Internet-based furniture production task automatic matching method, system and terminal

Through the Internet-based automatic matching method of furniture production tasks, using rule analysis and evaluation optimization, the automation, accurate and timely allocation of furniture production tasks is achieved, and the problems of untimely, inaccurate and inflexible task allocation in the existing technology are solved, and the problems of untimely, inaccurate and inflexible task allocation in the existing technology are improved. Productivity and stability.

CN118626882BActive Publication Date: 2024-11-19SICHUAN YADU FURNITURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411119239.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-19
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

In the prior art, furniture production task allocation lacks automation, flexibility and stability, resulting in untimely and inaccurate task allocation, and the inability to adapt to different production scenarios, resulting in uneven task allocation and unfair equipment processing and execution.

Method used

Provide an Internet-based furniture production task automatic matching method. By obtaining tasks to be executed, determining matching rules, using preset rule analysis system to generate production allocation plans, and selecting target plans based on the evaluation system to ensure timely and accurate allocation of tasks. Combined with rule analysis and evaluation and optimization rules, automation, flexibility and stability are achieved.

Benefits of technology

It realizes the automation, accurate and timely allocation of furniture production tasks, improves production efficiency and reduces costs, avoids task repetition, delay and loss, has stronger adaptability and generalization capabilities, and has higher stability and reliability. prevents uneven task allocation and unprocessable equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118626882B_ABST
    Figure CN118626882B_ABST
Patent Text Reader

Abstract

The present invention relates to an automatic matching method, system and terminal for furniture production tasks based on the Internet, the method comprising: obtaining furniture production tasks to be executed; determining matching rules corresponding to the furniture production tasks to be executed according to the furniture production tasks to be executed and the production task matching rules; parsing the matching rules corresponding to the furniture production tasks to be executed using a preset rule parsing system, matching corresponding order resources according to the parsing results, and generating a production distribution plan that meets the requirements of the furniture production tasks to be executed; evaluating the production distribution plan according to a preset evaluation system, determining a target production distribution plan according to the evaluation results; and executing the furniture production tasks to be executed according to the target production distribution plan. Through the present invention, the production and manufacturing process of furniture manufacturing enterprises can be made more efficient and intelligent, thereby improving production efficiency and reducing costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production task decision making, and in particular to an Internet-based automatic matching method, system and terminal for furniture production tasks. Background Art

[0002] In the existing technology, after the production plan is created, the production tasks need to be manually assigned to the task work orders, which makes it impossible to timely and accurately send the created task work orders to each production team for production. However, with the continuous deepening of the digital transformation of enterprises and the development of artificial intelligence technology, enterprises are using digital resources in more and more ways. By deeply combining algorithms and other technologies, it is beneficial for furniture manufacturing companies to achieve intelligent production upgrades. Therefore, the application of automatic matching methods for production tasks based on the wooden furniture industrial Internet has also emerged.

[0003] At present, the automatic matching methods of production tasks based on the wooden furniture industrial Internet are divided into the following categories:

[0004] (1) Rule-based matching method

[0005] This method uses pre-set rules or algorithms to match production tasks based on their characteristics (such as process requirements, quantity, materials, etc.) and the capabilities of available resources (such as equipment production efficiency, worker skills, etc.). The rules of this matching method are all formulated by enterprise managers and the business logic of the production execution process. It can only formulate specific rules for specific enterprises and cannot be applied to other application scenarios. It also does not have the ability to optimize rules.

[0006] (2) Matching method based on optimization algorithm

[0007] This method uses optimization algorithms to find production task allocation solutions. The optimization goals may include matching production efficiency, minimizing production costs, or improving resource utilization. However, this matching method can only be based on specific optimization goals and does not have automation capabilities and flexibility.

[0008] (3) Matching based on machine learning

[0009] With the development of big data and artificial intelligence technology, automatic matching of production tasks based on machine learning is increasingly favored by production managers. However, the matching method of machine learning is not stable and reliable.

[0010] Therefore, there is an urgent need to propose an automated, flexible and stable matching method that can be applied to all furniture production tasks and can automatically allocate wooden furniture production tasks. Summary of the invention

[0011] To solve one of the above problems, the present invention provides an Internet-based automatic matching method, system and terminal for furniture production tasks.

[0012] To achieve the above object, the technical solution of the present invention is specifically implemented as follows:

[0013] On the one hand, the present invention provides an automatic matching method for furniture production tasks based on the Internet, comprising: obtaining furniture production tasks to be executed; determining matching rules corresponding to the furniture production tasks to be executed based on the furniture production tasks to be executed and production task matching rules; parsing the matching rules corresponding to the furniture production tasks to be executed using a preset rule parsing system, matching corresponding resource data based on the parsing results, and generating a production distribution plan that meets the requirements of the furniture production tasks to be executed; evaluating the production distribution plan based on a preset evaluation system, and determining a target production distribution plan based on the evaluation results; and executing the furniture production tasks to be executed according to the target production distribution plan.

