A method and system for constructing an industrial data security inspection index system

By building an industrial data security inspection index system, the problems of insufficient real-time and lack of detailed analysis in traditional methods are solved, real-time monitoring and detailed analysis are realized, the loss rate is reduced, and production efficiency and product quality are improved.

CN118608016BActive Publication Date: 2024-11-05FUJIAN ZHONGXIN NET SAFETY INFORMATION TECHNOLOGY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411082970.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-05
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The loss rate monitoring and management methods of traditional industrial production workshops lack real-time monitoring and prevention mechanisms, resulting in lagging abnormal situation discovery and lack of detailed analysis, making it difficult to effectively identify potential abnormal situations and take remedial measures.

Method used

By building an industrial data security inspection indicator system, including pre-acquisition of process flow charts, monitoring defect data, building primary and secondary safety inspection indicators, time series analysis, screening impact coefficients and correlation coefficients, establishing an industrial inspection compensation manual, and taking corresponding compensation measures .

Benefits of technology

The transformation from post-detection to real-time monitoring has been achieved, and abnormal processes have been quickly discovered and judged, which has reduced the generation of defective products and waste products, improved production efficiency and product quality, and provided a systematic and scientific safety inspection indicator system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118608016B_ABST
    Figure CN118608016B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for constructing an industrial data security inspection index system, which relates to the technical field of industrial index inspection. By constructing primary security inspection indicators in each current process in real time, the transition from post-detection to real-time monitoring is further realized, and abnormal processes can be quickly discovered and judged, further avoiding the problem of delayed abnormal situation discovery in traditional methods, thereby improving production efficiency and product quality. By conducting a detailed analysis of the time series in the abnormal process, the secondary loss rate Ssz of the abnormal process in each historical monitoring period is checked. b , construct the secondary safety inspection index of abnormal process, and can carefully judge the secondary loss rate Ssz in each monitoring period b For the first-level loss rate Ssz a The impact degree of the abnormal situation can be determined by filtering out the time series corresponding to the first three groups of impact coefficients Yxyz, which further realizes the accurate positioning and impact analysis of abnormal situations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial index inspection, and specifically to a method and system for constructing an industrial data security inspection index system. Background Art

[0002] In the field of industrial production quality management and control, especially in industrial inspection and monitoring, with the high degree of automation and complexity of modern industrial production, defects may occur in the production process of each process in the production workshop, resulting in many defective or waste products. Therefore, the loss rate in the industrial production workshop has become a focus of attention. Among them, the loss rate of each process is an important indicator to measure production efficiency and product quality.

[0003] The current methods for monitoring and managing the loss rate of each process in industrial production workshops have some shortcomings. Traditional inspection methods usually rely on post-detection and lack real-time monitoring and prevention mechanisms, resulting in delayed detection of abnormal situations, affecting production efficiency and quality. In addition, traditional methods often lack detailed analysis when judging abnormal processes and analyzing the impact of various factors on the loss rate, making it difficult to effectively identify potential abnormal situations and take corresponding remedial measures in the actual production process, ignoring the importance of progressive approach. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a method and system for constructing an industrial data security inspection indicator system, which solves the problems in the above-mentioned background technology.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for constructing an industrial data security inspection index system comprises the following steps:

[0006] S1. Obtain the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, construct the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process;

[0007] S2. Based on the abnormal process obtained in step S1, the time series analysis method is used to analyze the time series within the abnormal process, and the secondary loss rate Ssz of the abnormal process in each historical monitoring period is checked. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out;

[0008] S3. Record the processing environment condition sets corresponding to the three selected time series, and analyze the effects of the processing environment condition sets on the secondary loss rate Ssz in the corresponding time series stage based on the processing environment condition sets. b The degree of influence of , in order to obtain the corresponding correlation coefficient Xgxs;

[0009] S4. According to several groups of correlation coefficients Xgxs, an industrial inspection compensation manual is established, and corresponding compensation measures are taken according to the industrial inspection compensation manual.

[0010] Preferably, S1 specifically comprises the following steps:

[0011] S11. According to the process flow chart of the industrial production workshop, the order and number of each process are clarified, and the duration of each monitoring period is set to one week to monitor the relevant defect data in each process, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced in each process.

[0012] Preferably, S1 further includes:

[0013] S12. Based on the relevant defect data obtained in step S11, construct the primary safety inspection index in each current process: the primary loss rate Ssz a , which can be obtained by:

[0014]

[0015] In the formula, It is expressed as the number of defective products produced in the i-th process during the current monitoring period. It is expressed as the amount of waste produced in the i-th process during the current monitoring period. It is expressed as the total output produced by the i-th process in the current monitoring period, It is expressed as the first-level loss rate obtained by the ith process in the current monitoring period;

[0016] S13. Preset the loss threshold Q, and compare and analyze the primary safety inspection indicators in each current process with the loss threshold Q to preliminarily determine the abnormal process. The specific determination content is as follows:

[0017] S131, if the primary loss rate Ssz in the corresponding process a When the loss threshold Q is exceeded, the process is judged to be in an abnormal state and marked as an abnormal process. At this time, an in-depth inspection instruction will be issued;

[0018] S132, if the primary loss rate Ssz in the corresponding process a When the loss threshold Q is not exceeded, it is determined that the process is not in an abnormal state temporarily.

