A steelmaking scheduling system based on digital twin technology

Through the steelmaking scheduling system based on digital twin technology, active scheduling, passive scheduling and supply scheduling analysis of the steelmaking production line are realized, which solves the problem of low steelmaking production efficiency in the existing technology and improves the efficiency of steelmaking production. and stability.

CN118625768BActive Publication Date: 2024-10-22SUZHOU HONGHAO OPTOELECTRONICS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411087426.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-22
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

The existing steelmaking dispatching system cannot perform active dispatching analysis and passive dispatching analysis based on real-time data, resulting in reduced steelmaking production efficiency and the inability to perform supply dispatching according to the needs of different production lines.

Method used

Design a steelmaking dispatching system based on digital twin technology, including the production line end, supply end and forecasting end. Through the active dispatching unit, passive dispatching unit and supply dispatching control unit, real-time data collection and analysis are carried out for active dispatching and passive dispatching. and supply scheduling analysis, inferring and executing scheduling instructions to optimize steelmaking production.

Benefits of technology

It improves the operating efficiency and production stability of the steelmaking production line, enhances the rationality of supply scheduling and production line output, and ensures the efficiency and feasibility of steelmaking production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118625768B_ABST
    Figure CN118625768B_ABST
Patent Text Reader

Abstract

The present invention discloses a steelmaking scheduling system based on digital twin technology, relates to the technical field of steelmaking scheduling, and solves the technical problem in the prior art that supply scheduling cannot be performed according to production process analysis of different production line requirements, resulting in a decrease in the efficiency of steelmaking production. Specifically, supply scheduling analysis is performed on the steelmaking production process, and supply scheduling is performed according to production process analysis of different production line requirements, so as to ensure reasonable planning of raw materials and perform reasonable scheduling when timely operation is impossible, thereby improving the efficiency of steelmaking production and at the same time improving the production stability of the production line, being able to cope with production line processing obstacles of different degrees, and ensuring the output of the production line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steelmaking scheduling, and in particular to a steelmaking scheduling system based on digital twin technology. Background Art

[0002] Digital twin technology is an innovative and transformative technology. It collects real-time data of physical objects, including physical properties, operating status, environmental parameters, etc., through various sensors and monitoring equipment. The steelmaking scheduling system is a comprehensive management system that plays a key role in the steelmaking production process. It is mainly responsible for coordinating and optimizing all aspects of steelmaking production, including the supply of raw materials, the operation of production equipment, the arrangement of production processes, and product quality control.

[0003] However, in the existing technology, it is impossible to perform active scheduling analysis and passive scheduling analysis on the steelmaking production line based on real-time data collection and analysis when the production line is in operation, and it is impossible to monitor the operation of the production line in real time, which reduces the scheduling efficiency. At the same time, it is impossible to perform supply scheduling based on the production process analysis of different production line requirements, resulting in a decrease in the efficiency of steelmaking production.

[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention

[0005] The purpose of the present invention is to solve the above-mentioned problems and to propose a steelmaking scheduling system based on digital twin technology.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] A steelmaking scheduling system based on digital twin technology, comprising a steelmaking scheduling platform, wherein the steelmaking scheduling platform is communicatively connected with a production line end, a supply end and a prediction end;

[0008] The production line end is connected with: an active scheduling unit, which is used to divide the steelmaking production line according to each production link, mark each production link as a sub-process, collect process sequence execution information and process sequence influence information, and divide the sub-process into sequence-influenced processes and sequence-influenced processes according to information comparison, and then collect active duration information and active speed information, and infer whether active scheduling is needed based on information analysis;

[0009] The passive scheduling unit is used to obtain the synchronous production period of multiple production lines, collect passive delay frequency data and passive speed deviation data, and infer whether the current steelmaking production line needs passive scheduling based on data analysis;

[0010] The supply side is connected with: a supply scheduling control unit for performing supply scheduling analysis on the steelmaking production process;

[0011] The prediction end is used to perform scheduling analysis and prediction on the current steelmaking production line, collect output ratio data and curve impact data, and infer whether the current steelmaking production line scheduling is qualified based on data comparison.