[0014] On the other hand, the present invention provides an Internet-based automatic matching system for furniture production tasks, including: a task acquisition module, used to acquire furniture production tasks to be executed; a matching rule module, used to determine the matching rules corresponding to the furniture production tasks to be executed according to the furniture production tasks to be executed and the production task matching rules; a parsing module, used to parse the matching rules corresponding to the furniture production tasks to be executed using a preset rule parsing system, match the corresponding order resources according to the parsing results, and generate a production distribution plan that meets the requirements of the furniture production tasks to be executed; an evaluation module, used to evaluate the production distribution plan according to a preset evaluation system, and determine the target production distribution plan according to the evaluation results; an execution module, used to execute the furniture production tasks to be executed according to the target production distribution plan.

[0015] Yet another aspect of the present invention provides a terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the aforementioned method when executing the computer program.

[0016] The beneficial effects of the present invention are embodied in that, through the Internet-based furniture production task automatic matching method, system and terminal provided by the present invention, according to the relevant rule requirements selected by the user, the rules can be deconstructed based on the rule parser, combined with the relevant evaluation and constraints, the wooden furniture production tasks are automatically allocated, multiple feasible production allocation plans are generated, and the most suitable production allocation plan is selected. The Internet-based furniture production task automatic matching method provided by this embodiment can ensure that the production tasks are distributed in a timely and accurate manner, avoiding the problems of task duplication, task delay, task loss, etc. caused by manual operation. At the same time, the production and manufacturing process of the furniture manufacturing enterprise can be made more efficient and intelligent, thereby improving production efficiency and reducing costs. In addition, compared with the rule-based matching method, the method of the present invention can output and generate more dimensional matching solutions and has the ability to optimize rules. Compared with the matching method based on the optimization algorithm, the method of the present invention can have stronger adaptability and generalization ability, and has more automation ability and flexibility. Compared with the matching method based on machine learning, the method of the present invention can explain the corresponding rules more clearly and has higher stability and reliability.

[0017] In addition, the Internet-based automatic matching method, system and terminal for furniture production tasks provided by the present invention can also prevent the imbalanced task allocation that may occur in the task allocation process in the prior art, or the situation where some tasks are assigned to designated equipment and then found that the equipment cannot process and execute them. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A flow chart of an automatic matching method for furniture production tasks based on the Internet provided in Example 1 of the present invention;

[0019] Figure 2 This is a schematic diagram of the framework of the Internet-based automatic matching system for furniture production tasks provided in Example 1 of the present invention;

[0020] Figure 3 This is a schematic diagram of a terminal provided in Example 1 of the present invention. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] Example 1

[0023] This embodiment provides an automatic matching method for furniture production tasks based on the Internet. Figure 1 As shown, the method includes:

[0024] Step S101, obtaining the furniture production tasks to be executed; specifically, the user can input specific furniture production tasks to the system through control methods such as text or voice. For example, a specific task expressed in text such as "produce 1,000 cherry wood round dining tables" can be input to the system through a visual interface; the user can also determine the furniture production tasks to be executed by selecting the rule element information required for furniture production task allocation. The rule element may include the number of production equipment required, the number of tasks to be completed, the production capacity of the production equipment, etc., so as to standardize and quantify the specific furniture production tasks.

[0025] Step S102, determine the matching rules corresponding to the furniture production tasks to be executed according to the furniture production tasks to be executed and the production task matching rules; specifically, the production task matching rules limit all possible rules of all furniture production processes, and the matching rules corresponding to the furniture production tasks to be executed refer to the specific rules required for the current furniture production tasks, which do not necessarily include all production task matching rules. By presetting the production task matching rules, and then establishing the matching rules corresponding to the specific furniture production tasks according to the production task matching rules, a high-availability data model that fits the actual production operation of the enterprise can be established, and the production execution task plan can be generated in combination with the data generated in the production activities, so as to obtain the information in the production execution process in the future to perform execution prediction analysis on the generated production task plan, and the analysis results are fed back to the operators through prediction analysis to achieve the effect of preparing for a rainy day.

[0026] In an optional implementation, the production task matching rules include: furniture product type, furniture manufacturing process, furniture manufacturing equipment, storage material information, etc., and other matching rules established by the management requirements of the furniture manufacturing enterprise. By listing the furniture type, manufacturing process, etc. that are specifically related to furniture manufacturing as production task matching rules, it is helpful to automatically match furniture production tasks.

[0027] The production task matching rule is used to match furniture production tasks. In an optional implementation, the user can select the matching rule for wooden furniture production tasks. Specifically, the matching rule set by the user in the system can be received, and other matching rules generated by machine learning and other technologies during the production execution process according to the user input rules can also be received. The present invention does not limit the specific matching rule content required for obtaining the user input for the production and manufacturing activities of wooden furniture.

[0028] In addition, the matching rules determined according to the current furniture production tasks include not only general production task matching rules, but also method ontology and semantic matching methods. The method ontology includes configuration files, algorithm models, data models, and operation details, and the semantic matching methods include: exact matching, rule matching, inclusion matching, and matching failure.

