Reactive power margin calculation and evaluation method and system considering wind and solar power access

By partitioning reactive power source nodes and merging load nodes, and combining the wind and solar uncertainty model, the reactive power margin is calculated using the QV-PV curve method, which solves the problem of voltage fluctuations in the wind and solar power system and improves the stability and management efficiency of the power grid.

CN118659399BActive Publication Date: 2024-11-08KAIFENG POWER SUPPLY COMPANY STATE GRID HENAN ELECTRIC POWER +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411133209.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-08
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

Existing reactive power reserve calculation methods fail to effectively address voltage fluctuations in wind and solar integrated power systems, lacking systematic hierarchical assessment and comprehensive consideration of reactive power source output capacity, leading to difficulties in voltage instability analysis.

Method used

By clustering and partitioning reactive power source nodes and merging load nodes, an uncertain probability model for wind and solar power is constructed. This model is used to perform partitioned probability power flow calculations, obtain reactive power reserves and demand using the QV-PV curve method, establish a comprehensive reactive power margin model, identify key nodes, and optimize resource allocation.

Benefits of technology

It enables the calculation and evaluation of reactive power margin in power systems, improves grid stability and management efficiency, optimizes resource allocation and fault response, and provides a systematic risk assessment tool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118659399B_ABST
    Figure CN118659399B_ABST
Patent Text Reader

Abstract

The present invention discloses a reactive margin calculation and evaluation method and system taking into account wind and solar access, clustering and partitioning reactive source nodes, merging load nodes, realizing reactive voltage partitioning, and identifying key nodes of partitions; performing partition probability flow calculation, further obtaining the expected value of partition node voltage and branch power flow, using the fusion QV-PV curve method to obtain the partition effective reactive power reserve under normal conditions and the partition effective reactive power demand under fault conditions, thereby obtaining the reactive margin of each partition; determining the comprehensive reactive margin, establishing a partition reactive margin evaluation system, calculating the weight values ​​of the evaluation system, assigning values ​​to the various indicators of the evaluation system, and then obtaining the reactive margin level score of the partition; each partition independently solves the reactive margin level score, realizing the calculation and evaluation of the reactive margin of the entire power system. The present invention optimizes the operation and management of the power system and improves the reliability and efficiency of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of voltage reactive power level assessment, and in particular relates to a reactive power margin calculation and evaluation method taking into account wind and solar power access. Background Art

[0002] The large-scale grid connection of new energy sources has brought new challenges to the power system. Among them, wind power and solar power are the most affected by meteorological conditions, and their output power has a high degree of uncertainty and volatility. This fluctuation can lead to a mismatch between the load and supply of the power system, thus affecting the short-term stability of the system. In this case, the voltage display of the power system may be unstable, which brings difficulties to subsequent analysis.

[0003] The existing reactive power reserve calculation methods have some defects in terms of evaluation methods and consideration of influencing factors. First, most studies only focus on the reactive power reserve between the grid operation point and the voltage collapse point, but in reality, it is necessary to consider that before the voltage collapse occurs, the system must take countermeasures to the voltage fluctuation. Therefore, the reactive power reserve before the voltage collapse is basically useless; second, there is a lack of systematic hierarchical evaluation of the reactive power level of the grid voltage. It is not enough to indicate the reactive power operation status of the power system only from the perspective of reactive power reserve. It is also necessary to comprehensively consider the reactive power output capacity of the reactive power source, so that the reactive voltage level of the system can be output from the reactive power perspective in combination with the voltage level. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a reactive margin calculation and evaluation method taking into account wind and solar access.

[0005] The present invention achieves the above technical objectives through the following technical means.

