A method of reservoir generation by hydraulic fracturing based on circulating liquid-electric effect

Through the cyclic hydroelectric effect hydraulic fracturing method, combined with high-pressure water injection and electric pulse fracturing, the problems of high energy consumption and difficult fracture initiation in the construction of hot dry rock reservoirs are solved, and efficient crack expansion and effective heat storage are achieved. The increased volume improves mining efficiency and economic benefits.

CN118582998BActive Publication Date: 2024-10-11NORTHEASTERN UNIV CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410992809.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-11
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

Existing dry-hot rock artificial thermal reservoir construction technology has problems such as high energy consumption, limited operating distance, difficulty in hydraulic fracturing initiation, and water pollution, making it difficult to effectively stimulate the permeability and connectivity of dry-hot rock reservoirs.

Method used

The cyclic hydroelectric effect hydraulic fracturing method is adopted, combining high-pressure water injection fracturing and electric pulse fracturing equipment, using the weak compressibility of the liquid and strong pulse current to excite the plasma channel to form a fracture network, and carry heat through low temperature The medium undergoes heat exchange and recycling.

Benefits of technology

It significantly increases the length and number of rock mass fractures, increases the connection distance between wells in development and the effective volume of artificial heat storage, improves mining efficiency and service life, is energy-saving and environmentally friendly, has low energy consumption, and forms a large-area fracture network with high efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118582998B_ABST
    Figure CN118582998B_ABST
Patent Text Reader

Abstract

The invention discloses a method for reservoir construction based on circulating liquid-electric effect hydraulic fracturing, the method comprising: S1, determining the depth and range of a hot dry rock thermal reservoir and determining a drilling arrangement according to the depth and range of the hot dry rock thermal reservoir, S2, constructing the drilling, the drilling at least comprising an injection well, a middle well and a production well, when the drilling construction reaches the hot dry rock thermal reservoir, stopping the operation, S3, starting a hydraulic fracturing device, and performing high-pressure water injection fracturing on the drilling, S4, starting an electric pulse fracturing device, and discharging electricity on the hot dry rock thermal reservoir until the middle well is connected to the injection well and the middle well is connected to the production well; the invention takes the circulating liquid-electric effect as the core, and integrates hydraulic fracturing and liquid-electric effect circulating heat storage to construct an artificial hot dry rock thermal reservoir, which can effectively increase the length and number of rock mass fractures, improve the well-to-well connection distance, the effective volume of the artificial heat storage and the heat exchange area in the development of hot dry rocks, and ensure that the artificial hot dry rock thermal reservoir has sufficient mining efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of artificial heat storage construction of hot dry rocks, and in particular relates to a method for creating a heat storage by hydraulic fracturing based on a circulating liquid-electric effect. Background Art

[0002] Geothermal energy is regarded as the world's third largest renewable energy source, and its exploitation has received much attention from governments around the world. Geothermal energy can generally be divided into dry geothermal energy and hydrothermal geothermal energy. Since hot dry rocks are located deep in the strata, their rocks have the characteristics of high geostress, high strength, high geotemperature, extremely low permeability and porosity, and the development of dry geothermal energy is very difficult. Therefore, studying how to stimulate hot dry rock reservoirs and establish artificial reservoirs with good permeability and connectivity has become the key to improving heat extraction efficiency and sustainability.

[0003] At present, the commonly used reservoir construction methods in the existing technology include hydraulic fracturing, multi-hole drilling, blasting, cyclic thermal shock and high-voltage electric pulses. The existing high-voltage pulse technology directly contacts the electrode with the rock. Under the action of the high-voltage electric pulse, the plasma channel generated in the rock expands rapidly due to heat, generating tensile force to crack the rock. The challenges faced by this technology are mainly high energy consumption and limited action distance; using only hydraulic fracturing often faces problems such as difficulty in initiating cracks, easy to cause water pollution, and poor transformation effect.

