A monitoring method for cementing displacement process

By putting tracer in cementing construction and detecting its concentration, calculating the proportion of each incoming fluid, the problem of inaccurate monitoring of cementing replacement efficiency in the existing technology is solved, and the effect of real-time monitoring and improving cementing quality is achieved. .

CN118582198BActive Publication Date: 2024-11-26TIANJIN DAGANG OILFIELD SHENGDA TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411063396.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-26
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The prior art cannot accurately monitor the cementing replacement efficiency in actual cementing construction, resulting in poor cementing quality and low efficiency, and lack of understanding of the mixing state.

Method used

Different types of tracers are placed in each well inlet fluid in the cementing well, and the tracer concentration in the cementing well retrieval fluid is detected, the proportion of each well inlet fluid is calculated, and the slurry mixing situation is evaluated, so as to achieve real-time replacement process monitor.

Benefits of technology

Accurate monitoring of the replacement process of drilling fluid by cement slurry during cementing construction, improves the replacement efficiency and cementing quality, avoids laboratory simulation errors, is low in cost and does not interfere with drilling construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118582198B_ABST
    Figure CN118582198B_ABST
Patent Text Reader

Abstract

The embodiment of the present disclosure provides a monitoring method for cementing displacement process, the method comprising: pumping each cementing fluid with a tracer into the wellbore annulus according to a conventional procedure, wherein a tracer is respectively placed in each fluid and the tracers are of different types; collecting cementing flowback fluid samples at a predetermined sampling time; detecting the concentration of each tracer in the cementing flowback fluid sample; obtaining the corresponding relationship between the sampling time and the concentration of each tracer, and realizing the monitoring of the displacement process. The method can realize real-time monitoring of the displacement process of cement slurry for drilling fluid in actual cementing construction by means of cementing displacement monitoring and tracing, can scientifically monitor the cementing displacement process, meet the requirements of refined cementing and improved displacement efficiency, and solve the problem that the existing displacement process monitoring method can only be used for laboratory simulation and has large errors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure relate to the field of oil and gas well drilling, and in particular, to a monitoring method for a cementing displacement process. Background Art

[0002] Cementing is one of the important links in the process of oil and gas well construction. It is a hidden underground operation project with wide coverage, high risks, high operational requirements and strong technical requirements. Cementing includes cementing design, cementing preparation, cementing construction, cementing technology, cementing quality inspection and analysis. Cementing construction refers to the process of lowering casing into the well and injecting cement slurry into the annular space / annulus between the wellbore and the casing to displace the drilling fluid in the annulus, and solidifying to form a cement wall after the cement slurry fills the wellbore annulus, thereby achieving the sealing of the well wall. In actual cementing construction, before injecting cement slurry, a pre-flushing fluid (flushing fluid or isolation fluid) is usually pumped in to separate the cement slurry from the drilling fluid to prevent the cement slurry from being contaminated by the drilling fluid. Since multiple fluids need to be injected into the annulus during cementing construction, the annular slurry column is a complex multiphase displacement process, and the displacement interface in the annular slurry column structure often appears in a mixed slurry state. How to mix and how to replace affect the cementing annulus replacement efficiency and determine the quality of cementing.

[0003] At present, the existing measurement methods cannot be implemented in actual cementing construction, or the measurement data is not accurate enough, resulting in the monitoring of displacement efficiency by existing technologies usually limited to laboratory simulation monitoring, and cannot be used in actual cementing construction. In actual cementing construction, the displacement effect is usually judged empirically only by observing the color and state of the cementing return fluid, lacking the understanding of the slurry state and displacement process, and unable to meet the needs of fine cementing and improving displacement efficiency. Summary of the invention

[0004] In order to solve the above technical problems, the embodiments described herein provide a monitoring method for a cementing displacement process.

[0005] The technical solution of the present invention:

[0006] According to a first aspect of the present disclosure, a monitoring method for a cementing displacement process is provided. The method comprises:

[0007] Pumping each well-entry fluid for cementing with tracers into the wellbore annulus according to conventional procedures, wherein a tracer is respectively placed in each well-entry fluid and the types of the tracers are different from each other;

[0008] Collect cementing flowback fluid samples at the scheduled sampling time;

[0009] detecting the concentration of each tracer in the cementing flowback fluid sample;

[0010] The corresponding relationship between the sampling time and the concentration of each tracer is obtained to realize the monitoring of the displacement process. In some embodiments of the present disclosure, the step of evaluating the mixing condition of each well fluid in the cementing return fluid is also included;

[0011] The step of evaluating the mixing conditions of each well fluid in the cementing flowback fluid comprises:

[0012] According to the corresponding relationship between the sampling time and the concentration of each tracer, as well as the concentration of each tracer, the mixing condition of each well fluid in the cementing flowback fluid is evaluated by the following formula:

[0013] The proportion of a certain well fluid in the cementing return fluid at a certain time = the concentration factor of a certain well fluid at a certain time / the sum of all well fluid concentration factors at a certain time 100% (1);

[0014] The concentration factor of a certain well fluid at a certain time = the detection concentration of a tracer placed in a certain well fluid in the cementing return fluid at a certain time / the concentration of the tracer placed in a certain well fluid 100% (2).

[0015] In some embodiments of the present disclosure, the wellbore fluid includes at least drilling fluid and leading slurry.

[0016] Correspondingly, the step of pumping each cementing fluid for the tracer delivery into the wellbore annulus according to the conventional procedure includes: adding a first tracer to the drilling fluid to obtain the drilling fluid for the tracer delivery, and pumping the drilling fluid for the tracer delivery into the wellbore annulus; adding a second tracer to the lead slurry to obtain the lead slurry for the tracer delivery, and pumping the lead slurry for the tracer delivery into the wellbore annulus after the drilling fluid for the tracer delivery is pumped out.

[0017] Correspondingly, the proportion of drilling fluid in cementing flowback fluid at a certain time = drilling fluid concentration factor at a certain time / (drilling fluid concentration factor at a certain time + cementing slurry concentration factor at a certain time) 100% (11);

[0018] The proportion of lead slurry in cementing flowback fluid at a certain time = lead slurry concentration factor at a certain time / (drilling fluid concentration factor at a certain time + lead slurry concentration factor at a certain time) 100% (12);

[0019] Drilling fluid concentration factor at a certain moment = detection concentration of tracer placed in drilling fluid in cementing return fluid at a certain moment / concentration of tracer placed in drilling fluid 100% (21);

[0020] The concentration factor of the slurry at a certain time = the detection concentration of the tracer placed in the slurry in the cementing return fluid at a certain time / the concentration of the tracer placed in the slurry 100% (22).

[0021] In some embodiments of the present disclosure, the well fluid further includes a pre-pad fluid, which is selected from any one of a flushing fluid and an isolation fluid.

