Mains backflow detection and protection method for energy storage system
By detecting the voltage and current difference between the power grid and the battery, dividing the backflow severity levels and performing shutdown operations, the battery damage problem of the energy storage system during the backflow of mains is solved, and the system reliability and switching life are improved.
Patent Information
- Application Number
- CN202411054172.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-02
AI Technical Summary
When the current energy storage system is inverted in the mains, it may cause overcurrent damage and overvoltage of the battery, reduce system reliability, and even endanger personal safety.
By detecting the difference and current between the grid voltage and the battery voltage, the backflow severity level is divided, and the shutdown operation is carried out when the backflow is detected, including the inverter wave sealing, the grid-side switch and the battery-side switch, the shutdown timing is optimized to achieve Quick protection.
It effectively improves the reliability of the energy storage system and switch service life, prevents battery damage caused by backflow, and ensures safe operation of the system.
Smart Images

Figure CN118589657B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy storage systems, and in particular to a method for detecting and protecting mains backflow of energy storage systems. Background Art
[0002] In the prior art, some components of energy storage systems are as follows Figure 1-Figure 7 As shown, it includes a bidirectional grid-connected inverter AC / DC (inverter for short), a grid-side switch S1 connecting the AC / DC with the mains, and a battery-side switch S2 connecting the AC / DC with the battery; wherein, Figure 1-Figure 4 It is a single-phase energy storage system, and its grid-side voltage (current) is single-phase; Figure 5-Figure 7 It is a three-phase energy storage system, and its grid-side voltage (current) is three-phase; among them, Figure 5 It is a three-phase three-wire energy storage system. Figure 6-Figure 7 It is a three-phase four-wire energy storage system. Figure 5 The three-phase three-wire energy storage system and Figure 6 or Figure 7 Compared with the three-phase and four-phase energy storage system, Figure 5 The grid side of the three-phase three-wire energy storage system only has phases A, B, and C, and lacks the N line.
[0003] When the mains voltage is high or the battery voltage is low, the mains will flow back into the battery. During this period, the battery charge and discharge power is not controlled. Depending on the difference between the mains voltage and the battery voltage, two abnormalities may occur:
[0004] 1) When the difference between the mains voltage and the battery voltage is large, it may cause overcurrent damage to the semiconductor devices inside the AC / DC and battery systems;
[0005] 2) When the battery is fully charged, if there is a long-term backflow, the battery will not be charged for a long time, and the battery is prone to abnormalities such as overvoltage and overcurrent. In severe cases, the battery may be damaged.
[0006] Both of the above abnormalities will cause the energy storage system to fail to work, reduce the reliability of the energy storage system, and may endanger personal safety. Summary of the invention
[0007] The object of the present invention is to provide a method for detecting and protecting the backflow of mains electricity in an energy storage system, so as to solve the above-mentioned problems caused by the backflow of mains electricity in the energy storage system existing in the prior art.
[0008] First, the present invention provides a method for detecting mains backflow of an energy storage system, and judges the severity level of mains backflow according to different degrees of mains backflow. The method includes: if it is detected that the difference between the peak value of the grid voltage and the battery voltage exceeds a first preset voltage value and lasts for more than a first preset time, it is determined that the current is a first-level severe backflow; if it is detected that within a power frequency cycle, the battery current peak is greater than the maximum allowable charging current of the battery, the difference between the peak value of the grid voltage and the battery voltage exceeds a second preset voltage value and lasts for more than the second preset time, it is determined that the current is a second-level severe backflow; if it is detected that within a power frequency cycle, the difference between the average value of the battery current and the maximum allowable charging current of the battery is greater than the preset current value, the difference between the peak value of the grid voltage and the battery voltage exceeds a third preset voltage value and lasts for more than the third preset time, it is determined that the current is a third-level severe backflow; if it is detected that after the battery is fully charged, the difference between the battery voltage and the maximum allowable charging voltage of the battery exceeds a fifth preset voltage value, the difference between the peak value of the grid voltage and the battery voltage exceeds a fourth preset voltage value and lasts for more than the fourth preset time, it is determined that the current is a fourth-level severe backflow. Among them, the first preset voltage value>the second preset voltage value>the third preset voltage value>the fourth preset voltage value; the first preset time≤the first preset time≤the second preset time≤the third preset time; the backflow severity level:the first level severe backflow>the second level severe backflow>the third level severe backflow>the fourth level severe backflow.
