Demand response transaction revenue determination method, device, equipment, medium and product
By building user resource characteristics and aggregation optimization model, the income of demand response transactions is calculated, and the problem of difficulty in simulating demand response transaction returns in the existing technology is solved, and effective simulation and rational utilization of resources under the recent invitation mode is achieved.
Patent Information
- Application Number
- CN202411134249.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The existing cost fitting method of aggregation object is difficult to apply to the aggregation decisions of load integrators under the recent invitation mode, making it difficult to effectively simulate the returns of demand-responsive transactions.
By obtaining the response capacity requirements of the third-party power consumption demand end and the demand response information of the proxy user, a characteristic model and aggregation optimization model of user resources are constructed, the returns of demand response transactions are calculated, including the invitation information of response quantity and price in each period, and the goal is The maximum function is the goal and the linearization process is used to determine the invitation information.
Effective simulation of demand-response transactions is realized, the impact of market price expectations on aggregation declarations is analyzed, the rational use of load-side resources is improved, and the problem of difficulty in simulating demand-response transaction returns in the existing technology is solved.
Smart Images

Figure CN118657547B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present invention relate to the field of electric power technology, and in particular, to a method, device, equipment, medium and product for determining demand response transaction revenue. Background Art
[0002] In the practice of load-side resources participating in dispatching transactions, an invitation model is usually adopted to encourage various types of users to respond according to time periods. Recently, invitation response has become one of the main modes for some provinces and regions in my country to carry out power demand response. Taking into account the uncertainty of user response, different levels of response quality evaluation standards are usually set to compare the actual response effect of load-side resources with the expected declared capacity to complete the tiered assessment and compensation. In the implementation process of demand response, load integrators play an important role. By integrating decentralized user resources with different response qualities and cost characteristics, they further tap the potential of demand response and improve the overall benefits of demand-side resource utilization. Integrators will deduct the agency user expenses from the revenue of the demand response market and obtain part of the profit.
[0003] The existing methods for fitting the cost of aggregated objects mainly describe the power regulation range and corresponding calling cost of the aggregated group from the perspective of various resource constraints of the directly controlled virtual power plant, and incorporate the equivalent constraints into the dispatch optimization model of the main grid, so as to achieve the connection between the aggregated objects and the economic dispatch plan of the power system. However, it is difficult to apply it to the aggregation decision of load integrators under the day-ahead invitation model, and therefore it is difficult to effectively simulate the benefits of demand response transactions. Summary of the invention
[0004] Embodiments of the present invention provide a method, device, equipment, medium and product for determining revenue from demand response transactions, so as to solve the existing problem of difficulty in effectively simulating the revenue from demand response transactions.
[0005] In order to solve the above-mentioned technical problems, the present invention is achieved as follows:
[0006] In a first aspect, an embodiment of the present invention provides a method for determining demand response transaction revenue, which is applied to a load integration terminal, wherein the load integration terminal includes at least one proxy user terminal, and the method includes:
[0007] Obtaining the response capacity demand issued by the third-party electricity demand end, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity;
[0008] Submitting the invitation information to the third-party electricity demand end, and obtaining an actual response plan issued by the third-party electricity demand end according to the invitation information;
[0009] The demand response transaction income is obtained according to the actual response plan and the income principle pre-specified by the load aggregator and the proxy user.
[0010] Optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes:
[0011] The response capacity demand is input into the characteristic model of the user resource to obtain the demand response information of the proxy user terminal, wherein the characteristic model of the user resource is determined based on the historical demand response information of the proxy user terminal to the historical response capacity demand.
[0012] Optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes:
[0013] Obtaining historical demand response information of the proxy user terminal to historical response capacity demand and agreed assessment and settlement parameters;
[0014] Constructing a characteristic model of user resources according to the historical demand response information and the agreed assessment and settlement parameters;
[0015] The characteristic model of the user resources takes at least one of the following as a constraint of the characteristic model of the user resources: a declared capacity range of the user resources, an adjustment rate of the actual response capacity, and an effective response capacity.
[0016] Optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side include:
[0017] An aggregation optimization model is constructed according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end, and the aggregation optimization model obtains the response income, assessment fee and cost paid by the response capacity of the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end;
[0018] Obtaining an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit;
[0019] Taking the maximum output of the objective function as the goal, the invitation information including the response quantity and price in each time period is obtained.
[0020] Optionally, the objective function is: ;
[0021] in, The load integration end is in the period Response benefits; The load integration end is in the period The cost of assessment; Calling resources for load integration Time the costs paid for response capacity; It is the time period resolution, and the unit is time period per hour.
[0022] Optionally, after obtaining the objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid for the response capacity, the method further includes:
[0023] Linearizing the objective function;
[0024] Taking the maximum of the objective function after linearization as the goal, the invitation information including the response quantity and price in each time period is obtained.
[0025] In a second aspect, an embodiment of the present invention provides a load integration terminal, wherein the load integration terminal includes at least one proxy user terminal, including:
[0026] The first processing module is used to obtain the response capacity demand issued by the third-party electricity demand end, and obtain the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity;
[0027] A second processing module is used to submit the invitation information to the third-party electricity demand end, and obtain an actual response plan issued by the third-party electricity demand end according to the invitation information;
[0028] The third processing module is used to obtain the demand response transaction income according to the actual response plan and the income principle pre-specified by the load aggregator and the proxy user.