[0022] Correspondingly, the step of pumping each well-injection fluid for cementing with tracers into the wellbore annulus according to conventional procedures includes: adding a first tracer to the drilling fluid to obtain drilling fluid with tracers, and pumping the drilling fluid with tracers into the wellbore annulus; adding a third tracer to the pre-fluid to obtain pre-fluid for tracers, and after the drilling fluid with tracers is pumped out, pumping the pre-fluid for tracers into the wellbore annulus; adding a second tracer to the lead slurry to obtain lead slurry for tracers, and after the pre-fluid for tracers is pumped out, pumping the lead slurry for tracers into the wellbore annulus.

[0023] Correspondingly, the proportion of drilling fluid in cementing flowback fluid at a certain moment = drilling fluid concentration factor at a certain moment / (drilling fluid concentration factor at a certain moment + front fluid concentration factor at a certain moment + lead slurry concentration factor at a certain moment) 100% (11);

[0024] The proportion of lead slurry in cementing flowback fluid at a certain time = lead slurry concentration factor at a certain time / (drilling fluid concentration factor at a certain time + front fluid concentration factor at a certain time + lead slurry concentration factor at a certain time) 100% (12);

[0025] The proportion of the pre-fluid in the cementing return fluid at a certain time = the pre-fluid concentration factor at a certain time / (the drilling fluid concentration factor at a certain time + the pre-fluid concentration factor at a certain time + the lead slurry concentration factor at a certain time) 100% (13);

[0026] Drilling fluid concentration factor at a certain moment = detection concentration of tracer placed in drilling fluid in cementing return fluid at a certain moment / concentration of tracer placed in drilling fluid 100% (21);

[0027] The concentration factor of the slurry at a certain time = the detection concentration of the tracer placed in the slurry in the cementing return fluid at a certain time / the concentration of the tracer placed in the slurry 100% (22);

[0028] The concentration factor of the pre-fluid at a certain moment = the detection concentration of the tracer placed in the pre-fluid in the cementing return fluid at a certain moment / the concentration of the tracer placed in the pre-fluid 100% (23).

[0029] In some embodiments of the present disclosure, the step of collecting cementing return fluid samples at a predetermined sampling time includes: predicting the starting time when the well fluid injected with tracers returns from the wellhead; determining the sampling time according to a sampling interval of 0.2 to 1 minute starting from the predicted starting time of the return; before sampling, numbering the sampling bottles and corresponding the sampling bottle numbers to the sampling times; and collecting cementing return fluid samples.

[0030] In some embodiments of the present disclosure, the starting time T0 of the wellbore annulus of the wellbore injected with the tracer is predicted based on the initial time T0 of the wellbore annulus injected with the tracer and the time it takes to run from the bottom of the wellbore annulus to the top. 返出的起始时刻 :

[0031] T 返出的起始时刻 = T0+V 井眼环空 / Q 入井液 (3);

[0032] T0 = ​​T 初始开启钻井液泵 +V 钻杆内 / Q 入井液 (4);

[0033] V 钻杆内 =π [(R 钻杆 -d 钻杆 2) 2 / 4] L 钻杆 (5);

[0034] For a wellbore without a variable diameter section, the formula for estimating the wellbore annulus volume is:

[0035] V 井眼环空= π / 4 (R 井眼 2 -R 套管 2 ) L (6);

[0036] For a wellbore with two diameter-changing sections, the formula for estimating the wellbore annulus volume is:

[0037] V 井眼环空= π / 4 (R 1井眼 2 -R 1套管 2 ) L1+π / 4 (R 2井眼 2 -R 2套管 2 ) L2 (7);

[0038] Among them, V 井眼环空 It represents the wellbore annulus volume estimated by wellbore structure design data and casing size; Q 入井液 It indicates the flow rate of the fluid into the well when the tracer is injected, which can be read by the flow meter installed on the pump pipeline; T 初始开启钻井液泵 represents the time when the pump for pumping the wellbore fluid for placing the tracer is initially turned on. In some embodiments of the present disclosure, the time when the pump for pumping the wellbore fluid for placing the tracer is initially turned on is taken as time 0 as a reference to simplify the calculation process; V 钻杆内 Indicates the volume of the drill pipe; R 钻杆 Indicates the outer diameter of the drill pipe, d 钻杆 Indicates the wall thickness of the drill pipe, L 钻杆 Indicates the actual penetration of the drill pipe, which are all known data; R 井眼 represents the outer diameter of the wellbore estimated using the drill bit diameter, R 套管 represents the outer diameter of the casing, L represents the well depth estimated using the designed drill pipe footage, and R 1井眼 represents the outer diameter of the wellbore in section 1 estimated using the drill bit diameter, R 2井眼 represents the outer diameter of the wellbore in section 2 estimated using the drill bit diameter, R 1套管 Indicates the outer diameter of the casing in well section 1, R 2套管 represents the outer diameter of the casing of section 2, L1 represents the well depth of section 1 estimated using the designed drill pipe footage, and L2 represents the well depth of section 2 estimated using the designed drill pipe footage. These data are all known data.

[0039] Formula (7) is only used as an example for a wellbore with two variable diameter sections. Similarly, if there are multiple variable diameter sections, the sum of the wellbore annulus volumes of the multiple variable diameter sections is the total wellbore annulus volume.

[0040] In some embodiments of the present disclosure, in order to avoid missing the actual start time of the return, sampling is started 5 to 10 minutes in advance according to the predicted start time of the return.

[0041] In some embodiments of the present disclosure, the end time of the return of the tracer fluid from the wellhead is predicted based on the predicted return start time and the running time of the total pumped amount of the tracer fluid in the wellbore annulus.

[0042] In some embodiments of the present disclosure, sampling is terminated 10 to 20 minutes after the predicted end time of the return, so as to ensure that the sampling time covers the actual end time of the return.

[0043] In some embodiments of the present disclosure, the cementing flowback fluid sample is digested and then the concentration of each tracer in the cementing flowback fluid sample is detected.

[0044] In some embodiments of the present disclosure, the digestion is microwave digestion;

[0045] The microwave digestion procedure includes: mixing the cementing flowback fluid sample and the digestion solution in a digestion tank and placing the mixture in a microwave digestion instrument, and heating the microwave digestion instrument to a digestion temperature to perform microwave digestion on the sample.

[0046] In some embodiments of the present disclosure, the digestion solution is a mixture of concentrated nitric acid and concentrated hydrochloric acid; the volume ratio of the concentrated nitric acid to the concentrated hydrochloric acid is (1-6):1.

[0047] In some embodiments of the present disclosure, the amount of the digestion solution used is at least 9 ml per 0.5 g of the cementing flowback fluid sample.

[0048] In some embodiments of the present disclosure, the temperature increasing method is gradient temperature increasing.

[0049] In some embodiments of the present disclosure, the digestion temperature is no greater than 190°C.

[0050] In some embodiments of the present disclosure, the step of removing acid from the sample after microwave digestion is also included.

[0051] In some embodiments of the present disclosure, the tracer is selected from any one of oxides of transition metal elements, hydroxides of transition metal elements, salts of transition metal elements, and complexes of transition metal elements.

[0052] In some embodiments of the present disclosure, the tracer is selected from any one of oxides of rare earth elements, hydroxides of rare earth elements, salts of rare earth elements, and complexes of rare earth elements.

