Real-time verification and reporting method and device for power generation data of wind, solar and storage integrated power station
By updating the maximum power that can be generated based on actual generated power and uploading it uniformly in wind, solar, and storage integrated power stations, the problem of data misalignment is solved and the accuracy of power generation data and power station benefits are improved.
Patent Information
- Application Number
- CN202411061207.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-05
AI Technical Summary
When reporting power generation data from integrated wind, solar, and storage power stations, due to different communication links, different update time scales, and unit inertia, the maximum power that can be generated is less than the actual power generated, resulting in low data quality and affecting the efficiency of the power station.
By obtaining the maximum transmittable power and actual transmitted power fed back by the energy management platform, the reporting scheduling step is determined based on the data frequency of the actual transmitted power, and the maximum transmittable power and actual transmitted power are collected and compared. When the maximum transmittable power is less than the actual transmitted power, Its value is updated when power is generated and uploaded to the power grid dispatching center uniformly to overcome the problem of data misalignment.
It improves the accuracy and quality of power generation data, reduces the occurrence of abnormal data, improves the operating efficiency and data processing efficiency of the power station, and ensures the safe operation of the power station.
Smart Images

Figure CN118587038B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid data reporting, and in particular to a method and device for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station. Background Art
[0002] With the rapid increase in installed capacity of new energy, a large number of new energy sources are connected to the power grid. The volatility, randomness and intermittency of new energy sources have brought great challenges to the safe and stable operation of the power grid. In order to better understand the power generation status and power generation capacity of new energy sites, the regional power grid dispatching center requires new energy sites within the jurisdiction to accurately report the real-time maximum power generation of wind power, photovoltaic and energy storage equipment, actual power generation and other key data in real time, and the accuracy of real-time reporting data is used as the examination target.
[0003] At present, the maximum power that can be generated by wind power is obtained through the wind speed and the power curve of the wind turbine and sent to the wind turbine energy management platform in real time. The wind turbine energy management platform sends it to the power grid dispatching system through the wind, solar and storage coordination controller. The real-time maximum power that can be generated by photovoltaic power stations is usually obtained by monitoring parameters such as solar radiation intensity, temperature and the voltage and current of photovoltaic components and sent to the photovoltaic energy management platform in real time. The photovoltaic energy management platform sends the real-time maximum power table to the power grid dispatching system through the wind, solar and storage coordination controller. The actual power generation of wind power and photovoltaic power is received by the wind, solar and storage coordination controller and distributed to the wind turbine and photovoltaic energy management platform for execution according to the same time scale. The wind, solar and storage coordination controller obtains the actual power of the unit from the wind and solar energy management platform and sends it to the power grid dispatching system.
[0004] The maximum power that can be generated by wind power and photovoltaic power is fluctuating, random and intermittent, so the update of the maximum power that can be generated is also random. The actual power generated by wind power and photovoltaic power is sent to the units at the same time scale according to the dispatching instructions, and the actual power generation power forwarded by the wind and solar energy management platform obtained by the wind, solar and storage coordination controller is sent to the power grid dispatching system. The maximum power that can be generated by wind, solar and storage is sent to the power grid dispatching system in real time through the dispatching data network. Due to different communication links, different update time scales and unit inertia, the maximum power that can be generated by the power station sent by the power grid dispatching center is misaligned with the actual power generation power, resulting in the maximum power that can be generated being less than the actual power generation power. The quality of the reported data is low, and it is then identified as abnormal data by the power grid dispatching center. When the abnormal data is greater than the specified value, the power station will be assessed for power, which reduces the efficiency of the power station. Summary of the invention
[0005] In view of this, the present invention provides a method and device for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station, so as to solve the technical problem of low quality of power generation data reported by the integrated power station.
[0006] In a first aspect, the present invention provides a method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station, including: obtaining the maximum transmittable power and the actual transmittable power fed back by an energy management platform; determining the reporting scheduling step according to the data frequency of the actual transmittable power fed back by the energy management platform; collecting the maximum transmittable power fed back by the energy management platform according to the reporting scheduling step; comparing the collected maximum transmittable power with the actual transmittable power at the same moment, and when the collected maximum transmittable power is less than the actual transmittable power at the same moment, updating the maximum transmittable power at the current moment to the actual transmittable power at the same moment; and uploading the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center in a unified manner according to the reporting scheduling step.