[0006] Reactive power margin calculation and evaluation method considering wind and solar access:

[0007] Cluster and partition reactive source nodes, merge load nodes, realize reactive voltage partitioning, and identify key nodes of partitioning;

[0008] Construct wind and solar uncertainty probability model and load uncertainty model, perform partition probability flow calculation, and then use Newton-Raphson flow calculation method to obtain the expected value of partition node voltage and branch power flow;

[0009] Based on the expected value of the distribution of the partition node voltage and the branch power flow, the fusion QV-PV curve method is used to obtain the partition effective reactive power reserve under normal operation and the partition effective reactive power demand under fault operation.

[0010] The reactive power margin of each partition is calculated by the effective reactive power reserve of the partition under the normal operation state and the effective reactive power demand of the partition under the fault operation state, and a comprehensive reactive power margin model is constructed by integrating the risk evaluation index of the power grid to determine the comprehensive reactive power margin used to construct the reactive power margin evaluation system of the partition;

[0011] Establish a zoned reactive power margin evaluation system, determine the participating factors that affect the reactive power output capacity of reactive sources, and establish a mathematical model for each participating factor;

[0012] The weight values ​​of the zone reactive margin evaluation system are calculated, and the indicators of the zone reactive margin evaluation system are assigned values, thereby obtaining the zone reactive margin level score; each zone independently solves the reactive margin level score, and finally realizes the calculation and evaluation of the reactive margin of the entire power system.

[0013] Furthermore, the identification of the key nodes of the partition is specifically:

[0014] (1) Determine the sensitivity of nodes in each partition to reactive power output;

[0015] Calculate the output change of other reactive sources in the partition under the same power change condition:

[0016] ΔQ ts (Q gi )=Q ts (Q gi )-Q ts (Q gi ′)

[0017] Among them, Q ts (Q gi ) is the sum of the outputs of other reactive sources in the front partition, Q ts (Q gi ′) is the sum of the output of other reactive sources in the partition after adjustment, Q gi represents the reactive power output of the parallel reactive source at node i;

[0018] Then we can get the sensitivity k of each node to the reactive output of reactive source: i :

[0019]

[0020] (2) Using node betweenness to distinguish node criticality;

[0021] The node betweenness is calculated by the following formula:

[0022]

[0023] Among them, B(k) represents the central value of the node betweenness, σ ijis the number of shortest or most efficient paths for transferring power between nodes i and j, σ ij (k) is the number of nodes passing through k in the shortest path or the most efficient path between nodes i and j, G * , L * They refer to the generation node set and the load node set respectively;

[0024] Calculate the comprehensive contribution of nodes:

[0025] T i =C ij +B(k)

[0026] Among them, the node electrical coupling Y ij is the corresponding element in the admittance matrix, representing the mutual admittance from node i to node j, Y ii and Y jj are the diagonal elements in the admittance matrix, representing the self-admittance of node i and node j respectively;

[0027] (3) Construct partition key node merging model:

[0028]

[0029] Among them, η1 and η2 are the node’s sensitivity to reactive power output k respectively. i And the node comprehensive contribution T i The weight factor is set as η1 = η2 = 1 / 2; select N i The largest node is the partition key node.

[0030] Furthermore, the partitioned effective reactive power reserve under the normal operating state is:

[0031] Q i,res =1 / 2(Q i,res (PV)+Q i,res (QV)

[0032] Among them, Q i,res (QV) is the partition effective reactive power reserve calculated using the QV curve, and Represents the expected value of reactive power at the operating point, Represents the expected value of reactive power at the nose point; Q i,res (PV) is the effective reactive power reserve of the partition calculated using the PV curve. Its value is the absolute value of the difference between the reactive power at the power system operating point and the reactive power at the voltage stability limit point.

[0033] Furthermore, the partition effective reactive power demand under the fault operation condition is:

[0034] Qi,d =1 / 2(Q i,d (PV)+Q i,d (QV)

[0035] Among them, Q i,d (QV) is the effective reactive power demand of the partition calculated using the QV curve, and is the expected value of reactive power generated by the reactive source at the operating point under fault operation, is the expected value of reactive power generated by the reactive source at the nose point under fault operation; Q i,d (PV) is the effective reactive power demand of the partition calculated using the PV curve. Its value is the absolute value of the difference between the reactive power at the operating point of the power system under fault operation and the reactive power at the voltage stability limit point.