[0029] Optionally, the first processing module includes:
[0030] The first processing submodule is used to input the response capacity demand into the characteristic model of the user resource to obtain the demand response information of the proxy user terminal, wherein the characteristic model of the user resource is determined based on the historical demand response information of the proxy user terminal to the historical response capacity demand.
[0031] Optionally, the first processing module includes:
[0032] The second processing submodule is used to obtain the historical demand response information of the proxy user terminal to the historical response capacity demand and the agreed assessment and settlement parameters;
[0033] A third processing submodule, configured to construct a characteristic model of user resources according to the historical demand response information and the agreed assessment and settlement parameters;
[0034] The characteristic model of the user resources takes at least one of the following as a constraint of the characteristic model of the user resources: a declared capacity range of the user resources, an adjustment rate of the actual response capacity, and an effective response capacity.
[0035] Optionally, the first processing module includes:
[0036] An optimization submodule, configured to construct an aggregation optimization model according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end, wherein the aggregation optimization model obtains the response income, assessment fee and cost paid by the response capacity of the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end;
[0037] A fourth processing submodule is used to obtain an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit;
[0038] The fifth processing submodule is used to obtain the invitation information including the response quantity and price in each time period with the goal of maximizing the output of the objective function.
[0039] Optionally, the objective function is: ;
[0040] in, The load integration end is in the period Response benefits; The load integration end is in the period The cost of assessment; Calling resources for load integration Time the costs paid for response capacity; It is the time period resolution, and the unit is time period per hour.
[0041] Optionally, also include:
[0042] A linearization processing submodule, used for linearizing the objective function;
[0043] The sixth processing submodule is used to obtain the invitation information including the response quantity and price in each time period by taking the maximum of the objective function after linearization processing as the goal.
[0044] In a third aspect, an embodiment of the present invention provides an electronic device, comprising a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps in the method for determining demand response transaction revenue as described in any one of the first aspects.
[0045] In a fourth aspect, an embodiment of the present invention provides a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, the steps in the method for determining demand response transaction revenue as described in any one of the first aspects are implemented.
[0046] In a fifth aspect, an embodiment of the present invention provides a computer program product, comprising computer instructions, which, when executed by a processor, implement the steps in the method for determining demand response transaction revenue as described in any one of the first aspects.
[0047] In the present invention, by simulating the benefits of demand response transactions under the day-ahead invitation model, the impact of market price expectations on aggregate declarations and the aggregate complementarity of different types of resources and their impact on aggregate declarations and benefits are analyzed, so as to achieve the rational utilization of numerous load-side resources and solve the existing problem of difficulty in effectively simulating the benefits of demand response transactions. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0049] Figure 1 is a flow chart of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0050] Figure 2 is a flow chart of another method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0051] Figure 3It is a schematic diagram of an effective response capacity settlement method of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0052] Figure 4 It is a schematic diagram of the settlement relationship between an aggregator and an agent user in a method for determining a demand response transaction revenue provided by an embodiment of the present invention;
[0053] Figure 5 It is a price expectation diagram of a demand response market according to a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0054] Figure 6 It is a schematic diagram comparing the time-segment revenue and the response ratio of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0055] Figure 7 It is a schematic diagram of an optimal aggregated declaration result of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0056] Figure 8 This is a schematic diagram of aggregated capacity of a part of a type of users in a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0057] Fig. 9 It is a schematic diagram of the aggregated capacity of two types of users in a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0058] Fig.10 It is a schematic diagram of optimal aggregate declared capacity under different expected market price scenarios of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0059] Fig.11 It is a schematic diagram of optimal aggregated bid prices under different expected market price scenarios of a method for determining demand response transaction revenue provided by an embodiment of the present invention;
[0060] Fig.12 is a structural schematic diagram of a load aggregation terminal provided by an embodiment of the present invention;
[0061] Fig.13 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0062] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0063] Please refer to Figure 1 The embodiment of the present invention provides a method for determining demand response transaction revenue, which is applied to a load integration terminal, wherein the load integration terminal includes at least one proxy user terminal, and the method includes:
[0064] Step 11: Obtain the response capacity demand issued by the third-party electricity demand end, and obtain the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity;
[0065] In the embodiment of the present invention, please refer to Figure 2 The load integration end includes at least one proxy user end. The load integrator needs to confirm the agency relationship with the user first and register as a demand response market entity. The day-ahead invitation response is when a short-term power supply gap or insufficient reserve is expected to occur the next day. The third-party power demand end, that is, the organizer (such as the power grid or government agency), issues a response invitation to respond to the capacity demand in the day-ahead planning stage. Participants who meet the access conditions, such as large users or load integrators (i.e., load integration ends), decide to submit response quantity and price information for each time period based on their own situation; so that the organizer can confirm the actual response plan of each participant based on the response quantity and price information for each time period; finally, compare the actual execution volume with the invitation confirmation result, evaluate the actual response effect, obtain response benefits or pay deviation assessment fees.
[0066] In an embodiment of the present invention, in the "invitation decision" link, the load aggregator considers the characteristic differences of the proxy user ends it represents, the settlement and sharing method agreed in the contract, and the expected demand response price, the standard of effective response capacity and other factors, and submits invitation information to the third-party electricity demand end. The invitation information includes: information such as the aggregated declared response capacity and the corresponding compensation quotation.