[0007] The present invention provides a real-time verification and reporting method for power generation data of a wind-solar-storage integrated power station. The method obtains the maximum transmittable power and the actual transmittable power fed back by an energy management platform, determines the reporting scheduling step length by the data frequency of receiving the actual transmittable power, and collects the maximum transmittable power fed back by the energy management platform according to the reporting scheduling step length, compares the collected maximum transmittable power with the actual transmittable power at the same time, and when the collected maximum transmittable power is less than the actual transmittable power at the same time, updates the current maximum transmittable power to the actual transmittable power at the same time, and finally uploads the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center in a unified manner according to the reporting scheduling step length, thereby overcoming the problem that the maximum transmittable power of the data sent to the power grid is less than the actual transmittable power due to different communication links, different update time scales, inertia of the unit and other reasons when the normal operation data of the unit is different.
[0008] Optionally, before comparing the collected maximum transmittable power with the actual transmittable power at the same moment, the method further includes: determining a value of a status word according to the collected maximum transmittable power at the current moment and the maximum transmittable power at the previous moment; and determining whether to compare the collected maximum transmittable power with the actual transmittable power at the same moment according to the value of the status word.
[0009] In this manner, whether to perform subsequent comparison is determined according to the value of the status word, thereby reducing unnecessary data comparisons and improving data processing efficiency.
[0010] Optionally, the value of the status word is determined according to the magnitude of the maximum transmittable power collected at the current moment and the maximum transmittable power collected at the previous moment, including: comparing the magnitude of the maximum transmittable power collected at the current moment and the maximum transmittable power collected at the previous moment; if the maximum transmittable power collected at the current moment is greater than the maximum transmittable power collected at the previous moment, the value of the status word is a first set value; if the maximum transmittable power collected at the current moment is equal to the maximum transmittable power collected at the previous moment, the value of the status word is a second set value; if the maximum transmittable power collected at the current moment is less than the maximum transmittable power collected at the previous moment, the value of the status word is a third set value.
[0011] In this manner, by setting the corresponding status word value for different comparison results, subsequent logic control is facilitated.
[0012] Optionally, determining whether to compare the collected maximum transmittable power with the actual transmittable power at the same time is performed according to the value of the status word, including: when the value of the status word is a third set value, comparing the collected maximum transmittable power with the actual transmittable power at the same time; when the value of the status word is the first set value or the second set value, not comparing the collected maximum transmittable power with the actual transmittable power at the same time.
[0013] In this manner, the maximum transmittable power collected is compared with the actual transmittable power at the same moment only when the value of the status word is the third set value, that is, the maximum transmittable power at the current moment is less than the maximum transmittable power at the previous moment, thereby reducing the number of comparisons and shortening the calculation cycle.
[0014] Optionally, after the updated maximum transmittable power and actual transmittable power are uniformly uploaded to the power grid dispatching center according to the reported dispatching step, the method further includes: when the value of the statistical status word is a third set value, the maximum transmittable power is updated to the values before and after the update of the actual transmittable power and the proportion of the updated data in all uploaded data; when the value of the statistical status word is a first set value, the deviation and deviation duration of the maximum transmittable power and actual transmittable power table; and the power generation loss is calculated according to the deviation and deviation duration of the maximum transmittable power and actual transmittable power table;
[0015] Generate core reports based on the values before and after the update, the proportion of updated data in all uploaded data, the deviation and deviation duration of the maximum power and actual power tables, and power generation losses.
[0016] In this method, by counting the values before and after the maximum transmittable power is updated to the actual transmittable power and the proportion of the updated data in all uploaded data, it is convenient to understand the update status of the reported data; by counting the deviation and deviation duration of the maximum transmittable power and the actual transmittable power table, and automatically calculating the power generation loss, it provides a reference for exploring the power generation capacity of the station and improves the power generation efficiency of the power station.
[0017] Optionally, after obtaining the maximum transmittable power and actual transmittable power fed back by the energy management platform, it also includes: determining whether there is a data failure in the maximum transmittable power and / or actual transmittable power fed back by the energy management platform; if a data failure occurs, stopping sending data to the power grid dispatching center and issuing a fault alarm to the power station centralized control.
[0018] This method can quickly respond to data failures and ensure the safe operation of the power station.
[0019] Optionally, the energy management platform is a combination of one or more of a wind turbine energy management platform, a photovoltaic energy management platform and an energy storage energy management platform; correspondingly, the maximum generateable power and the actual generated power are the maximum generateable power and the actual generated power of the wind turbine, photovoltaic inverter or energy storage unit.
