Testing device for the effect of drilling and completion fluid impregnation on geothermal reservoirs and the impact on heat extraction efficiency of production wells

By designing a test device to simulate the geothermal reservoir environment, the problem of measuring the impact of drilling and completion fluid impregnation on the thermal efficiency of production wells has been solved, and the accuracy of drilling and completion fluid selection and loss reduction have been achieved.

CN118655177BActive Publication Date: 2024-10-25SHANDONG UNIV OF SCI & TECH +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411132485.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-25
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

Existing technology cannot effectively test the impact of drilling and completion fluid impregnated geothermal reservoirs on the thermal efficiency of production wells. It lacks testing devices that can modulate the temperature and pressure conditions of geothermal reservoirs, and cannot measure and record the flow rate and temperature difference of production wellbores, resulting in Losses caused by improper selection of drilling and completion fluids are inevitable.

Method used

A system including a rack, a reservoir rock sample clamping device, a power supply system, a temperature control device, a formation water pumping system, a drilling and completion fluid displacement and impregnation control device, a heat medium pumping recovery system and integrated monitoring and analysis was designed. The systematic testing device can simulate the geothermal reservoir environment, measure and record the flow rate and temperature difference of the production wellbore, and quantify the changes in heat recovery efficiency under different drilling and completion fluid systems.

Benefits of technology

This device can accurately simulate the geothermal reservoir environment, quantify the impact of drilling and completion fluids on heat recovery efficiency, determine the most suitable geothermal reservoir drilling and completion fluid, and reduce losses due to improper selection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118655177B_ABST
    Figure CN118655177B_ABST
Patent Text Reader

Abstract

The present invention discloses a test device for drilling and completion fluid impregnation of geothermal reservoirs to affect the heat extraction efficiency of production wells, which belongs to the field of geothermal energy development technology, and includes a frame, a reservoir rock sample clamping device and a power supply system, wherein the reservoir rock sample clamping device is arranged on the frame, the top side of the reservoir rock sample clamping device is slidably connected with a pressure loading and regulating device, a temperature regulating device is arranged on the outside of the reservoir rock sample clamping device, and a formation water pumping system and a drilling and completion fluid displacement impregnation regulating device are arranged on the side of the pressure loading and regulating device. In the present invention, the environmental conditions and material conditions of the geothermal reservoir are effectively simulated, the penetration of the geothermal reservoir by the drilling and completion fluid is realized, the flow rate and temperature difference of the production wellbore are accurately measured, the heat extraction efficiency of different drilling and completion fluids is quantified, and it is determined whether the drilling and completion fluid impregnation of the geothermal reservoir affects the heat extraction efficiency of the production well; if there is an effect, the drilling and completion fluid with the least effect is determined, which provides support for evaluating the applicability of the drilling and completion fluid in the geothermal reservoir.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geothermal energy development, and in particular relates to a testing device for drilling and completion fluid impregnating a geothermal reservoir to affect the heat extraction efficiency of a production well. Background Art

[0002] The amount of hot dry rock resources in China at a depth of 3-10 kilometers underground is equivalent to about 856 trillion tons of standard coal, which is about 5 times the energy reserves of all oil, natural gas and coal in the world, and has huge development potential. At present, the main consideration is to use horizontal wells + multi-stage fracturing to obtain heat recovery rates with industrial value. Hot dry rock reservoirs are water-free or low in water. During the drilling and fracturing process, the drilling fluid, cementing fluid and fracturing fluid impregnate the reservoir under the pressure of the wellbore liquid column, and can react physically and chemically with the reservoir minerals, thereby significantly affecting the permeability and thermal conductivity of the rock around the well, and even making it difficult for production wells in high-quality heat reservoirs to obtain the expected heat recovery benefits.

[0003] The contact between drilling and completion fluid and the surrounding rock is inevitable. The selection of drilling and completion fluids with low sensitivity to geothermal reservoir minerals and low pollution is an important research direction in the field of geothermal development. Since the cost of drilling and completion operations is usually as high as tens of millions, evaluating and optimizing the drilling and completion fluid system before drilling and completion operations is a necessary and economical solution.

