A composite vibration isolation foundation test device

Through the composite vibration isolation foundation test device that automatically digs and fills trenches, it solves the cumbersome problems of adjusting the arrangement of vibration isolation piles and handling empty trenches in the vibration isolation test, improves the test efficiency and accuracy, and reduces manpower investment and Human error.

CN118653518BActive Publication Date: 2024-10-18GUANGZHOU TAIYU TECH DEV CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411132057.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-18
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

In the existing technology, it is difficult to adjust the arrangement of vibration isolation piles multiple times during the vibration isolation test, and the processing of empty trenches is cumbersome, which affects the detection efficiency and effect.

Method used

A composite vibration isolation foundation test device including a base, a trenching mechanism and a storage mechanism is used to automatically dig and fill trenches to achieve consistency and simplicity in trenching, storage, and discharge operations, reducing manpower input. , and automatically grab and place the vibration isolation piles through the lifting and clamping mechanism.

Benefits of technology

It improves the efficiency and accuracy of vibration isolation tests, reduces manual handling time and labor input, ensures that the test site is close to its original state, and reduces the impact of empty trenches on test data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118653518B_ABST
    Figure CN118653518B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of vibration isolation test of vibration isolation piles, and specifically to a composite vibration isolation foundation test device, comprising a base, an exciter and a sensor for detecting vibration parameters are arranged on the outside of the base, a grooving mechanism for digging grooves on the base, a material storage mechanism is arranged on the top of the grooving mechanism, and a power part is arranged on the base; the grooving mechanism comprises a vertically arranged cylinder and a drill rod arranged in the cylinder, and a discharge port is arranged at the top of the cylinder; the material storage mechanism comprises a material storage box, a sleeve is arranged at the center of the material storage box, the cylinder is sleeved outside the cylinder, a discharge port is arranged at the bottom of the sleeve, a feed slot is arranged on the cylinder, and a telescopic part is arranged between the bottom surface of the material storage box and the outer wall of the cylinder. The present invention realizes automatic digging of grooves for placing vibration isolation piles through the cooperation of the grooving mechanism and the material storage mechanism, and automatically completes the filling of the grooves after the test is completed, thereby realizing the continuity of operations such as grooving, material storage, material discharge, and filling, and improving the efficiency of vibration isolation test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of vibration isolation pile vibration isolation test, and in particular to a composite vibration isolation foundation test device. Background Art

[0002] In the control of vibration isolation measures for rail transit roadbed, the main research is from the aspects of controlling the vibration source and the propagation path of vibration waves. However, it is difficult to implement this measure without affecting normal operation in existing lines. Therefore, this measure can only be applied to rail transit lines that are being repaired. In existing rail transportation lines, setting up barriers to hinder the propagation of vibration waves has become a common means to solve the vibration isolation process. In order to obtain the desired vibration isolation effect, the current method is to change the empty trench to a filled trench, add vibration isolation piles to the filled trench, and improve the vibration isolation effect. The vibration isolation effect is usually directly related to the arrangement of the vibration isolation piles. When conducting basic tests on vibration isolation piles, it is necessary to first dig a filled trench in the test site, and then bury the vibration isolation piles in the filled trench, and then use sensors to detect the vibration transmitted from the vibration source. The problem with the existing test method is that it is difficult to accurately control the arrangement of the vibration isolation piles. Specifically, the arrangement needs to be adjusted continuously. The process of adjusting the placement of the vibration isolation piles is relatively cumbersome. After the subsequent vibration isolation piles are replaced, the processing of the original empty trench requires a lot of labor. If the original empty trench is not properly handled, it will affect the transmission of vibration, and then affect the test data of the vibration isolation piles.

[0003] In the prior art, a Chinese patent document with the publication number CN110567665B discloses a vibration reduction and isolation model test device for railway vibration sources, including a test box, soil inside the box, a vibration isolation barrier, a data acquisition device, and a load application device. During the specific test, the required buried positions and quantities are planned in advance, and the soil is filled from bottom to top inside the test box. During the filling process, sensors and vibration isolation barriers are buried according to the soil layer distribution and the preset positions of the sensors.