[0020] In the second aspect, the present invention provides a real-time verification and reporting device for power generation data of a wind, solar and storage integrated power station, including: a feedback receiving module, used to obtain the maximum transmittable power and the actual transmittable power fed back by an energy management platform; a step determination module, used to determine the reporting scheduling step according to the data frequency of the actual transmittable power fed back by the energy management platform; a data acquisition module, used to collect the maximum transmittable power fed back by the energy management platform according to the reporting scheduling step; a power update module, used to compare the collected maximum transmittable power and the actual transmittable power at the same moment, when the collected maximum transmittable power is less than the actual transmittable power at the same moment, the maximum transmittable power at the current moment is updated to the actual transmittable power at the same moment; a data reporting module, used to upload the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center in a unified manner according to the reporting scheduling step.
[0021] In a third aspect, the present invention provides a scheduling core data reporting device, including: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the real-time verification and reporting method of power generation data of a wind, solar and storage integrated power station according to the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0022] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a flow chart of a method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to an embodiment of the present invention;
[0025] Figure 2 This is a schematic diagram of a scenario application of a scheduling core data reporting device according to an embodiment of the present invention;
[0026] Figure 3 It is a structural block diagram of a device for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to an embodiment of the present invention;
[0027] Figure 4 It is a schematic diagram of the hardware structure of the scheduling core data reporting device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0029] At present, when the power generation data of the wind, solar and storage integrated power station is reported, the normal operation data of the unit is different due to different communication links, different update time scales and unit inertia, resulting in the maximum power that can be sent to the power grid data being less than the actual power, resulting in abnormal data. Based on this, an embodiment of the present invention provides a method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station.
[0030] According to an embodiment of the present invention, an embodiment of a method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and, although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0031] In this embodiment, a method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station is provided, which is applied to a dispatching core data reporting device, such as Figure 2 As shown in the figure, the dispatch core data reporting device uniformly receives the data fed back by each energy management platform, processes it and uploads it to the power grid dispatch center. Figure 1 As shown, the process of the method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station includes the following steps:
[0032] Step S101, obtaining the maximum transmittable power and the actual transmittable power fed back by the energy management platform.
[0033] Specifically, optionally, the energy management platform is a combination of one or more of a wind turbine energy management platform, a photovoltaic energy management platform and an energy storage energy management platform.
[0034] In one example, the energy management platform is a wind turbine energy management platform, a photovoltaic energy management platform, and an energy storage energy management platform.
[0035] Correspondingly, the maximum generable power and actual generated power are the maximum generable power and actual generated power of the wind turbine, photovoltaic inverter or energy storage unit.
[0036] Each energy management platform collects the maximum power and actual power of the corresponding power generation unit and sends it to the scheduling core data reporting device at a preset frequency. The scheduling core data reporting device thus obtains the maximum power and actual power fed back by the energy management platform.
[0037] It should be understood that due to the limitations of the power grid operating conditions, the upload frequency and time of the maximum power that can be generated and the actual power generated are inconsistent.
[0038] Step S102, determining the reporting scheduling step length according to the data frequency of the actual power fed back by the energy management platform.
[0039] Specifically, the data frequency of the actual power generated by wind power, photovoltaic power and energy storage is used as the reporting scheduling step, so as to ensure the integrity and accuracy of the actual power data as much as possible.
[0040] Step S103, collecting the maximum transmittable power fed back by the energy management platform according to the reported scheduling step size.
[0041] Specifically, the scheduling core data reporting device collects the maximum transmittable power fed back by the energy management platform according to the reported scheduling step size to obtain the data of the maximum transmittable power and the actual transmittable power at the same time.
[0042] Step S104, comparing the collected maximum transmittable power with the actual transmittable power at the same time, when the collected maximum transmittable power is less than the actual transmittable power at the same time, updating the current maximum transmittable power to the actual transmittable power at the same time.
[0043] Step S105, the updated maximum transmittable power and the actual transmittable power are uniformly uploaded to the power grid dispatching center according to the reported dispatching step size.
[0044] Specifically, when the maximum generateable power is greater than or equal to the actual generated power, the current maximum generateable power and actual generated power data of wind, solar and storage are directly and uniformly sent to the power grid dispatching center.