[0019] Preferably, S2 specifically includes the following steps:

[0020] S21. Extract relevant defect data of abnormal processes in each historical monitoring period according to historical data in the industrial production workshop, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced by the abnormal process in each historical monitoring period;

[0021] S211, the secondary loss rate Ssz of abnormal processes in each historical monitoring period b To obtain it, follow the following steps:

[0022]

[0023] In the formula, It is expressed as the number of defective products produced by abnormal processes during the jth monitoring period, It is expressed as the number of waste products produced by abnormal processes during the jth monitoring period, It is expressed as the total output produced by abnormal processes in the jth monitoring period, It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period.

[0024] Preferably, S2 also includes:

[0025] S22. By constructing a longitudinal loss analysis model and using time series analysis methods, the secondary loss rate Ssz in each monitoring period is analyzed. b The first-level loss rate Ssz of the corresponding abnormal process a The corresponding influence coefficient Yxyz can be obtained by the following method:

[0026]

[0027] In the formula, It is expressed as the number of monitoring periods, j=1, 2, 3, ..., , a represents the intercept term, Expressed as a correction constant, It is expressed as the influence of the secondary loss rate in the jth monitoring period on the primary loss rate of the abnormal process. It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period, It is expressed as the first-level loss rate obtained by the abnormal process in the jth monitoring period.

[0028] Preferably, S2 also includes:

[0029] S23. After comparing the sizes of several groups of influence coefficients Yxyz obtained in step S22, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out, and the time series corresponding to the three groups of influence coefficients Yxyz are sorted in order from large to small, and marked as the first analysis time series, the second analysis time series and the third analysis time series respectively.

[0030] Preferably, S3 specifically includes the following steps:

[0031] S31, monitoring and recording the processing environment condition set in the first analysis time sequence, the second analysis time sequence and the third analysis time sequence, wherein the processing environment condition set includes the operating temperature Zwd and the operating pressure Yzy during the production process in the industrial production workshop;

[0032] S32. Analyze the effect of the processing environment condition set on the secondary loss rate Ssz in the corresponding time sequence stage b The influence degree of the linear normalization is calculated to obtain the corresponding correlation coefficient Xgxs, which is obtained according to the following formula:

[0033]

[0034]

[0035] In the formula, It is expressed as the influence of the operating temperature Zwd on the secondary loss rate in the corresponding timing stage, It is expressed as the influence of the operating pressure Yzy on the secondary loss rate in the corresponding time sequence stage, It is represented as the operating temperature at the i-th monitoring point in the k-th analysis time series, It is expressed as the operating pressure at the i-th monitoring point in the k-th analysis time series, It is expressed as the secondary loss rate at the i-th monitoring point in the k-th analysis time series, It is expressed as the standard deviation of the operating temperature in the kth analysis time series, It is expressed as the standard deviation of the operating pressure in the kth analysis time series, Expressed as the standard deviation of the secondary loss rate in the kth analysis time series, Expressed as and The covariance of .

[0036] Preferably, S4 specifically comprises the following steps:

[0037] S41, according to the method of obtaining the correlation coefficient Xgxs in step S32, six groups of corresponding correlation coefficients Xgxs can be obtained;

[0038] S42, respectively compare the six groups of corresponding correlation coefficients Xgxs with the value 1 to determine whether there is a linear relationship, and specifically determine in the following manner:

[0039] S421, if the corresponding correlation coefficient Xgxs = 1. Determine whether there is a completely positive linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions;

[0040] S422, if the corresponding correlation coefficient Xgxs = 1. Determine that there is a completely negative linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions;

[0041] S423. If the corresponding correlation coefficient Xgxs=0, it is determined that there is no completely linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop.

[0042] Preferably, S4 also includes:

[0043] S43, recording the judgment result in step S42 in real time in the industrial inspection compensation manual, and formulating corresponding compensation measures in the industrial inspection compensation manual, the industrial inspection compensation manual specifically includes the following contents:

[0044] S431, temperature compensation: if there is a completely positive linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted downward, and the adjustment range will be within -1°C to -5°C each time. After the adjustment, the relevant defect data of each process in the industrial production workshop will be monitored at a monitoring frequency of once per hour. If there is a completely negative linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted upward, and the adjustment range will be within 1°C to 5°C each time. After the adjustment, the monitoring will be carried out at a monitoring frequency of once per hour.

[0045] S432, pressure compensation: If there is a completely positive linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy downward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, the relevant defect data of each process in the industrial production workshop are monitored at a monitoring frequency of once per hour; if there is a completely negative linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy upward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, it is monitored at a monitoring frequency of once per hour.

