An intelligent control system and method for maintaining effective safety distance molding

By collecting and processing stamping product specification data, dynamic control of stamping distance and online quality monitoring are realized, which solves the problem of stamping that the existing system cannot adapt to products of different specifications, and improves the applicability and production efficiency of the stamping control system.

CN118584901BActive Publication Date: 2024-10-29TIANJIN KEDIAN PETROCHEMICAL TECH DEV CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411026570.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-29
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The existing forming intelligent control system cannot dynamically control the stamping distance online in real time during the stamping process, cannot process products of different specifications, and lacks online monitoring and evaluation of stamping product quality, which reduces the applicability of the system. .

Method used

By collecting the product specification data required by customers, performing data preprocessing and numerical processing, we generate standard specification data and stamping operation action distance data to achieve dynamic control of the stamping forming distance, and use ultrasonic thickness gauges and data recognition algorithms to determine the thickness error of stamped finished products. Match, generate quality analysis results, and feed them back to the quality monitoring center in real time.

Benefits of technology

It realizes flexible control of the stamping forming operation distance according to products of different specifications, improves the applicability and production efficiency of the stamping forming control system, and improves the intelligence and reliability of the system through online quality monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118584901B_ABST
    Figure CN118584901B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of stamping control, and discloses an intelligent control system and method for maintaining an effective safety distance for forming; the system comprises a stamping product data acquisition module, a stamping distance measurement and stamping execution module, and a stamping product stamping quality monitoring module; by scientifically presetting the total stroke parameters of the no-load stamping operation of the stamping equipment and the standard customer-required stamping product specification parameters for numerical processing, the stamping operation action distance parameters of the stamping equipment are accurately measured, thereby realizing flexible control of the stamping operation action distance according to the stamping product specifications, improving the safety and applicability of the stamping operation, scientifically and autonomously executing product stamping operations according to different stamping product specifications, and improving the functional diversity and production efficiency of the stamping control system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of stamping forming control, and in particular to an intelligent control system and method for forming by maintaining an effective safety distance. Background Art

[0002] The forming intelligent control system is the stamping processing automation system, which includes the transportation of raw materials, stamping process and inspection, replacement and installation of stamping dies, transportation and treatment of waste materials and other links. When designing the stamping processing automation system, a reasonable automated stamping processing system should be determined based on the shape, size, precision requirements, production batch and raw material form of the processed product. According to the shape, size, precision requirements, production batch and raw material form of the processed product, the feeding device mode, automation mode and degree of automation are determined. Among them, the feeding device uses different types of feeding devices according to different raw materials. For coils, strips and sheets: when the processed raw materials are coils, strips and sheets, a one-time processing feeding device can be selected. The one-time processing feeding device has roller type, clamping type and hook type. Its auxiliary devices include feeding devices, correction devices, etc., including brackets, coiling machines, correction machines and other devices. For blanks and semi-finished blanks: When the processed raw materials are blanks or semi-finished blanks after blanking, a secondary processing feeding device can be selected. The feeding of secondary processing generally uses a magazine and a hopper to send the blank to the processing position of the mold at a certain time interval and a certain working rhythm. Before the blank is sent into the mold, it is also necessary to equip it with additional mechanisms such as sorting and orientation for pre-processing. The secondary processing feeding device has many forms such as gate type, turntable type, swing arm type, vibration type, etc. After the stamping process is completed, a discharge device and a material return device should also be set to remove the stamping parts and waste from the mold in time. These removal functions are usually achieved by the weight of the stamping parts themselves, mechanical chip removal devices, pneumatic or hydraulic devices, and manipulators. In the reciprocating movement of the press slide, the processed raw materials or single blanks should be sent to the working position determined by the mold within a certain time to complete the processing and removal of the parts. The feeding, feeding and removal of the entire project require complete coordination and synchronization. The existing intelligent forming control system can only use a fixed stamping distance to perform stamping operations during the stamping process. It cannot dynamically control the stamping distance in real time to manufacture stamping products of different specifications according to the required specifications of the stamping products, nor can it monitor and evaluate the stamping quality of the stamping products online. This also reduces the applicability of the stamping process control system.

[0003] The Chinese invention patent with publication number CN106020143B discloses a distributed control system for a glass magnesium board production line and a control method thereof. The distributed control system for a glass magnesium board production line includes an upper computer IPC, a template on-line control unit, a plate conveying control unit, a batching and mixing control unit, a plate forming control unit, a plate cutting control unit, and a plate cage control unit. The upper computer IPC serves as the master station of Modbus, and each control unit serves as a slave station of Modbus, which together constitutes a distributed control system for a glass magnesium board production line. The upper computer IPC is responsible for data exchange between the control units to ensure the coordinated work of the control units; each control unit includes a PLC and a touch screen, and realizes control of each unit under the coordination of the upper computer IPC. The present invention adopts distributed control, and integrates industrial bus technology, advanced sensor technology, PID technology, remote monitoring and other technologies into the control system, with a high degree of automation. The above technical scheme cannot perform dynamic online forming processing on glass magnesium boards of different specifications during the forming process of glass magnesium boards, and can only form glass magnesium boards of the same specifications. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In order to solve the problem that the above-mentioned existing intelligent forming control system can only use a fixed stamping distance to perform stamping operations during the stamping forming process, and cannot dynamically control the stamping distance in real time according to the required stamping product specifications to manufacture stamping products of different specifications, nor can it monitor and evaluate the stamping quality of stamping products online; it also reduces the applicability of the stamping forming process control system, the above purpose of online collection of stamping product specification parameters, scientific analysis of stamping distance parameters, dynamic control of the stamping distance of stamping equipment in stamping processing, online collection of stamping product specifications, and intelligent evaluation of the quality of stamping products is achieved.

