AI Technical Summary

Technical Problem

[0002]在现代建筑设计中,越来越多的建筑使用双曲幕墙作为建筑材料,传统的双曲幕墙的建模主要是依据手动绘图法和简单几何近似法,手动绘图法是通过手工绘制二维图纸来表达双曲幕墙的形状和尺寸,但是该方法效率低下,精度受限,简单几何近似法是使用简单的几何形状(如圆柱、圆锥等)来近似双曲幕墙的曲面,但是该方法会出现数据不准确的问题,导致后续的材料计算和施工出现偏差,因此,需要一种能够提高双曲幕墙的建模准确性的方法

Benefits of technology

[0071] By extracting the core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index, the present invention can remove redundant data in the curtain wall preparation data and improve the processing efficiency of subsequent curtain wall evaluation models. The present invention constructs the process curtain wall model corresponding to the preparation process of the hyperbolic curtain wall by using the model construction layer in the curtain wall evaluation model, so as to obtain the curtain wall processing corresponding to each process in the preparation process. The engineering model facilitates the calculation and processing of subsequent processing sophistication. Based on the application scenario, the present invention analyzes the scenario functional requirements corresponding to the hyperbolic curtain wall, and can obtain the corresponding implementation functions of the hyperbolic curtain wall in the application scenario. The present invention combines the process efficiency and the processing precision to optimize the preparation process, which can improve the preparation accuracy of the preparation process and facilitate the improvement of the subsequent model construction accuracy corresponding to the hyperbolic curtain wall. Therefore, the embodiments of the present invention provide a data modeling method and system based on BIM technology in the preparation of hyperbolic curtain walls, which can improve the accuracy of data modeling in the preparation of hyperbolic curtain walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586213B_ABST
    Figure CN118586213B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of hyperbolic curtain wall modeling, and provides a data modeling method and system for realizing the preparation of hyperbolic curtain walls based on BIM technology, including: analyzing the modeling index corresponding to the hyperbolic curtain wall, extracting the core preparation process data in the curtain wall preparation data; using the model building layer in the curtain wall evaluation model to build the process curtain wall model corresponding to the preparation process of the hyperbolic curtain wall, and using the precision evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model; calculating the performance metric value corresponding to the performance metric criterion, and evaluating the process efficiency corresponding to the preparation process; optimizing the preparation process to obtain the optimized preparation process, using the visualization display layer in the BIM model to build the visualization model of the hyperbolic curtain wall, and using the layout decision layer in the BIM model to optimize the layout of the visualization model, and obtaining the curtain wall digital model corresponding to the hyperbolic curtain wall. The present invention aims to improve the accuracy of data modeling under the preparation of hyperbolic curtain walls.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hyperbolic curtain wall modeling, and in particular to a data modeling method and system for realizing hyperbolic curtain wall preparation based on BIM technology. Background Art

[0002] In modern architectural design, more and more buildings use hyperbolic curtain walls as building materials. The traditional modeling of hyperbolic curtain walls is mainly based on manual drawing and simple geometric approximation. The manual drawing method expresses the shape and size of the hyperbolic curtain wall by manually drawing two-dimensional drawings, but this method is inefficient and has limited accuracy. The simple geometric approximation method uses simple geometric shapes (such as cylinders, cones, etc.) to approximate the surface of the hyperbolic curtain wall, but this method will have inaccurate data, resulting in deviations in subsequent material calculations and construction. Therefore, a method that can improve the modeling accuracy of the hyperbolic curtain wall is needed. Summary of the invention

[0003] The present invention provides a method and system for realizing data modeling in the preparation of a hyperbolic curtain wall based on BIM technology, the main purpose of which is to improve the accuracy of data modeling in the preparation of a hyperbolic curtain wall.

[0004] To achieve the above object, the present invention provides a data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology, comprising:

[0005] A hyperbolic curtain wall to be modeled is obtained, a preparation process corresponding to the hyperbolic curtain wall is queried, curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall are collected, a modeling index corresponding to the hyperbolic curtain wall is analyzed, and core preparation process data in the curtain wall preparation data is extracted based on the preparation process and the modeling index, wherein the extracting core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index includes:

[0006] Analyze the process efficacy corresponding to the preparation process, and extract the data identifier corresponding to the curtain wall preparation data;

[0007] The regression coefficient between the process efficacy and the data identifier is calculated by the following formula:

[0008]

[0009] in, represents the regression coefficient between process efficacy and data identification, Represents the observed value of the indicator of the process efficacy corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the process efficacy, represents the observed value of the identifier corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the data identifier, and n represents the total number of data identifiers;

[0010] Mining data description information corresponding to the curtain wall preparation data;

[0011] Calculating a matching coefficient between the data description information and the modeling index;

[0012] Combining the regression coefficient and the matching coefficient, extracting the core preparation process data in the curtain wall preparation data;

[0013] Input the core preparation data and the modeling index as input data into a pre-trained curtain wall evaluation model, use the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and use the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing accuracy corresponding to the process curtain wall model;

[0014] Determine an application scenario corresponding to the hyperbolic curtain wall, analyze the scenario function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate a performance metric criterion corresponding to the hyperbolic curtain wall based on the scenario function requirements, calculate a performance metric value corresponding to the performance metric criterion based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance metric value;

[0015] In combination with the process efficiency and the processing precision, the preparation process is optimized to obtain an optimized preparation process, and optimized preparation data corresponding to the optimized preparation process is collected, and the optimized preparation data is input into a pre-trained BIM model, and a visualization model of the hyperbolic curtain wall is constructed using the visualization display layer in the BIM model. In combination with the scene function requirements, the layout of the visualization model is optimized using the layout decision layer in the BIM model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

[0016] Optionally, the calculating a matching coefficient between the data description information and the modeling index includes:

[0017] Calculating information entropy corresponding to the data description information;

[0018] According to the information entropy, the data description information is subjected to information filtering processing to obtain target description information;

[0019] Respectively performing element identification on the target description information and the modeling index to obtain information elements and index elements;

[0020] Calculating the element matching degree between the information element and the indicator element;

[0021] According to the element matching degree, a matching coefficient between the data description information and the modeling index is obtained.