[0004] However, there is currently no testing device for the effect of drilling and completion fluid impregnation on the geothermal reservoir and its impact on the heat extraction efficiency of the production well. The main technical difficulties include: first, the device needs to be able to modulate the temperature and pressure conditions under the geothermal reservoir; second, the minerals contained in the device need to be the same as those in the original formation; third, the pre-installed minerals in the device need to be replaceable to test the impact of various drilling and completion fluid systems; fourth, the device needs to be able to measure and record the flow rate and temperature difference of the production wellbore to quantitatively evaluate the changes in heat extraction efficiency under different drilling and completion fluid systems.

[0005] Therefore, there is an urgent need for a testing device that can quantitatively evaluate the impact of drilling and completion fluid impregnation on geothermal reservoirs and the impact on the heat extraction efficiency of production wells. Summary of the invention

[0006] The purpose of the present invention is to provide a testing device and method for drilling and completion fluid impregnation into geothermal reservoirs to affect the heat extraction efficiency of production wells, which can improve the accuracy of drilling and completion fluid selection and reduce the losses caused by improper drilling and completion fluid selection.

[0007] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a testing device for the influence of drilling and completion fluid impregnation on geothermal reservoir on heat extraction efficiency of production wells, comprising a frame, a reservoir rock sample clamping device and a power supply system, wherein the reservoir rock sample clamping device is arranged on the frame, the top side of the reservoir rock sample clamping device is slidably connected with the overburden pressure loading and regulating device, a temperature regulating device is arranged on the outside of the reservoir rock sample clamping device, a formation water pumping system and a drilling and completion fluid displacement impregnation regulating device are arranged on the side of the overburden pressure loading and regulating device, a rock sample temperature time domain monitoring system is arranged on the inside of the reservoir rock sample clamping device, a heat extraction medium pumping recovery system is arranged on the side of the overburden pressure loading and regulating device and the rock sample temperature time domain monitoring system, a produced fluid pressure time domain monitoring system is arranged on the side of the rock sample temperature time domain monitoring system, and an integrated monitoring and analysis system is arranged on the frame.

[0008] As a further description of the above technical solution: the power supply system provides power for the overburden loading and control device, the formation water pumping system, the drilling and completion fluid displacement and impregnation control device, the heat medium pumping and recovery system, the rock sample temperature time domain monitoring system, the produced fluid pressure time domain monitoring system, and the integrated monitoring and analysis system.

[0009] As a further description of the above technical solution: the reservoir rock sample clamping device is used to load rock sample powder, and the reservoir rock sample clamping device includes a hollow cylinder with openings at both ends and an end cover, the bottom end of the reservoir rock sample clamping device is sealed by the end cover, and circular holes are provided at the center of the end cover and at the bottom of the center close to the edge, an artificial wellbore of a heat extraction medium pumping recovery system is provided at the center circular hole, and a pipeline connected to a rock sample temperature time domain monitoring system is provided in the circular hole at the bottom of the center close to the edge.

[0010] As a further description of the above technical solution: the overburden pressure loading and regulating device is equipped with a press, the overburden pressure loading and regulating device is a circular movable pressure head, circular openings are arranged at the center and near the edge of the overburden pressure loading and regulating device, the artificial wellbore of the heat extraction medium pumping and recovery system passes through the center opening in a sealed manner, and the circular opening near the edge is connected to the formation water pumping system and the drilling and completion fluid displacement and impregnation regulating device.

[0011] As a further description of the above technical solution: the temperature control device includes a plurality of electrically controlled heating rods and a shell, the electrically controlled heating rods are evenly distributed on the outside of the reservoir rock sample clamping device, the electrically controlled heating rods are fixed by end covers, and the shell is sleeved on the outside of the reservoir rock sample clamping device.

[0012] As a further description of the above technical solution: the heat extraction medium pumping recovery system consists of a storage tank with a liquid level gauge, a first recovery tank with a liquid level gauge, a temperature and pressure sensor, an artificial wellbore and a second pressure pump. The storage tank with the liquid level gauge and the first recovery tank with the liquid level gauge are at the ends of both sides of the artificial wellbore. The artificial wellbore is a cylindrical pipe. The artificial wellbore passes through the center of the reservoir rock sample clamping device. The artificial wellbore is fixed by an end cover and a pressure loading and regulating device. A sealing ring is provided at the connection. The temperature and pressure sensor is located in the artificial wellbore near the reservoir rock sample clamping device. The second pressure pump is located in the artificial wellbore near the storage tank with a liquid level gauge.