[0012] As a preferred embodiment of the present invention, the process sequence execution information and the process sequence impact information are respectively the frequency of changing the execution sequence of the sub-process corresponding to the execution equipment in the steelmaking production line in the historical execution stage, and the floating frequency of the qualified rate of the current steelmaking production line product after the execution sequence in the historical execution stage of the execution equipment is floating;

[0013] If the process sequence execution information exceeds the sequence change frequency threshold, and the process sequence impact information does not exceed the pass rate floating frequency threshold, the sub-processes corresponding to the execution sequence are grouped in pairs and uniformly marked as sequence-independent processes;

[0014] If the process sequence execution information does not exceed the sequence change frequency threshold, or the process sequence impact information exceeds the pass rate floating frequency threshold, the sub-processes corresponding to the execution sequence will be grouped in pairs and uniformly marked as sequence impact processes.

[0015] As a preferred embodiment of the present invention, the active duration information and the active speed information are respectively the average idle time of the steelmaking production line sub-process when the preset operation speed of the production line in the current steelmaking production line is compared with the actual operation speed of the current production line, and the speed ratio of the steelmaking production increase speed and the steelmaking qualified rate decrease speed after the corresponding idle time of the steelmaking production line sub-process is used;

[0016] If the active duration information exceeds the average idle duration threshold, and the active speed information exceeds the speed ratio threshold, the current steelmaking production line will be actively scheduled; if the active duration information does not exceed the average idle duration threshold, or the active speed information does not exceed the speed ratio threshold, the current steelmaking production line will not be actively scheduled.

[0017] As a preferred embodiment of the present invention, the passive delay frequency data and the passive speed deviation data are respectively the increasing speed of the time-consuming delay frequency corresponding to the same sub-process of different production lines during the multi-production line synchronous production period, and the increasing span of the deviation between the steelmaking output speed of the current production line and the preset output speed when the same sub-process of different production lines executes the time-consuming floating;

[0018] If the passive delay frequency data exceeds the time-consuming delay frequency increase speed threshold, or the passive speed deviation data exceeds the speed deviation increase span threshold, it is determined that the current multi-production line synchronous production requires passive scheduling, and a passive scheduling signal is generated and sent to the steelmaking scheduling platform; if the passive delay frequency data does not exceed the time-consuming delay frequency increase speed threshold, and the passive speed deviation data does not exceed the speed deviation increase span threshold, it is determined that the current multi-production line synchronous production does not require passive scheduling.

[0019] As a preferred embodiment of the present invention, after receiving the passive scheduling signal, the steelmaking scheduling platform schedules the synchronous operation of multiple production lines, and sets the sub-process with time-consuming and delayed execution or the sub-process with abnormal speed deviation and increased span as the scheduled object, otherwise it is set as the scheduling object. If the scheduled object and the processing body of the scheduling object are convenient for transportation, the processing body will be transported and delivered to the production line where the scheduling object is located; if the scheduled object and the processing body of the scheduling object are not convenient for transportation, the production task of the scheduled object will be shortened and the saved raw materials will be transported to the scheduling object, and at the same time, the execution performance detection and maintenance of the sub-process of the scheduled object will be carried out.

[0020] As a preferred embodiment of the present invention, the supply scheduling analysis process is as follows:

[0021] The raw material consumption of each production line is analyzed to obtain the raw material consumption rate and steelmaking output rate of each production line. Continuous data collection is carried out on each production line. Statistics are made based on the raw material consumption rate and steelmaking output rate at each time point during the continuous collection period, and curves are constructed based on the statistical values, which are marked as consumption rate curve and output rate curve respectively. At the same time, the output ratio is calculated based on the ratio of raw material consumption and steelmaking output at each time point, and the average output ratio at each time point is obtained by dividing the current steelmaking task output and the corresponding time period.

[0022] As a preferred embodiment of the present invention, the non-parallel area of ​​the consumption speed curve and the production line speed curve during the operation of the steelmaking production line is obtained, the overlapping time period of the rising section of the consumption speed curve and the rising section of the production line speed curve is collected, and the current overlapping time period is set as the time period for raw materials to be replenished; conversely, the overlapping time period of the falling section of the consumption speed curve and the falling section of the production line speed curve is collected, and the current overlapping time period is set as the time period for raw materials to be reduced.