[0046] An industrial data security inspection indicator system construction system, including a preliminary security inspection module, an abnormal process analysis module, a condition impact module and a compensation module;

[0047] The preliminary safety inspection module obtains the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, it constructs the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process;

[0048] The abnormal process analysis module uses the time series analysis method to analyze the time series within the abnormal process and check the secondary loss rate Ssz of the abnormal process in each historical monitoring period. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out;

[0049] The conditional influence module records the processing environment condition sets corresponding to the three selected time series, and analyzes the influence of the processing environment condition sets on the secondary loss rate Ssz2 in the corresponding time series stage based on the processing environment condition sets, so as to obtain the corresponding correlation coefficient Xgxs;

[0050] The compensation module establishes an industrial inspection compensation manual based on several groups of correlation coefficients Xgxs, and takes corresponding compensation measures based on the industrial inspection compensation manual.

[0051] The present invention provides a method and system for constructing an industrial data security inspection index system, which has the following beneficial effects:

[0052] (1) By constructing primary safety inspection indicators in each process in real time, the transition from post-detection to real-time monitoring is further realized, which can quickly discover and judge abnormal processes, further avoiding the problem of delayed abnormal situation discovery in traditional methods, thereby improving production efficiency and product quality. By conducting a detailed analysis of the time series within the abnormal process, the secondary loss rate Ssz of the abnormal process in each historical monitoring period is checked. b , construct the secondary safety inspection index of abnormal process, and can carefully judge the secondary loss rate Ssz in each monitoring period b For the first-level loss rate Ssz aThe corresponding influence coefficient Yxyz is obtained and compared, and the time series corresponding to the first three groups of influence coefficients Yxyz are selected, which further realizes the accurate positioning and impact analysis of abnormal situations. The processing environment condition sets corresponding to the three groups of selected time series are recorded in detail, and their effects on the secondary loss rate Ssz in the corresponding time series stage are analyzed. b The corresponding correlation coefficient Xgxs is obtained, so that the impact of various environmental factors on the loss rate can be comprehensively considered, which solves the problem of insufficient detailed analysis in traditional methods. According to several groups of correlation coefficients Xgxs, a scientific and reasonable industrial inspection compensation manual is established, and corresponding compensation measures are taken according to the manual. Through scientific data analysis and compensation methods, the generation of defective and waste products can be minimized, the loss rate of each process can be reduced, the overall production quality and efficiency can be improved, and the shortcomings of experience judgment and subjective analysis in traditional methods can be made up. In short, this method starts from the primary loss rate Ssz a To the secondary loss rate Ssz b , and then to the progressive analysis of the influence coefficient Yxyz and the correlation coefficient Xgxs, further ensuring the comprehensiveness and systematicness of the analysis process. It provides a refined and multi-level industrial data security inspection indicator system, which helps to further comprehensively identify and control various abnormal situations that may occur in the production process, and provides a systematic and scientific safety inspection indicator system for industrial production workshops.

[0053] (2) By establishing primary safety inspection indicators, timely warning and prevention of the large-scale production of defective or waste products can be achieved, thereby effectively reducing the production loss rate. When judging abnormal processes and analyzing the impact of various factors on the loss rate, this method no longer relies on rough overall data, but instead uses time series analysis methods to examine historical monitoring data in detail and construct secondary safety inspection indicators. This meticulous analysis method allows accurate judgment of the secondary loss rate Ssz within each monitoring period. b The first-level loss rate Ssz in the corresponding process a The degree of influence is determined and the influence coefficient Yxyz is quantified to ensure the scientificity and accuracy of the analysis results.

[0054] (3) By quantifying the loss rate of abnormal processes in different time periods, a deep-level safety inspection indicator is formed, which not only improves the accuracy of abnormal detection, but also provides data-driven decision support for enterprises. b By conducting analysis, we can identify trends and periodic problems in abnormal processes. This analysis method can help companies understand whether certain defects have temporal regularity, so as to take preventive measures in future production processes and reduce the generation of defective and waste products. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 A schematic diagram of the steps of a method for constructing an industrial data security inspection index system according to the present invention;

[0056] Figure 2 The present invention is a schematic diagram of a system flow for constructing an industrial data security inspection indicator system. DETAILED DESCRIPTION

[0057] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0058] Example 1

[0059] See also Figure 1 The present invention provides a method for constructing an industrial data security inspection index system, comprising the following steps:

[0060] S1. Obtain the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, construct the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process;

[0061] S2. Based on the abnormal process obtained in step S1, the time series analysis method is used to analyze the time series within the abnormal process, and the secondary loss rate Ssz of the abnormal process in each historical monitoring period is checked. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out;

[0062] S3. Record the processing environment condition sets corresponding to the three selected time series, and analyze the effects of the processing environment condition sets on the secondary loss rate Ssz in the corresponding time series stage based on the processing environment condition sets. b The degree of influence of , in order to obtain the corresponding correlation coefficient Xgxs;

[0063] S4. According to several groups of correlation coefficients Xgxs, an industrial inspection compensation manual is established, and corresponding compensation measures are taken according to the industrial inspection compensation manual.

