Railway line starting control system and method
By setting up a lane quantity detection and feedback detection device in the railway line starting control system, the deviation of these devices controls the lane-starting device action, the problem of railway line starting operations being affected by vibration of vehicle body and working device is solved, and the problem of railway line starting operations is improved Control accuracy and system flexibility.
Patent Information
- Application Number
- CN202411113181.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-14
AI Technical Summary
The impact of the vibration of railway line starting operations on the vehicle body and the working device is great, resulting in a decrease in detection and control accuracy.
The railway line starting control system is adopted, including a trailing quantity detection device and a trailing quantity feedback detection device, which are respectively used to detect and calculate the trailing quantity and real-time displacement changes, and control the trailing equipment according to the deviation through the trailing quantity execution control device. The action reduces the impact of vibration and improves control accuracy.
It effectively reduces the impact of the vibration of the vehicle body and working device on the road, and improves control accuracy and system flexibility.
Smart Images

Figure CN118621637B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway track maintenance, and more specifically to a railway line track starting control system and method. Background Art
[0002] During the use of railway lines, due to the constant pressure of rail traffic and the erosion of the line roadbed by the external environment, the track position changes are inevitable. Usually, specific equipment such as tamping vehicles are used to maintain the line to lift or straighten the line to the predetermined position.
[0003] The vertical alignment of the tamping vehicle is achieved by installing a three-point eccentric chord measurement system on each of the left and right rails. The track leveling system includes three leveling rods and leveling sensors at the front, middle and rear. The leveling rods are respectively placed on the front, middle and rear measuring trolleys and are straightened and fixed by the car body or the working device. During the operation, the line position adjustment is completed by comparing and eliminating the deviation between the feedback value detected by the leveling sensor and the target value. That is, the detection and control accuracy of the system depends on the leveling measurement system composed of leveling rods. Although the leveling measurement system is placed on the measuring trolley, its position is fixed by the car body. Therefore, it is greatly affected by the vibration of the car body and the working device during the operation, which affects the detection and accuracy control of the leveling system.
[0004] In summary, how to effectively solve the problem that the track lifting operation is greatly affected by the vibration of the vehicle body and the working device is a problem that the technical personnel in this field need to solve. Summary of the invention
[0005] In view of this, an object of the present invention is to provide a railway track lifting control system and method, which can effectively solve the problem that the track lifting operation is greatly affected by the vibration of the vehicle body and the working device.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A railway line track-lifting control system comprises a track-lifting amount execution control device, a track-lifting amount detection device and a track-lifting amount feedback detection device which are respectively arranged, wherein the track-lifting amount detection device is used to detect and solve the track-lifting amounts of the left track and the right track, and send them to the track-lifting amount execution control device as a target track-lifting amount; the track-lifting amount feedback detection device is used to detect the real-time vertical displacement change of the working points of the left track and the right track during the operation process with the static position of the tamping vehicle in the process of lowering the pickaxe as a detection reference, and send them to the track-lifting amount execution control device as the control feedback amount for executing the track-lifting amount; the track-lifting amount execution control device is used to control the action of the track-lifting device according to the deviation between the target track-lifting amount and the corresponding control feedback amount.
[0008] On the one hand, in the above-mentioned railway line track starting control system, the track starting quantity detection device includes a front measuring car, an intermediate measuring car and a rear measuring car, the intermediate measuring car is arranged at the working point, the front measuring car and the rear measuring car are respectively arranged on the front and rear side tracks of the working point, the front measuring car, the intermediate measuring car and the rear measuring car are respectively provided with horizontal level detection sensors, the intermediate measuring car is provided with a longitudinal level detection sensor and a positive vector sensor, a measuring chord line is determined between the center point of the front measuring car and the center point of the rear measuring car, and the measuring chord line is a light chord or a physical chord.
[0009] On the other hand, in the above-mentioned railway line track-lifting control system, the track-lifting amount feedback detection device includes a target object arranged at the working point and a camera arranged at the static position, and the camera is used to collect the position image of the target object before the pickaxe is lowered and the real-time position image of the target object during the operation, so as to obtain the real-time displacement change of the target object in the vertical direction and use it as the real-time displacement change corresponding to the working point.
[0010] On the other hand, in the above-mentioned railway line track starting control system, the static position is one of a front measuring vehicle provided in front of the working point, a rear measuring vehicle provided behind the working point, and a vehicle body of a tamping vehicle.
