Logistics network node dynamic optimization and management method, device, equipment and medium
Through the analysis of logistics data and three-dimensional map optimization, dynamic management solutions are generated, and the problems of data silos and information asymmetry in traditional management methods are solved, and the response capability and overall efficiency of the logistics network are improved.
Patent Information
- Application Number
- CN202411118372.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-15
AI Technical Summary
Traditional logistics network node management methods are difficult to deal with frequent uncertain events, resulting in inefficient logistics and increased costs.
By obtaining logistics data, node data and external dynamic data, data analysis and three-dimensional map construction, real-time dynamic optimization and management of real-time node three-dimensional maps, and a targeted dynamic management solution is generated.
It improves the accuracy and timeliness of logistics decision-making, ensures that logistics network nodes can quickly respond to changes in the external environment, reduces the risk of logistics delay caused by emergencies, and improves management level and overall operation efficiency.
Smart Images

Figure CN118644170B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of logistics network nodes, and in particular to a method, device, equipment and medium for dynamic optimization and management of logistics network nodes. Background Art
[0002] In the modern logistics industry, with the growth of global trade and the rise of e-commerce, the complexity and dynamics of logistics networks are increasing. As the key nodes connecting the logistics chain, logistics network nodes undertake multiple functions such as cargo storage, sorting, and distribution. Traditional logistics network node management methods often focus on static planning and are difficult to cope with the frequent uncertain events in the logistics network, resulting in low logistics efficiency and increased costs. Summary of the invention
[0003] The main purpose of the present invention is to provide a method, device, equipment and medium for dynamic optimization and management of logistics network nodes, which can quickly respond to changes in the external environment.
[0004] To achieve the above objectives, the present invention provides a method for dynamic optimization and management of logistics network nodes, comprising:
[0005] Obtain logistics data, node data and external dynamic data through logistics network nodes;
[0006] Performing data analysis on the logistics data to obtain comprehensive logistics data, analyzing the node data to obtain real-time node data and normal node data, and dynamically analyzing the external dynamic data to obtain comprehensive dynamic data;
[0007] Based on the normal node data and the comprehensive dynamic data, a preset three-dimensional map is constructed to obtain an initial node three-dimensional map, and the initial node three-dimensional map is optimized according to the real-time node data to obtain a node three-dimensional map;
[0008] Mapping the comprehensive logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information;
[0009] Perform a solution analysis on the node dynamic information to obtain a dynamic management solution, obtain feedback information of the logistics network nodes based on the dynamic management solution, and dynamically optimize the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map.
[0010] Furthermore, logistics data, node data and external dynamic data are obtained through logistics network nodes, including:
[0011] Acquire original logistics network data through the logistics network nodes, classify and screen the logistics network data, and obtain corresponding logistics screening data, node screening data and external dynamic screening data;
[0012] Check in sequence whether the logistics screening data, node screening data and external dynamic screening data meet the requirements of the preset screening rules. When any of the logistics screening data, node screening data and external dynamic screening data does not meet the requirements of the screening rules, re-acquire the original logistics network data for classification screening;
[0013] When the logistics screening data, the node screening data and the external dynamic screening data all meet the requirements of the screening rules, the logistics screening data, the node screening data and the external dynamic screening data are sorted in turn to obtain the logistics data, the node data and the external dynamic data.
[0014] Further, the data analysis of the logistics data is performed to obtain comprehensive logistics data, the node data is analyzed to obtain real-time node data and normal node data, and the external dynamic data is dynamically analyzed to obtain comprehensive dynamic data, including:
[0015] Performing index data analysis on the logistics data to obtain transportation index data and cargo management data, and integrating the transportation index data and cargo management data to obtain the comprehensive logistics data;
[0016] Performing data analysis on the node data to obtain node inventory data, node loading and unloading data, and node location data; performing node analysis on the logistics network nodes based on the node inventory data and the node loading and unloading data to obtain node type data; performing relationship analysis on the logistics network nodes based on the node location data and the node type data to obtain node connection relationships;
[0017] Arrange the node inventory data and the node loading and unloading data to obtain the real-time node data, and arrange the node type data, the node connection relationship and the node position data to obtain the normal node data;
[0018] Dynamic information analysis is performed on the external dynamic data to obtain meteorological data and traffic information data, and the meteorological data and traffic information data are integrated to obtain comprehensive dynamic data.
[0019] Further, the map construction of a preset three-dimensional map based on the normal node data and the comprehensive dynamic data to obtain an initial node three-dimensional map, and the optimization processing of the initial node three-dimensional map according to the real-time node data to obtain a node three-dimensional map includes:
[0020] Reading the normal node data to obtain the node type data, the node connection relationship and the node position data, and mapping the node position data, the node type data and the node connection relationship to the three-dimensional map;
[0021] Constructing map nodes in the three-dimensional map using the node position data to obtain mapping nodes of logistics nodes in the three-dimensional map, connecting the mapping nodes according to the node connection relationship, and setting parameters for the mapping nodes according to the node type data to obtain a node grid map;
[0022] Reading the comprehensive dynamic data to obtain the meteorological data and the traffic information data, mapping the meteorological data and the traffic information data to a node grid map, and dynamically constructing the node grid map based on the meteorological data and the traffic information data to obtain the node three-dimensional map;
[0023] Perform node matching on the real-time node data and the initial node three-dimensional map to obtain corresponding matching nodes;
[0024] Reading the real-time node data to obtain the node inventory data and the node loading and unloading data, and performing parameter calculation on the node inventory data and the node loading and unloading data to obtain inventory parameters and loading and unloading parameters;
[0025] The matching nodes are updated according to the inventory parameters and the loading and unloading parameters to obtain the three-dimensional map of the nodes.