[0064] In this embodiment, by obtaining the process flow chart of the industrial production workshop in advance, determining the number of processes, monitoring the relevant defect data in each process, and constructing the primary safety inspection indicators in each process, the real-time monitoring and prevention mechanism of each process is further realized, thereby avoiding the problem of delayed detection of abnormal situations caused by relying on post-detection in traditional methods, and improving production efficiency and quality. Based on the time series analysis method of abnormal processes, the secondary loss rate Ssz in each historical monitoring period is analyzed. b Conduct inspections, re-construct the secondary safety inspection indicators for abnormal processes, and determine the secondary loss rate Ssz b The first-level loss rate Ssz in the corresponding process a The corresponding influence coefficient Yxyz is obtained, and the time series corresponding to the first three groups of influence coefficients Yxyz are screened out. This process realizes detailed abnormal process analysis, can accurately identify potential abnormal situations, and take targeted remedial measures. By recording the processing environment condition sets corresponding to the three groups of screened time series, and analyzing the effects of these environmental conditions on the secondary loss rate Ssz in the corresponding time series stage b The influence degree of the environmental condition is obtained, and the corresponding correlation coefficient Xgxs is obtained. This multi-dimensional environmental condition analysis method can consider the influence of various production factors on the loss rate in many aspects, and provide a more accurate basis for judgment. According to several groups of correlation coefficients Xgxs, an industrial inspection compensation manual is established, and corresponding compensation measures are taken according to the manual, which can further effectively reduce the generation of defective and waste products, reduce the loss rate, and significantly improve product quality and production efficiency. From primary safety inspection indicators to secondary safety inspection indicators, from influence coefficients to correlation coefficients, this method progresses layer by layer, and gradually refines the analysis, further ensuring the systematic and comprehensive nature of the monitoring and management process, avoiding the importance of ignoring the progressive level in traditional methods, and improving the accuracy of anomaly identification and the effectiveness of compensation strategies. In short, this method solves the problems of insufficient real-time performance, lack of detailed analysis, unscientific anomaly identification and remedial measures in traditional methods by constructing a systematic, real-time and multi-dimensional industrial data safety inspection indicator system, and provides a scientific and efficient solution for quality control and loss rate management of each process in industrial production workshops.

[0065] Example 2

[0066] Please refer to Figure 1 Specifically: S1 specifically includes the following steps:

[0067] S11. According to the process flow chart of the industrial production workshop, the order and number of each process are clarified, and the duration of each monitoring period is set to one week to monitor the relevant defect data in each process, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced in each process.

[0068] S1 also includes:

[0069] S12. Based on the relevant defect data obtained in step S11, construct the primary safety inspection index in each current process: the primary loss rate Ssz a , which can be obtained by:

[0070]

[0071] In the formula, It is expressed as the number of defective products produced in the i-th process during the current monitoring period. It is expressed as the amount of waste produced in the i-th process during the current monitoring period. It is expressed as the total output produced by the i-th process in the current monitoring period, It is expressed as the first-level loss rate obtained by the ith process in the current monitoring period;

[0072] The above-mentioned defective product quantity Cps, waste product quantity Fps and total output Zcz can be recorded in real time by a counting device installed on the production line to record the number of products, defective product quantity and waste product quantity passing through the production line;

[0073] S13. Preset the loss threshold Q, and compare and analyze the primary safety inspection indicators in each current process with the loss threshold Q to preliminarily determine the abnormal process. The specific determination content is as follows:

[0074] S131, if the primary loss rate Ssz in the corresponding process a When the loss threshold Q is exceeded, the process is judged to be in an abnormal state and marked as an abnormal process. At this time, an in-depth inspection instruction will be issued;

[0075] S132, if the primary loss rate Ssz in the corresponding process a When the loss threshold Q is not exceeded, it is determined that the process is not in an abnormal state temporarily.

[0076] In this embodiment, the method uses a clear process flow chart to understand the order and quantity of the processes in advance, and accurately constructs primary safety inspection indicators by monitoring the defective products, waste products and total production volume in each process. This process further ensures that the production situation of each process can be carefully and accurately recorded and analyzed, which helps to timely discover abnormal processes, thereby improving the accuracy and reliability of overall monitoring. By calculating the primary loss rate Ssz of each process a , and compared with the pre-set loss threshold Q. This method provides a way to quantitatively evaluate the process status. aWhen the loss threshold Q is exceeded, the abnormal process can be judged and marked in time, further ensuring that the problem can be discovered and handled at an early stage to reduce potential production losses. This standardized judgment method makes the evaluation of process status more objective and scientific; after discovering the abnormal process, the method can immediately issue an in-depth inspection instruction to further analyze the abnormal process. The abnormal early warning mechanism can take measures when the problem just occurs, further avoiding the further spread and deterioration of the problem, reducing the products that were originally in the defective stage from gradually turning into waste due to failure to be discovered in time, and ensuring the continuity and stability of production; by comprehensively monitoring and analyzing the defective and waste products in each process, timely identifying and solving problems in the production process, reducing the generation of defective and waste products, not only reducing production costs, but also improving the overall quality of the product and the market competitiveness of the enterprise.