[0006] (II) Technical solution

[0007] The present invention is implemented by the following technical solution: a method for maintaining an effective safety distance for forming intelligent control, the method comprising the following steps:

[0008] S1. Collect the stamping product specification data required by customers;

[0009] S2, preprocessing the stamping product specification data required by the customer to generate the standard stamping product specification data required by the customer and outputting it;

[0010] S3, numerically processing and measuring the stamping product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping equipment to generate the stamping operation distance data of the stamping equipment;

[0011] S4, performing product stamping and forming operations according to the stamping and forming product specification data required by the standard customer and the stamping operation action distance data of the stamping and forming equipment;

[0012] S5. When the stamping operation of the product is completed, the stamping thickness data of the stamping product is collected;

[0013] S6, performing numerical subtraction measurement on the stamping thickness data of the stamping finished product and the specification data of the stamping product required by the standard customer to generate stamping thickness error data of the stamping finished product;

[0014] S7. Use a data recognition algorithm to match the stamping thickness error data of the stamped finished product with the stamping thickness error data interval of the standard stamped finished product to perform numerical matching of the stamping thickness error of the stamped finished product. Based on the numerical matching result of the stamping thickness error of the stamped finished product, generate quality analysis result data of the stamped finished product, and push the quality analysis result data of the stamped finished product back to the quality monitoring center of the stamped finished product.

[0015] Preferably, the steps of collecting the stamping product specification data required by the customer are as follows:

[0016] S11. Collect the stamping product specification data required by the customer online through the ERP management platform and collect and generate the stamping product specification data set A required by the customer. The stamping product specification data required by the customer represents the stamping thickness data of the finished product after the stamping process required by the customer.

[0017] Preferably, the steps of preprocessing the stamping product specification data required by the customer to generate the standard stamping product specification data required by the customer and outputting the data are as follows:

[0018] S21, using the wavelet transform method to perform data noise reduction on the customer required stamping product specification data in the customer required stamping product specification data set A to generate a standard customer required stamping product specification data set A'=(a'1, ..., a' m ,…,a' σ ), m=1,2,3,...,σ; where a' m represents the specification data of the stamping products required by the standard customer corresponding to the stamping products required by the mth standard customer, and σ represents the maximum number of stamping products required by the standard customer;

[0019] S22, outputting the data set A' of stamping product specifications required by the standard customer.

[0020] Preferably, the steps of numerically processing and measuring the stamping product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping equipment to generate the stamping operation distance data of the stamping equipment are as follows:

[0021] S31, establishing total stroke data K of no-load stamping operation of stamping forming equipment; the total stroke data of no-load stamping operation of stamping forming equipment represents the maximum stroke of stamping operation of dynamic stamping die end of stamping forming equipment in no-load state;

[0022] S32, the standard customer required stamping product specification data a' in the standard customer required stamping product specification data set A' m According to the standard customer's required stamping product quantity m and the total stroke data K of the no-load stamping operation of the stamping equipment, numerical subtraction and absolute value processing are performed to generate the stamping operation distance data set A"=(a'1',…,a" m ,…,a” σ ), where a” m Indicates the stamping product specification data a' required by the standard customer m The corresponding stamping operation distance data of stamping forming equipment, a” m =|a' m -K|; The stamping operation action distance data of the stamping forming equipment represents the maximum action distance of the stamping operation of the dynamic stamping die end when the stamping forming equipment performs the stamping forming operation.

[0023] Preferably, the steps of performing the product stamping operation according to the stamping product specification data required by the standard customer and the stamping operation action distance data of the stamping equipment are as follows:

[0024] S41, the stamping and forming equipment is based on the stamping and forming product specification data a' required by the standard customer in the stamping and forming product specification data set A'. m and the stamping operation distance data set A of ... m Carry out product stamping operations in an orderly manner according to the quantity m of stamping products required by standard customers.

[0025] Preferably, when the product stamping operation is completed, the operation steps for collecting the stamping thickness data of the stamping product are as follows:

[0026] S51, when the stamping operation of the product is completed, the stamping thickness data of the stamping product completed by the stamping process is collected online by an ultrasonic thickness gauge and a stamping thickness data set B of the stamping product is generated.m ,…,b σ ), where b m Indicates the standard stamping product specification data required by customers a' m Corresponding stamping thickness data of stamping products.

[0027] Preferably, the steps of performing numerical subtraction measurement on the stamping thickness data of the stamping finished product and the specification data of the stamping product required by the standard customer to generate the stamping thickness error data of the stamping finished product are as follows:

[0028] S61, the stamping thickness data b of the stamping finished product in the stamping thickness data set B m According to the stamping product quantity number m required by the standard customer and the stamping product specification data a' required by the standard customer in the stamping product specification data set A' m Perform numerical difference measurement to generate the stamping thickness error data set C = (c1,…,c m ,…,c σ ), where c m Indicates the stamping thickness data b of the stamping product m Stamping product specifications required by standard customers a' m The corresponding stamping thickness error data of the stamping finished product;

[0029] The punching thickness error data c of the punching finished product m The value can be negative, zero or positive; when the stamping thickness error data c of the stamping product m A negative value indicates the stamping thickness data b of the stamping product. m Smaller than the standard customer required stamping product specification data a' m ;

[0030] When the stamping thickness error data c m A value of zero indicates the stamping thickness data b of the stamping product m Equal to the standard customer required stamping product specification data a' m ;

[0031] When the stamping thickness error data c m A positive value indicates the stamping thickness data b of the stamping product. m Greater than the standard customer required stamping product specification data a' m .