[0067] In order to take into account the uncertainty of the invited resource response and encourage users to reduce the impact of this uncertainty, the third-party electricity demand side usually sets different levels of effective response capacity certification standards based on the deviation between the actual response amount of the load integration side and the declared response amount confirmed by the invitation, such as Figure 3 As shown in Figure 2, the effective response capacity used to calculate the demand response benefits can be expressed as:
[0068] (1-1);
[0069] According to market rules, in actual solicitation-based demand response practices, when the actual response capacity of a resource in certain scenarios is too small compared to the response capacity declared by invitation, so that the effective response capacity falls within the dead zone, not only will the effective response capacity of the resource be certified as 0, but a certain assessment fee will usually be charged:
[0070] (1-2);
[0071] (1-3);
[0072] Among them, the constants are:
[0073] / / are the dead zone certification coefficient, discount zone certification coefficient and saturation zone certification coefficient of the effective response capacity respectively, ;
[0074] is the discount factor of the effective response capacity against the actual response capacity;
[0075] is the minimum penalty fee;
[0076] is the deviation assessment coefficient;
[0077] variable:
[0078] The effective response capacity used by the integrator to calculate the demand response benefits during period t;
[0079] The capacity declared by the integrator upon invitation and confirmation in period t;
[0080] is the actual response capacity confirmed by the integrator in time period t;
[0081] is the deviation assessment fee of the integrator in period t;
[0082] is the demand response unit compensation standard for period t (or the price expected to be obtained by clearing demand response market transactions);
[0083] is the response deviation assessment standard for period t;
[0084] In the embodiment of the present invention, by integrating diverse proxy user resources, an aggregated response characteristic that is more suitable for the demand response market evaluation standard is obtained. This avoids the loss of response revenue caused by the actual response capacity of a single characteristic resource falling into the dead zone and discount zone, and improves the expected demand response revenue by absorbing user resources with low response quality.
[0085] Step 12: Submitting the invitation information to the third-party electricity demand end, and obtaining an actual response plan issued by the third-party electricity demand end according to the invitation information;
[0086] In the embodiment of the present invention, please refer to Figure 2 The organizer can confirm the actual response plan of each participant according to the response quantity and price information of each time period; the aggregated decision based on the day-ahead invitation response is helpful to integrate user resources with different response qualities, achieve better matching with external conditions, improve the interpretability of the day-ahead invitation response effect and cost / benefit for integrators, and provide a reference for the declaration of day-ahead invitation response capacity and price.
[0087] Step 13: Obtain demand response transaction revenue according to the actual response plan and the revenue principle pre-specified by the load aggregator and the proxy user.
[0088] In the embodiment of the present invention, please refer to Figure 2 Finally, the actual execution volume is compared with the invitation confirmation result, the actual response effect is evaluated, the response benefit is obtained or the deviation assessment fee is paid, the implementation process of the day-ahead invitation response and the aggregation agency mechanism of the load integrator for the user response resources are considered, and an aggregation model of the day-ahead invitation response is constructed. The goal is to maximize the expected benefits of the load integrator, taking into account the user resource characteristics, the differences in the agency mechanism, and the organizer's requirements for the effective response capacity grading certification.
[0089] In an embodiment of the present invention, by simulating the benefits of demand response transactions under the day-ahead invitation model, the impact of market price expectations on aggregate declarations and the aggregate complementarity of different types of resources and their impact on aggregate declarations and benefits are analyzed, thereby achieving the rational utilization of numerous load-side resources and solving the existing problem of difficulty in effectively simulating the benefits of demand response transactions.
[0090] In the embodiment of the present invention, optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes:
[0091] The response capacity demand is input into the characteristic model of the user resource to obtain the demand response information of the proxy user terminal, wherein the characteristic model of the user resource is determined based on the historical demand response information of the proxy user terminal to the historical response capacity demand.
[0092] In the embodiment of the present invention, the demand response resources dispersed on the user side have small individual capacity and different response reliability between different resources. Directly participating in the invitation response of the organizer may not meet the requirements of the entry threshold, and the risk of coping with the tier assessment is relatively high. Therefore, through the agent of the load integrator, the dispersed user resources are formed into an aggregated entity to participate in the invitation response on the day before, such as Figure 4 As shown;
[0093] Specifically, based on the principle of "sharing benefits and sharing risks", the agency settlement relationship between the load integrator and the agent user end mainly includes two categories: Category 1 (linked compensation), the load integrator and the agent user end agree on the profit sharing ratio and the assessment fee sharing ratio in the agency contract, and the agent user end settles with the load integrator based on its own effective response capacity and changes in the demand response market price; Category 2 (fixed compensation): referring to the assessment and certification standards of the demand response organizer, regardless of the market compensation price for the aggregated response resources, the load integrator will compensate the agent user end for the effective response capacity at a fixed price, and the agent user end does not need to pay the deviation assessment fee.
[0094] In an embodiment of the present invention, by inputting the response capacity demand into the characteristic model of the user resources, the demand response information of the proxy user end is obtained, and the historical response of various types of users and the assessment and settlement parameters agreed in the agency contract are considered to complete the characteristic modeling of decentralized user resources, perform characteristic modeling on the demand response resources of decentralized users, integrate user resources with different response qualities, achieve better matching with external conditions, improve the interpretability of the integrator's invitation response effect and cost / benefit on the day before, and provide a reference for the declaration of the day-ahead invitation response capacity and price.