[0013] As a further description of the above technical solution: the formation water pumping system consists of a simulated formation water tank with a liquid level meter and a first pressure pump. The left side of the first pressure pump is connected to the second three-way valve switch, and the pipelines are respectively connected to the formation water pumping system and the drilling and completion fluid displacement and contamination control device. A first pressure sensor is arranged in the pipeline between the second three-way valve switch and the overpressure loading and control device.

[0014] As a further description of the above technical solution: the drilling and completion fluid displacement and impregnation control device is composed of a drilling and completion fluid tank with a liquid level gauge and a third pressure pump, and has the same structure as the formation water pumping system, and is connected to a second three-way valve switch at the lower side, and the second three-way valve switch is provided with a first pressure sensor near the overburden pressure loading and control device;

[0015] The rock sample temperature time domain monitoring system is composed of a plurality of temperature sensors, which are evenly distributed in the reservoir rock sample clamping device, and the temperature sensors are fixed by end covers.

[0016] As a further description of the above technical solution: the produced fluid pressure time domain monitoring system is composed of a second pressure sensor, a first three-way valve switch and two second recovery tanks. The right side of the second pressure sensor is connected to the rock sample in the reservoir rock sample clamping device through a pipeline passing through the end cover, and a sealing ring is provided at the connection between the end cover and the pipeline. The left side is connected to the first three-way valve switch. The three sides of the first three-way valve switch are respectively connected to the reservoir rock sample clamping device and the two second recovery tanks.

[0017] As a further description of the above technical solution: the integrated monitoring and analysis system is composed of a computer, a software program and a data cable, the computer is a carrier of the software program, the software program is used for data collection, calculation and characterization, and the computer is connected to the various devices by the data cable.

[0018] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0019] In the present invention, the environmental conditions and material conditions of the geothermal reservoir are effectively simulated, the penetration of the drilling and completion fluid into the geothermal reservoir is achieved, the flow rate and temperature difference of the production wellbore are accurately measured, the heat recovery efficiency of different drilling and completion fluids is quantified, and it is determined whether the penetration of the drilling and completion fluid into the geothermal reservoir affects the heat recovery efficiency of the production well; if there is an impact, the drilling and completion fluid with the least impact is determined, providing support for evaluating the applicability of the drilling and completion fluid in the geothermal reservoir. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the overall structure of a testing device proposed by the present invention for testing the impact of drilling and completion fluid on geothermal reservoirs and the heat extraction efficiency of production wells;

[0021] Figure 2 This is a schematic cross-sectional structure diagram of a testing device proposed by the present invention for testing the influence of drilling and completion fluid impregnation on geothermal reservoirs on the heat extraction efficiency of production wells.

[0022] Legend:

