A two-layer optimization configuration method for a thermal-storage combined frequency regulation hybrid energy storage system

Through the dual-layer optimal configuration method of the combined fire-storage frequency modulation hybrid energy storage system, combined with the grid connection guidelines and the complementary hybrid energy storage system of HESS, the high cost and economic benefits of the combined fire-storage energy storage configuration method in the existing technology are solved. It reduces problems, achieves efficient regulation performance and economically optimized configuration, and extends the service life of the battery energy storage system.

CN118589541BActive Publication Date: 2024-10-29ZHEJIANG UNIV +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411061117.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-29
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

The existing combined fire-storage energy storage configuration method has the problems of high cost and low economic benefit in frequency regulation applications, and a single BESS configuration cannot effectively solve a variety of adjustment problems, especially in the face of frequent short-term adjustment components, the adjustment capability is insufficient. This results in a waste of energy storage resources.

Method used

The dual-layer optimal configuration method of combined fire-storage frequency regulation hybrid energy storage system is used to determine the regulation performance-oriented frequency regulation requirements based on grid connection guidelines, and construct a HESS complementary hybrid storage composed of power-type flywheel energy storage and energy-type battery energy storage. The dual-layer optimized configuration model of the energy system optimizes the adjustment performance and economy, ensuring that the adjustment performance requirements are met and operating costs are minimized.

Benefits of technology

On the premise of regulating performance orientation, an optimized configuration solution that takes into account both economy and regulating performance is achieved, which reduces the waste of energy storage resources, extends the service life of the battery energy storage system, and reduces the whole life cycle cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118589541B_ABST
    Figure CN118589541B_ABST
Patent Text Reader

Abstract

The present application relates to a two-layer optimization configuration method, system, electronic device and storage medium for a thermal-storage combined frequency regulation hybrid energy storage system. By combining the requirements of the grid-connected guidelines for the regulation performance of the automatic generation control (AGC) of thermal power units, based on the historical AGC frequency regulation instruction demand characteristics and the unit's own response characteristics, a frequency regulation demand determination method guided by regulation performance is designed; a power-type flywheel energy storage (FESS) is introduced to form a hybrid energy storage system (HESS) with complementary characteristics of an energy-type BESS and a power-type FESS; and a two-layer optimization configuration model of a thermal-storage combined AGC frequency regulation HESS guided by regulation performance is constructed. The upper layer optimizes the configuration of the thermal power unit and the HESS to improve the regulation performance and economy, and the lower layer optimizes the joint regulation strategy under the specific AGC instruction to ensure that the regulation performance requirements are met and the operating cost is minimized. Under the premise of being guided by regulation performance, an optimized configuration scheme that takes into account both economy and regulation performance can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power plant operation and maintenance support, and in particular to a method and system for optimizing the configuration of a thermal-storage combined frequency regulation hybrid energy storage double-layer. Background Art

[0002] The high proportion of intermittent and fluctuating renewable energy access poses a severe challenge to the system power balance. The frequency regulation problem of the power system will become more prominent, and higher requirements will be placed on the frequency regulation performance of the generator set. Thermal power units are the main frequency regulation power source of the power system, but their regulation performance has many shortcomings, and other auxiliary means are needed to improve the regulation performance of the units.

[0003] In related technologies, a common method is to introduce energy storage devices to build a combined thermal-storage system to improve the frequency regulation performance of the unit's automatic generation control (AGC), providing more flexible and efficient auxiliary service support for thermal power units. The currently commonly used combined thermal-storage energy storage configuration method has strong engineering promotion but lacks guidance and optimization related to frequency regulation effects, that is, the system frequency regulation requirements and the mutual influence relationship between frequency regulation related indicators are not fully considered in the energy storage planning stage, resulting in a waste of energy storage resources.

[0004] In actual frequency regulation applications, a single battery energy storage system (BESS) is often used. It has a low cost, but irregular deep charging and discharging seriously affects its service life, and the chemical properties of the battery deteriorate. It usually needs to be replaced in about 2 years, and the cost is high over the entire life cycle. In the face of an increasingly harsh frequency regulation environment, BESS has insufficient regulation capabilities for frequent and short-term regulation components. Configuring only from a single BESS configuration cannot solve multiple problems. Summary of the invention

[0005] The embodiments of the present application provide a dual-layer optimization configuration method, system, computer device and computer-readable storage medium for a thermal-storage combined frequency modulation hybrid energy storage system, so as to at least solve the problem that the related art only studies from the aspect of a single BESS configuration and cannot solve the problem that the configuration method in the prior art leads to high cost and low economic benefit.

[0006] In a first aspect, an embodiment of the present application provides a two-layer optimization configuration method for a thermal-storage combined frequency modulation hybrid energy storage system, characterized in that the method comprises:

[0007] Based on the grid-connected guidelines’ demand information on the AGC frequency regulation performance of thermal power units, as well as the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, the frequency regulation demand corresponding to the thermal-storage combined frequency regulation system guided by regulation performance is determined;

[0008] According to the frequency regulation demand, a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model is constructed, and a configuration strategy is generated according to the double-layer optimization configuration model, wherein the double-layer optimization configuration model is a configuration model of a HESS complementary hybrid energy storage system composed of power-type flywheel energy storage and energy-type battery energy storage.

[0009] In some embodiments, based on the grid-connected guidelines' demand information on the AGC frequency regulation performance of thermal power units, demand characteristics corresponding to historical AGC frequency regulation instructions, and unit response characteristics, determining the frequency regulation demand guided by the regulation performance includes:

[0010] Acquire adjustment targets of three stages in the adjustment process, wherein the adjustment targets include an adjustment rate target, an adjustment accuracy target, and a response time;

[0011] Based on the grid-connected guidelines’ demand information on the AGC frequency regulation performance of thermal power units, the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, and the regulation target, the regulation performance-oriented frequency regulation demand boundary is constructed.