[0011] On the other hand, in the above-mentioned railway line track starting control system, the target object is a light source or a target.
[0012] On the other hand, in the above-mentioned railway line track-lifting control system, the track-lifting amount feedback detection device includes an operating point measuring rod arranged at the operating point and a front measuring rod and a rear measuring rod respectively arranged on the front and rear sides of the operating point, a reference chord is arranged between the ends of the front measuring rod and the rear measuring rod, and a position sensor is arranged on the operating point measuring rod, and the position sensor is used to detect the position detection value relative to the reference chord before the pick is lowered and the real-time position detection value relative to the reference chord during the operation, so as to obtain the real-time displacement change of the operating point.
[0013] On the other hand, in the above-mentioned railway line starting control system, the reference chord is a light line or a physical line.
[0014] The railway track lifting control system provided by the present invention has the following beneficial effects: a track lifting amount detection device for the target track lifting amount and a track lifting amount feedback detection device for the track lifting amount executed in real time during the operation are separately set, and the track lifting amount feedback detection device uses the static position during the operation of the pickaxe as a reference for detection, thereby reducing the deviation effect of the operation vibration on the track lifting control feedback and improving the control accuracy. The track lifting amount detection device and the track lifting amount feedback detection device are separately set, which greatly improves the flexibility of the railway track lifting control system.
[0015] In order to achieve the above object, the present invention also provides a railway line track starting control method, the railway line track starting control method comprises adopting any railway line track starting control system, the railway line track starting control method comprises:
[0016] The track lift detection device detects and calculates the track lifts of the left track and the right track, and sends the values to the track lift execution control device as target track lifts;
[0017] The track lifting amount feedback detection device detects the real-time displacement change of the working points of the left track and the right track in the vertical direction during the operation process, and sends it to the track lifting amount execution control device as the control feedback amount for executing the track lifting amount;
[0018] The track-lifting amount execution control device controls the action of the track-lifting device according to the deviation between the target track-lifting amount and the corresponding control feedback amount.
[0019] On the one hand, in the above-mentioned railway line track starting control method, the track starting amount detection device detects and calculates the track starting amounts of the left track and the right track, specifically including:
[0020] The track rise detection device uses the plane determined by the target positions of the front measuring car and the rear measuring car of the reference rail and the target position of the middle measuring car of the superelevation rail as the reference plane, and the virtual chord determined by the target position connecting the position points of the fixed measuring chord lines on the front measuring car and the rear measuring car as the operation reference virtual chord, and uses the detection value of the horizontal detection sensor of the middle measuring car to distribute and respectively solve the track rise of the left track and the right track; wherein, the lower one of the left track and the right track is used as the reference rail, and the other is used as the superelevation rail.
[0021] On the other hand, in the above-mentioned railway line starting control method, the starting amounts of the left track and the right track respectively satisfy the following formulas:
[0022] ;
[0023] ;
[0024] In the formula, Lif_L is the starting amount of the left track;
[0025] Lif_R is the starting amount of the right track;
[0026] Level_C Check the vertical level value for point C;
[0027] SUP_C The theoretical super height of point C;
[0028] Sup_C Detect superelevation at point C;
[0029] Sup_D Detect superelevation at point D;
[0030] Sup_B Detect superelevation for point B;
[0031] Offset_B is the deviation between the actual position of point B and the target position;
[0032] Offset_D is the deviation between the actual position of point D and the target position;
[0033] Ver_C is the positive vector detection value of point C;
[0034] l is the center distance between the left track and the right track;
[0035] BC Measure the chord length between the cars for points B and C;
[0036] BD Measure the chord length between the cars for points B and D;
[0037] CD Measure the chord length between points C and D.
[0038] The railway line track starting control method provided by the present invention adopts any of the above-mentioned railway line track starting control systems. Since the above-mentioned railway line track starting control systems have the above-mentioned technical effects, the railway line track starting control method should also have corresponding technical effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0040] Figure 1 A schematic diagram of the structure of a railway line starting control system according to a specific embodiment of the present invention;
[0041] Figure 2 It is a structural schematic diagram of a track lift amount feedback detection device and a track lift amount detection device;
[0042] Figure 3 A schematic diagram of the calculation model for executing the track start quantity;
[0043] Figure 4 It is a structural schematic diagram of another track-starting amount feedback detection device;
[0044] Figure 5 Schematic diagram of the calculation model for the target start amount.