[0004] During the actual use of the above structure, it is not convenient to adjust the arrangement of the vibration isolation piles. The soil in the test box needs to be cleaned out. After adjusting the position of the vibration isolation material, it is difficult to ensure that the soil is refilled to remain consistent with the previous one, which affects the test data and detection efficiency of the vibration isolation detection. Summary of the invention

[0005] The present invention provides a composite vibration isolation foundation test device to solve the technical problems in the prior art that it is inconvenient to adjust the arrangement of vibration isolation piles multiple times during vibration isolation tests, and the processing of empty grooves is cumbersome, which affects the detection efficiency and effect.

[0006] In order to solve the above problems, the present invention provides a composite vibration isolation foundation test device adopts the following technical solutions:

[0007] It includes a base, the outside of which is provided with a vibrator and a sensor for detecting vibration parameters, the bottom of the base is provided with a slide rail mechanism for driving the base to move, the base is provided with a grooving mechanism for digging grooves, the top of the grooving mechanism is provided with a material storage mechanism, and the base is provided with a power part for driving the grooving mechanism and the material storage mechanism to move vertically synchronously.

[0008] The grooving mechanism includes a vertically arranged cylinder and a drill rod arranged in the cylinder. A driving member for driving the drill rod to rotate is provided at the top of the cylinder. The bottom port of the cylinder is open to the outside and a slot hole allowing the cylinder to pass vertically is provided on the base. A discharge port is provided at the top of the cylinder.

[0009] The material storage mechanism includes a material storage box, a sleeve is provided at the center of the material storage box, the cylinder is vertically slidably sleeved outside the cylinder, a discharge port is provided at the bottom of the sleeve, a feed slot is provided on the cylinder, and a telescopic part is provided between the bottom surface of the material storage box and the outer wall of the cylinder. The telescopic action of the telescopic part drives the sleeve and the cylinder to generate relative vertical movement, so that the discharge port and the feed slot are connected or staggered.

[0010] By adopting the above technical scheme, the trenches for placing vibration isolation piles can be automatically dug through the cooperation of the trenching mechanism and the material storage mechanism, and the trenches can be automatically filled after the test is completed, thereby achieving the continuity and simplicity of trenching, material storage, and material discharge operations, reducing manpower input, facilitating the adjustment of the arrangement of vibration isolation piles, and improving the efficiency of vibration isolation tests.

[0011] In addition, during the vibration isolation test, when adjusting the arrangement of the vibration isolation piles, the empty trenches can be filled in time to make the test site as close to the original state as possible, reduce the impact of the empty trenches on the vibration isolation pile test data, and improve the accuracy of the test.

[0012] Furthermore, an annular cover is provided at the top of the storage box, a feed opening is formed between the inner wall of the annular cover and the outer wall of the sleeve, and the discharge port is located above the feed opening.

[0013] Furthermore, a plate seat is provided outside the cylinder and is spaced below the material storage box. The telescopic member is fixed on the plate seat and the top of the telescopic member is connected to the bottom surface of the material storage box.

[0014] By adopting the above technical scheme, when a trench is dug by a drill rod, the excavated soil is discharged from the discharge port while the drill rod with spiral blades drills downward, and enters the storage box through the feed port; when landfill is required, the discharge port is connected with the feed slot through the action of the telescopic member, and the excavated soil is buried in the trench through the reverse rotation of the drill rod. The automatic storage of the excavated soil facilitates the subsequent automatic landfill, and the automated operations of trenching and landfilling improve work efficiency.

[0015] Furthermore, the storage box is provided with partitions, which are a plurality of partitions spaced apart between the inner wall of the storage box and the outer wall of the sleeve, a storage cavity is formed between adjacent partitions, and the discharge ports at the bottom of the sleeve are a plurality of discharge ports corresponding one to one with the storage cavities.

[0016] The plate seat is provided with a linkage assembly for driving the material storage box to rotate relative to the cylinder.

[0017] By adopting the above technical solution, multiple storage chambers are set up, so that when different trenches are dug, the excavated soil is placed in different storage chambers accordingly, and the discharge of soil in different storage chambers is achieved through relative rotation between the storage box and the cylinder, which facilitates the digging of trenches of different properties and improves the flexibility of equipment use.

