A method, system and device for water conservancy grid parameter inversion based on artificial intelligence

The AI-driven water conservancy grid parameter inversion method automates model updates and parameter adjustments, addressing high manpower costs and accuracy issues in hydrological forecast models, thereby improving monitoring efficiency and user experience.

CN118607199BActive Publication Date: 2024-12-03SHANDONG FENGSHI INFORMATION TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410665135.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2024-12-03
Estimated Expiration
2044-05-27

AI Technical Summary

Technical Problem

Existing hydrological forecast models require frequent updates, leading to high manpower costs and reduced accuracy over time, affecting the efficiency of water conservancy monitoring.

Method used

An AI-based method and system for water conservancy grid parameter inversion that automatically determines when a model needs updating, processes current data sets, calculates simulation errors, and adjusts parameters to maintain model accuracy without manual intervention.

Benefits of technology

This approach reduces manpower costs and improves the flexibility and accuracy of hydrological forecast models, enhancing user experience by automating the calibration process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118607199B_ABST
    Figure CN118607199B_ABST
Patent Text Reader

Abstract

The present application provides a method, system and device for inversion of water conservancy grid parameters based on artificial intelligence, which belongs to the field of water conservancy monitoring technology. The method determines whether there is a water conservancy forecast model to be updated based on preset update conditions; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation according to the water conservancy grid data of the selected river section that meets the preset update conditions; if it exists, the current water conservancy dynamic data set corresponding to the selected river section is obtained through the preset ETL tool; the current water conservancy dynamic data set is input into the water conservancy forecast model to be updated, so as to determine the hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated; according to the hydrological simulation error parameter set, the parameters to be calibrated corresponding to the water conservancy forecast model to be updated are determined, so as to perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of water conservancy monitoring technology, and in particular to an artificial intelligence-based water conservancy grid parameter inversion method, system and equipment. Background Art

[0002] With the development of information technology and the continuous construction of water conservancy industry systems, the response mechanisms and measures to water disasters such as mountain torrents and waterlogging are becoming increasingly perfect, and the accuracy of hydrological forecast models is gradually improving.

[0003] At present, the hydrological forecast model is established and trained by the modeling team and then used by water conservancy monitoring personnel. The inventors found that during the use of the hydrological forecast model, as the use time goes by, the error of the hydrological forecast model output results becomes larger and larger, and the modeling team needs to rely on regular updates of the model. This greatly increases the manpower cost and affects the normal use of water conservancy monitoring personnel.

[0004] Based on this, there is an urgent need for a technical solution that can enable the hydrological forecast model to flexibly conduct accurate water conservancy monitoring and reduce labor input. Summary of the invention

[0005] The embodiments of the present application provide a method, system and device for water conservancy grid parameter inversion based on artificial intelligence, which are used to solve the current problems of difficulty in updating hydrological forecast models, high manpower costs, and inability to effectively ensure that hydrological forecast models can flexibly perform accurate water conservancy monitoring, which affects user use.

[0006] On the one hand, an embodiment of the present application provides a method for inverting water conservancy grid parameters based on artificial intelligence, the method comprising:

[0007] Based on the preset update conditions, determining whether there is a water conservancy forecast model to be updated; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation according to the water conservancy grid data of the selected river section that meets the preset update conditions;

[0008] If it exists, obtain the current water conservancy dynamic data set corresponding to the selected river section range through the preset ETL tool;

[0009] Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated;

[0010] According to the hydrological simulation error parameter set, the parameters to be calibrated corresponding to the water conservancy forecast model to be updated are determined, so that after the water conservancy forecast model to be updated is updated according to the parameters to be calibrated, the hydrological simulation is performed on the selected river section.

[0011] In one implementation of the present application, based on a preset update condition, determining whether there is a water conservancy forecast model to be updated currently includes:

[0012] Obtain hydrological simulation information from a user terminal to determine whether there is a corresponding preset water conservancy forecast model based on the hydrological simulation information, so as to use the preset water conservancy forecast model as the water conservancy forecast model to be updated; wherein the hydrological simulation information at least includes the corresponding selected river section range.