[0045] The following are marked in the accompanying drawings:
[0046] 1-track, 2-rear measuring vehicle, 3-middle measuring vehicle, 4-front measuring vehicle, 5-measuring chord, 6-positive vector sensor, 7-longitudinal level detection sensor, 8-horizontal level detection sensor, 9-target, 10-camera, 11-position sensor, 12-front measuring rod, 13-rear measuring rod, 14-reference chord, 15-reference plane, 16-virtual chord. DETAILED DESCRIPTION
[0047] The embodiment of the invention discloses a railway track lifting control system and method, so as to reduce the influence of vibration of a vehicle body and a working device on the track lifting operation.
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] In one embodiment, see Figure 1 The railway line track lifting control system provided by the present invention comprises a track lifting amount execution control device 300, a track lifting amount detection device 100 and a track lifting amount feedback detection device 200 which are respectively arranged. In the present application, separate detection devices are respectively arranged for the detection of the target track lifting amount and the feedback of the track lifting amount executed in real time during the operation, namely, the track lifting amount detection device 100 and the track lifting amount feedback detection device 200. It can be understood that the two are arranged separately, which means that the two do not share detection devices such as sensors, and the track lifting amount feedback detection device 200 does not rely on the track lifting amount detection device 100 for independent detection. Therefore, it is different from the traditional shared leveling measurement system for the detection of the target track lifting amount and the detection of the track lifting amount executed in real time during the operation. The specific installation relationship between the track lifting amount detection device 100 and the track lifting amount feedback detection device 200 can be set separately or in coordination as needed.
[0050] The track lift detection device 100 is used to detect and calculate the track lifts of the left track and the right track, and send them to the track lift execution control device 300 as target track lifts, i.e., the target track lift corresponding to the left track and the target track lift corresponding to the right track.
[0051] The track-lifting amount feedback detection device 200 is used to detect the real-time vertical displacement changes of the working points of the left track and the right track during the operation process, using the static position of the tamping vehicle during the operation of the pickaxe as a detection reference, and send it to the track-lifting amount execution control device 300 as the control feedback amount for executing the track-lifting amount. The track-lifting amount feedback detection device 200 mainly realizes the detection of the vertical displacement changes of the working point position during the execution of the track-lifting process. It uses the non-moving point position of the tamping vehicle during the tamping operation as a detection reference, and determines the execution track-lifting amount by comparing the deviation between the vertical position detection value of the working point before the pickaxe is lowered and the feedback detection value during the track-lifting execution process. The real-time track-lifting amount detection of the left track and the right track does not depend on the height difference detection value of the left and right tracks in the operation area.
[0052] The track-lifting amount execution control device 300 is used to control the action of the track-lifting device 400 according to the deviation between the target track-lifting amount and the corresponding control feedback amount, so as to correct the vertical position deviation of the track. The track-lifting amount execution control device 300 obtains the track-lifting amount obtained by the track-lifting amount detection device 100 as the target track-lifting amount, obtains the control feedback amount of the execution track-lifting amount fed back by the track-lifting amount feedback detection device 200, and controls the action of the track-lifting operation execution device by comparing the deviation between the target track-lifting amount and the control feedback amount to eliminate the deviation.
[0053] By using the railway track raising control system provided by the present invention, before performing the track raising operation, the track raising amount detection device 100 completes the track raising amount solution and transmits it to the track raising amount execution control device 300 as the target track raising amount for track raising execution. During the track raising operation, the track raising amount feedback detection device 200 detects the real-time track raising amount and sends it to the track raising amount execution control device 300 as the control feedback amount for executing the track raising amount. The track raising amount execution control device 300 compares the deviation between the target track raising amount and the control feedback amount and controls the action of the track raising operation execution device to eliminate the deviation. The track raising amount detection device 100 for the target track raising amount and the track raising amount feedback detection device 200 for the real-time track raising amount during the operation are respectively set, and the track raising amount feedback detection device 200 uses the static position during the operation as a reference for detection, which reduces the deviation effect of the operation vibration on the track raising control feedback and improves the control accuracy. Moreover, the track raising amount detection device 100 and the track raising amount feedback detection device 200 are respectively set, which greatly improves the flexibility of the railway track raising control system. And the railway line track control system can be placed under the vehicle body.