[0053] In some embodiments of the present disclosure, the rare earth element is selected from any one of lanthanum, cerium, praseodymium, neodymium, samarium, europium, gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium, and lutetium.

[0054] Beneficial technical effects of the present invention:

[0055] A monitoring method for cementing displacement process provided by an embodiment of the present invention can realize real-time monitoring of the displacement process of cement slurry on drilling fluid in actual cementing construction by means of cementing displacement monitoring and tracing. Specifically, since different types of tracers are respectively added to each well-entering fluid for cementing such as drilling fluid and cement slurry in the embodiment of the present invention, the concentration of each tracer in the cementing return fluid is detected and corresponds to the sampling time, so that the displacement process of the corresponding well-entering fluid in the annulus during the return flow is reflected by the distribution of each tracer concentration over time, that is, the displacement process of each well-entering fluid in the cementing slurry column structure. Since this method is measured during the actual cementing construction process, it can avoid the error caused by the inability of the laboratory simulation device to simulate the actual situation, making the monitoring of the displacement process more accurate and intuitive. Therefore, this method can scientifically monitor the cementing displacement process, meet the requirements of refined cementing and improve the displacement efficiency, and solve the problem that the existing displacement process monitoring method can only be used for laboratory simulation and has large errors. In addition, the method takes a short time and is synchronized with the drilling and cementing operations, does not interfere with the normal drilling operations, and does not need to delay the drilling and cementing operations; and the method is low in cost.

[0056] Furthermore, the monitoring method can evaluate the mixing condition / mixing state of each well fluid in the cementing flowback fluid by calculation based on the corresponding relationship between the sampling time and the concentration of each tracer, combined with the injection concentration of each tracer. Specifically, firstly, the detected concentration of each tracer in the cementing flowback fluid at a certain moment is compared with the injection concentration of the corresponding tracer, the concentration factor of each well fluid is calculated, and the concentration is normalized; then, the concentration factor of each well fluid is compared with the total concentration factor (that is, the sum of all well fluid concentration factors), and the proportion of each well fluid in the cementing flowback fluid can be obtained, that is, the mixing condition / mixing state and degree of each well fluid in the cementing slurry column structure when it is returned (especially in the middle and late stages of the return), especially through the mixing state of the lead slurry and the drilling fluid at the end of the return, or the mixing state with the drilling fluid and the pre-fluid, which can indirectly reflect the displacement efficiency of the cement slurry / lead slurry on the displaced fluid, and provide a basis for displacement efficiency simulation.

[0057] The method first performs microwave digestion on the cementing return fluid sample, and ensures that the cementing return fluid sample can be completely digested into a clear liquid by controlling the composition, proportion, dosage, digestion temperature, heating method, etc. of the digestion liquid, so that the measured concentration of the tracer in the sample more truly reflects the actual concentration of the tracer, and the recovery rate of the tracer in the cementing return fluid can reach more than 98.9%. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the drawings of the embodiments will be briefly described below. It should be noted that the drawings described below only relate to some embodiments of the present disclosure, but are not intended to limit the present disclosure, wherein:

[0059] Figure 1 It is a flow chart of a monitoring method for a cementing displacement process provided by an embodiment of the present invention;

[0060] Figure 2 is a flow chart of a monitoring method for a cementing displacement process provided by another embodiment of the present invention;

[0061] Figure 3 It is a time concentration curve diagram of each tracer in cementing flowback fluid provided by the application example of the present invention. DETAILED DESCRIPTION

[0062] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the described embodiments of the present disclosure, all other embodiments obtained by those skilled in the art without creative work also fall within the scope of protection of the present disclosure.

[0063] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by a person skilled in the art to which the subject matter of the present disclosure belongs. It will be further understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the specification and the relevant art, and will not be interpreted in an idealized or overly formal form unless otherwise explicitly defined herein. As used herein, a statement that two or more parts are "connected" or "coupled" together shall mean that the parts are joined together directly or through one or more intermediate components.

[0064] The reagents used in the examples are as follows:

[0065] Ultrapure water, resistivity ≥18ΜΩ﹒ cm; concentrated nitric acid: ρ(HNO3)=1.42g / ml (mass fraction of nitric acid is 71.6%), high-grade purity; concentrated hydrochloric acid: ρ(HCl)=1.19g / ml (mass fraction of hydrochloric acid is 40%), high-grade purity; external standard solution: mixed standard solution of rare earth elements Ho, Er, and Yb, ρ=10µg / ml; internal standard solution (used to examine the stability of instrument measurement): Rh standard solution (ρ=100µg / ml), Re standard solution (ρ=100µg / ml); mass spectrometer tuning solution: ρ=10µg / L.

[0066] The instruments and equipment used in the embodiments and application examples are as follows:

[0067] Inductively coupled plasma mass spectrometer; analytical balance: accuracy 0.0001g; microwave digester; graphite digester; filtration device; ultrapure water instrument.

[0068] Example 1

[0069] A monitoring method for cementing displacement process in this embodiment, Figure 1 is a flow chart of a monitoring method for cementing displacement process provided by an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:

[0070] S1. Pump the cementing fluids containing tracers into the wellbore annulus according to conventional procedures.

[0071] A tracer is added to each well fluid and the types of tracers are different from each other.

[0072] In a specific embodiment, the well fluid includes drilling fluid, pre-fluid and lead slurry. The steps of pumping each well fluid for cementing with tracer into the wellbore annulus according to conventional procedures include: adding a first tracer to the drilling fluid to obtain drilling fluid with tracer, and pumping the drilling fluid with tracer into the wellbore annulus; adding a third tracer to the pre-fluid to obtain pre-fluid with tracer, and pumping the pre-fluid with tracer into the wellbore annulus after the drilling fluid with tracer is pumped out; adding a third tracer to the lead slurry to obtain lead slurry with tracer, and pumping the lead slurry with tracer into the wellbore annulus after the pre-fluid with tracer is pumped out.

[0073] For example, at the filling port of the drilling fluid tank, slowly move 10m 3 20L of the first tracer solution was added to the left and right drilling fluids, and the slurry pump was used to circulate for 4 hours. At the same time, the stirring blades in the tank were constantly stirred to ensure that the tracer and the drilling fluid were evenly mixed, and the drilling fluid with the tracer was obtained; 20L of the second tracer solution was slowly added to the flushing fluid at the filling port of the flushing fluid tank, and the slurry pump was used to circulate for 2 hours. At the same time, the stirring blades in the tank were turned to ensure that the tracer and the flushing fluid were evenly mixed, and the flushing fluid with the tracer was obtained; 5L of the third tracer solution was used to replace part of the slurry preparation water to prepare 10m 3 The leading slurry for dosing tracers on the left and right sides is continuously stirred with stirring blades to ensure that the tracer and the leading slurry are evenly mixed to obtain the leading slurry for dosing tracers; the drilling fluid for dosing tracers, the flushing fluid for dosing tracers and the leading slurry for dosing tracers are pumped into the wellbore annulus from the bottom of the well in turn, and the initial time of pumping into the wellbore annulus and the respective pumping amount are recorded.