[0013] In one implementation of the present application, based on a preset update condition, determining whether there is a water conservancy forecast model to be updated currently includes:

[0014] Determine the corresponding update time interval according to the last update time and current time of the preset water conservancy forecast model;

[0015] When the updating time interval is greater than a preset threshold, the preset water conservancy forecast model is used as the water conservancy forecast model to be updated.

[0016] In one implementation of the present application, a current water conservancy dynamic data set corresponding to the selected river section is obtained through a preset ETL tool, specifically including:

[0017] Determine the data processing format corresponding to the water conservancy forecast model to be updated and the corresponding selected river section range;

[0018] Through the preset ETL tool, the preset database is connected, and according to the data processing format and the selected river section range, the corresponding current water conservancy dynamic data set is captured.

[0019] In one implementation of the present application, the current water dynamic data set includes at least: rainfall, water level, and flow.

[0020] In one implementation of the present application, the current water conservancy dynamic data set is input into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated, specifically including:

[0021] Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, and determining the simulated water conservancy dynamic data set output by the water conservancy forecast model to be updated;

[0022] According to the data dimension, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, so as to add the difference value of each data dimension obtained to the hydrological simulation error parameter set.

[0023] In one implementation of the present application, according to the data dimension, the simulated water conservancy dynamic data set and the corresponding measured water conservancy data set are subtracted for corresponding data, specifically including:

[0024] According to the subtraction rule of the same section, each of the hydrological simulation error parameters in the simulated hydraulic dynamic data set at the same section is subtracted from the measured hydraulic data of the corresponding data dimension in the measured hydraulic data set.

[0025] In one implementation of the present application, according to the hydrological simulation error parameter set, the parameters to be calibrated corresponding to the water conservancy forecast model to be updated are determined, and after the water conservancy forecast model to be updated is updated according to the parameters to be calibrated, the hydrological simulation is performed on the selected river section, specifically including:

[0026] Comparing each hydrological simulation error parameter in the hydrological simulation error parameter set with an error threshold of a corresponding data dimension;

[0027] According to the comparison result, determining the model output accuracy of the water conservancy prediction model to be updated;

[0028] When the model output accuracy is less than a predetermined value, the hydraulic parameters in the hydraulic forecast model to be updated are corrected until the model output accuracy is greater than or equal to the predetermined value, and the corrected hydraulic parameters are used as the parameters to be calibrated to update the hydraulic forecast model to be updated.

[0029] On the other hand, the embodiment of the present application also provides a water conservancy grid parameter inversion system based on artificial intelligence, the system comprising:

[0030] A determination module, used to determine whether there is a water conservancy forecast model to be updated based on a preset update condition; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation based on water conservancy grid data of a selected river section that meets the preset update condition;

[0031] An acquisition module, used for acquiring a current hydraulic dynamic data set corresponding to the selected river section range through a preset ETL tool, if any;

[0032] An input module, used for inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated;

[0033] The parameter determination module is used to determine the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, so as to perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated.

[0034] On the other hand, the embodiment of the present application further provides a hydraulic grid parameter inversion device based on artificial intelligence, the device comprising:

[0035] at least one processor; and a memory in communication with the at least one processor; wherein the memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the at least one processor to:

[0036] Based on the preset update conditions, determining whether there is a water conservancy forecast model to be updated; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation according to the water conservancy grid data of the selected river section that meets the preset update conditions;

[0037] If it exists, obtain the current water conservancy dynamic data set corresponding to the selected river section range through a preset ETL tool;

[0038] Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated;

[0039] According to the hydrological simulation error parameter set, the parameters to be calibrated corresponding to the water conservancy forecast model to be updated are determined, so that after the water conservancy forecast model to be updated is updated according to the parameters to be calibrated, the hydrological simulation is performed on the selected river section.