[0009] Furthermore, when the energy storage system is a single-phase energy storage system, the grid voltage peak is the grid phase voltage peak; when the energy storage system is a three-phase three-wire energy storage system, the grid voltage peak is the maximum value of the three grid line voltage peaks; when the energy storage system is a three-phase four-wire energy storage system, the grid voltage peak is the maximum value of the three grid phase voltage peaks.
[0010] Furthermore, the first preset voltage value, the second preset voltage value, the third preset voltage value, and the fourth preset voltage value are preset proportions of the rated voltage of the power grid.
[0011] Furthermore, the preset current value is a preset ratio of the rated current of the battery.
[0012] Furthermore, the fifth preset voltage value is a preset ratio of the maximum allowable charging voltage of the battery.
[0013] Furthermore, when the energy storage system is a single-phase energy storage system or a three-phase four-wire energy storage system, the grid rated voltage is the grid phase voltage rated value; when the energy storage system is a three-phase three-wire energy storage system, the grid rated voltage is the grid line voltage rated value.
[0014] Secondly, the present invention also discloses a method for protecting an energy storage system from backflow of mains electricity. When backflow of mains electricity is detected according to the aforementioned detection method, the energy storage system is shut down.
[0015] Furthermore, if the energy storage system is a single-phase energy storage system, the shutdown operation includes: the first step: inverter blocking; the second step: disconnecting the grid side switch at the point where the grid voltage passes zero; the third step: disconnecting the battery side switch.
[0016] Furthermore, if the energy storage system is a three-phase energy storage system but each phase of the grid-side switch can be independently controlled, the shutdown operation includes: the first step: inverter blocking; the second step: disconnecting each phase of the grid-side switch in sequence at the point where the grid voltage passes zero; the third step: disconnecting the battery-side switch.
[0017] Furthermore, if the energy storage system is a three-phase energy storage system and each phase of the grid-side switch cannot be independently controlled, the shutdown operation includes: the first step: inverter blocking; the second step: calculating the maximum value of the three-phase output current sampling value of the inverter at the current moment; the third step: calculating the minimum value of all the maximum values within an industrial frequency cycle, and recording the phase of an industrial frequency cycle corresponding to the minimum value; the fourth step: disconnecting the battery side switch at the phase; the fifth step: disconnecting the grid side switch.
[0018] The mains backflow detection and protection method of the above energy storage system can judge the severity level of the mains backflow according to the different degrees of the mains backflow, and realize the rapid protection of the energy storage system by optimizing the shutdown timing of the energy storage system according to different control modes of the switch, and can effectively increase the service life of the switch and improve the reliability of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A block diagram of a single-phase energy storage system in the prior art;
[0020] Figure 2 It is another block diagram of a single-phase energy storage system in the prior art;
[0021] Figure 3 It is another block diagram of a single-phase energy storage system in the prior art;
[0022] Figure 4 It is another block diagram of a single-phase energy storage system in the prior art;
[0023] Figure 5 A block diagram of a three-phase three-wire energy storage system in the prior art;
[0024] Figure 6 A block diagram of a three-phase four-wire energy storage system in the prior art;
[0025] Figure 7Another block diagram of a three-phase four-wire energy storage system in the prior art;
[0026] Figure 8 A method for detecting backflow of mains electricity in an energy storage system according to an embodiment of the present invention;
[0027] Fig. 9 A method for detecting backflow of mains electricity in a single-phase energy storage system of the present invention;
[0028] Fig.10 A method for detecting backflow of mains electricity in a three-phase three-wire energy storage system of the present invention;
[0029] Fig.11 A method for detecting backflow of mains electricity in a three-phase four-wire energy storage system of the present invention;
[0030] Fig.12 A method for protecting a single-phase energy storage system from backflow of mains electricity according to the present invention;
[0031] Fig.13 A method for protecting a three-phase energy storage system from backflow of mains electricity according to an embodiment of the present invention;
[0032] Fig.14 This is another embodiment of the present invention. A method for protecting a three-phase energy storage system from backflow of mains electricity.