[0018] Furthermore, the linkage assembly includes a motor fixed on the plate base and a vertical rotating shaft driven to rotate by the motor, a driving gear is fixedly sleeved on the vertical rotating shaft, a sleeve is provided at the bottom end of the storage box and is sleeved outside the cylinder, and a driven gear is fixedly sleeved outside the sleeve and meshes with the driving gear.

[0019] Furthermore, an auxiliary support seat is fixedly mounted on the sleeve, the auxiliary support seat is located above the driven gear, a protrusion is disposed on one side of the auxiliary support seat, and the top end of the vertical rotating shaft is rotationally supported by the protrusion.

[0020] Furthermore, an annular groove is provided on the bottom surface of the storage box, and an annular slider is slidably provided on the lower end surface of the annular groove. The cross-section of the annular slider is I-shaped, and the top end of the telescopic member is fixedly connected to the annular slider.

[0021] By adopting the above technical solution, the relative rotation between the storage box and the cylinder is driven by a stable linkage component, and the overall structural stability is strong. At the same time, through the sliding cooperation between the annular groove and the annular slider, the storage box and the cylinder are snapped together and the rotational cooperation connection is achieved.

[0022] Furthermore, a lifting and clamping mechanism for automatically grabbing or placing the vibration isolation piles is provided on the base.

[0023] Furthermore, the lifting and clamping mechanism comprises a guide cylinder fixed on the base, a telescopic rod is provided at the top end of the guide cylinder, a driving end of the telescopic rod extends into the guide cylinder and a clamping claw is provided at the driving end.

[0024] The bottom end of the guide cylinder passes through the base and the bottom port is communicated with the outside.

[0025] By adopting the above technical solution, the automated grabbing and placement of vibration isolation piles can greatly reduce the time and labor input of manual handling, thereby improving the overall work efficiency. At the same time, due to the accurate and fast operation, it can also reduce delays and losses caused by human factors.

[0026] The beneficial effect of the composite vibration isolation foundation test device provided by the present invention is that when testing the vibration isolation piles, it is necessary to adjust the positions of the vibration isolation piles multiple times, so as to obtain the arrangement with the best vibration isolation effect through the test. The present invention realizes automatic digging of grooves for placing vibration isolation piles through the cooperation of the grooving mechanism and the material storage mechanism, and automatically completes the filling of the grooves after the test is completed, thereby achieving the continuity of operations such as grooving, material storage, material discharge, and filling, reducing manpower input, facilitating the adjustment of the arrangement of vibration isolation piles, and improving the efficiency of vibration isolation tests. In addition, the automatic grabbing and placement of vibration isolation piles by the lifting and clamping mechanism can greatly reduce the time and labor input of manual handling, thereby improving overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] By reading the following detailed description with reference to the accompanying drawings, the above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0028] Figure 1 It is a structural schematic diagram of the composite vibration isolation foundation test device of the present invention;

[0029] Figure 2 This is one of the partial structural schematic diagrams of the composite vibration isolation foundation test device of the present invention;

[0030] Figure 3 It is a structural schematic diagram of the cooperation between the grooving mechanism, the material storage mechanism and the linkage assembly in the present invention;

[0031] Figure 4 for Figure 3 A partial enlarged view of the middle area A;

[0032] Figure 5 for Figure 3 A cross-sectional structural diagram of the middle structure;

[0033] Figure 6 for Figure 5 A partial enlarged view of the middle area B;

[0034] Figure 7 for Figure 3 A sectional front view of the middle structure;

[0035] Figure 8 for Figure 7 A partial enlarged view of the middle area C;

[0036] Fig. 9 A top view of the base and the structure provided on the base in the present invention;

[0037] Fig.10 is a cross-sectional view of the lifting and clamping mechanism of the present invention;

[0038] Fig.11 This is the second partial structural schematic diagram of the composite vibration isolation foundation test device of the present invention;

[0039] Fig.12 Schematic diagram of the structure of the circular frame bracket in an embodiment of the present invention.