[0012] The frequency regulation demand boundary is used as a frequency regulation demand signal to control the output characteristics of the HESS complementary hybrid energy storage system, and the setting targets corresponding to the frequency regulation demand boundaries at different stages are configured according to the minimum AGC power response deviation to meet the regulation target.

[0013] In some embodiments, the method further comprises:

[0014] In the response phase, the frequency regulation demand boundary is determined based on the constraint that the output is equal to the actual frequency regulation output of the thermal power unit within a preset time after the thermal power unit issues a new instruction, and that the response dead zone is crossed at the first moment after the preset period;

[0015] In the ramping phase, the frequency regulation demand boundary is determined based on the constraint condition that the frequency regulation demand boundary changes at a preset rate and the energy storage power demand is reduced as much as possible under the premise that the expected frequency regulation rate meets the frequency regulation rate requirement;

[0016] In the stable stage, the frequency modulation demand boundary is determined by setting the dead zone setting power to a preset interval as a constraint condition based on the AGC instruction as a reference.

[0017] In some embodiments, the method further comprises:

[0018] In the ramp-up phase, when the thermal power unit increases its output, the frequency regulation demand boundary of the ramp-up phase Determined by the following formula:

[0019]

[0020] in, is the frequency modulation value corresponding to the frequency modulation demand boundary, is the actual frequency modulation output value of the thermal power unit;

[0021] In the ramp-up phase, when the thermal power unit reduces its output, the frequency regulation demand boundary of the ramp-up phase Determined by the following formula:

[0022]

[0023] in, is the frequency modulation value corresponding to the frequency modulation demand boundary, is the actual frequency modulation output value of the thermal power unit;

[0024] In the stable stage, the frequency modulation demand boundary is determined by the following formula:

[0025]

[0026] in, is the frequency modulation requirement boundary, AGC power deviation is the difference between the AGC frequency regulation instruction and the actual frequency regulation output value of the thermal power unit. is a parameter used to determine the preset interval.

[0027] In some of the embodiments, the inner layer of the two-layer optimization configuration model is an operation layer, which is used to optimize the regulation performance target by regulating the performance-oriented fire-storage joint regulation strategy with the goal of minimizing the reciprocal of battery energy storage life loss and comprehensive regulation index;

[0028] The outer layer of the double-layer optimization configuration model is the economic layer, which is used to determine the optimal configuration strategy of the HESS complementary hybrid energy storage system based on the HESS investment cost and the adjustment performance compensation income, with the goal of maximizing net profit.

[0029] In some of the embodiments, according to the frequency regulation requirements, the operation layer of constructing the regulation performance-oriented thermal-storage joint AGC frequency regulation double-layer optimization configuration model includes:

[0030] The rain flow method is used to obtain the discharge depth corresponding to all non-periodic cycles based on the SOC curve of the BESS system;

[0031] The following formula is used to obtain the BESS in the operation cycle Total equivalent charge and discharge times :

[0032]

[0033] in, is the number of cycles in the battery energy storage system during its operation period, is the maximum number of cycles of the battery energy storage system when fully charged and discharged. It is the relationship between the number of cycles and the depth of charge and discharge of lithium iron phosphate batteries in the battery energy storage system. For battery energy storage system i The discharge depth corresponding to the cycle period;

[0034] Obtaining an equivalent life loss of the battery energy storage system according to the discharge depth and charge and discharge times within the operation cycle;

[0035] An operation layer optimization model is established with minimizing the equivalent life loss and minimizing the inverse of the comprehensive regulation performance index of the unit as the optimization objectives, and with the regulation rate target, the regulation accuracy target and the response time target as decision variables.

[0036] In some of the embodiments, according to the frequency regulation demand, the economic layer of the regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model is constructed, including:

[0037] Determine the average annual investment cost of HESS based on the average annual configuration cost of HESS, the average annual replacement cost of HESS, the average annual maintenance cost of HESS and the average annual electricity loss cost of HESS;

[0038] respectively obtaining the total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance, and obtaining a net benefit parameter based on the total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance;

[0039] An economic layer optimization model is established with maximizing the net benefit parameter as the optimization goal, and with the capacity configuration parameters of the BESS system associated with the net benefit parameter and the capacity configuration parameters of the flywheel energy storage as decision variables.

[0040] In some embodiments, the method further comprises:

[0041] The economic layer adopts a particle swarm algorithm to solve the economic layer optimization model and determine the solution parameters of the economic layer optimization model;

[0042] Based on the solution parameters of the operating layer optimization model, a target ion group algorithm is used to determine the solution parameters of the operating layer optimization model.

[0043] In a second aspect, an embodiment of the present application provides a system for double-layer optimization configuration of a thermal-storage combined frequency modulation hybrid energy storage system, the system comprising: a preprocessing module and a configuration module, wherein:

[0044] The preprocessing module is used to determine the frequency regulation demand corresponding to the thermal-storage combined frequency regulation system guided by the regulation performance based on the grid-connected guidelines for the AGC frequency regulation performance of the thermal power unit, as well as the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions;

[0045] The configuration module is used to construct a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model according to the frequency regulation demand, and generate a configuration strategy according to the double-layer optimization configuration model, wherein the double-layer optimization configuration model is a configuration model of a HESS complementary hybrid energy storage system composed of power-type flywheel energy storage and energy-type battery energy storage.