[0022] Optionally, the step of inputting the core preparation data and the modeling index as input data into a pre-trained curtain wall evaluation model, and using the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, comprises:

[0023] Extracting key data features of the core preparation data using the feature extraction layer in the model building layer;

[0024] According to the modeling index, the curtain wall three-dimensional resource component is configured using the resource configuration layer in the model construction layer;

[0025] According to the preparation process, clustering the key features of the data is performed using the clustering layer in the model building layer to obtain process clustering features;

[0026] In combination with the process clustering features, the curtain wall three-dimensional resource component is used to construct a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process.

[0027] Optionally, the step of evaluating the processing accuracy of the process curtain wall model by using the accuracy evaluation layer in the curtain wall evaluation model includes:

[0028] Querying the processing deviation type corresponding to the preparation process, the processing deviation type including: geometric deviation and surface fitting deviation;

[0029] Extracting geometric feature points corresponding to the process curtain wall model and the preset standard curtain wall model to obtain model feature geometric points and standard feature feature points;

[0030] Calculating the distance deviation value between the model feature geometric point and the standard feature feature point using the geometric deviation function in the accuracy evaluation layer;

[0031] Performing surface fitting processing on the process curtain wall model and the standard curtain wall model respectively to obtain a curtain wall fitting surface and a standard fitting surface;

[0032] Calculating the surface deviation value between the curtain wall fitting surface and the standard fitting surface by using the error function in the accuracy evaluation layer;

[0033] The processing precision corresponding to the process curtain wall model is evaluated in combination with the surface deviation value and the distance deviation value.

[0034] Optionally, analyzing scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario includes:

[0035] Collecting scene information of the application scene, and analyzing scene attributes corresponding to the application scene according to the scene information;

[0036] According to the scene attributes, determining the application function requirements of the hyperbolic curtain wall in the application scene, and analyzing the attribute benefits corresponding to the scene attributes;

[0037] In combination with the attribute benefits, the scene function requirements corresponding to the hyperbolic curtain wall are screened out from the application function requirements.

[0038] Optionally, the calculating, based on the material performance data, a performance metric value corresponding to the performance metric criterion includes:

[0039] Performing discrete data elimination processing on the material performance data to obtain target performance data;

[0040] Performing smoothing correction on the target performance data to obtain smoothed performance data;

[0041] Extracting the associated performance value corresponding to the performance metric criterion from the smoothed performance data;

[0042] Standardizing the associated performance value to obtain a standard performance value;

[0043] Based on the standard performance value, a performance metric value corresponding to the performance metric criterion is calculated.

[0044] Optionally, the step of inputting the optimized preparation data into a pre-trained BIM model and constructing a visualization model of the hyperbolic curtain wall using a visualization display layer in the BIM model includes:

[0045] Using the mapping layer in the visualization layer to match the optimized preparation data with the preset data fields, to obtain field matching data;

[0046] The data association layer in the visualization display layer is used to associate the field matching data with the preset curtain wall elements, and the element association data;

[0047] According to the element association data, a visualization model of the hyperbolic curtain wall is constructed using a three-dimensional geometry engine in the visualization display layer.

[0048] Optionally, combining the scene function requirements and utilizing the layout decision layer in the BIM model to perform layout optimization processing on the visualization model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall includes:

[0049] According to the preset installation rules, the component integration layer in the layout decision layer is used to integrate the visualization model to obtain an integrated model;

[0050] Calculating the installation compatibility of each model in the integrated model, and determining the optimal integrated model in the integrated model based on the installation compatibility;

[0051] In combination with the functional requirements of the scenario, the target decision layer in the layout decision layer is used to define the decision objective function corresponding to the optimal integrated model;

[0052] Calculating the objective function value corresponding to the integrated model using the decision objective function;

[0053] According to the objective function value, the layout optimization algorithm in the layout decision layer is used to perform layout optimization processing on the optimal integrated model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

[0054] Optionally, calculating the installation compatibility corresponding to each model in the integrated model includes:

[0055] measuring component distances corresponding to the integrated model;

[0056] Counting the number of components in the integrated model;

[0057] Calculating a distance offset corresponding to the component distance;

[0058] The installation fit corresponding to each model in the integrated model is calculated by combining the distance offset and the number of components.

[0059] A data modeling system for realizing the preparation of a hyperbolic curtain wall based on BIM technology, characterized in that the system comprises:

[0060] A data processing module is used to obtain a hyperbolic curtain wall to be modeled, query the preparation process corresponding to the hyperbolic curtain wall, collect curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall, analyze the modeling index corresponding to the hyperbolic curtain wall, and extract core preparation process data from the curtain wall preparation data based on the preparation process and the modeling index, wherein the extracting the core preparation process data from the curtain wall preparation data based on the preparation process and the modeling index includes:

[0061] Analyze the process efficacy corresponding to the preparation process, and extract the data identifier corresponding to the curtain wall preparation data;

[0062] The regression coefficient between the process efficacy and the data identifier is calculated by the following formula:

[0063]

[0064] in, represents the regression coefficient between process efficacy and data identification, Represents the observed value of the indicator of the process efficacy corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the process efficacy, represents the observed value of the identifier corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the data identifier, and n represents the total number of data identifiers;

[0065] Mining data description information corresponding to the curtain wall preparation data;

[0066] Calculating a matching coefficient between the data description information and the modeling index;

[0067] Combining the regression coefficient and the matching coefficient, extracting the core preparation process data in the curtain wall preparation data;

[0068] A precision evaluation module is used to input the core preparation data and the modeling index as input data into a pre-trained curtain wall evaluation model, use the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and use the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model;

[0069] A process efficiency module is used to determine the application scenario corresponding to the hyperbolic curtain wall, analyze the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate the performance measurement criteria corresponding to the hyperbolic curtain wall based on the scene function requirements, calculate the performance measurement value corresponding to the performance measurement criteria based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance measurement value;

[0070] The digital model building module is used to optimize the preparation process in combination with the process efficiency and the processing precision to obtain an optimized preparation process, and collect optimized preparation data corresponding to the optimized preparation process, input the optimized preparation data into a pre-trained BIM model, and use the visualization display layer in the BIM model to build a visualization model of the hyperbolic curtain wall. In combination with the scene function requirements, the layout decision layer in the BIM model is used to optimize the layout of the visualization model to obtain a digital curtain wall model corresponding to the hyperbolic curtain wall.