[0095] In the embodiment of the present invention, optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes:
[0096] Obtaining historical demand response information of the proxy user terminal to historical response capacity demand and agreed assessment and settlement parameters;
[0097] Constructing a characteristic model of user resources according to the historical demand response information and the agreed assessment and settlement parameters;
[0098] The characteristic model of the user resources takes at least one of the following as a constraint of the characteristic model of the user resources: a declared capacity range of the user resources, an adjustment rate of the actual response capacity, and an effective response capacity.
[0099] In the embodiment of the present invention, for the load integration end, in the optimal decision-making process of the day-ahead invitation response, it is necessary to complete the characteristic modeling of user resources based on the historical response of various users and the assessment and settlement parameters agreed in the agency contract. Among them, the main constraints to be considered include:
[0100] Constraints on the reported capacity range of user resources:
[0101] (2-1);
[0102] The adjustment rate constraint of the actual response capacity:
[0103] (2-2);
[0104] (2-3);
[0105] Effective response capacity constraints follow the unified approval standards of demand response organizers, namely:
[0106] (2-4);
[0107] According to the difference in the agency settlement model between integrators and users, the fees paid by integrators to "Type 1 users" can be expressed as:
[0108] (2-5);
[0109] According to the assessment criteria of the invitation response organizer, the assessment fee for user response deviation is:
[0110] (2-6);
[0111] The cost that the integrator pays to "Type 2 users" can be expressed as:
[0112] (2-7);
[0113] Among them, the constants are:
[0114] / The lower and upper limits of the capacity that user j can declare on behalf of, in kW;
[0115] / The power limit for user j in adjacent time intervals, kW / min;
[0116] is the response rate parameter estimated based on the actual response capacity and invited response capacity of user j in historical response scenarios, %;
[0117] It is the user's share ratio of demand response benefits agreed in the agency contract. %;
[0118] The proportion coefficient of the assessment fee to be borne by the agreed users, %;
[0119] is the fixed settlement fee agreed in the contract, RMB;
[0120] variable:
[0121] The declared capacity of user j acting as the agent of the load integrator in period t, kW;
[0122] is the estimated actual response capacity of proxy user j in time period t, kW;
[0123] The user response deviation assessment fee evaluated according to the assessment criteria of the invitation response organizer, RMB / kW;
[0124] is the effective response capacity of proxy user j in period t, kW;
[0125] In the embodiment of the present invention, by integrating diverse proxy user resources, an aggregated response characteristic that is more suitable for the demand response market evaluation standard is obtained, thereby avoiding the loss of response revenue caused by the actual response capacity of a single characteristic resource falling in the dead zone and discount zone, and improving the expected demand response revenue by absorbing user resources with lower response quality.
[0126] In the embodiment of the present invention, optionally, the obtaining of the response capacity demand issued by the third-party electricity demand side and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side include:
[0127] An aggregation optimization model is constructed according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end, and the aggregation optimization model obtains the response income, assessment fee and cost paid by the response capacity of the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end;
[0128] Obtaining an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit;
[0129] Taking the maximum output of the objective function as the goal, the invitation information including the response quantity and price in each time period is obtained.
[0130] In the embodiment of the present invention, by comprehensively considering the response resource characteristics of the proxy users, the response assessment criteria, and the price expectations of the load aggregator for the demand response market, an objective function is constructed with the goal of maximizing the expected profit, and a decision on the day-ahead invitation response is made to obtain the invited aggregate response capacity and the invited price for each time period.
[0131] The objective function is:
[0132] (3-1);
[0133] in, The load integration end is in the period Response benefits; The load integration end is in the period The cost of assessment; Calling resources for load integration Time the costs paid for response capacity; It is the time period resolution, and the unit is time period per hour.
[0134] Market rule parameters:
[0135] is the time period resolution, the time period is every hour;
[0136] Virtual Power Plant Constraints
[0137] , Virtual Power Plant Trading Unit in the period Total predicted actual response capacity of:
[0138] (3-2);
[0139] , Virtual Power Plant Trading Unit in the period Total declared response capacity:
[0140] (3-3);
[0141] , Virtual Power Plant Trading Unit in the period The minimum response capacity constraint is:
[0142] (3-4);
[0143] , Virtual Power Plant Trading Unit in the period The minimum response duration constraint is:
[0144] (3-5);
[0145] , Virtual Power Plant Trading Unit in the period The effective response capacity is:
[0146] (3-6);
[0147] , Virtual Power Plant Trading Unit in the period The response yield is:
[0148] (3-7);
[0149] , Virtual Power Plant Trading Unit in the period The assessment fee is:
[0150] (3-8);
[0151] variable:
[0152] For resources Counting period Declared response capacity, MW;
[0153] For resources In the period Actual response capacity forecast, MW;
[0154] For resources In the period Effective response capacity, MW;
[0155] For virtual power plants in the period Total declared response capacity, MW;
[0156] For virtual power plants in the period The predicted actual response capacity, MW;
[0157] For virtual power plants in the period Effective response capacity, MW;
[0158] For virtual power plants in the period Whether it is in the state of providing response capacity, 0 / 1;
[0159] Market rule parameters:
[0160] The lower limit of the capacity that can be applied for by virtual power plants invited to apply for the day before, MW;
[0161] is the minimum duration of the day-ahead invitation virtual power plant, h;
[0162] Settlement parameters:
[0163] For the period Demand response forecast clearing price, RMB / MWh;
[0164] constant:
[0165] is the maximum value, 1e6
[0166] Resource Constraints
[0167] , resource The predicted actual response capacity for time period t is:
[0168] (3-9);
[0169] , resource Time The effective response capacity is:
[0170] (3-10);
[0171] , resource Time The upper limit of the declaration response capacity is:
[0172] (3-11);
[0173] , resource Time The response increase rate constraint is:
[0174] (3-12);
[0175] , resource Time The response down-regulation rate constraint is:
[0176] (3-13);
[0177] , resource Time Calling cost:
[0178] (3-14);
[0179] Among them, the resource response deviation assessment fee in settlement relationship 1 The calculation method is as follows:
[0180] (3-15);
[0181] variable:
[0182] For resources In the period Assessment costs due to insufficient response, RMB;
[0183] Resource performance parameters:
[0184] For resources Counting period The upper limit of the declared response capacity is the response capacity adjusted after considering the correction of abnormal data and the declared capacity of resources with reference to the baseline load, reflecting the actual response capacity, MW;
[0185] For resources Climbing and descending slope rate, MW / min;
[0186] For resources In the period The predicted responsiveness, %, is based on the actual responsiveness prediction function get;
[0187] Market rule parameters:
[0188] is the effective response ratio threshold, %;
[0189] is the response capacity discount factor, %;
[0190] It is the penalty factor for the recent invitation assessment;
[0191] The upper and lower limits of the price for the day-ahead invitation, RMB / MWh;
[0192] The lower limit of the day-ahead invitation price assessment, RMB / MWh;
[0193] Settlement parameters:
[0194] For resources Type of settlement method with load aggregators, , corresponding to the calculation relationships of contract templates 1, 2, and 3;
[0195] / It is the settlement ratio of income and assessment fees under settlement method 1, %;
[0196] It is the monthly settlement comprehensive price for load aggregators, RMB / MWh;
[0197] It is the profit sharing ratio under settlement method 2, %;
[0198] For load aggregators and resources Fixed settlement price, RMB / MWh;
[0199] constant:
[0200] is the minimum value, 1e-6;
[0201] In the embodiment of the present invention, the aggregation decision based on the day-ahead invitation response helps to integrate user resources with different response qualities, achieve better matching with external conditions, improve the interpretability of the day-ahead invitation response effect and cost / benefit at the load integration end, and provide a reference for the declaration of day-ahead invitation response capacity and price.
[0202] In the embodiment of the present invention, optionally, after obtaining the objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid for the response capacity, the method further includes:
[0203] Linearizing the objective function;
[0204] Taking the maximum of the objective function after linearization as the goal, the invitation information including the response quantity and price in each time period is obtained.
[0205] In the embodiment of the present invention, the constraint (3-6) on the objective function line is linearized. Specifically, it is replaced by constraints (4-1), (4-6)-(4-18):
[0206] , Virtual power plant transaction unit effective response capacity determination gear, auxiliary indication 0 / 1 variable,
[0207] (4-1);
[0208] (4-2);
[0209] (4-3);
[0210] (4-4);
[0211] (4-5);
[0212] Introducing continuous auxiliary decision variables , used for equivalent , , , , and add constraints:
[0213] (4-6);
[0214] (4-7);
[0215] (4-8);
[0216] (4-9);
[0217] (4-10);
[0218] (4-11);
[0219] (4-12);
[0220] (4-13);
[0221] (4-14);
[0222] (4-15);
[0223] (4-16);
[0224] (4-17);
[0225] (4-18);
[0226] Constraints (3-8) can be equivalent to:
[0227] (4-19);
[0228] (4-20);
[0229] In an embodiment of the present invention, by introducing intermediate variables and logical relationship constraints, a nonlinear relationship decoupling method is proposed to adapt the effective response capacity grading evaluation rules, decouple the significant nonlinear relationship between the demand response optimal aggregation decision variables, thereby improving the practicality of the demand response aggregation decision.
[0230] In the embodiment of the present invention, further optimization is performed to make the resource combination and resource response capacity , total response capacity It is the strategy for the optimal bid quantity under the current forecast demand response price. In the case of single-segment quotation, the bid price is taken as the average. ,in , In order to invite and clear the forecast price in the day ahead, by integrating diverse proxy user resources, we can obtain aggregate response characteristics that are more suitable for the demand response market evaluation standards, and try to avoid the actual response capacity of a single characteristic resource falling in the dead zone and discount zone, which will lead to loss of response revenue. On the premise that some high-quality response user resources have been represented, the expected demand response revenue can be improved by absorbing some user resources with lower response quality.
[0231] In the embodiment of the present invention, specifically, the revenue simulation process of the demand response transaction in the day-ahead invitation mode is as follows:
[0232] Clarify the implementation process of the day-ahead invitation response and the aggregation proxy mechanism of the user response resources of the load integration end to the proxy user end;
[0233] Considering the historical response of various users and the assessment and settlement parameters agreed in the agency contract, the characteristic modeling of the demand response resources of decentralized users is completed;
[0234] Considering the response resource characteristics of the proxy users at the load aggregation end, the response assessment criteria, and the price expectations for the demand response market, an aggregate optimization model is conducted with the goal of maximizing expected benefits.
[0235] Nonlinear analysis and linearization of aggregation models;
[0236] Based on the linearized aggregation optimization model, the revenue simulation of the load aggregation end proxy users participating in the day-ahead invitation response market transaction is carried out;
[0237] De-aggregate and formulate response strategies based on simulation situations;
[0238] Track the execution of response strategies and actual benefits, analyze deviations, and correct model parameters.