[0026] Furthermore, mapping the integrated logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information includes:
[0027] Performing key information analysis on the comprehensive logistics data to obtain the transportation index data and the cargo management data;
[0028] Performing initial node matching on the comprehensive logistics data and the node three-dimensional map to obtain a corresponding first logistics node, and extracting first node information of the first node;
[0029] Mapping the cargo management data to the first node information, updating the first node information, and obtaining the second node information;
[0030] Mapping the transport index data to the node three-dimensional map, and performing node path association extraction on the first logistics node to obtain first node path information, and updating the first node path information according to the second node information to obtain second node path information;
[0031] According to the second node information and the second node path information, the node three-dimensional map is updated to obtain the real-time node three-dimensional map;
[0032] Dynamically analyze the real-time node three-dimensional map to obtain the node dynamic information.
[0033] Further, the performing solution analysis on the node dynamic information to obtain a dynamic management solution includes:
[0034] Perform key parameter analysis on the node dynamic information to obtain node inventory status, node transportation efficiency, node environmental information and logistics path information;
[0035] Based on the node environment information and logistics path information, the time is calculated to obtain the logistics transportation time. Based on the node inventory status and node transportation efficiency, the efficiency is calculated to obtain the logistics efficiency time. The logistics transportation time and logistics efficiency time are comprehensively calculated to obtain the logistics comprehensive time.
[0036] Determine whether the comprehensive logistics time meets the preset logistics scheduling requirements. When the comprehensive logistics time does not meet the logistics scheduling requirements, perform deviation analysis on the comprehensive logistics time according to the logistics scheduling requirements to obtain deviation parameters, and generate the dynamic management plan based on the deviation parameters.
[0037] Furthermore, the obtaining feedback information of the logistics network nodes based on the dynamic management scheme, and dynamically optimizing the real-time node three-dimensional map based on the feedback information to obtain the optimized real-time node three-dimensional map, includes:
[0038] Performing expected analysis on the dynamic management scheme to obtain expected node data;
[0039] Performing node matching on the dynamic management scheme to obtain the corresponding logistics network node, and acquiring the feedback information sent by the logistics network node after executing the dynamic management scheme;
[0040] Performing parameter analysis on the feedback information to obtain corresponding map node parameters;
[0041] Determine whether the map node parameters meet the expected node data requirements. When the map node parameters do not meet the expected node data requirements, optimize the map node parameters through the expected node data to obtain the optimized parameters.
[0042] The real-time node three-dimensional map is dynamically optimized according to the optimization parameters to obtain the optimized real-time node three-dimensional map.
[0043] The present invention also provides a logistics network node dynamic optimization and management device, which is applied to any of the above-mentioned logistics network node dynamic optimization and management methods, and is characterized by comprising:
[0044] A collection module, which is used to obtain logistics data, node data and external dynamic data through logistics network nodes;
[0045] An analysis module, the analysis module is used to perform data analysis on the logistics data to obtain comprehensive logistics data, analyze the node data to obtain real-time node data and normal node data, and dynamically analyze the external dynamic data to obtain comprehensive dynamic data;
[0046] A processing module, the processing module is used to construct a preset three-dimensional map based on the normal node data and the comprehensive dynamic data to obtain an initial node three-dimensional map, and optimize the initial node three-dimensional map according to the real-time node data to obtain a node three-dimensional map;
[0047] A calculation module, the calculation module is used to map the comprehensive logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyze the real-time node three-dimensional map to obtain node dynamic information;
[0048] A control module, wherein the control module is used to perform a solution analysis on the node dynamic information to obtain a dynamic management solution, obtain feedback information of the logistics network node based on the dynamic management solution, and dynamically optimize the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map.
[0049] The present invention also provides a logistics network node dynamic optimization and management device, comprising:
[0050] Memory, used to store programs;
[0051] The processor is used to execute the program to implement each step of the method for dynamic optimization and management of logistics network nodes as described in any one of the above.
[0052] The present invention also provides a storage medium storing computer instructions, wherein the computer instructions are used to enable a computer to execute any of the above methods.
[0053] The present invention provides the following beneficial effects:
[0054] By fully integrating logistics data, node data and external dynamic data, all-round monitoring and analysis of the status of logistics network nodes is achieved. This comprehensive data processing method can accurately capture the dynamic changes in the logistics process, solve the problems of data islands and information asymmetry in traditional management methods, and improve the accuracy and timeliness of logistics decisions. The initial node three-dimensional map constructed based on normal node data and comprehensive dynamic data can intuitively display the distribution and status of logistics network nodes. The map is dynamically optimized through real-time node data to ensure the real-time and accuracy of map information, so that logistics network nodes can quickly respond to changes in the external environment and reduce the risk of logistics delays caused by emergencies. Through in-depth analysis of node dynamic information, targeted dynamic management plans can be generated, which not only improves the management level of logistics network nodes, but also realizes the continuous optimization of management plans through feedback information. This data-driven decision support and feedback mechanism can effectively solve the problem of decision lag in traditional management methods and improve the overall operation efficiency of the logistics network. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a flow chart of a method for dynamic optimization and management of logistics network nodes provided by the present invention;
[0056] Figure 2 It is a structural diagram of a logistics network node dynamic optimization and management device provided by the present invention;
[0057] Figure 3 It is a structural diagram of a logistics network node dynamic optimization and management device provided by the present invention.