[0033] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION
[0034] In order to facilitate understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are provided in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.
[0035] The present invention discloses a method for detecting backflow of mains electricity in an energy storage system. According to different degrees of backflow of mains electricity, the severity level of backflow of mains electricity is judged. The detection method of one embodiment is as follows: Figure 8 As shown:
[0036] If it is detected that the difference between the peak value of the grid voltage and the battery voltage exceeds the first preset voltage value and lasts longer than the first preset time, it is determined that the current situation is the first level of severe backflow;
[0037] If it is detected that within a power frequency cycle, the battery current peak value is greater than the maximum allowable battery charging current, the difference between the grid voltage peak value and the battery voltage exceeds a second preset voltage value, and the duration is greater than a second preset time, it is determined that the current is a second-level severe backflow;
[0038] If it is detected that within a power frequency cycle, the difference between the average value of the battery current and the maximum allowable charging current of the battery is greater than the preset current value, the difference between the peak value of the grid voltage and the battery voltage exceeds the third preset voltage value, and the duration is greater than the third preset time, it is determined that the current is the third level of severe backflow;
[0039] If it is detected that after the battery is fully charged, the difference between the battery voltage and the maximum allowable charging voltage of the battery exceeds the fifth preset voltage value, the difference between the grid voltage peak and the battery voltage exceeds the fourth preset voltage value, and the duration is greater than the fourth preset time, it is determined that the current situation is the fourth level of severe backflow.
[0040] in,
[0041] The first preset voltage value>the second preset voltage value>the third preset voltage value>the fourth preset voltage value;
[0042] The first preset time ≤ the first preset time ≤ the second preset time ≤ the third preset time;
[0043] Backflow severity levels: Level 1 severe backflow > Level 2 severe backflow > Level 3 severe backflow > Level 4 severe backflow.
[0044] For a single-phase energy storage system, a detection method in one embodiment is as follows: Fig. 9 As shown:
[0045] If it is detected that Vg_max-Vbat>U1 and the duration is greater than T1, it is determined that the current is the first level of severe backflow; where Vg_max is the peak value of the grid voltage (grid phase voltage peak value), and Vbat is the battery voltage.
[0046] If it is detected that within a power frequency cycle, Ib_max>Ib_c_max, Vg_max-Vbat>U2, and the duration is greater than T2, it is determined that the current is the second level severe backflow; where Ib_max is the battery current peak value, and Ib_c_max is the maximum allowable charging current of the battery.
[0047] If it is detected that within a power frequency cycle, Ib_avg-Ib_c_max>△I, Vg_max-Vbat>U3, and the duration is greater than T3, it is determined that the current is the third level of severe backflow; where Ib_avg is the average value of the battery current.
[0048] If it is detected that after the battery is fully charged, Vbat-Vb_c_max>△U, and Vg_max-Vbat>U4, and the duration is greater than T4, it is determined that the current is the fourth level of severe backflow. Among them, Vb_c_max is the maximum allowable charging voltage of the battery.
[0049] For the above single-phase energy storage system, where:
[0050] Backflow severity levels: Level 1 severe backflow > Level 2 severe backflow > Level 3 severe backflow > Level 4 severe backflow.
[0051] U1>U2>U3>U4, T1≤T2≤T3≤T4.
[0052] U1: first preset voltage value; U2: second preset voltage value; U3: third preset voltage value; U4: fourth preset voltage value; △U: fifth preset voltage value; △I: preset current value.
[0053] T1: first preset time; T2: second preset time; T3: third preset time; T4: fourth preset time.