[0029] In an optional implementation, after step S102, the method of this embodiment may further include: establishing rule elements for the matching rules corresponding to the furniture production tasks to be executed, where the rule element refers to an independent rule unit of a single production process node in the furniture production task; extracting the rule factor constraints of the rule element into algorithm factors according to the preset algorithm model, wherein the rule factor is the rule element that constitutes the rule element; judging whether the various algorithm factor constraints of the rule element meet the corresponding preset requirements, and if so, retaining the rule element in the matching rules corresponding to the furniture production tasks to be executed. By establishing rule elements related to each production process node and combining data models and algorithm models, a comprehensive analysis of the subtleties of production operations can be conducted, which helps to strengthen the execution method and make an execution plan that matches the execution process before and after the production task.

[0030] In an optional specific implementation, S102 may include sub-steps S1021 to S1024:

[0031] Step S1021, modular rules are created according to furniture product types, furniture manufacturing processes, furniture manufacturing equipment, storage material information, and furniture manufacturing enterprise management requirements. The modular rules may correspond to production task matching rules required by a production line, a production workshop, or a factory. By modularizing the production task matching rules of a production line, workshop, or factory, the present invention is convenient for application in different production lines, workshops, and factories.

[0032] Step S1022 , each production task matching rule is established as a standard independent rule element (a rule element refers to an independent rule unit of a single production process node in each production task matching rule).

[0033] Step S1023: extract the rule factors of the rule element (the rule factors are the specific contents of the rule element, such as capacity, working hours, etc.) into algorithm factors according to the algorithm model constraints. The optional algorithm model can be created by taking the following steps:

[0034] First, collect data such as the production capacity, equipment status, personnel attendance, and basic personnel data of a production line, a production workshop, or a factory during production execution.

[0035] Secondly, the collected duplicate data, timeout exception data, etc. in the production execution are preprocessed, missing values ​​are processed, and the data is standardized according to the data standards set by the system. Data features are extracted and feature data related to the rules are obtained. For example, the production capacity data of each production unit in the production execution process within one hour or one day is obtained as the capacity constraint condition for the production task matching results.

[0036] Secondly, the algorithm model is trained and tuned, and the model parameters (such as production capacity, quantity, task execution priority, etc.) are iteratively optimized according to the actual production usage scenarios.

[0037] Finally, the model is evaluated and continuously monitored and updated. The model's prediction results are visualized and analyzed through visualization tools to further understand the model's performance. The model is updated and maintained in a timely manner according to new data and business needs to maintain its good performance.

[0038] By establishing an algorithm model, it is possible to establish a corresponding data model based on the equipment information of production execution and the product information, personnel information, process information, etc. that the equipment can process. By adjusting the decision parameters in the model, it is possible to optimize the production execution results or quickly establish a new task matching method. This can meet the needs of different enterprises, different management modes, different production equipment, and different process flows for the division of production task orders and the dispatch of production tasks. It can also optimize the decision model based on the execution results and execution requirements.

[0039] Step S1024, determine whether the constraints of each algorithm factor of the rule element meet the preset requirements. If the requirements are met, the rule element can be retained in the matching rules corresponding to the furniture production task to be executed. Specifically, the algorithm factor of the rule element can be incorporated into the production task matching rule for calculation, and the calculation result can be obtained. The calculation result is determined by the set production capacity and the proportion of the tasks to be produced of each device. If the production requirements are met, the corresponding rule element can be retained. For example, a certain cutting node has 5 identical cutting devices. A certain matching rule requires that the task volume of the device with the least tasks cannot be less than 80% of the task volume of the device with the highest tasks. If 4 of the assigned tasks are assigned tasks that require 8 hours of production, and the other device is assigned tasks that only take 4 hours, then this allocation result is unreasonable and the tasks need to be reallocated. If the new allocation result is that 4 devices have 7 hours of tasks and the other device has 8 hours of tasks, then this allocation result is reasonable according to the matching rule.

[0040] Step S103, using the preset rule parsing system to parse the matching rules corresponding to the furniture production task to be executed, matching the corresponding resource data according to the parsing results, and generating a production allocation plan that meets the requirements of the furniture production task to be executed. Specifically, the preset rule parsing system in this embodiment can be set in a rule parser, which can be implemented by a software program or implanted into the system. Its main function is to parse the set rule functions, rule models, etc. into a structural form that can be executed by the system. Through the rule parser of the preset rule parsing system, the meaning of the rules can be identified more accurately, and the required resource data can be matched quickly and accurately, which improves the automatic matching accuracy of wooden furniture production tasks, improves the efficiency of production task allocation, and thus improves the overall production efficiency.

[0041] In actual use, operators can modify matching rule parameters according to actual conditions. These modifications take into account the relationship between input parameters and other parameters. After the matching rules are modified, they can accurately and quickly match results that meet the rule conditions. In the process of modifying parameters, the system will further obtain new rules based on the modification frequency and the changes between rule parameters, and prompt abnormal relationships during the modification of rule parameters. By modifying rule parameters or matching rule execution, the system automatically optimizes and upgrades matching rules, which can improve the accuracy and satisfaction of matching rules.