[0004] Although these new rock-breaking technologies have their own strengths, they all inevitably have some limitations, which are often limited by factors such as cost, energy consumption, equipment parameters, and working environment. At the same time, given that the ore rocks in my country's metal mines are basically hard rocks, a simple, reliable, safe, efficient, and environmentally friendly hard rock crushing technology is urgently needed. Summary of the invention

[0005] The object of the present invention is to provide a method for reservoir formation by hydraulic fracturing based on circulating liquid-electric effect.

[0006] In order to solve the above technical problems, the basic concept of the technical solution adopted by the present invention is: a method for reservoir creation by hydraulic fracturing based on circulating liquid-electric effect, the method comprising: S1, determining the depth and range of the hot dry rock thermal reservoir and determining the arrangement of drilling according to the depth and range of the hot dry rock thermal reservoir;

[0007] S2, constructing the well, wherein the well at least includes an injection well, a well and a production well, and stopping the operation when the well reaches the hot dry rock reservoir;

[0008] S3, starting the hydraulic fracturing device to perform high-pressure water injection fracturing on the well;

[0009] S4, starting the electric pulse fracturing device, discharging electricity to the hot dry rock thermal reservoir until the middle well is connected to the injection well, and discharging electricity to the middle well and the production well.

[0010] Furthermore, the method further comprises: S5, injecting a low-temperature heat-carrying medium into the injection well into the hot dry rock thermal reservoir;

[0011] The low-temperature heat-carrying medium flows through the hot dry rock thermal reservoir to perform heat exchange through a thermoelectric exchanger, and hot water is extracted from the well for power generation or heating.

[0012] Furthermore, the hydraulic fracturing device comprises: a water tank, a water injection conduit, and a high-pressure pump;

[0013] S3 specifically includes injecting a low-temperature heat-carrying medium into the water tank, pressurizing the low-temperature heat-carrying medium with a high-pressure pump, and then injecting the low-temperature heat-carrying medium into the well through the water injection pipe.

[0014] Further, in S3, during the high-pressure water injection fracturing process, water level monitoring is performed simultaneously;

[0015] The step of performing water level monitoring includes: monitoring the water level in the well by a water level monitoring device to ensure that during water injection and fracturing, the water level in the well is continuously maintained at a value greater than or equal to a preset first set value.

[0016] Further, S4 specifically includes that the electric pulse fracturing device includes a power generation device, a discharge cable, and a discharge pointer, and the discharge cable is electrically connected to the discharge pointer;

[0017] The discharge cable is extended below the water level of the well, and the dry hot rock thermal reservoir is discharged at least twice through the power generation device.

[0018] Further, S4 also includes the following steps: S41, discharging the hot dry rock thermal reservoir at least twice by the electric pulse fracturing device;

[0019] S42, after each discharge, determining whether the middle well is connected to the injection well, and determining whether the middle well is connected to the production well;

[0020] S43, if the middle well is connected to the injection well, and the middle well is connected to the production well, shutting down the electric pulse fracturing device;

[0021] S44. If the middle well is not connected to the injection well, and the middle well is not connected to the production well, continue to perform the discharge operation, and repeat the judgment step of S42 after setting a time interval until it is confirmed that the middle well is connected to the injection well, and the middle well is connected to the production well.

[0022] Furthermore, in S3, a microseismic monitoring device is also included, which is used to monitor the crack expansion degree and impact range of the well after high-pressure water injection fracturing of the well, and then determine the location and drilling depth of the next well to be drilled according to the detection results.

[0023] Furthermore, the discharge pointers are symmetrically distributed with the center of the well as the symmetry axis, and the electrode spacing of the topological parameter ranges from 5 cm to 15 cm.

[0024] Furthermore, the low-temperature heat-carrying medium includes a medium for transferring heat energy under low-temperature conditions, and the low-temperature heat-carrying medium is water or oil.

[0025] Furthermore, the middle well is located at the center of the development site, and the injection well and the production well are located on both sides of the development site respectively.

[0026] After adopting the above technical scheme, the present invention has the following beneficial effects compared with the prior art.