[0023] 101. Reservoir rock sample clamping device; 102. Overburden pressure loading and control device; 103. Temperature control device; 104. Formation water pumping system; 105. Drilling and completion fluid displacement and impregnation control device; 106. Heat medium pumping and recovery system; 107. Rock sample temperature time domain monitoring system; 108. Produced fluid pressure time domain monitoring system; 109. Integrated monitoring and analysis system; 110. Power supply system; 201. Liquid level meter; 202. First recovery tank; 203. First pressure sensor; 204. Pipeline; 205. Temperature and pressure sensor; 2 06. Heating rod; 207. Temperature sensor; 208. Press; 209. Movable pressure head; 210. First pressure pump; 211. Rack; 212. Computer; 213. Data cable; 214. Artificial wellbore; 215. End cover; 216. Shell; 217. First three-way valve switch; 218. Storage tank; 219. Simulated formation water tank; 220. Second pressure pump; 221. Second three-way valve switch; 222. Second recovery storage tank; 223. Second pressure sensor; 224. Drilling and completion fluid tank; 225. Third pressure pump. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Please see attached Figure 1 -Attached Figure 2The present invention provides a technical solution: a test device for the effect of drilling and completion fluid impregnation on the heat reservoir on the heat extraction efficiency of a production well, comprising a frame 211, a reservoir rock sample clamping device 101 and a power supply system 110, wherein the reservoir rock sample clamping device 101 is arranged on the frame 211, the top side of the reservoir rock sample clamping device 101 is slidably connected to the overburden pressure loading and regulating device 102, a temperature regulating device 103 is arranged on the outside of the reservoir rock sample clamping device 101, and a side of the overburden pressure loading and regulating device 102 is arranged There are a formation water pumping system 104, a drilling and completion fluid displacement and impregnation control device 105, a rock sample temperature time domain monitoring system 107 is arranged inside the reservoir rock sample clamping device 101, a heat medium pumping recovery system 106 is arranged on the side of the overburden pressure loading and control device 102 and the rock sample temperature time domain monitoring system 107, a produced fluid pressure time domain monitoring system 108 is arranged on the side of the rock sample temperature time domain monitoring system 107, and an integrated monitoring and analysis system 109 is arranged on the frame 211.

[0026] The power supply system 110 provides power for the overburden loading and control device 102, the formation water pumping system 104, the drilling and completion fluid displacement and impregnation control device 105, the heat medium pumping and recovery system 106, the rock sample temperature time domain monitoring system 107, the produced fluid pressure time domain monitoring system 108, and the integrated monitoring and analysis system 109.

[0027] The reservoir rock sample clamping device 101 is used to load rock sample powder. The reservoir rock sample clamping device 101 includes a hollow cylinder with openings at both ends and an end cover 215. The bottom end of the reservoir rock sample clamping device 101 is sealed by the end cover 215. Circular holes are provided at the center and near the edge of the center below the end cover 215. An artificial wellbore 214 of a heat medium pumping recovery system 106 is provided at the center circular hole. A pipeline 204 connected to a rock sample temperature time domain monitoring system 107 is provided in the circular hole at the center below the edge.

[0028] The overburden pressure loading and regulating device 102 is equipped with a press 208 for pressurizing the rock sample in the reservoir rock sample holding device 101. The overburden pressure loading and regulating device 102 is a circular movable pressure head 209. Circular openings are set in the center and near the edge of the overburden pressure loading and regulating device 102. The artificial wellbore 214 of the heat medium pumping and recovery system 106 passes through the center opening in a sealed manner. The circular opening near the edge is connected to the formation water pumping system 104 and the drilling and completion fluid displacement and impregnation regulating device 105. The overburden pressure loading and regulating device 102 is used to regulate the overburden pressure of the rock sample in the reservoir rock sample holding device 101, thereby regulating the permeability and porosity of the rock sample.

[0029] The temperature control device 103 includes a plurality of electrically controlled heating rods 206 and a shell 216 . The electrically controlled heating rods 206 are evenly distributed on the outside of the reservoir rock sample clamping device 101 . The electrically controlled heating rods 206 are fixed by end covers 215 . The shell 216 is sleeved on the outside of the reservoir rock sample clamping device 101 .

[0030] The heat extraction medium pumping recovery system 106 consists of a storage tank 218 with a liquid level meter 201, a first recovery tank 202 with a liquid level meter 201, a temperature and pressure sensor 205, an artificial wellbore 214 and a second pressure pump 220. The storage tank 218 with a liquid level meter 201 and the first recovery tank 202 with a liquid level meter 201 are at the ends of both sides of the artificial wellbore 214. The artificial wellbore 214 is a cylindrical pipe. The artificial wellbore 214 passes through the center of the reservoir rock sample clamping device 101. The artificial wellbore 214 is fixed by an end cover 215 and a pressure loading and regulating device 102. A sealing ring is provided at the connection. The temperature and pressure sensor 205 is located in the artificial wellbore 214 near the reservoir rock sample clamping device 101, and is used to measure the temperature difference and pressure difference of the medium. The second pressure pump 220 is located in the artificial wellbore 214 near the storage tank 218 with a liquid level meter 201, and is used to control the flow and pressure of the medium.

