A quantitative analysis method for port leakage risk of bulk chemical tankers
By constructing accident tree model, event tree model and Bayesian network model, the risk factors and consequences of chemical ship port leakage are analyzed, and the shortcomings of chemical ship port leakage risk analysis in the existing technology are solved, and different operations are achieved Scientific assessment and effective prevention and control of leakage risks during the process.
Patent Information
- Application Number
- CN202411088053.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-09
AI Technical Summary
When analyzing the risk of leakage of chemical ships at ports, the prior art ignores other operating processes except loading and unloading and relocation processes, and it is difficult to intuitively reflect the impact of risk factors on the consequences of the accident, and cannot effectively guide risk prevention and control.
Using a combination method based on the accident tree model, event tree model and Bayesian network model, a risk analysis model for port leakage of bulk chemical ships is constructed, and the failure probability of accidents and consequences is determined through logical reasoning and fuzzy logic, and the failure probability of accidents and consequences is identified in different operating processes. The main risk factors and consequences of leakage.
Provide scientific and effective analysis methods for chemical ship port leakage risks, identify the most affected accident risk factors in different operational processes, and provide decision-making support for ship management and port safety management, improving the targeted nature of risk prevention and control and effectiveness.
Smart Images

Figure CN118628001B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of fully automated products and relates to a method for quantitatively analyzing the port leakage risk of bulk chemical ships. Background Art
[0002] With the increase in the amount of chemical transported at sea, chemical leakage accidents are also constantly occurring. Chemical tanker leakage accidents at ports often cause immeasurable loss of life and property and unpredictable environmental pollution problems. If fires and explosions are caused by the leakage of dangerous chemicals, the scope of the accident will be further expanded, causing huge losses.
[0003] Existing technologies for analyzing port leakage risks focus more on loading and unloading, berthing and unberthing processes, ignoring the risks of other operational processes and the assessment of accident consequences. The risk assessment conclusions cannot fully reflect the actual risk level. In addition, the relevant evaluation methods cannot intuitively reflect the impact of risk factors on risk targets, making it difficult to guide risk prevention and control. Summary of the invention
[0004] In order to solve the above problems, the technical solution adopted by the present invention is: a method for quantitatively analyzing the port leakage risk of bulk chemical ships, comprising the following steps:
[0005] Step 1: Based on the identified risk factors and consequences of leakage accidents of bulk chemical tankers during port operations, an accident tree model of leakage risk during bulk chemical tanker operations in port is constructed;
[0006] Step 2: Construct an event tree model for bulk chemical tanker port leakage;
[0007] Step 3: Combine the accident tree model of the leakage risk of bulk chemical tankers in port operations with the bulk chemical tanker port leakage event tree to construct a bowtie model of bulk chemical tanker port leakage accidents;
[0008] Step 4: Convert the bowtie model of bulk chemical tanker port leakage accident into a Bayesian network model of bulk chemical tanker port leakage accident;
[0009] Step 5: Conduct risk quantification analysis based on the Bayesian network model of bulk chemical tanker port leakage accidents; determine the failure probability of bulk chemical tanker port leakage accidents and consequences.
[0010] Furthermore: the port operation process includes loading and unloading operations, navigation operations within the port, berthing and unberthing operations, and anchoring operations.
[0011] Furthermore, the accident tree model of leakage risk of bulk chemical ships in port operations includes a leakage accident tree model for bulk chemical ships loading and unloading operations, a leakage accident tree model for bulk chemical ships sailing in port, a leakage accident tree model for bulk chemical ships berthing and unberthing operations, and a leakage accident tree model for bulk chemical ships during anchoring.
[0012] Further: the construction method of the bulk chemical ship loading and unloading operation leakage accident tree model, the bulk chemical ship navigation operation leakage accident tree model, the bulk chemical ship berthing and unberthing operation leakage accident tree model and the bulk chemical ship anchoring period leakage accident tree model are the same; the construction process of the bulk chemical ship loading and unloading operation leakage accident tree model is as follows:
[0013] Based on the accident tree theory, logical deduction reasoning is carried out to logically arrange the risk factors leading to bulk chemical tanker loading and unloading operations layer by layer until the vertical analysis level of the accident tree reaches the basic event position.
[0014] Taking the bulk chemical tanker loading and unloading leakage accident M1 as the top event, the fuzzy fault tree method is used to determine the intermediate events and basic events that lead to the bulk chemical tanker loading and unloading leakage accident M1.
[0015] The accident tree model of leakage in bulk chemical tanker loading and unloading operations is determined through logical reasoning among top events, intermediate events and basic events.
[0016] Further: the bulk chemical tanker port leakage event tree model includes the following event types: initial event, dangerous event and final event;
[0017] Among them, the initial events are: bulk chemical tanker port leakage A;
[0018] Dangerous events are: failure to discover in time B, flammable and explosive cargo C, failure of fire protection system D, incomplete life-saving facilities E;
[0019] The final events are: safety, environmental damage, property loss, major property loss, and casualties.
[0020] Further: the process of performing risk quantification analysis based on the Bayesian network model of bulk chemical ship port leakage accident and determining the failure probability of bulk chemical ship port leakage accident and its consequences is as follows:
[0021] Fuzzy logic and expert elicitation methods are used to quantify the failure frequencies of all basic and hazardous events;
[0022] The similarity aggregation method is used to aggregate the experts' judgments into a single fuzzy set to determine the failure probability of bulk chemical tanker port leakage accidents and consequences.