[0036] Furthermore, the reactive power margin of each partition is: Q i,m =Q i,res -Q i,d .

[0037] Furthermore, the comprehensive reactive power margin model is:

[0038] Q m =w Q Q′ i,m +w V ·U′ risk_i

[0039] Where: Q′ i,m is the normalized value of reactive power margin in each partition, U′ risk_i is the normalized value of the overvoltage risk index, w Q and w V Q′ i,m and U′ risk_i The weight of .

[0040] Furthermore, the partition reactive power margin evaluation system is:

[0041]

[0042] y0=ω1y1+ω2y2+ω3y3

[0043] Among them, in the criteria layer, is the overall reactive power output characteristic index of the partition, γ1 and γ2 are Q m and In the sub-criteria layer, y0 is the output characteristic index of a single reactive source, y1, y2 and y3 represent the reactive response time, reactive support time and reactive input effect of the reactive source respectively, and ω1, ω2 and ω3 represent the weights of reactive response time, reactive support time and reactive input effect respectively.

[0044] Furthermore, the mathematical model of reactive power response time is:

[0045]

[0046] in, represents the average distribution coefficient of dynamic reactive power source, Indicates the maximum average time specified by the system, t max Indicates the maximum response time required by the system, t * represents the actual response time of the dynamic reactive power source, and d represents the compensation distribution coefficient;

[0047] The mathematical model of reactive support time is:

[0048] y2=m1y 21 +m2y 22 +m3y 23

[0049] Among them, m1, m2, and m3 are all distribution coefficients, and the actual reactive support time t′<T c When m1=0, T c <t′<T max When m2=m(t′), T max <t′, m3=1, T c is the minimum reactive power support time, T max is the maximum reactive power support time required by the system, m(t′) is the membership function value of the reactive power support time; y 21 Indicates that the reactive power support time of the reactive power source is much shorter than the reactive power support time required by the power system, y 22 Indicates that the reactive power support time of the reactive power source meets the minimum reactive power support time required by the power system, but is lower than the reactive power support time required by the power system. 23 Indicates the situation where the reactive power support time of the reactive power source is greater than the reactive power support time required by the power system;

[0050] The mathematical model of reactive power input effect is:

[0051] y3=μ1y 31 +μ2y 32 +μ3y 33

[0052] Among them, μ1, μ2, and μ3 are all distribution coefficients, and when the actual reactive power compensation capacity C<C0, μ1=0, C0<C<C max When μ2=μ(C), C max When <C, μ3=1, C0 is the minimum reactive power compensation capacity required by the system, C max is the maximum reactive power compensation capacity required by the system, μ(C) represents the membership function value of the reactive power input effect; y 31 Indicates that the input effect of reactive power source is not enough to affect the voltage of the power system, y 32 It means that the reactive power source can provide some support to the voltage stability of the power system, but it may not be enough to provide sufficient reactive power compensation. 33 Indicates that the reactive power compensation capacity of the reactive power source is sufficient.

[0053] A reactive margin calculation and evaluation system taking into account wind and solar access comprises a memory and a processor; wherein the memory stores a computer program, and when the program is executed by the processor, the reactive margin calculation and evaluation method taking into account wind and solar access can be implemented.

[0054] A computer-readable storage medium stores a computer program, which, when executed by a processor, can implement the above-mentioned reactive power margin calculation and evaluation method taking into account wind and solar access.

[0055] The beneficial effects of the present invention are:

[0056] (1) The present invention proposes a two-step voltage partitioning strategy for reactive source and load nodes, which divides the power grid into N area Decoupled areas can limit the impact of local failures and avoid chain reactions across the entire network, thereby improving the overall security of the system.