[0040] Compared with the prior art, the present invention has the following significant effects:

[0041] Through the above technical solution, the present application can correct the water conservancy parameters before the water conservancy forecast model is used, without investing too much manpower to calibrate the model and participate in the model parameter calibration, thereby improving the efficiency of the model calibration. In this way, the hydrological forecast model can be updated flexibly and easily, effectively ensuring that the hydrological forecast model can flexibly carry out accurate water conservancy monitoring and improve the user experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0043] Figure 1 A schematic diagram of a flow chart of a water conservancy grid parameter inversion method based on artificial intelligence in an embodiment of the present application;

[0044] Figure 2This is a structural schematic diagram of a water conservancy grid parameter inversion system based on artificial intelligence in an embodiment of the present application;

[0045] Figure 3 This is a schematic diagram of the structure of a hydraulic grid parameter inversion device based on artificial intelligence in an embodiment of the present application. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0047] The embodiments of the present application provide a method, system and device for water conservancy grid parameter inversion based on artificial intelligence, which are used to solve the current technical solutions that are difficult to update the hydrological forecast model, the high manpower cost, and the inability to effectively ensure that the hydrological forecast model can flexibly perform accurate water conservancy monitoring, which affects user use.

[0048] The following describes in detail various embodiments of the present application in conjunction with the accompanying drawings.

[0049] The present application embodiment provides a water conservancy grid parameter inversion method based on artificial intelligence, such as Figure 1 As shown, the method may include steps S101-S104:

[0050] S101, the server determines whether there is a water conservancy forecast model to be updated based on preset update conditions.

[0051] Among them, the water conservancy forecast model to be updated is used to perform hydrological simulation based on the water conservancy grid data of the selected river section that meets the preset update conditions.

[0052] It should be noted that the server, as the executor of the artificial intelligence-based water conservancy grid parameter inversion method, is only an example. The executor is not limited to the server, and this application does not make any specific limitations on this.

[0053] The water conservancy forecast model is a pre-established model for hydrological simulation. It takes the river basin as the object, and establishes a grid unit body with a minimum unit such as 1km*1km. Each unit body is regarded as an independent water conservancy simulation object to assign corresponding hydrological parameters such as river roughness, time step, river network buildings and inlet and outlet boundary conditions.

[0054] In the embodiment of the present application, based on the preset update condition, determining whether there is a water conservancy forecast model to be updated currently includes:

[0055] The server obtains hydrological simulation information from the user terminal to determine whether there is a corresponding preset water conservancy forecast model according to the hydrological simulation information, so as to use the preset water conservancy forecast model as the water conservancy forecast model to be updated. The hydrological simulation information at least includes the corresponding selected river section range.

[0056] In other words, the preset update condition can be triggered by the user, and the user sends the hydrological simulation information through the user terminal, indicating that the hydrological simulation of a selected river section is performed through the hydrological forecast model. At this time, the server will determine that the hydrological forecast model is the hydrological forecast model to be updated, and then perform subsequent update operations to invert the hydrological grid parameters.

[0057] In another embodiment of the present application, based on a preset update condition, determining whether there is a water conservancy forecast model to be updated currently includes:

[0058] The server determines the corresponding update time interval according to the last update time of the preset water conservancy forecast model and the current time. When the update time interval is greater than the preset threshold, the preset water conservancy forecast model is used as the water conservancy forecast model to be updated.

[0059] That is to say, a preset threshold value may be pre-stored in the server, and by recording the update time of the water conservancy forecast model, whether the preset water conservancy forecast model needs to be updated is determined based on the update frequency. If the update time interval, that is, the time between the last update time and the current time exceeds the time length corresponding to the preset threshold value, such as one month, three months, etc., the preset water conservancy forecast model is used as the water conservancy forecast model to be updated for update operation.

[0060] At this time, the selected river section range can be a range pre-specified by the user based on actual use, and this application does not make any specific limitations on this.