[0046] In a third aspect, an embodiment of the present application provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method described in the first aspect above when executing the computer program.

[0047] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method described in the first aspect above.

[0048] Compared with the related art, the embodiment of the present application provides a two-layer optimization configuration method for a thermal-storage combined frequency regulation hybrid energy storage system. By combining the requirements of the grid-connected guidelines for the regulation performance of the automatic generation control (AGC) of thermal power units, based on the historical AGC frequency regulation instruction demand characteristics and the unit's own response characteristics, a frequency regulation demand determination method guided by regulation performance is designed; a power-type flywheel energy storage (FESS) is introduced to form a hybrid energy storage system (HESS) with complementary characteristics of an energy-type BESS and a power-type FESS; and a regulation performance-oriented thermal-storage combined AGC frequency regulation HESS two-layer optimization configuration model is constructed. The upper layer optimizes the configuration of the thermal power unit and the HESS to improve the regulation performance and economy, and the lower layer optimizes the joint regulation strategy under the specific AGC instruction to ensure that the regulation performance requirements are met and the operating cost is minimized. Under the premise of being guided by regulation performance, an optimized configuration scheme that takes into account both economy and regulation performance can be obtained. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0050] Figure 1 It is a flow chart of a double-layer optimization configuration method of a thermal-storage combined frequency modulation hybrid energy storage system according to an embodiment of the present application;

[0051] Figure 2This is a schematic diagram of the AGC unit adjustment process;

[0052] Figure 3 Schematic diagram of the overall structure of the fire-storage combined system control according to an embodiment of the present application;

[0053] Figure 4 This is a schematic diagram of joint frequency regulation of thermal power and storage under the FP strategy;

[0054] Figure 5 A schematic diagram of frequency modulation requirements oriented by regulation performance according to an embodiment of the present application;

[0055] Figure 6 A schematic diagram of a hybrid energy storage capacity configuration solution process according to an embodiment of the present application;

[0056] Figure 7 It is a structural block diagram of a double-layer optimization configuration system of a thermal-storage combined frequency modulation hybrid energy storage system according to an embodiment of the present application;

[0057] Figure 8 It is a schematic diagram of the combined frequency modulation curve of thermal storage under the example FP and Kp strategies;

[0058] Fig. 9 It is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0059] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0060] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0061] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0062] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantity limitation, and may indicate the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can mean: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.

[0063] The high proportion of intermittent and fluctuating renewable energy access poses a severe challenge to the system power balance. The frequency regulation problem of the power system will become more prominent, and higher requirements will be placed on the frequency regulation performance of the generator set. Thermal power units are the main frequency regulation power source of the power system, but their regulation performance has many shortcomings, and other auxiliary means are needed to improve the regulation performance of the units.

[0064] The commonly used method is to introduce energy storage devices to build a combined thermal-storage system to improve the frequency regulation performance of the unit's automatic generation control (AGC), providing more flexible and efficient auxiliary service support for thermal power units. The currently commonly used combined thermal-storage energy storage configuration method has strong engineering promotion but lacks guidance optimization related to the frequency regulation effect, that is, the requirements of system frequency regulation and the mutual influence between frequency regulation related indicators are not fully considered in the energy storage planning stage, resulting in a waste of energy storage resources. In actual frequency regulation applications, a single battery energy storage system (BESS) is often used, which is low in cost, but irregular deep charging and discharging seriously affects its service life, resulting in the degradation of battery chemical properties. It usually needs to be replaced in about 2 years, and the cost is high over the entire life cycle. In the face of an increasingly harsh frequency regulation environment, BESS has insufficient regulation capabilities for frequent and short-term regulation components. Research only from the perspective of a single BESS configuration cannot solve the fundamental problem.

[0065] In view of this, the embodiment of the present application provides a double-layer optimization configuration method for a thermal-storage combined frequency regulation hybrid energy storage system. Figure 1 is a flow chart of a double-layer optimization configuration method for a thermal-storage combined frequency modulation hybrid energy storage system according to an embodiment of the present application, such as Figure 1 As shown, the process includes the following steps:

[0066] S101, determining the frequency regulation demand guided by the regulation performance based on the grid-connected guidelines for the AGC frequency regulation performance of the thermal power unit, the demand characteristics corresponding to the historical AGC frequency regulation instructions, and the unit response characteristics;

[0067] It should be noted that before this step, it is necessary to first conduct an assessment of the AGC frequency regulation performance of the thermal power unit to provide information support for determining the frequency regulation demand oriented by the regulation performance;

[0068] Specifically, the evaluation of the AGC frequency regulation performance of thermal power units includes the following steps:

[0069] In this field, the compensation method of AGC frequency regulation units has gradually developed into a compensation mechanism based on regulation performance and regulation contribution, providing AGC frequency regulation auxiliary services with timely response, fast speed, high accuracy and high power regulation contribution to obtain higher compensation costs.

[0070] In order to explain in detail the compensation method and requirements for unit regulation performance, take a certain region as an example:

[0071] The AGC unit regulation process mainly includes three stages: initial response, ramp-up and stabilization. Figure 2The diagram of the AGC unit regulation process is shown in Figure 1. A region uses comprehensive regulation performance indicators and regulation depth to evaluate and compensate thermal power units that provide AGC services. The unit compensation method is daily compensation, which can calculate the unit's j The daily compensation fee is:

[0072] (1)

[0073] Where: The compensation price for AGC frequency modulation performance is 0, For the unit i The adjustment depth of the adjustment process, For the unit j The total daily adjustment depth refers to the effective adjustment amount of the unit in response to the AGC command; For the j The comprehensive regulation performance index of the AGC unit comprehensively considers the regulation rate, regulation accuracy and response time, etc., to measure the regulation performance of the unit. Specifically, the calculation method of the indicators at each stage of the AGC regulation process refers to the "two detailed rules" of a certain region.