[0071] The present invention extracts the core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index, thereby removing redundant data in the curtain wall preparation data and improving the processing efficiency of the subsequent curtain wall evaluation model. The present invention constructs the process curtain wall model corresponding to the preparation process of the hyperbolic curtain wall by using the model construction layer in the curtain wall evaluation model, so as to obtain the curtain wall processing model corresponding to each process in the preparation process, which is convenient for the calculation and processing of the subsequent processing precision. The present invention analyzes the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, and can obtain the corresponding implementation function of the hyperbolic curtain wall in the application scenario. The present invention optimizes the preparation process in combination with the process efficiency and the processing precision, which can improve the preparation accuracy of the preparation process and facilitate the improvement of the accuracy of the subsequent model construction corresponding to the hyperbolic curtain wall. Therefore, the data modeling method and system for realizing the preparation of hyperbolic curtain walls based on BIM technology provided in the embodiment of the present invention can improve the accuracy of data modeling under the preparation of hyperbolic curtain walls. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] Figure 1 A flow chart of a data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology provided in one embodiment of the present invention;

[0073] Figure 2 A functional module diagram of a data modeling system for realizing the preparation of a hyperbolic curtain wall based on BIM technology provided in one embodiment of the present invention.

[0074] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0075] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0076] The embodiment of the present application provides a data modeling method for the preparation of hyperbolic curtain walls based on BIM technology. In the embodiment of the present application, the execution subject of the data modeling method for the preparation of hyperbolic curtain walls based on BIM technology includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided in the embodiment of the present application. In other words, the data modeling method for the preparation of hyperbolic curtain walls based on BIM technology can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc. The server can be an independent server, or it can be a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (Content Delivery Network, CDN), and big data and artificial intelligence platforms.

[0077] Reference Figure 1 FIG. 1 is a flow chart of a method for implementing a data modeling method for preparing a hyperbolic curtain wall based on BIM technology according to an embodiment of the present invention. In this embodiment, the method for implementing a data modeling method for preparing a hyperbolic curtain wall based on BIM technology includes steps S1 to S4.

[0078] S1. Obtain a hyperbolic curtain wall to be modeled, query a preparation process corresponding to the hyperbolic curtain wall, collect curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall, analyze modeling indicators corresponding to the hyperbolic curtain wall, and extract core preparation process data from the curtain wall preparation data based on the preparation process and the modeling indicators.

[0079] The present invention extracts the core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index, thereby removing redundant data in the curtain wall preparation data and improving the processing efficiency of the subsequent curtain wall evaluation model, wherein the hyperbolic curtain wall is a building curtain wall with a complex curved surface shape, the preparation process is the processing flow of the hyperbolic curtain wall, the curtain wall preparation data and the material performance data are respectively various related information generated and recorded in each preparation process of the hyperbolic curtain wall and performance information of the material processing process, the modeling index is the corresponding modeling requirement when modeling the hyperbolic curtain wall, such as the required data index, the core preparation process data is the data obtained after removing the data in the curtain wall preparation data that is irrelevant to the modeling and invalid, further, the preparation process corresponding to the hyperbolic curtain wall can be queried from the Internet in a human-computer interaction manner; the collection of the curtain wall preparation data and the material performance data corresponding to the hyperbolic curtain wall can be achieved by sensors, such as optical sensors, temperature sensors and related mechanical testing tools.

[0080] As an embodiment of the present invention, the core preparation process data in the curtain wall preparation data is extracted based on the preparation process and the modeling index, including: analyzing the process efficacy corresponding to the preparation process, and extracting the data identifier corresponding to the curtain wall preparation data, calculating the regression coefficient between the process efficacy and the data identifier, and mining the data description information corresponding to the curtain wall preparation data, calculating the matching coefficient between the data description information and the modeling index, and combining the regression coefficient and the matching coefficient to extract the core preparation process data in the curtain wall preparation data.

[0081] Among them, the process efficacy represents the process function corresponding to the preparation process, the data identifier is the data label corresponding to the curtain wall preparation data, the regression coefficient represents the degree of influence between the process efficacy and the data identifier, the data description information is the description information of the data content corresponding to the curtain wall preparation data, and the matching coefficient represents the degree of matching between the data description information and the modeling indicator.

[0082] Optionally, the process efficacy corresponding to the preparation process can be obtained by analyzing the introduction content in the process flow chart, and the data identification corresponding to the curtain wall preparation data can be realized by an identification extraction tool, which is compiled by a script language, such as JS script language; the calculation of the regression coefficient between the process efficacy and the data identification can be realized by the least squares method; the mining of the data description information corresponding to the curtain wall preparation data can be realized by the association rule mining method to find out the frequent associations and dependencies between data items; the regression coefficient and the matching coefficient corresponding to the curtain wall preparation data are added, and the core preparation process data in the curtain wall preparation data is extracted according to the result of the addition. For example, the results of adding the regression coefficient and the matching coefficient are 1.5, 1.8, and 2 respectively, then the curtain wall preparation data corresponding to 1.8 and 2 are used as the core preparation data.

[0083] Further, as an optional embodiment of the present invention, the calculating the regression coefficient between the process efficacy and the data identifier includes:

[0084] The regression coefficient between the process efficacy and the data identifier is calculated by the following formula:

[0085]

[0086] in, represents the regression coefficient between process efficacy and data identification, Represents the observed value of the indicator of the process efficacy corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the process efficacy, represents the observed value of the identifier corresponding to the i-th identifier in the data identifier, represents the average observation value corresponding to the data identifier, and n represents the total number of data identifiers.