[0042] In an optional implementation, step S103 can be implemented by the following steps: using a rule parser to parse and obtain the matching rules corresponding to the furniture production task to be executed; matching the order resources that meet the furniture production task to be executed according to the matching rules; matching the required production resources according to the type of order resources, and generating a production allocation plan that meets the requirements of the furniture production task to be executed. Specifically, an order can refer to an order included in the furniture production task to be executed. The difference between an order and a production task is that an order should also have relevant requirements and documents, such as raw material requirements, processing documents, etc. A furniture production task to be executed can contain multiple orders, and an order can also be disassembled into multiple furniture production tasks to be executed. Therefore, order resources refer to the raw material data, processing technology data, processing file data and other resources required by the order to be executed during the production execution process, and are divided into different resource types according to the types of these resources (correspondingly, the resource type may include raw material type, processing file type, processing technology type, etc.). Production resources refer to the types of resources such as production and processing equipment and manpower contained in the process nodes in production, for example, the electronic cutting saw equipment of the cutting node.

[0043] In a possible implementation, S103 specifically includes sub-steps S1031 to S1034:

[0044] Step S1031, using a rule parser to parse the matching rules corresponding to the furniture production task to be executed.

[0045] Step S1032, matching order resources that meet the production requirements according to matching rules.

[0046] Step S1033: classify the matched order resources according to different resource types.

[0047] Step S1034, generating a qualified production task allocation plan according to resource type matching required production resources.

[0048] In a specific implementation, step S1034 matches the required production resources according to the type of order resources to generate a production allocation plan that meets the requirements of the furniture production task to be executed, including the following steps:

[0049] Calculate the total production capacity of a single production resource:

[0050] (1)

[0051] in, T Represents the total production capacity of a single production resource, N Indicates the total number of production units corresponding to a single production resource, C i Indicates the representative i The capacity factor of a production unit, E i Representative i Baseline capacity of production units;

[0052] Determine whether the production resources can match the maximum production quantity of the corresponding order resources based on the total production capacity of the production resources;

[0053] If possible, the total number of furniture production tasks to be executed will be P Assign to each production unit and calculate the corresponding production allocation plan by the following formula:

[0054] (2)

[0055] in, P i Indicates i The number of production units to be allocated. The higher the actual capacity of the production unit (that is, the greater the product of the base capacity and the capacity factor), the more production quantities it should be allocated. In this way, a balanced distribution of production quantities can be achieved while making full use of iThe capacity of a production unit.

[0056] Step S104, evaluate the production distribution plan according to the preset evaluation system, and determine the target production distribution plan according to the evaluation results; specifically, to determine whether the production distribution plan generated according to the matching rules meets the production execution requirements of the current furniture production task, it is necessary to establish an evaluation function to decide whether to retain the generated results. By discarding the results with low scores through the evaluation function, the system's calculation amount and the number of result sets can be reduced, and the production distribution plan that best meets the production execution requirements in the result set can be quickly and accurately obtained, helping enterprises to realize the intelligence of production activities.

[0057] In an optional implementation, the production distribution plan is evaluated according to a preset evaluation system, and the target production distribution plan is determined according to the evaluation results, including: establishing constraints according to the production task matching rules; screening the production distribution plans that meet the constraints in the production distribution plan; obtaining corresponding evaluation rules according to the production distribution plans and constraints that meet the constraints; and determining the target production distribution plan according to the evaluation rules. Specifically, the constraints can be established according to different production tasks, or according to the management needs of different enterprises. By establishing constraints, the production matching plan can be customized. For example, if a certain production node of an enterprise has multiple identical production equipment, if the set production plan makes the load time of a single equipment much higher than other equipment, on the one hand, it may lead to an extension of the time to complete the production plan, and on the other hand, it will cause excessive wear of a certain equipment, which is not conducive to the rational use of resources of the production enterprise. In view of this, some constraints can be determined according to the production task matching rules, and the constraints can be fully considered when evaluating the production distribution plan, so as to select the most reasonable production distribution plan.

[0058] In a specific implementation, S104 may include sub-steps S1041 to S1044:

[0059] Step S1041: Establish constraint conditions for matching results according to the production task matching requirements. The constraint conditions can be established in the following ways:

[0060] First, the actual capacity of a single production unit of a single resource type is calculated using the following formula.

[0061] (3)

[0062] in, A i Indicates i The actual capacity of each production unit, C i Indicates i The capacity factor of a production unit,E i Indicates i Baseline capacity of production units;

[0063] Secondly, set individual constraints. For example, when the production task assigned to a single production unit is lower than the constraint value Q, it is necessary to reduce the production unit and regenerate the production task plan. Specifically, before the allocation calculation, check the filter first i The actual production tasks currently assigned to the production units P i ’ Is it greater than or equal to i The capacity constraint condition of a production unit is If it is not satisfied, then the i The production unit should be abandoned and not participate in the allocation. P i ’

[0064] (4)

[0065] in, P i ’ Indicates i The actual production tasks currently assigned to each production unit. The total number of units to be produced is allocated based on the proportion of the actual production capacity of each screened production unit to the total actual production capacity after screening.

[0066] (5)

[0067] in, P j is the total actual capacity after screening, Represents the filtered production unit set, which contains all production units that meet the conditions. These production units that meet the conditions will not be abandoned even if they are assigned the minimum quantity to be produced.

[0068] Step S1042, using the constraint conditions to filter out the generated production allocation plans that meet the conditions.