[0074] Furthermore, in this embodiment, based on the grid-connected guidelines' demand information on the AGC frequency regulation performance of thermal power units, as well as the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, the frequency regulation demand corresponding to the thermal-storage joint frequency regulation guided by the regulation performance is determined, specifically, the following steps are included:

[0075] S1, thermal-storage joint AGC frequency regulation strategy:

[0076] The control strategy of the combined thermal-storage system mainly includes the primary power distribution between the thermal power unit and the HESS and the secondary power distribution between the power-type energy storage and the energy-type energy storage. The HESS in this embodiment introduces the power-type flywheel energy storage FESS to form a hybrid energy storage system HESS with complementary characteristics of the energy-type battery energy storage BESS and the power-type FESS. Figure 3 Schematic diagram of the overall control structure of the fire-storage combined system according to an embodiment of the present application.

[0077] Furthermore, in the primary distribution, the AGC command signal is first Send it to the unit for response, and then Converted into frequency modulation demand signal , With unit output Power Deviation As a frequency regulation demand signal for energy storage ;

[0078] In the secondary allocation, first Send it to FESS for response, and get FESS output based on FESS charging and discharging strategy ,Will and The difference is used as the instruction of BESS And send it to BESS for response, and get BESS output based on BESS charging and discharging strategy .

[0079] Based on the state of charge (SOC) of FESS and BESS, t The FESS and BESS outputs at the moment are expressed as equation (2) and equation (3) respectively.

[0080] (2)

[0081] (3)

[0082] Where: , They are t SOC values ​​of FESS and HESS at the moment; , are the rated powers of FESS and BESS respectively; , They are the upper and lower limits of SOC of FESS, respectively; , They are the upper and lower limits of SOC of BESS respectively.

[0083] exist t Time, BESS and FESS discharge duration or charging time After that, SOC is expressed as formula (4) and formula (5) respectively.

[0084] (4)

[0085] (5)

[0086] In the formula, , are the BESS charging and discharging efficiency respectively; , are the charging and discharging efficiency of FESS respectively; , They are the rated capacities of BESS and FESS respectively.

[0087] It can be understood that the above step S1 specifically analyzes the thermal-storage combined AGC frequency regulation control strategy. Further, based on the above analysis results, combined with the grid connection guidelines, the demand characteristics corresponding to the historical AGC frequency regulation instructions and the unit response characteristics, the frequency regulation demand corresponding to the thermal-storage combined frequency regulation guided by the regulation performance is determined;

[0088] S2, Energy-saving performance-oriented joint frequency regulation demand design method for fire-storage

[0089] In related technologies, the full power control strategy (FP strategy) is often used in engineering applications to convert the AGC command signal Directly used as frequency modulation demand signal , Figure 4 This is a schematic diagram of the combined frequency regulation of heat and storage under the FP strategy. Figure 4 As shown in (a) in t At this moment, AGC power deviation Equal to AGC command signal and actual output of the unit If energy storage is connected to the system, the combined output of thermal-storage is .

[0090] The inventor of this case analyzed the prior art and found through experiments that:

[0091] Under a given energy storage capacity configuration, the FP strategy is adopted, and the thermal-storage combined AGC frequency regulation has the following problems:

[0092] Question 1: The response time index of the full power output of energy storage in the initial response period The excessive increase of The improvement cannot guarantee the comprehensive adjustment performance The best solution, but it also brings higher frequency regulation power demand and higher energy storage investment;

[0093] Question 2: During the ramp-up period, the energy storage system outputs at full power to improve the index , but the energy storage part of the frequency regulation power is wasted, and the frequency regulation power demand is high, resulting in high energy storage investment;

[0094] Question 3: During the stable period, that is, when the unit's own output has not entered the stable period, the energy storage frequency regulation power demand is relatively high, and after the unit relies on its own output to track the AGC command, it usually fluctuates up and down on the AGC command, and the energy storage is frequently charged and discharged, resulting in a large loss in life.

[0095] Based on the above analysis results, the performance-oriented frequency regulation demand calculation steps provided in this embodiment include:

[0096] Combined with the grid connection guidelines, based on the AGC command demand characteristics and unit response characteristics, if the regulation targets of the three stages of the regulation process are known, that is, the regulation rate targets , Adjustment accuracy target and response time goals , construct the frequency regulation demand boundary oriented by regulation performance , the corresponding AGC frequency deviation is ; Figure 5 A schematic diagram of frequency modulation requirements guided by regulation performance according to an embodiment of the present application.

[0097] Different stages The setting target is to meet the regulation performance target requirement with the minimum AGC power response deviation. The specific design method is as follows:

[0098] Early Response: Design After the crew issues a new instruction Equal to And in Step out of the response dead zone at any time, that is The post-storage energy starts to work, making the combined output of thermal energy storage go beyond the dead zone. If the unit output is within the AGC power demand boundary Within time If the response time is advanced, , initial response .

[0099] Ramp-up period: Design by The rate changes so that the regulation rate index can meet the requirements and reduce the energy storage power demand as much as possible. Before If the time enters the stable period ahead of time, .