[0087] Among them, the indicator observation value and the identification observation value are the performance values ​​corresponding to the process efficacy and the data identification respectively. The process efficacy and the data identification can be vectorized to obtain the corresponding indicator vector and identification vector, and the vector values ​​corresponding to the indicator vector and the identification vector are calculated, and the corresponding vector values ​​are used as observation values.

[0088] Further, as an optional embodiment of the present invention, the calculation of the matching coefficient between the data description information and the modeling indicator includes: calculating the information entropy corresponding to the data description information, performing information filtering processing on the data description information according to the information entropy to obtain target description information, performing element identification on the target description information and the modeling indicator respectively to obtain information elements and indicator elements, calculating the element matching degree between the information elements and the indicator elements, and obtaining the matching coefficient between the data description information and the modeling indicator according to the element matching degree.

[0089] Among them, the information entropy represents the degree of information confusion corresponding to the data description information, the information element and the indicator element are respectively a combination of specific characters and symbols in the target description information and the modeling indicator, and the element matching degree represents the matching degree between the information element and the indicator element.

[0090] Furthermore, the information entropy corresponding to the data description information can be realized by the Shannon entropy algorithm; according to the information entropy, the average entropy corresponding to the data description information is calculated, and the information entropy is compared with the average entropy. If the information entropy is less than the average entropy, the data description information corresponding to the information entropy is filtered out to obtain the target description information; the element identification of the target description information and the modeling indicator can be realized by a recognition algorithm, such as OCR recognition technology; the step of calculating the element matching degree between the information element and the indicator element is: counting the number of intersection elements and the number of union elements in the information element and the indicator element, calculating the ratio of the number of intersection elements to the number of union elements, and obtaining the element matching degree; summing the element matching degrees to obtain the matching degree of each information in the data description information, converting the matching degree into a coefficient form to obtain a matching coefficient. If the matching degree is 60%, the corresponding matching coefficient is 0.6.

[0091] S2. Input the core preparation data and the modeling index as input data into a pre-trained curtain wall evaluation model, use the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and use the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model.

[0092] The present invention constructs a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process by utilizing the model construction layer in the curtain wall evaluation model, so as to obtain a curtain wall processing model corresponding to each process in the preparation process, which is convenient for the calculation and processing of the subsequent processing precision. The curtain wall evaluation model is a model for evaluating the quality of the curtain wall corresponding to the preparation process. The curtain wall evaluation model can be obtained by collecting a large amount of historical preparation data for training and improvement. The model construction layer is a neural layer that combines the core preparation data to construct a three-dimensional model of the hyperbolic curtain wall after the preparation process. The process curtain wall model is a model corresponding to each processed curtain wall in the preparation process.

[0093] As an embodiment of the present invention, the core preparation data and the modeling indicators are input as input data into a pre-trained curtain wall evaluation model, and the model building layer in the curtain wall evaluation model is used to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, including: using the feature extraction layer in the model building layer to extract the data key features of the core preparation data, according to the modeling indicators, using the resource configuration layer in the model building layer to configure the curtain wall three-dimensional resource component, according to the preparation process, using the clustering layer in the model building layer to cluster the data key features to obtain process clustering features, and combining the process clustering features, using the curtain wall three-dimensional resource component to build the process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process.

[0094] Among them, the feature extraction layer is a neural network used to extract data features of the core preparation data, and is composed of multiple convolution kernels. The resource configuration layer is a module used to configure components required for building a model, and is composed of a component database. The clustering layer is a neural network that classifies and processes the key features of the data according to the preparation process, and is composed of clustering algorithms, such as a hierarchical clustering algorithm.

[0095] The present invention evaluates the processing precision corresponding to the process curtain wall model by utilizing the accuracy evaluation layer in the curtain wall evaluation model. The processing precision can be used to understand the processing accuracy corresponding to the preparation process, which is convenient for understanding the process with processing problems in the preparation process. The accuracy evaluation layer is a neural layer for evaluating the quality of the process curtain wall model, and the processing precision indicates the degree of refinement and accuracy of the process curtain wall model corresponding to the preparation process.

[0096] As an embodiment of the present invention, the use of the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model includes: querying the processing deviation type corresponding to the preparation process, the processing deviation type includes: geometric deviation and surface fitting deviation, extracting the geometric feature points corresponding to the process curtain wall model and the preset standard curtain wall model to obtain model feature geometric points and standard feature points, using the geometric deviation function in the accuracy evaluation layer to calculate the distance deviation value between the model feature geometric points and the standard feature points, performing surface fitting processing on the process curtain wall model and the standard curtain wall model respectively to obtain a curtain wall fitting surface and a standard fitting surface, using the error function in the accuracy evaluation layer to calculate the surface deviation value between the curtain wall fitting surface and the standard fitting surface, combining the surface deviation value and the distance deviation value, and evaluating the processing precision corresponding to the process curtain wall model.

[0097] Among them, the processing deviation type is the deviation evaluation index of the preparation process, the preset standard curtain wall model is a pre-assembled comparison model, the model feature geometric points and the standard feature points are respectively the key points in the process curtain wall model and the preset standard curtain wall model, the geometric deviation function is constructed by a distance algorithm, such as the Euclidean distance algorithm, and the error function is composed of a root mean square error function.

[0098] Furthermore, the surface deviation value and the distance deviation value are combined to calculate a comprehensive deviation value corresponding to the process curtain wall model. According to the calculated comprehensive deviation value, the process curtain wall model is divided into different quality levels, such as excellent, good, qualified, unqualified, etc. According to the quality level, the processing precision corresponding to the process curtain wall model is evaluated.

[0099] S3. Determine an application scenario corresponding to the hyperbolic curtain wall, analyze the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate a performance measurement criterion corresponding to the hyperbolic curtain wall based on the scene function requirements, calculate a performance measurement value corresponding to the performance measurement criterion based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance measurement value.