[0040] Description of reference numerals:

[0041] 1. Base; 11. Slot; 101. Vibrator; 102. Sensor; 2. Slide rail mechanism; 3. Grooving mechanism; 31. Cylinder; 311. Discharge port; 312. Feed slot; 313. Plate seat; 32. Drill rod; 4. Storage mechanism; 40. Telescopic member; 401. Annular slot; 402. Annular slider; 41. Storage box; 411. Sleeve; 412. Discharge port; 413. Annular cover; 414. Feed port; 415. Partition; 416. Storage cavity; 417. Casing; 418. Driven gear; 419. Auxiliary support seat; 4191. Bump; 5. Linkage assembly; 51. Motor; 52. Vertical shaft; 521. Driving gear; 6. Lifting and clamping mechanism; 61. Guide cylinder; 62. Telescopic rod; 63. Clamping claw; 7. Power member. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Those skilled in the art should know that the embodiments described below are part of the embodiments of the present disclosure, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0043] Any number of elements in the drawings is for illustration and not limitation, and any naming is for distinction only and does not have any limiting meaning.

[0044] The principle and spirit of the present invention are explained in detail below with reference to several representative embodiments of the present invention.

[0045] Embodiment of the composite vibration isolation foundation test device provided by the present invention:

[0046] like Figures 1 to 11As shown, the composite vibration isolation foundation test device includes a base 1, the outside of the base 1 is provided with a vibration exciter 101 and a sensor 102 for detecting vibration parameters, the bottom end of the base 1 is provided with a slide rail mechanism 2 for driving the base 1 to move, the base 1 is provided with a grooving mechanism 3 for digging grooves, the top of the grooving mechanism 3 is provided with a storage mechanism 4, and the base 1 is provided with a power member 7 for driving the grooving mechanism 3 and the storage mechanism 4 to move vertically synchronously, wherein the power member 7 is specifically a cylinder, and the top end of the piston rod of the power member 7 is fixedly connected to the storage mechanism 4.

[0047] Specifically, the groove digging mechanism 3 and the material storage mechanism 4 are rotationally matched, and a linkage component 5 for driving the groove digging mechanism 3 and the material storage mechanism 4 to rotate relative to each other is provided on the groove digging mechanism 3.

[0048] Specifically, the base 1 is also provided with a lifting and clamping mechanism 6 for automatically grabbing or placing the vibration isolation piles.

[0049] The trenching mechanism 3 and the material storage mechanism 4 cooperate to realize automatic trenching for placing the vibration isolation piles, and automatically fill the trench after the test is completed, thereby realizing the continuity and simplicity of trenching, material storage, material discharge, filling and other operations, reducing manpower input and improving the efficiency of the vibration isolation test.

[0050] In addition, during the vibration isolation test, when adjusting the arrangement of the vibration isolation piles, the empty trenches can be filled in time to make the test site as close to the original state as possible, reduce the impact of the empty trenches on the vibration isolation pile test data, and improve the accuracy of the test.

[0051] In this embodiment, the slide rail mechanism 2 includes a first linear slide rail arranged in parallel with an interval, a first slider is provided on the first linear slide rail, a second linear slide rail arranged in parallel with an interval is provided between the two first sliders, a second slider is provided on the second linear slide rail, and the base 1 is fixedly supported by the two second sliders.

[0052] In this embodiment, the grooving mechanism 3 includes a vertically arranged cylinder 31 and a drill rod 32 arranged in the cylinder 31. A driving member for driving the drill rod 32 to rotate is provided at the top of the cylinder 31. The bottom port of the cylinder 31 is open to the outside and a slot hole 11 allowing the cylinder 31 to pass vertically is provided on the base 1. A discharge port 311 is provided at the top of the cylinder 31.

[0053] It should be noted that the driving member is a servo motor, which drives the drill rod 32 to rotate forward or reversely.

[0054] When a trench is dug by the drill rod 32, the excavated soil is discharged from the discharge port 311 into the storage mechanism 4 while the drill rod 32 with spiral blades drills downward. When landfill is required, the excavated soil is filled into the trench by the reverse rotation of the drill rod 32. The automatic storage of the excavated soil facilitates the subsequent automatic landfill. The automated operations of trenching and landfilling improve work efficiency.