[0074] In a specific embodiment, before pumping in the drilling fluid for tracer injection, the flushing fluid for tracer injection and the slurry for tracer injection, samples of tracer injection are collected multiple times at the filling ports of the respective material tanks, for example, three times, with a sampling interval of 1 to 2 minutes, so as to determine the injection concentration of the corresponding tracer in each sample through detection.

[0075] In a specific embodiment, the tracer concentration in the drilling fluid for tracer administration, the pre-fluid for tracer administration, and the lead slurry for tracer administration is greater than the detection limit of the detection instrument, and is greater than 20 times the corresponding tracer background concentration contained in the drilling fluid stock solution, so as to eliminate the interference of the tracer background concentration and improve the detection accuracy.

[0076] In a specific embodiment, the substance used as a tracer is any one of an oxide of a transition metal element, a hydroxide of a transition metal element, a salt of a transition metal element, or a complex of a transition metal element. Further, the substance used as a tracer is any one of an oxide of a rare earth element, a hydroxide of a rare earth element, a salt of a rare earth element, or a complex of a rare earth element. The rare earth element may be any one of lanthanum, cerium, praseodymium, neodymium, samarium, europium, gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium, and lutetium.

[0077] Exemplarily, the first tracer is a complex of ytterbium (Yb), the third tracer is a complex of erbium (Er), and the second tracer is a complex of holmium (Ho).

[0078] S2. Collect cementing flowback fluid samples at the scheduled sampling time.

[0079] In a specific implementation, the step of collecting cementing flowback fluid samples at a predetermined sampling time includes: predicting the starting time when the well fluid injected with tracers returns from the wellhead; determining the sampling time according to a sampling interval of 0.2 to 1 minute starting from the predicted starting time of the return; before sampling, numbering the sampling bottles and corresponding the sampling bottle numbers to the sampling times; and collecting cementing flowback fluid samples.

[0080] In a specific embodiment, the starting time T0 of the wellbore annulus of the wellbore injected with the tracer is predicted based on the initial time T0 of the wellbore annulus injected with the tracer and the time it takes to run from the bottom of the wellbore annulus to the top. 返出的起始时刻 :

[0081] T 返出的起始时刻 = T0+V 井眼环空 / Q 入井液 (3);

[0082] T0 = ​​T 初始开启钻井液泵 +V 钻杆内 / Q 入井液 (4);

[0083] V 钻杆内 =π [(R 钻杆 -d 钻杆 2) 2 / 4] L 钻杆 (5);

[0084] For a wellbore without a variable diameter section, the formula for estimating the wellbore annulus volume is:

[0085] V 井眼环空= π / 4 (R 井眼 2 -R 套管 2 ) L (6);

[0086] For a wellbore with two diameter-changing sections, the formula for estimating the wellbore annulus volume is:

[0087] V 井眼环空= π / 4 (R 1井眼 2 -R 1套管 2 ) L1+π / 4 (R 2井眼 2 -R 2套管 2 ) L2 (7);

[0088] Among them, V 井眼环空 It represents the wellbore annulus volume estimated by wellbore structure design data and casing size; Q 入井液 It indicates the flow rate of the fluid into the well when the tracer is injected, which can be read by the flow meter installed on the pump pipeline; T 初始开启钻井液泵 represents the time when the pump for pumping the wellbore fluid for placing the tracer is initially turned on. In some embodiments of the present disclosure, the time when the pump for pumping the wellbore fluid for placing the tracer is initially turned on is taken as time 0 as a reference to simplify the calculation process; V 钻杆内 Indicates the volume of the drill pipe; R 钻杆 Indicates the outer diameter of the drill pipe, d 钻杆 Indicates the wall thickness of the drill pipe, L 钻杆 Indicates the actual penetration of the drill pipe, which are all known data; R 井眼 represents the outer diameter of the wellbore estimated using the drill bit diameter, R 套管 represents the outer diameter of the casing, L represents the well depth estimated using the designed drill pipe footage, and R 1井眼 represents the outer diameter of the wellbore in section 1 estimated using the drill bit diameter, R2井眼 represents the outer diameter of the wellbore in section 2 estimated using the drill bit diameter, R 1套管 Indicates the outer diameter of the casing in well section 1, R 2套管 represents the outer diameter of the casing of section 2, L1 represents the well depth of section 1 estimated using the designed drill pipe footage, and L2 represents the well depth of section 2 estimated using the designed drill pipe footage. These data are all known data.

[0089] Formula (7) is only used as an example for a wellbore with two variable diameter sections. Similarly, if there are multiple variable diameter sections, the sum of the wellbore annulus volumes of the multiple variable diameter sections is the total wellbore annulus volume.

[0090] In a specific implementation manner, in order to avoid missing the actual start time of the return, sampling is started 5 to 10 minutes in advance according to the predicted start time of the return.

[0091] In a specific implementation, the end time of the return of the tracer fluid from the wellhead is predicted based on the predicted return start time and the running time of the total pumped amount of the tracer fluid in the wellbore annulus.

[0092] For example, the end time T of the well fluid after the tracer is returned from the wellhead is 返出的结束时刻 It can be predicted by the following formula:

[0093] T 返出的结束时刻 =T 返出的起始时刻 +V 入井液 / Q 入井液 (8);

[0094] Among them, T 返出的起始时刻 According to formula (3), V 入井液 Indicates the total amount of fluid pumped into the well for placing tracers, Q 入井液 Indicates the flow rate of fluid entering the well for placing tracer.

[0095] It should be noted that the flow rate of the drilling fluid for placing the tracer is different. For example, the current flow rate of the drilling fluid is 1.12m 3 / min; the flushing fluid displacement at that time was 0.63m 3 / min; the slurry displacement at that time was 1.58m 3 / min.

[0096] In a specific implementation, sampling is terminated 10 to 20 minutes after the predicted end time of the return, so as to ensure that the sampling time covers the actual end time of the return.

[0097] The sampling time interval can be adjusted according to the flow rate of cementing return fluid and actual working conditions; in addition, the sampling tool is rinsed multiple times in real time during the sampling process.

[0098] S3. Detecting the concentration of each tracer in the cementing flowback fluid sample.

[0099] In a specific embodiment, the step of detecting the tracer concentration in the cementing flowback fluid sample includes: performing microwave digestion treatment on the cementing flowback fluid sample, and then detecting the concentration of each tracer in the cementing flowback fluid sample by inductively coupled plasma mass spectrometry. The microwave digestion treatment reference standard is "HJ832-2021 Microwave Digestion Method for Total Metal Elements in Soil and Sediment"; the mass spectrometry detection reference standard is "HJ700-2014 Determination of 65 Elements in Water Quality Inductively Coupled Plasma Mass Spectrometer".

[0100] The microwave digestion procedure includes: mixing the cementing flowback fluid sample and the digestion solution in a digestion tank and placing the mixture in a microwave digestion instrument, and heating the microwave digestion instrument to a digestion temperature to perform microwave digestion on the sample.