[0032] Preferably, the data recognition algorithm is used to match the stamping thickness error data of the stamping formed product with the stamping thickness error data interval of the standard stamping formed product to the stamping thickness error of the stamping formed product, and according to the stamping thickness error value matching result of the stamping formed product, the stamping formed product quality analysis result data is generated, and the stamping formed product quality analysis result data is pushed and fed back to the stamping formed product quality monitoring center. The operation steps are as follows:

[0033] S71, establishing a standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming, wherein -d1 represents the minimum value of the stamping thickness error data of the standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming, and d2 represents the maximum value of the stamping thickness error data of the standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming;

[0034] S72, using a data recognition algorithm to identify the stamping thickness error data c of the stamping thickness error data set C of the stamping finished product m The stamping thickness error value of the stamping formed product is matched with the standard stamping formed product stamping thickness error data of the standard stamping formed product stamping thickness error data interval [-d1, ..., d2], and the data recognition algorithm executes the stamping thickness error data of the stamping formed product c m The specific operation steps for matching the stamping thickness error value of the stamping formed product with the stamping thickness error data of the standard stamping formed product in the stamping thickness error data interval [-d1, ..., d2] are as follows:

[0035] S721, initialization, assuming that in the σ-dimensional stamping thickness error data set C search space, the error value search cheetah initialization position is described as:

[0036] Where w i,j The j-th dimension position of the cheetah in the search space of the stamping thickness error data set C for the i-th head error value search, τ is the upper and lower limits of the j-th dimension search space, rand is a random number between 0 and 1, and R is set to the maximum number of iterations;

[0037] S722, complete the initialization and execute the search strategy to search for prey. The error value search cheetah performs a full range scan or active search in its territory or surrounding area to find the prey. That is, the error value search cheetah searches for the stamping thickness error data c of the stamping finished product in the search space of the stamping thickness error data set C of the stamping finished product. mAnd numerically match it with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product; the search strategy is mathematically described as In the formula The j-dimensional position of the cheetah in the r+1th iteration of the i-th head error value search is the position in the search space of the stamping thickness error data set C of the stamping finished product. The j-dimensional position of the cheetah in the r-th iteration for the numerical search of the error value of the i-th head, that is, the position in the search space of the stamping thickness error data set C of the stamping finished product, Search for the random number with normal distribution in the jth dimension of the cheetah for the error value of the i-th head, is the search step length of the jth dimension of the rth iteration of the cheetah for the i-th head error numerical search, and R is the maximum number of iterations of the algorithm;

[0038] S723, the search for prey is performed using a sit-and-wait strategy. In the search mode, the prey may be exposed to the error value search cheetah's field of view, that is, the stamping thickness error data c of the stamping finished product cannot be searched out in the stamping thickness error data set C search space. m The cheetah adopts a sit-and-wait ambush strategy to approach the prey. The sit-and-wait ambush strategy includes lying on the ground or hiding in the bushes. The strategy is mathematically described as

[0039] S724, execute the sit-and-wait strategy to approach the prey and attack the prey according to the attack strategy. In the algorithm, each error value search cheetah can adjust its position according to the position of the escaping prey, the leading error value search cheetah or the nearby error value search cheetah to obtain the best attack position, that is, search for different stamping thickness error data c of stamping finished product in the stamping thickness error data set C search space m The attack strategy is numerically matched with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product. The attack strategy is mathematically described as Where υ i,j Search the cheetah's j-th dimension steering factor for the i-th head error value; The j-dimensional interaction factor of the r-th iteration of the i-th error value search cheetah reflects the interaction between error value search cheetahs or between error value search cheetahs and the leading error value search cheetah;

[0040] S725, execute S722, S723, S724 until the maximum number of iterations R is met, and output the stamping thickness error data c of the stamping product mThe result of numerical matching with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product;

[0041] S73, outputting the stamping thickness error data c of the stamping product in step S725 m The results of numerical matching are performed with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping products to generate the stamping product quality analysis result data set E = (e1,…,e m ,…,e σ ), where e m Indicates the stamping thickness data b of the stamping product m The stamping finished product quality analysis result data corresponding to the stamping finished product;

[0042] When c m ∈[-d1,…,d2], indicating that the stamping product meets the standard stamping thickness error requirements, and the stamping product quality analysis result data e is output m To be qualified;

[0043] when If the stamping product does not meet the standard stamping thickness error requirements, the stamping product quality analysis result data e will be output. m for failure to meet the standards;

[0044] S74, pushing the stamping finished product quality analysis result data set E to the stamping finished product quality monitoring center through the Internet of Things communication network.

[0045] An effective safety distance forming intelligent control system for realizing the effective safety distance forming intelligent control method, the system includes a stamping forming product data acquisition module, a stamping forming distance measurement and stamping forming execution module, and a stamping forming finished product stamping quality monitoring module;

[0046] The stamping product data acquisition module includes a stamping product specification acquisition unit required by the customer, a stamping product specification preprocessing unit required by the customer, and a stamping product specification output unit required by the customer;

[0047] The customer-required stamping product specification collection unit collects the customer-required stamping product specification data through the ERP management platform; the customer-required stamping product specification preprocessing unit performs data preprocessing on the customer-required stamping product specification data to generate standard customer-required stamping product specification data; the customer-required stamping product specification output unit is used to output standard customer-required stamping product specification data;

[0048] The stamping distance metering and stamping execution module includes a stamping equipment no-load stamping operation action total stroke storage unit, a stamping equipment stamping operation action distance metering unit, and a product stamping operation execution unit;