[0055] In this embodiment, the storage mechanism 4 includes a storage box 41, a sleeve 411 is provided at the center of the storage box 41, the cylinder 31 is vertically slidably sleeved outside the cylinder 31, a discharge port 412 is provided at the bottom of the sleeve 411, and a feed slot 312 is provided on the cylinder 31. A telescopic member 40 is provided between the bottom surface of the storage box 41 and the outer wall of the cylinder 31. The telescopic action of the telescopic member 40 drives the sleeve 411 and the cylinder 31 to generate relative vertical movement, so that the discharge port 412 is connected to the feed slot 312 or is staggered.

[0056] It should be noted that the telescopic member 40 is specifically a cylinder.

[0057] A plate seat 313 is disposed outside the cylinder 31 and is spaced below the material storage box 41 . The telescopic member 40 is fixed on the plate seat 313 and the top of the telescopic member 40 is connected to the bottom surface of the material storage box 41 .

[0058] Specifically, the bottom surface of the storage box 41 is provided with an annular groove 401, and the lower end surface of the annular groove 401 is slidably provided with an annular slider 402, the cross-section of the annular slider 402 is I-shaped, and the telescopic part 40, i.e. the top end of the piston rod of the cylinder, is fixedly connected to the lower surface of the annular slider 402.

[0059] The top of the material storage box 41 is provided with an annular cover 413 , a material discharge port 414 is formed between the inner wall of the annular cover 413 and the outer wall of the sleeve 411 , and the material discharge port 311 is located above the material discharge port 414 .

[0060] Among them, partitions 415 are provided in the storage box 41, and there are six partitions 415 distributed between the inner wall of the storage box 41 and the outer wall of the sleeve 411. Storage cavities 416 are formed between adjacent partitions 415, and there are six discharge ports 412 at the bottom of the sleeve 411 corresponding to the storage cavities 416 one by one.

[0061] By setting up multiple storage chambers 416, when digging different trenches, the excavated soil is placed in different storage chambers 416 accordingly, and the soil in different storage chambers 416 is discharged through relative rotation between the storage box 41 and the cylinder 31, which facilitates the digging of trenches of different properties and improves the flexibility of equipment use.

[0062] In this embodiment, the linkage assembly 5 is disposed on the plate seat 313 and is used to drive the storage box 41 to rotate relative to the cylinder 31 .

[0063] Among them, the linkage assembly 5 includes a motor 51 fixed on the plate seat 313 and a vertical rotating shaft 52 driven to rotate by the motor 51, a driving gear 521 is fixedly sleeved on the vertical rotating shaft 52, and a sleeve 417 is provided at the bottom end of the storage box 41 and is sleeved outside the cylinder 31, and a driven gear 418 meshing with the driving gear 521 is fixedly sleeved outside the sleeve 417.

[0064] An auxiliary support seat 419 is fixedly mounted on the sleeve 417 . The auxiliary support seat 419 is located above the driven gear 418 . A protrusion 4191 is disposed on one side of the auxiliary support seat 419 . The top end of the vertical rotating shaft 52 is rotatably supported by the protrusion 4191 .

[0065] The stable linkage assembly 5 drives the storage box 41 and the cylinder 31 to rotate relative to each other, and the overall structure has strong stability.

[0066] In this embodiment, the lifting and clamping mechanism 6 includes a guide tube 61 fixed on the base 1 , a telescopic rod 62 is provided at the top of the guide tube 61 , a driving end of the telescopic rod 62 extends into the guide tube 61 and a clamping claw 63 is provided at the driving end.

[0067] It should be noted that the telescopic rod 62 is specifically a cylinder.

[0068] The bottom end of the guide tube 61 passes through the base 1 and the bottom port is connected to the outside.

[0069] Automated grabbing and placement of vibration isolation piles can greatly reduce the time and labor input of manual handling, thereby improving overall work efficiency.

[0070] During the specific use of the composite vibration isolation foundation test device of the present invention, the vibration isolation pile to be placed is first clamped by the lifting clamping mechanism 6. Specifically, the composite vibration isolation foundation test device can be first placed on a Fig.12 On the circular frame bracket shown, the vibration isolation pile is placed under the circular frame, and then the telescopic rod 62 is started, the piston rod of the telescopic rod 62 extends downward, and drives the clamping claw 63 to extend out of the guide cylinder 61, and then the corresponding vibration isolation pile is clamped by the clamping claw 63, and then retracted by the telescopic rod 62, and the vibration isolation pile is upwardly retracted into the guide cylinder 61.