[0027] The present invention takes the circulating liquid-electric effect as the core, and integrates hydraulic fracturing and liquid-electric effect circulating heat storage and other means to construct artificial heat storage in hot dry rocks. It can effectively increase the length and number of rock cracks, significantly improve the inter-well connection distance, effective volume of artificial heat storage and heat exchange area in hot dry rock development, and ensure that the artificial heat storage in hot dry rocks has sufficient mining efficiency and service life.

[0028] In addition, the basic principle of the liquid-electric effect of the present invention is to utilize the weak (in)compressibility of the liquid to excite the rapidly expanding plasma channel through a strong pulse current. The compressed liquid radiation shock wave has the following beneficial effects: (1) The resolution of the electric spark source discharged in water is good, and it is used both on land and in the ocean. A higher performance ratio can be obtained after repeated excitation, and the power supply is diverse and can meet different conditions. (2) Low energy consumption, high power, and controllable shock waves. High-frequency repeated discharges can be performed, and the single discharge intensity is large and easy to control. Energy saving and environmental protection, this method only requires electricity. (3) Since the shock wave formed by the discharge in water diffuses to the surrounding in the form of a spherical wave, the shock wave formed by this method has a long range, a wide range, and high efficiency, thereby generating a large-area fracture network, and the fractures are further extended and expanded. (4) After injecting a low-temperature heat-carrying medium into the injection well, the high-temperature fluid can be obtained by using its flow heat exchange in the thermal reservoir. After heat exchange, the thermal energy is converted back into electrical energy, thereby realizing the liquid-electric effect cycle storage. (5) During the liquid-electric discharge process, some active products will be generated, which can sterilize and purify water.

[0029] The present invention applies the circulating liquid-electric effect to the construction of artificial hot dry rock heat storage, which can not only effectively overcome the defects of hydraulic fracturing technology in the process of constructing artificial heat reservoirs, but also improve economic benefits.

[0030] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The accompanying drawings are part of the present invention and are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute an improper limitation of the present invention. Obviously, the drawings described below are only some embodiments. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the accompanying drawings:

[0032] Figure 1 This is a flow chart of a method for creating a reservoir by hydraulic fracturing based on a circulating liquid-electric effect according to the present invention;

[0033] Figure 2 It is a structural schematic diagram of the drilling and device of the present invention;

[0034] Figure 3 It is a schematic diagram of the structure inside the drilling well of the present invention.

[0035] Description of the drawings: 1. Injection well; 2. Middle well; 3. Production well; 4. Well to be drilled; 501. Water tank; 502. Water injection pipe; 503. High-pressure pump; 601. Power generation device; 602. Insulated energized wire; 603. Discharge pointer; 604. Control switch; 605. Thermoelectric exchanger; 701. Hydrophone; 702. Sensor; 703. Signal processor; 704. Microseismic monitoring device; 705. Water level monitoring device; 706. Computer; 707. Cable; 8. Water outlet; 9. Drilling direction; 10. Hot dry rock thermal reservoir.

[0036] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but are intended to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0038] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as “upper”, “lower”, “front”, “back”, “left”, “right”, “vertical”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0040] Example

[0041] As attached Figure 1-3As shown, the present invention provides a method for reservoir creation by hydraulic fracturing based on circulating liquid-electric effect, firstly, deep hot dry rock is fractured by hydraulic fracturing, and then an electric pulse fracturing device is used to expand the fractures and create secondary fractures, the method comprising, S1, determining the depth and range of the hot dry rock reservoir 10 according to geological conditions, and formulating a drilling layout plan: arranging the injection well 1, the middle well 2, and the production well 3 on both sides and the center of the development site, respectively, wherein the middle well 2 is located in the center of the development site, and the injection well 1 and the production well 3 are located on both sides of the development site, respectively.