[0100] If the unit is required to increase output, the ramp period for:

[0101] (6)

[0102] If the unit is required to reduce output, the ramp period for:

[0103] (7)

[0104] Stabilization period: Design Set the power in the stable dead zone based on the AGC command , that is, the unit output is in the dead zone and the energy storage does not work. Then the stable period for:

[0105] (8)

[0106] It can be understood that due to the calculation of the present application scheme It has the characteristics of regulating performance and will As frequency modulation demand signal , control the HESS output. The performance-oriented thermal-storage joint control strategy is referred to as the Kp strategy. However, the three regulation performance targets in the Kp strategy are difficult to quantify directly and need to be determined by certain means. Therefore, an optimization configuration model is further constructed to determine the energy storage capacity configuration and regulation performance targets.

[0107] S102, based on the frequency regulation requirements, construct a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model, and complete the energy storage generation configuration strategy based on the double-layer optimization configuration model, where the HESS double-layer optimization configuration model is a configuration model of the HESS complementary hybrid energy storage system composed of power-type flywheel energy storage and energy-type battery energy storage.

[0108] In this embodiment, in the two-layer model of HESS capacity optimization configuration, the inner layer is the operation layer, which is based on the thermal-storage joint control strategy guided by the regulation performance, with the goal of minimizing the battery energy storage life loss and the inverse of the comprehensive regulation index, and optimizes the three regulation performance targets; the outer layer is the economic layer, which determines the HESS optimal configuration based on the HESS investment cost and the regulation performance compensation income, with the goal of maximizing the annual net profit.

[0109] S1, run inner layer analysis and modeling

[0110] The life of BESS is mainly related to its charge and discharge times and charge and discharge depth. The relationship curve between the cycle times and charge and discharge depth of lithium iron phosphate battery is shown in the following formula.

[0111] (9)

[0112] In the formula, For the i The depth of discharge (DOD) corresponding to the cycle; is the maximum number of cycles of BESS when fully charged and discharged. and The values ​​are 8000 and 1 respectively.

[0113] The rain flow method is used to convert the DOD corresponding to all non-periodic cycles based on the SOC curve of BESS, and the corresponding curve is converted according to formula (18). The total equivalent charge and discharge times are shown in the following formula.

[0114] (10)

[0115] In the formula, k is the BESS period The number of cycles obtained within.

[0116] During the operation period, the BESS equivalent life loss It is expressed as:

[0117] (11)

[0118] Furthermore, the frequency regulation demand oriented by regulation performance and the operating status curve of HESS are closely related to the setting of three regulation performance targets. The larger the index corresponding to the regulation performance target, the greater the frequency regulation demand of HESS. and The minimum reciprocal is the goal, choose , and As the decision variable, the operation layer optimization model is established, and the optimization function is:

[0119] (12)

[0120] Combined with the grid connection guidelines, At least the regulatory performance assessment requirements should be met, i.e. ,and It should not be too large. In this application, its maximum value is set to 6 times the standard adjustment rate, that is, ; At least smaller than the dead zone , and is greater than or equal to 0; in practice, the duration of the AGC instruction Usually more than 30s, so Should be less than ,Right now Less than 30s. The constraints are:

[0121] (13)

[0122] S2, Analysis and Modeling of the Outer Economy

[0123] ① Average annual investment cost of hybrid energy storage

[0124] Based on the life cycle cost (LCC), the average annual investment cost of HESS includes configuration cost , Replacement cost , Maintenance cost and power loss costs wait.

[0125] 1. Annual average configuration cost of HESS: Configuration cost is the fixed investment in the design and construction phase, including power cost and capacity cost.

[0126] (14)

[0127] (15)

[0128] In the formula, , They are the unit power investment costs of BESS and FESS respectively; , They are the unit capacity investment costs of BESS and FESS respectively; , are the rated powers of BESS and FESS respectively; , are the rated capacities of BESS and FESS respectively; The cash factor for a lump sum payment; is the base discount rate; The project operation cycle.

[0129] 2. Annual replacement cost of HESS: The life of BESS is mainly related to its charge and discharge times, and the cost of replacing the equipment needs to be calculated. The maximum charge and discharge times of FESS can reach more than 10 million times, which can ensure that there is no need to replace the equipment within 20 years.

[0130] (16)

[0131] In the formula, The number of replacements during the project life cycle.

[0132] 3. Average annual maintenance cost of HESS:

[0133] (17)

[0134] In the formula, , They are the maintenance costs per unit power of BESS and FESS respectively; , are the maintenance costs per unit capacity of BESS and FESS respectively.

[0135] 4. Annual average power loss cost of HESS: HESS will lose some power during charging and discharging, resulting in power cost. The annual average power loss cost of HESS is:

[0136] (18)

[0137] In the formula, The unit price of lost electricity.

[0138] In summary, the average annual investment cost of HESS is

[0139] (19)

[0140] ② AGC frequency modulation compensation income

[0141] Total contribution compensation cost of annual average AGC performance and the average annual AGC regulation performance net benefit It is expressed as:

[0142] (20)

[0143] In the formula, The number of operating days per year for the unit; It is the electricity quantity assessment that does not meet the regulation performance requirements, generally 0.