[0031] The formation water pumping system 104 is composed of a simulated formation water tank 219 with a liquid level meter 201 and a first pressure pump 210. The left side of the first pressure pump 210 is connected to the second three-way valve switch 221. The pipeline 204 is respectively connected to the formation water pumping system 104 and the drilling and completion fluid displacement and impregnation control device 105. A first pressure sensor 203 is arranged in the pipeline between the second three-way valve switch 221 and the overburden loading and control device 102. The second three-way valve switch 221 is used to control the flow of the formation water pumping system 104 and the drilling and completion fluid displacement and impregnation control device 105.

[0032] The drilling and completion fluid displacement and impregnation control device 105 is composed of a drilling and completion fluid tank 224 with a liquid level meter 201 and a third pressure pump 225. The structure is the same as that of the formation water pumping system 104. The lower side is connected to the second three-way valve switch 221. The second three-way valve switch 221 is provided with a first pressure sensor 203 near the overburden pressure loading and control device 102.

[0033] The rock sample temperature time domain monitoring system 107 is composed of a plurality of temperature sensors 207 , which are evenly distributed in the reservoir rock sample clamping device 101 . The temperature sensors 207 are fixed by end covers 215 .

[0034] The produced fluid pressure time domain monitoring system 108 consists of a second pressure sensor 223, a first three-way valve switch 217 and two second recovery tanks 222. The right side of the second pressure sensor 223 is connected to the rock sample in the reservoir rock sample clamping device 101 through the pipeline 204 passing through the end cover 215, and a sealing ring is provided at the connection between the end cover 215 and the pipeline 204. The left side is connected to the first three-way valve switch 217. The three sides of the first three-way valve switch 217 are respectively connected to the reservoir rock sample clamping device 101 and the two second recovery tanks 222, which are used to connect and close the pipeline 204 between the recovery tank and the reservoir rock sample clamping device 101.

[0035] The integrated monitoring and analysis system 109 is composed of a computer 212, a software program and a data line 213. The computer 212 is a carrier of the software program, and the software program is used for data collection, calculation and characterization. The computer 212 is connected to various devices by a data line 213. The integrated monitoring and analysis system 109 is used for back-end data processing. Through the pressure and injected liquid volume measured by the formation water pumping system 104, the drilling and completion fluid displacement and impregnation control device 105, and the produced liquid pressure time domain monitoring system 108, the rock sample temperature measured by the rock sample temperature time domain monitoring system 107, and the pressure and temperature of the circulating fluid measured by the heat medium pumping recovery system 106, the physical properties of the rock sample in the reservoir rock sample clamping device 101 are calculated to characterize the heat transfer capacity of the rock sample.

[0036] The overburden loading and regulating device 102 is used to regulate the pressure of the rock sample in the reservoir rock sample clamping device 101, thereby controlling the permeability and porosity of the rock sample; the temperature regulating device 103 is used to regulate the temperature of the rock sample in the reservoir rock sample clamping device 101 to simulate the formation temperature conditions; the formation water pumping system 104 is used to inject simulated formation water into the rock sample in the reservoir rock sample clamping device 101, thereby regulating the water saturation of the rock sample; the drilling and completion fluid displacement and impregnation regulating device 105 is used to impregnate the rock sample in the reservoir rock sample clamping device 101 with drilling and completion fluid to simulate the formation conditions after being impregnated by the drilling and completion fluid; the heat recovery medium pumping recovery system 106 is used to circulate the fluid medium to recover the heat stored in the reservoir rock mass; the rock sample temperature time domain monitoring system 107 is used to monitor the reservoir rock sample clamping device 101 The time domain changes of the axial and radial temperatures of the inner rock sample; the produced fluid pressure time domain monitoring system 108 is used to measure the temperature of the produced fluid of the formation water pumping system 104 and the drilling and completion fluid displacement and impregnation control device 105; the integrated monitoring and analysis system 109 is used for back-end data processing, calculating the physical properties of the rock sample in the reservoir rock sample clamping device 101, and calculating and characterizing the heat transfer capacity of the rock sample under different experimental conditions; the power supply system 110 provides power for the overburden pressure loading and control device 102, the formation water pumping system 104, the drilling and completion fluid displacement and impregnation control device 105, the heat medium pumping recovery system 106, the rock sample temperature time domain monitoring system 107, the produced fluid pressure time domain monitoring system 108, and the integrated monitoring and analysis system 109; the rack 211 is used to fix and support the overall test device.