[0069] Step S1043, obtain the rules for evaluation based on the obtained production allocation plan and constraints. For example, prioritize the production tasks based on their importance and urgency. Prioritize the production tasks for key customers and urgent orders to ensure on-time delivery.

[0070] In addition, the evaluation rules can be dynamically optimized to remove unreasonable evaluation rules. That is, it can also include:

[0071] Step S1044, based on the obtained production task matching plan results and constraints, obtain the rules that can be optimized; for example, based on the obtained production allocation plan and priority constraints, compare and confirm the results of production task matching. When the priority condition in the production task matching result is not met, it means that the evaluation rule may no longer be applicable, and the rules that produce the result are obtained. These rules are the rules that need to be optimized. This method can automatically optimize the evaluation rules. The monitoring management model automatically provides suggestions for the optimization of matching rules, and generates new matching rules based on the actual execution of the matching plan, which is conducive to the continuous optimization and upgrading of the rule model and helps decision makers develop more efficient solutions.

[0072] Step S1045, the operator adjusts the rule parameters and confirms whether the adjusted parameters are temporary or permanent. If it is a permanent adjustment, the rule model is adjusted. In the specific system operation process, the operator can adjust the value of the rule parameters such as production capacity and equipment quantity through the system visualization page. After entering the corresponding production capacity, equipment quantity and other data, the operator selects whether the adjusted parameter value is temporary or permanent on the page. If it is a permanent adjustment, the rule factor value in the rule element is adjusted. If it is a temporary adjustment, it will only take effect on the result of this adjustment.

[0073] Step S1046, according to the production task execution results and feedback issues, the corresponding parameters are automatically calculated and new matching rules are generated, and the new matching rules can be put into effect after the operator makes the final confirmation.

[0074] In an optional implementation, the actual capacity can be evaluated, and the configuration of the production unit can be adjusted based on the evaluation result feedback. The calculation evaluation function of the actual capacity can be implemented in the following way:

[0075] (6)

[0076] This evaluation function calculates the actual capacity A i and capacity factor C i and compare it with the benchmark capacity E i Make a comparison. F(i) is a dimensionless number that represents the i The actual capacity in a production unit is the multiple of the benchmark capacity after adjustment by the capacity factor.

[0077] if F(i) > 1, it means that the actual capacity of the production unit (after adjustment for the capacity factor) exceeds its benchmark capacity.

[0078] if F(i) = 1, it means that the actual capacity of the production unit (after adjustment by the capacity factor) is exactly equal to its benchmark capacity.

[0079] if F(i) < 1, it means that the actual capacity of the production unit (after adjustment for the capacity factor) is lower than its benchmark capacity.

[0080] If the result of obtaining a production unit is F(i) < 1, the results can be fed back to the management personnel to adjust the equipment, personnel and other data configurations of the corresponding production unit.

[0081] Step S105, execute the furniture production task to be executed according to the target production allocation plan. Specifically, the production allocation plan sets the specific work to be done at a certain node of a certain production process, and the production task can be completed only according to the production allocation plan.

[0082] The Internet-based automatic matching method for furniture production tasks provided in this embodiment can deconstruct the rules based on the rule parser according to the relevant rule requirements selected by the user, automatically distribute the wooden furniture production tasks in combination with the relevant evaluation and constraints, generate multiple feasible production distribution plans, and select the most suitable production distribution plan. The Internet-based automatic matching method for furniture production tasks provided in this embodiment can ensure that the production tasks are distributed in a timely and accurate manner, avoiding the problems of task duplication, task delay, task loss, etc. caused by manual operation. At the same time, the production and manufacturing process of the furniture manufacturing enterprise can be made more efficient and intelligent, thereby improving production efficiency and reducing costs. In addition, compared with the rule-based matching method, the method of the present invention can output and generate more dimensional matching solutions and has the ability to optimize rules. Compared with the matching method based on the optimization algorithm, the method of the present invention can have stronger adaptability and generalization ability, and has more automation ability and flexibility. Compared with the matching method based on machine learning, the method of the present invention can explain the corresponding rules more clearly and has higher stability and reliability.

[0083] In addition, the automatic matching method for furniture production tasks provided in this embodiment can also prevent the imbalanced task allocation that may occur in the task allocation process in the prior art, or the situation where some tasks are assigned to a designated device and then found that the device cannot process and execute them.

[0084] In an optional implementation, the Internet-based automatic matching method for furniture production tasks provided in this embodiment also includes: dynamically evaluating the results of executing the target production allocation plan according to a preset evaluation system; regenerating a new production allocation plan when the results of executing the target production allocation plan no longer meet the preset evaluation system; and continuing to execute the furniture production tasks to be executed according to the new production allocation plan. Specifically, the aforementioned evaluation method can be used to dynamically evaluate the results in execution, or the management personnel can appropriately adjust the evaluation method according to the progress of execution. By monitoring the matching rules and the matching plan generation process and results, abnormal situations of the matching plan can be quickly discovered, and the subsequent feedback of the execution results is to intuitively present the allocation method and execution results of the entire task to the management personnel and operators in a visual manner, so that the management personnel and operators can promptly discover related problems and make targeted improvements and controls.