[0054] In some embodiments, see Figure 2The track-lift detection device 100 includes a front measuring vehicle 4, an intermediate measuring vehicle 3 and a rear measuring vehicle 2. The intermediate measuring vehicle 3 is arranged at the working point. The front measuring vehicle 4 and the rear measuring vehicle 2 are arranged at the front and rear tracks of the working point. The front measuring vehicle 4, the intermediate measuring vehicle 3 and the rear measuring vehicle 2 are respectively provided with a horizontal level detection sensor 8. The intermediate measuring vehicle 3 is provided with a longitudinal level detection sensor 7 and a positive vector sensor 6. A measuring chord 5 is determined between the center point of the front measuring vehicle 4 and the center point of the rear measuring vehicle 2. The measuring chord 5 is an optical chord or a physical chord. Specifically, the measuring chord 5 passes through the longitudinal level detection sensor 7. At least three measuring vehicles are arranged, namely, the front measuring vehicle 4, the middle measuring vehicle 3 and the rear measuring vehicle 2, and the front measuring vehicle 4, the middle measuring vehicle 3 and the rear measuring vehicle 2 are all equipped with a horizontal level detection sensor 8, and the middle measuring vehicle 3 is equipped with a vertical level detection sensor 7, and a measuring chord 5 is connected and fixed between the front measuring vehicle 4 and the rear measuring vehicle 2, specifically, the measuring chord 5 is connected and fixed between the center points of the front measuring vehicle 4 and the rear measuring vehicle 2, and passes through the vertical level detection sensor 7 of the middle measuring vehicle 3. During the detection, the plane determined by the target position of the front measuring vehicle 4 and the rear measuring vehicle 2 of the reference rail and the target position of the middle measuring vehicle 3 of the superelevation rail is used as the reference plane 15; a virtual chord 16 is determined as the operation reference virtual chord along the target position connecting line of the position points of the fixed measuring chord 5 on the front measuring vehicle 4 and the rear measuring vehicle 2, and the horizontal level detection value of the middle measuring vehicle 3 is used to distribute and respectively solve the deviation of the two tracks from the operation target position, namely, the track start amount.
[0055] Specifically, the three measuring vehicles, namely the front measuring vehicle 4 at point D on the track along the working direction, the middle measuring vehicle 3 at point C and the rear measuring vehicle 2 at point B, form a single-string detection system. Before the vehicle arrives at the working point (point C) to perform the pick action, the control system obtains the theoretical data of the working line (including theoretical superelevation, theoretical leveling, front-end deviation compensation, etc.) from the automatic guided operation industrial computer (AGC) and obtains the detection leveling value, superelevation value, and positive vector value corresponding to the working point from the track starting amount detection device 100. According to the principle of the single-string detection system, the following is established: Figure 5 The track start amount detection and solution model shown in the figure takes the plane established by the target position of the front measuring vehicle 4 (point D) of the reference track, the target position of the rear measuring vehicle 2 (point B) of the rear measuring vehicle 2 (point C) of the superelevation rail as the reference plane 15; along the line connecting the target positions of the fixed measuring chord line 5 of the front measuring vehicle 4 (point D) and the rear measuring vehicle 2 (point B), a virtual chord 16 is determined as the operation reference virtual chord line, and the horizontal detection value of the middle measuring vehicle 3 (point C) is used to allocate and solve the track start amount of the left track and the right track from the operation target position. Taking the left track as the superelevation rail and the low rail (right track) as the reference rail as an example, the deviation of the operation point from the target operation position, that is, the track start amount of the left track and the right track, respectively satisfies the following relationship:
[0056] ;
[0057] ;
[0058] In the formula, Lif_L is the starting amount of the left track;
[0059] Lif_R is the starting amount of the right track;
[0060] Level_C The vertical level value is detected at point C, which is detected by the vertical level detection sensor 7;
[0061] SUP_C The theoretical super height of point C can be obtained from the industrial computer for automatic guidance operation;
[0062] Sup_C To detect superelevation at point C, the horizontal level detection sensor 8 on the intermediate measuring vehicle 3 is used for detection;
[0063] Sup_D To detect superelevation at point D, the horizontal level detection sensor 8 on the front measuring vehicle 4 is used for detection;
[0064] Sup_B To detect superelevation at point B, the horizontal level detection sensor 8 on the rear measuring vehicle 2 is used for detection;
[0065] Offset_B is the deviation between the actual position of point B and the target position, which can be obtained from the industrial computer of the automatic guidance operation;
[0066] Offset_D is the deviation between the actual position of point D and the target position, which can be obtained from the industrial computer of the automatic guidance operation;
[0067] Ver_C is the verse detection value of point C, detected by the verse sensor 6;
[0068] l is the center distance between the left track and the right track;
[0069] BC Measure the chord length between the cars for points B and C;
[0070] BD Measure the chord length between the cars for points B and D;
[0071] CD Measure the chord length between points C and D.