[0144] ③ Economic optimization model

[0145] Based on the average annual investment cost of HESS and the compensation income of regulation performance, the average annual net income can be obtained as follows:

[0146] (twenty one)

[0147] If the HESS capacity configuration is determined, the operation curves of FESS and BESS can be obtained from the operation inner layer, thereby obtaining the net income under the average annual investment cost of HESS and the compensation income of regulation performance. Therefore, with the maximum annual net income as the goal, the BESS capacity configuration parameters are selected. and FESS capacity configuration parameters and As the decision variable, an economic layer optimization model is established, and the optimization function is:

[0148] (twenty two)

[0149] According to statistics from actual engineering applications: BESS power configuration does not exceed the unit 5%, and the charging or discharging time under rated conditions shall not exceed 1h. The FESS generally operates for no more than 12 minutes, and mainly plays an auxiliary role in the HESS, reducing the number of unnecessary actions of the BESS, and reducing the depth of action according to actual conditions. The FESS is relatively expensive, so the FESS rated power shall not exceed the maximum possible value of the BESS rated power, and the continuous operation time shall not exceed 0.2 hours. Therefore, the constraints are:

[0150] (twenty three)

[0151] S3, solution of the hybrid energy storage double-layer optimization configuration model;

[0152] The economic outer layer and the operational inner layer are nested in each other during the optimization process. The economic outer layer uses particle swarm optimization (PSO) to optimize the , , and To make decisions, the inner layer takes the decision variables given by the outer layer as known quantities and uses the multi-objective particle swarm optimization (MOPSO) to , and Make decisions and select the best solution among non-inferior solutions. Figure 6 A schematic diagram of a hybrid energy storage capacity configuration solution process according to an embodiment of the present application.

[0153] Through the above steps S101 to S102, combined with the requirements of the grid-connected guidelines for the regulation performance of the automatic generation control (AGC) of thermal power units, based on the historical AGC frequency regulation instruction demand characteristics and the unit's own response characteristics, a frequency regulation demand determination method oriented by regulation performance is designed; a power-type flywheel energy storage (FESS) is introduced to form a hybrid energy storage system (HESS) with complementary characteristics of the energy-type BESS and the power-type FESS; and a regulation performance-oriented thermal-storage combined AGC frequency regulation HESS two-layer optimization configuration model is constructed. The upper layer optimizes the configuration of the thermal power unit and the HESS to improve the regulation performance and economy, and the lower layer optimizes the joint regulation strategy under the specific AGC instruction to ensure that the regulation performance requirements are met and the operating cost is minimized. Under the premise of being oriented to regulation performance, an optimal configuration scheme that takes into account both economy and regulation performance can be obtained.

[0154] This embodiment also provides a dual-layer optimization configuration method system for a thermal-storage combined frequency modulation hybrid energy storage system, which is used to implement the above-mentioned embodiments and preferred implementation modes, and will not be repeated hereafter. As used below, the terms "module", "unit", "subunit", etc. can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0155] The embodiment of the present application provides a double-layer optimization configuration system for a thermal-storage combined frequency regulation hybrid energy storage system. Figure 7 is a structural block diagram of a double-layer optimization configuration system of a thermal-storage combined frequency modulation hybrid energy storage system according to an embodiment of the present application, such as Figure 7 As shown, the system includes: a pre-processing module 70 and a configuration module 71, wherein:

[0156] The preprocessing module 70 is used to determine the frequency regulation demand corresponding to the thermal-storage combined frequency regulation system guided by the regulation performance based on the grid-connected guidelines for the AGC frequency regulation performance of the thermal power unit, the demand characteristics corresponding to the historical AGC frequency regulation instructions, and the unit response characteristics;

[0157] The configuration module 71 is used to construct a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model according to the frequency regulation requirements, and complete the energy storage generation configuration strategy according to the double-layer optimization configuration model, wherein the HESS double-layer optimization configuration model is a configuration model of a HESS complementary hybrid energy storage system composed of power-type flywheel energy storage and energy-type battery energy storage.

[0158] Through the above system, combined with the grid-connected guidelines for the regulation performance of the automatic generation control (AGC) of thermal power units; the power-type flywheel energy storage (FESS) is introduced to form a hybrid energy storage system (HESS) with complementary characteristics of the energy-type BESS and the power-type FESS; and a regulation performance-oriented thermal-storage combined AGC frequency regulation HESS two-layer optimization configuration model is constructed to ensure that the regulation performance requirements are met and the operating costs are minimized. Under the premise of regulation performance as the guide, an optimized configuration plan that takes into account both economy and regulation performance can be obtained.

[0159] Finally, in an exemplary embodiment, an example of actually deploying the solution of the present application in an offline environment is as follows:

[0160] The proposed configuration method is studied and analyzed based on the one-month AGC command and actual power operation data of a 330MW thermal power unit in a power plant. The technical and economic parameters of the hybrid energy storage capacity optimization configuration double-layer model, the economic outer PSO algorithm parameters, and the operation inner MOPSO algorithm parameters are shown in Tables 1, 2, and 3, respectively.

[0161] Table 1: Technical and economic parameters of the hybrid energy storage double-layer configuration model

[0162]

[0163] Table 2: PSO algorithm parameters for the hybrid energy storage double-layer configuration model

[0164]

[0165] Table 3: MOPSO algorithm parameters for the hybrid energy storage double-layer configuration model

[0166]

[0167] In order to verify the effectiveness and superiority of the HESS optimization configuration strategy oriented by regulation performance, the following comparative analysis is conducted on the HESS optimization configuration results, BESS optimization configuration results, BESS optimization configuration without energy storage, FP strategy and the proposed HESS optimization configuration results to verify the effectiveness and superiority of the HESS optimization configuration strategy oriented by regulation performance.

[0168] Based on the performance-oriented HESS two-layer optimization configuration process, the PSO-MOPSO algorithm is used to solve the optimal solution: ( , , , )=(4.31MW, 2.05MWh, 2.20MW, 0.18MWh), the optimal solution for the inner parameters is ( , , )=(0, 25.2MW / min, 15.1s). In order to verify the superiority of the designed configuration method, the optimal solution of BESS configuration based on FP strategy is solved as follows: , )=(4.94MW, 2.87MWh). The frequency regulation demand under the FP strategy is the AGC instruction, and the frequency regulation demand under the Kp strategy is the Kp strategy frequency regulation demand; Figure 8 The schematic diagram of the combined frequency modulation curve of thermal storage under the example FP and Kp strategies is shown in Figure 6 As shown in Figure 2, the frequency regulation demand is lower under the Kp strategy, so the frequency regulation deviation is smaller. The energy storage tracking curve and SOC change curve under the two strategies are shown in Figure 2. Figure 8 As shown in (b) and (c) in the figure, the Kp strategy reduces the unnecessary output that exceeds the frequency regulation demand in the early stage of the response energy storage output and the ramp period. In addition, due to the introduction of FESS, it can provide greater power increment support when the FESS has sufficient power, thereby improving the frequency regulation effect.