[0054] The value ranges of U1, U2, U3, and U4 are as follows: In one embodiment, the value range of U1 is 20%-40% of the rated voltage of the power grid, the value range of U2 is 15%-30% of the rated voltage of the power grid, the value range of U3 is 10%-25% of the rated voltage of the power grid, and the value range of U4 is 5%-15% of the rated voltage of the power grid. Other ranges can also be selected according to actual needs. In different embodiments, U1, U2, U3, and U4 can be 30%, 20%, 15%, and 5% of the rated voltage of the power grid, respectively, or 35%, 25%, 20%, and 15% of the rated voltage of the power grid, respectively; or 20%, 15%, 10%, and 5% of the rated voltage of the power grid, respectively; or other values can also be selected according to actual needs. Among them, the rated voltage of the power grid is the rated value of the voltage between the live wire and the neutral wire, or the rated value of the phase voltage of the power grid.
[0055] The values of T1, T2, T3, and T4 can be 10ms, 10ms, 10ms, and 10ms respectively; 10ms, 20ms, 30ms, and 50ms respectively; 20ms, 20ms, 20ms, and 20ms respectively; 20ms, 50ms, 100ms, and 200ms respectively; or other values can be selected according to actual needs.
[0056] The value range of △I is: 2%~10% of the rated current of the battery, 3%-12% of the rated current of the battery, or 5%-15% of the rated current of the battery; other values can also be selected according to actual needs.
[0057] The value range of △U is: 1%~10% of the maximum allowable charging voltage of the battery; 1%~15% of the maximum allowable charging voltage of the battery; 2%~12% of the maximum allowable charging voltage of the battery; 5%~15% of the maximum allowable charging voltage of the battery; or other values can be selected according to actual needs.
[0058] For a three-phase three-wire energy storage system, a detection method in one embodiment is as follows: Fig.10 As shown:
[0059] If it is detected that Vl_max- Vbat>U1' and the duration is greater than T1', it is determined that the current situation is the first level of severe backflow; wherein, Vl_max is the peak value of the grid voltage (the maximum value of the three line voltage peaks of the grid, the three line voltages of the grid refer to the voltage Vab between phase A and phase B of the grid, the voltage Vbc between phase B and phase C of the grid, and the voltage Vca between phase C and phase A of the grid), and Vbat is the battery voltage.
[0060] If it is detected that within a power frequency cycle, Ib_max>Ib_c_max, Vl_max -Vbat>U2', and the duration is greater than T2', it is determined that the current is the second level severe backflow; where Ib_max is the battery current peak value, and Ib_c_max is the maximum allowable battery charging current.
[0061] If it is detected that within a power frequency cycle, Ib_avg-Ib_c_max>△I', Vl_max-Vbat>U3', and the duration is greater than T3', it is determined that the current is the third level of severe backflow; where Ib_avg is the average value of the battery current.
[0062] If it is detected that after the battery is fully charged, Vbat-Vb_c_max>△U', Vl_max-Vbat>U4', and the duration is greater than T4', it is determined that the current is the fourth level of severe backflow. Vb_c_max is the maximum allowable charging voltage of the battery.
[0063] For the above three-phase three-wire energy storage system, where:
[0064] Backflow severity levels: Level 1 severe backflow > Level 2 severe backflow > Level 3 severe backflow > Level 4 severe backflow.
[0065] U1'>U2'>U3'>U4', T1'≤T2'≤T3'≤T4'.
[0066] U1': first preset voltage value; U2': second preset voltage value; U3': third preset voltage value; U4': fourth preset voltage value; △U': fifth preset voltage value; △I': preset current value.
[0067] T1': first preset time; T2': second preset time; T3': third preset time; T4': fourth preset time.
[0068] The value ranges of U1', U2', U3', and U4' are as follows: In one embodiment, the value range of U1' is 20%-40% of the rated voltage of the grid, the value range of U2' is 15%-30% of the rated voltage of the grid, the value range of U3' is 10%-25% of the rated voltage of the grid, and the value range of U4' is 5%-15% of the rated voltage of the grid. Other ranges can also be selected according to actual needs. In different embodiments, U1', U2', U3', and U4' can be 30%, 20%, 15%, and 5% of the rated voltage of the grid, respectively; or 35%, 25%, 20%, and 15% of the rated voltage of the grid, respectively; or 20%, 15%, 10%, and 5% of the rated voltage of the grid, respectively; or other values can also be selected according to actual needs. Among them, the rated voltage of the grid is the rated value of the grid line voltage,
[0069] The values of T1', T2', T3' and T4' can be 10ms, 10ms, 10ms, 10ms respectively; 10ms, 20ms, 30ms, 50ms respectively; 20ms, 20ms, 20ms, 20ms respectively; 20ms, 50ms, 100ms, 200ms respectively; other values can also be selected according to actual needs.