[0042] In this embodiment, the drilling layout plan is determined specifically including: (1) collecting geological exploration reports, seismic interpretation data, logging data and existing drilling data of the target area to fully understand the stratigraphic structure, lithology distribution, tectonic stress field and reservoir characteristics of hot dry rock resources; and quantitatively analyzing the physical properties of hot dry rock such as density, porosity, permeability, mineral composition and thermal conductivity through laboratory testing or on-site rapid testing technology to provide a basis for subsequent design.

[0043] (2) Based on the results of geological surveys, accurately determine the depth and horizontal distribution range of hot dry rock reservoirs, identify favorable heat storage areas, and comprehensively consider factors such as heat reservoir thickness, heat reserves, permeability, and geological structure stability to define the most suitable development area.

[0044] (3) Drilling layout design: Injection wells are arranged at the edge of the thermal reservoir or at locations where fluids can be easily injected to ensure that the fluids can enter the reservoir evenly and effectively. Middle well 2, as a key point for monitoring and regulation, is arranged at the center or key area of ​​the thermal reservoir to monitor the fracturing effect and reservoir dynamic changes in real time. Production well 3 is arranged at a location in the thermal reservoir where fluids can easily converge and be produced, while taking into account the relative position relationship with injection well 1 and middle well 2 to optimize the fluid flow path and improve mining efficiency.

[0045] In a feasible implementation, the method further includes, S2, drilling well construction, the drilling well includes at least an injection well 1, a middle well 2 and a production well 3, and when the drilling construction reaches the hot dry rock thermal reservoir 10, the operation is stopped. The drilling is deep into the hot dry rock reservoir 10 to ensure that the injected liquid can effectively cover the entire mining area. During the drilling process, the operation is stopped when the construction reaches the target reservoir. In addition, a comprehensive assessment is made of the risks that may be encountered during the drilling process (such as blowout, well collapse, formation water, etc.), and corresponding emergency plans and response measures are formulated to ensure the safety of the drilling operation.

[0046] In a feasible embodiment, the method further includes, S3, starting the hydraulic fracturing device, performing high-pressure water injection fracturing on the injection well 1, the middle well 2 and the production well 3, and artificially creating a reservoir for the dense hot dry rock reservoir 10 to form a certain fracture network. Then continuously pump in the low-temperature heat-carrying medium, the low-temperature heat-carrying medium includes a medium for transferring heat energy in an environment below normal temperature 25°C, and the low-temperature heat-carrying medium is water or oil. During the high-pressure water injection fracturing, water level monitoring is performed simultaneously, and the step of performing water level monitoring includes: monitoring the water level in the well through the water level monitoring device 705 to ensure that during the water injection fracturing, the water level in the well continues to be greater than or equal to a preset first set value; ensuring that a certain water level is left in the well, so that the liquid-electric effect can be achieved and the electric spark source can be stimulated.

[0047] In this technical solution, the hydraulic fracturing device includes: a water tank 501, a water injection pipe 502, and a high-pressure pump 503. S3 specifically includes injecting a low-temperature heat-carrying medium into the water tank 501, pressurizing the low-temperature heat-carrying medium for a set time through the high-pressure pump 503, and then injecting it into the well through the water injection pipe 502.

[0048] In this technical solution, in S3, a microseismic monitoring device 704 is also included, which is used to monitor the crack expansion degree and impact range of the well after high-pressure water injection fracturing of the well, and then determine the location and drilling depth of the next well to be drilled according to the detection results.

[0049] Specifically, the detection results of the microseismic monitoring device 704 are used to determine the position and depth of the next drilling, which specifically includes the following steps: 1. First, a large number of vibration signals collected from the microseismic monitoring device 704 need to be sorted and preprocessed to remove noise and interference signals.

[0050] In this technical solution, based on the processed data, the cracks are reconstructed in three dimensions using crack imaging software. This process will generate a crack distribution map showing the geometry, location, length, direction and possible branching of the cracks.

[0051] 2. Fracture effect evaluation: Analyze the connectivity, density and distribution uniformity of the fractures, and evaluate their potential impact on heat energy transfer; determine the impact range of the fractures, that is, the breadth and depth of the fractures in the hot dry rock thermal reservoir 10; combine the preset fracturing target and actual monitoring results to determine whether the fracturing effect of the current drilling meets expectations.