[0023] Further: the process of aggregating the expert's judgment into a single fuzzy set using the similarity aggregation method to determine the failure probability of bulk chemical tanker port leakage accidents and consequences is as follows:
[0024] The total number of experts is M, and the expert judgment aggregation steps are as follows:
[0025] (1) Estimate the consistency of each pair of experts p and q;
[0026] (2) Calculate the average agreement of experts;
[0027] (3) Calculate the relative agreement R of experts;
[0028] (4) Calculate the expert consensus coefficient C;
[0029] (5) Summarize the expert judgment results;
[0030] (6) The brittleness value obtained after defuzzification is converted into failure probability, that is, the probability of occurrence of basic events and dangerous events, which is then converted into the prior probability of the root node in the Bayesian network model of bulk chemical tanker port leakage accidents;
[0031] (7) Update the conditional probability table of the intermediate nodes in the Bayesian network model of bulk chemical tanker port leakage accidents with reference to expert opinions, thereby updating the risks;
[0032] (8) Based on the modified conditional probability table and the operating principles of the accident tree model of the leakage risk of bulk chemical tankers during port operations, the event tree model of bulk chemical tanker port leakage and the Bayesian network model of bulk chemical tanker port leakage accidents, the risk value of bulk chemical tanker port leakage and the probability of occurrence of accident consequences caused by different dangerous events can be calculated.
[0033] The invention provides a method for quantitatively analyzing the risk of bulk chemical tanker port leakage, which has the following advantages: the invention conducts risk analysis on different operation processes of chemical tankers in port, determines the risk factors that have the greatest impact on leakage accidents in different operation processes, and evaluates different accident consequences. The method provides a scientific and effective new method and new approach for bulk chemical tanker port leakage risk identification and consequence analysis, and provides effective theory and decision-making support for risk assessment and safety management of ship managers, port managers, and company safety and environmental departments. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0035] Figure 1 is a flow chart of the method;
[0036] Figure 2 It is the accident tree model diagram of leakage in bulk chemical tanker loading and unloading operation;
[0037] Figure 3 It is the accident tree model diagram of leakage of bulk chemical tanker during navigation operation in the port;
[0038] Figure 4 It is the accident tree model diagram of leakage of bulk chemical tanker during berthing and unberthing operation;
[0039] Figure 5 This is the accident tree model diagram of a bulk chemical tanker leaking during anchoring;
[0040] Figure 6 It is the event tree model diagram of bulk chemical tanker port leak;
[0041] Figure 7 This is a bow-tie model diagram of a bulk chemical tanker port spill accident;
[0042] Figure 8 It is a diagram of the Bayesian model of leakage in bulk chemical tanker loading and unloading operations;
[0043] Fig. 9 It is a Bayesian network model diagram of leakage during navigation operation of bulk chemical tanker in port;
[0044] Fig.10 It is a Bayesian network model diagram of leakage of bulk chemical tanker at berthing and unberthing operation;
[0045] Fig.11 It is a Bayesian network model diagram of leakage during anchoring of bulk chemical tanker;
[0046] Fig.12 This is the BN model diagram for bulk chemical tanker port leakage accident;
[0047] Fig.13 It is the basic structure of the event tree and the probability calculation diagram. DETAILED DESCRIPTION
[0048] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0049] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] Figure 1 is a flow chart of the method;
[0051] A method for quantitatively analyzing the risk of bulk chemical tanker port leakage comprises the following steps:
[0052] Step 1: Based on the identified risk factors and consequences of leakage accidents of bulk chemical tankers in port operations, an accident tree model of leakage risk during bulk chemical tanker operations in port is constructed; the port operations include loading and unloading operations, navigation operations in the port, berthing and unberthing operations, and anchoring operations.
[0053] Step 2: Construct an event tree model for bulk chemical tanker port leakage;
[0054] Step 3: Combine the accident tree model of the leakage risk of bulk chemical tankers in port operations with the bulk chemical tanker port leakage event tree to construct a bowtie model of bulk chemical tanker port leakage accidents;
[0055] Step 4: Convert the bowtie model of bulk chemical tanker port leakage accident into a Bayesian network model of bulk chemical tanker port leakage accident;
[0056] Step 5: Conduct risk quantification analysis based on the Bayesian network model of bulk chemical tanker port leakage accidents; determine the failure probability of bulk chemical tanker port leakage accidents and consequences.
[0057] Step 1, step 2, step 3, step 4 and step 5 are performed in sequence;
[0058] Furthermore, the identification of risk factors and consequences of leakage accidents occurring during the loading and unloading, berthing, anchoring and port navigation of bulk chemical ships includes the following steps:
[0059] Firstly, through the bulk chemical tanker port leakage accident report data and relevant research materials, the object of risk quantitative analysis was determined to be "bulk chemical tanker port leakage accident".
[0060] Due to the dangerous characteristics of bulk chemical tankers and operational requirements, the port operation process of bulk chemical tankers is divided into loading and unloading at port, berthing and unberthing, anchoring and port navigation operations.
[0061] Through in-depth research on relevant historical data and combined with expert opinions, the risk factors that lead to leakage accidents in different operation processes of bulk chemical tankers in ports and the dangerous factors that lead to different accident consequences are identified.