[0070] The value range of △I' can be 2%-10% of the rated current of the battery, 3%-12% of the rated current of the battery, or 5%-15% of the rated current of the battery; other values can also be selected according to actual needs.
[0071] The value range of △U' can be 1%~10% of the maximum allowable charging voltage of the battery; 1%~15% of the maximum allowable charging voltage of the battery; 2%~12% of the maximum allowable charging voltage of the battery; 5%~15% of the maximum allowable charging voltage of the battery; or other values can be selected according to actual needs.
[0072] For a three-phase four-wire energy storage system, a detection method in one embodiment is as follows: Fig.11 As shown:
[0073] If it is detected that Vp_max - Vbat>U1'' and the duration is greater than T1'', it is determined that the current situation is the first level of severe backflow; wherein, Vp_max is the peak value of the grid voltage (the maximum value of the three phase voltage peaks of the grid, the three phase voltages of the grid refer to the voltage Van between the grid phase A and the neutral line N, the voltage Vbn between the grid phase B and the neutral line N, and the voltage Vcn between the grid phase C and the neutral line N), and Vbat is the battery voltage.
[0074] If it is detected that within a power frequency cycle, Ib_max>Ib_c_max, Vp_max - Vbat>U2'', and the duration is greater than T2'', it is determined that the current is the second-level severe backflow; among them, Ib_max is the battery current peak value, and Ib_c_max is the maximum allowable charging current of the battery.
[0075] If it is detected that within a power frequency cycle, Ib_avg-Ib_c_max>△I'', Vp_max - Vbat>U3'', and the duration is greater than T3'', it is determined that the current is the third level of severe backflow; where Ib_avg is the average value of the battery current.
[0076] If it is detected that after the battery is fully charged, Vbat-Vb_c_max>△U'', Vp_max - Vbat>U4'', and the duration is greater than T4'', it is determined that the current is the fourth level of severe backflow. Among them, Vb_c_max is the maximum allowable charging voltage of the battery.
[0077] For the above three-phase four-wire energy storage system, where:
[0078] Backflow severity levels: Level 1 severe backflow > Level 2 severe backflow > Level 3 severe backflow > Level 4 severe backflow.
[0079] U1''>U2''>U3''>U4'', T1''≤T2''≤T3''≤T4''.
[0080] U1'': first preset voltage value; U2'': second preset voltage value; U3'': third preset voltage value; U4'': fourth preset voltage value; △U'': fifth preset voltage value; △I'': preset current value.
[0081] T1'': first preset time; T2'': second preset time; T3'': third preset time; T4'': fourth preset time.
[0082] The value ranges of U1'', U2'', U3'', and U4'' are as follows: In one embodiment, the value range of U1'' is 20%-40% of the rated voltage of the grid, the value range of U2'' is 15%-30% of the rated voltage of the grid, the value range of U3'' is 10%-25% of the rated voltage of the grid, and the value range of U4'' is 5%-15% of the rated voltage of the grid. Other ranges can also be selected according to actual needs. In different embodiments, U1'', U2'', U3'', and U4'' can be 30%, 20%, 15%, and 5% of the rated voltage of the grid, respectively; or 35%, 25%, 20%, and 15% of the rated voltage of the grid, respectively; or 20%, 15%, 10%, and 5% of the rated voltage of the grid, respectively; or other values can also be taken. Among them, the rated voltage of the grid is the rated value of the phase voltage of the grid,
[0083] The values of T1'', T2'', T3'', and T4'' can be 10ms, 10ms, 10ms, 10ms respectively; 10ms, 20ms, 30ms, 50ms respectively; 20ms, 20ms, 20ms, 20ms respectively; 20ms, 50ms, 100ms, 200ms respectively; or other values can be selected according to actual needs.