[0072] The positive and negative in the above formula are related to the direction definition of each parameter. The track start detection device 100 calculates the track start of the left track ( Lif_L ) and the start of the right track ( Lif_R) is transmitted to the track raising amount execution control device 300 as the target track raising amount of the track raising control system. For a line with a climbing vertical curve, the calculation of the track raising amount needs to subtract the target leveling amount or its compensation amount.
[0073] In some embodiments, see Figure 2 The track-lifting amount feedback detection device 200 includes a target object 9 arranged at the working point and a camera 10 arranged at a stationary position. The camera 10 is used to collect the position image of the target object 9 before the pickaxe is lowered and the real-time position image of the target object 9 during the working process, so as to obtain the real-time displacement change of the target object 9 in the vertical direction and use it as the real-time displacement change of the corresponding working point. In this embodiment, the track-lifting execution feedback system uses image recognition to detect the vertical position changes of the left track and the right track before and during the track-lifting action. Specifically, an intermediate measuring vehicle 3 is set at the working point, a front measuring vehicle 4 is set at the front side of the working point, and a rear measuring vehicle 2 is set at the rear side of the working point. Target objects 9 are respectively set at the positions corresponding to the left track and the right track on the intermediate measuring vehicle 3 at the working point, the camera 10 is set on the front measuring vehicle 4, and a horizontal detection sensor 8 is set on the front measuring vehicle 4.
[0074] Before the tamping pick is used, the camera 10 records the position (0 point) of the target object 9 in front of the pick (before the start-up action is performed) and the deflection angle α of the camera 10 in the horizontal direction, such as Figure 3 As shown. During the execution of the starting action, the camera 10 records the position of the target object 9 (point o') and the horizontal deflection angle α of the camera 10, which can be seen in the camera 10 field of view plane (such as Figure 3 The horizontal change dy and vertical change dh of the position of the target object 9 in the field of view plane and the displacement change L are detected. Since the position of the camera 10 used for recording does not change during the track lifting operation, it is considered that the deflection angle α of the camera 10 in the horizontal direction does not change. Therefore, the vertical displacement change dH of the target object 9, i.e. the position of the working point, during the operation has the following relationship (the corresponding left track and the right track satisfy the following relationship respectively):
[0075] ;
[0076] ;
[0077] ;
[0078] in, l is the center distance between the left track and the right track;
[0079] H is the horizontal detection value of the front measuring vehicle 4;
[0080] dy is the change in lateral displacement of the field of view of the camera 10;
[0081] dh is the vertical displacement change of the field of view of the camera 10;
[0082] L is the displacement change of the working point.
[0083] In some embodiments, the static position is one of the front measuring vehicle 4 located in front of the working point, the rear measuring vehicle 2 located behind the working point, and the body of the tamping vehicle. That is, the camera 10 can be installed on the front measuring vehicle 4, the rear measuring vehicle 2, or other positions on the vehicle, as long as the position does not change and is not blocked during the process of lowering the pick. The camera 10 can be a general camera, a high-speed camera, an infrared camera, an ultraviolet camera, or a camera.
[0084] In some embodiments, the target 9 is a light source or a target. That is, the target 9 can be a target with a symbolic meaning for easy identification, or a light source for easy capture by the camera 10, such as common light, ultraviolet light, infrared light, laser light, etc.