[0077] Example 3

[0078] Please refer to Figure 1 Specifically: S2 specifically includes the following steps:

[0079] S21. Extract relevant defect data of abnormal processes in each historical monitoring period according to historical data in the industrial production workshop, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced by the abnormal process in each historical monitoring period;

[0080] S211, the secondary loss rate Ssz of abnormal processes in each historical monitoring period b To obtain it, follow the following steps:

[0081]

[0082] In the formula, It is expressed as the number of defective products produced by abnormal processes during the jth monitoring period, It is expressed as the number of waste products produced by abnormal processes during the jth monitoring period, It is expressed as the total output produced by abnormal processes in the jth monitoring period, It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period.

[0083] In this embodiment, by extracting the relevant defect data of abnormal processes in each historical monitoring period, we can further understand the production situation of abnormal processes in different time periods, which provides a detailed data basis for subsequent analysis and helps to understand the long-term performance of abnormal processes and their root causes. At the same time, through this detailed calculation, we can obtain the specific loss situation in each monitoring period, which provides a solid foundation for accurate data analysis. bBy acquiring and analyzing, the changing trend of the loss rate of abnormal processes in different time periods can be identified. This trend analysis can help discover long-standing hidden problems and identify potential abnormal situations, thereby providing an important reference for prevention and improvement measures. The in-depth analysis of historical data means that anomaly detection is no longer limited to data at a single point in time, but combines a comprehensive analysis of historical trends and detailed indicators. This method improves the sensitivity and accuracy of anomaly detection, helps to promptly discover and deal with abnormal situations, and reduces the number of defective and waste products in the production process. In short, the invention can deeply understand the losses in each monitoring period, identify long-standing abnormal trends, optimize production processes, reduce loss rates, and improve production efficiency and product quality by extracting and analyzing historical data related to abnormal processes, and has significant beneficial effects.

[0084] Example 4

[0085] Please refer to Figure 1 Specifically, S2 also includes:

[0086] S22. By constructing a longitudinal loss analysis model and using time series analysis methods, the secondary loss rate Ssz in each monitoring period is analyzed. b The first-level loss rate Ssz of the corresponding abnormal process a The corresponding influence coefficient Yxyz can be obtained by the following method:

[0087]

[0088] In the formula, It is expressed as the number of monitoring periods, j=1, 2, 3, ..., , a represents the intercept term, which represents the value of the dependent variable when the independent variable is zero. The dependent variable here is , Expressed as a correction constant, It is expressed as the influence of the secondary loss rate in the jth monitoring period on the primary loss rate of the abnormal process. It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period, It is expressed as the first-level loss rate obtained by the abnormal process in the jth monitoring period.

[0089] It should be noted that time series analysis methods are a class of statistical and machine learning methods used to analyze and model time series data. Time series data is a series of data points arranged in chronological order, which may be observations or measurements collected at regular intervals.

[0090] S2 also includes:

[0091] S23. After comparing the sizes of several groups of influence coefficients Yxyz obtained in step S22, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out, and the time series corresponding to the three groups of influence coefficients Yxyz are sorted in order from large to small, and marked as the first analysis time series, the second analysis time series and the third analysis time series respectively.

[0092] In this embodiment, the secondary loss rate Ssz in each period can be further quantified by the above formula: b For the first-level loss rate Ssz a The influence of Yxyz can provide deep insights to help enterprises better understand the changing rules of abnormal processes. By obtaining the influence coefficient Yxyz, we can clearly understand the specific impact of the loss rate changes in different time periods on the overall production process. This precise analysis method improves the understanding of the impact of the loss rate in each time period. It is also helpful to analyze the impact of different historical stages on the current time period when the process is abnormal in the current time period, so as to further analyze the relevant parameters that really affect the product quality, which helps enterprises to take targeted improvement measures and improve production quality; by comparing the size of several groups of influence coefficients Yxyz, the time series corresponding to the first three groups of influence coefficients Yxyz are selected, and marked as the first analysis time series, the second analysis time series and the third analysis time series in turn. This process enables enterprises to focus on the key time series with the greatest impact, concentrate resources and energy for in-depth analysis and improvement, and further improve the efficiency and effectiveness of problem solving. By accurately screening and analyzing the time series with the greatest impact, enterprises can optimize and adjust these time series, take effective remedial measures, reduce the generation of defective and waste products, and significantly reduce the loss rate in the production process. The optimized production process can improve production efficiency and product quality, and enhance the competitiveness and economic benefits of enterprises. Through the data-based longitudinal analysis model, enterprises can achieve refined production management. In summary, this method can not only provide deep insights and clear impact analysis by constructing a longitudinal loss analysis model and screening key impact time series, but also focus on core issues, optimize production processes, reduce loss rates, and significantly improve the production efficiency and product quality of enterprises, with significant beneficial effects.