[0100] The present invention analyzes the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, and can obtain the corresponding implementation function of the hyperbolic curtain wall in the application scenario, wherein the application scenario is the usage scenario corresponding to the hyperbolic curtain wall, such as a building exterior wall, the scene function requirement is the function of the hyperbolic curtain wall in the application scenario, such as sun protection, the performance metric criterion is the performance evaluation index corresponding to the hyperbolic curtain wall, and the performance metric value is the performance degree corresponding to the performance metric criterion.

[0101] As an embodiment of the present invention, analyzing the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario includes: collecting scene information of the application scenario, parsing scene attributes corresponding to the application scenario according to the scene information, determining the application function requirements of the hyperbolic curtain wall in the application scenario based on the scene attributes, and analyzing the attribute benefits corresponding to the scene attributes, and screening out the scene function requirements corresponding to the hyperbolic curtain wall from the application function requirements in combination with the attribute benefits.

[0102] Among them, the scene information is the information related to the application scenario, such as building purpose, pedestrian flow, and environmental conditions; the scene attributes are the scene properties of the application scenario, such as environmental attributes or spatial attributes; the application function requirements are the functions that the hyperbolic curtain wall is to achieve when applied in the application scenario; and the attribute benefits are the economic benefits corresponding to the application scenario.

[0103] Optionally, analyze key elements in the scene information, such as geographical location, building purpose, user characteristics, etc., to obtain scene attributes corresponding to the application scene; determine the application function requirements of the hyperbolic curtain wall in the application scene based on the attribute type corresponding to the scene attribute. For example, for a high-end office building application scene located in the city center, its environmental attributes are mild climate and sufficient light; its spatial attributes are high-rise and large office area; its social attributes are mainly business people and large traffic; its functional attribute is office; and its aesthetic attribute pursues modern and simple style. Based on these scene attributes, the application function requirements of the hyperbolic curtain wall determined include: using high-strength glass materials to adapt to high-rise wind pressure, having good thermal insulation and lighting adjustment functions to save energy and provide comfort. The indoor environment is simple and elegant, and the exterior design can be integrated with the surrounding modern buildings; the input cost required to achieve specific scene attributes can be calculated, including material procurement, construction costs, maintenance costs, etc., and the benefits brought about by this can be compared, such as long-term cost savings brought about by energy saving, economic returns brought about by enhancing the value of the building, etc., so as to analyze the attribute benefits corresponding to the scene attributes; the scene function requirements corresponding to the hyperbolic curtain wall can be selected from the application function requirements through the cost-benefit matrix method. A matrix is ​​constructed with the horizontal axis as the application function requirements and the vertical axis as the attribute benefits. The quantitative impact of each function requirement on each attribute benefit (such as the amount of cost reduction, the amount of benefit increase, etc.) is filled in the matrix cells, and the screening is carried out by comparing the data in the matrix.

[0104] The present invention calculates the performance metric value corresponding to the performance metric criterion based on the material performance data, and the performance of the hyperbolic curtain wall in the application scenario can be understood through the performance metric value, thereby facilitating the evaluation of the process efficiency corresponding to the subsequent preparation process, wherein the performance metric value is the specific performance degree corresponding to the performance metric criterion.

[0105] As an embodiment of the present invention, the performance metric value corresponding to the performance metric criterion is calculated based on the material performance data, including: performing discrete data elimination processing on the material performance data to obtain target performance data, smoothing correction on the target performance data to obtain smoothed performance data, extracting associated performance values ​​corresponding to the performance metric criterion from the smoothed performance data, standardizing the associated performance values ​​to obtain standard performance values, and calculating the performance metric value corresponding to the performance metric criterion based on the standard performance value.

[0106] Among them, the smoothed performance data is the data after the fluctuation between the target performance data is reduced, the associated performance value is the specific performance value corresponding to the performance measurement criterion, and the standard performance value is the performance value obtained after the difference influence between the associated performance values ​​is eliminated.

[0107] Furthermore, the data variance value between the material performance data is calculated. If the data variance value is less than the variance threshold, the data is eliminated to obtain the target performance data; the smoothing correction of the target performance data can be achieved by the weighted average method; the associated performance value corresponding to the performance metric criterion is extracted from the smoothed performance data, which can be achieved by a corresponding extraction function, and the extraction function is compiled by JAVA language. If the smoothed performance data is not a numerical value, the data is quantized to obtain the associated performance value; the standard performance values ​​corresponding to the performance metric criterion are summed to obtain the performance metric value corresponding to the performance metric criterion.

[0108] S4. In combination with the process efficiency and the processing precision, the preparation process is optimized to obtain an optimized preparation process, and the optimized preparation data corresponding to the optimized preparation process is collected, and the optimized preparation data is input into a pre-trained BIM model, and a visualization model of the hyperbolic curtain wall is constructed using the visualization display layer in the BIM model. In combination with the scene function requirements, the layout of the visualization model is optimized using the layout decision layer in the BIM model to obtain a digital curtain wall model corresponding to the hyperbolic curtain wall.

[0109] The present invention optimizes the preparation process in combination with the process efficiency and the processing precision, which can improve the preparation accuracy of the preparation process and facilitate improving the accuracy of model construction corresponding to the subsequent hyperbolic curtain wall, wherein the optimized preparation process is the process obtained after the preparation process is optimized, and the optimized preparation data is the processing preparation data corresponding to the optimized preparation process. Optionally, the optimization processing steps of the preparation process are: combining the process efficiency and the processing precision, determining the process to be optimized in the preparation process, analyzing the problems of the process to be optimized, such as improper operating methods, insufficient personnel skills and raw material quality, formulating specific optimization measures according to the analyzed problems, and optimizing the preparation process according to the optimization measures to obtain the optimized preparation process.