[0049] The no-load stamping operation action total stroke storage unit of the stamping and forming equipment is used to store the no-load stamping operation action total stroke data of the stamping and forming equipment; the stamping operation action distance metering unit of the stamping and forming equipment performs numerical processing and metering on the stamping and forming product specification data required by the standard customer and the no-load stamping operation action total stroke data of the stamping and forming equipment to generate the stamping operation action distance data of the stamping and forming equipment; the product stamping and forming operation execution unit executes the product stamping and forming operation according to the stamping and forming product specification data required by the standard customer and the stamping operation action distance data of the stamping and forming equipment;

[0050] The stamping quality monitoring module for stamping finished products includes a stamping thickness collection unit for stamping finished products, a stamping thickness error measurement unit for stamping finished products, a standard stamping thickness error interval unit for stamping finished products, a stamping quality analysis unit for stamping finished products, and a stamping quality analysis result feedback unit for stamping finished products;

[0051] The stamping thickness collection unit for stamping formed finished products collects the stamping thickness data of stamping formed finished products through an ultrasonic thickness gauge; the stamping thickness error measurement unit for stamping formed finished products performs numerical subtraction measurement on the stamping thickness data of the stamping formed finished products and the standard stamping formed product specification data required by the customer to generate the stamping thickness error data of the stamping formed finished products; the standard stamping thickness error interval unit for stamping formed finished products is used to store the stamping thickness error data interval of the standard stamping formed finished products; the stamping formed finished product quality analysis unit uses a data recognition algorithm to match the stamping thickness error data of the stamping formed finished products with the stamping thickness error data interval of the standard stamping formed finished products, and generates the stamping formed finished product quality analysis result data based on the stamping thickness error numerical matching result of the stamping formed finished products; the stamping formed finished product quality analysis result feedback unit pushes the stamping formed finished product quality analysis result data to the stamping formed finished product quality monitoring center.

[0052] (III) Beneficial effects

[0053] The present invention provides an intelligent control system and method for maintaining an effective safety distance.

[0054] Beneficial effects:

[0055] 1. Through the stamping product specification collection unit required by customers, the ERP management platform is used to accurately collect the stamping product specification parameters required by customers online, providing data support for the dynamic and scientific control of the stamping distance of the stamping equipment; the stamping product specification preprocessing unit required by customers and the stamping product specification output unit required by customers cooperate with each other to perform data noise reduction preprocessing on the stamping product specification parameters required by customers, thereby improving the authenticity of the stamping product specification parameters required by customers, automatically outputting the generated standard stamping product specification parameters required by customers, and improving the digital parameter collection of the stamping control operation process.

[0056] 2. Through the cooperation between the total stroke storage unit of the no-load stamping operation action of the stamping forming equipment and the stamping operation action distance metering unit of the stamping forming equipment, the total stroke parameters of the no-load stamping operation action of the stamping forming equipment are scientifically preset and numerically processed with the standard stamping product specification parameters required by the customer, and the stamping operation action distance parameters of the stamping forming equipment are accurately measured, so as to realize the flexible control of the stamping operation action distance according to the specifications of the stamping forming products, thereby improving the safety and applicability of the stamping forming operation; the product stamping forming operation execution unit scientifically and independently executes the product stamping operation according to the specifications of different stamping forming products, thereby improving the functional diversity and production efficiency of the stamping forming control system.

[0057] 3. Through the cooperation between the stamping thickness collection unit of the stamping finished product and the stamping thickness error measurement unit of the stamping finished product, the ultrasonic thickness gauge is used to collect the stamping thickness parameters of the stamping finished product online, so as to realize the online acquisition of the specification parameters of the stamping finished product; at the same time, the stamping thickness parameters of the stamping finished product are numerically subtracted from the specification parameters of the stamping product required by the standard customer, and the stamping thickness error parameters of the stamping finished product are accurately calculated to realize the precise measurement of the specification error of the stamping finished product; the standard stamping thickness error interval unit of the stamping finished product and the stamping finished product quality analysis unit cooperate with each other, and the preset standard stamping thickness error data interval of the stamping finished product is combined with the intelligent recognition algorithm to perform numerical matching with the stamping thickness error data of the stamping finished product, and the quality analysis result parameters of the stamping finished product are intelligently generated to realize accurate and intelligent evaluation of the quality of the stamping finished product; the stamping finished product quality analysis result feedback unit feeds back the quality analysis result data of the stamping finished product to the stamping finished product quality monitoring center through the Internet of Things communication network, so as to realize efficient and scientific quality monitoring of the stamping finished product and improve the intelligence and reliability of the stamping control system. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 A schematic diagram of a module of an intelligent control system for maintaining an effective safety distance provided by the present invention;

[0059] Figure 2The present invention provides a flow chart of an intelligent control method for maintaining an effective safety distance for molding. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] The embodiments of the intelligent control system and method for maintaining an effective safety distance are as follows:

[0062] See also Figure 1 - Figure 2 , a method for maintaining an effective safety distance for forming intelligent control, the method comprising the following steps:

[0063] S1. Collect the stamping product specification data required by customers;

[0064] S2. Preprocess the data of stamping product specifications required by customers to generate and output the data of stamping product specifications required by standard customers;

[0065] S3, numerically processing and measuring the stamping product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping equipment to generate the stamping operation distance data of the stamping equipment;

[0066] S4. Perform product stamping operations according to the stamping product specification data required by the standard customer and the stamping operation distance data of the stamping equipment;

[0067] S5. When the stamping operation of the product is completed, the stamping thickness data of the stamping product is collected;

[0068] S6, performing numerical subtraction measurement on the stamping thickness data of the stamping finished product and the specification data of the stamping product required by the standard customer to generate the stamping thickness error data of the stamping finished product;

[0069] S7. Use data recognition algorithm to match the stamping thickness error data of the stamped finished product with the stamping thickness error data interval of the standard stamped finished product. Generate stamping finished product quality analysis result data based on the stamping thickness error value matching result of the stamped finished product, and push the stamping finished product quality analysis result data back to the stamping finished product quality monitoring center.