[0093] Example 5

[0094] Please refer to Figure 1 Specifically: S3 specifically includes the following steps:

[0095] S31, monitoring and recording the processing environment condition set in the first analysis time sequence, the second analysis time sequence and the third analysis time sequence, wherein the processing environment condition set includes the operating temperature Zwd and the operating pressure Yzy during the production process in the industrial production workshop;

[0096] S32. Analyze the effect of the processing environment condition set on the secondary loss rate Ssz in the corresponding time sequence stage b The influence degree of the linear normalization is calculated to obtain the corresponding correlation coefficient Xgxs, which is obtained according to the following formula:

[0097]

[0098]

[0099] In the formula, It is expressed as the influence of the operating temperature Zwd on the secondary loss rate in the corresponding timing stage, It is expressed as the influence of the operating pressure Yzy on the secondary loss rate in the corresponding time sequence stage, It is represented as the operating temperature at the i-th monitoring point in the k-th analysis time series, It is expressed as the operating pressure at the i-th monitoring point in the k-th analysis time series, It is expressed as the secondary loss rate at the i-th monitoring point in the k-th analysis time series, It is expressed as the standard deviation of the operating temperature in the kth analysis time series, It is expressed as the standard deviation of the operating pressure in the kth analysis time series, Expressed as the standard deviation of the secondary loss rate in the kth analysis time series, Expressed as and The covariance of .

[0100] The above-mentioned operating temperature Zwd can be monitored and obtained by a temperature sensor. The temperature sensor can convert temperature changes into electrical signals. Common types of temperature sensors include thermocouples, thermal resistors, thermistors and infrared temperature sensors.

[0101] The operating pressure Yzy can be monitored and obtained through a pressure sensor;

[0102] In this embodiment, the processing environment condition sets in the first analysis time sequence, the second analysis time sequence and the third analysis time sequence are accurately monitored and recorded. These processing environment conditions include the operating temperature and operating pressure in the industrial production workshop. Through real-time monitoring and data recording, it is further ensured that the environmental changes in each time sequence stage are captured. Based on the monitored processing environment condition data, the effects of operating temperature and operating pressure on the secondary loss rate Ssz in the corresponding time sequence stage are analyzed. bThe degree of influence of the operating temperature and operating pressure is further ensured by linear normalization processing to ensure the comparison and evaluation of various influencing factors on a unified scale. These correlation coefficients reflect the specific degree of influence of operating temperature and operating pressure on the loss rate of abnormal processes in different time series stages. Through detailed environmental condition analysis and correlation coefficient evaluation, it helps enterprise managers optimize production environment management and control strategies. According to the data in different time series stages, environmental factors such as operating temperature and operating pressure are accurately adjusted to minimize the loss rate of abnormal processes. In short, through the processing environment condition analysis and correlation coefficient calculation in step S3, this method effectively optimizes the production environment management and loss rate control strategy, realizes refined production management and cost control for enterprises, and has significant creative effects.

[0103] Example 6

[0104] Please refer to Figure 1 Specifically: S4 specifically includes the following steps:

[0105] S41, according to the method of obtaining the correlation coefficient Xgxs in step S32, six groups of corresponding correlation coefficients Xgxs can be obtained;

[0106] S42, respectively compare the six groups of corresponding correlation coefficients Xgxs with the value 1 to determine whether there is a linear relationship, and specifically determine in the following manner:

[0107] S421, if the corresponding correlation coefficient Xgxs = 1. Determine whether there is a completely positive linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions;

[0108] S422, if the corresponding correlation coefficient Xgxs = 1. Determine that there is a completely negative linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions;

[0109] S423. If the corresponding correlation coefficient Xgxs=0, it is determined that there is no completely linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop. At this time, the corresponding parameters will be excluded from affecting the loss rate in the industrial production workshop.

[0110] It should be noted that the six groups of corresponding correlation coefficients Xgxs obtained above are respectively:

[0111] The correlation coefficient of the operating temperature Zwd to the secondary loss rate in the first analysis time sequence stage, the correlation coefficient of the operating pressure Yzy to the secondary loss rate in the first analysis time sequence stage, the correlation coefficient of the operating temperature Zwd to the secondary loss rate in the second analysis time sequence stage, the correlation coefficient of the operating pressure Yzy to the secondary loss rate in the second analysis time sequence stage, the correlation coefficient of the operating temperature Zwd to the secondary loss rate in the third analysis time sequence stage, and the correlation coefficient of the operating pressure Yzy to the secondary loss rate in the third analysis time sequence stage;

[0112] S4 also includes:

[0113] S43, recording the judgment result in step S42 in real time in the industrial inspection compensation manual, and formulating corresponding compensation measures in the industrial inspection compensation manual, the industrial inspection compensation manual specifically includes the following contents:

[0114] S431, temperature compensation: if there is a completely positive linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted downward, and the adjustment range will be within -1°C to -5°C each time. After the adjustment, the relevant defect data of each process in the industrial production workshop will be monitored at a monitoring frequency of once per hour. If there is a completely negative linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted upward, and the adjustment range will be within 1°C to 5°C each time. After the adjustment, the monitoring will be carried out at a monitoring frequency of once per hour.

[0115] S432, pressure compensation: If there is a completely positive linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy downward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, the relevant defect data of each process in the industrial production workshop are monitored at a monitoring frequency of once per hour; if there is a completely negative linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy upward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, it is monitored at a monitoring frequency of once per hour.