[0023] As a preferred embodiment of the present invention, the production ratio of the period of raw materials to be replenished and the period of raw materials to be reduced is obtained. If the real-time production ratio exceeds the average production ratio, the corresponding steelmaking production line will be scheduled to replenish raw materials during the period of raw materials to be replenished. On the contrary, the corresponding steelmaking production line will be continuously monitored and not scheduled during the period of raw materials to be reduced.

[0024] If the real-time output ratio does not exceed the average output ratio, the corresponding steelmaking production line will not be scheduled for raw materials during the period of raw material replenishment and quality inspection will be carried out on each sub-process of the current steelmaking production line. Conversely, the corresponding steelmaking production line will be scheduled to reduce raw materials during the period of raw material reduction. After completing the supply scheduling control, a control completion signal is generated and sent to the steelmaking scheduling platform.

[0025] As a preferred embodiment of the present invention, the output ratio data and the curve influence data are respectively the continuous decline rate of the lowest output ratio value at each operating moment during the scheduling process of the steelmaking production line, and the number of increased moments corresponding to the parallel length of the consumption speed curve at each operating moment and the production line speed curve.

[0026] As a preferred embodiment of the present invention, if the output ratio data exceeds the continuous decline rate threshold, or the curve influence data does not exceed the increase time quantity threshold, a secondary scheduling prediction signal is generated and the secondary scheduling prediction signal is sent to the steelmaking scheduling platform; if the output ratio data does not exceed the continuous decline rate threshold, and the curve influence data exceeds the increase time quantity threshold, a scheduling qualification signal is generated and the scheduling qualification signal is sent to the steelmaking scheduling platform.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. In the present invention, active scheduling analysis is performed on the steelmaking production line, that is, active scheduling is performed according to real-time production demand under the premise that each process of the steelmaking production line is operating properly, so as to ensure the operation efficiency of the steelmaking production line and improve the operation rate of the production line without affecting the operation stability of the steelmaking production line; passive scheduling analysis is performed on the steelmaking production line, the operation efficiency is evaluated according to the real-time operation of multiple production lines, scheduling is performed between production lines when the operation efficiency is abnormal, and the operation progress of the production lines is reasonably planned to ensure the overall steelmaking efficiency, thereby reducing the output of the steelmaking production line.

[0029] 2. In the present invention, supply scheduling analysis is performed on the steelmaking production process, and supply scheduling is performed according to the production process analysis of different production line requirements, so as to ensure reasonable planning of raw materials and perform reasonable scheduling when timely operation is not possible, thereby improving the efficiency of steelmaking production and at the same time improving the production stability of the production line, being able to cope with different degrees of production line processing obstacles and ensuring the output of the production line.

[0030] 3. In the present invention, the scheduling analysis and prediction of the current steelmaking production line are carried out, and the scheduling efficiency of the current steelmaking production line is inferred through real-time scheduling analysis detection, so as to facilitate timely scheduling and control of the steelmaking production line, ensure the production efficiency of the steelmaking production line while ensuring the feasibility of scheduling the steelmaking production line. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0032] Figure 1 It is a principle block diagram of the present invention as a whole;

[0033] Figure 2 This is a principle block diagram of Embodiment 1 of the present invention;

[0034] Figure 3This is a principle block diagram of Embodiment 2 of the present invention;

[0035] Figure 4 This is a principle block diagram of Embodiment 3 of the present invention. DETAILED DESCRIPTION

[0036] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0038] See also Figure 1 As shown, a steelmaking scheduling system based on digital twin technology includes a steelmaking scheduling platform, wherein the steelmaking scheduling platform is communicatively connected with a production line end, a supply end, and a prediction end; Embodiment 1

[0039] This embodiment analyzes and controls the production line during the steelmaking process, so as to facilitate steelmaking scheduling based on the production line. Figure 2 As shown, the steelmaking scheduling platform and the production line end are connected by an active scheduling unit and a passive scheduling unit;

[0040] The steelmaking scheduling platform generates a scheduling instruction and sends it to the production line end. After receiving the instruction, the production line end generates an active scheduling signal and sends the active scheduling signal to the active scheduling unit. After receiving the active scheduling signal, the active scheduling unit performs active scheduling analysis on the steelmaking production line, that is, it performs active scheduling according to real-time production needs under the premise that each process of the steelmaking production line is running qualified, so as to ensure the operation efficiency of the steelmaking production line and improve the operation rate of the production line without affecting the operation stability of the steelmaking production line.