[0062] The identified risk factors for leakage accidents of bulk chemical tankers during port operations include:
[0063] M5: Human factors, M6: Ship and equipment factors, M7: Environmental factors, M8: Management factors, M9: Cargo factors, M 10 :Knowledge and skills factors, M 11 :Crew quality factors, M 12 :Physiological factors, M 13 :Ship structure factor, M 14 : Equipment factor, M 15 : Meteorological factors, M 16 :Hydrological factors, M 17 :Crew Management Factors, M 18 : Cargo handling factor, M 19 :Cargo nature factors, M 20 :Lack of operational knowledge, M 21 :Lack of operational skills, M 22 :Loading and unloading equipment failure, M 23 :Improper operation, M 24 :Topographic factors, M 25 : Port waters factors;
[0064] X1: poor business level, X2: poor communication, X3: unfamiliar with the nature of the cargo, X4: operational errors, X5: irregular sweeping operations, X6: improper flat operations, X7: improper sampling operations, X8: illegal operations, X9: poor safety awareness, X 10 :For personal protective equipment, X 11 : Lack of professional responsibility, X 12 : Improper duty, X 13 :Staff fatigue, X 14 : Lack of concentration, X 15 :Older ship, X 16 :The ship type is not suitable for installation, X 17:Cargo holds and fixed pipelines have inherent defects such as sand holes, X 18 :The structural strength is not high, X 19 :Valve pipeline failure, X 20 :Pump system failure, X 21 :Monitoring alarm system failure, X 22 : Cargo hose is in poor condition or inherently defective, X 23 :Protective equipment is not perfect, X 24 : Lightning, X 25 : Strong wind, X 26 :Large temperature difference, X 27 :Tsunamis, earthquakes, etc. cause short-term dramatic rise and fall of sea levels, 28 : Heavy fog, snow and other poor visibility weather, X 29 :High flow rate, X 30 : The tidal range is large and the pipelines and cables are not adjusted in time, X 31 : Personnel management is chaotic, X 32 :The personnel have not received effective training, X 33 : Rules and regulations are not standardized, X 34 :Inadequate equipment maintenance, X 35 :Improper cargo stowage, X 36 :Improper loading and unloading sequence, X 37 : Improper heating / cooling of cargo, X 38 : Loading goods not listed in the sudden personal certificate, X 39 :The cargo is corrosive, X 40 :Cargo reacts with water, X 41 :The ship has a large tonnage, X 42 :Ship equipment failure, X 43 :The channel is narrow, X 44 : The channel is shallow”, X 45 : The traffic density is high and the ship is hit by other ships, X 46 : The berth location is unreasonable, X 47 : The navigation facilities and equipment are not perfect;
[0065] The consequences of the identified risk factors of leakage accidents of bulk chemical tankers during port operations are: safety, environmental damage, property loss, major property loss, and casualties;
[0066] The accident tree model of leakage risk during bulk chemical ship operation in port includes a leakage accident tree model for bulk chemical ship loading and unloading operation, a leakage accident tree model for bulk chemical ship navigation operation in port, a leakage accident tree model for bulk chemical ship berthing and unberthing operation, and a leakage accident tree model for bulk chemical ship during anchoring;
[0067] The construction methods of the leakage accident tree model for bulk chemical ship loading and unloading operations, the leakage accident tree model for bulk chemical ship navigation operations in the port, the leakage accident tree model for bulk chemical ship berthing and unberthing operations, and the leakage accident tree model for bulk chemical ship during anchoring are the same;
[0068] Figure 2 It is the accident tree model diagram of leakage in bulk chemical tanker loading and unloading operation;
[0069] The construction process of the bulk chemical ship loading and unloading leakage accident tree model is as follows:
[0070] Based on the accident tree theory, logical deduction reasoning is carried out to logically arrange the risk factors leading to bulk chemical tanker loading and unloading operations layer by layer until the vertical analysis level of the accident tree reaches the basic event position.
[0071] Taking the bulk chemical tanker loading and unloading leakage accident M1 as the top event, the fuzzy fault tree method is used to determine the intermediate events and basic events that lead to the bulk chemical tanker loading and unloading leakage accident M1.
[0072] The accident tree model of leakage in bulk chemical tanker loading and unloading operations is determined through logical reasoning among top events, intermediate events and basic events.
[0073] The accident tree model for leakage during loading and unloading of bulk chemical ships, the accident tree model for leakage during navigation in the port, the accident tree model for leakage during berthing and unberthing of bulk chemical ships, and the accident tree model for leakage during anchoring of bulk chemical ships have the same structure, and all include top events, intermediate events, and basic events.
[0074] The accident tree model for leakage during loading and unloading of bulk chemical ships, the accident tree model for leakage during navigation of bulk chemical ships in port, the accident tree model for leakage during berthing and unberthing of bulk chemical ships, and the accident tree model for leakage during anchoring of bulk chemical ships are based on the first lower event of the top event respectively;
[0075] Take the 1st lower-level event as the 1st result event, output the conditional event of the 1st result event, take the conditional event as the 2nd lower-level event of the 1st lower-level event, and deduce layer by layer until the nth lower-level event is taken as the nth result event. If the conditional event of the nth result event cannot be output, then the nth lower-level event is the basic event, and the 1st lower-level event to the n-1th lower-level event are intermediate events.
[0076] The top event of the bulk chemical tanker loading and unloading leakage accident tree model is:
[0077] M1: Leakage accident during loading and unloading of bulk chemicals on board a tanker;
[0078] The intermediate events of the bulk chemical tanker loading and unloading leakage accident tree model are:
[0079] M5: Human factors, M6: Ship and equipment factors, M7: Environmental factors, M8: Management factors, M9: Cargo factors; M10: Knowledge and skills factors, M11: Crew quality factors, M12: Physiological factors, M13: Ship structure factors, M15: Meteorological factors, M14: Equipment factors, M16: Hydrological factors, M17: Crew management factors, M18: Cargo operation factors, M19: Cargo nature factors, M20: Lack of operation knowledge, M21: Lack of operation skills;
[0080] The basic events of the bulk chemical tanker loading and unloading leakage accident tree model are:
[0081] X1: Poor business level, X2: Poor communication, X3: Unfamiliar with the nature of the cargo, X4: Operational errors, X5: Irregular tank sweeping operations, X6: Improper flat operations, X7: Improper sampling operations, X8: Illegal operations, X9: Poor safety awareness, X10: For personal protective equipment, X11: Lack of professional responsibility, X12: Improper duty, X13: Staff fatigue, X14: Lack of concentration, X15: Older ship, X16: Unsuitable ship type, X17: Inherent defects such as sand holes in cargo holds and fixed pipelines, X18: Low structural strength, X19: Valve pipeline failure, X20: Pump system failure, X21: Monitoring and alarm system failure, X22: Cargo hose is in poor condition or has inherent defects, X23: Incomplete protective equipment, X24: Lightning, X25: Strong wind, X26: : Large temperature difference, X27: Short-term dramatic rise and fall of sea level caused by tsunamis, earthquakes, etc., X28: Weather with poor visibility such as fog and snowfall, X29: Large flow rate, X30: Failure to adjust pipelines and cables in time due to large tidal range, X31: Chaotic personnel management, X32: Personnel have not been effectively trained, X33: Irregular rules and regulations, X34: Inadequate equipment maintenance, X35: Improper cargo stowage, X36: Improper loading and unloading sequence, X37: Improper cargo heating / cooling, X38: Loading cargo not included in the personal certificate, X39: Cargo is corrosive, X40: Cargo reacts with water;
[0082] Further, by logically reasoning the intermediate events and basic events of the leakage accident tree model of the bulk chemical ship loading and unloading operation, the leakage accident tree model of the bulk chemical ship navigation operation in the port is determined;
[0083] The bulk chemical ship loading and unloading operation leakage accident tree model connects the top event, the basic event and the basic event through the logic gate to establish the bulk chemical ship loading and unloading operation leakage accident tree model, wherein the following are connected through the logic OR gate:
[0084] X 31, X 32 Connect M 17 ;
[0085] M 17 , X 33 , X 34 Connect M8 separately;
[0086] X 15 , X 16 , X 17 , X 18 Connect M 13 ;
[0087] X 19 , X 20 , X 21 Connect M 22 ;
[0088] X1, X2, and X3 are connected to M 20 ;
[0089] X5, X6, and X7 are connected to M 23 ;
[0090] X4, X8, M 23 Connect M 21 ;
[0091] X9, X 10 , X 11 , X 12 Connect M 11 ;
[0092] X 13 , X 14 Connect M 12 ;
[0093] X 24 , X 25 , X 26 , X 27 , X 28 Connect M 15 ;
[0094] X 29 , X 30 Connect M 16 ;
[0095] X 35 , X 36 , X 37 , X 38 Connect M 18 ;
[0096] X 39 , X 40 Connect M19 ;
[0097] M 13 , M 14 Connect M6 separately;
[0098] M 10 、M 11 , M 12 Connect M5 respectively;
[0099] M 15 , M 16 Connect M7 respectively;
[0100] M 18 , M 19 Connect M9 respectively;
[0101] M9, M 8、 M 5、 M 6、 M7 is connected to M1 respectively;
[0102] The following are connected via the AND gate:
[0103] M 22 , X 22 , X 23 Connect M8 separately;
[0104] M 20 、M 21 Connect M 10 ;
[0105] Figure 3 It is the accident tree model diagram of leakage of bulk chemical tanker during navigation operation in the port;
[0106] The top event of the accident tree model for leakage of bulk chemical ships in port navigation is:
[0107] M2: Bulk chemical tanker leakage accident during navigation operation in the port;
[0108] The intermediate events of the accident tree model for leakage of bulk chemical ships during navigation in the port are:
[0109] M5: Human factors, M6: Vessel and equipment factors, M7: Environmental factors, M8: Management factors, M9: Cargo factors; 10 :Knowledge and skills factors, M 11 :Crew quality factors, M 12 :Physiological factors, M 13 :Ship structure factor, M 15 : Meteorological factors, M 14 : Equipment factor, M 16 :Hydrological factors, M 17:Crew Management Factors, M 18 : Cargo handling factor, M 19 :Cargo nature factors, M 20 :Lack of operational knowledge, M 21 : Lack of operational skills;
[0110] The basic events of the accident tree model for leakage of bulk chemical ships in port navigation are: X1: poor business level, X2: poor communication, X3: unfamiliarity with the nature of the cargo, X4: operational errors, X7: improper sampling operations, X8: illegal operations, X9: poor safety awareness, X10: poor safety awareness, X11: poor business level, X12: poor communication, X13: unfamiliarity with the nature of the cargo, X14: operational errors, X15: improper sampling operations, X16: illegal operations, X17: poor safety awareness, X18: poor safety awareness, X19: poor safety awareness, X20: poor communication, X21: poor communication, X22: poor communication, X23: poor communication, X24: poor communication, X25: poor communication, X26: poor communication, X27: poor communication, X28: poor communication, X29: poor communication, X30: poor communication, X31: poor communication, X32: poor communication, X33: poor communication, X34: poor 11 : Lack of professional responsibility, X 12 : Improper duty, X 13 :Staff fatigue, X 14 : Lack of concentration, X 15 :Older ship, X 17 :Cargo holds and fixed pipelines have inherent defects such as sand holes, X 18 :The structural strength is not high, X 24 : Lightning, X 25 : Strong wind, X 26 :Large temperature difference, X 27 :Tsunamis, earthquakes, etc. cause short-term dramatic rise and fall of sea levels, 28 : Heavy fog, snow and other poor visibility weather, X 29 :High flow rate, X 30 : The tidal range is large and the pipelines and cables are not adjusted in time, X 31 : Personnel management is chaotic, X 32 :The personnel have not received effective training, X 33 : Rules and regulations are not standardized, X 36 :Improper loading and unloading sequence, X 37 : Improper heating / cooling of cargo, X 38 : Loading goods not listed in the sudden personal certificate, X 41 :The ship has a large tonnage, X 43 :The channel is narrow, X 44 :The channel is shallow, X 45 : The traffic density is high and the ship is hit by other ships, X 46 : The berth location is unreasonable, X 47 : The navigation facilities and equipment are not perfect;