[0110] The present invention inputs the optimized preparation data into a pre-trained BIM model, and uses the visualization display layer in the BIM model to construct a visualization model of the hyperbolic curtain wall, so as to obtain a visualization display model of the components of the hyperbolic curtain wall, so as to facilitate subsequent layout optimization processing, wherein the BIM model is a visualization model for constructing each component of the hyperbolic curtain wall, and a model for performing layout optimization on the visualization model, and the visualization display layer is a neural layer for constructing a visualization three-dimensional model of the hyperbolic curtain wall.

[0111] As an embodiment of the present invention, the optimized preparation data is input into a pre-trained BIM model, and a visualization model of the hyperbolic curtain wall is constructed using a visualization layer in the BIM model, including: using a mapping layer in the visualization layer to match the optimized preparation data with a preset data field to obtain field matching data, using a data association layer in the visualization layer to associate the field matching data with preset curtain wall elements to obtain element association data, and based on the element association data, using a three-dimensional geometry engine in the visualization layer to construct a visualization model of the hyperbolic curtain wall.

[0112] Among them, the mapping layer is a neural layer that inputs the optimized preparation data into the corresponding preset data field, which is composed of field matching rules and contains a series of predefined rules and algorithms for determining which preset data fields the input data should correspond to. The preset data fields are parameter indicators of the hyperbolic curtain wall, such as size fields, material type fields, etc. The data association layer is a functional module that associates and integrates the field matching data with preset curtain wall elements. The preset curtain wall elements are the basic components corresponding to the hyperbolic curtain wall, such as panels, connectors and hardware, etc. The three-dimensional geometry engine is the core component inside the BIM model, which is responsible for processing and generating corresponding geometric shapes, and can calculate and construct components of complex three-dimensional geometric structures based on the input data. Furthermore, the preset data fields and the preset curtain wall elements can be set according to the training data of the BIM model.

[0113] The present invention combines the scene function requirements and utilizes the layout decision layer in the BIM model to perform layout optimization processing on the visualization model, thereby obtaining a digital curtain wall model corresponding to the hyperbolic curtain wall, thereby improving the modeling accuracy of the hyperbolic curtain wall, wherein the layout decision layer is a neural layer that performs overall optimization on the visualization model.

[0114] As an embodiment of the present invention, the layout of the visualization model is optimized by using the layout decision layer in the BIM model in combination with the scene function requirements to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall, including: according to a preset installation rule, the visualization model is integrated by using the component integration layer in the layout decision layer to obtain an integrated model, the installation fit corresponding to each model in the integrated model is calculated, based on the installation fit, the optimal integrated model in the integrated model is determined, in combination with the scene function requirements, the decision objective function corresponding to the optimal integrated model is defined by using the target decision layer in the layout decision layer, the objective function value corresponding to the integrated model is calculated by using the decision objective function, and according to the objective function value, the layout optimization algorithm in the layout decision layer is used to optimize the layout of the optimal integrated model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

[0115] Among them, the preset installation rules are the component installation requirements of the hyperbolic curtain wall, the component integration layer is a module that assembles the visualization model according to the installation rules, and is composed of an integrated rule engine. The installation fit represents the degree of fit of the overall components of each model in the integrated model. The target decision layer is a neural layer that defines the optimization target of the optimal integrated model, and is composed of an intelligent analysis engine. The decision objective function is a function that calculates the target value corresponding to the integrated model, such as minimizing cost, maximizing lighting performance, minimizing wind load, etc. The layout optimization algorithm includes a genetic algorithm, a particle swarm optimization algorithm, etc.

[0116] Optionally, the integrated model corresponding to the maximum value of the installation fit is taken as the optimal integrated model; the objective function value and the corresponding required threshold are compared, and according to the comparison result, the optimal integrated model is optimized by using the layout optimization algorithm in the layout decision layer to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall. For example, if the daylighting factor of the curtain wall installation area is required to be no less than a specific value (for example, 2%), if the daylighting factor in the objective function value is 1.5%, the inclination angle of the optimal integrated model can be adjusted.

[0117] Further, as an optional embodiment of the present invention, the calculation of the installation fit corresponding to each model in the integrated model includes: measuring the component distance corresponding to the integrated model, counting the number of components in the integrated model, calculating the distance offset corresponding to the component distance, and combining the distance offset and the number of components to calculate the installation fit corresponding to each model in the integrated model.

[0118] Among them, the component distance is the installation distance between the components in the integrated model, and the distance offset is the difference between the component distance and the standard installation distance of the component. Furthermore, the measurement of the component distance corresponding to the integrated model can be achieved by a measuring tool, such as a laser rangefinder; the model offset can be obtained by summing the distance offsets corresponding to the components in each model in the integrated model, and the model fit is divided by the number of components to obtain the average offset, and the installation fit = 1-average offset.

[0119] The present invention extracts the core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index, and can remove the redundant data in the curtain wall preparation data, thereby improving the processing efficiency of the subsequent curtain wall evaluation model. The present invention constructs the process curtain wall model corresponding to the preparation process of the hyperbolic curtain wall by using the model construction layer in the curtain wall evaluation model, so as to obtain the curtain wall processing model corresponding to each process in the preparation process, which is convenient for the calculation and processing of the subsequent processing precision. The present invention analyzes the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, and can obtain the corresponding implementation function of the hyperbolic curtain wall in the application scenario. The present invention optimizes the preparation process in combination with the process efficiency and the processing precision, which can improve the preparation accuracy of the preparation process, and is convenient for improving the accuracy of the subsequent model construction corresponding to the hyperbolic curtain wall. Therefore, the data modeling method for realizing the preparation of hyperbolic curtain walls based on BIM technology provided in the embodiment of the present invention can improve the accuracy of data modeling under the preparation of hyperbolic curtain walls.

[0120] like Figure 2 As shown, it is a functional module diagram of a data modeling system for realizing the preparation of a hyperbolic curtain wall based on BIM technology provided by an embodiment of the present invention.