[0116] In this embodiment, according to the method in step S32, six groups of corresponding correlation coefficients are obtained, and then these correlation coefficients are compared with the value 1 respectively to judge the linear relationship between the parameters in the processing environment condition set and the loss rate in the industrial production workshop. According to the judgment result of the linear relationship, the upward or downward adjustment of the operating temperature is adjusted, and the monitoring frequency is set once an hour to monitor the defect data of the process in real time. According to the relationship between the operating pressure and the loss rate, the pressure valve is adjusted upward or downward, and corresponding monitoring is performed at the same time to further ensure the optimization of the production environment and the reduction of the loss rate. By real-time monitoring and adjustment of the processing environment conditions, the precise management of the production process is achieved. This method can not only effectively reduce the loss rate, improve product quality and production efficiency, but also effectively save production costs and resource utilization.

[0117] Example 7

[0118] Please refer to Figure 1 and Figure 2 ,Specifically: A system for building industrial data security inspection ,index system, including a preliminary security inspection module, an abnormal ,process analysis module, a condition impact module and a compensation module;

[0119] The preliminary safety inspection module obtains the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, it constructs the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process;

[0120] The abnormal process analysis module uses the time series analysis method to analyze the time series within the abnormal process and check the secondary loss rate Ssz of the abnormal process in each historical monitoring period. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out;

[0121] The conditional influence module records the processing environment condition sets corresponding to the three selected time series, and analyzes the influence of the processing environment condition sets on the secondary loss rate Ssz2 in the corresponding time series stage based on the processing environment condition sets, so as to obtain the corresponding correlation coefficient Xgxs;

[0122] The compensation module establishes an industrial inspection compensation manual based on several groups of correlation coefficients Xgxs, and takes corresponding compensation measures based on the industrial inspection compensation manual.

[0123] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for constructing an industrial data security inspection indicator system. Features: The following steps are included: S1. Obtain the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, construct the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process; S2. Based on the abnormal process obtained in step S1, the time series analysis method is used to analyze the time series within the abnormal process, and the secondary loss rate Ssz of the abnormal process in each historical monitoring period is checked. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out; S3. Record the processing environment condition sets corresponding to the three selected time series, and analyze the effects of the processing environment condition sets on the secondary loss rate Ssz in the corresponding time series stage based on the processing environment condition sets. b The degree of influence of , in order to obtain the corresponding correlation coefficient Xgxs; S4. According to several groups of correlation coefficients Xgxs, establish an industrial inspection compensation manual, and take corresponding compensation measures according to the industrial inspection compensation manual; S1 includes: S12. Based on the acquired relevant defect data, construct the primary safety inspection index in each process: primary loss rate Ssz a , which can be obtained by: ; In the formula, It is expressed as the number of defective products produced in the i-th process during the current monitoring period. It is expressed as the amount of waste produced in the i-th process during the current monitoring period. It is expressed as the total output produced by the i-th process in the current monitoring period, It is expressed as the first-level loss rate obtained by the ith process in the current monitoring period; S13. Preset the loss threshold Q, and compare and analyze the primary safety inspection indicators in each current process with the loss threshold Q to preliminarily determine the abnormal process. The specific determination content is as follows: S131, if the primary loss rate Ssz in the corresponding process a When the loss threshold Q is exceeded, the process is judged to be in an abnormal state and marked as an abnormal process. At this time, an in-depth inspection instruction will be issued; S132, if the primary loss rate Ssz in the corresponding process a If the loss threshold Q is not exceeded, it is determined that the process is not in an abnormal state temporarily; S21. Extract relevant defect data of abnormal processes in each historical monitoring period according to the historical data in the industrial production workshop, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced by the abnormal process in each historical monitoring period; S211, Secondary loss rate Ssz for abnormal processes in each historical monitoring period b To obtain it, follow the following steps: ; In the formula, It is expressed as the number of defective products produced by abnormal processes during the jth monitoring period, It is expressed as the number of waste products produced by abnormal processes during the jth monitoring period, It is expressed as the total output produced by abnormal processes in the jth monitoring period, It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period; S2 also includes: S22. By constructing a longitudinal loss analysis model and using time series analysis methods, the secondary loss rate Ssz in each monitoring period is analyzed. b The first-level loss rate Ssz of the corresponding abnormal process a The corresponding influence coefficient Yxyz can be obtained by the following method: ; In the formula, It is expressed as the number of monitoring periods, j=1, 2, 3, ..., , a represents the intercept term, Expressed as a correction constant, It is expressed as the influence of the secondary loss rate in the jth monitoring period on the primary loss rate of the abnormal process. It is expressed as the secondary loss rate obtained by the abnormal process in the jth monitoring period, It is expressed as the first-level loss rate obtained by the abnormal process in the jth monitoring period; S2 also includes: S23, after comparing the sizes of the several groups of influence coefficients Yxyz obtained in step S22, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out, and the time series corresponding to the three groups of influence coefficients Yxyz are sorted in descending order, and marked as the first analysis time series, the second analysis time series and the third analysis time series respectively; S3 specifically includes the following steps: S31, monitoring and recording the processing environment condition set in the first analysis time sequence, the second analysis time sequence and the third analysis time sequence, wherein the processing environment condition set includes the operating temperature Zwd and the operating pressure Yzy during the production process in the industrial production workshop; S32. Analyze the effect of the processing environment condition set on the secondary loss rate Ssz in the corresponding time sequence stage b The influence degree of the linear normalization is calculated to obtain the corresponding correlation coefficient Xgxs, which is obtained according to the following formula: ; ; In the formula, It is expressed as the influence of the operating temperature Zwd on the secondary loss rate in the corresponding timing stage, It is expressed as the influence of the operating pressure Yzy on the secondary loss rate in the corresponding time sequence stage, It is expressed as the operating temperature at the rth monitoring point in the kth analysis time series, It is expressed as the operating pressure at the rth monitoring point in the kth analysis time series, It is expressed as the secondary loss rate at the rth monitoring point in the kth analysis time series, It is expressed as the standard deviation of the operating temperature in the kth analysis time series, It is expressed as the standard deviation of the operating pressure in the kth analysis time series, Expressed as the standard deviation of the secondary loss rate in the kth analysis time series, Expressed as and The covariance of S4 specifically includes the following steps: S41, according to the method of obtaining the correlation coefficient Xgxs in step S32, six groups of corresponding correlation coefficients Xgxs can be obtained; S42, respectively compare the six groups of corresponding correlation coefficients Xgxs with the value 1 to determine whether there is a linear relationship, and specifically determine in the following manner: S421, if the corresponding correlation coefficient Xgxs = 1. Determine whether there is a completely positive linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions; S422, if the corresponding correlation coefficient Xgxs = 1. Determine that there is a completely negative linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop, and issue compensation instructions; S423. If the corresponding correlation coefficient Xgxs=0, it is determined that there is no completely linear relationship between the corresponding parameters in the processing environment condition set and the loss rate in the industrial production workshop; S4 also includes: S43, recording the judgment result in step S42 in real time in the industrial inspection compensation manual, and formulating corresponding compensation measures in the industrial inspection compensation manual, the industrial inspection compensation manual specifically includes the following contents: S431, temperature compensation: if there is a completely positive linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted downward, and the adjustment range will be within -1°C to -5°C each time. After the adjustment, the relevant defect data of each process in the industrial production workshop will be monitored at a monitoring frequency of once per hour. If there is a completely negative linear relationship between the operating temperature Zwd and the loss rate in the production workshop, the operating temperature Zwd will be adjusted upward, and the adjustment range will be within 1°C to 5°C each time. After the adjustment, the monitoring will be carried out at a monitoring frequency of once per hour. S432, pressure compensation: If there is a completely positive linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy downward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, the relevant defect data of each process in the industrial production workshop are monitored at a monitoring frequency of once per hour; if there is a completely negative linear relationship between the operating pressure Yzy and the loss rate in the production workshop, the pressure regulating valve will adjust the operating pressure Yzy upward, and the adjustment range for each time is within 0.1MPa to 0.5MPa. After the adjustment, it is monitored at a monitoring frequency of once per hour.