[0058] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0059] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0060] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0061] Reference Figure 1 As shown, the present invention provides a method for dynamic optimization and management of logistics network nodes, comprising:
[0062] Step S1: Obtain logistics data, node data and external dynamic data through logistics network nodes;
[0063] Step S2: Analyze the logistics data to obtain comprehensive logistics data, analyze the node data to obtain real-time node data and normal node data, and dynamically analyze the external dynamic data to obtain comprehensive dynamic data;
[0064] Step S3: constructing a preset three-dimensional map based on normal node data and comprehensive dynamic data to obtain an initial node three-dimensional map, and optimizing the initial node three-dimensional map according to real-time node data to obtain a node three-dimensional map;
[0065] Step S4: mapping the comprehensive logistics data to the node three-dimensional map to obtain the real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information;
[0066] Step S5: Analyze the node dynamic information to obtain a dynamic management plan, obtain feedback information of the logistics network nodes based on the dynamic management plan, and dynamically optimize the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map.
[0067] Based on the above steps, the detailed steps are as follows:
[0068] Step S1:
[0069] Logistics data acquisition: Use RFID tags, GPS positioning and other technologies to collect tracking information of goods from source to destination, including changes in environmental conditions such as the location, temperature, and humidity of the goods.
[0070] Node data acquisition:
[0071] Physical attribute data: including basic information such as the geographical location coordinates, transportation accessibility, storage capacity, etc. of each node in the logistics network.
[0072] Operational data: Indicators such as work efficiency, number of employees, working hours, loading and unloading capacity, etc. of the involved nodes.
[0073] External dynamic data acquisition:
[0074] Weather data: Obtain weather forecast information along the route through the Meteorological Bureau API or other weather forecast services, including temperature, wind speed, precipitation, etc.
[0075] Traffic conditions: Use traffic broadcasts, navigation systems and other means to monitor road congestion in real time.
[0076] Emergencies: Collect emergencies such as natural disasters and major events that may affect logistics and transportation.
[0077] Step S2:
[0078] Logistics data analysis:
[0079] Conduct in-depth mining on the collected logistics data to identify key logistics trends and patterns, and analyze factors such as the flow of goods, transportation time, cost efficiency, etc. from the key logistics trends and patterns to form comprehensive logistics data.
[0080] Analyze the node data to obtain real-time node data and normal node data;
[0081] Among them, real-time node data refers to the real-time status data of each node at the current moment, such as the current inventory level, available resources, etc.
[0082] Normal node data refers to the long-term stable characteristics of each node, such as geographical location, maximum capacity and other basic information.
[0083] External dynamic data analysis:
[0084] Conduct dynamic analysis on external dynamic data, that is, monitor and analyze changes in external factors that affect logistics operations to obtain comprehensive dynamic data.
[0085] Step S3:
[0086] According to the actual geographical distribution of the logistics network, a basic three-dimensional map framework is created. The map framework needs to include all logistics nodes and be accurately placed according to the actual geographical location.
[0087] Import normal node data into the 3D map framework. These data include the basic properties of the nodes (such as geographic location, capacity limitations, operating hours, etc.).
[0088] Use color coding or icons to distinguish different types of nodes, such as warehouses, distribution centers, delivery sites, etc., and mark the node's name, address, and connection to other parts of the logistics network on the map.
[0089] According to comprehensive dynamic data, such as weather forecast, traffic conditions, holiday schedule and real-time traffic flow data, it is integrated into the 3D map framework. Different levels of traffic congestion or bad weather are indicated by different colors or animation effects, such as red for severe congestion and yellow for minor congestion.
[0090] After combining normal node data and comprehensive dynamic data, an initial three-dimensional map including logistics network nodes and the surrounding environment is generated.
[0091] Based on real-time node data, such as current inventory levels, available resources, etc., the initial node three-dimensional map is dynamically updated to obtain a node three-dimensional map.
[0092] Dynamic updates include adjusting the color, icon, or status indicator of a node to reflect the latest situation. For example, when a node's inventory reaches a critical value, its icon color may change to red.
[0093] Step S4:
[0094] The comprehensive logistics data is mapped into a node three-dimensional map, which includes information such as the flow direction of goods, transportation time, cost efficiency, etc., and different colors or icons are used to represent different logistics activities, such as shipping, receiving, transit, etc.
[0095] For example, green can be used to indicate normal delivery, yellow to indicate delayed delivery, and red to indicate failure to deliver on time, etc.
[0096] The mapped comprehensive logistics data is combined with the node three-dimensional map to generate a real-time node three-dimensional map that includes logistics activities, and the flow path of goods is represented by different visual elements on the map (such as lines, arrows, etc.).
[0097] Dynamically analyze real-time node 3D maps, including identifying bottlenecks, evaluating transportation efficiency, and predicting potential problems.
[0098] For example, by analyzing the speed and quantity of goods moving, it is possible to identify which road sections are frequently congested and which nodes have insufficient processing capacity.
[0099] Extract key node dynamic information from dynamic analysis, such as which nodes are overcrowded and which nodes are running out of inventory, and organize this information into an easy-to-understand form, such as a report or dashboard.