[0061] S102, when the server determines that there is a water conservancy forecast model to be updated, the server obtains a current water conservancy dynamic data set corresponding to the selected river section through a preset ETL tool.

[0062] When it is determined that there is no water conservancy forecast model to be updated, the server will not actively perform the model update task.

[0063] In the embodiment of the present application, a current water conservancy dynamic data set corresponding to the selected river section is obtained through a preset ETL tool, specifically including:

[0064] The server determines the data processing format and the corresponding selected river section range corresponding to the water conservancy forecast model to be updated, connects with the preset database through the preset ETL tool, and captures the corresponding current water conservancy dynamic data set according to the data processing format and the selected river section range.

[0065] The preset ETL (Extract-Transform-Load) tool can utilize the data processing format of the updated water conservancy forecast model provided by the server (including input and output data formats), and according to the selected river section range, obtain the water conservancy dynamic data in the corresponding data processing format within the selected river section range from the preset database to form the current water conservancy dynamic data set.

[0066] In the embodiment of the present application, the current water conservancy dynamic data set includes at least: water conservancy dynamic data such as rainfall, water level, and flow.

[0067] S103, the server inputs the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated.

[0068] In the embodiment of the present application, the current water conservancy dynamic data set is input into the water conservancy forecast model to be updated, so as to determine the hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated, specifically including:

[0069] The server inputs the current water conservancy dynamic data set into the water conservancy forecast model to be updated, and determines the simulated water conservancy dynamic data set output by the water conservancy forecast model to be updated. According to the data dimension, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, so as to add the difference of each data dimension to the hydrological simulation error parameter set.

[0070] That is to say, the server uses the current water conservancy dynamic data set as input data through the water conservancy forecast model to be updated, performs hydrological simulation and outputs a simulated water conservancy dynamic data set. After obtaining the simulated water conservancy dynamic data set, the server will subtract the corresponding data of the simulated water conservancy dynamic data set from the measured water conservancy data set according to the data dimension. For example, the simulated water conservancy dynamic data set contains {a1, a2, a3}, which is composed of the water conservancy dynamic data corresponding to the first water conservancy grid, a1 is rainfall, a2 is water level, and a3 is flow. The measured water conservancy data set is {b1, b2, b3}, and the hydrological simulation error parameter set obtained by subtracting the corresponding data is {b1-a1, b2-a2, b3-a3}.

[0071] In the embodiment of the present application, according to the data dimension, the simulated water conservancy dynamic data set and the corresponding measured water conservancy data set are subtracted for corresponding data, specifically including:

[0072] The server subtracts each hydrological simulation error parameter in the simulated hydraulic dynamic data set at the same section from the measured hydraulic data of the corresponding data dimension in the measured hydraulic data set according to the subtraction rule for the same section.

[0073] In other words, the server will automatically perform subtraction processing on the simulated hydraulic dynamic data set and the measured hydraulic data set at the same section to improve the accuracy and efficiency of data subtraction.

[0074] In addition, the present application can also calculate the average error between each hydrological simulation error parameter in the simulated hydrological dynamic data set and the measured hydrological data of the corresponding data dimension in the measured hydrological data set, and add the average error to the hydrological simulation error parameter set.

[0075] S104, the server determines the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, and performs hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated.

[0076] In the embodiment of the present application, according to the hydrological simulation error parameter set, the parameters to be calibrated corresponding to the water conservancy forecast model to be updated are determined, and after the water conservancy forecast model to be updated is updated according to the parameters to be calibrated, the hydrological simulation is performed on the selected river section, specifically including:

[0077] The server compares each hydrological simulation error parameter in the hydrological simulation error parameter set with the error threshold of the corresponding data dimension. According to the comparison result, the model output accuracy of the water conservancy forecast model to be updated is determined. When the model output accuracy is less than the predetermined value, the water conservancy parameters in the water conservancy forecast model to be updated are corrected until the model output accuracy is greater than or equal to the predetermined value, and the corrected water conservancy parameters are used as the parameters to be calibrated to update the water conservancy forecast model to be updated.