[0101] In a specific embodiment, the digestion solution is a mixture of concentrated nitric acid and concentrated hydrochloric acid; the volume ratio of the concentrated nitric acid to the concentrated hydrochloric acid is (1-6):1; the concentrated hydrochloric acid refers to hydrochloric acid with a concentration greater than 30% (mass fraction, g / 100g); the concentrated nitric acid refers to nitric acid with a concentration greater than 60% (mass fraction, g / 100g); the amount of the digestion solution used is at least 9 ml of the digestion solution volume used for every 0.5g of the cementing backflow fluid sample; the heating method is gradient heating; the digestion temperature is not greater than 190°C.

[0102] Exemplarily, the microwave digestion procedure includes: weighing 0.5g cementing flowback fluid sample, placing it in a digestion tank, adding 6ml concentrated nitric acid and 3ml concentrated hydrochloric acid in sequence, and after the sample and the digestion solution are fully mixed, the digestion tank is placed in the digestion tank bracket and then placed in the furnace cavity of the microwave digestion instrument, and the microwave digestion instrument is heated to each digestion temperature in sequence according to the gradient heating program in Table 1 and maintained for a period of time to perform microwave digestion on the sample, and cooled after the program is completed. After the temperature in the tank drops to room temperature, take out the digestion tank in the acid-proof fume hood, slowly release the pressure and air, and open the digestion tank cover.

[0103] Table 1 Microwave digestion gradient heating program

[0104] program Digestion temperature Keep Time 1 Room temperature → 90℃ 5min 2 90→120℃ 5min 3 120→190℃ 60min

[0105] In a specific embodiment, the method further includes the step of removing acid from the sample after microwave digestion. For example, the acid is removed by graphite digestion. Specifically, the digestion tank is moved to a graphite furnace digestion apparatus, the heating temperature is set to 120° C., and the acid is removed for 30 minutes under boiling state.

[0106] In a specific embodiment, the method further includes the steps of fixing the volume of the sample after removing the acid and filtering it.

[0107] Exemplarily, the digestion tank is taken out, the residual liquid in the tank is transferred to a 50 ml centrifuge tube, the inner wall of the digestion tank is rinsed with a 2% (mass fraction, g / 100 g) nitric acid solution, the washing liquid is transferred to the centrifuge tube, and then the volume is fixed to 50 g with a 2% (mass fraction, g / 100 g) nitric acid solution, shaken, and after standing for 60 minutes, the liquid in the centrifuge tube is filtered to obtain a filtrate, and 10 ml of the filtrate is taken out and transferred to a test tube for testing.

[0108] In a specific embodiment, the test steps of detecting the tracer concentration in the cementing flowback fluid sample and each cementing fluid sample by an inductively coupled plasma mass spectrometer include: after igniting the plasma, preheating the instrument for 30 minutes, and then using the mass spectrometer tuning fluid to tune the sensitivity, oxides and double charges of the instrument; using a rare earth element mixed standard solution to prepare a series of standard solutions of the elements to be tested, using an inductively coupled plasma mass spectrometer to measure the standard solutions of the elements to be tested, and drawing a standard curve of the elements to be tested; finally, the concentrations of the three tracer rare earth elements in each sample are measured. Before the measurement, the system is flushed with a nitric acid solution with a concentration of 2% (mass fraction, g / 100g) until the signal drops to the minimum, and the sample is measured after the analysis signal is stable.

[0109] S4. Obtain the corresponding relationship between the sampling time and the concentration of each tracer to realize the monitoring of the displacement process.

[0110] In a specific embodiment, the step of obtaining the correspondence between the sampling time and the concentration of each tracer to realize monitoring of the displacement process includes: corresponding the detection results of each tracer concentration in step S3 to the sampling time in step S2, drawing a table or drawing a time concentration curve of each tracer in the cementing return fluid, and obtaining the relationship between the change of the concentration of the three tracers in the cementing return fluid sample over time, which reflects the displacement process of the lead slurry with the drilling fluid and the flushing fluid.

[0111] Example 2

[0112] A monitoring method for cementing displacement process in this embodiment is as follows: Figure 2 As shown, based on Example 1, it also includes S5, evaluating the mixing conditions of each well fluid in the cementing return fluid.

[0113] In a specific embodiment, the step of evaluating the mixing conditions of each well fluid in the cementing flowback fluid includes:

[0114] According to the corresponding relationship between the sampling time and the concentration of each tracer, as well as the concentration of each tracer, the mixing condition of each well fluid in the cementing flowback fluid is evaluated by the following formula:

[0115] The proportion of a certain well fluid in the cementing return fluid at a certain time = the concentration factor of a certain well fluid at a certain time / the sum of all well fluid concentration factors at a certain time 100% (1);

[0116] The concentration factor of a certain well fluid at a certain time = the detection concentration of a tracer placed in a certain well fluid in the cementing return fluid at a certain time / the concentration of the tracer placed in a certain well fluid 100% (2).

[0117] In a specific implementation, the well fluid includes drilling fluid, pre-pad fluid and lead slurry, and the corresponding proportions of the three well fluids in the cementing flowback fluid and the concentration factor formulas of the three well fluids are as follows:

[0118] The proportion of drilling fluid in cementing flowback fluid at a certain time = drilling fluid concentration factor at a certain time / (drilling fluid concentration factor at a certain time + front fluid concentration factor at a certain time + lead slurry concentration factor at a certain time) 100% (11);

[0119] The proportion of lead slurry in cementing flowback fluid at a certain time = lead slurry concentration factor at a certain time / (drilling fluid concentration factor at a certain time + front fluid concentration factor at a certain time + lead slurry concentration factor at a certain time) 100% (12);

[0120] The proportion of the pre-fluid in the cementing return fluid at a certain time = the pre-fluid concentration factor at a certain time / (the drilling fluid concentration factor at a certain time + the pre-fluid concentration factor at a certain time + the lead slurry concentration factor at a certain time) 100% (13);

[0121] Drilling fluid concentration factor at a certain moment = detection concentration of tracer placed in drilling fluid in cementing return fluid at a certain moment / concentration of tracer placed in drilling fluid 100% (21);

[0122] The concentration factor of the slurry at a certain time = the detection concentration of the tracer placed in the slurry in the cementing return fluid at a certain time / the concentration of the tracer placed in the slurry 100% (22);

[0123] The concentration factor of the pre-fluid at a certain moment = the detection concentration of the tracer placed in the pre-fluid in the cementing return fluid at a certain moment / the concentration of the tracer placed in the pre-fluid 100% (23).