[0057] (2) The present invention proposes a partition node merging strategy that considers line topology to identify partition key nodes. By considering the topological structure of the line, it is possible to more accurately identify key nodes that have an important impact on the stability and operation of the power grid, making resource optimization and fault response more effective, and achieving a complete analysis that considers the actual conditions of each part of the system;

[0058] (3) The present invention establishes a probabilistic model that takes into account the uncertainty of wind and solar output, which can more accurately predict the future state of the power grid, especially when a high proportion of renewable energy is connected;

[0059] (4) The present invention uses the fusion QV-PV curve method to obtain the partitioned effective reactive power reserve Q under normal operating conditions. i,res and the effective reactive power demand Q of the partition under fault operation i,d , further calculate the reactive power margin Q of each partition i,m, and integrates the grid risk assessment indicators to build a comprehensive reactive power margin model, which not only considers the quantity of reactive power reserves, but also its quality and reliability, providing a systematic risk assessment tool for reactive power management of the grid;

[0060] (5) The present invention establishes an evaluation system for the reactive power margin of each zone, comprehensively considers the reactive power margin of the system when it faces unstable conditions, and evaluates in detail the voltage support capability of the reactive power source under different operating conditions, thereby providing a basis for selecting appropriate reactive power source configuration and deployment;

[0061] (6) The present invention determines the participating factors that affect the reactive power output capacity of the reactive power source, and can more accurately control the reactive power source to achieve the expected power grid support effect; in addition, a mathematical model of the influence of each participating factor on the reactive power source output capacity is established;

[0062] (7) The present invention calculates the weights of various indicators in the zoned reactive margin evaluation system and assigns them points. The weight and score system helps to identify reactive sources with better or worse performance, making resource allocation more reasonable and ensuring the maximization of grid stability and efficiency;

[0063] (8) The present invention provides a comprehensive and detailed reactive power margin evaluation and management framework, which not only optimizes the operation and management of the power system, but also improves the reliability and efficiency of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 The flowchart of the reactive power margin calculation and evaluation method taking into account wind and solar access of the present invention;

[0065] Figure 2 This is a QV curve calculation example diagram obtained by the present invention under normal operation of the power system;

[0066] Figure 3 It is a flow chart of reactive source node clustering and partitioning of the present invention. DETAILED DESCRIPTION

[0067] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0068] like Figure 1 As shown, the present invention provides a reactive margin calculation and evaluation method taking into account wind and solar access, comprising the following steps:

[0069] S1. A two-step voltage partitioning strategy is proposed, which includes reactive source node clustering and load node merging.

[0070] S11. Clustering and partitioning reactive source nodes: In order to better ensure the complex relationship and influence of reactive source nodes in the actual power system, fuzzy C-means (FCM) is used for clustering and partitioning;

[0071] According to the reactive source data sample S * , select the number of cluster centers C(C * );

[0072] For each point x of the reactive source data sample i , calculate its value for cluster center c j The membership degree u ij ;u ij is a function based on the distance from the point to the cluster center, expressed as:

[0073]

[0074] Among them, ||x i -c j || is point x i To cluster center c j The Euclidean distance of , m is the fuzzification parameter;

[0075] The data point x i Classification and cluster center c j The cluster area with the smallest membership.

[0076] Use the membership degree to update each cluster center. The new cluster center is the weighted average of all the points in the cluster. Each point x i The weight is calculated as follows:

[0077]

[0078] Where N is the total number of reactive source data points;

[0079] Determine the range of variation of cluster centers:

[0080] ||V (t+1) -V (t) ||<∈

[0081] Among them, V (t) represents the set of all cluster centers in the tth iteration, V (t+1) represents the set of all cluster centers (i.e. updated) in the t+1th iteration, ∈ is the preset threshold;

[0082] When the t+1th iteration satisfies the above formula, the clustering result is output, and a clustering platform with reasonable partitioning of system reactive power source nodes is obtained. The classification process can be found in Figure 3 ;