[0045] When the maximum generateable power is less than the actual generateable power at the same moment, the current maximum generateable power of wind, solar and storage will be updated to their respective actual generateable powers, and uploaded to the power grid dispatching center in a unified manner according to the reported dispatching step.
[0046] The present invention provides a real-time verification and reporting method for power generation data of a wind-solar-storage integrated power station. The method obtains the maximum transmittable power and the actual transmittable power fed back by an energy management platform, determines the reporting scheduling step length by the data frequency of receiving the actual transmittable power, and collects the maximum transmittable power fed back by the energy management platform according to the reporting scheduling step length, compares the collected maximum transmittable power with the actual transmittable power at the same time, and when the collected maximum transmittable power is less than the actual transmittable power at the same time, updates the current maximum transmittable power to the actual transmittable power at the same time, and finally uploads the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center in a unified manner according to the reporting scheduling step length, thereby overcoming the problem that the maximum transmittable power of the data sent to the power grid is less than the actual transmittable power due to different communication links, different update time scales, inertia of the unit and other reasons when the normal operation data of the unit is different.
[0047] In one embodiment, in step S101, after obtaining the maximum transmittable power and the actual transmittable power fed back by the energy management platform, the method further includes:
[0048] Step S1011, determining whether there is a data failure in the maximum transmittable power and / or the actual transmittable power fed back by the energy management platform;
[0049] Step S1012: If a data failure occurs, data transmission to the power grid dispatching center is stopped and a failure alarm is issued to the power station centralized control center.
[0050] Specifically, the conditions for judging whether the maximum transmittable power and / or the actual transmittable power reported by the energy management platform has data failure are that the reported data is obviously wrong or not reported or cannot be collected, etc. Among them, when the reported data does not meet the preset normal range, it is considered that the reported data is obviously wrong. If no data is received within the preset time interval, it is judged that the data is not reported or cannot be collected.
[0051] The embodiments of the present invention can quickly respond to data failures and ensure safe operation of power stations.
[0052] In one embodiment, before comparing the collected maximum transmittable power with the actual transmittable power at the same time in step S104, the method further includes:
[0053] Step S1041, determining the value of the status word according to the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment.
[0054] Specifically, the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment are compared; if the maximum transmittable power at the current moment is greater than the maximum transmittable power at the previous moment, the value of the status word is the first set value; if the maximum transmittable power at the current moment is equal to the maximum transmittable power at the previous moment, the value of the status word is the second set value; if the maximum transmittable power at the current moment is less than the maximum transmittable power at the previous moment, the value of the status word is the third set value.
[0055] The first set value, the second set value and the third set value are set according to the actual situation. In an exemplary embodiment, the first set value is "1", the second set value is "0", and the third set value is "-1". The first set value, the second set value and the third set value are used to distinguish different comparison results. By setting the corresponding status word value for different comparison results, subsequent logic control is convenient.
[0056] Step S1042: Determine whether to compare the collected maximum transmittable power with the actual transmit power at the same time according to the value of the status word.
[0057] Specifically, when the value of the status word is the third set value, the collected maximum transmittable power is compared with the actual transmittable power at the same time; when the value of the status word is the first set value or the second set value, the collected maximum transmittable power is not compared with the actual transmittable power at the same time.
[0058] That is, when the value of the status word is "-1", the maximum power that can be generated is compared with the actual power generated at the same time, and the subsequent update process is performed. When the value of the status word is "1" or "0", no subsequent comparison and update process is performed, and the collected data is directly reported to the power grid dispatching center.
[0059] In the embodiment of the present invention, the maximum transmittable power collected is compared with the actual transmittable power at the same moment only when the value of the status word is the third set value, that is, the maximum transmittable power at the current moment is less than the maximum transmittable power at the previous moment, which can reduce the number of comparisons and shorten the calculation cycle.
[0060] The embodiment of the present invention determines the value of the status word according to the comparison result of the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment, and determines whether to perform subsequent comparison according to the value of the status word, thereby reducing unnecessary data comparison and improving data processing efficiency.