[0070] For further information, see Figure 1 - Figure 2The steps to collect the stamping product specification data required by customers are as follows:

[0071] S11. Collect the stamping product specification data required by the customer online through the ERP management platform and collect and generate the stamping product specification data set A required by the customer. The stamping product specification data required by the customer represents the stamping thickness data of the finished product after the stamping process required by the customer.

[0072] The steps for preprocessing the stamping product specification data required by the customer to generate the standard stamping product specification data required by the customer and outputting it are as follows:

[0073] S21, using the wavelet transform method to perform data noise reduction on the stamping product specification data required by the customer in the stamping product specification data set A, and then generate the standard stamping product specification data set A'=(a'1, ..., a' m ,…,a' σ ), m=1,2,3,...,σ; where a' m represents the specification data of the stamping products required by the standard customer corresponding to the stamping products required by the mth standard customer, and σ represents the maximum number of stamping products required by the standard customer;

[0074] S22, outputting data of the stamping product specification data set A' required by standard customers.

[0075] Through the stamping product specification collection unit required by customers, the ERP management platform is used to accurately collect the stamping product specification parameters required by customers online, providing data support for the dynamic and scientific control of the stamping distance of the stamping equipment; the stamping product specification preprocessing unit required by customers and the stamping product specification output unit required by customers cooperate with each other to perform data noise reduction preprocessing on the stamping product specification parameters required by customers, thereby improving the authenticity of the stamping product specification parameters required by customers, automatically outputting the generated standard stamping product specification parameters required by customers, and improving the digital parameter collection of the stamping control operation process.

[0076] For further information, see Figure 1 - Figure 2 The steps for numerically processing and measuring the stamping product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping equipment to generate the stamping operation distance data of the stamping equipment are as follows:

[0077] S31, establishing the total stroke data K of the no-load stamping operation of the stamping forming equipment; the total stroke data of the no-load stamping operation of the stamping forming equipment represents the maximum stroke of the stamping operation of the dynamic stamping die end of the stamping forming equipment in the no-load state;

[0078] S32, the standard customer required stamping product specification data a' in the standard customer required stamping product specification data set A' m According to the standard customer's required stamping product quantity m and the total stroke data K of the stamping equipment's no-load stamping operation, the numerical difference is taken and the absolute value is taken to process and measure the stamping equipment's stamping operation distance data set A"=(a'1',…,a" m ,…,a” σ ), where a” m Indicates the standard stamping product specification data required by customers a' m The corresponding stamping operation distance data of stamping forming equipment, a” m =|a' m -K|; The stamping operation action distance data of the stamping forming equipment indicates the maximum action distance of the stamping operation at the dynamic stamping die end of the stamping forming equipment during the stamping forming operation.

[0079] The steps for performing product stamping operations based on the stamping product specification data required by the standard customer and the stamping operation distance data of the stamping equipment are as follows:

[0080] S41, stamping equipment according to the standard customer required stamping product specification data a' in the standard customer required stamping product specification data set A' m and the stamping operation distance data set A of the stamping equipment, the stamping operation distance data a” of the stamping equipment m Carry out product stamping operations in an orderly manner according to the quantity m of stamping products required by standard customers.

[0081] Through the cooperation between the no-load stamping operation action total stroke storage unit of the stamping equipment and the stamping operation action distance metering unit of the stamping equipment, the no-load stamping operation action total stroke parameters of the stamping equipment are scientifically preset and numerically processed with the standard customer required stamping product specification parameters, and the stamping operation action distance parameters of the stamping equipment are accurately measured, thereby realizing flexible control of the stamping operation action distance according to the stamping product specifications, thereby improving the safety and applicability of the stamping operation; the product stamping operation execution unit executes the product stamping operation scientifically and independently according to the specifications of different stamping products, thereby improving the functional diversity and production efficiency of the stamping control system.

[0082] For further information, see Figure 1 - Figure 2 When the stamping operation of the product is completed, the steps for collecting the stamping thickness data of the stamping product are as follows:

[0083] S51, when the stamping operation of the product is completed, the stamping thickness data of the stamping product completed by the stamping process is collected online by an ultrasonic thickness gauge and a stamping thickness data set B of the stamping product is generated. m ,…,b σ ), where b m Indicates the standard stamping product specification data required by customers a' m Corresponding stamping thickness data of stamping products.

[0084] The steps for numerically subtracting the stamping thickness data of the stamped finished product from the standard stamping product specification data required by the customer to generate the stamping thickness error data of the stamped finished product are as follows:

[0085] S61, the stamping thickness data b of the stamping finished product in the stamping thickness data set B m According to the stamping product quantity number m required by the standard customer and the stamping product specification data a' required by the standard customer in the stamping product specification data set A' m Perform numerical difference measurement to generate the stamping thickness error data set C = (c1,…,c m ,…,c σ ), where c m Indicates the stamping thickness data b of the stamping product m Stamping product specifications required by standard customers a' m The corresponding stamping thickness error data of the stamping finished product;

[0086] Stamping thickness error data of stamping products c m The value can be negative, zero or positive; when the stamping thickness error data c of the stamping product m A negative value indicates the stamping thickness data b of the stamping product m Smaller than the standard customer required stamping product specification data a' m ;

[0087] When the stamping thickness error data of the stamping product is c m A value of zero indicates the stamping thickness data b of the stamping product m Equal to the standard stamping product specification data a' required by customers m ;

[0088] When the stamping thickness error data of the stamping product is c m A positive value indicates the stamping thickness data b of the stamping product. m Larger than the standard customer required stamping product specifications data a' m .