[0100] Step S5:
[0101] Review the extracted node dynamic information, including but not limited to the node's workload, congestion, inventory level, equipment failure, etc. Identify the main factors affecting logistics efficiency and determine the priority.
[0102] Based on the results of the analysis, a preliminary management plan is developed to solve the identified problems. The plan includes adjusting the workflow, increasing or decreasing resource allocation, optimizing route planning, improving facility layout, etc.
[0103] Use computer simulation or small-scale pilots to test the effectiveness of the management plan, analyze the simulation results, evaluate whether the plan can effectively solve the problem, and record potential problem points. Based on the simulation results and evaluation feedback, make necessary adjustments and optimizations to the preliminary management plan to determine the final dynamic management plan.
[0104] Based on the dynamic management solution, feedback information of the logistics network nodes is obtained, and the real-time node three-dimensional map is dynamically optimized based on the feedback information to obtain an optimized real-time node three-dimensional map.
[0105] The present invention provides a method for dynamic optimization and management of logistics network nodes, which realizes all-round monitoring and analysis of the status of logistics network nodes by comprehensively integrating logistics data, node data and external dynamic data. Through this comprehensive data processing method, the dynamic changes in the logistics process can be accurately captured, the problems of data islands and information asymmetry in traditional management methods are solved, and the accuracy and timeliness of logistics decisions are improved. The initial node three-dimensional map constructed based on normal node data and comprehensive dynamic data can intuitively show the distribution and status of logistics network nodes. The map is dynamically optimized through real-time node data to ensure the real-time and accuracy of map information, so that the logistics network nodes can quickly respond to changes in the external environment and reduce the risk of logistics delays caused by emergencies. Through in-depth analysis of node dynamic information, targeted dynamic management plans can be generated, which not only improves the management level of logistics network nodes, but also realizes continuous optimization of management plans through feedback information. This data-driven decision support and feedback mechanism can effectively solve the problem of decision lag in traditional management methods and improve the overall operation efficiency of the logistics network.
[0106] In one embodiment, obtaining logistics data, node data and external dynamic data through logistics network nodes includes:
[0107] Obtain original logistics network data from each node in the logistics network, including but not limited to cargo tracking information, node status, traffic conditions, weather forecast, etc. Data sources can be sensors, RFID tags, GPS tracking systems, logistics management systems, etc.
[0108] The acquired original logistics network data is classified and screened, and the data is divided into three categories: logistics screening data, node screening data and external dynamic screening data.
[0109] Logistics screening data: data related to logistics activities, such as the status of goods, the time of shipment and receipt, etc.
[0110] Node screening data: information related to logistics network nodes, such as the storage capacity, loading and unloading efficiency, etc. of the nodes.
[0111] External dynamic screening data: data from outside the logistics network, such as weather forecasts, road construction information, etc.
[0112] Check whether each type of screening data meets the preset screening rule requirements.
[0113] The screening rules include standards such as data integrity, data timeliness, and data format correctness. Logistics screening data must meet rules related to logistics operations, such as data update frequency, accuracy of cargo information, etc. Node screening data must meet rules related to node status, such as the maximum capacity of the node, the operating hours of the node, etc. External dynamic screening data must meet rules related to external conditions, such as the accuracy and timeliness of weather forecasts.
[0114] When any category of screening data does not meet the requirements of the screening rules, the original logistics network data is re-acquired and the classification screening and detection screening processes are repeated.
[0115] For example, if the delivery time of a batch of goods is missing in the logistics screening data, it is necessary to re-acquire the relevant data and screen again.
[0116] When all the filtered data meet the requirements of the filtering rules, start to organize the data.
[0117] Logistics screening data is organized into logistics data, node screening data is organized into node data, and external dynamic screening data is organized into external dynamic data.
[0118] This embodiment ensures the quality of data through classification screening and detection mechanisms with preset screening rules. It improves the accuracy, completeness and consistency of data and reduces decision-making errors caused by data quality issues. The screened data is sorted to form structured logistics data, node data and external dynamic data. This simplifies the organization of data and facilitates subsequent data analysis and application development.
[0119] In one embodiment, data analysis is performed on logistics data to obtain comprehensive logistics data, node data is analyzed to obtain real-time node data and normal node data, and external dynamic data is dynamically analyzed to obtain comprehensive dynamic data, including:
[0120] Analyze the logistics data, extract transportation index data (such as transportation time, cost, efficiency, etc.) and cargo management data (such as cargo status, location, quantity, etc.), integrate the transportation index data and cargo management data to form comprehensive logistics data.
[0121] Analyze the node data and extract node inventory data, node loading and unloading data, and node location data.
[0122] Node type data: Analyze the logistics network nodes based on the node inventory data and node loading and unloading data to determine the node type (such as warehouse, distribution center, etc.).
[0123] Node connection relationship: Based on node location data and node type data, analyze the connection relationship between nodes, including physical distance, connection path, etc.
[0124] The node inventory data and node loading and unloading data are sorted to obtain real-time node data; the node type data, node connection relationship and node location data are sorted to obtain normal node data.
[0125] Analyze external dynamic data, extract meteorological data (such as weather forecasts, natural disaster warnings, etc.) and traffic information data (such as road conditions, traffic control, etc.), and integrate meteorological data and traffic information data to form comprehensive dynamic data.