[0239] In the embodiments of the present invention, the specific implementation examples are as follows:
[0240] Taking the organizational model of Guangdong's day-ahead invitation-based demand response market as an example, a revenue simulation example of load aggregation-end proxy users participating in day-ahead invitation-based response market transactions is constructed.
[0241] Among them, the relevant parameters of the demand response market are: threshold coefficients of the discount zone / linear zone / saturation zone of effective response capacity , , The response capacity discount coefficients are 75%, 85%, and 110% respectively. Set to 80%, the minimum deviation penalty price The price is 0.5 yuan / kWh, and the deviation penalty coefficient is set to 50%;
[0242] The minimum aggregation capacity of the load aggregation end is 10MW, and the minimum continuous response time is 2h. The user resource information of the load aggregation end agent is shown in Table 1. The time periods for the demand response organizer to issue the invitation response in the previous day are 8:00-17:00 and 19:00-21:00. The expectations of the load aggregation end for the demand response market price are as follows: Figure 5 shown.
[0243] Table 1
[0244] Among them, the revenue of the day-ahead demand response transaction is simulated and calculated, and the benefits generated by the use of the aggregation optimization algorithm are analyzed. For this purpose, a control group is set up, that is, the user's declared amount is not changed.
[0245] The original calculation example declared a response capacity of 550MWh, the response ratio in each time period was 0.832, the effective response capacity was in the discount zone, the total market revenue was 665,600 yuan, and there was no assessment fee; based on the contract signing situation of each user, the user demand response capacity call cost was calculated according to the settlement relationship shown below, the total payment fee was 622,500 yuan, and the net profit was 43,100 yuan.
[0246] The optimized strategy example reported a response capacity of 371.2MWh, the response ratio in each time period was 0.85, the effective response capacity was in the linear area, the total market revenue was 615,600 yuan, and there was no assessment fee. According to the contract signing situation of each user, the user demand response capacity call cost was calculated according to the settlement relationship shown below. The total payment fee was 408,400 yuan and the net income was 207,232 yuan. Compared with the original control group, the net income increased significantly.
[0247] Table 2
[0248] Please refer to Table 2 and Figure 6 From the above calculation results, it can be seen that for the aggregation optimization strategy, the revenue simulation of demand response transactions can be carried out, and compared with the revenue declared by the original example, it can be seen that the aggregation optimization strategy can achieve the improvement of the platform revenue level and the overall response execution degree; ideally, if the effective response capacity can be achieved across gears, the revenue improvement will be very significant.
[0249] And by comparison Figure 5 and Figure 7 It can be seen that during periods when market price expectations are higher, the load aggregator is invited to declare more capacity and declare higher prices. The main reason is that the load aggregator represents a large proportion of users, and the payment made by the load aggregator to users in the agency contract has a linkage effect with the market price.
[0250] Further comparison of the aggregation capacity of the first and second category users represented by the load aggregation end is as follows: Figure 8 and Fig. 9 As shown in Table 1, it can be seen that compared with the resources of users 2, 3, and 4, the quality indicators of user 1's resources in terms of expected response reliability, revenue sharing, and assessment sharing ratio are poor; therefore, Figure 8 The results show that the load aggregation end will give priority to aggregating all resources of users 2 and 4 and part of the resources of user 3 during all invited time periods, and will only aggregate the resources of user 1 during some time periods when the market price is expected to be higher.
[0251] For the second type of users of the agent, the load aggregation end needs to comprehensively consider the relationship between the fixed payment price agreed in the contract and the expected price of the demand response market, as well as the reliability of the user's resource response, and comprehensively decide on the capacity to be included in the aggregation declaration.
[0252] from Fig. 9 From the analysis of the results, it can be seen that although the response reliability of user 6 resources is higher, the payment price agreed in its contract is also much higher than that of user 5. Therefore, it is aggregated and submitted to the demand response organizer only during the period from 14:00 to 18:00 when the market price is expected to be higher; the fixed payment price of user 5 is 1.5 yuan / kWh, which has a large price advantage for market price expectations. Therefore, the response capacity is aggregated and submitted during all invitation periods.
[0253] It can be seen from this that under the given market price expectation conditions, the optimal aggregation decision of the day-ahead invitation response can help the load aggregation end to combine user response resources with different response characteristics and different payment costs, form the invitation declaration results for each time period, and improve the interpretability of the day-ahead invitation response effect and expected cost / benefit by the load aggregation end.
[0254] In the transaction decision-making process of proxy user resources participating in the demand response market, the load aggregation end should not only pay attention to the rationality of the optimal aggregation modeling to ensure the decision effect; it also needs to pay attention to how to improve the accuracy between the expected value and the actual value of the market price, and try to avoid the loss of some winning response capacity and aggregation benefits due to unreasonable aggregation declared prices. In order to achieve this, the total cost of the load aggregation end (expected assessment fee + proxy user demand response capacity settlement fee) is calculated according to the agency contract and market forecast price, and the price is declared along the calculated cost, so as to increase the probability of winning the bid by declaring a low price and realize the benefits of the optimal capacity.
[0255] Based on the conditions of this example, the expected market price of the demand response at the load aggregation end in each invitation period is raised, and the optimal aggregated declared capacity and the invited declared price under different expected market price scenarios are calculated. The results are as follows: Fig.10 and Fig.11 As shown in the figure, from the trend analysis, the aggregated declared capacity of the load aggregation end increases with the increase of market price expectations.