[0089] The stamping thickness error data of the stamped finished product is matched with the stamping thickness error data interval of the standard stamped finished product by using the data recognition algorithm. According to the stamping thickness error value matching result of the stamped finished product, the stamped finished product quality analysis result data is generated. The operation steps of pushing the stamped finished product quality analysis result data back to the stamped finished product quality monitoring center are as follows:

[0090] S71, establishing a standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming products, wherein -d1 represents the minimum value of the standard stamping thickness error data for finished stamping forming products in the standard stamping thickness error data interval [-d1, ..., d2], and d2 represents the maximum value of the standard stamping thickness error data for finished stamping forming products in the standard stamping thickness error data interval [-d1, ..., d2];

[0091] S72, using a data recognition algorithm to identify the stamping thickness error data c of the stamping thickness error data set C of the stamping finished product m The stamping thickness error value of the stamping formed product is matched with the standard stamping thickness error data of the standard stamping formed product in the stamping thickness error data interval [-d1,…,d2], and the data recognition algorithm is executed to identify the stamping thickness error data of the stamping formed product c m The specific operation steps for matching the stamping thickness error value of the stamping formed product with the stamping thickness error data of the standard stamping formed product in the stamping thickness error data interval [-d1,…,d2] are as follows:

[0092] S721, initialization, assuming that in the σ-dimensional stamping thickness error data set C search space, the error value search cheetah initialization position is described as:

[0093] Where w i,j The j-th dimension position of the cheetah in the search space of the stamping thickness error data set C for the i-th head error value search, τ is the upper and lower limits of the j-th dimension search space, rand is a random number between 0 and 1, and R is set to the maximum number of iterations;

[0094] S722, complete the initialization and execute the search strategy to search for prey. The error value search cheetah performs a full range scan or active search in its territory or surrounding area to find the prey. That is, the error value search cheetah searches for the stamping thickness error data c of the stamping finished product in the search space of the stamping thickness error data set C of the stamping finished product. mAnd numerically match it with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product; the search strategy is mathematically described as In the formula The j-dimensional position of the cheetah in the r+1th iteration of the i-th head error value search is the position in the search space of the stamping thickness error data set C of the stamping finished product. The j-dimensional position of the cheetah in the r-th iteration for the numerical search of the error value of the i-th head, that is, the position in the search space of the stamping thickness error data set C of the stamping finished product, Search for the random number with normal distribution in the jth dimension of the cheetah for the error value of the i-th head, is the search step length of the jth dimension of the rth iteration of the cheetah for the i-th head error numerical search, and R is the maximum number of iterations of the algorithm;

[0095] S723, the search for prey is performed using a sit-and-wait strategy. In the search mode, the prey may be exposed to the error value search cheetah's field of view, that is, the stamping thickness error data c of the stamping finished product cannot be searched out in the stamping thickness error data set C search space. m The cheetah adopts a sit-and-wait ambush strategy to approach its prey. The sit-and-wait ambush strategy includes lying on the ground or hiding in the bushes. The strategy is mathematically described as

[0096] S724, execute the sit-and-wait strategy to approach the prey and attack the prey according to the attack strategy. In the algorithm, each error value search cheetah can adjust its position according to the position of the escaping prey, the leading error value search cheetah or the nearby error value search cheetah to obtain the best attack position, that is, search for different stamping thickness error data c of stamping finished product in the stamping thickness error data set C search space m The attack strategy is numerically matched with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product. The attack strategy is mathematically described as Where υ i,j Search the cheetah's j-th dimension steering factor for the i-th head error value; The j-dimensional interaction factor of the r-th iteration of the i-th error value search cheetah reflects the interaction between error value search cheetahs or between error value search cheetahs and the leading error value search cheetah;

[0097] S725, execute S722, S723, S724 until the maximum number of iterations R is met, and output the stamping thickness error data c of the stamping product m The result of numerical matching with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product;

[0098] S73, outputting the stamping thickness error data c of the stamping product according to step S725 m The results of numerical matching are performed with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping products to generate the stamping product quality analysis result data set E = (e1,…,e m ,…,e σ ), where e m Indicates the stamping thickness data b of the stamping product m The stamping finished product quality analysis result data corresponding to the stamping finished product;

[0099] When c m ∈[-d1,…,d2], indicating that the stamping product meets the standard stamping thickness error requirements, and the stamping product quality analysis result data e is output m To be qualified;

[0100] when If the stamping product does not meet the standard stamping thickness error requirements, the stamping product quality analysis result data e will be output. m for failure to meet the standards;

[0101] S74. Push the stamping finished product quality analysis result data set E to the stamping finished product quality monitoring center through the Internet of Things communication network.

[0102] Through the cooperation between the stamping thickness collection unit of the stamping finished product and the stamping thickness error measurement unit of the stamping finished product, the ultrasonic thickness gauge is used to collect the stamping thickness parameters of the stamping finished product online, so that the specification parameters of the stamping finished product can be obtained online; at the same time, the stamping thickness parameters of the stamping finished product are numerically subtracted from the specification parameters of the stamping product required by the standard customer, and the stamping thickness error parameters of the stamping finished product are accurately calculated to achieve accurate measurement of the specification error of the stamping finished product; the standard stamping thickness error interval unit of the stamping finished product and the stamping finished product quality analysis unit cooperate with each other, and the preset standard stamping thickness error data interval of the stamping finished product is combined with the intelligent recognition algorithm to perform numerical matching with the stamping thickness error data of the stamping finished product, and the quality analysis result parameters of the stamping finished product are intelligently generated to achieve accurate and intelligent evaluation of the quality of the stamping finished product; the stamping finished product quality analysis result feedback unit feeds back the quality analysis result data of the stamping finished product to the stamping finished product quality monitoring center through the Internet of Things communication network, so as to achieve efficient and scientific quality monitoring of the stamping finished product and improve the intelligence and reliability of the stamping control system.