[0041] The steelmaking production line is divided according to each production link, and each production link is marked as a sub-process. The change frequency of the execution sequence of the sub-process corresponding to the execution equipment in the historical execution stage of the steelmaking production line is obtained, and the floating frequency of the qualified rate of the current steelmaking production line products after the execution sequence fluctuates in the historical execution stage of the execution equipment. The change frequency of the execution sequence of the sub-process corresponding to the execution equipment in the historical execution stage of the steelmaking production line and the floating frequency of the qualified rate of the current steelmaking production line products after the execution sequence fluctuates in the historical execution stage of the execution equipment are marked as process sequence execution information and process sequence impact information, and are compared with the sequence change frequency threshold and the qualified rate floating frequency threshold respectively:

[0042] If the frequency of change of the execution sequence of the corresponding sub-process in the steelmaking production line in the historical execution stage of the execution equipment exceeds the sequence change frequency threshold, and the current steelmaking production line product qualification rate fluctuation frequency does not exceed the qualification rate fluctuation frequency threshold after the execution sequence fluctuates in the historical execution stage of the execution equipment, then the sub-processes corresponding to the execution sequence are grouped in pairs and uniformly marked as sequence-independent processes; for example: in the actual steelmaking scenario, for the rolling process and the continuous casting process, the rolling process can be executed first if there is quantity, and the rolling parameters of the billet rolling can be set in advance if there is no quantity;

[0043] If the change frequency of the execution sequence of the corresponding execution equipment in the historical execution stage of the sub-process in the steelmaking production line does not exceed the sequence change frequency threshold, or the current steelmaking production line product qualification rate fluctuation frequency exceeds the qualification rate fluctuation frequency threshold after the execution sequence fluctuates in the historical execution stage of the execution equipment, the sub-processes corresponding to the execution sequence are grouped in pairs and uniformly marked as sequence-affecting processes; for example: in the actual steelmaking scenario, the converter steelmaking process and the refining process, if the sequence is changed, it is easy to cause an increase in cost, and if there is a deviation in the execution time, the real-time steelmaking quality will be affected;

[0044] The average idle time of the steelmaking production line sub-process when the preset operating speed of the production line in the current steelmaking production line is compared with the actual operating speed of the current production line is collected. For example, when the conveyor belt is used to transport raw materials, the actual speed of raw material pretreatment is faster than the preset speed, which easily causes the conveyor belt to run idle or the pretreatment equipment to run idle. At the same time, the speed ratio of the steelmaking production increase speed after the idle time corresponding to the steelmaking production line sub-process and the steelmaking qualified rate decrease speed is obtained, and the average idle time of the steelmaking production line sub-process when the preset operating speed of the production line in the current steelmaking production line is compared with the actual operating speed of the current production line, and the speed ratio of the steelmaking production increase speed after the idle time corresponding to the steelmaking production line sub-process and the steelmaking qualified rate decrease speed are marked as active time information and active speed information, respectively, and compared with the average idle time threshold and speed ratio threshold, respectively:

[0045] If the average idle time of the steelmaking production line sub-process exceeds the average idle time threshold when the preset operating speed of the production line in the current steelmaking production line is compared with the actual operating speed of the current production line, and the speed ratio of the steelmaking production increase speed after the corresponding idle time of the steelmaking production line sub-process is utilized to the steelmaking qualified rate decrease speed exceeds the speed ratio threshold, then the current steelmaking production line is actively scheduled, an active scheduling signal is generated and sent to the steelmaking scheduling platform. After receiving the active scheduling signal, the steelmaking scheduling platform obtains the sequence-independent process and increases the overlapping processing time of the sequence-independent process. At the same time, after the sequence-independent process is scheduled and operated, the overlapping time of the sequence-influencing process is monitored to avoid a decrease in steelmaking efficiency due to abnormal operation sequence;