[0071] Then, the composite vibration isolation foundation test device is placed at the test point, and the base 1 is moved to a suitable position through the action of the slide rail mechanism 2, and then the telescopic member 40 is started first, and the telescopic member 40 is extended. At this time, since the storage mechanism 4 is fixed, the cylinder 31 moves downward relatively and extends downward out of the base 1, and the drill rod 32 contacts the ground. Then, the servo motor is started to drive the drill rod 32 to rotate forward, and the power member 7 is started synchronously. The piston rod of the power member 7 is gradually retracted and drives the grooving mechanism 3 and the storage mechanism 4 to move downward synchronously, that is, the drill rod 32 gradually moves downward for drilling, and at the same time The soil generated during the drilling process is transported upward through the drill rod 32 with spiral blades and passes through the discharge port 311. The soil discharged from the discharge port 311 enters the storage chamber 416 through the discharge port 414. After the groove is dug, the power part 7 is reset, and at the same time, the groove digging mechanism 3 is moved away from the top of the dug groove through the action of the slide rail mechanism 2, and one of the lifting and clamping mechanisms 6 is moved to the top of the groove accordingly, and extended downward through the action of the telescopic rod 62, and the vibration isolation pile is placed in the corresponding groove. After the corresponding placement is completed, the clamp 63 is released and the telescopic rod 62 is reset.

[0072] Similarly, when another trench needs to be dug, the motor 51 rotates and drives the storage box 41 to rotate, so that the discharge port 311 corresponds to a storage cavity 416 of a hole, and then the above operation is repeated to complete the trench digging and the placement of the vibration isolation piles.

[0073] It should be noted that when digging the trench, that is, when the cylinder 31 is moved downward by the action of the telescopic member 40, the discharge port 412 and the feed slot 312 are staggered up and down. Therefore, when the trench needs to be filled, the telescopic member 40 is reset to make the discharge port 412 correspond to the feed slot 312, so that the soil in the storage cavity 416 can enter the cylinder 31.

[0074] Specifically, the power member 7 is used to make the trenching mechanism 3 and the storage mechanism 4 fall into the empty trench to be filled synchronously, and then the drill rod 32 rotates in the opposite direction to transport the soil in the corresponding storage chamber 416 to the corresponding empty trench. At the same time, the spiral blades of the drill rod 32 assist in compacting the soil to achieve better filling of the trench.

[0075] After the vibration isolation piles are arranged, the vibration exciter 101 at the appropriate position is started and the vibration parameters are detected by the sensor 102, and the vibration isolation effect of the vibration isolation piles is analyzed through the parameters.

[0076] By using the device of the present invention, when adjusting the position of the vibration isolation piles in multiple tests, the test efficiency is improved and the accuracy of the test detection is improved by automatically digging and filling the trenches.

[0077] According to the above description of this specification, those skilled in the art may also understand that the terms used below, such as "up", "down", "front", "back", "left", "right", "width", "horizontal", "top", "bottom", "inside", "outside" and the like, which indicate orientation or positional relationships, are based on the orientation or positional relationships shown in the drawings of this specification, and are only for the purpose of facilitating the explanation of the scheme of the present invention and simplifying the description, rather than explicitly or implicitly indicating that the devices or elements involved must have the specific orientation, be constructed and operated in a specific orientation. Therefore, the above-mentioned orientation or positional relationship terms cannot be understood or interpreted as limitations on the scheme of the present invention.

[0078] In addition, in the description of this specification, “plurality” means at least two, for example, two, three or more, etc., unless otherwise clearly and specifically defined.