[0103] An effective safety distance forming intelligent control system that realizes an effective safety distance forming intelligent control method, the system includes a stamping forming product data acquisition module, a stamping forming distance measurement and stamping forming execution module, and a stamping forming finished product stamping quality monitoring module;

[0104] The stamping product data acquisition module includes a stamping product specification acquisition unit required by customers, a stamping product specification preprocessing unit required by customers, and a stamping product specification output unit required by customers;

[0105] The customer-required stamping product specification collection unit collects the customer-required stamping product specification data through the ERP management platform; the customer-required stamping product specification preprocessing unit performs data preprocessing on the customer-required stamping product specification data to generate standard customer-required stamping product specification data; the customer-required stamping product specification output unit is used to output standard customer-required stamping product specification data;

[0106] The stamping distance metering and stamping execution module includes a total stroke storage unit for no-load stamping operation of the stamping equipment, a distance metering unit for stamping operation of the stamping equipment, and a product stamping operation execution unit;

[0107] The total stroke storage unit of the no-load stamping operation of the stamping forming equipment is used to store the total stroke data of the no-load stamping operation of the stamping forming equipment; the stamping operation distance measurement unit of the stamping forming equipment performs numerical processing and measurement on the stamping forming product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping forming equipment to generate the stamping operation distance data of the stamping forming equipment; the product stamping forming operation execution unit executes the product stamping forming operation according to the stamping forming product specification data required by the standard customer and the stamping operation distance data of the stamping forming equipment;

[0108] The stamping quality monitoring module of the stamping finished product includes a stamping thickness collection unit of the stamping finished product, a stamping thickness error measurement unit of the stamping finished product, a standard stamping thickness error interval unit of the stamping finished product, a stamping finished product quality analysis unit, and a stamping finished product quality analysis result feedback unit;

[0109] The stamping thickness collection unit of the stamping finished product collects the stamping thickness data of the stamping finished product through an ultrasonic thickness gauge; the stamping thickness error measurement unit of the stamping finished product performs numerical subtraction measurement on the stamping thickness data of the stamping finished product and the standard stamping product specification data required by the customer to generate the stamping thickness error data of the stamping finished product; the standard stamping thickness error interval unit of the stamping finished product is used to store the stamping thickness error data interval of the standard stamping finished product; the stamping finished product quality analysis unit uses a data recognition algorithm to match the stamping thickness error data of the stamping finished product with the stamping thickness error data interval of the standard stamping finished product, and generates the stamping finished product quality analysis result data based on the stamping thickness error numerical matching result of the stamping finished product; the stamping finished product quality analysis result feedback unit pushes the stamping finished product quality analysis result data to the stamping finished product quality monitoring center.