[0046] If the average idle time of the steelmaking production line sub-process does not exceed the average idle time threshold when the preset operating speed of the production line in the current steelmaking production line is compared with the actual operating speed of the current production line, or the speed ratio of the steelmaking production increase speed and the steelmaking qualified rate decrease speed after the corresponding idle time of the steelmaking production line sub-process is utilized does not exceed the speed ratio threshold, then the current steelmaking production line will not be actively scheduled, and a no active scheduling signal will be generated and sent to the steelmaking scheduling platform;

[0047] At the same time, if there is no active scheduling demand or the active scheduling plan is determined, a passive scheduling signal is generated and sent to the passive scheduling unit. After receiving the passive scheduling signal, the passive scheduling unit performs passive scheduling analysis on the steelmaking production line, evaluates the operation efficiency according to the real-time operation of multiple production lines, schedules between production lines when the operation efficiency is abnormal, and reasonably plans the operation progress of the production lines to ensure the overall steelmaking efficiency, thereby reducing the output of the steelmaking production line;

[0048] The synchronous production period of multiple production lines is obtained, and the corresponding execution time delay frequency increase speed of the same sub-process of different production lines in the synchronous production period of multiple production lines is collected. At the same time, the deviation increase span of the steelmaking output speed of the current production line and the preset output speed when the execution time of the same sub-process of different production lines is floating is obtained, and the corresponding execution time delay frequency increase speed of the same sub-process of different production lines in the synchronous production period of multiple production lines and the deviation increase span of the steelmaking output speed of the current production line and the preset output speed when the execution time of the same sub-process of different production lines is floating are marked as passive delay frequency data and passive speed deviation data, respectively, and compared with the time delay frequency increase speed threshold and speed deviation increase span threshold respectively:

[0049] If the deviation increase span between the steelmaking output speed of the current production line and the preset output speed exceeds the speed increase threshold of the time-consuming delay frequency when the same sub-process of different production lines executes time-consuming floating, or the deviation increase span between the steelmaking output speed of the current production line and the preset output speed exceeds the speed deviation increase span threshold when the same sub-process of different production lines executes time-consuming floating, it is determined that the current multi-production line synchronous production needs passive scheduling, and a passive scheduling signal is generated and sent to the steelmaking scheduling platform. After receiving the passive scheduling signal, the steelmaking scheduling platform schedules the synchronous operation of multiple production lines, and takes the sub-process with time-consuming delay or the sub-process with abnormal speed deviation increase span as the scheduled object, otherwise it is set as the scheduling object. If the scheduled object and the processing body of the scheduling object are easy to transport, such as iron ore, the processing body is transported and transported to the production line where the scheduling object is located; if the scheduled object and the processing body of the scheduling object are not easy to transport, such as molten iron, the output task of the scheduled object is shortened and the saved raw materials are transported to the scheduling object, and the execution performance detection and maintenance of the sub-process of the scheduled object is performed at the same time;

[0050] If the deviation increase span between the steelmaking output speed of the current production line and the preset output speed does not exceed the time delay frequency increase speed threshold when the same sub-process of different production lines executes time-consuming floating, and the deviation increase span between the steelmaking output speed of the current production line and the preset output speed does not exceed the speed deviation increase span threshold when the same sub-process of different production lines executes time-consuming floating, it is determined that the current multi-production line synchronous production does not need passive scheduling; Embodiment 2

[0051] The previous embodiment schedules the production line during steel production. This embodiment schedules the supply of raw materials based on the previous embodiment. Figure 3 As shown, the steelmaking scheduling platform is connected to the supply end through a supply scheduling control unit;

[0052] After the steelmaking scheduling platform sends the scheduling instruction to the supply side, the supply side generates a supply scheduling control signal and sends the supply scheduling control signal to the supply scheduling control unit. After receiving the supply scheduling control signal, the supply scheduling control unit performs supply scheduling analysis on the steelmaking production process, and performs supply scheduling according to the production process analysis of different production line requirements, so as to ensure the reasonable planning of raw materials and perform reasonable scheduling when they cannot be operated in time, thereby improving the efficiency of steelmaking production and the production stability of the production line, being able to cope with different degrees of production line processing obstacles and ensuring the output of the production line;