[0085] This embodiment also provides an Internet-based furniture production task automatic matching system, which is used to execute the above-mentioned Internet-based furniture production task automatic matching method. The technical features already described in the method section will not be repeated here, and only the system architecture will be explained. Figure 2 As shown, the furniture production task automatic matching system 20 includes:

[0086] The task acquisition module 201 is used to obtain furniture production tasks to be executed; specifically, the user can input specific furniture production tasks to the system through control methods such as text or voice. For example, the task acquisition module 201 can have a visual interface, through which task requirements can be input, such as producing 1,000 cherry wood round dining tables and other specific tasks expressed in words; the user can also determine the furniture production tasks to be executed by selecting the rule element information required for furniture production task allocation. The rule element can include the required number of production equipment, the number of tasks to be completed, the production capacity of the production equipment, etc., so as to standardize and quantify specific furniture production tasks.

[0087] The matching rule module 202 is used to determine the matching rules corresponding to the furniture production tasks to be executed based on the furniture production tasks to be executed and the production task matching rules; specifically, the production task matching rules limit all possible rules of all furniture production processes, and the matching rules corresponding to the furniture production tasks to be executed refer to the specific rules required for the current furniture production tasks, which do not necessarily include all production task matching rules. By presetting the production task matching rules, and then establishing the matching rules corresponding to the specific furniture production tasks based on the production task matching rules, a high-availability data model that fits the actual production operations of the enterprise can be established, and the production execution task plan can be generated in combination with the data generated in the production activities, so as to obtain the information in the production execution process in the future to perform execution prediction analysis on the generated production task plan, and the analysis results are fed back to the operators through prediction analysis to achieve the effect of preparing for a rainy day.

[0088] In an optional implementation, the production task matching rules include: furniture product type, furniture manufacturing process, furniture manufacturing equipment, storage material information, etc., and other matching rules established by the management requirements of the furniture manufacturing enterprise. By listing the furniture type, manufacturing process, etc. that are specifically related to furniture manufacturing as production task matching rules, it is helpful to automatically match furniture production tasks.

[0089] In an optional implementation, the matching rules corresponding to the furniture production tasks to be executed are determined in the following manner: rule elements are established for the matching rules corresponding to the furniture production tasks to be executed, and the rule element refers to an independent rule unit of a single production process node in the furniture production task; the rule factor constraints of the rule element are extracted into algorithm factors according to the preset algorithm model, wherein the rule factor is the rule element constituting the rule element; it is determined whether the various algorithm factor constraints of the rule element meet the corresponding preset requirements, and if so, the rule element is retained in the matching rules corresponding to the furniture production tasks to be executed. By establishing rule elements related to each production process node and combining data models and algorithm models to conduct a comprehensive analysis of the subtleties of production operations, it is helpful to strengthen the activity execution method and make an execution plan that matches the execution process before and after the production task.

[0090] The parsing module 203 is used to parse the matching rules corresponding to the furniture production tasks to be executed by using the preset rule parsing system, match the corresponding order resources according to the parsing results, and generate a production distribution plan that meets the requirements of the furniture production tasks to be executed; specifically, the preset rule parsing system in this embodiment can be set in a rule parser, which can be implemented by a software program or implanted into the system, and its main function is to parse the set rule functions, rule models, etc. into a structure form that can be executed by the system. Through the rule parser of the preset rule parsing system, the meaning of the rules can be identified more accurately, and the required data resources can be matched quickly and accurately, which improves the automatic matching accuracy of wooden furniture production tasks, improves the efficiency of production task allocation, and thus improves the overall production efficiency.

[0091] In an optional embodiment, the function of the parsing module 203 is completed in the following manner: using a rule parser to parse and obtain the matching rules corresponding to the furniture production task to be executed; matching the order resources that meet the furniture production task to be executed according to the matching rules; matching the required production resources according to the type of order resources, and generating a production allocation plan that meets the requirements of the furniture production task to be executed. Specifically, an order can refer to an order included in the furniture production task to be executed. The difference between an order and a production task is that an order should also have relevant requirements and documents, such as raw material requirements, processing documents, etc. A furniture production task to be executed can contain multiple orders, and an order can also be disassembled into multiple furniture production tasks to be executed. Therefore, order resources refer to the raw material data, processing technology data, processing file data and other resources required by the order to be executed during the production execution process, and are divided into different resource types according to the different types of these resources (correspondingly, the resource type can include raw material type, processing file type, processing technology type, etc.). Production resources refer to the production and processing equipment, manpower and other resource types contained in the process node in production, for example, the electronic cutting saw of the cutting node.

[0092] Evaluation module 204 is used to evaluate the production allocation plan according to a preset evaluation system and determine the target production allocation plan according to the evaluation results; specifically, to determine whether the production allocation plan generated according to the matching rules meets the production execution requirements of the current furniture production task, it is necessary to establish an evaluation function to decide whether to retain the generated results. By discarding the results with low scores through the evaluation function, the system's calculation amount and the number of result sets can be reduced, and the production allocation plan that best meets the production execution requirements in the result set can be quickly and accurately obtained, helping enterprises to realize the intelligence of production activities.