[0078] The server may pre-store error thresholds for different data dimensions, for example, the error threshold for water level is 20 cm, and the error threshold for flow is 10%. If the hydrological simulation error parameter is greater than the corresponding error threshold, the output error of the corresponding data dimension is determined, otherwise the output is accurate. The server may count the output results of each data dimension of the model output and calculate the model output accuracy. If the model output accuracy is less than a predetermined value, the model hydraulic parameters are corrected, that is, the hydraulic parameters are corrected according to a user-specified adjustment rule, such as parameter reduction or increase.

[0079] Through the above technical solution, the present application can correct the water conservancy parameters before the water conservancy forecast model is used, without investing too much manpower to calibrate the model and participate in the model parameter calibration, thereby improving the efficiency of the model calibration. In this way, the hydrological forecast model can be updated flexibly and easily, effectively ensuring that the hydrological forecast model can flexibly carry out accurate water conservancy monitoring and improve the user experience.

[0080] Figure 2 A schematic diagram of the structure of a water conservancy grid parameter inversion system 200 based on artificial intelligence provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the system includes:

[0081] The determination module 201 is used to determine whether there is a water conservancy forecast model to be updated based on the preset update conditions. The water conservancy forecast model to be updated is used to perform hydrological simulation based on the water conservancy grid data of the selected river section that meets the preset update conditions. The acquisition module 202 is used to obtain the current water conservancy dynamic data set corresponding to the selected river section through the preset ETL tool if it exists. The input module 203 is used to input the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine the hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated. The parameter determination module 204 is used to determine the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, so as to perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated.

[0082] In the embodiment of the present application, the determination module 201 is specifically used for:

[0083] The hydrological simulation information from the user terminal is obtained to determine whether there is a corresponding preset water conservancy forecast model according to the hydrological simulation information, so as to use the preset water conservancy forecast model as the water conservancy forecast model to be updated. The hydrological simulation information at least includes the corresponding selected river section range.

[0084] In the embodiment of the present application, the determination module 201 is further specifically used for:

[0085] According to the last update time of the preset water conservancy forecast model and the current time, the corresponding update time interval is determined. When the update time interval is greater than the preset threshold, the preset water conservancy forecast model is used as the water conservancy forecast model to be updated.

[0086] In the embodiment of the present application, the acquisition module 202 is specifically used for:

[0087] Determine the data processing format and the corresponding selected river range corresponding to the water conservancy forecast model to be updated. Connect with the preset database through the preset ETL tool, and capture the corresponding current water conservancy dynamic data set according to the data processing format and the selected river range.

[0088] In the embodiment of the present application, the current water conservancy dynamic data set includes at least: rainfall, water level, and flow.

[0089] In the embodiment of the present application, the input module 203 is specifically used for:

[0090] The current water conservancy dynamic data set is input into the water conservancy forecast model to be updated, and the simulated water conservancy dynamic data set output by the water conservancy forecast model to be updated is determined. According to the data dimension, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, so as to add the difference of each data dimension to the hydrological simulation error parameter set.

[0091] In the embodiment of the present application, the input module 203 is further specifically used for:

[0092] According to the subtraction rule of the same section, the hydrological simulation error parameters in the simulated hydraulic dynamic data set at the same section are subtracted from the measured hydraulic data of the corresponding data dimension in the measured hydraulic data set.

[0093] In the embodiment of the present application, the parameter determination module 204 is specifically used for:

[0094] Compare each hydrological simulation error parameter in the hydrological simulation error parameter set with the error threshold of the corresponding data dimension. According to the comparison result, determine the model output accuracy of the water conservancy forecast model to be updated. When the model output accuracy is less than the predetermined value, correct the water conservancy parameters in the water conservancy forecast model to be updated until the model output accuracy is greater than or equal to the predetermined value, and use the corrected water conservancy parameters as the parameters to be calibrated to update the water conservancy forecast model to be updated.