[0124] According to formulas (21) to (23), the proportion of the detected concentration of each well fluid in the cementing flowback fluid in the injection concentration can be obtained at a certain moment, and the concentration can be normalized; according to formulas (11) to (13), the proportion of each well fluid in the cementing flowback fluid at a certain moment can be obtained, that is, the mixing state / mixing degree of each well fluid in the cementing slurry column structure when it is returned (especially in the middle and late stages of the return), especially through the mixing state of the lead slurry with the drilling fluid and the pre-fluid at the end of the return, which can indirectly reflect the displacement efficiency of the cement slurry / lead slurry to the displaced fluid, providing a basis for the displacement efficiency simulation. Among them, the denominator of formulas (11) to (13) is the total proportion of the concentration factors of the three injected well fluids, that is, it only shows the proportion of each well fluid in the cementing flowback fluid formed by all the well fluids, so as to exclude the influence of the residual mud, formation rock soil, and formation water mixed in the cementing flowback fluid during the return process on the concentration of each tracer.

[0125] Application Example 1

[0126] A monitoring method for cementing displacement process of Example 1 is applied to an actual oil production well, and the wellbore structure design data of the oil production well are as follows: the first opening is designed to drill to 500m with a φ311.1mm drill bit; the second opening is designed to drill to 1859m with a φ215.9mm drill bit.

[0127] Casing selection: One-opening design φ244.5mm×500m casing; two-opening design φ139.7mm×1859m casing.

[0128] The outer diameter of the drill pipe is 127mm, the wall thickness is 7.52mm, and the actual drilling footage of the drill pipe is 1743m.

[0129] The drilling fluid flow rate for placing tracers is 1.12m 3 / min, and the flow rate of the flushing liquid for placing the tracer is 0.63m 3 / min, the slurry flow rate for placing tracers is 1.58m 3 / min.

[0130] The time when the drilling fluid pump for pumping the tracer is initially turned on is time 0, then the initial time when the drilling fluid for the tracer enters the wellbore annulus is T0=π [(127-7.52 2) 2 / 4] 1859 / 1000000=18.30m 3 / 1.12 m 3 / min =16.34min;

[0131] The annular volume V estimated by the wellbore structure design data and casing size is 43.45m 3 :

[0132] Vwellbore annulus = π / 4 (311.12-244.52) 500 / 1000000+π / 4 (215.92-139.72) (1859-500) / 1000000=43.45m 3 ;

[0133] Predict the starting time T of the drilling fluid with tracer to return from the wellhead = T0 + V wellbore annulus / Q drilling fluid = 16.34 + 43.45 / 1.12 = 55.13min ≈ 55min;

[0134] Predict the end time of the tracer slurry returning from the wellhead

[0135] The initial time when the tracer slurry enters the wellbore annulus is T0=π [(127-7.52 2) 2 / 4] 1859 / 1000000=18.30m 3 / 1.58 m 3 / min =11.58min;

[0136] Predict the starting time T of the drilling fluid with tracer to return from the wellhead = T0 + V wellbore annulus / Q drilling fluid = 11.58 + 43.45 / 1.58 = 39.08min ≈ 39min;

[0137] The predicted end time T of the tracer slurry returning from the wellhead is the end time of return = T start time of return + V drilling fluid / Q drilling fluid = 39 + 9.5 / 1.58 = 45.01 min.

[0138] The method comprises the following steps:

[0139] 13.5m3 of ytterbium complex drilling fluid was added successively. 3 , 8.8m of erbium complex flushing liquid 3 And the slurry of holmium complex was added 9.5m 3 Pump into the wellbore annulus;

[0140] Collect cementing flowback samples 5 minutes in advance of the predicted return start time, and end sampling 15 minutes after the predicted return end time;

[0141] All cementing flowback fluid samples were subjected to microwave digestion and the concentrations of ytterbium complex, erbium complex and holmium complex were tested.

[0142] The corresponding relationship between the sampling time and the concentration of each tracer is obtained to monitor the displacement process. Figure 3 As shown in the figure, the displacement process is as follows: the drilling fluid starts to return at 10.00 min when the pump for pumping the wellbore fluid for placing the tracer is initially turned on (time 0), and is in the concentrated return flow of drilling fluid during 11.00 min to 19.50 min; the flushing fluid starts to return at 20.00 min, and is mixed with the drilling fluid and returned during 20 min to 24.33 min; the lead slurry starts to return at 24.67 min, and is in the concentrated return flow during 25 min to 26.67 min; the lead slurry is mixed with the drilling fluid and the flushing fluid and returned during 24.67 min to 25 min; the lead slurry is mixed with the flushing fluid and returned during 25.33 min to 25.67 min; the lead slurry returns alone during 26.00 min to 26.67 min, and the Ho concentration in the lead slurry reaches the placement concentration, and the Yb in the drilling fluid and the Er in the flushing fluid are both at the local concentration, indicating that the cement slurry has returned to the designed depth.

[0143] Table 2. Correspondence between tracer concentrations and sampling times in actual oil wells

[0144] Sampling time / min 0.00 1.00 2.00 3.00 4.00 5.00 Yb concentration / μg / L 3.744 0.100 3.542 1.969 6.000 4.731 Er concentration / μg / L 0.207 0.699 0.408 0.683 0.147 0.467 Ho concentration / μg / L 0.259 1.235 0.466 0.380 0.266 1.133 Sampling time / min 6.00 7.00 8.00 9.00 10.00 11.00 Yb concentration / μg / L 3.221 4.064 6.428 6.760 56.866 351.642 Er concentration / μg / L 0.373 0.485 0.552 0.584 0.488 0.098 Ho concentration / μg / L 0.480 0.784 0.243 1.087 0.055 0.632 Sampling time / min 12.00 13.00 14.00 15.00 16.00 17.00 Yb concentration / μg / L 326.854 365.369 361.235 360.081 347.573 351.317 Er concentration / μg / L 0.253 0.587 0.378 0.543 0.453 0.210 Ho concentration / μg / L 0.783 0.805 1.147 0.073 0.215 1.114 Sampling time / min 18.00 18.50 19.00 19.50 20.00 20.33 Yb concentration / μg / L 329.625 361.488 369.864 342.836 282.962 230.341 Er concentration / μg / L 0.048 0.583 0.053 0.478 98.609 154.329 Ho concentration / μg / L 0.532 1.123 0.551 0.831 1.125 0.613 Sampling time / min 20.67 21.00 21.33 21.67 22.00 22.33 Yb concentration / μg / L 186.723 160.306 116.839 203.564 196.381 169.466 Er concentration / μg / L 203.672 243.082 291.275 190.534 200.035 235.612 Ho concentration / μg / L 1.036 0.572 0.665 1.107 0.159 1.171 Sampling time / min 22.67 23.00 23.33 23.67 24.00 24.33 Yb concentration / μg / L 65.511 161.371 242.463 269.763 120.356 141.824 Er concentration / μg / L 348.127 228.639 155.339 127.420 287.584 262.521 Ho concentration / μg / L 0.206 1.106 0.036 1.011 0.359 0.313 Sampling time / min 24.67 25.00 25.33 25.67 26.00 26.33 Yb concentration / μg / L 69.110 30.103 3.079 3.541 7.808 5.356 Er concentration / μg / L 177.112 146.086 61.634 34.703 0.125 0.684 Ho concentration / μg / L 141.975 214.517 343.254 367.379 384.724 366.882 Sampling time / min 26.67 Yb concentration / μg / L 6.688 Er concentration / μg / L 0.136 Ho concentration / μg / L 385.305

[0145] Note: The background concentration of Yb in the drilling fluid is 0.100μg / L~6.76μg / L (corresponding to the sampling time of 0.00min~9.00min), the background concentration of Er is 0.048μg / L~0.699μg / L (corresponding to the sampling time of 0.00min~19.50min), and the background concentration of Ho is 0.036μg / L~1.235μg / L (corresponding to the sampling time of 0.00min~24.33min); the concentration of tracer in drilling fluid C (Yb) =368.603μg / L, the concentration of tracer in the pre-fluid C (Er) =439.633μg / L, the concentration of tracer in the slurry C (Ho) =386.134μg / L.