[0083] S12, merging the load nodes based on electrical distance;

[0084] Perform power flow calculation on the partitioned nodes in polar coordinate form and obtain the Jacobian matrix J:​

[0085]

[0086] Among them, △P is the active power unbalance of node i, △Q is the reactive power unbalance of node i, △δ is the phase angle change of node i, △U is the voltage change of node i, H, N, M, L are Jacobian sub-matrices;

[0087] According to the Jacobian submatrix L, the sensitivity matrix S is obtained, and the specific expression is:

[0088] S=-L -1

[0089] The voltage sensitivity matrix is ​​mapped to a two-dimensional coordinate system through a mapping function to obtain the electrical distance, and the electrical distance here is defined as:

[0090]

[0091] Among them, S ii , S ij , S ji , S jj is the corresponding element value of the sensitivity matrix;

[0092] The load nodes are classified into the reactive source node clustering platform with the smallest electrical distance to them, thereby realizing reactive voltage partitioning.

[0093] S2, a partition node merging strategy considering the line topology, used to identify the partition key nodes;

[0094] S21, introduce equivalent reactive power compensation method to determine the sensitivity of nodes in each partition to reactive power source output;

[0095] Connect a virtual phase regulator in parallel at non-reactive source node i, and calculate the output change of other reactive sources in the partition under the same power change:

[0096] ΔQ ts (Q gi )=Q ts (Q gi )-Q ts (Q gi ′)

[0097] Among them, Q gi represents the reactive power output of the parallel reactive source at node i, Q ts (Q gi ) is the sum of the outputs of other reactive sources in the front partition, Q ts (Q gi ′) is the sum of the outputs of other reactive sources in the zone after adjustment;

[0098] Then we can get the sensitivity k of each node to the reactive output of reactive source: i :

[0099]

[0100] S22. Use node betweenness to further distinguish node criticality and make up for the limitations of a single method for reactive power source and reactive power output of nodes;

[0101] The node betweenness can be calculated as follows:

[0102]

[0103] Among them, B(k) represents the central value of the node betweenness, σ ij is the number of shortest or most efficient paths for transferring power between nodes i and j, σ ij (k) is the number of nodes passing through k in the shortest path or the most efficient path between nodes i and j, G * , L * They refer to the generation node set and the load node set respectively;

[0104] Calculate the comprehensive contribution of the node; the comprehensive contribution of the node refers to the consideration of the global importance of the node on the basis of combining the characteristics of the node itself. The calculation method of the comprehensive contribution of the node is as follows:

[0105] T i =C ij +B(k)

[0106] Among them, the node electrical coupling Y ij is the corresponding element in the admittance matrix, representing the mutual admittance from node i to node j, Y ii and Y jj are the diagonal elements in the admittance matrix, representing the self-admittance of node i and node j respectively;

[0107] S23, build partition key node merging model:

[0108]

[0109] Among them, η1 and η2 are the node’s sensitivity to reactive power output k respectively. i And the node comprehensive contribution T i The weight factor is set as η1 = η2 = 1 / 2; select N i The largest node is the partition key node.

[0110] S3. Construction method of wind and solar uncertainty probability model;

[0111] S31. Collect historical meteorological data and wind and solar power plant data in previous years within the system area;

[0112] S32. Perform Weibull fitting modeling on the wind speed ν (data of the wind power plant):

[0113]

[0114] S33. Use the log-normal density distribution function to fit the solar irradiance (historical meteorological data) model:

[0115]

[0116] Among them, a, b, c, and d are standard parameters of the Weibull function, and G represents the solar irradiance;

[0117] S34, construct wind power P w The functional relationship with wind speed is:

[0118]

[0119] Among them, v in 、v r and v out are cut-in wind speed, rated wind speed and cut-out wind speed respectively, P wr It represents the rated output power of the wind turbine;

[0120] S35, build solar P s The functional relationship with solar irradiance is:

[0121]

[0122] Among them, G sd and R c The solar irradiance is 1000W / m 2 120W / m 2 The specific irradiance at sr Indicates the rated output power of solar photovoltaic modules;

[0123] The functional relationship between wind power and wind speed, and the functional relationship between solar energy and solar irradiance constitute the wind-solar uncertainty probability model.