[0037] The reservoir rock sample clamping device 101 , the overburden pressure loading and regulating device 102 are connected to the formation water pumping system 104 , the drilling and completion fluid displacement and impregnation regulating device 105 , the heat medium pumping and recovery system 106 , and the produced fluid pressure time domain monitoring system 108 through the pipeline 204 .

[0038] The power supply system 110 provides power for the overburden loading and control device 102, the formation water pumping system 104, the drilling and completion fluid displacement and impregnation control device 105, the heat medium pumping and recovery system 106, the rock sample temperature time domain monitoring system 107, the produced fluid pressure time domain monitoring system 108, and the integrated monitoring and analysis system 109.

[0039] After the overburden loading and control device 102, the temperature control device 103, and the formation water pumping system 104 are fully prepared, various data are recorded; the heat medium pumping recovery system 106 transports cold fluid through the artificial wellbore 214; after the cold fluid flows through the reservoir rock sample clamping device 101 and absorbs energy, it flows to the recovery storage tank, and the data of the heat medium pumping recovery system 106 is recorded to quantify the energy absorbed by the cold fluid; the collection of unimpregnated heat recovery efficiency is completed; the formation water pumping system 104 is closed, and the drilling and completion fluid displacement impregnation control device 105 is opened to impregnate the rock sample in the reservoir rock sample clamping device 101; the collection of impregnated heat recovery efficiency is completed, and the data is compared and evaluated.

[0040] Specifically, the end cap 215 is tightened by threads, the overpressure loading and regulating device 102 is connected to the inner wall of the reservoir rock sample clamping device 101 by sliding, and the reservoir rock sample clamping device 101 is sealed by a sealing ring; a circular hole is opened at the center of the overpressure loading and regulating device 102 and the end cap 215, and the artificial wellbore 214 passes through the central hole of the overpressure loading and regulating device 102 and the end cap 215, and a sealing ring is provided at the connection to ensure the sealing of the connection;

[0041] Remove the overburden pressure loading and regulating device 102, fill the reservoir rock sample clamping device 101 with hot dry rock sample powder, close the overburden pressure loading and regulating device 102, and regulate the rock sample pressure in the reservoir rock sample clamping device 101; open the temperature regulating device 103 to keep the temperature of the hot dry rock powder at the geothermal reservoir temperature; open the overburden pressure loading and regulating device 102, regulate the rock sample pressure in the reservoir rock sample clamping device 101, and keep the temperature of the hot dry rock powder at the geothermal reservoir pressure; open The formation water pumping system 104 is opened to keep the water saturation of the hot dry rock powder at the water saturation of the geothermal reservoir; after measuring the heat recovery efficiency of the unimpregnated dry hot rock sample powder in the reservoir rock sample clamping device 101, the formation water pumping system 104 is closed, and the drilling and completion fluid displacement and impregnation control device 105 is opened to test the heat recovery efficiency after the drilling and completion fluid is impregnated; the data is processed by the integrated monitoring and analysis system 109 to confirm whether the impregnation of the geothermal reservoir by the drilling and completion fluid affects the heat recovery efficiency of the production well.

[0042] Working principle, when in use: drill dry hot rock in the geothermal reservoir as a sample, grind it into powder, weigh it, and load it into the reservoir rock sample clamping device 101. The purpose of weighing is to measure the density of the sample, and then calculate the porosity of the rock sample; turn on the overburden pressure loading and regulation device 102 to apply pressure, simulate the pressure of the overburden rock formation, and regulate the porosity and permeability; turn on the temperature regulation device 103, heat and keep the rock sample in the reservoir rock sample clamping device 101, simulate the geothermal heat source, and provide heat flow injection; turn on the formation water pumping system 104 and the three-way valve switch, inject simulated formation water into the reservoir rock sample clamping device 101, impregnate the sample, until liquid flows out of the outlet, simulate the formation water impregnating the geothermal reservoir, and analyze and calculate the water saturation of the rock sample in combination with the injection volume and injection pressure, and then calculate the porosity and permeability of the rock sample;

