building construction method in this application.

[0107] The communication bus 502 may be used to transmit information between the above-mentioned components.

[0108] The memory 503 may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, an optical disc storage (including a compressed optical disc, a laser disc, an optical disc, a digital versatile disc, a Blu-ray disc, etc.), a magnetic disk or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer, but is not limited thereto. The memory 503 may exist independently and be connected to the processor 501 via the communication bus 502. The memory 503 may also be integrated with the processor 501.

[0109] The memory 503 is used to store the program code for executing the solution of the present application, and the execution is controlled by the processor 501. The processor 501 is used to execute the program code stored in the memory 503. The program code may include one or more software modules. The large-span steel structure factory building construction method in the above embodiment can be implemented by the processor 501 and one or more software modules in the program code in the memory 503.

[0110] The communication interface 504 uses any transceiver or other device for communicating with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area networks (WLAN), etc.

[0111] In a specific implementation, as an embodiment, a computer device may include multiple processors, each of which may be a single-CPU processor or a multi-CPU processor. The processor here may refer to one or more devices, circuits, and / or processing cores for processing data (e.g., computer program instructions).

[0112] The above-mentioned computer device may be a general-purpose computer device or a special-purpose computer device. In a specific implementation, the computer device may be a desktop computer, a portable computer, a network server, a personal digital assistant (PDA), a mobile phone, a tablet computer, a wireless terminal device, a communication device or an embedded device. The embodiment of the present application does not limit the type of computer device.

[0113] In addition, the present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned large-span steel structure factory building construction method is implemented.

[0114] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0115] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A construction method for a large-span steel structure plant. It is characterized in that The steps include: Obtain weld cross-section data at the plate interface during the construction of large-span steel structure workshops; Determine the weld contour boundary of the plate during plant construction according to the weld cross-section data, and determine the groove filling value at the plate welding location through the weld contour boundary; Acquire the path posture information of the welding gun during the plant construction, determine the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information, and then determine the segmented compensation degree of welding during the plant construction according to the welding swing characteristics and the groove filling value; Determine the weld defect information of the welding heat affected zone during the plant construction, synchronize the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance; Determine the welding cost of plate welding during the construction of a large-span steel structure plant according to the segmented compensation degree and the directional shrinkage degree, and then adjust the welding trajectory during the plate welding process according to the welding cost; Determining the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information specifically includes: Extracting the motion trajectory of the welding gun during welding from the path posture information; Reconstructing the motion trajectory to obtain a trajectory evaluation index of the weld; Determine a swing amplitude dynamic data segment according to the movement posture information; Determine welding swing amplitude characteristics through the trajectory evaluation index and the swing amplitude dynamic data segment; Determining the segmented compensation degree of welding in factory construction by the welding swing amplitude characteristics and the groove filling value specifically includes: The welding swing amplitude characteristic and the groove filling value are merged to obtain a welding fusion compensation amount; Determine the starting and ending points of the welding section during the welding process; The welding fusion compensation amount is segmented according to the starting and ending points of the welding section to obtain the segmented compensation degree of welding in the plant construction; Synchronizing the weld defect information with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone specifically includes: Determine the welding deviation intersection at the interface according to the weld defect information; Obtain welding trajectory deviation in welding path; Extracting the trajectory difference center in the welding path according to the welding trajectory deviation; The welding deviation intersection point and the trajectory difference center are mutually verified to obtain the interface eccentricity distance of the weld in the welding heat affected zone; The welding cost of plate welding during the construction of a large-span steel structure workshop is determined according to the segmented compensation degree and the directional shrinkage degree, and specifically includes: Determining first welding loss information according to the segmented compensation degree; determining second welding loss information according to the directional shrinkage; Determining the welding cost of plate welding during the construction of a large-span steel structure factory building by using the first welding loss information and the second welding loss information; The path posture information represents the position coordinates and posture angle of the welding gun in the three-dimensional space during the welding process, as well as the motion trajectory, speed, acceleration and swing characteristics of the welding gun.