[0061] In one embodiment, in step S105, after the updated maximum transmittable power and the actual transmittable power are uniformly uploaded to the power grid dispatching center according to the reported dispatching step, the following further includes:
[0062] Step S106, when the value of the statistical status word is the third set value, the maximum transmittable power is updated to the values before and after the update of the actual transmit power and the proportion of the updated data in the total uploaded data;
[0063] Step S107, counting the deviation and deviation duration between the maximum transmittable power and the actual transmittable power when the value of the status word is the first set value;
[0064] Step S108, calculating the power generation loss according to the deviation between the maximum power that can be generated and the actual power generated and the duration of the deviation;
[0065] Step S109, generating a core report based on the values before and after the update, the proportion of the updated data in the total uploaded data, the deviation and deviation duration of the maximum transmittable power and the actual transmittable power table, and the power generation loss.
[0066] Specifically, the dispatch core data reporting device automatically generates the data reported within this month every month. When the status word is the third set value, that is, the status word is "-1", the current maximum power of wind, light, and storage marked in red is updated to the updated value before and after the actual power of each power and the daily and monthly proportion. When the status word is the first set value, that is, the status word is "1", the deviation and deviation duration between the actual power and the maximum power are automatically counted, the power generation loss is automatically calculated, and the core report is generated based on the statistical data.
[0067] In this embodiment, by counting the values before and after the maximum transmittable power is updated to the actual transmittable power and the proportion of the updated data in all uploaded data, it is convenient to understand the update status of the reported data; by counting the deviation and deviation duration of the maximum transmittable power and the actual transmittable power table, and automatically calculating the power generation loss, a reference is provided for exploring the power generation capacity of the station and improving the power generation efficiency of the power station.
[0068] A method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station in an embodiment of the present invention overcomes the problem of abnormal data in which the maximum power that can be generated by sending data to the power grid is less than the actual power generated due to different communication links, different update time scales and unit inertia when the normal operation data of the unit is operating.
[0069] By taking the actual power update cycle as the step length and starting the comparison program only when the status word is "-1", the number of comparisons is reduced and the calculation cycle is shortened.
[0070] Generate core reports, starting from data value, maximize the quality and timeliness of reported dispatch core data, and improve the automation level of core reports of stations to reduce work intensity. At the same time, it can also automatically calculate the maximum possible deviation and deviation duration, and automatically calculate power generation losses, to provide a reference for mining station power generation capacity and improve power generation efficiency.
[0071] In summary, the embodiments of the present invention greatly improve the quality, timeliness and intelligence level of reported scheduling core data.
[0072] The embodiment of the present invention also provides a real-time verification and reporting device for power generation data of a wind-solar-storage integrated power station, such as Figure 3 As shown, including:
[0073] Feedback receiving module 301, used to obtain the maximum transmittable power and actual transmittable power fed back by the energy management platform;
[0074] A step length determination module 302, configured to determine a reporting scheduling step length according to the frequency of data of actual power fed back by the energy management platform;
[0075] The data collection module 303 is used to collect the maximum transmittable power fed back by the energy management platform according to the reported scheduling step length;
[0076] The power update module 304 is used to compare the maximum transmittable power collected with the actual transmittable power at the same time, and when the maximum transmittable power collected is less than the actual transmittable power at the same time, update the maximum transmittable power at the current time to the actual transmittable power at the same time;
[0077] The data reporting module 305 is used to uniformly upload the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center according to the reporting scheduling step.
[0078] The real-time verification and reporting device for power generation data of an integrated wind, solar and storage power station in an embodiment of the present invention obtains the maximum transmittable power and the actual transmittable power fed back by an energy management platform, determines the reporting scheduling step by receiving the data frequency of the actual transmittable power, and collects the maximum transmittable power fed back by the energy management platform according to the reporting scheduling step, compares the collected maximum transmittable power with the actual transmittable power at the same time, and when the collected maximum transmittable power is less than the actual transmittable power at the same time, updates the current maximum transmittable power to the actual transmittable power at the same time, and finally uploads the updated maximum transmittable power and the actual transmittable power to the power grid dispatching center in a unified manner according to the reporting scheduling step, thereby overcoming the problem that the maximum transmittable power of the data sent to the power grid is less than the actual transmittable power due to different communication links, different update time scales and inertia of the unit when the normal operation data of the unit is different.
[0079] Further, the power update module 304 includes:
[0080] A status word determination module, used to determine the value of the status word according to the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment collected;
[0081] The comparison and determination module is used to determine whether to compare the collected maximum transmittable power with the actual transmit power at the same time according to the value of the status word.
[0082] Furthermore, the status word determination module includes:
[0083] A first comparison module is used to compare the maximum transmittable power at the current moment with the maximum transmittable power at the previous moment.