[0052] 3. Determine the location and depth of the next well: Based on the fracture distribution map and effect evaluation results, analyze how to optimize the fracture network to improve the efficiency of heat extraction, including determining whether new wells are needed to fill the blank areas of the fracture network or enhance the connectivity of existing fractures: observe the main expansion direction of the fractures, and choose to arrange the next well in this direction or in a direction that intersects with it to maximize the connectivity of the fracture network. Consider the expansion distance and impact range of the fractures, and determine the reasonable distance between the next well and the current well: This distance ensures that the new well can form new effective fractures and connect with the existing fracture network.

[0053] In this technical solution, geological exploration data is combined to analyze the formation characteristics and rock properties at different depths, and the depth that is conducive to fracture expansion and heat energy extraction is selected. According to the fracture expansion depth of the current drilling, the starting depth and ending depth of the next drilling are determined, so that the new drilling and the existing fracture network overlap or intersect in depth.

[0054] In a feasible embodiment, the method further includes, S4, starting the electric pulse fracturing device, the electric pulse fracturing device includes a power generation device 601, a discharge cable, and a discharge pointer 603, the discharge cable is electrically connected to the discharge pointer 603; the discharge pointer 603 is symmetrically distributed with the center of the well as the symmetry axis, the electrode spacing of the topological parameter ranges from 5 to 15 cm, and the material is a copper rod, which is a non-refractory metal and a copper rod with a relatively low melting and boiling point, and can generate a stronger shock wave; the discharge cable is extended below the water level of the well, and the dry hot rock thermal reservoir 10 is discharged at least twice through the power generation device 601, the number of discharges each time is 30 to 100 times, the discharge frequency is 10 Hz to 30 Hz, and the voltage range of the electric pulse fracturing device is 200 KV to 500 KV. The dry hot rock thermal reservoir 10 is discharged until the middle well 2 is connected to the injection well 1, and the middle well 2 is connected to the production well 3.

[0055] In the technical solution, S4 also includes the following steps: S41, discharging the hot dry rock thermal reservoir 10 multiple times by the electric pulse fracturing device; S42, after each discharge, determining whether the middle well 2 is connected to the injection well 1, and whether the middle well 2 is connected to the production well 3;

[0056] S43, if after the discharge, the middle well 2 is connected to the injection well 1, and the middle well 2 is connected to the production well 3; then close the electric pulse fracturing device;

[0057] S44, if it is determined that the middle well 2 is not connected to the injection well 1, and the middle well 2 is not connected to the production well 3; the discharge operation is continued, and the judgment step of S42 is repeated after a time interval is set until it is confirmed that the middle well 2 is connected to the injection well 1, and the middle well 2 is connected to the production well 3. Then the electric pulse fracturing device is closed, and the two-stage discharge pointer 603 is moved to the next well 4 to be drilled.

[0058] In a feasible implementation manner, S5, after the middle well 2 and the injection well 1 are connected, and the middle well 2 and the production well 3 are connected, a low-temperature heat-carrying medium is injected into the injection well 1 into the hot dry rock thermal reservoir 10; wherein, the low-temperature heat-carrying medium flows through the hot dry rock thermal reservoir 10 and undergoes heat exchange through the thermoelectric exchanger 605, and after the heat exchange, part of the heat energy is converted into electrical energy by the thermoelectric exchanger 605, and the control switch 604 is automatically started to charge the power generation device 601, thereby realizing the circulating liquid-electric effect rock breaking, and hot water is extracted from the well for power generation or heating.

[0059] The above description is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this patent can make some changes or modifications to equivalent embodiments of equivalent changes by using the technical content suggested above without departing from the scope of the technical solution of the present invention. The implementation scheme in the above embodiment can also be further combined or replaced. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the solution of the present invention.