[0111] Further, the bulk chemical ship voyage operation leakage accident tree model is determined by logically reasoning the intermediate events and basic events of the bulk chemical ship voyage operation leakage accident tree model;
[0112] The bulk chemical ship voyage leakage accident tree model is established by connecting the top events, basic events and basic events through logic gates, wherein the following events are connected through logic OR gates:
[0113] X 35 , X 36 , X 37 , X 38 Connect M9 respectively;
[0114] X 31 , X 32 Connect M 17 ;
[0115] M 17 , X 33 , X 34 Connect M8 separately;
[0116] X1, X2, and X3 are connected to M 20 ;
[0117] X4, X7, X8 are connected to M 21 ;
[0118] X9, X 11 , X 12 Connect M 11 ;
[0119] X 13 , X 14 Connect M 12 ;
[0120] M 20 、M 21 Connect M 10 ;
[0121] M 10 、M 11 、M 12 Connect M5 respectively;
[0122] X 15 , X 41 , X 18 Connect M 13 ;
[0123] M 13 , X 42 Connect M6 separately;
[0124] X 24 , X 25 , X 26 , X 27 Connect M 15 ;
[0125] X 29 , X 30 Connect M 16 ;
[0126] X 43 , X 44 Connect M 24 ;
[0127] X 45 , X 46 , X 47 Connect M 25 ;
[0128] M 15 、M 16 、M 24 、M 25 Connect M7 respectively;
[0129] M9, M 8、 M 5、 M 6、 M7 is connected to M2 respectively;
[0130] The following are connected via the AND gate:
[0131] M 20 、M 21 Connect M 10 ;
[0132] Figure 4 It is the accident tree model diagram of leakage of bulk chemical tanker during berthing and unberthing operation;
[0133] The top event of the bulk chemical tanker leakage accident tree model is:
[0134] M3: Bulk chemical spill accident tree during berthing and unberthing operations;
[0135] The intermediate events of the bulk chemical leakage accident tree model for berthing and unberthing operations are:
[0136] M5: Human factors, M6: Ship and equipment factors, M7: Environmental factors, M8: Management factors, M9: Cargo factors; 10: Knowledge and skills factors, M 11 :Crew quality factors, M 12 :Physiological factors, M 13 :Ship structure factor, M 15 : Meteorological factors, M 14 : Equipment factor, M 16 :Hydrological factors, M 17 :Crew Management Factors, M 18 : Cargo handling factor, M 19:Cargo nature factors, M 20 :Lack of operational knowledge, M 21 : Lack of operational skills;
[0137] The basic events of the accident tree model for bulk chemical leakage during berthing and unberthing operations are:
[0138] X1: poor business skills, X2: poor communication, X3: unfamiliar with the nature of the goods, X4: operational errors, X8: illegal operations, X9: poor safety awareness, X 10 :For personal protective equipment, X 11 : Lack of professional responsibility, X 12 : Improper duty, X 13 :Staff fatigue, X 14 : Lack of concentration, X 15 :Older ship, X 18 :The structural strength is not high, X 24 : Lightning, X 25 : Strong wind, X 26 :Large temperature difference, X 27 :Tsunamis, earthquakes, etc. cause short-term dramatic rise and fall of sea levels, 28 : Heavy fog, snow and other poor visibility weather, X 29 :High flow rate, X 30 : The tidal range is large and the pipelines and cables are not adjusted in time, X 31 : Personnel management is chaotic, X 32 :The personnel have not received effective training, X 33 : Rules and regulations are not standardized, X 35 :Improper cargo stowage, X 36 :Improper loading and unloading sequence, X 37 : Improper heating / cooling of cargo, X 38 : Loading goods not listed in the sudden personal certificate, X 43 :The channel is narrow, X 44 :The channel is shallow, X 45 : The traffic density is high and the ship is hit by other ships, X 46 : The berth location is unreasonable, X 47 : The navigation facilities and equipment are not perfect;
[0139] Further, the bulk chemical ship berthing and unberthing operation leakage accident tree model is determined by logically reasoning the intermediate events and basic events of the bulk chemical ship berthing and unberthing operation leakage accident tree model;
[0140] The bulk chemical ship berthing and unberthing operation leakage accident tree connects the top events, basic events and basic events through logic gates to establish a bulk chemical ship berthing and unberthing operation leakage accident tree model, wherein the following are connected through logic OR gates:
[0141] X 35 , X 36 , X 37 , X 38 Connect M9 respectively;
[0142] X 31 , X 32 Connect M 17 ;
[0143] M 17 , X 33 , X 34 Connect M8 separately;
[0144] X1, X2, and X3 are connected to M 20 ;
[0145] X4 and X8 are connected to M 21 ;
[0146] X9, X 10 , X 11 , X 12 Connect M 11 ;
[0147] X 13 , X 14 Connect M 12 ;
[0148] X 15 , X 41 , X 18 Connect M 13 ;
[0149] M 13 , X 42 Connect M6 separately;
[0150] X 24 , X 25 , X 26 , X 27 , X 28 Connect M 15 ;
[0151] X 29 , X 30 Connect M 16 ;
[0152] X 43 , X 44 Connect M 24 ;
[0153] X 45 , X 46 , X 47 Connect M 25;
[0154] M 15 、M 16 、M 24 、M 25 Connect M7 respectively;
[0155] M 10 、M 11 、M 12 Connect M5 respectively;
[0156] M 20 、M 21 Connect M 10 ;
[0157] M9, M 8、 M 5、 M 6、 M7 is connected to M2 respectively;
[0158] The following are connected via the AND gate:
[0159] M 20 、M 21 Connect M 10 ;
[0160] M 17 , X 33 , X 34 Connect M8 separately;
[0161] The top event of the accident tree model for leakage during anchoring of bulk chemical tanker is:
[0162] M4: Bulk chemical tanker leak during anchoring;
[0163] The intermediate events of the accident tree model for leakage during anchoring of bulk chemical tanker are:
[0164] M5: Human factors, M6: Ship and equipment factors, M7: Environmental factors, M8: Management factors, M9: Cargo factors; 10: Knowledge and skills factors, M 11 :Crew quality factors, M 12 :Physiological factors, M 13 :Ship structure factor, M 15 : Meteorological factors, M 14 : Equipment factor, M 16 :Hydrological factors, M 17 :Crew Management Factors, M 18 : Cargo handling factor, M 19 :Cargo nature factors, M 20 :Lack of operational knowledge, M 21 : Lack of operational skills;