[0084] The value range of △I'' can be 2%-10% of the rated current of the battery, 3%-12% of the rated current of the battery, or 5%-15% of the rated current of the battery; other values can also be selected according to actual needs.
[0085] The value range of △U'' is: 1%~10% of the maximum allowable charging voltage of the battery; 1%~15% of the maximum allowable charging voltage of the battery; 2%~12% of the maximum allowable charging voltage of the battery; 5%~15% of the maximum allowable charging voltage of the battery; or other values can be selected according to actual needs.
[0086] The present invention also discloses a method for protecting an energy storage system from backflow of city power. After the energy storage system is detected to have backflow of city power according to the above detection method, the energy storage system is protected, that is, the energy storage system is shut down. Specifically,
[0087] When the energy storage system is a single-phase energy storage system, after detecting abnormal backflow of mains power, the shutdown operation is as follows Fig.12 As shown,
[0088] Step 1: The inverter is blocked, and only reverse current exists at this time;
[0089] Step 2: disconnect the grid-side switch S1 at the point where the grid voltage passes zero;
[0090] Step 3: Disconnect the battery side switch S2.
[0091] In the above-mentioned single-phase energy storage system, if the grid-side switch S1 includes not only the L-line switch S11 but also the N-line switch S12 (e.g. Figure 2 , Figure 4 ), there are three ways to "disconnect the grid-side switch S1 at the zero-crossing point of the grid voltage" in the second step above:
[0092] The first method: the L-line switch S11 is disconnected when the grid voltage crosses zero, and then the N-line switch S12 is disconnected;
[0093] In the second mode, the N-line switch S12 is disconnected when the grid voltage crosses zero, and then the L-line switch S11 is disconnected;
[0094] In the third mode, the L line switch S11 and the N line switch S12 are disconnected simultaneously when the grid voltage passes through zero.
[0095] The above three methods are all applicable to the case where the L line switch S11 and the N line switch S12 can be controlled independently; the above third method is applicable to the case where the L line switch S11 and the N line switch S12 cannot be controlled independently.
[0096] If the battery side switch S2 includes a positive switch S21, a negative switch S22 (eg Figure 3 , Figure 4 ), in one embodiment, the third step can be: if the breaking capacity of the positive switch S21 is stronger than that of the negative switch S22, the positive switch S21 is disconnected first, and then the negative switch S22 is disconnected; if the breaking capacity of the positive switch S21 is weaker than that of the negative switch S22, the negative switch S22 is disconnected first, and then the positive switch S21 is disconnected; if the breaking capacity of the positive switch S21 and the negative switch S22 are the same, the positive switch S21 and the negative switch S22 are disconnected at the same time; or, if the breaking capacity of the positive switch S21 and the negative switch S22 are different, the switch with stronger breaking capacity is disconnected first, and then the switch with weaker breaking capacity is disconnected; if the breaking capacity of the two is the same, the two are disconnected at the same time. Among them, the positive switch S21 connects the positive pole of the battery and the positive input terminal of the AC / DC, and the negative switch S22 connects the negative pole of the battery and the negative input terminal of the AC / DC.
[0097] When the energy storage system is a three-phase energy storage system, but the grid-side switch S1 phases (phase A, phase B, phase C) can be controlled independently, after detecting the abnormal backflow of mains power, the shutdown operation is as follows: Fig.13 As shown,
[0098] Step 1: The inverter is blocked, and only reverse current exists at this time;
[0099] Step 2: disconnect each phase of the grid-side switch S1 in sequence at the point where the grid voltage crosses zero (for example, first disconnect the A-phase switch of S1 at the point where the A-phase voltage crosses zero, then disconnect the B-phase switch of S1 at the point where the B-phase voltage crosses zero, and finally disconnect the C-phase switch of S1 at the point where the C-phase voltage crosses zero; or, first disconnect the B-phase switch of S1 at the point where the B-phase voltage crosses zero, then disconnect the C-phase switch of S1 at the point where the C-phase voltage crosses zero, and finally disconnect the A-phase switch of S1 at the point where the A-phase voltage crosses zero; or, first disconnect the C-phase switch of S1 at the point where the C-phase voltage crosses zero, then disconnect the A-phase switch of S1 at the point where the A-phase voltage crosses zero, and finally disconnect the B-phase switch of S1 at the point where the B-phase voltage crosses zero);
[0100] Step 3: Disconnect the battery side switch S2.