[0095] Figure 3 A schematic diagram of the structure of a water conservancy grid parameter inversion device based on artificial intelligence provided in an embodiment of the present application, such as Figure 3 As shown, the device includes:

[0096] At least one processor; and a memory in communication with the at least one processor. The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to:

[0097] Based on the preset update conditions, determine whether there is a water conservancy forecast model to be updated. The water conservancy forecast model to be updated is used to perform hydrological simulation based on the water conservancy grid data of the selected river section that meets the preset update conditions. If it exists, obtain the current water conservancy dynamic data set corresponding to the selected river section through the preset ETL tool. Input the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine the hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated. According to the hydrological simulation error parameter set, determine the parameters to be calibrated corresponding to the water conservancy forecast model to be updated, so as to perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated.

[0098] The systems, devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.

[0099] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing this specification, the functions of each unit can be implemented in the same or multiple software and / or hardware.

[0100] Those skilled in the art will appreciate that the embodiments of this specification may be provided as methods, systems, or computer program products. Therefore, the embodiments of this specification may be in the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the embodiments of this specification may be in the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0101] This specification is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of this specification. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1A device that provides the functions specified in a block or multiple blocks.

[0102] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0103] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0104] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0105] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0106] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0107] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0108] This specification may be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. This specification may also be practiced in distributed computing environments where tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules may be located in local and remote computer storage media, including storage devices.

[0109] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0110] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0111] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A water conservancy grid parameter inversion method based on artificial intelligence, characterized in that: The method comprises: Based on the preset update conditions, determining whether there is a water conservancy forecast model to be updated; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation according to the water conservancy grid data of the selected river section that meets the preset update conditions; If it exists, obtain the current water conservancy dynamic data set corresponding to the selected river section range through the preset ETL tool; Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated; Determine the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, and perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated; The water conservancy forecast model is a pre-established model for hydrological simulation, which takes the river basin as the object, establishes a grid-divided unit body, and regards each unit body as an independent water conservancy simulation object to assign corresponding hydrological parameters and inflow and outflow boundary conditions; the hydrological parameters include: river roughness, time step, river network buildings; Wherein, based on the preset update condition, determining whether there is a water conservancy forecast model to be updated currently specifically includes: Acquire hydrological simulation information from a user terminal to determine whether a corresponding preset water conservancy forecast model exists according to the hydrological simulation information, so as to use the preset water conservancy forecast model as the water conservancy forecast model to be updated; wherein the hydrological simulation information at least includes the corresponding selected river section range; Or the determining whether there is a water conservancy forecast model to be updated based on the preset update condition specifically includes: Determine the corresponding update time interval according to the last update time and current time of the preset water conservancy forecast model; When the update time interval is greater than a preset threshold, the preset water conservancy forecast model is used as the water conservancy forecast model to be updated; The current water conservancy dynamic data set corresponding to the selected river section is obtained through the preset ETL tool, specifically including: Determine the data processing format corresponding to the water conservancy forecast model to be updated and the corresponding selected river section range; By means of the preset ETL tool, the preset database is connected, and according to the data processing format and the selected river section range, the corresponding current water conservancy dynamic data set is captured; The current water conservancy dynamic data set includes at least: rainfall, water level, and flow; The step of inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a set of hydrological simulation error parameters corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated, specifically includes: Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, and determining the simulated water conservancy dynamic data set output by the water conservancy forecast model to be updated; According to the data dimensions, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, so as to add the obtained difference values ​​of each data dimension to the hydrological simulation error parameter set; According to the data dimension, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, specifically including: According to the subtraction rule of the same section, each of the hydrological simulation error parameters in the simulated hydraulic dynamic data set at the same section is subtracted from the measured hydraulic data of the corresponding data dimension in the measured hydraulic data set.