[0256] However, for the optimal aggregation decision at the load aggregation end, whenever the expectation of the demand response market price changes, the aggregated declared price is more sensitive to the market price expectation, but the aggregated declared capacity at the load aggregation end does not always change accordingly. The main reason is that under the current calculation logic, the optimized aggregation capacity and the predicted market price are used as the basis for cost measurement. The cost expenditure of the load aggregation end to a class of proxy users is directly linked to the clearing price of the demand response market. Therefore, the aggregated declared price is more sensitive to market price expectations. Under different market price expectations, it is still possible to allocate and combine user resources with different response characteristics and different costs to obtain higher expected returns while ensuring that the aggregated capacity remains unchanged.
[0257] Compared with the decentralized single resources directly participating in the demand response market transactions, in addition to the scale benefits, the aggregation participation method can make full use of the complementary advantages between different single resources to form response resources that are more suitable for the organizer's assessment standards, thereby improving the expected benefits. In order to further verify the role of aggregating multiple types of user resources, based on the conditions of this example, the maximum response capacity of the load aggregation end proxy user 1 is adjusted to different scenarios of 0MW to 4MW, and the aggregation optimization model is solved to obtain the results shown in Table 3.
[0258] Table 3
[0259] Compared with other proxied users, although the response reliability of user 1 resources is lower (75%), and the user revenue sharing ratio agreed in the contract is higher (90%), the load aggregation end integrates it with the resources of users with better quality that have been proxied, making the aggregated resources more suitable for the effective capacity certification standard of the day-ahead invitation response. Compared with the scenario where the user is not represented in the demand response transaction, the expected revenue of the day-ahead invitation response of the load aggregation end after the load aggregation end acts as the agent for the user can be increased by up to 7.308×103 yuan, and the aggregated electricity declared on the day of operation can be increased by up to 12MWh. The marginal revenue generated is also much greater than the marginal revenue of demand response obtained from the market when only the agent user 1 participates (350 yuan).
[0260] It is worth noting that in scenarios 4 and 5 of Table 3, as well as in the scenario of this example, although there are differences in the maximum responsive capacity of user 1 in the boundary condition settings, the final aggregation optimization results of the load aggregation end are the same. This shows that the load aggregation end has a limit capacity of 3MW to absorb the resource with poor response quality through the response resources of other users with better response quality that have been proxied, while ensuring the expected increase in revenue. Through the optimal aggregation measurement and analysis under different proxy capacity scenarios, the limit capacity of the load aggregation end to absorb resources with a certain response rate level under the premise of increasing expected revenue can be quantified, thereby providing more detailed and useful decision-making information for the aggregation agent.
[0261] Please refer to Fig.12 The embodiment of the present invention provides a load integration terminal, the load integration terminal includes at least one proxy user terminal, including:
[0262] The first processing module 121 is used to obtain the response capacity demand issued by the third-party electricity demand end, and obtain the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity;
[0263] The second processing module 122 is used to submit the invitation information to the third-party electricity demand end, and obtain the actual response plan issued by the third-party electricity demand end according to the invitation information;
[0264] The third processing module 123 is used to obtain the demand response transaction income according to the actual response plan and the income principle pre-specified by the load aggregator and the proxy user.
[0265] In the embodiment of the present invention, optionally, the first processing module includes:
[0266] The first processing submodule is used to input the response capacity demand into the characteristic model of the user resource to obtain the demand response information of the proxy user terminal, wherein the characteristic model of the user resource is determined based on the historical demand response information of the proxy user terminal to the historical response capacity demand.
[0267] In the embodiment of the present invention, optionally, the first processing module includes:
[0268] The second processing submodule is used to obtain the historical demand response information of the proxy user terminal to the historical response capacity demand and the agreed assessment and settlement parameters;
[0269] A third processing submodule, configured to construct a characteristic model of user resources according to the historical demand response information and the agreed assessment and settlement parameters;
[0270] The characteristic model of the user resources takes at least one of the following as a constraint of the characteristic model of the user resources: a declared capacity range of the user resources, an adjustment rate of the actual response capacity, and an effective response capacity.
[0271] In the embodiment of the present invention, optionally, the first processing module includes:
[0272] An optimization submodule, configured to construct an aggregation optimization model according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end, wherein the aggregation optimization model obtains the response income, assessment fee and cost paid by the response capacity of the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end;
[0273] A fourth processing submodule is used to obtain an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit;
[0274] The fifth processing submodule is used to obtain the invitation information including the response quantity and price in each time period with the goal of maximizing the output of the objective function.
[0275] In the embodiment of the present invention, optionally, the objective function is: ;
[0276] in, The load integration end is in the period Response benefits; The load integration end is in the period The cost of assessment; Calling resources for load integration Time the costs paid for response capacity; It is the time period resolution, and the unit is time period per hour.
[0277] In the embodiment of the present invention, optionally, the method further includes:
[0278] A linearization processing submodule, used for linearizing the objective function;
[0279] The sixth processing submodule is used to obtain the invitation information including the response quantity and price in each time period by taking the maximum of the objective function after linearization processing as the goal.
[0280] The load integration terminal provided by the embodiment of the present invention can realize Figure 1 The various processes implemented in the method embodiment achieve the same technical effect and will not be described again here to avoid repetition.
[0281] The embodiment of the present invention provides an electronic device 130, see Fig.13 As shown, Fig.13 This is a principle block diagram of an electronic device 130 according to an embodiment of the present invention, including a processor 131, a memory 132, and a program or instruction stored in the memory 132 and executable on the processor 131. When the program or instruction is executed by the processor, the steps in any method for determining the revenue from demand response trading of the present invention are implemented.