2. According to claim 1, a method for constructing an industrial data security inspection indicator system, Features: S1 specifically includes the following steps: S11. According to the process flow chart of the industrial production workshop, the order and number of each process are clarified, and the duration of each monitoring period is set to one week to monitor the relevant defect data in each process, including the number of defective products Cps, the number of waste products Fps and the total output Zcz produced in each process.

3. A system for constructing an industrial data security inspection indicator system, comprising a method for constructing an industrial data security inspection indicator system according to any one of claims 1 to 2, Features: It includes preliminary safety inspection module, abnormal process analysis module, condition impact module and compensation module; The preliminary safety inspection module obtains the process flow chart of the industrial production workshop in advance to determine the number of processes. By monitoring the relevant defect data in each process, it constructs the primary safety inspection indicators in each process: the first-level loss rate Ssz a , and after comparison, preliminarily determine the abnormal process; The abnormal process analysis module uses the time series analysis method to analyze the time series within the abnormal process and check the secondary loss rate Ssz of the abnormal process in each historical monitoring period. b , in order to construct the secondary safety inspection index of abnormal process and determine the secondary loss rate Ssz in each monitoring period b The first-level loss rate Ssz for this abnormal process a The influence degree of the influence coefficient Yxyz is obtained, and after comparison, the time series corresponding to the first three groups of influence coefficients Yxyz are screened out; The condition impact module records the processing environment condition sets corresponding to the three selected time series, and analyzes the effects of the processing environment condition sets on the secondary loss rate Ssz in the corresponding time series stage based on the processing environment condition sets. 2 The degree of influence of , in order to obtain the corresponding correlation coefficient Xgxs; The compensation module establishes an industrial inspection compensation manual based on several groups of correlation coefficients Xgxs, and takes corresponding compensation measures based on the industrial inspection compensation manual.

Citation Information

Patent Citations

  • Clothing production line whole process monitoring method and system

    CN117592864A

  • Dynamic detection method and system for defective products in PCBA (Printed Circuit Board Assembly) board production

    CN117990715A

  • Abnormality detection method, exposing method and aligner, and method for manufacturing device

    JP2003197509A

  • Failure cause analysis system, failure cause analysis program and failure cause analysis method

    JP2023044477A