[0126] This embodiment can more accurately grasp various indicators in the logistics process, such as transportation time, cost, cargo status, etc., by conducting detailed indicator analysis on logistics data. By using comprehensive logistics data, bottlenecks and inefficient links in the logistics process can be discovered, thereby optimizing the logistics process, improving logistics efficiency, and reducing operating costs. Through real-time node data, the inventory status of each node can be timely understood to avoid excessive inventory or out-of-stock phenomena. Combined with normal node data, future inventory needs can be predicted and prepared in advance. Based on node location data and node type data, the connection relationship between each node can be clearly understood, which is conducive to the coordination and cooperation of the logistics network. By analyzing the node connection relationship, the logistics path can be optimized and the transportation time and cost can be reduced. By integrating external dynamic data, such as meteorological data and traffic information data, weather changes and traffic conditions can be timely understood, so that corresponding measures can be taken.
[0127] In one embodiment, a preset three-dimensional map is constructed based on normal node data and comprehensive dynamic data to obtain an initial node three-dimensional map, and the initial node three-dimensional map is optimized according to real-time node data to obtain a node three-dimensional map, including:
[0128] Read the normal node data to obtain node type data, node connection relationship and node position data, and map the node position data, node type data and node connection relationship into a three-dimensional map;
[0129] The map nodes are constructed in the three-dimensional map through the node position data to obtain the mapping nodes of the logistics nodes in the three-dimensional map, the mapping nodes are connected according to the node connection relationship, and the parameters of the mapping nodes are set according to the node type data to obtain the node grid map;
[0130] Read the comprehensive dynamic data to obtain meteorological data and traffic information data, map the meteorological data and traffic information data to the node grid map, and dynamically construct the node grid map based on the meteorological data and traffic information data to obtain a three-dimensional node map;
[0131] Perform node matching between the real-time node data and the initial node three-dimensional map to obtain corresponding matching nodes;
[0132] Read the real-time node data to obtain node inventory data and node loading and unloading data, calculate the parameters of the node inventory data and node loading and unloading data to obtain inventory parameters and loading and unloading parameters;
[0133] The matching nodes are updated according to the inventory parameters and loading and unloading parameters to obtain a three-dimensional map of the nodes.
[0134] This embodiment can intuitively display the structure and status of the logistics network by mapping normal node data and comprehensive dynamic data into a three-dimensional map, thereby improving the visualization of the logistics network. Integrating meteorological data and traffic information data into the three-dimensional map enables the map to reflect changes in the external environment, thereby enhancing the practicality and information richness of the map. By matching real-time node data with the initial node three-dimensional map, changes in the logistics network can be quickly located. Setting parameters for the mapping nodes according to the node type data helps to manage different nodes in the logistics network more finely. The node grid map constructed through the node connection relationship can more effectively plan logistics routes and schedule resources, thereby improving the management efficiency of the logistics network. The dynamic construction function of the environment in the map can assist in predicting potential problems, taking preventive measures, and reducing operational risks. Through the visual management and dynamic response of the logistics network, resources can be allocated more efficiently, reducing unnecessary waiting time and costs. Based on the node connection relationship and real-time traffic information of the three-dimensional map, the logistics route can be optimized, and transportation time and costs can be reduced.
[0135] In one embodiment, the integrated logistics data is mapped to a node three-dimensional map to obtain a real-time node three-dimensional map, and the real-time node three-dimensional map is dynamically analyzed to obtain node dynamic information, including:
[0136] Conduct key information analysis on comprehensive logistics data to obtain transportation index data (including key indicators such as transportation time, cost, efficiency, etc.) and cargo management data (including information such as cargo status, location, quantity, etc.).
[0137] Perform initial node matching on the comprehensive logistics data and the node three-dimensional map to obtain the corresponding first logistics node, and extract the first node information of the first node. The first node information includes the basic attributes and status of the node, such as the type, location, current inventory level, etc. of the node.
[0138] The cargo management data is mapped to the first node information to reflect the status change of the cargo, such as the change in the quantity of the cargo, the change in the location of the cargo, etc. The first node information is updated according to the cargo management data to obtain the second node information reflecting the latest status of the cargo.
[0139] The transport index data is mapped to the node three-dimensional map, and the node path association extraction is performed on the first logistics node to obtain the first node path information, and the first node path information is updated according to the second node information to obtain the second node path information.
[0140] The node three-dimensional map is updated according to the second node information and the second node path information to obtain a real-time node three-dimensional map, which reflects the latest logistics network status, including information such as the location, status and transportation path of the goods.
[0141] Dynamically analyze the real-time node three-dimensional map to obtain node dynamic information, which includes the node's workload, cargo transportation progress, potential bottlenecks, congestion, etc.
[0142] This embodiment realizes real-time monitoring of the status of the logistics network by real-time mapping of comprehensive logistics data and updating of node information. Based on the dynamic analysis of the real-time node three-dimensional map, changes in the logistics network can be quickly identified and responded to in a timely manner. Through the dynamic analysis of the real-time node three-dimensional map, potential problem points can be predicted and preventive measures can be taken. Based on transportation indicator data and cargo management data, logistics routes can be optimized to reduce transportation time and costs. Through the analysis of node dynamic information, logistics resources can be allocated more reasonably and overall efficiency can be improved. The construction of the real-time node three-dimensional map makes the information in the supply chain more transparent and enhances the collaboration between upstream and downstream companies. Through the visual display of the three-dimensional map, all parties in the supply chain can more intuitively understand the status of the logistics network.