[0282] An embodiment of the present invention provides a readable storage medium, on which a program or instruction is stored. When the program or instruction is executed by a processor, the various processes of an embodiment of a method for determining demand response transaction revenue such as any of the above-mentioned items are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
[0283] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement the above Figure 1 The various processes of the method embodiment shown can achieve the same technical effect, and will not be described again here to avoid repetition.
[0284] Computer readable media include permanent and non-permanent, removable and non-removable media, and can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0285] It should be noted that the collection, collection, updating, analysis, processing, use, transmission, storage and other aspects of user personal information involved in the technical solution of this disclosure are in compliance with the provisions of relevant laws and regulations, are used for legitimate purposes, and do not violate public order and good morals. Necessary measures are taken for user personal information to prevent illegal access to user personal information data and maintain the security of user personal information and network security.
[0286] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0287] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0288] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD), and includes a number of instructions for enabling a service classification device (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in each embodiment of the present application.
[0289] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A method for determining demand response transaction revenue, characterized in that: Applied to a load integration terminal, the load integration terminal includes at least one proxy user terminal, and the method includes: Obtaining the response capacity demand issued by the third-party electricity demand end, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity; Submitting the invitation information to the third-party electricity demand end, and obtaining an actual response plan issued by the third-party electricity demand end according to the invitation information; Obtaining demand response transaction revenue according to the actual response plan and a revenue principle pre-specified by the load aggregator and the proxy user; The obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes: An aggregation optimization model is constructed according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end. The aggregation optimization model obtains the response income, assessment fee and cost paid by the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end to the response capacity demand; Obtaining an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit; Taking the maximum output of the objective function as the goal, obtaining the invitation information including the response quantity and price in each time period; The objective function is: in, is the response benefit of the load integration terminal in period t; is the assessment fee of the load integration end in time period t; The cost paid by the load integrator for calling the response capacity of resource i in period t; δ is the period resolution, and the unit is period per hour.
2. The method for determining demand response transaction revenue according to claim 1, characterized in that: The obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes: The response capacity demand is input into the characteristic model of the user resource to obtain the demand response information of the proxy user terminal, wherein the characteristic model of the user resource is determined based on the historical demand response information of the proxy user terminal to the historical response capacity demand.
3. The method for determining demand response transaction revenue according to claim 2, characterized in that: The obtaining of the response capacity demand issued by the third-party electricity demand side, and obtaining the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user side to the response capacity demand, includes: Obtaining historical demand response information of the proxy user terminal to historical response capacity demand and agreed assessment and settlement parameters; Constructing a characteristic model of user resources according to the historical demand response information and the agreed assessment and settlement parameters; The characteristic model of the user resources takes at least one of the following as a constraint of the characteristic model of the user resources: a declared capacity range of the user resources, an adjustment rate of the actual response capacity, and an effective response capacity.
4. The method for determining demand response transaction revenue according to claim 1, characterized in that: After obtaining the objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid for the response capacity, the method further includes: Linearizing the objective function; Taking the maximum of the objective function after linearization as the goal, the invitation information including the response quantity and price in each time period is obtained.
5. A load integration terminal, characterized in that: The load integration terminal includes at least one proxy user terminal, including: The first processing module is used to obtain the response capacity demand issued by the third-party electricity demand end, and obtain the invitation information including the response quantity and price of each time period according to the demand response information of the proxy user end to the response capacity demand; wherein the demand response information includes at least one of the following: the characteristics of the proxy user resources, the settlement and sharing method with the proxy user end, the expected demand response price and the effective response capacity; A second processing module is used to submit the invitation information to the third-party electricity demand end, and obtain an actual response plan issued by the third-party electricity demand end according to the invitation information; A third processing module is used to obtain demand response transaction benefits according to the actual response plan and the benefit principle pre-specified by the load aggregator and the proxy user; The first processing module comprises: An optimization submodule, configured to construct an aggregation optimization model according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end, wherein the aggregation optimization model obtains the response income, assessment fee and cost paid by the response capacity of the load integration end according to the response capacity demand issued by the third-party electricity demand end and the demand response information of the proxy user end; A fourth processing submodule is used to obtain an objective function according to the response benefit of the load integration terminal, the assessment fee and the cost paid by the response capacity, wherein the objective function represents the expected benefit; A fifth processing submodule, configured to obtain the invitation information including the response quantity and price in each time period with the goal of maximizing the output of the objective function; The objective function is: in, is the response benefit of the load integration terminal in period t; is the assessment fee of the load integration terminal in period y; The cost paid by the load integrator for calling the response capacity of resource i in period y; δ is the period resolution, and the unit is period per hour.
6. An electronic device, characterized in that: It includes a processor, a memory, and a program or instruction stored in the memory and executable on the processor, and when the program or instruction is executed by the processor, it implements the steps in the method for determining the demand response transaction revenue as described in any one of claims 1 to 4.
7. A readable storage medium, characterized in that: The readable storage medium stores a program or instruction, and when the program or instruction is executed by a processor, the steps in the method for determining demand response transaction revenue as described in any one of claims 1 to 4 are implemented.
8. A computer program product, characterized in that The method comprises computer instructions, which, when executed by a processor, implement the steps in the method for determining demand response transaction revenue as claimed in any one of claims 1 to 4.
Citation Information
Patent Citations
Resource aggregation optimization method and device for power demand response and storage medium
CN115577827A