[0084] A first status word setting module, configured to set the status word value to a first set value if the maximum power that can be generated at the current moment is greater than the maximum power that can be generated at the previous moment;
[0085] A second status word setting module, configured to set the value of the status word to a second set value if the maximum transmittable power at the current moment is equal to the maximum transmittable power at the previous moment;
[0086] The third status word setting module is used for setting the status word value to a third set value if the maximum transmittable power at the current moment is less than the maximum transmittable power at the previous moment.
[0087] Furthermore, the comparison and determination module includes:
[0088] A comparison implementation module, used for comparing the maximum transmittable power collected with the actual transmit power at the same time when the value of the status word is a third set value;
[0089] The comparison skip module is used for not comparing the collected maximum transmittable power with the actual transmittable power at the same time when the value of the status word is the first set value or the second set value.
[0090] Furthermore, the real-time verification and reporting device for power generation data of the wind-solar-storage integrated power station also includes:
[0091] A first statistical module, used for counting the value of the status word as the third set value, the maximum transmittable power is updated to the values before and after the update of the actual transmit power, and the proportion of the updated data in the total uploaded data;
[0092] A second statistical module is used to count the deviation and deviation duration of the maximum transmittable power and the actual transmittable power table when the value of the status word is the first set value;
[0093] A loss calculation module, used for calculating power generation loss according to the deviation and deviation duration of the maximum power that can be generated and the actual power table;
[0094] The report generation module is used to generate core reports based on the values before and after the update, the proportion of the updated data in the total uploaded data, the deviation and deviation duration of the maximum power and actual power tables, and the power generation loss.
[0095] Furthermore, the feedback receiving module 301 includes:
[0096] A fault judgment module is used to judge whether there is a data fault in the maximum transmittable power and / or the actual transmittable power fed back by the energy management platform;
[0097] The alarm module is used to stop sending data to the power grid dispatching center and send a fault alarm to the power station centralized control if a data failure occurs.
[0098] Furthermore, the energy management platform is a combination of one or more of a wind turbine energy management platform, a photovoltaic energy management platform and an energy storage energy management platform; correspondingly, the maximum generateable power and the actual generateable power are the maximum generateable power and the actual generateable power of the wind turbine, photovoltaic inverter or energy storage unit.
[0099] The embodiment of the present invention also provides a schematic diagram of the structure of a scheduling core data reporting device, such as Figure 4 As shown, the scheduling core data reporting device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process instructions executed in the scheduling core data reporting device, including instructions stored in or on the memory to display graphical information of the GUI on an external input / output device (such as a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple scheduling core data reporting devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.
[0100] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0101] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0102] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required by at least one function; the data storage area may store data created according to the use of the scheduling core data reporting device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the scheduling core data reporting device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0103] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0104] The scheduling core data reporting device also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 can be connected via a bus or other means. Figure 4 The example of connecting through bus is taken in the following.
[0105] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the scheduling core data reporting device, such as a touch screen, a keypad, a mouse, a trackpad, a touchpad, an indicator rod, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device may be a touch screen.
[0106] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0107] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0108] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station, characterized in that: include: Obtain the maximum transmittable power and actual transmittable power fed back by the energy management platform, wherein each energy management platform sends the maximum transmittable power and actual transmittable power of the corresponding power generation unit collected by it to the scheduling core data reporting device at a preset frequency, and the scheduling core data reporting device thereby obtains the maximum transmittable power and actual transmittable power fed back by the energy management platform; Determine the reporting scheduling step length according to the data frequency of the actual power fed back by the energy management platform; The maximum transmittable power fed back by the energy management platform is collected according to the reported scheduling step length, wherein the scheduling core data reporting device collects the maximum transmittable power fed back by the energy management platform according to the reported scheduling step length to obtain data of the maximum transmittable power and the actual transmittable power at the same time; Compare the maximum transmittable power collected with the actual transmittable power at the same time. If the maximum transmittable power collected is less than the actual transmittable power at the same time, update the maximum transmittable power at the current time to the actual transmittable power at the same time. The updated maximum transmittable power and actual transmittable power are uniformly uploaded to the power grid dispatching center according to the reported dispatching step.
2. The method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to claim 1 is characterized in that: Before comparing the maximum transmittable power collected and the actual transmittable power at the same time, the following steps are also included: Determine the value of the status word according to the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment. According to the value of the status word, it is determined whether to compare the collected maximum transmittable power with the actual transmit power at the same time.