[0093] In an optional implementation, the production distribution plan is evaluated according to a preset evaluation system, and the target production distribution plan is determined according to the evaluation results, including: establishing constraints according to the production task matching rules; screening the production distribution plans that meet the constraints in the production distribution plan; obtaining corresponding evaluation rules according to the production distribution plans and constraints that meet the constraints; and determining the target production distribution plan according to the evaluation rules. Specifically, the constraints can be established according to different production tasks, or according to the management needs of different enterprises. By establishing constraints, the production matching plan can be customized. For example, if a certain production node of an enterprise has multiple identical production equipment, if the set production plan makes the load time of a single equipment much higher than other equipment, on the one hand, it may lead to an extension of the time to complete the production plan, and on the other hand, it will cause excessive wear of a certain equipment, which is not conducive to the rational use of resources of the production enterprise. In view of this, some constraints can be determined according to the production task matching rules, and the constraints can be fully considered when evaluating the production distribution plan, so as to select the most reasonable production distribution plan.

[0094] The execution module 205 is used to execute the furniture production tasks to be executed according to the target production allocation plan. Specifically, the production allocation plan sets the specific work to be done at a certain node of a production process, and the production task can be completed only according to the production allocation plan.

[0095] The Internet-based furniture production task automatic matching system provided by the present embodiment can deconstruct the rules based on the rule parser according to the relevant rule requirements selected by the user, automatically distribute the wooden furniture production tasks in combination with the relevant evaluation and constraints, generate multiple feasible production distribution plans, and select the most suitable production distribution plan. The Internet-based furniture production task automatic matching system provided by the present embodiment can ensure that the production tasks are distributed in a timely and accurate manner, avoiding the problems of task duplication, task delay, task loss, etc. caused by manual operation. At the same time, the production and manufacturing process of the furniture manufacturing enterprise can be made more efficient and intelligent, thereby improving production efficiency and reducing costs. In addition, compared with the rule-based matching method, the method of the present invention can output and generate more dimensional matching solutions and has the ability to optimize rules. Compared with the matching method based on the optimization algorithm, the method of the present invention can have stronger adaptability and generalization ability, and has more automation ability and flexibility. Compared with the matching method based on machine learning, the method of the present invention can explain the corresponding rules more clearly and has higher stability and reliability.

[0096] In addition, the furniture production task automatic matching system provided in this embodiment can also prevent the imbalanced task allocation that may occur in the task allocation process in the prior art, or the situation where some tasks are assigned to a designated device and then found that the device cannot process and execute them.

[0097] In an optional embodiment, the system also includes: a dynamic monitoring module 206, which is used to dynamically evaluate the results of executing the target production allocation plan according to a preset evaluation system, and regenerate a new production allocation plan when the results of executing the target production allocation plan no longer meet the preset evaluation system; an execution module 205, which is also used to continue to execute the furniture production tasks to be executed according to the new production allocation plan. Specifically, the aforementioned evaluation method can be used to dynamically evaluate the results in execution, and the evaluation method can also be appropriately adjusted by the management personnel according to the progress of the execution. By monitoring the matching rules and the matching plan generation process and results, the abnormal situation of the matching plan can be quickly discovered, and the subsequent feedback of the execution results is to intuitively present the allocation method and execution results of the entire task to the management personnel and operators in a visual way, so that the management personnel and operators can promptly discover related problems and make targeted improvements and controls.

[0098] This embodiment also provides a terminal 30, such as Figure 3 As shown, the terminal 30 includes a memory 301, a processor 302, and a computer program 303 stored in the memory 301 and executable on the processor 302, for example, a program for implementing the aforementioned automatic matching method for furniture production tasks. The processor 302 executes the computer program 303 to implement the steps in each embodiment of the aforementioned automatic matching method for furniture production tasks.

[0099] Exemplarily, the computer program 303 may be divided into one or more modules, one or more modules are stored in the memory 301, and are executed by the processor 302 to complete the present application. One or more modules may be a series of computer program instruction segments capable of completing specific functions, and the instruction segments are used to describe the execution process of the computer program 303 in the terminal device 30. The terminal device 30 may include, but is not limited to, a processor 301 and a memory 302.

[0100] In the description of the embodiments of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "center", "top", "bottom", "top", "bottom", "inside", "outside", "inner side", "outer side" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Among them, "inside" refers to an internal or enclosed area or space. "Periphery" refers to the area surrounding a specific component or a specific area.

[0101] In the description of the embodiments of the present invention, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0102] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", and "assemble" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0103] In the description of the embodiments of the present invention, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.

[0104] In the description of the embodiments of the present invention, it should be understood that "-" and "~" represent the range between two values, and the range includes the endpoints. For example: "AB" represents a range greater than or equal to A and less than or equal to B. "A~B" represents a range greater than or equal to A and less than or equal to B.

[0105] In the description of the embodiments of the present invention, the term "and / or" herein is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " herein generally indicates that the associated objects before and after are in an "or" relationship.