[0146] Application Example 2

[0147] A monitoring method for cementing displacement process of Example 1 is applied to an actual oil production well, and the wellbore structure design data of the oil production well are as follows: the first opening is designed to drill to 500m with a φ311.1mm drill bit; the second opening is designed to drill to 1859m with a φ215.9mm drill bit.

[0148] Casing selection: One-opening design φ244.5mm×500m casing; two-opening design φ139.7mm×1859m casing.

[0149] The outer diameter of the drill pipe is 127mm, the wall thickness is 7.52mm, and the actual drilling footage of the drill pipe is 1743m.

[0150] The drilling fluid flow rate for placing tracers is 1.12m 3 / min, and the flow rate of the flushing liquid for placing the tracer is 0.63m 3 / min, the slurry flow rate for placing tracers is 1.58m 3 / min.

[0151] The time when the drilling fluid pump for pumping the tracer is initially turned on is time 0, then the initial time when the drilling fluid for the tracer enters the wellbore annulus is T0=π [(127-7.52 2) 2 / 4] 1859 / 1000000=18.30m 3 / 1.12 m 3 / min =16.34min;

[0152] The annular volume V estimated by the wellbore structure design data and casing size is 43.45m 3 :

[0153] Vwellbore annulus = π / 4 (311.12-244.52) 500 / 1000000+π / 4 (215.92-139.72) (1859-500) / 1000000=43.45m 3 ;

[0154] Predict the starting time T of the drilling fluid with tracer to return from the wellhead = T0 + V wellbore annulus / Q drilling fluid = 16.34 + 43.45 / 1.12 = 55.13min ≈ 55min;

[0155] Predict the end time of the tracer slurry returning from the wellhead

[0156] The initial time when the tracer slurry enters the wellbore annulus is T0=π [(127-7.52 2) 2 / 4] 1859 / 1000000=18.30m 3 / 1.58 m 3 / min =11.58min;

[0157] Predict the starting time T of the drilling fluid with tracer to return from the wellhead = T0 + V wellbore annulus / Q drilling fluid = 11.58 + 43.45 / 1.58 = 39.08min ≈ 39min;

[0158] The predicted end time T of the tracer slurry returning from the wellhead is the end time of return = T start time of return + V drilling fluid / Q drilling fluid = 39 + 9.5 / 1.58 = 45.01 min.

[0159] The method comprises the following steps:

[0160] 13.5m3 of ytterbium complex drilling fluid was added successively. 3 , 8.8m of erbium complex flushing liquid 3 And the slurry of holmium complex was added 9.5m 3 Pump into the wellbore annulus;

[0161] Collect cementing flowback samples 5 minutes in advance of the predicted return start time, and end sampling 15 minutes after the predicted return end time;

[0162] All cementing flowback fluid samples were subjected to microwave digestion and the concentrations of ytterbium complex, erbium complex and holmium complex were tested.

[0163] The corresponding relationship between the sampling time and the concentration of each tracer is obtained to monitor the displacement process. Figure 3 As shown in the figure, the displacement process is as follows: the drilling fluid starts to return at 10.00 min when the pump for pumping the wellbore fluid for placing the tracer is initially turned on (time 0), and is in the concentrated return flow of drilling fluid during 11.00 min to 19.50 min; the flushing fluid starts to return at 20.00 min, and is mixed with the drilling fluid and returned during 20 min to 24.33 min; the lead slurry starts to return at 24.67 min, and is in the concentrated return flow during 25 min to 26.67 min; the lead slurry is mixed with the drilling fluid and the flushing fluid and returned during 24.67 min to 25 min; the lead slurry is mixed with the flushing fluid and returned during 25.33 min to 25.67 min; the lead slurry returns alone during 26.00 min to 26.67 min, and the Ho concentration in the lead slurry reaches the placement concentration, and the Yb in the drilling fluid and the Er in the flushing fluid are both at the local concentration, indicating that the cement slurry has returned to the designed depth.

[0164] Substitute the data in Table 3 and the concentration of each tracer into the following formula to evaluate the mixing condition of each well fluid in the cementing flowback fluid:

[0165] The proportion of drilling fluid in cementing annulus flowback fluid τ 钻井液 :

[0166] τ 钻井液 =α / (α+β+γ) 100% (21)

[0167] The proportion of flushing fluid in cementing annulus flowback fluidτ 冲洗液 :

[0168] τ 冲洗液 =β / (α+β+γ) 100% (22)

[0169] The proportion of lead slurry in cementing annulus flowback fluid τ 领浆 :

[0170] τ 领浆 =γ / (α+β+γ) 100% (23)

[0171] Note: α represents the ratio of the detected concentration of Yb in the cementing annulus flowback fluid to the injected concentration of Yb in the drilling fluid at a certain time;

[0172] β represents the ratio of the detected concentration of Er in the cementing annulus flowback fluid to the concentration of Er in the flushing fluid at a certain time;

[0173] γ represents the ratio of the detected concentration of Ho in the cementing annulus flowback fluid to the injected concentration of Ho in the collar slurry at a certain moment.

[0174] The obtained sampling time is related to α, β, γ, (α+β+γ), τ 钻井液 , τ 冲洗液 and τ 领浆 The corresponding relationship is shown in Table 3.

[0175] Table 3. Mixing of drilling fluid, flushing fluid and lead slurry in cementing flowback fluid