[0143] In one embodiment, a solution analysis is performed on the node dynamic information to obtain a dynamic management solution, including:
[0144] By analyzing the key parameters of the node dynamic information, we can obtain the node inventory status (including available capacity, types of stored goods), node transportation efficiency (including loading speed, unloading speed, processing time, etc.), node environmental information (including weather conditions, traffic conditions, infrastructure conditions, etc.) and logistics path information (including path distance, capacity, estimated travel time, etc.).
[0145] Time calculation is performed based on node environmental information and logistics path information to obtain logistics transportation time. Efficiency calculation is performed based on node inventory status and node transportation efficiency to obtain logistics efficiency time. Logistics transportation time and logistics efficiency time are comprehensively calculated to obtain comprehensive logistics time.
[0146] Determine whether the comprehensive logistics time meets the preset logistics scheduling requirements. When the comprehensive logistics time does not meet the logistics scheduling requirements, perform deviation analysis on the comprehensive logistics time according to the logistics scheduling requirements, obtain deviation parameters, and generate a dynamic management plan based on the deviation parameters.
[0147] This embodiment can more accurately evaluate the bottlenecks and potential problem points in the logistics network by analyzing the key parameters of the node dynamic information, so as to take measures to optimize the logistics process and improve the overall logistics efficiency. By comprehensively calculating the logistics transportation time and logistics efficiency time, the delivery time of goods can be predicted more accurately, reducing customer dissatisfaction and additional costs caused by delays. The dynamic management scheme in the embodiment can be quickly adjusted according to changes in actual conditions, improving the flexibility of the logistics system and its ability to respond to emergencies. By optimizing path selection, reducing invalid waiting time, etc., logistics costs such as fuel costs and human resource costs can be effectively reduced.
[0148] In one embodiment, feedback information of logistics network nodes is obtained based on a dynamic management solution, and a real-time node three-dimensional map is dynamically optimized based on the feedback information to obtain an optimized real-time node three-dimensional map, including:
[0149] Conduct prospective analysis on the dynamic management scheme to obtain prospective node data;
[0150] Perform node matching on the dynamic management scheme to obtain the corresponding logistics network nodes, and obtain feedback information sent by the logistics network nodes after executing the dynamic management scheme;
[0151] Perform parameter analysis on the feedback information to obtain the corresponding map node parameters;
[0152] Determine whether the map node parameters meet the expected node data requirements. When the map node parameters do not meet the expected node data requirements, optimize the map node parameters through the expected node data to obtain the optimized parameters.
[0153] The real-time node three-dimensional map is dynamically optimized according to the optimization parameters to obtain an optimized real-time node three-dimensional map.
[0154] This embodiment can quickly obtain feedback information after the execution of the plan through expected analysis and node matching of the dynamic management plan, so as to adjust the status of the logistics network in time. Parameter analysis and optimization based on feedback information can quickly respond to changes in the logistics network and improve the response speed of the logistics network. The expected node data obtained through expected analysis can more accurately guide the operation of the logistics network and realize refined management. Parameter optimization is performed based on the comparison between map node parameters and expected node data to ensure that the logistics network operates according to the predetermined goals. By analyzing the feedback information, inefficient links in the logistics network can be identified, thereby optimizing resource allocation and reducing unnecessary costs.
[0155] Reference Figure 2As shown, the present invention also provides a logistics network node dynamic optimization and management device, which is applied to any of the above-mentioned logistics network node dynamic optimization and management methods, and is characterized by comprising:
[0156] The acquisition module is used to obtain logistics data, node data and external dynamic data through logistics network nodes;
[0157] Analysis module: The analysis module is used to analyze logistics data to obtain comprehensive logistics data, analyze node data to obtain real-time node data and normal node data, and dynamically analyze external dynamic data to obtain comprehensive dynamic data;
[0158] The processing module is used to construct a preset three-dimensional map based on normal node data and comprehensive dynamic data to obtain an initial node three-dimensional map, and optimize the initial node three-dimensional map according to real-time node data to obtain a node three-dimensional map;
[0159] A calculation module is used to map the comprehensive logistics data to the node three-dimensional map to obtain the real-time node three-dimensional map, and dynamically analyze the real-time node three-dimensional map to obtain node dynamic information;
[0160] The control module is used to analyze the node dynamic information to obtain a dynamic management plan, obtain feedback information of the logistics network nodes based on the dynamic management plan, and dynamically optimize the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map.
[0161] The present invention provides a logistics network node dynamic optimization and management device, which realizes all-round monitoring and analysis of the status of logistics network nodes by comprehensively integrating logistics data, node data and external dynamic data. Through this comprehensive data processing method, the dynamic changes in the logistics process can be accurately captured, the problems of data islands and information asymmetry in traditional management methods are solved, and the accuracy and timeliness of logistics decisions are improved. The initial node three-dimensional map constructed based on normal node data and comprehensive dynamic data can intuitively show the distribution and status of logistics network nodes. The map is dynamically optimized through real-time node data to ensure the real-time and accuracy of map information, so that the logistics network nodes can quickly respond to changes in the external environment and reduce the risk of logistics delays caused by emergencies. Through in-depth analysis of node dynamic information, targeted dynamic management plans can be generated, which not only improves the management level of logistics network nodes, but also realizes continuous optimization of management plans through feedback information. This data-driven decision support and feedback mechanism can effectively solve the problem of decision lag in traditional management methods and improve the overall operation efficiency of the logistics network.