[0085] Different from the above-mentioned method using image recognition, in some other implementations, please refer to Figure 4The track-lifting amount feedback detection device 200 includes a working point measuring rod arranged at the working point and a front measuring rod 12 and a rear measuring rod 13 respectively arranged at the front and rear sides of the working point. A reference chord 14 is arranged between the ends of the front measuring rod 12 and the rear measuring rod 13. A position sensor 11 is arranged on the working point measuring rod. The position sensor 11 is used to detect the position detection value relative to the reference chord 14 before the lowering of the pickaxe and the real-time position detection value relative to the reference chord 14 during the working process, so as to obtain the real-time displacement change of the working point. Specifically, an intermediate measuring vehicle 3 is arranged at the working point, a front measuring vehicle 4 is arranged at the front side of the working point at point D, and a rear measuring vehicle 2 is arranged at the rear side of the working point at point B. The working point measuring rods are arranged on the intermediate measuring vehicle 3 at positions corresponding to the left track and the right track, respectively, the front measuring rods 12 are arranged on the front measuring vehicle 4 at positions corresponding to the left track and the right track, respectively, and the rear measuring rods 13 are arranged on the rear measuring vehicle 2 at positions corresponding to the left track and the right track, respectively. The end positions R and F of the front measuring rod 12 and the rear measuring rod 13 corresponding to the left track are connected to form a reference chord 14, and the end positions R and F of the front measuring rod 12 and the rear measuring rod 13 corresponding to the right track are connected to form a reference chord 14. Position sensors 11 are respectively installed at the ends of the measuring rods at the working points of the left track and the right track. Similarly, the position sensor 11 records its position detection value H1 relative to the corresponding reference chord 14 before the lower pick. During the track-lifting operation, the position sensor 11 records in real time the detection value H2 of the position change caused by the lifting of the intermediate measuring vehicle 3 due to the track-lifting operation. Since the positions of the R and F points of the reference chord 14 do not change during the execution of the track-lifting action, it is considered that the position of the reference chord 14 does not change. It can be seen that the displacement change dH of the working point (point C) in the vertical direction during the operation is dH=H1-H2, and the displacement change dH in the vertical direction during the operation is used as the control feedback amount for executing the track-lifting amount. The corresponding left track and right track respectively satisfy the corresponding above relationship, that is, dH_L =H1_L-H2_L, wherein dH_L is the control feedback amount of the left track's track-lifting execution amount, H1_L is the position detection value of the position sensor 11 corresponding to the left track before the pick is lowered relative to the corresponding reference chord 14, and H2_L is the detection value of the position sensor 11 corresponding to the left track during the track-lifting operation, which records in real time the position change of the intermediate measuring vehicle 3 caused by the track-lifting operation being lifted; dH_R =H1_R-H2_R, wherein dH_R is the control feedback amount of the right track's track-lifting execution amount, H1_R is the position detection value of the position sensor 11 corresponding to the right track before the pick is lowered relative to the corresponding reference chord 14, and H2_R is the detection value of the position sensor 11 corresponding to the right track during the track-lifting operation, which records in real time the position change of the intermediate measuring vehicle 3 caused by the track-lifting operation being lifted. It is worth noting that dH reflects the detection change value of the position sensor 11, and the detection error caused by the zero drift of the sensor itself will not affect the detection result. Therefore, compared with the traditional detection method, it is beneficial to improve the detection accuracy of the feedback detection system.
[0086] In some embodiments, the reference string 14 is a light string or a physical string. In some embodiments, the setting position (R, F) of the reference string 14 can also be installed at other positions on the vehicle, but it should be ensured that the position does not change during the road-lifting operation, is not disturbed by the operation, and is easy to install.
[0087] The above feedback detection is mainly applicable to the detection of reference positions (such as positions R and F determined by camera 10 and reference chord 14) that do not change during the operation. If the reference point position changes, corresponding position compensation calculations need to be performed based on its position change, which will not be elaborated here.
[0088] Based on the railway line track starting control system provided in the above embodiment, the present invention further provides a railway line track starting control method, the railway line track starting control method adopts any one of the railway line track starting control systems in the above embodiment, and the railway line track starting control method comprises:
[0089] The track lift detection device detects and calculates the track lifts of the left track and the right track, and sends the values to the track lift execution control device as target track lifts;
[0090] The track lifting amount feedback detection device detects the real-time displacement change of the working points of the left track and the right track in the vertical direction during the operation process, and sends it to the track lifting amount execution control device as the control feedback amount for executing the track lifting amount;
[0091] The track lifting amount execution control device controls the action of the track lifting device according to the deviation between the target track lifting amount and the corresponding control feedback amount.