[0053] Analyze the raw material consumption of each production line, obtain the raw material consumption rate and steel production output rate of each production line, and continuously collect data for each production line. According to the raw material consumption rate and steel production output rate at each time point during the continuous collection period, statistics are collected, and curves are constructed based on the statistical values, which are marked as consumption rate curve and output rate curve respectively; at the same time, the output ratio is calculated based on the ratio of raw material consumption and steel production at each time point, and the average output ratio at each time point is obtained according to the current steelmaking task output and the corresponding time period;

[0054] The non-parallel area of ​​the consumption speed curve and the production line speed curve during the operation of the steelmaking production line is obtained, and the overlapping period of the rising section of the consumption speed curve and the rising section of the production line speed curve is collected, and the current overlapping period is set as the period for replenishing raw materials; conversely, the overlapping period of the falling section of the consumption speed curve and the falling section of the production line speed curve is collected, and the current overlapping period is set as the period for reducing raw materials;

[0055] The production ratio of the period of raw materials to be replenished and the period of raw materials to be reduced is obtained. If the real-time production ratio exceeds the average production ratio, the corresponding steelmaking production line will be scheduled to replenish raw materials during the period of raw materials to be replenished. Otherwise, the corresponding steelmaking production line will be continuously monitored and no scheduling will be carried out during the period of raw materials to be reduced.

[0056] If the real-time production ratio does not exceed the average production ratio, the corresponding steelmaking production line will not be scheduled for raw materials during the period of raw material replenishment, and quality inspection will be performed on each sub-process of the current steelmaking production line. On the contrary, the corresponding steelmaking production line will be scheduled for raw material reduction during the period of raw material reduction to avoid accumulation of raw material supply on the production line;

[0057] After completing the supply scheduling control, a control completion signal is generated and sent to the steelmaking scheduling platform; Embodiment 3

[0058] The first two embodiments both perform real-time scheduling analysis on the steel production line, and this embodiment is further improved on the basis of the first two embodiments. Figure 4 As shown, the steelmaking scheduling platform is connected to the prediction end in communication. After the steelmaking scheduling platform completes the real-time scheduling, it generates a scheduling prediction signal and sends the scheduling prediction signal to the prediction end. After receiving the scheduling prediction signal, the prediction end performs scheduling analysis and prediction on the current steelmaking production line. The scheduling efficiency of the current steelmaking production line is inferred through real-time scheduling analysis and detection, so as to timely schedule and control the steelmaking production line, ensure the production efficiency of the steelmaking production line, and ensure the feasibility of the scheduling of the steelmaking production line;

[0059] The continuous decline rate of the lowest output ratio at each moment in the process of scheduling the steelmaking production line is obtained, and the number of increased moments corresponding to the parallel length of the consumption speed curve and the production line speed curve at each moment in the process of scheduling the steelmaking production line is obtained. The continuous decline rate of the lowest output ratio at each moment in the process of scheduling the steelmaking production line and the number of increased moments corresponding to the parallel length of the consumption speed curve and the production line speed curve at each moment in the process of scheduling the steelmaking production line are marked as output ratio data and curve impact data, respectively, and compared with the continuous decline rate threshold and the increase time number threshold, respectively:

[0060] If the continuous decrease rate of the output at each moment of operation compared to the minimum value during the scheduling of the steelmaking production line exceeds the continuous decrease rate threshold, or the number of increased moments corresponding to the parallel length of the consumption speed curve and the production line speed curve at each moment of operation does not exceed the threshold of the number of increased moments, then it is determined that the scheduling efficiency of the steelmaking production line is low, a secondary scheduling prediction signal is generated and sent to the steelmaking scheduling platform, and after receiving the secondary scheduling prediction signal, the steelmaking scheduling platform performs secondary scheduling on the steelmaking production line;