[0162] Reference Figure 3As shown, the present invention also provides a logistics network node dynamic optimization and management device, including:
[0163] Memory, used to store programs;
[0164] The processor is used to execute the program to implement each step of the method for dynamic optimization and management of logistics network nodes described in any one of the above.
[0165] In this embodiment, the processor and the memory may be connected via a bus or other means. The memory may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a read-only memory, a flash memory, a hard disk, or a solid-state drive. The processor may be a general-purpose processor, such as a central processing unit, a digital signal processor, an application-specific integrated circuit, or one or more integrated circuits configured to implement the embodiments of the present invention.
[0166] The present invention also provides a storage medium storing computer instructions, wherein the computer instructions are used to enable a computer to execute any of the above methods.
[0167] It should be noted that technicians in the relevant technical field can clearly understand that for the convenience and conciseness of description, the specific working process of the system and each module described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0168] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for dynamic optimization and management of logistics network nodes, characterized in that: include: Obtain logistics data, node data and external dynamic data through logistics network nodes; Performing data analysis on the logistics data to obtain comprehensive logistics data, analyzing the node data to obtain real-time node data and normal node data, and dynamically analyzing the external dynamic data to obtain comprehensive dynamic data; Based on the normal node data and the comprehensive dynamic data, a preset three-dimensional map is constructed to obtain an initial node three-dimensional map, and the initial node three-dimensional map is optimized according to the real-time node data to obtain a node three-dimensional map; Mapping the comprehensive logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information; Performing a solution analysis on the node dynamic information to obtain a dynamic management solution, obtaining feedback information of the logistics network node based on the dynamic management solution, and dynamically optimizing the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map; The data analysis of the logistics data to obtain comprehensive logistics data, the analysis of the node data to obtain real-time node data and normal node data, and the dynamic analysis of the external dynamic data to obtain comprehensive dynamic data include: Performing index data analysis on the logistics data to obtain transportation index data and cargo management data, and integrating the transportation index data and cargo management data to obtain the comprehensive logistics data; Performing data analysis on the node data to obtain node inventory data, node loading and unloading data, and node location data; performing node analysis on the logistics network nodes based on the node inventory data and the node loading and unloading data to obtain node type data; performing relationship analysis on the logistics network nodes based on the node location data and the node type data to obtain node connection relationships; Arrange the node inventory data and the node loading and unloading data to obtain the real-time node data, and arrange the node type data, the node connection relationship and the node position data to obtain the normal node data; Performing dynamic information analysis on the external dynamic data to obtain meteorological data and traffic information data, and integrating the meteorological data and traffic information data to obtain comprehensive dynamic data; The step of mapping the integrated logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information includes: Performing key information analysis on the comprehensive logistics data to obtain the transportation index data and the cargo management data; Performing initial node matching on the comprehensive logistics data and the node three-dimensional map to obtain a corresponding first logistics node, and extracting first node information of the first node; Mapping the cargo management data to the first node information, updating the first node information, and obtaining the second node information; Mapping the transport index data to the node three-dimensional map, and performing node path association extraction on the first logistics node to obtain first node path information, and updating the first node path information according to the second node information to obtain second node path information; The node three-dimensional map is updated according to the second node information and the second node path information to obtain the real-time node three-dimensional map; the real-time node three-dimensional map is dynamically analyzed to obtain the node dynamic information.
2. The method for dynamic optimization and management of logistics network nodes according to claim 1, characterized in that: Obtain logistics data, node data and external dynamic data through logistics network nodes, including: Acquire original logistics network data through the logistics network nodes, classify and screen the logistics network data, and obtain corresponding logistics screening data, node screening data and external dynamic screening data; Check in sequence whether the logistics screening data, node screening data and external dynamic screening data meet the requirements of the preset screening rules. When any of the logistics screening data, node screening data and external dynamic screening data does not meet the requirements of the screening rules, re-acquire the original logistics network data for classification screening; When the logistics screening data, the node screening data and the external dynamic screening data all meet the requirements of the screening rules, the logistics screening data, the node screening data and the external dynamic screening data are sorted in turn to obtain the logistics data, the node data and the external dynamic data.
3. The method for dynamic optimization and management of logistics network nodes according to claim 1, characterized in that: The method constructs a preset three-dimensional map based on the normal node data and the comprehensive dynamic data to obtain an initial node three-dimensional map, and optimizes the initial node three-dimensional map according to the real-time node data to obtain a node three-dimensional map, including: Reading the normal node data to obtain the node type data, the node connection relationship and the node position data, and mapping the node position data, the node type data and the node connection relationship to the three-dimensional map; Constructing map nodes in the three-dimensional map using the node position data to obtain mapping nodes of logistics nodes in the three-dimensional map, connecting the mapping nodes according to the node connection relationship, and setting parameters for the mapping nodes according to the node type data to obtain a node grid map; Reading the comprehensive dynamic data to obtain the meteorological data and the traffic information data, mapping the meteorological data and the traffic information data into a node grid map, and dynamically constructing the node grid map according to the meteorological data and the traffic information data to obtain the node three-dimensional map; Perform node matching on the real-time node data and the initial node three-dimensional map to obtain corresponding matching nodes; Reading the real-time node data to obtain the node inventory data and the node loading and unloading data, and performing parameter calculation on the node inventory data and the node loading and unloading data to obtain inventory parameters and loading and unloading parameters; The matching nodes are updated according to the inventory parameters and the loading and unloading parameters to obtain the three-dimensional map of the nodes.