[0165] The basic events of the accident tree model for leakage of bulk chemical tankers during anchoring are as follows: X1: poor business level, X2: poor communication, X3: unfamiliarity with the nature of the cargo, X4: operational errors, X5: irregular tank sweeping operations, X6: improper flat operations, X7: improper sampling operations, X8: illegal operations, X9: poor safety awareness, X11: lack of professional responsibility, X12: improper duty, X13: staff fatigue, X14: lack of concentration, X15: old age, X18: low structural strength, X24: lightning, X25: strong winds, X26: large temperature differences, X27: short-term drastic rise and fall of the sea level caused by tsunamis, earthquakes, etc., X28: poor visibility weather such as fog and snowfall, X29: high flow rate, X30 : Pipelines and cables were not adjusted in time due to large tidal range, X31: Personnel management was chaotic, X32: Personnel had not been effectively trained, X33: Rules and regulations were not standardized, X34: Equipment maintenance was not in place, X35: Improper cargo stowage, X36: Improper loading and unloading sequence, X37: Improper cargo heating / cooling, X38: Loading cargo not included in the personal certificate, X41: Large tonnage of the ship, X42: Ship equipment failure, X43: Narrow channel, X44: Shallow channel depth, X47: Incomplete navigation facilities and equipment;
[0166] Figure 5 This is the accident tree model diagram of a bulk chemical tanker leaking during anchoring;
[0167] Further, the accident tree model for leakage during anchoring of bulk chemical ship is determined by logically reasoning the intermediate events and basic events of the accident tree model for leakage during anchoring of bulk chemical ship;
[0168] The bulk chemical ship leakage accident tree during anchoring connects the top events, basic events and basic events through logic gates to establish a bulk chemical ship leakage accident tree model during anchoring, wherein the following are connected through logic OR gates:
[0169] X 31 , X 32 Connect M 17 ;
[0170] M 17 , X 33 , X 34 Connect M8 separately;
[0171] X 15 , X 41 , X 18 Connect M 13 ;
[0172] M 13 , X 42Connect M6 separately;
[0173] X1, X2, and X3 are connected to M 20 ;
[0174] X5, X6, and X7 are connected to M 23 ;
[0175] M 23 , X4, X8 are connected to M 21 ;
[0176] M 20 、M 21 Connect M 10 ;
[0177] X9, X 11 , X 12 Connect M 11 ;
[0178] X 13 , X 14 Connect M 12 ;
[0179] X 24 , X 25 , X 26 , X 27 , X 28 Connect M 15 ;
[0180] X 29 , X 30 Connect M 16 ;
[0181] X 43 , X 44 Connect M 24 ;
[0182] X 45 , X 47 Connect M 25 ;
[0183] M 16 、M 24 、M 25 Connect M7 respectively;
[0184] X 35 , X 36 , X 37 , X 38 Connect M9 respectively;
[0185] M 10 、M 11 、M 12 Connect M5 respectively;
[0186] M9, M 8、 M 5、 M 6、 M7 is connected to M2 respectively;
[0187] The following are connected via the AND gate:
[0188] M 20 、M 21 Connect M 10 ;
[0189] M 17 , X 33 , X 34 Connect M8 separately;
[0190] Figure 6 It is the event tree model diagram of bulk chemical tanker port leak;
[0191] Further: construct a bulk chemical tanker port leakage event tree model, the event tree structure is a tree diagram that is approximately horizontal, the specific process is as follows:
[0192] Event Tree Analysis (ETA) is a process analysis from cause to effect. It starts from the initial state of the event and analyzes it step by step in the order of its development. At each step, both the desired event (success) and the undesirable event (failure) are considered until the final result.
[0193] The event tree is used to analyze the consequences of chemical tanker leakage accidents. Bulk chemical tanker port leakage (A) is selected as the initial event of the event tree. According to the existence of dangerous events in different links, all possible consequences of the accident are obtained. The established bulk chemical tanker port leakage event tree model is shown in the attached figure. Figure 6 shown.
[0194] The bulk chemical tanker port leakage event tree model includes the following event types: initial event, dangerous event and final event; wherein the initial event is: bulk chemical tanker port leakage A.
[0195] The dangerous events are: B. not discovered in time, B. cargo is flammable and explosive, C. fire-fighting system fails, D. life-saving facilities are incomplete, E.
[0196] The final events are: safety, environmental damage, property loss, major property loss, and casualties.
[0197] Figure 7 This is a bow-tie model diagram of a bulk chemical tanker port spill accident;
[0198] Furthermore, the accident tree model of the leakage risk of bulk chemical ships in port operations is combined with the bulk chemical ship port leakage event tree to construct the bowtie model of bulk chemical ship port leakage accidents as follows:
[0199] The accident tree model for leakage of bulk chemical ships in loading and unloading operations, the accident tree model for leakage of bulk chemical ships in port navigation, the accident tree model for leakage of bulk chemical ships in berthing and unberthing operations, and the accident tree model for leakage of bulk chemical ships during anchoring are combined with the bulk chemical ship port leakage event tree to construct a bow-tie model for bulk chemical ship port leakage accidents.
[0200] In the bow-tie model of bulk chemical tanker port leakage accidents, the top event of the accident tree is located in the middle, with the accident tree on the left and the event tree on the right. The established bow-tie model is shown in the attached figure. Figure 7 shown.
[0201] Furthermore, the process of converting the bowtie model of bulk chemical tanker port leakage accident into the Bayesian network model of bulk chemical tanker port leakage accident is as follows:
[0202] According to the bow-tie model of bulk chemical tanker port leakage accident and Bayesian BN principle, the accident tree model is mapped to the Bayesian model BN respectively. The process is as follows:
[0203] (1) The top events in the accident tree are converted into leaf nodes of the Bayesian model BN, the intermediate events are converted into intermediate nodes of the Bayesian model BN, and the basic events are converted into the root nodes of the Bayesian model BN. The nodes are connected with one-way arrows. The starting node of the arrow is the cause node, and the node pointed by the arrow is the result node.
[0204] (2) Taking the probability of occurrence of basic events as the prior probability of the root node, the logical relationship between events is converted into conditional probability, and the following Bayesian network models are constructed: leakage of bulk chemical ships during loading and unloading operations, leakage of bulk chemical ships during navigation operations in the port, leakage of bulk chemical ships during berthing and unberthing operations, and leakage of bulk chemical ships during anchoring.