2. The method for inversion of water conservancy grid parameters based on artificial intelligence according to claim 1 is characterized in that: Determining the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, and performing hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated, specifically includes: Comparing each hydrological simulation error parameter in the hydrological simulation error parameter set with an error threshold of a corresponding data dimension; According to the comparison result, determining the model output accuracy of the water conservancy prediction model to be updated; When the model output accuracy is less than a predetermined value, the hydraulic parameters in the hydraulic forecast model to be updated are corrected until the model output accuracy is greater than or equal to the predetermined value, and the corrected hydraulic parameters are used as the parameters to be calibrated to update the hydraulic forecast model to be updated.

3. A water conservancy grid parameter inversion system based on artificial intelligence, characterized in that: The system comprises: A determination module, used to determine whether there is a water conservancy forecast model to be updated based on a preset update condition; wherein the water conservancy forecast model to be updated is used to perform hydrological simulation based on water conservancy grid data of a selected river section that meets the preset update condition; An acquisition module, used for acquiring a current water conservancy dynamic data set corresponding to the selected river section range through a preset ETL tool, if any; An input module, used for inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, so as to determine a hydrological simulation error parameter set corresponding to the current water conservancy dynamic data set according to the water conservancy forecast model to be updated; A parameter determination module, used for determining the parameters to be calibrated corresponding to the water conservancy forecast model to be updated according to the hydrological simulation error parameter set, so as to perform hydrological simulation on the selected river section after updating the water conservancy forecast model to be updated according to the parameters to be calibrated; The water conservancy forecast model is a pre-established model for hydrological simulation, which takes the river basin as the object, establishes a grid-divided unit body, and regards each unit body as an independent water conservancy simulation object to assign corresponding hydrological parameters and inflow and outflow boundary conditions; the hydrological parameters include: river roughness, time step, river network buildings; Wherein, the determination module is specifically used for: Acquire hydrological simulation information from a user terminal to determine whether a corresponding preset water conservancy forecast model exists according to the hydrological simulation information, so as to use the preset water conservancy forecast model as the water conservancy forecast model to be updated; wherein the hydrological simulation information at least includes the corresponding selected river section range; Or the determination module is specifically used for: Determine the corresponding update time interval according to the last update time and current time of the preset water conservancy forecast model; When the update time interval is greater than a preset threshold, the preset water conservancy forecast model is used as the water conservancy forecast model to be updated; Wherein, the acquisition module is specifically used for: Determine the data processing format corresponding to the water conservancy forecast model to be updated and the corresponding selected river section range; By means of the preset ETL tool, the preset database is connected, and according to the data processing format and the selected river section range, the corresponding current water conservancy dynamic data set is captured; The current water conservancy dynamic data set includes at least: rainfall, water level, and flow; Wherein, the input module is specifically used for: Inputting the current water conservancy dynamic data set into the water conservancy forecast model to be updated, and determining the simulated water conservancy dynamic data set output by the water conservancy forecast model to be updated; According to the data dimensions, the simulated water conservancy dynamic data set is subtracted from the corresponding measured water conservancy data set, so as to add the obtained difference values ​​of each data dimension to the hydrological simulation error parameter set; Wherein, the input module is also specifically used for: According to the subtraction rule of the same section, each of the hydrological simulation error parameters in the simulated hydraulic dynamic data set at the same section is subtracted from the measured hydraulic data of the corresponding data dimension in the measured hydraulic data set.

4. A hydraulic grid parameter inversion device based on artificial intelligence, characterized in that: The device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the artificial intelligence-based water conservancy grid parameter inversion method as described in any one of claims 1-2 above.

Citation Information

Patent Citations

  • Hydrological model parameter calibration method and device, computer equipment and storage medium

    CN110990761A

  • Distributed hydrological model parameter calibration method based on multi-point parallel correction

    CN111985106A

  • Hydrological forecasting model parameter calibration method based on deep reinforcement learning

    CN113255206A

  • Parameter distinguishing scene intelligent calibration hydrological forecasting method and terminal

    CN115618642A

  • Method and system of real-time simulation and forecasting in a fully-integrated hydrologic environment

    EP3857269A1