3. The method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to claim 2 is characterized in that: The value of the status word is determined according to the maximum transmittable power at the current moment and the maximum transmittable power at the previous moment, including: Compare the maximum power that can be generated at the current moment with the maximum power that can be generated at the previous moment; If the maximum power that can be generated at the current moment is greater than the maximum power that can be generated at the previous moment, the value of the status word is the first set value; If the maximum power that can be generated at the current moment is equal to the maximum power that can be generated at the previous moment, the value of the status word is the second set value; If the maximum power that can be generated at the current moment is less than the maximum power that can be generated at the previous moment, the value of the status word is the third set value.
4. The method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to claim 3 is characterized in that: Determine whether to compare the maximum transmittable power collected with the actual transmit power at the same time according to the value of the status word, including: When the value of the status word is the third set value, the maximum transmittable power collected is compared with the actual transmit power at the same time; When the value of the status word is the first set value or the second set value, the collected maximum transmittable power and the actual transmit power at the same time are not compared.
5. The method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to claim 4 is characterized in that: After the updated maximum transmittable power and the actual transmittable power are uniformly uploaded to the power grid dispatching center according to the reported dispatching step, the method further includes: When the value of the statistical status word is the third set value, the maximum transmittable power is updated to the values before and after the update of the actual transmit power and the proportion of the updated data in the total uploaded data; When the value of the statistical status word is the first set value, the deviation and deviation duration of the maximum transmittable power and the actual transmittable power table; Calculate power generation loss based on the deviation between the maximum power that can be generated and the actual power generated and the duration of the deviation; Generate core reports based on the values before and after the update, the proportion of updated data in all uploaded data, the deviation and deviation duration of the maximum power and actual power tables, and power generation losses.
6. The method for real-time verification and reporting of power generation data of a wind, solar and storage integrated power station according to claim 1 is characterized in that: After obtaining the maximum transmittable power and actual transmittable power from the energy management platform, the following are also included: Determine whether there is a data failure in the maximum transmittable power and / or the actual transmittable power fed back by the energy management platform; If a data failure occurs, data transmission to the power grid dispatching center will stop and a fault alarm will be issued to the power station centralized control.
7. The method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to claim 1 is characterized in that: The energy management platform is a combination of one or more of a wind turbine energy management platform, a photovoltaic energy management platform and an energy storage energy management platform; Correspondingly, the maximum generable power and actual generated power are the maximum generable power and actual generated power of the wind turbine, photovoltaic inverter or energy storage unit.
8. A real-time verification and reporting device for power generation data of a wind, solar and storage integrated power station, characterized in that: include: A feedback receiving module is used to obtain the maximum transmittable power and actual transmittable power fed back by the energy management platform. Each energy management platform sends the maximum transmittable power and actual transmittable power of the corresponding power generation unit collected by it to the scheduling core data reporting device at a preset frequency, and the scheduling core data reporting device thereby obtains the maximum transmittable power and actual transmittable power fed back by the energy management platform; A step length determination module, used to determine the reporting scheduling step length according to the data frequency of the actual power fed back by the energy management platform; A data collection module is used to collect the maximum transmittable power fed back by the energy management platform according to the reported scheduling step length, wherein the scheduling core data reporting device collects the maximum transmittable power fed back by the energy management platform according to the reported scheduling step length to obtain the data of the maximum transmittable power and the actual transmittable power at the same time; A power update module is used to compare the maximum transmittable power collected with the actual transmittable power at the same time. When the maximum transmittable power collected is less than the actual transmittable power at the same time, the maximum transmittable power at the current time is updated to the actual transmittable power at the same time. The data reporting module is used to uniformly upload the updated maximum transmittable power and actual transmittable power to the power grid dispatching center according to the reporting scheduling step.
9. A scheduling core data reporting device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to any one of claims 1 to 7 by executing the computer instructions.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method for real-time verification and reporting of power generation data of a wind-solar-storage integrated power station according to any one of claims 1 to 7.
Citation Information
Patent Citations
Power prediction deviation compensation method and device and controller
CN112491044A
Coordination control method and device for primary frequency modulation and AGC (Automatic Gain Control), and electronic equipment
CN115549128A
Cited By
Collaborative design integrated optimization method and system based on optical storage power station
CN121663575A
Wind and light storage integrated energy management system and scheduling method and system
CN122136912A