[0205] The Bayesian network model for leakage during bulk chemical ship loading and unloading operations, the Bayesian network model for leakage during bulk chemical ship navigation operations in the port, the Bayesian network model for leakage during berthing and unberthing operations of bulk chemical ships, and the Bayesian network model for leakage during anchoring of bulk chemical ships are shown in the attached figure. Figure 8-11 shown.
[0206] Figure 8 It is a diagram of the Bayesian model of leakage in bulk chemical tanker loading and unloading operations;
[0207] Fig. 9It is a Bayesian network model diagram of leakage during navigation operation of bulk chemical tanker in port;
[0208] Fig.10 It is a Bayesian network model diagram of leakage of bulk chemical tanker during berthing and unberthing operation;
[0209] Fig.11 It is a Bayesian network model diagram of leakage during anchoring of bulk chemical tanker;
[0210] The Bayesian model diagram of bulk chemical ship loading and unloading operation leakage, the Bayesian network model diagram of bulk chemical ship navigation operation leakage in the port, the Bayesian network model diagram of bulk chemical ship berthing and unberthing operation leakage, and the Bayesian network model diagram of bulk chemical ship leakage during anchoring are combined to obtain the BN model diagram of bulk chemical ship port leakage accident. The BN model of bulk chemical ship port leakage accident is shown in the attached figure. Fig.12 shown.
[0211] Furthermore, a risk quantification analysis is conducted based on the Bayesian network model of bulk chemical tanker port leakage accidents; the process of determining the failure probability of bulk chemical tanker port leakage accidents and consequences is as follows:
[0212] As there is not enough empirical data to determine the likelihood and consequences of bulk liquid chemical tanker port spill accidents, fuzzy logic and expert elicitation methods are used to quantify the failure frequencies of all basic and hazardous events.
[0213] In order to combine the opinions of each expert, the similarity aggregation method (SAM) is used to aggregate the expert judgments into a single fuzzy set. The total number of experts is M, and the expert judgment aggregation steps are as follows:
[0214] (1) Estimate the consistency of each pair of experts p and q;
[0215] Each pair of experts p and q The language expression is converted into trapezoidal fuzzy numbers, respectively, p Trapezoidal fuzzy number E p =(a1,a2,a3,a4),Expert q Trapezoidal fuzzy number E q = (b1, b2, b3, b4), then the expert p With experts q Consistency The calculation of is shown in the following formula. i , b i To express fuzzy numbers in expert language, For experts p With experts q Consistency:
[0216]
[0217] (2) Calculate the average expert agreement A; where: A p For experts p The average consistency of
[0218]
[0219] Where: M is the total number of experts, For experts p With experts q degree of consistency.
[0220] (3) Calculate the relative agreement R of experts; R p For experts p The relative consistency is as follows:
[0221] in: A p For experts p The average agreement, A k is the average agreement of expert k;
[0222] (4) Calculate the expert consensus coefficient C:
[0223] in, R p For experts p The relative consistency of C p For experts p The consensus coefficient, : Weight factor of expert p.
[0224] β is the relaxation factor, β=0.5;
[0225] ω is the weight factor of the expert, which is determined by scoring each expert based on his or her position, years of service / qualifications, and educational level.
[0226] For expert i, the calculation formula of its weight score is as follows:
[0227] Weight score (E i ) = Position score + Service years score + Education level score;
[0228] The calculation formula of the weight factor is as follows:
[0229]
[0230] (5) Summarize the expert judgment results:
[0231]
[0232] in, E AG is the aggregated expert judgment fuzzy set, C i For experts i The consensus coefficient, E i Be an expert i fuzzy set.
[0233] The central area defuzzification method is introduced to transform the trapezoidal fuzzy set E AG = ( n 1, n 2, n 3, n 4) Converted into clarity number, i.e. crispness X * , the calculation formula is shown as follows.
[0234]
[0235] Among them, E AG is the aggregated expert judgment fuzzy set, n i is the summarized fuzzy number of expert judgment, and each expert corresponds to a fuzzy set consisting of n1, n2, n3, and n4.
[0236] Next, the brittleness value obtained after defuzzification is converted into failure probability P r , the calculation formula is shown as follows, that is, the probability of occurrence of basic events and dangerous events is obtained, which is then converted into the prior probability of the root node in BN.
[0237]
[0238]
[0239] in, P r is the failure probability, X * For brittleness, k is a constant coefficient.
[0240] Update the conditional probability table of the intermediate nodes in the Bayesian network model of bulk chemical tanker port leakage accidents with reference to expert opinions, thereby updating the risks;
[0241] For a certain intermediate node in the BN, since it depends on the parent node with the same state, although the node may have a "YES" condition, when all the parent nodes of the node have a "NO" state, the node is considered to be non-existent. For this case, the conditional probability table is updated using expert judgment.
[0242] According to the modified conditional probability table and the operation principles of the accident tree model of leakage risk of bulk chemical tankers during port operations, the event tree model of bulk chemical tanker port leakage and the Bayesian network model of bulk chemical tanker port leakage accidents, the risk value of bulk chemical tanker port leakage and the probability of occurrence of accident consequences caused by different dangerous events can be calculated.
[0243] Calculation of risk value of bulk chemical tanker port leakage: Using the Bayesian network analysis software Netica, the prior probability of the root node and the conditional probability of the intermediate node are automatically calculated after inputting
[0244] Calculation of the probability of accident consequences: Calculation is performed based on the calculated risk value of bulk chemical tanker port leakage and the operation principle of the event tree. The operation principle of the event tree is shown in Fig.13 .
[0245] Event tree operation principle:
[0246] According to the general probability rule in statistics, the sum of the probabilities of all branches in the system is equal to 1, that is, P (success) + P (failure) = 1. The probability of each result on the right side of the event tree is equal to the product of the probabilities of all branches that lead to the result. The basic structure of the event tree and probability calculation are shown in the figure below, where P is the probability.