[0169] Table 4: Comparison of regulation performance and economy under different schemes

[0170]

[0171] Table 4 shows the frequency regulation performance and economic efficiency comparison before energy storage configuration, FP strategy BESS configuration and Kp strategy HESS configuration. The average annual adjustment depth increased by 2.3 and 2.4 times respectively. They increased by 262,000 MW and 440,000 MW respectively. The cost of BESS increased by 12.451 million yuan and 15.308 million yuan respectively. The average operating life of BESS was 1.69 years and 2.08 years respectively. 10.783 million yuan and 9.557 million yuan, The increase was RMB 639,000 and RMB 5,751,000 respectively. From the perspectives of regulation performance, energy storage investment and net income, the proposed energy storage optimization configuration method has obvious advantages.

[0172] In one embodiment, Fig. 9 is a schematic diagram of the internal structure of an electronic device according to an embodiment of the present application, such as Fig. 9 As shown, an electronic device is provided, which may be a server, and its internal structure diagram may be shown in Figure 9. The electronic device includes a processor, a network interface, an internal memory, and a non-volatile memory connected through an internal bus, wherein the non-volatile memory stores an operating system, a computer program, and a database. The processor is used to provide computing and control capabilities, the network interface is used to communicate with an external terminal through a network connection, the internal memory is used to provide an environment for the operation of the operating system and the computer program, and when the computer program is executed by the processor, a method for double-layer optimization configuration of a thermal-storage combined frequency modulation hybrid energy storage system is implemented, and the database is used to store data.

[0173] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the electronic device to which the scheme of the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0174] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0175] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0176] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0177] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A double-layer optimization configuration method for a thermal-storage combined frequency modulation hybrid energy storage system, characterized in that: The method comprises: Based on the grid-connected guidelines' demand information on the AGC frequency regulation performance of thermal power units, as well as the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, the frequency regulation demand corresponding to the thermal-storage combined frequency regulation system guided by the regulation performance is determined, specifically including: obtaining the regulation targets in the three stages of the regulation process, wherein the regulation targets include the regulation rate target, the regulation accuracy target and the response time target; Based on the grid-connected guidelines’ demand information on the AGC frequency regulation performance of thermal power units, the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, and the regulation target, the regulation performance-oriented frequency regulation demand boundary is constructed. The frequency regulation demand boundary is used as a frequency regulation demand signal to control the output characteristics of the HESS complementary hybrid energy storage system, and the setting targets corresponding to the frequency regulation demand boundaries at different stages are configured according to the minimum AGC power response deviation to meet the regulation target; According to the frequency regulation demand, a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model is constructed, and a configuration strategy is generated according to the double-layer optimization configuration model, wherein the double-layer optimization configuration model is a configuration model of a HESS complementary hybrid energy storage system composed of power-type flywheel energy storage and energy-type battery energy storage; The inner layer of the two-layer optimization configuration model is the operation layer, which is used to optimize the regulation target by adjusting the performance-oriented fire-storage joint regulation strategy with the goal of minimizing the reciprocal of battery energy storage life loss and comprehensive regulation index; The outer layer of the two-layer optimization configuration model is an economic layer, which is used to determine the optimal configuration strategy of the HESS complementary hybrid energy storage system based on the HESS investment cost and the adjustment performance compensation income, with the goal of maximizing net profit; According to the frequency regulation requirements, the operation layer of the regulation performance-oriented thermal-storage joint AGC frequency regulation double-layer optimization configuration model is constructed, including: The rain flow method is used to obtain the discharge depth corresponding to all non-periodic cycles based on the SOC curve of the BESS system; The following formula is used to obtain the BESS in the operation cycle Total equivalent charge and discharge times : in, is the number of cycles in the battery energy storage system during its operation period, is the maximum number of cycles of the battery energy storage system when fully charged and discharged. It is the relationship between the number of cycles and the depth of charge and discharge of lithium iron phosphate batteries in the battery energy storage system. For battery energy storage system i The discharge depth corresponding to the cycle period; Obtaining an equivalent life loss of the battery energy storage system according to the discharge depth and charge and discharge times within the operation cycle; Taking minimizing the equivalent life loss and minimizing the inverse of the comprehensive regulation performance index of the unit as optimization objectives, and taking the regulation rate objective, the regulation accuracy objective and the response time objective as decision variables, an operation layer optimization model is established; According to the frequency regulation requirements, the economic layer of the regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model is constructed, including: Determine the average annual investment cost of HESS based on the average annual configuration cost of HESS, the average annual replacement cost of HESS, the average annual maintenance cost of HESS and the average annual electricity loss cost of HESS; The total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance are respectively obtained, and a net benefit parameter is obtained based on the total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance; An economic layer optimization model is established with maximizing the net benefit parameter as the optimization goal, and with the capacity configuration parameters of the BESS system associated with the net benefit parameter and the capacity configuration parameters of the flywheel energy storage as decision variables.