[0106] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The automatic matching method of furniture production tasks based on the Internet is characterized by: include: Get the furniture production tasks to be executed; Determine the matching rule corresponding to the furniture production task to be executed according to the furniture production task to be executed and the production task matching rule, wherein the production task matching rule is established in the following manner: create modular rules according to furniture product type, furniture manufacturing process, furniture manufacturing equipment, storage material information and furniture manufacturing enterprise management requirements, and the modular rules correspond to the production task matching rules required by a production line, a production workshop or a factory; Analyze the matching rules corresponding to the furniture production task to be executed by using a preset rule analysis system, match the corresponding resource data according to the analysis result, and generate a production allocation plan that meets the requirements of the furniture production task to be executed; Evaluate the production allocation plan according to a preset evaluation system, and determine the target production allocation plan according to the evaluation results; Executing the furniture production task to be executed according to the target production allocation plan; Wherein, after determining the matching rule step corresponding to the furniture production task to be executed according to the furniture production task to be executed and the production task matching rule, the Internet-based furniture production task automatic matching method further includes: The matching rules corresponding to the furniture production task to be executed are respectively used to establish rule elements, wherein the rule element refers to an independent rule unit of a single production process node in the furniture production task; Extracting the rule factor constraints of the rule element into algorithm factors according to a preset algorithm model, wherein the rule factor is a rule element constituting the rule element; It is determined whether the constraints of various algorithm factors of the rule element meet the corresponding preset requirements. If so, the rule element is retained in the matching rule corresponding to the furniture production task to be executed.

2. The method according to claim 1, characterized in that: The matching rules corresponding to the furniture production task to be executed are parsed by using the preset rule parsing system, and the corresponding resource data are matched according to the parsing result to generate a production allocation plan that meets the requirements of the furniture production task to be executed, including: Using a rule parser to parse and obtain a matching rule corresponding to the furniture production task to be executed; Matching order resources that meet the furniture production task to be executed according to the matching rules; The required production resources are matched according to the type of the order resources to generate a production allocation plan that meets the requirements of the furniture production task to be executed.

3. The method according to claim 2, characterized in that Matching the required production resources according to the type of the order resources to generate a production allocation plan that meets the requirements of the furniture production task to be executed, including the following steps: Calculate the total production capacity of a single production resource: ; in, T Represents the total production capacity of a single production resource, N Indicates the total number of production units corresponding to a single production resource, C i Indicates the representative i The capacity coefficient of the production unit, E i Representative i the base capacity of the production unit; Determining whether the production resource can match the maximum production quantity of the corresponding order resource according to the total production capacity of the production resource; If yes, the total number of furniture to be produced corresponding to the furniture production task to be executed is P Assigned to each of the production units, the corresponding production allocation plan is calculated by the following formula: ; in, P i Indicates i The quantity to be produced to which the production unit should be allocated.

4. The method according to claim 1, characterized in that: The production allocation plan is evaluated according to a preset evaluation system, and a target production allocation plan is determined according to the evaluation result, including: Establishing constraint conditions according to the production task matching rules; Screening the production allocation plans that meet the constraint conditions among the production allocation plans; Acquire corresponding evaluation rules according to the production allocation plan that meets the constraint conditions and the constraint conditions; The target production allocation plan is determined according to the evaluation rules.

5. The method according to claim 1, characterized in that The method further comprises: Dynamically evaluating the results of executing the target production allocation plan according to the preset evaluation system; When the result of executing the target production allocation plan no longer satisfies the preset evaluation system, a new production allocation plan is regenerated; Continue to execute the furniture production tasks to be executed according to the new production allocation plan.

6. The Internet-based furniture production task automatic matching system is characterized by: include: A task acquisition module is used to acquire furniture production tasks to be executed; A matching rule module is used to determine the matching rule corresponding to the furniture production task to be executed according to the furniture production task to be executed and the production task matching rule, and respectively establish rule elements for the matching rule corresponding to the furniture production task to be executed, wherein the rule element refers to an independent rule unit of a single production process node in the furniture production task; extract the rule factor constraint of the rule element into an algorithm factor according to a preset algorithm model, wherein the rule factor is a rule element constituting the rule element; determine whether each algorithm factor constraint of the rule element meets the corresponding preset requirements, and if so, retain the rule element in the matching rule corresponding to the furniture production task to be executed; The production task matching rules are established in the following manner: modular rules are created according to furniture product types, furniture manufacturing processes, furniture manufacturing equipment, storage material information, and furniture manufacturing enterprise management requirements, and the modular rules correspond to the production task matching rules required for a production line, a production workshop, or a factory; A parsing module, used to parse the matching rules corresponding to the furniture production task to be executed by using a preset rule parsing system, match the corresponding order resources according to the parsing results, and generate a production allocation plan that meets the requirements of the furniture production task to be executed; An evaluation module, used to evaluate the production allocation plan according to a preset evaluation system, and determine a target production allocation plan according to the evaluation result; An execution module is used to execute the furniture production tasks to be executed according to the target production allocation plan.

7. The system according to claim 6, characterized in that The system further comprises: a dynamic monitoring module, configured to dynamically evaluate the result of executing the target production allocation plan according to the preset evaluation system, and to regenerate a new production allocation plan when the result of executing the target production allocation plan no longer satisfies the preset evaluation system; The execution module is also used to continue executing the furniture production tasks to be executed according to the new production allocation plan.

8. A terminal comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.