[0092] After the vehicle reaches the position of the waiting operation point, the control system records the detection value of the track lifting amount detection device when performing the pick operation, and completes the target track lifting amount solution of the operation point position in combination with the theoretical value transmitted by the automatic guided operation industrial computer (AGC). At the same time, the initial position of the operation point detected by the track lifting amount detection feedback device when the pick is lowered is recorded, and transmitted to the next stage execution control system together with the target track lifting amount obtained by the solution. During the track lifting execution process, the actual track lifting execution amount, that is, the control feedback amount of the execution track lifting amount, is determined according to the detection position fed back in real time by the track lifting amount feedback detection device, and the deviation value between the control feedback amount and the target track lifting amount is used to control the action of the track lifting execution device to eliminate the deviation.
[0093] Specifically, the track lift execution control device obtains the target track lifts of the left track and the right track respectively detected and calculated by the track lift detection device ( Lif_L , Lif_R ) and the control feedback of the execution of the left track and the right track respectively fed back by the execution detection feedback device ( dH , dH ), the starting amount execution control device calculates the starting deviation of the left track E_L = Lif_L - dH and the deviation of the right track E_R = Lif_R - dH ,by E_L , E_R As the control quantity of the track-lifting device's execution action, until the error is eliminated, the track-lifting device's track-lifting action is completed, and the track-lifting device is maintained until the current round of track-lifting and tamping operations are completed.
[0094] In the railway line track lifting control method provided by the present invention, a track lifting amount detection device for the target track lifting amount and a track lifting amount feedback detection device for the real-time track lifting amount during the operation are respectively set, and the track lifting amount feedback detection device uses the static position during the operation of the pickaxe as a reference for detection, thereby reducing the deviation effect of the operation vibration on the track lifting control feedback and improving the control accuracy. The track lifting amount detection device and the track lifting amount feedback detection device are respectively set, which greatly improves the flexibility of the railway line track lifting control system.
[0095] In some embodiments, the track lengths of the left track and the right track satisfy the following formulas respectively:
[0096] ;
[0097] ;
[0098] In the formula, Lif_L is the starting amount of the left track;
[0099] Lif_R is the starting amount of the right track;
[0100] Level_C Check the vertical level value for point C;
[0101] SUP_C The theoretical super height of point C;
[0102] Sup_C Detect superelevation at point C;
[0103] Sup_D Detect superelevation at point D;
[0104] Sup_B Detect superelevation for point B;
[0105] Offset_B is the deviation between the actual position of point B and the target position;
[0106] Offset_D is the deviation between the actual position of point D and the target position;
[0107] Ver_C is the positive vector detection value of point C;
[0108] l is the center distance between the left track and the right track;
[0109] BC Measure the chord length between the cars for points B and C;
[0110] BD Measure the chord length between the cars for points B and D;
[0111] CD Measure the chord length between points C and D.
[0112] In some embodiments, the track lift detection device detects and calculates the track lift of the left track and the right track, specifically including:
[0113] The track-starting amount detection device uses the plane determined by the target positions of the front measuring car and the rear measuring car of the reference rail and the target position of the middle measuring car of the superelevation rail as the reference plane, and the virtual chord determined by the line connecting the target positions of the fixed measuring chord position points of the front measuring car and the rear measuring car as the operation reference virtual chord, and uses the detection value of the horizontal detection sensor of the middle measuring car to distribute and solve the track-starting amounts of the left track and the right track respectively; wherein, the lower one of the left track and the right track is used as the reference rail, and the other is used as the superelevation rail.