Claims

1. A method for reservoir generation by hydraulic fracturing based on circulating liquid-electric effect, characterized in that: The method comprises, S1. Determine the depth and range of the hot dry rock thermal reservoir (10) and determine a drilling arrangement plan according to the depth and range of the hot dry rock thermal reservoir (10); S2, drilling the well, the well at least comprising an injection well (1), a well (2) and a production well (3), and stopping the drilling operation when the well reaches the hot dry rock thermal reservoir (10); S3, starting the hydraulic fracturing device to perform high-pressure water injection fracturing on the wellbore; the hydraulic fracturing device comprises: a water tank (501), a water injection conduit (502), and a high-pressure pump (503); S3 specifically comprises injecting a low-temperature heat-carrying medium into the water tank (501), pressurizing the low-temperature heat-carrying medium through the high-pressure pump (503), and then injecting the low-temperature heat-carrying medium into the wellbore through the water injection conduit (502); S4, the electric pulse fracturing device comprises a power generation device (601), a discharge cable, and a discharge pointer (603), wherein the discharge cable is electrically connected to the discharge pointer (603), the electric pulse fracturing device is started, and the hot dry rock thermal reservoir (10) is discharged until the middle well (2) is connected to the injection well (1), and the middle well (2) is connected to the production well (3), the discharge cable is extended below the water level of the well, and the hot dry rock thermal reservoir (10) is discharged at least twice through the power generation device (601); S4 also includes the following steps: S41, discharging the hot dry rock thermal reservoir (10) at least twice by means of the electric pulse fracturing device; S42, after each discharge, determining whether the middle well (2) is connected to the injection well (1), and determining whether the middle well (2) is connected to the production well (3); S43, if the middle well (2) is connected to the injection well (1), and if it is determined that the middle well (2) is connected to the production well (3), shutting down the electric pulse fracturing device; S44, if the middle well (2) is not connected to the injection well (1), and the middle well (2) is not connected to the production well (3), then continue to perform the discharge operation, and repeat the judgment step of S42 after setting a time interval, until it is confirmed that the middle well (2) is connected to the injection well (1), and the middle well (2) is connected to the production well (3); S5, injecting a low-temperature heat-carrying medium into the injection well (1) into the hot dry rock thermal reservoir (10); The low-temperature heat-carrying medium flows through the hot dry rock thermal reservoir (10) to perform heat exchange through a heat-electricity exchanger (605), and hot water is extracted from the well for power generation or heating.

2. The method for creating reserves by hydraulic fracturing based on circulating liquid-electric effect according to claim 1, characterized in that: In S3, during the high-pressure water injection fracturing process, water level monitoring is performed simultaneously; The step of monitoring the water level comprises: monitoring the water level in the well by means of a water level monitoring device (705) to ensure that during the water injection and fracturing period, the water level in the well is continuously maintained at a value greater than or equal to a preset first set value.

3. The method for creating reserves by hydraulic fracturing based on circulating liquid-electric effect according to claim 2, characterized in that: In S3, a microseismic monitoring device (704) is also included, which is used to monitor the crack expansion degree and impact range of the well after high-pressure water injection fracturing is performed on the well, and then determine the location and drilling depth of the next well to be drilled according to the detection results.

4. The method for creating reserves by hydraulic fracturing based on circulating liquid-electric effect according to claim 1, characterized in that: The discharge pointers (603) are symmetrically distributed with the center of the well as the symmetry axis, and the electrode spacing of the topological parameter ranges from 5 cm to 15 cm.

5. The method for creating reserves by hydraulic fracturing based on circulating liquid-electric effect according to claim 1, characterized in that: The low-temperature heat-carrying medium includes a medium used to transfer heat energy under low-temperature conditions, and the low-temperature heat-carrying medium is water or oil.

6. The method for reservoir generation by hydraulic fracturing based on circulating liquid-electric effect according to any one of claims 1 to 5, characterized in that: The middle well (2) is located at the center of the development site, and the injection well (1) and the production well (3) are located on both sides of the development site respectively.