4. The method for dynamic optimization and management of logistics network nodes according to claim 1, characterized in that: The performing scheme analysis on the node dynamic information to obtain a dynamic management scheme includes: Perform key parameter analysis on the node dynamic information to obtain node inventory status, node transportation efficiency, node environmental information and logistics path information; Based on the node environment information and logistics path information, the time is calculated to obtain the logistics transportation time. Based on the node inventory status and node transportation efficiency, the efficiency is calculated to obtain the logistics efficiency time. The logistics transportation time and logistics efficiency time are comprehensively calculated to obtain the logistics comprehensive time. Determine whether the comprehensive logistics time meets the preset logistics scheduling requirements. When the comprehensive logistics time does not meet the logistics scheduling requirements, perform deviation analysis on the comprehensive logistics time according to the logistics scheduling requirements to obtain deviation parameters, and generate the dynamic management plan based on the deviation parameters.
5. The method for dynamic optimization and management of logistics network nodes according to claim 1, characterized in that: The obtaining feedback information of the logistics network nodes based on the dynamic management scheme, and dynamically optimizing the real-time node three-dimensional map based on the feedback information to obtain the optimized real-time node three-dimensional map, includes: Performing expected analysis on the dynamic management scheme to obtain expected node data; Performing node matching on the dynamic management scheme to obtain the corresponding logistics network node, and acquiring the feedback information sent by the logistics network node after executing the dynamic management scheme; Performing parameter analysis on the feedback information to obtain corresponding map node parameters; Determine whether the map node parameters meet the expected node data requirements. When the map node parameters do not meet the expected node data requirements, optimize the map node parameters through the expected node data to obtain the optimized parameters. The real-time node three-dimensional map is dynamically optimized according to the optimization parameters to obtain the optimized real-time node three-dimensional map.
6. A logistics network node dynamic optimization and management device, applied to any one of the logistics network node dynamic optimization and management methods of claims 1-5 above, characterized in that: include: A collection module, which is used to obtain logistics data, node data and external dynamic data through logistics network nodes; An analysis module, the analysis module is used to perform data analysis on the logistics data to obtain comprehensive logistics data, analyze the node data to obtain real-time node data and normal node data, and dynamically analyze the external dynamic data to obtain comprehensive dynamic data; A processing module, the processing module is used to construct a preset three-dimensional map based on the normal node data and the comprehensive dynamic data to obtain an initial node three-dimensional map, and optimize the initial node three-dimensional map according to the real-time node data to obtain a node three-dimensional map; A calculation module, the calculation module is used to map the comprehensive logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyze the real-time node three-dimensional map to obtain node dynamic information; A control module, the control module is used to perform a solution analysis on the node dynamic information to obtain a dynamic management solution, obtain feedback information of the logistics network node based on the dynamic management solution, and dynamically optimize the real-time node three-dimensional map based on the feedback information to obtain an optimized real-time node three-dimensional map; The data analysis of the logistics data to obtain comprehensive logistics data, the analysis of the node data to obtain real-time node data and normal node data, and the dynamic analysis of the external dynamic data to obtain comprehensive dynamic data include: Performing index data analysis on the logistics data to obtain transportation index data and cargo management data, and integrating the transportation index data and cargo management data to obtain the comprehensive logistics data; Performing data analysis on the node data to obtain node inventory data, node loading and unloading data, and node location data; performing node analysis on the logistics network nodes based on the node inventory data and the node loading and unloading data to obtain node type data; performing relationship analysis on the logistics network nodes based on the node location data and the node type data to obtain node connection relationships; Arrange the node inventory data and the node loading and unloading data to obtain the real-time node data, and arrange the node type data, the node connection relationship and the node position data to obtain the normal node data; Performing dynamic information analysis on the external dynamic data to obtain meteorological data and traffic information data, and integrating the meteorological data and traffic information data to obtain comprehensive dynamic data; The step of mapping the integrated logistics data to the node three-dimensional map to obtain a real-time node three-dimensional map, and dynamically analyzing the real-time node three-dimensional map to obtain node dynamic information includes: Performing key information analysis on the comprehensive logistics data to obtain the transportation index data and the cargo management data; Performing initial node matching on the comprehensive logistics data and the node three-dimensional map to obtain a corresponding first logistics node, and extracting first node information of the first node; Mapping the cargo management data to the first node information, updating the first node information, and obtaining the second node information; Mapping the transport index data to the node three-dimensional map, and performing node path association extraction on the first logistics node to obtain first node path information, and updating the first node path information according to the second node information to obtain second node path information; According to the second node information and the second node path information, the node three-dimensional map is updated to obtain the real-time node three-dimensional map; Dynamically analyze the real-time node three-dimensional map to obtain the node dynamic information.
7. A logistics network node dynamic optimization and management device, characterized in that: include: Memory, used to store programs; A processor is used to execute the program to implement each step of a logistics network node dynamic optimization and management method as described in any one of claims 1 to 5.
8. A storage medium, characterized in that: Computer instructions are stored, and the computer instructions are used to make a computer execute the method according to any one of claims 1 to 5.