2. The method according to claim 1, characterized in that The method further comprises: In the response phase, the frequency regulation demand boundary is determined based on the constraint that the output is equal to the actual frequency regulation output of the thermal power unit within a preset time after the thermal power unit issues a new instruction, and that the response dead zone is crossed at the first moment after the preset period; In the ramping stage, the frequency regulation demand boundary is determined based on the constraint condition that the frequency regulation demand boundary changes at a preset rate and the energy storage power demand is reduced as much as possible under the premise that the expected frequency regulation rate meets the frequency regulation rate requirement; In the stable stage, the frequency modulation demand boundary is determined by setting the dead zone setting power to a preset interval as a constraint condition based on the AGC instruction as a reference.

3. The method according to claim 2, characterized in that The method further comprises: In the ramp-up phase, when the thermal power unit increases its output, the frequency regulation demand boundary of the ramp-up phase Determined by the following formula: in, is the frequency modulation value corresponding to the frequency modulation demand boundary, is the actual frequency modulation output value of the thermal power unit; In the ramp-up phase, when the thermal power unit reduces its output, the frequency regulation demand boundary of the ramp-up phase Determined by the following formula: in, is the frequency modulation value corresponding to the frequency modulation demand boundary, is the actual frequency modulation output value of the thermal power unit; In the stable stage, the frequency modulation demand boundary is determined by the following formula: in, is the frequency modulation demand boundary, is a parameter used to determine the preset interval, It is the difference between the AGC frequency regulation instruction and the actual frequency regulation output value of the thermal power unit.

4. The method according to claim 1, characterized in that The method further comprises: The economic layer adopts a particle swarm algorithm to solve the economic layer optimization model and determine the solution parameters of the economic layer optimization model; Based on the solution parameters of the operating layer optimization model, a target ion group algorithm is used to determine the solution parameters of the operating layer optimization model.

5. A dual-layer optimal configuration system of a thermal-storage combined frequency modulation hybrid energy storage system, characterized in that: The system comprises: a preprocessing module and a configuration module, wherein: The preprocessing module is used to determine the frequency regulation demand corresponding to the thermal-storage combined frequency regulation system guided by the regulation performance based on the grid-connected guidelines for the AGC frequency regulation performance of the thermal power unit, as well as the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions; The configuration module is used to construct a regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model according to the frequency regulation demand, and generate a configuration strategy according to the double-layer optimization configuration model, wherein the double-layer optimization configuration model is a configuration model of a HESS complementary hybrid energy storage system composed of a power-type flywheel energy storage and an energy-type battery energy storage, specifically including: obtaining regulation targets in three stages of the regulation process, wherein the regulation targets include a regulation rate target, a regulation accuracy target, and a response time target; Based on the grid-connected guidelines’ demand information on the AGC frequency regulation performance of thermal power units, the demand characteristics and unit response characteristics corresponding to the historical AGC frequency regulation instructions, and the regulation target, the regulation performance-oriented frequency regulation demand boundary is constructed. The frequency regulation demand boundary is used as a frequency regulation demand signal to control the output characteristics of the HESS complementary hybrid energy storage system, and the setting targets corresponding to the frequency regulation demand boundaries at different stages are configured according to the minimum AGC power response deviation to meet the regulation target; The inner layer of the two-layer optimization configuration model is the operation layer, which is used to optimize the regulation target by adjusting the performance-oriented fire-storage joint regulation strategy with the goal of minimizing the reciprocal of battery energy storage life loss and comprehensive regulation index; The outer layer of the two-layer optimization configuration model is an economic layer, which is used to determine the optimal configuration strategy of the HESS complementary hybrid energy storage system based on the HESS investment cost and the adjustment performance compensation income, with the goal of maximizing net profit; According to the frequency regulation requirements, the operation layer of the regulation performance-oriented thermal-storage joint AGC frequency regulation double-layer optimization configuration model is constructed, including: The rain flow method is used to obtain the discharge depth corresponding to all non-periodic cycles based on the SOC curve of the BESS system; The following formula is used to obtain the BESS in the operation cycle Total equivalent charge and discharge times : in, is the number of cycles in the battery energy storage system during its operation period, is the maximum number of cycles of the battery energy storage system when fully charged and discharged. It is the relationship between the number of cycles and the depth of charge and discharge of lithium iron phosphate batteries in the battery energy storage system. For battery energy storage system i The discharge depth corresponding to the cycle period; Obtaining an equivalent life loss of the battery energy storage system according to the discharge depth and charge and discharge times within the operation cycle; Taking minimizing the equivalent life loss and minimizing the inverse of the comprehensive regulation performance index of the unit as optimization objectives, and taking the regulation rate objective, the regulation accuracy objective and the response time objective as decision variables, an operation layer optimization model is established; According to the frequency regulation requirements, the economic layer of the regulation performance-oriented thermal-storage combined AGC frequency regulation double-layer optimization configuration model is constructed, including: Determine the average annual investment cost of HESS based on the average annual configuration cost of HESS, the average annual replacement cost of HESS, the average annual maintenance cost of HESS and the average annual electricity loss cost of HESS; The total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance are respectively obtained, and a net benefit parameter is obtained based on the total contribution compensation fee of the AGC performance and the net benefit of the AGC regulation performance; An economic layer optimization model is established with maximizing the net benefit parameter as the optimization goal, and with the capacity configuration parameters of the BESS system associated with the net benefit parameter and the capacity configuration parameters of the flywheel energy storage as decision variables.

6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 4 is implemented.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Hybrid energy storage system capacity and power configuration method and system

    CN116094000A

  • Hybrid energy storage double-layer optimization configuration method for reducing frequency modulation loss of thermal power generating unit

    CN116436038A