[0110] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for maintaining an effective safety distance for intelligent molding control, characterized in that: The method comprises the following steps: S1. Collect the stamping product specification data required by the customer, and S1 includes the following steps: S11, collecting the stamping product specification data required by the customer online through the ERP management platform and collecting and generating the stamping product specification data set A required by the customer, wherein the stamping product specification data required by the customer represents the stamping thickness data of the finished product after the stamping process required by the customer; S2, preprocessing the stamping product specification data required by the customer to generate the standard stamping product specification data required by the customer and outputting it, wherein S2 includes the following steps: S21, using the wavelet transform method to perform data noise reduction on the customer required stamping product specification data in the customer required stamping product specification data set A to generate a standard customer required stamping product specification data set A'=(a'1, ..., a' m ,…,a' σ ), m=1,2,3,...,σ; where a' m represents the specification data of the stamping products required by the standard customer corresponding to the stamping products required by the mth standard customer, and σ represents the maximum number of stamping products required by the standard customer; S22, outputting data of the stamping product specification data set A' required by the standard customer; S3, numerically processing and measuring the stamping product specification data required by the standard customer and the total stroke data of the no-load stamping operation of the stamping equipment to generate the stamping operation distance data of the stamping equipment, wherein S3 includes the following steps: S31, establishing total stroke data K of no-load stamping operation of stamping forming equipment; the total stroke data of no-load stamping operation of stamping forming equipment represents the maximum stroke of stamping operation of dynamic stamping die end of stamping forming equipment in no-load state; S32, the standard customer required stamping product specification data a' in the standard customer required stamping product specification data set A' m According to the standard customer's required stamping product quantity m and the total stroke data K of the no-load stamping operation of the stamping equipment, numerical subtraction and absolute value processing are performed to generate the stamping operation distance data set A"=(a"1,…,a" m ,…,a” σ ), where a” m Indicates the stamping product specification data a' required by the standard customer m The corresponding stamping operation distance data of stamping forming equipment, a” m =|a' m -K|; The stamping operation action distance data of the stamping forming equipment represents the maximum action distance of the stamping operation of the dynamic stamping die end of the stamping forming equipment during the stamping forming operation; S4, performing product stamping and forming operations according to the stamping and forming product specification data required by the standard customer and the stamping operation action distance data of the stamping and forming equipment, wherein S4 comprises the following steps: S41, the stamping equipment is based on the stamping product specification data a' required by the standard customer in the stamping product specification data set A' required by the standard customer m and the stamping operation distance data set A of ... m Carry out product stamping and forming operations in an orderly manner according to the number m of stamping and forming products required by standard customers; S5. When the stamping operation of the product is completed, the stamping thickness data of the stamping product is collected. The S5 includes the following steps: S51, when the stamping operation of the product is completed, the stamping thickness data of the stamping product completed by the stamping process is collected online by an ultrasonic thickness gauge and a stamping thickness data set B of the stamping product is generated. m ,…,b σ ), where b m Indicates the standard stamping product specification data required by customers a' m The corresponding stamping thickness data of the stamping finished product; S6, performing numerical subtraction measurement on the stamping thickness data of the stamping finished product and the specification data of the stamping product required by the standard customer to generate stamping thickness error data of the stamping finished product, wherein S6 comprises the following steps: S61, the stamping thickness data b of the stamping finished product in the stamping thickness data set B m According to the stamping product quantity number m required by the standard customer and the stamping product specification data a' required by the standard customer in the stamping product specification data set A' m Perform numerical difference measurement to generate the stamping thickness error data set C = (c1,…,c m ,…,c σ ), where c m Indicates the stamping thickness data b of the stamping product m Stamping product specifications required by standard customers a' m The corresponding stamping thickness error data of the stamping finished product; The punching thickness error data c of the punching finished product m The value can be negative, zero or positive; when the stamping thickness error data c of the stamping product m A negative value indicates the stamping thickness data b of the stamping product. m Smaller than the standard customer required stamping product specification data a' m ; When the stamping thickness error data c m A value of zero indicates the stamping thickness data b of the stamping product m Equal to the standard customer required stamping product specification data a' m ; When the stamping thickness error data c m A positive value indicates the stamping thickness data b of the stamping product. m Greater than the standard customer required stamping product specification data a' m ; S7, using a data recognition algorithm to match the stamping thickness error data of the stamping formed product with the stamping thickness error data interval of the standard stamping formed product, and generating stamping formed product quality analysis result data based on the stamping thickness error value matching result of the stamping formed product, and pushing the stamping formed product quality analysis result data back to the stamping formed product quality monitoring center, wherein S7 includes the following steps: S71, establishing a standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming, wherein -d1 represents the minimum value of the stamping thickness error data of the standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming, and d2 represents the maximum value of the stamping thickness error data of the standard stamping thickness error data interval [-d1, ..., d2] for finished stamping forming; S72, using a data recognition algorithm to identify the stamping thickness error data c of the stamping thickness error data set C of the stamping finished product m The stamping thickness error value of the stamping formed product is matched with the standard stamping formed product stamping thickness error data of the standard stamping formed product stamping thickness error data interval [-d1, ..., d2], and the data recognition algorithm executes the stamping thickness error data of the stamping formed product c m The specific operation steps for matching the stamping thickness error value of the stamping formed product with the stamping thickness error data of the standard stamping formed product in the stamping thickness error data interval [-d1, ..., d2] are as follows: S721, initialization, assuming that in the σ-dimensional stamping thickness error data set C search space, the error value search cheetah initialization position is described as: Where w i,j The j-th dimension position of the cheetah in the search space of the stamping thickness error data set C for the i-th head error value search, τ is the upper and lower limits of the j-th dimension search space, rand is a random number between 0 and 1, and R is set to the maximum number of iterations; S722, complete the initialization and execute the search strategy to search for prey. The error value search cheetah performs a full range scan or active search in its territory or surrounding area to find the prey. That is, the error value search cheetah searches for the stamping thickness error data c of the stamping finished product in the search space of the stamping thickness error data set C of the stamping finished product. m And the value is matched with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product; S723, the search for prey is performed using a sit-and-wait strategy. In the search mode, the prey may be exposed to the error value search cheetah's field of view, that is, the stamping thickness error data c of the stamping finished product cannot be searched out in the stamping thickness error data set C search space. m Numerical matching is performed with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product. Error value search Every action of the cheetah may cause the prey to escape. The cheetah adopts a sit-and-wait ambush strategy to approach the prey. The sit-and-wait ambush strategy includes lying on the ground or hiding in the bushes. S724, execute the sit-and-wait strategy to approach the prey and attack the prey according to the attack strategy. In the algorithm, each error value search cheetah can adjust its position according to the position of the escaping prey, the leading error value search cheetah or the nearby error value search cheetah to obtain the best attack position, that is, search for different stamping thickness error data c of stamping finished product in the stamping thickness error data set C search space m And the value is matched with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product; S725, execute S722, S723, S724 until the maximum number of iterations R is met, and output the stamping thickness error data c of the stamping product m The result of numerical matching with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping product; S73, outputting the stamping thickness error data c of the stamping product in step S725 m The results of numerical matching are performed with the standard stamping thickness error data interval [-d1,…,d2] of the finished stamping products to generate the stamping product quality analysis result data set E = (e1,…,e m ,…,e σ ), where e m Indicates the stamping thickness data b of the stamping product m The stamping finished product quality analysis result data corresponding to the stamping finished product; When c m ∈[-d1,…,d2], indicating that the stamping product meets the standard stamping thickness error requirements, and the stamping product quality analysis result data e is output m To be qualified; when If the stamping product does not meet the standard stamping thickness error requirements, the stamping product quality analysis result data e will be output. m for failure to meet the standards; S74, pushing the stamping finished product quality analysis result data set E to the stamping finished product quality monitoring center through the Internet of Things communication network.

2. An effective safety distance forming intelligent control system that implements the effective safety distance forming intelligent control method according to claim 1, characterized in that: The system comprises a stamping product data acquisition module, a stamping distance measurement and stamping execution module, and a stamping product stamping quality monitoring module.

Citation Information

Patent Citations

  • Distributed Control System and Control Method for Magnesium Oxide Board Production Line

    CN106020143B

  • Forming simulation system and method for washing machine inner barrel stamping part production

    CN112547970A

  • Method and system for automatically judging forming quality of stamping part

    CN115945570A

  • Control system and control method of deep-drawing part stamping equipment

    CN116859826A

  • Intelligent data modeling management system and method based on source end static data

    CN118154140A