[0043] The drilling and completion fluid displacement and impregnation control device 105 is turned on, and the formation water is displaced by the drilling and completion fluid, and the displacement efficiency and relative permeability are measured and calculated; the heat extraction medium pumping and recovery system 106 is turned on, and the cold fluid is injected into the artificial wellbore 214 through the pressure pump of the heat extraction medium pumping and recovery system 106, until the temperature and pressure sensors 205 at the inlet and outlet of the artificial wellbore 214 reach a stable value, and the value is recorded and the cycle is continued; the rock sample temperature time domain monitoring system 107 is turned on to monitor the temperature change of the rock sample in real time and transmit data in real time; the extraction hydraulic system is turned on The force time domain monitoring system 108 monitors the pressure and output of the produced fluid in real time, and transmits data to the integrated monitoring and analysis system 109 in real time; the integrated monitoring and analysis system 109 is used to integrate, control and analyze the data; multiple groups of data are compared, the heat recovery efficiency of the unimpregnated samples and the impregnated samples are compared to determine whether the impregnation of the geothermal reservoir with the drilling and completion fluid affects the heat recovery efficiency of the production wells, and the heat recovery efficiencies of the samples impregnated with different drilling and completion fluids are compared to determine which drilling and completion fluid impregnation geothermal reservoir has the least effect on the heat recovery efficiency of the production wells.

[0044] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A testing device for measuring the effect of drilling and completion fluid on the heat recovery efficiency of a production well by impregnating a geothermal reservoir, comprising a frame (211), a reservoir rock sample clamping device (101) and a power supply system (110), characterized in that: The reservoir rock sample clamping device (101) is arranged on the frame (211); the top side of the reservoir rock sample clamping device (101) is slidably connected to the overburden pressure loading and regulating device (102); a temperature regulating device (103) is arranged on the outside of the reservoir rock sample clamping device (101); a formation water pumping system (104) and a drilling and completion fluid displacement and impregnation regulating device (105) are arranged on the side of the overburden pressure loading and regulating device (102); a rock sample temperature time domain monitoring system (107) is arranged on the inside of the reservoir rock sample clamping device (101); a heat extraction medium pumping and recovery system (106) is arranged on the side of the overburden pressure loading and regulating device (102) and the rock sample temperature time domain monitoring system (107); a produced fluid pressure time domain monitoring system (108) is arranged on the side of the rock sample temperature time domain monitoring system (107); and an integrated monitoring and analysis system (109) is arranged on the frame (211); The reservoir rock sample clamping device (101) is used to load rock samples punched from rock cuttings or rock sample powder. The reservoir rock sample clamping device (101) comprises a hollow cylinder with openings at both ends and an end cover (215). The bottom end of the reservoir rock sample clamping device (101) is sealed by the end cover (215). The end cover (215) is provided with a circular hole at the center and at the edge below the center. The center circular hole is provided with an artificial wellbore (214) of a heat extraction medium pumping recovery system (106). The circular hole at the edge below the center is provided with a pipeline (204) connected to a rock sample temperature time domain monitoring system (107). The heat extraction medium pumping recovery system (106) comprises a storage tank (218) with a liquid level meter (201), a first recovery storage tank (202) with a liquid level meter (201), and a temperature and pressure sensor (218). 05), an artificial wellbore (214) and a second pressure pump (220), a storage tank (218) with a liquid level meter (201) and a first recovery storage tank (202) with a liquid level meter (201) are located at the ends of both sides of the artificial wellbore (214), the artificial wellbore (214) is a cylindrical pipe, the artificial wellbore (214) passes through the center of the reservoir rock sample clamping device (101), the artificial wellbore (214) is fixed by an end cover (215) and a pressure loading and regulating device (102), and a sealing ring is provided at the connection, the temperature and pressure sensor (205) is located in the artificial wellbore (214) near the reservoir rock sample clamping device (101), and the second pressure pump (220) is located in the artificial wellbore (214) near the storage tank (218) with a liquid level meter (201).

2. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The power supply system (110) provides power for the overburden pressure loading and control device (102), the formation water pumping system (104), the drilling and completion fluid displacement and impregnation control device (105), the heat recovery medium pumping and recovery system (106), the rock sample temperature time domain monitoring system (107), the produced fluid pressure time domain monitoring system (108), and the integrated monitoring and analysis system (109).

3. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The overburden pressure loading and regulating device (102) is equipped with a press (208). The overburden pressure loading and regulating device (102) is a circular movable pressure head (209). Circular openings are arranged at the center and near the edge of the overburden pressure loading and regulating device (102). The artificial wellbore (214) of the heat extraction medium pumping and recovery system (106) passes through the opening at the center in a sealed manner. The circular opening near the edge is connected to the formation water pumping system (104) and the drilling and completion fluid displacement and impregnation regulating device (105).

4. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The temperature control device (103) comprises a plurality of electrically controlled heating rods (206) and a shell (216); the electrically controlled heating rods (206) are evenly distributed on the outside of the reservoir rock sample clamping device (101); the electrically controlled heating rods (206) are fixed by end covers (215); and the shell (216) is sleeved on the outside of the reservoir rock sample clamping device (101).

5. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The formation water pumping system (104) is composed of a simulated formation water tank (219) with a liquid level meter (201) and a first pressure pump (210). The left side of the first pressure pump (210) is connected to a second three-way valve switch (221). The pipeline (204) is respectively connected to the formation water pumping system (104) and the drilling and completion fluid displacement and impregnation control device (105). A first pressure sensor (203) is provided in the pipeline between the second three-way valve switch (221) and the overburden pressure loading and control device (102).

6. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The drilling and completion fluid displacement and impregnation control device (105) is composed of a drilling and completion fluid tank (224) with a liquid level meter (201) and a third pressure pump (225), and has the same structure as the formation water pumping system (104). The lower side is connected to a second three-way valve switch (221), and the second three-way valve switch (221) is provided with a first pressure sensor (203) near the overburden pressure loading and control device (102); The rock sample temperature time domain monitoring system (107) is composed of a plurality of temperature sensors (207) which are evenly distributed in the reservoir rock sample clamping device (101), and the temperature sensors (207) are fixed by end covers (215).

7. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The produced fluid pressure time domain monitoring system (108) is composed of a second pressure sensor (223), a first three-way valve switch (217), and two second recovery storage tanks (222); the right side of the second pressure sensor (223) is connected to the rock sample in the reservoir rock sample clamping device (101) via a pipeline (204) through which an end cover (215) passes, and a sealing ring is provided at the connection between the end cover (215) and the pipeline (204); the left side is connected to the first three-way valve switch (217); and the three sides of the first three-way valve switch (217) are respectively connected to the reservoir rock sample clamping device (101) and the two second recovery storage tanks (222).

8. The testing device for measuring the effect of drilling and completion fluid impregnation on geothermal reservoirs on heat extraction efficiency of production wells according to claim 1, characterized in that: The integrated monitoring and analysis system (109) is composed of a computer (212), a software program and a data line (213). The computer (212) is a carrier of the software program. The software program is used for data collection, calculation and characterization. The computer (212) is connected to the overburden pressure loading and control device (102), the temperature control device (103), the formation water pumping system (104), the drilling and completion fluid displacement and impregnation control device (105), the heat medium pumping recovery system (106), the rock sample temperature time domain monitoring system (107), the produced fluid pressure time domain monitoring system (108), the integrated monitoring and analysis system (109), and the power supply system (110) by the data line (213).

Citation Information

Patent Citations

  • Carbon dioxide imbibition diffusion oil discharge experimental device in tight oil reservoir

    CN111006988A

  • Device for testing influence of hydration heat of cement paste / drilling fluid on stability of natural gas hydrate

    CN112083141A

  • Rock fracture flow guide and heat exchange testing device and method

    CN112326728A

  • Surrounding rock thermal damage and seepage coupling experiment device and method for simulating shaft heating

    CN117782844A

  • Fractured network hydrothermal transfer and solute transport measuring device and method

    CN118112037A