[0114] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0115] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A railway line starting control system, characterized in that: It includes a track lifting amount execution control device, a track lifting amount detection device and a track lifting amount feedback detection device which are respectively arranged, wherein the track lifting amount feedback detection device performs independent detection independently of the track lifting amount detection device; The track lift detection device is used to detect and calculate the track lifts of the left track and the right track, and send them to the track lift execution control device as target track lifts; The track lifting amount feedback detection device is used to detect the real-time displacement changes of the working points of the left track and the right track in the vertical direction during the operation process, using the static position of the tamping vehicle during the operation of the pickaxe as a detection reference, and send it to the track lifting amount execution control device as the control feedback amount for executing the track lifting amount; The track-lifting amount execution control device is used to control the action of the track-lifting device according to the deviation between the target track-lifting amount and the corresponding control feedback amount; The track lift detection device comprises a front measuring vehicle, an intermediate measuring vehicle and a rear measuring vehicle, wherein the intermediate measuring vehicle is arranged at the working point, and the front measuring vehicle and the rear measuring vehicle are arranged at the tracks at the front and rear sides of the working point respectively, and the front measuring vehicle, the intermediate measuring vehicle and the rear measuring vehicle are respectively provided with a horizontal level detection sensor, and the intermediate measuring vehicle is provided with a vertical level detection sensor and a positive vector sensor, and a measuring chord is determined between the center point of the front measuring vehicle and the center point of the rear measuring vehicle, and the measuring chord is an optical chord or a physical chord, and the measuring chord passes through the vertical level detection sensor; The track lifting amount feedback detection device includes a target object arranged at the working point and a camera arranged at the static position, wherein the camera is used to collect a position image of the target object before the pick is lowered and a real-time position image of the target object during the working process, so as to obtain a real-time displacement change of the target object in the vertical direction and serve as the real-time displacement change corresponding to the working point; Alternatively, the track lifting amount feedback detection device comprises an operating point measuring rod arranged at the operating point and a front measuring rod and a rear measuring rod respectively arranged at the front and rear sides of the operating point, a reference chord is arranged between the ends of the front measuring rod and the rear measuring rod, and a position sensor is arranged on the operating point measuring rod, and the position sensor is used to detect the position detection value relative to the reference chord before the pick is lowered and the real-time position detection value relative to the reference chord during the operation, so as to obtain the real-time displacement change of the operating point; An intermediate measuring vehicle is set at the operation point, a front measuring vehicle is set at the front side of the operation point, and a rear measuring vehicle is set at the rear side of the operation point. Operation point measuring rods are set at the positions corresponding to the left track and the right track on the intermediate measuring vehicle, front measuring rods are set at the positions corresponding to the left track and the right track on the front measuring vehicle, and rear measuring rods are set at the positions corresponding to the left track and the right track on the rear measuring vehicle; The end positions of the front measuring rod and the rear measuring rod corresponding to the left track are connected to form a reference chord, and the end positions of the front measuring rod and the rear measuring rod corresponding to the right track are connected to form a reference chord. Position sensors are installed at the ends of the measuring rods at the working points of the left track and the right track respectively.
2. The railway line starting control system according to claim 1, characterized in that: The stationary position is one of a front measuring vehicle provided in front of the working point, a rear measuring vehicle provided behind the working point, and a vehicle body of a tamping vehicle.
3. The railway line starting control system according to claim 1, characterized in that: The target object is a light source or a target.
4. The railway line starting control system according to claim 1, characterized in that: The reference chord is a light line or a solid line.
5. A railway line starting control method, characterized in that: The railway line starting control system according to any one of claims 1 to 4 is adopted, and the railway line starting control method comprises: The track lift detection device detects and calculates the track lifts of the left track and the right track, and sends the values to the track lift execution control device as target track lifts; The track lifting amount feedback detection device detects the real-time displacement change of the working points of the left track and the right track in the vertical direction during the operation process, and sends it to the track lifting amount execution control device as the control feedback amount for executing the track lifting amount; The track-lifting amount execution control device controls the action of the track-lifting device according to the deviation between the target track-lifting amount and the corresponding control feedback amount.
6. The railway line starting control method according to claim 5, characterized in that: The track lift detection device detects and calculates the track lift of the left track and the right track, specifically including: The track rise detection device uses the plane determined by the target positions of the front measuring car and the rear measuring car of the reference rail and the target position of the middle measuring car of the superelevation rail as the reference plane, and the virtual chord determined by the target position connecting the position points of the fixed measuring chord lines on the front measuring car and the rear measuring car as the operation reference virtual chord, and uses the detection value of the horizontal detection sensor of the middle measuring car to distribute and respectively solve the track rise of the left track and the right track; wherein, the lower one of the left track and the right track is used as the reference rail, and the other is used as the superelevation rail.
7. The railway line starting control method according to claim 5, characterized in that: The track lengths of the left track and the right track satisfy the following formulas respectively: ; ; In the formula, Lif_L is the starting amount of the left track; Lif_R is the starting amount of the right track; Level_C Check the vertical level value for point C; SUP_C The theoretical super height of point C; Sup_C Detect superelevation at point C; Sup_D Detect superelevation at point D; Sup_B Detect superelevation for point B; Offset_B is the deviation between the actual position of point B and the target position; Offset_D is the deviation between the actual position of point D and the target position; Ver_C is the positive vector detection value of point C; l is the center distance between the left track and the right track; BC Measure the chord length between the cars for points B and C; BD Measure the chord length between the cars for points B and D; CD Measure the chord length between points C and D.