Claims

1. A composite vibration isolation foundation test device, comprising a base (1), an exciter (101) and a sensor (102) for detecting vibration parameters are arranged outside the base (1), and a slide rail mechanism (2) for driving the base (1) to move is arranged at the bottom end of the base (1), characterized in that: The base (1) is provided with a groove digging mechanism (3) for digging grooves, the top of the groove digging mechanism (3) is provided with a material storage mechanism (4), and the base (1) is provided with a power member (7) for driving the groove digging mechanism (3) and the material storage mechanism (4) to move vertically synchronously; The grooving mechanism (3) comprises a vertically arranged cylinder (31) and a drill rod (32) arranged in the cylinder (31); a driving member for driving the drill rod (32) to rotate is arranged at the top of the cylinder (31); a bottom end of the cylinder (31) is open to the outside and a slot (11) is arranged on the base (1) for allowing the cylinder (31) to pass vertically; and a discharge port (311) is arranged at the top of the cylinder (31); The material storage mechanism (4) comprises a material storage box (41), a sleeve (411) is provided at the center of the material storage box (41), the cylinder (31) is vertically slidably sleeved outside the cylinder (31), a discharge port (412) is provided at the bottom of the sleeve (411), a feed slot (312) is provided on the cylinder (31), a telescopic member (40) is provided between the bottom surface of the material storage box (41) and the outer wall of the cylinder (31), and the sleeve (411) and the cylinder (31) are driven to move vertically relative to each other through the telescopic action of the telescopic member (40), so that the discharge port (412) and the feed slot (312) are connected or staggered. The cylinder (31) is provided with a plate seat (313) spaced apart and located below the material storage box (41); the telescopic member (40) is fixed on the plate seat (313) and the top of the telescopic member (40) is connected to the bottom surface of the material storage box (41); The storage box (41) is provided with a partition (415), wherein the partitions (415) are a plurality of partitions distributed at intervals between the inner wall of the storage box (41) and the outer wall of the sleeve (411), a storage cavity (416) is formed between adjacent partitions (415), and the discharge openings (412) at the bottom of the sleeve (411) are a plurality of material storage cavities (416) corresponding one to one. The plate seat (313) is provided with a linkage assembly (5) for driving the material storage box (41) to rotate relative to the cylinder (31).

2. The composite vibration isolation foundation test device according to claim 1, characterized in that: An annular cover (413) is provided at the top of the material storage box (41), a material discharge port (414) is formed between the inner wall of the annular cover (413) and the outer wall of the sleeve (411), and the material discharge port (311) is located above the material discharge port (414).

3. The composite vibration isolation foundation test device according to claim 1, characterized in that: The linkage assembly (5) comprises a motor (51) fixed on a plate seat (313) and a vertical rotating shaft (52) driven to rotate by the motor (51); a driving gear (521) is fixedly sleeved on the vertical rotating shaft (52); a sleeve (417) sleeved outside the cylinder (31) is provided at the bottom end of the material storage box (41); a driven gear (418) meshing with the driving gear (521) is fixedly sleeved outside the sleeve (417).

4. The composite vibration isolation foundation test device according to claim 3, characterized in that: An auxiliary support seat (419) is fixedly sleeved on the sleeve (417), and the auxiliary support seat (419) is located above the driven gear (418). A protrusion (4191) is provided on one side of the auxiliary support seat (419), and the top end of the vertical rotating shaft (52) is rotatably supported by the protrusion (4191).

5. The composite vibration isolation foundation test device according to claim 3, characterized in that: The bottom surface of the material storage box (41) is provided with an annular groove (401), the lower end surface of the annular groove (401) is slidably provided with an annular slider (402), the cross section of the annular slider (402) is I-shaped, and the top end of the telescopic member (40) is fixedly connected to the annular slider (402).

6. The composite vibration isolation foundation test device according to any one of claims 1 to 5, characterized in that: The base (1) is provided with a lifting and clamping mechanism (6) for automatically grabbing or placing the vibration isolation piles.

7. The composite vibration isolation foundation test device according to claim 6, characterized in that: The lifting and clamping mechanism (6) comprises a guide cylinder (61) fixedly mounted on the base (1); a telescopic rod (62) is provided at the top end of the guide cylinder (61); a driving end of the telescopic rod (62) extends into the guide cylinder (61) and a clamping claw (63) is provided at the driving end; The bottom end of the guide cylinder (61) passes through the base (1) and the bottom port is connected to the outside.

Citation Information

Patent Citations

  • A vibration reduction and isolation model test device for railway vibration sources

    CN110567665B

  • Sterol compositions from pulping soap

    AU2002300278A1

  • BR30905552A2