[0101] If the three-phase energy storage system is a three-phase four-wire energy storage system, and the grid-side switch S1 also includes an N-wire switch (see Figure 7 ), the N line switch can be controlled independently, and the above second step also includes disconnecting the N line switch after all phases of the grid side switch S1 are disconnected.
[0102] If the battery-side switch S2 of the three-phase energy storage system includes a positive switch and a negative switch, the third step can refer to the description of the single-phase energy storage system. If the positive switch and the negative switch have different breaking capacities, the switch with a stronger breaking capacity is disconnected first, and then the switch with a weaker breaking capacity is disconnected; if the breaking capacities of the two are the same, the two are disconnected at the same time.
[0103] In the above protection method, the inverter is first blocked and then the grid-side switch S1 is disconnected. After blocking, the AC power will continue to flow back into the battery. At this time, the grid voltage and current are in phase, and the grid voltage and current will not be out of sync. Therefore, when S1 is disconnected at the point where the grid voltage passes through zero, S1 is disconnected with zero current.
[0104] After the grid-side switch S1 is disconnected, the grid is not connected to the inverter. At this time, if the battery-side switch S2 is disconnected, the battery-side switch S2 will not be disconnected with current.
[0105] In summary, when S1 and S2 are disconnected, they are both disconnected at zero current, which effectively improves the service life of the switch, avoids the risk of disconnecting the switch with current, and improves system reliability.
[0106] If the energy storage system is a three-phase energy storage system and the phases (A, B, C) of the grid-side switch S1 cannot be controlled independently:
[0107] When abnormal backflow of mains power is detected, the shutdown operation is as follows: Fig.14 As shown,
[0108] Step 1: The inverter blocks the wave; at this time, only reverse current exists;
[0109] Step 2: Calculate the maximum value Imax of the sampling value of the three-phase output current of the inverter at the current moment;
[0110] Step 3: Calculate the minimum value Imax_min among all Imax values in a power frequency cycle, and record the phase φ of a power frequency cycle corresponding to Imax_min;
[0111] Step 4: Disconnect the battery side switch S2 at phase φ;
[0112] Step 5: Disconnect the grid-side switch S1.
[0113] If the battery-side switch S2 of the three-phase energy storage system includes a positive switch and a negative switch, and if the positive switch and the negative switch have different breaking capacities, the fourth step of "disconnecting the battery-side switch S2 at phase φ" is to first disconnect the switch with a stronger breaking capacity at phase φ, and then disconnect the switch with a weaker breaking capacity; if the positive switch and the negative switch have the same breaking capacity, both are disconnected at phase φ at the same time.
[0114] The aforementioned protection method of the present invention disconnects the battery side switch S2 at the phase φ, at which time the current at the disconnection moment of the DC switch is minimum, which is beneficial to increase the service life of the switch and improve the system reliability.
[0115] The power frequency in the power frequency cycle described in the present invention may be 50-60 Hz, or may be other frequencies (segments) according to actual application scenarios.
[0116] The mains backflow detection method of the energy storage system of the present invention can judge the severity level of the mains backflow according to the different degrees of the mains backflow, and realize the detection of abnormal working conditions of the mains backflow; the mains backflow protection method of the energy storage system realizes the rapid protection of the energy storage system by optimizing the shutdown timing of the energy storage system according to different control modes of the switch. The above-mentioned embodiments only express several implementation methods of the present invention, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for ordinary technicians in this field, without departing from the concept of the present invention, several variations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.