[0176] Sampling time / min α β γ α+β+γ <![CDATA[τ 钻井液 ]]> <![CDATA[τ 冲洗液 ]]> <![CDATA[τ 领浆 ]]> 10.00 0.154 0.001 0.000 0.155 99.2% 0.7% 0.1% 11.00 0.953 0.000 0.002 0.955 99.8% 0.0% 0.2% 12.00 0.886 0.001 0.002 0.889 99.7% 0.1% 0.2% 13.00 0.991 0.001 0.002 0.994 99.7% 0.1% 0.2% 14.00 0.979 0.001 0.003 0.983 99.6% 0.1% 0.3% 15.00 0.976 0.001 0.000 0.978 99.9% 0.1% 0.0% 16.00 0.942 0.001 0.001 0.944 99.8% 0.1% 0.1% 17.00 0.953 0.000 0.003 0.956 99.6% 0.1% 0.3% 18.00 0.894 0.000 0.001 0.895 99.8% 0.0% 0.2% 18.50 0.980 0.001 0.003 0.984 99.6% 0.1% 0.3% 19.00 1.003 0.000 0.001 1.004 99.8% 0.0% 0.1% 19.50 0.930 0.001 0.002 0.933 99.7% 0.1% 0.2% 20.00 0.767 0.224 0.003 0.995 77.1% 22.6% 0.3% 20.33 0.625 0.351 0.002 0.977 63.9% 35.9% 0.2% 20.67 0.506 0.464 0.003 0.973 52.1% 47.7% 0.3% 21.00 0.435 0.553 0.001 0.989 43.9% 55.9% 0.1% 21.33 0.317 0.663 0.002 0.981 32.3% 67.5% 0.2% 21.67 0.552 0.434 0.003 0.988 55.8% 43.9% 0.3% 22.00 0.532 0.455 0.000 0.988 53.9% 46.1% 0.0% 22.33 0.460 0.536 0.003 0.999 46.0% 53.7% 0.3% 22.67 0.178 0.792 0.001 0.971 18.3% 81.6% 0.1% 23.00 0.438 0.520 0.003 0.961 45.5% 54.2% 0.3% 23.33 0.657 0.354 0.000 1.011 65.0% 35.0% 0.0% 23.67 0.731 0.290 0.003 1.024 71.4% 28.3% 0.3% 24.00 0.326 0.655 0.001 0.982 33.2% 66.7% 0.1% 24.33 0.385 0.598 0.001 0.983 39.1% 60.8% 0.1% 24.67 0.187 0.403 0.368 0.958 19.6% 42.1% 38.4% 25.00 0.082 0.332 0.556 0.970 8.4% 34.3% 57.3% 25.33 0.008 0.140 0.889 1.038 0.8% 13.5% 85.7% 25.67 0.010 0.079 0.951 1.040 0.9% 7.6% 91.5% 26.00 0.021 0.000 0.996 1.018 2.1% 0.0% 97.9% 26.33 0.015 0.002 0.950 0.966 1.5% 0.2% 98.3% 26.67 0.018 0.000 0.998 1.016 1.8% 0.0% 98.2%

[0177] Note: Since the cementing flowback fluid samples were basically at the local concentration before 10.00 min, and the well fluids started to flow back after 10.00 min, Table 3 only takes the data after 10.00 min.

[0178] It can be seen from Table 3 that during the flowback period of 10.00 min to 26.67 min, the respective proportions of Yb, Er and Ho in the cementing flowback fluid at any sampling time reflect the mixing conditions of drilling fluid, flushing fluid and lead slurry in the cementing slurry column structure during the flowback period.

[0179] For example, in Table 3, at 24.67 min, the values ​​of τdrilling fluid, τflushing fluid and τcollar slurry are 19.6%, 42.1% and 38.4% respectively, which means that at 24.67 min, the proportions of drilling fluid, flushing fluid and collar slurry in the flowback fluid are 19.6%, 42.1% and 38.4% respectively, that is, the proportions of drilling fluid, flushing fluid and collar slurry involved in the mixing.

[0180] Unless the context clearly indicates otherwise, the singular form of the words used herein and in the appended claims includes the plural and vice versa. Thus, when referring to the singular, the plural form of the corresponding term is generally included. Similarly, the words "comprise" and "include" are to be interpreted as inclusive rather than exclusive. Likewise, the terms "include" and "or" should be interpreted as inclusive unless such interpretation is expressly prohibited herein. Where the term "example" is used herein, particularly when it is located after a group of terms, the "example" is merely exemplary and illustrative and should not be considered exclusive or comprehensive.

[0181] Further aspects and scopes of adaptability become apparent from the description provided herein. It should be understood that various aspects of the present application can be implemented individually or in combination with one or more other aspects. It should also be understood that the description and specific embodiments herein are intended for purposes of illustration only and are not intended to limit the scope of the present application.

[0182] Several embodiments of the present disclosure are described in detail above, but it is obvious that those skilled in the art can make various modifications and variations to the embodiments of the present disclosure without departing from the spirit and scope of the present disclosure. The protection scope of the present disclosure is defined by the attached claims.

Claims

1. A monitoring method for cementing displacement process, characterized in that: The method comprises: Pumping each well-injected fluid for cementing with tracer into the wellbore annulus according to conventional procedures, wherein each well-injected fluid is respectively injected with a tracer and the types of tracers are different from each other; the well-injected fluid at least includes drilling fluid, slurry and pre-pad fluid; collecting cementing flowback fluid samples at a predetermined sampling time; detecting the concentration of each tracer in the cementing flowback fluid sample; Matching the concentration of each tracer with the sampling time, determining the distribution of the concentration of each tracer over time, and generating monitoring results of the displacement process; According to the corresponding relationship between the sampling time and the concentration of each tracer, as well as the concentration of each tracer, the mixing condition of each well fluid in the cementing flowback fluid is evaluated by the following formula: The proportion of a certain well fluid in the cementing return fluid at a certain time = the concentration factor of a certain well fluid at a certain time / the sum of all well fluid concentration factors at a certain time 100% (1); The concentration factor of a well fluid at a certain time = the detection concentration of a tracer placed in a well fluid in the cementing return fluid at a certain time / the concentration of the tracer placed in a well fluid 100% (2).

2. A monitoring method for cementing displacement process according to claim 1, characterized in that: The pre-fluid is selected from any one of a flushing fluid and an isolation fluid.

3. A monitoring method for cementing displacement process according to claim 1, characterized in that: The cementing flowback fluid sample is digested and then the concentration of each tracer in the cementing flowback fluid sample is detected.

4. A monitoring method for cementing displacement process according to claim 3, characterized in that: The digestion is microwave digestion; The microwave digestion procedure includes: mixing the cementing flowback fluid sample and the digestion solution in a digestion tank and placing the mixture in a microwave digestion instrument, and heating the microwave digestion instrument to a digestion temperature to perform microwave digestion on the sample.

5. A monitoring method for cementing displacement process according to claim 4, characterized in that: The digestion solution is a mixture of concentrated nitric acid and concentrated hydrochloric acid; the volume ratio of the concentrated nitric acid to the concentrated hydrochloric acid is (1-6):1; and / or, the amount of the digestion solution used is at least 9 ml per 0.5 g of the cementing flowback fluid sample; And / or, the heating method is gradient heating; and / or, the digestion temperature is no greater than 190°C; And / or, the method further comprises the step of removing acid from the sample after microwave digestion.

6. A monitoring method for cementing displacement process according to claim 1, characterized in that: The tracer is selected from any one of oxides of transition metal elements, hydroxides of transition metal elements, salts of transition metal elements, and complexes of transition metal elements.

7. A monitoring method for cementing displacement process according to claim 6, characterized in that: The tracer is selected from any one of oxides of rare earth elements, hydroxides of rare earth elements, salts of rare earth elements, and complexes of rare earth elements.

8. A monitoring method for cementing displacement process according to claim 7, characterized in that: The rare earth element is selected from any one of lanthanum, cerium, praseodymium, neodymium, samarium, europium, gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium and lutetium.