[0061] If the continuous decrease rate of the output at each moment of the operation of the steelmaking production line during the scheduling process does not exceed the continuous decrease rate threshold, and the parallel length of the consumption speed curve at each moment of the operation and the production line speed curve corresponding to the increase in the number of moments exceeds the increase in the number of moments threshold, then it is determined that the scheduling efficiency of the steelmaking production line is high, and a scheduling qualification signal is generated and sent to the steelmaking scheduling platform;

[0062] The above formulas are obtained by collecting a large amount of data and performing software simulation, and a formula close to the actual value is selected. The coefficients in the formula are set by technicians in this field according to actual conditions;

[0063] When the present invention is in use, the active scheduling unit is used to divide the steelmaking production line according to each production link, and mark each production link as a sub-process, collect process sequence execution information and process sequence influence information, and divide the sub-process into sequence non-influenced processes and sequence influence processes according to information comparison, and then collect active duration information and active speed information, and infer whether active scheduling is needed according to information analysis; the passive scheduling unit is used to obtain the synchronous production time period of multiple production lines, collect passive delay frequency data and passive speed deviation data, and infer whether the current steelmaking production line needs passive scheduling according to data analysis; the supply scheduling control unit is used to perform supply scheduling analysis on the steelmaking production process; the prediction end is used to perform scheduling analysis and prediction on the current steelmaking production line, collect output ratio data and curve influence data, and infer whether the current steelmaking production line scheduling is qualified according to data comparison.

[0064] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A steelmaking scheduling system based on digital twin technology, It is characterized in that It includes a steelmaking scheduling platform, wherein the steelmaking scheduling platform is connected with the production line end, the supply end and the forecast end; The production line end is connected with: an active scheduling unit, which is used to divide the steelmaking production line according to each production link, and mark each production link as a sub-process, collect process sequence execution information and process sequence influence information, and divide the sub-process into sequence-independent processes and sequence-influenced processes according to information comparison; the process sequence execution information and process sequence influence information are respectively the frequency of change of the execution sequence of the execution equipment corresponding to the sub-process in the steelmaking production line in the historical execution stage, and the floating frequency of the current steelmaking production line product qualification rate after the execution sequence in the historical execution stage of the execution equipment fluctuates; If the process sequence execution information exceeds the sequence change frequency threshold, and the process sequence impact information does not exceed the pass rate floating frequency threshold, the sub-processes corresponding to the execution sequence are grouped in pairs and uniformly marked as sequence-independent processes; If the process sequence execution information does not exceed the sequence change frequency threshold, or the process sequence impact information exceeds the pass rate floating frequency threshold, the sub-processes of the corresponding execution sequence are grouped in pairs and uniformly marked as sequence impact processes; Then, active duration information and active speed information are collected, and whether active scheduling is needed is inferred based on information analysis; the active duration information and active speed information are respectively the average idle time of the steelmaking production line sub-process when the preset operation speed of the production line in the current steelmaking production line is compared with the actual operation speed of the current production line, and the speed ratio of the steelmaking production increase rate to the steelmaking qualified rate decrease rate after the corresponding idle time of the steelmaking production line sub-process is utilized; If the active duration information exceeds the average idle duration threshold, and the active speed information exceeds the speed ratio threshold, the current steelmaking production line is actively scheduled; If the active duration information does not exceed the average idle duration threshold, or the active speed information does not exceed the speed ratio threshold, the current steelmaking production line will not be actively scheduled; The passive scheduling unit is used to obtain the synchronous production period of multiple production lines, collect passive delay frequency data and passive speed deviation data, and infer whether the current steelmaking production line needs passive scheduling based on data analysis; The passive delay frequency data and passive speed deviation data are respectively the increasing speed of the delay frequency corresponding to the execution time consumption of the same sub-process of different production lines during the multi-production line synchronous production period, and the increasing span of the deviation between the steelmaking output speed of the current production line and the preset output speed when the execution time consumption of the same sub-process of different production lines fluctuates; If the passive delay frequency data exceeds the time-consuming delay frequency increase speed threshold, or the passive speed deviation data exceeds the speed deviation increase span threshold, it is determined that the current multi-production line synchronous production requires passive scheduling, and a passive scheduling signal is generated and sent to the steelmaking scheduling platform; if the passive delay frequency data does not exceed the time-consuming delay frequency increase speed threshold, and the passive speed deviation data does not exceed the speed deviation increase span threshold, it is determined that the current multi-production line synchronous production does not require passive scheduling The supply side is connected with: a supply scheduling control unit for performing supply scheduling analysis on the steelmaking production process; The prediction end is used to perform scheduling analysis and prediction on the current steelmaking production line, collect output ratio data and curve impact data, and infer whether the current steelmaking production line scheduling is qualified based on data comparison; the output ratio data and curve impact data are the continuous decline rate of the lowest output ratio at each moment in the operation process of the steelmaking production line scheduling, and the number of times the parallel length of the consumption speed curve and the production line speed curve at each moment of operation corresponds to the increase in the number of times.