Claims
1. A method for detecting backflow of mains electricity in an energy storage system, characterized in that: The method determines the severity level of mains power backflow according to different degrees of mains power backflow, and the method includes: If it is detected that the difference between the peak value of the grid voltage and the battery voltage exceeds the first preset voltage value and lasts longer than the first preset time, it is determined that the current situation is the first level of severe backflow; If it is detected that within a power frequency cycle, the battery current peak value is greater than the maximum allowable charging current of the battery, the difference between the grid voltage peak value and the battery voltage exceeds a second preset voltage value, and the duration is greater than a second preset time, it is determined that the current is a second-level severe backflow; If it is detected that within one power frequency cycle, the difference between the average value of the battery current and the maximum allowable charging current of the battery is greater than the preset current value, the difference between the peak value of the grid voltage and the battery voltage exceeds the third preset voltage value, and the duration is greater than the third preset time, it is determined that the current is the third level of severe backflow; If it is detected that after the battery is fully charged, the difference between the battery voltage and the maximum allowable charging voltage of the battery exceeds the fifth preset voltage value, and the difference between the peak value of the grid voltage and the battery voltage exceeds the fourth preset voltage value, and the duration is greater than the fourth preset time, it is determined that the current is the fourth level of severe backflow; in, The first preset voltage value>the second preset voltage value>the third preset voltage value>the fourth preset voltage value; The first preset time ≤ the first preset time ≤ the second preset time ≤ the third preset time; Backflow severity levels: the first level severe backflow > the second level severe backflow > the third level severe backflow > the fourth level severe backflow.
2. The method for detecting mains backflow of an energy storage system according to claim 1, characterized in that: When the energy storage system is a single-phase energy storage system, the grid voltage peak is the grid phase voltage peak; when the energy storage system is a three-phase three-wire energy storage system, the grid voltage peak is the maximum value of the three grid line voltage peaks; when the energy storage system is a three-phase four-wire energy storage system, the grid voltage peak is the maximum value of the three grid phase voltage peaks.
3. The method for detecting backflow of mains electricity in an energy storage system according to claim 1, characterized in that: The first preset voltage value, the second preset voltage value, the third preset voltage value, and the fourth preset voltage value are preset proportions of the rated voltage of the power grid.
4. The method for detecting mains backflow of an energy storage system according to claim 1, characterized in that: The preset current value is a preset ratio of the rated current of the battery.
5. The method for detecting mains backflow of an energy storage system according to claim 1, characterized in that: The fifth preset voltage value is a preset ratio of the maximum allowable charging voltage of the battery.
6. The method for detecting backflow of mains electricity in an energy storage system according to claim 3, characterized in that: When the energy storage system is a single-phase energy storage system or a three-phase four-wire energy storage system, the grid rated voltage is the grid phase voltage rated value; when the energy storage system is a three-phase three-wire energy storage system, the grid rated voltage is the grid line voltage rated value.
7. A method for protecting an energy storage system from backflow of city power, characterized in that: When the detection method according to any one of claims 1 to 6 detects the backflow of mains power, the energy storage system is shut down.
8. The method for protecting the energy storage system from backflow of mains electricity according to claim 7, characterized in that: If the energy storage system is a single-phase energy storage system, the shutdown operation includes: Step 1: Inverter blocking wave; Step 2: disconnect the grid-side switch at the point where the grid voltage crosses zero; Step 3: Disconnect the battery side switch.
9. The method for protecting the energy storage system from backflow of mains electricity according to claim 7, characterized in that: If the energy storage system is a three-phase energy storage system but each phase of the grid-side switch can be controlled independently, the shutdown operation includes: Step 1: Inverter blocking wave; Step 2: disconnect each phase of the grid side switch in sequence at the point where the grid voltage passes through zero; Step 3: Disconnect the battery side switch.
10. The method for protecting the energy storage system from backflow of mains electricity according to claim 7, characterized in that: If the energy storage system is a three-phase energy storage system and each phase of the grid-side switch cannot be controlled independently, the shutdown operation includes: Step 1: Inverter blocking wave; Step 2: Calculate the maximum value of the three-phase output current sampling value of the inverter at the current moment; Step 3: Calculate the minimum value among all the maximum values in one power frequency cycle, and record the phase of one power frequency cycle corresponding to the minimum value; Step 4: disconnecting the battery side switch at the phase; Step 5: Disconnect the grid-side switch.