[0247] A sensitivity analysis of the risk factors was conducted to determine the most significant risk factors leading to port spills from bulk liquid chemical tankers.
[0248] The conditional probabilities of the root nodes in the constructed BN model are set to 100% in turn, and the changes in the probability of leakage occurring in different operation processes are recorded.
[0249] Through sensitivity analysis, it is found that among the nodes with leakage in loading and unloading operations, X 13 , X9, X 24 , X 11 , X 25 , X 12 The sensitivity of factors such as inflammatory response is significantly higher than other risk factors;
[0250] During navigation, berthing and anchoring in the port, 42 The highest sensitivity.
[0251] Based on leakage accidents in different operation processes, human factors and environmental factors are the main risks affecting port leakage of bulk liquid chemical ships, followed by ship and equipment factors, and cargo factors, while management factors have the least impact.
[0252] Identifying key risk factors for bulk liquid chemical tanker port spill incidents.
[0253] According to the above risk quantification analysis results, it is determined that human factors and environmental factors are the main risks affecting port leakage of bulk liquid chemical ships, followed by ship and equipment factors and cargo factors, and management factors have the least impact. 42 , X9, X 13 , X 11 , X 35 , X 36 , X 24 Factors such as these are the root causes that may lead to leakage accidents and require attention.
[0254] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for quantitatively analyzing the risk of bulk chemical tanker port leakage, characterized by: The following steps are involved: Step 1: Based on the identified risk factors and consequences of leakage accidents of bulk chemical tankers during port operations, an accident tree model of leakage risk during bulk chemical tanker operations in port is constructed; The accident tree model of leakage risk during bulk chemical ship operation in port includes a leakage accident tree model for bulk chemical ship loading and unloading operation, a leakage accident tree model for bulk chemical ship navigation operation in port, a leakage accident tree model for bulk chemical ship berthing and unberthing operation, and a leakage accident tree model for bulk chemical ship during anchoring; The construction methods of the bulk chemical ship loading and unloading operation leakage accident tree model, the bulk chemical ship navigation operation leakage accident tree model, the bulk chemical ship berthing and unberthing operation leakage accident tree model and the bulk chemical ship anchoring period leakage accident tree model are the same; the construction process of the bulk chemical ship loading and unloading operation leakage accident tree model is as follows: Based on the accident tree theory, logical deduction reasoning is carried out to logically arrange the risk factors leading to bulk chemical tanker loading and unloading operations layer by layer until the vertical analysis level of the accident tree reaches the basic event position. Taking the bulk chemical tanker loading and unloading leakage accident M1 as the top event, the fuzzy fault tree method is used to determine the intermediate events and basic events that lead to the bulk chemical tanker loading and unloading leakage accident M1. Through logical reasoning of top events, intermediate events and basic events, the accident tree model of leakage in bulk chemical tanker loading and unloading operations is determined; Step 2: Construct an event tree model for bulk chemical tanker port leakage; Step 3: Combine the accident tree model of the leakage risk of bulk chemical tankers in port operations with the bulk chemical tanker port leakage event tree to construct a bowtie model of bulk chemical tanker port leakage accidents; Step 4: Convert the bowtie model of bulk chemical tanker port leakage accident into a Bayesian network model of bulk chemical tanker port leakage accident; Step 5: Conduct risk quantification analysis based on the Bayesian network model of bulk chemical tanker port leakage accidents; determine the failure probability of bulk chemical tanker port leakage accidents and consequences; The process of conducting risk quantification analysis based on the Bayesian network model of bulk chemical tanker port leakage accident and determining the failure probability of bulk chemical tanker port leakage accident and its consequences is as follows: Fuzzy logic and expert elicitation methods are used to quantify the failure frequencies of all basic and hazardous events; The similarity aggregation method is used to aggregate the experts' judgments into a single fuzzy set to determine the failure probability of bulk chemical tanker port leakage accidents and consequences; The process of aggregating the expert judgment into a single fuzzy set using the similarity aggregation method to determine the failure probability of bulk chemical tanker port leakage accidents and consequences is as follows: The total number of experts is M, and the expert judgment aggregation steps are as follows: (1) Estimate the consistency of each pair of experts p and q; (2) Calculate the average agreement of experts; (3) Calculate the relative agreement R of experts; (4) Calculate the expert consensus coefficient; (5) Based on steps (1)-(4), the expert judgment results are summarized to obtain the expert judgment fuzzy set; (6) After defuzzifying the expert judgment fuzzy set, the brittleness value is obtained, and the brittleness value is converted into a failure probability, that is, the probability of occurrence of basic events and dangerous events is obtained; the probability of occurrence of the basic events and dangerous events is converted into the prior probability of the root node in the Bayesian network model of bulk chemical tanker port leakage accident; (7) Update the conditional probability table of the intermediate nodes in the Bayesian network model of bulk chemical tanker port leakage accidents with reference to expert opinions, thereby updating the risks; (8) Based on the modified conditional probability table and the operating principles of the accident tree model of the leakage risk of bulk chemical tankers during port operations, the event tree model of bulk chemical tanker port leakage and the Bayesian network model of bulk chemical tanker port leakage accidents, the risk value of bulk chemical tanker port leakage and the probability of occurrence of accident consequences caused by different dangerous events can be calculated.
2. A method for quantitatively analyzing the risk of bulk chemical tanker port leakage according to claim 1, characterized in that: The port operation process includes loading and unloading operations, navigation operations within the port, berthing and unberthing operations, and anchoring operations.
3. The method for quantitatively analyzing the risk of bulk chemical tanker port leakage according to claim 1 is characterized by: The bulk chemical tanker port leakage event tree model includes the following event types: initial event, dangerous event and final event; Among them, the initial events are: bulk chemical tanker port leakage A; Dangerous events are: failure to discover in time B, flammable and explosive cargo C, failure of fire protection system D, incomplete life-saving facilities E; The final events are: safety, environmental damage, property loss, major property loss, and casualties.