2. The method according to claim 1, It is characterized in that Determining the weld contour boundary of the plate during plant construction according to the weld cross-section data specifically includes: Determine the weld characteristic quantity when the plate is welded according to the weld cross-section data; Determine a plurality of contour point sets of weld contours by using the weld feature quantities; The weld contour boundary of the plate during plant construction is determined by all contour point sets.

3. The method according to claim 1, It is characterized in that Determining the groove filling value at the plate welding location by the weld contour boundary specifically includes: Generate groove point cloud data at the plate welding location according to the weld contour boundary; Fitting the groove point cloud data to obtain the groove filling fitting amount; The groove filling value at the plate welding location is determined by the groove filling fitting amount.

4. A large-span steel structure factory building construction device, the large-span steel structure factory building construction device includes a construction control unit, It is characterized in that The construction control unit comprises: The acquisition module is used to obtain the weld cross-section data at the plate interface during the construction of a large-span steel structure plant; A processing module, used to determine the weld contour boundary of the plate during the plant construction according to the weld cross-section data, and determine the groove filling value at the plate welding location through the weld contour boundary; The processing module is further used to obtain the path posture information of the welding gun during the plant construction, determine the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information, and then determine the segmented compensation degree of welding during the plant construction according to the welding swing characteristics and the groove filling value; The processing module is also used to determine the weld defect information of the welding heat affected zone during the factory construction, synchronize the weld defect information with the welding trajectory deviation in the welding path, obtain the interface eccentricity distance of the weld in the welding heat affected zone, and determine the directional shrinkage at the interface after welding according to the interface eccentricity distance; An execution module, used to determine the welding cost of plate welding during the construction of a large-span steel structure factory building according to the segmented compensation degree and the directional shrinkage degree, and then adjust the welding trajectory during the plate welding process according to the welding cost; Determining the welding swing characteristics of the welding gun when welding the butted plates according to the path posture information specifically includes: Extracting the motion trajectory of the welding gun during welding from the path posture information; Reconstructing the motion trajectory to obtain a trajectory evaluation index of the weld; Determine a swing amplitude dynamic data segment according to the movement posture information; Determine welding swing amplitude characteristics through the trajectory evaluation index and the swing amplitude dynamic data segment; Determining the segmented compensation degree of welding in factory construction by the welding swing amplitude characteristics and the groove filling value specifically includes: The welding swing amplitude characteristic and the groove filling value are merged to obtain a welding fusion compensation amount; Determine the starting and ending points of the welding section during the welding process; The welding fusion compensation amount is segmented according to the starting and ending points of the welding section to obtain the segmented compensation degree of welding in the plant construction; Synchronizing the weld defect information with the welding trajectory deviation in the welding path to obtain the interface eccentricity distance of the weld in the welding heat affected zone specifically includes: Determine the welding deviation intersection at the interface according to the weld defect information; Obtain welding trajectory deviation in welding path; Extracting the trajectory difference center in the welding path according to the welding trajectory deviation; The welding deviation intersection point and the trajectory difference center are mutually verified to obtain the interface eccentricity distance of the weld in the welding heat affected zone; The welding cost of plate welding during the construction of a large-span steel structure workshop is determined according to the segmented compensation degree and the directional shrinkage degree, and specifically includes: Determining first welding loss information according to the segmented compensation degree; determining second welding loss information according to the directional shrinkage; Determining the welding cost of plate welding during the construction of a large-span steel structure factory building by using the first welding loss information and the second welding loss information; The path posture information represents the position coordinates and posture angle of the welding gun in the three-dimensional space during the welding process, as well as the motion trajectory, speed, acceleration and swing characteristics of the welding gun.

5. A computer device, It is characterized in that The computer device includes a memory and a processor, the memory stores codes, and the processor is configured to obtain the codes and execute the large-span steel structure factory building construction method according to any one of claims 1 to 3.

6. A computer-readable storage medium storing a computer program, It is characterized in that When the computer program is executed by a processor, the method for constructing a large-span steel structure factory building as described in any one of claims 1 to 3 is implemented.

Citation Information

Patent Citations

  • Method, system and terminal for generating process model added with compensation amount and groove

    CN113704892A

  • Segmented construction method for large-span steel beam

    CN117052138A