[0121] The data modeling system 100 for realizing the preparation of hyperbolic curtain walls based on BIM technology described in the present invention can be installed in an electronic device. According to the functions implemented, the data modeling system 100 for realizing the preparation of hyperbolic curtain walls based on BIM technology can include a data processing module 101, a precision evaluation module 102, a process efficiency module 103 and a digital model construction module 104. The module described in the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0122] In this embodiment, the functions of each module / unit are as follows:

[0123] The data processing module 101 is used to obtain a hyperbolic curtain wall to be modeled, query the preparation process corresponding to the hyperbolic curtain wall, collect curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall, analyze the modeling index corresponding to the hyperbolic curtain wall, and extract the core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index;

[0124] The precision evaluation module 102 is used to input the core preparation data and the modeling index as input data into a pre-trained curtain wall evaluation model, use the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and use the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model;

[0125] The process efficiency module 103 is used to determine the application scenario corresponding to the hyperbolic curtain wall, analyze the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate the performance measurement criteria corresponding to the hyperbolic curtain wall based on the scene function requirements, calculate the performance measurement value corresponding to the performance measurement criteria based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance measurement value;

[0126] The digital model building module 104 is used to optimize the preparation process in combination with the process efficiency and the processing precision to obtain an optimized preparation process, and collect optimized preparation data corresponding to the optimized preparation process, input the optimized preparation data into a pre-trained BIM model, and use the visualization display layer in the BIM model to build a visualization model of the hyperbolic curtain wall. In combination with the scene function requirements, the layout decision layer in the BIM model is used to optimize the layout of the visualization model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

[0127] In detail, each module described in the data modeling system 100 for realizing the preparation of a hyperbolic curtain wall based on BIM technology described in the embodiment of the present application is used in the same manner as described above. Figure 1 The data modeling method for realizing the preparation of hyperbolic curtain walls based on BIM technology is a technical means described in the text, and can produce the same technical effect, so it will not be repeated here.

[0128] In the several embodiments provided by the present invention, it should be understood that the provided methods and systems can be implemented in other ways. For example, the method embodiments described above are only illustrative, for example, the division of the modules is only a logical function division, and there may be other division methods in actual implementation.

[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A data modeling method for realizing the preparation of hyperbolic curtain wall based on BIM technology, characterized in that: The method comprises: A hyperbolic curtain wall to be modeled is obtained, a preparation process corresponding to the hyperbolic curtain wall is queried, curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall are collected, a modeling index corresponding to the hyperbolic curtain wall is analyzed, and core preparation process data in the curtain wall preparation data is extracted based on the preparation process and the modeling index, wherein the extracting core preparation process data in the curtain wall preparation data based on the preparation process and the modeling index includes: Analyze the process efficacy corresponding to the preparation process, and extract the data identifier corresponding to the curtain wall preparation data; The regression coefficient between the process efficacy and the data identifier is calculated by the following formula: in, represents the regression coefficient between process efficacy and data identification, Represents the observed value of the indicator of the process efficacy corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the process efficacy, represents the observed value of the identifier corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the data identifier, and n represents the total number of data identifiers; Mining data description information corresponding to the curtain wall preparation data; Calculating a matching coefficient between the data description information and the modeling index; Combining the regression coefficient and the matching coefficient, extracting the core preparation process data in the curtain wall preparation data; Inputting the core preparation process data and the modeling index as input data into a pre-trained curtain wall evaluation model, using the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and using the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing accuracy corresponding to the process curtain wall model, wherein inputting the core preparation process data and the modeling index as input data into a pre-trained curtain wall evaluation model, and using the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, includes: Extracting key features of the core preparation process data using the feature extraction layer in the model building layer; According to the modeling index, the curtain wall three-dimensional resource component is configured using the resource configuration layer in the model construction layer; According to the preparation process, clustering the key features of the data is performed using the clustering layer in the model building layer to obtain process clustering features; In combination with the process clustering features, the curtain wall three-dimensional resource component is used to construct a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process; Determine an application scenario corresponding to the hyperbolic curtain wall, analyze the scenario function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate a performance metric criterion corresponding to the hyperbolic curtain wall based on the scenario function requirements, calculate a performance metric value corresponding to the performance metric criterion based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance metric value; In combination with the process efficiency and the processing precision, the preparation process is optimized to obtain an optimized preparation process, and optimized preparation data corresponding to the optimized preparation process is collected, and the optimized preparation data is input into a pre-trained BIM model, and a visualization model of the hyperbolic curtain wall is constructed using the visualization display layer in the BIM model. In combination with the scene function requirements, the layout of the visualization model is optimized using the layout decision layer in the BIM model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

2. A data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology as claimed in claim 1, characterized in that: The calculating the matching coefficient between the data description information and the modeling index includes: Calculating information entropy corresponding to the data description information; According to the information entropy, the data description information is subjected to information filtering processing to obtain target description information; Respectively performing element identification on the target description information and the modeling index to obtain information elements and index elements; Calculating the element matching degree between the information element and the indicator element; According to the element matching degree, a matching coefficient between the data description information and the modeling index is obtained.

3. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 1, characterized in that: The step of evaluating the processing precision corresponding to the process curtain wall model by using the precision evaluation layer in the curtain wall evaluation model includes: Querying the processing deviation type corresponding to the preparation process, the processing deviation type including: geometric deviation and surface fitting deviation; Extracting geometric feature points corresponding to the process curtain wall model and the preset standard curtain wall model to obtain model feature geometric points and standard feature feature points; Calculating the distance deviation value between the model feature geometric point and the standard feature feature point using the geometric deviation function in the accuracy evaluation layer; Performing surface fitting processing on the process curtain wall model and the standard curtain wall model respectively to obtain a curtain wall fitting surface and a standard fitting surface; Calculating the surface deviation value between the curtain wall fitting surface and the standard fitting surface by using the error function in the accuracy evaluation layer; The processing precision corresponding to the process curtain wall model is evaluated in combination with the surface deviation value and the distance deviation value.

4. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 1, characterized in that: Based on the application scenario, analyzing the scene function requirements corresponding to the hyperbolic curtain wall includes: Collecting scene information of the application scene, and analyzing scene attributes corresponding to the application scene according to the scene information; According to the scene attributes, determining the application function requirements of the hyperbolic curtain wall in the application scene, and analyzing the attribute benefits corresponding to the scene attributes; In combination with the attribute benefits, the scene function requirements corresponding to the hyperbolic curtain wall are screened out from the application function requirements.

5. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 1, characterized in that: The calculating, based on the material performance data, a performance metric value corresponding to the performance metric criterion includes: Performing discrete data elimination processing on the material performance data to obtain target performance data; Performing smoothing correction on the target performance data to obtain smoothed performance data; Extracting the associated performance value corresponding to the performance metric criterion from the smoothed performance data; Standardizing the associated performance value to obtain a standard performance value; Based on the standard performance value, a performance metric value corresponding to the performance metric criterion is calculated.

6. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 1, characterized in that: The step of inputting the optimized preparation data into a pre-trained BIM model and constructing a visualization model of the hyperbolic curtain wall using a visualization display layer in the BIM model includes: Using the mapping layer in the visualization layer to match the optimized preparation data with the preset data fields, to obtain field matching data; The data association layer in the visualization display layer is used to associate the field matching data with the preset curtain wall elements, and the element association data; According to the element association data, a visualization model of the hyperbolic curtain wall is constructed using a three-dimensional geometry engine in the visualization display layer.

7. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 1, characterized in that: The method combines the scene function requirements and utilizes the layout decision layer in the BIM model to perform layout optimization processing on the visualization model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall, including: According to preset installation rules, the component integration layer in the layout decision layer is used to integrate the visualization model to obtain an integrated model; Calculating the installation compatibility of each model in the integrated model, and determining the optimal integrated model in the integrated model based on the installation compatibility; In combination with the functional requirements of the scenario, the target decision layer in the layout decision layer is used to define the decision objective function corresponding to the optimal integrated model; Calculating the objective function value corresponding to the integrated model using the decision objective function; According to the objective function value, the layout optimization algorithm in the layout decision layer is used to perform layout optimization processing on the optimal integrated model to obtain a curtain wall digital model corresponding to the hyperbolic curtain wall.

8. The data modeling method for realizing the preparation of a hyperbolic curtain wall based on BIM technology according to claim 7, characterized in that: The calculating the installation fit corresponding to each model in the integrated model includes: measuring component distances corresponding to the integrated model; Counting the number of components in the integrated model; Calculating a distance offset corresponding to the component distance; The installation fit corresponding to each model in the integrated model is calculated by combining the distance offset and the number of components.

9. A data modeling system for realizing the preparation of hyperbolic curtain walls based on BIM technology, characterized in that: The system comprises: A data processing module is used to obtain a hyperbolic curtain wall to be modeled, query the preparation process corresponding to the hyperbolic curtain wall, collect curtain wall preparation data and material performance data corresponding to the hyperbolic curtain wall, analyze the modeling index corresponding to the hyperbolic curtain wall, and extract core preparation process data from the curtain wall preparation data based on the preparation process and the modeling index, wherein the extracting the core preparation process data from the curtain wall preparation data based on the preparation process and the modeling index includes: Analyze the process efficacy corresponding to the preparation process, and extract the data identifier corresponding to the curtain wall preparation data; The regression coefficient between the process efficacy and the data identifier is calculated by the following formula: in, represents the regression coefficient between process efficacy and data identification, Represents the observed value of the indicator of the process efficacy corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the process efficacy, represents the observed value of the identifier corresponding to the i-th identifier in the data identifier, represents the average observed value corresponding to the data identifier, and n represents the total number of data identifiers; Mining data description information corresponding to the curtain wall preparation data; Calculating a matching coefficient between the data description information and the modeling index; Combining the regression coefficient and the matching coefficient, extracting the core preparation process data in the curtain wall preparation data; A precision evaluation module is used to input the core preparation process data and the modeling index as input data into a pre-trained curtain wall evaluation model, use the model building layer in the curtain wall evaluation model to build a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, and use the accuracy evaluation layer in the curtain wall evaluation model to evaluate the processing precision corresponding to the process curtain wall model, wherein the core preparation process data and the modeling index are input as input data into a pre-trained curtain wall evaluation model, and the model building layer in the curtain wall evaluation model is used to build the process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process, including: Extracting key features of the core preparation process data using the feature extraction layer in the model building layer; According to the modeling index, the curtain wall three-dimensional resource component is configured using the resource configuration layer in the model construction layer; According to the preparation process, clustering the key features of the data is performed using the clustering layer in the model building layer to obtain process clustering features; In combination with the process clustering features, the curtain wall three-dimensional resource component is used to construct a process curtain wall model of the hyperbolic curtain wall corresponding to the preparation process; A process efficiency module is used to determine the application scenario corresponding to the hyperbolic curtain wall, analyze the scene function requirements corresponding to the hyperbolic curtain wall based on the application scenario, formulate the performance measurement criteria corresponding to the hyperbolic curtain wall based on the scene function requirements, calculate the performance measurement value corresponding to the performance measurement criteria based on the material performance data, and evaluate the process efficiency corresponding to the preparation process according to the performance measurement value; The digital model building module is used to optimize the preparation process in combination with the process efficiency and the processing precision to obtain an optimized preparation process, and collect optimized preparation data corresponding to the optimized preparation process, input the optimized preparation data into a pre-trained BIM model, and use the visualization display layer in the BIM model to build a visualization model of the hyperbolic curtain wall. In combination with the scene function requirements, the layout decision layer in the BIM model is used to optimize the layout of the visualization model to obtain a digital curtain wall model corresponding to the hyperbolic curtain wall.

Citation Information

Patent Citations

  • Curtain wall modeling method and system based on BIM model

    CN112149211A

  • Unit type curtain wall parametric modeling method based on BIM technology

    CN114372301A

  • Engineering quality checking method and system based on BIM (Building Information Modeling) and live-action measurement technology

    CN118195375A