2. According to claim 1, a steelmaking scheduling system based on digital twin technology, It is characterized in that After receiving the passive scheduling signal, the steelmaking scheduling platform schedules the synchronous operation of multiple production lines, and sets the sub-processes with time-consuming and delayed execution or the sub-processes with abnormal speed deviation and increased span as the scheduled objects, otherwise it is set as the scheduling object. If the scheduled object and the processing body of the scheduling object are convenient for transportation, the processing body will be transported and delivered to the production line where the scheduling object is located; if the scheduled object and the processing body of the scheduling object are not convenient for transportation, the production task of the scheduled object will be shortened and the saved raw materials will be transported to the scheduling object, and the execution performance detection and maintenance of the sub-processes of the scheduled object will be carried out.

3. According to claim 1, a steelmaking scheduling system based on digital twin technology, It is characterized in that The supply scheduling analysis process is as follows: The raw material consumption of each production line is analyzed to obtain the raw material consumption rate and steelmaking output rate of each production line. Continuous data collection is carried out on each production line, and the raw material consumption rate and steelmaking output rate at each time point during the continuous collection period are statistically analyzed. Curves are constructed based on the statistical values, which are marked as consumption rate curve and output rate curve respectively. At the same time, the output ratio is calculated based on the ratio of raw material consumption and steelmaking output at each time point, and the average output ratio at each time point is obtained by dividing the current steelmaking task output and the corresponding time period.

4. According to claim 3, a steelmaking scheduling system based on digital twin technology, It is characterized in that The non-parallel area between the consumption speed curve and the production line speed curve during the operation of the steelmaking production line is obtained, the overlapping time period of the rising section of the consumption speed curve and the rising section of the production line speed curve is collected, and the current overlapping time period is set as the time period for replenishing raw materials; conversely, the overlapping time period of the falling section of the consumption speed curve and the falling section of the production line speed curve is collected, and the current overlapping time period is set as the time period for reducing raw materials.

5. According to claim 4, a steelmaking scheduling system based on digital twin technology, It is characterized in that The production ratio of the period of raw materials to be replenished and the period of raw materials to be reduced is obtained. If the real-time production ratio exceeds the average production ratio, the corresponding steelmaking production line will be scheduled to replenish raw materials during the period of raw materials to be replenished. Otherwise, the corresponding steelmaking production line will be continuously monitored and no scheduling will be carried out during the period of raw materials to be reduced. If the real-time output ratio does not exceed the average output ratio, the corresponding steelmaking production line will not be scheduled for raw materials during the period of raw material replenishment and quality inspection will be carried out on each sub-process of the current steelmaking production line. Conversely, the corresponding steelmaking production line will be scheduled to reduce raw materials during the period of raw material reduction. After completing the supply scheduling control, a control completion signal is generated and sent to the steelmaking scheduling platform.

6. According to claim 5, a steelmaking scheduling system based on digital twin technology, It is characterized in that If the output ratio data exceeds the continuous decline rate threshold, or the curve influence data does not exceed the increase time quantity threshold, a secondary scheduling prediction signal is generated and sent to the steelmaking scheduling platform; if the output ratio data does not exceed the continuous decline rate threshold, and the curve influence data exceeds the increase time quantity threshold, a scheduling qualification signal is generated and sent to the steelmaking scheduling platform.