[0124] S4, perform partition probability power flow calculation;

[0125] S41, perform modeling considering load uncertainty;

[0126] The load power often fluctuates with the change of time. The load value in a general sense is its average value. The probability density function of the load active power P and reactive power Q (i.e., the load uncertainty model) is:

[0127]

[0128] Among them, δ P and μ P is the variance and expected value of active power, δ Q and μ Q is the variance and expected value of reactive power;

[0129] S42, performing power flow calculation using the three-point estimation method;

[0130] Using the wind and solar uncertainty probability model and load uncertainty model, the input random variable X of the power flow calculation using the three-point estimation method is obtained. K The mean and standard deviation of k and δ k , use the following formula to calculate three estimation points, denoted as X K,1 , X K,2 , X K,3 ;

[0131] x k,i =μ k +ξ k,i δ k ,i=1,2,3

[0132] In the formula, ξ k,i is a position variable, and its expression is:

[0133]

[0134] Where: k,3 is a random variable X K The third-order center distance of X is called the skewness coefficient, which means K The degree to which the distribution of deviates from the standard normal distribution; k,4 is a random variable X K The fourth-order central moment is called the kurtosis coefficient; if λ k,4 is very small, indicating that the random variable X K The values ​​of are concentrated near the expectation; if λ k,4 is 0, indicating that the random variable X K The distribution of is consistent with the steepness of the normal distribution; the expressions for the two are:

[0135]

[0136] The expected values ​​of node voltage and branch power flow in the partition are obtained by the Newton-Raphson power flow calculation method from the three estimated points, where the expected values ​​of reactive power and voltage at node i are expressed as follows:

[0137]

[0138] The node voltages and branch power flows used in solving the partitioned effective reactive power reserve and partitioned effective reactive power demand of S5 and the reactive power margin of S6 are all distributed expected values.

[0139] S5. Use the fusion QV-PV curve method to obtain the partition effective reactive power reserve Q under normal operation. i,res and the effective reactive power demand Q of the partition under fault operation i,d ;

[0140] S51, install a virtual phase regulator at the key node i of the partition, obtain the corresponding reactive power value by changing the voltage of the partition node, draw the QV curve of the key node of the partition under normal operation, and calculate the effective reactive power reserve of the partition, such as Figure 2 Its expression is:

[0141]

[0142] in, Represents the expected value of reactive power at the operating point, Represents the expected value of reactive power at the nose point;

[0143] S52. Similarly, draw the QV curve under the condition of fault operation of the key node of the partition, and calculate the effective reactive power demand of the partition. The expression is:

[0144]

[0145] in, is the expected value of reactive power generated by the reactive source at the operating point under fault operation, is the expected value of reactive power generated by the reactive source at the nose point under fault operation;

[0146] S53, conduct continuous power flow on the power system to obtain the PV curve of the key nodes of the partition under normal operation, and take the absolute value of the difference between the reactive power at the power system operation point and the reactive power at the voltage stability limit point as the effective reactive power reserve Q of the partition i,res (PV);

[0147] S54, conduct continuous power flow on the power system, draw the PV curve under fault operation of the key nodes of the partition, take the absolute value of the difference between the reactive power at the operating point of the power system under fault operation and the reactive power at the voltage stability limit point as the effective reactive power demand Q of the partition i,d (PV);

[0148] S55. Use the fusion QV-PV curve method to obtain the partition effective reactive power reserve under normal operating conditions:

[0149] Qi,res =1 / 2(Q i,res (PV)+Q i,res (QV)

[0150] The fusion QV-PV curve method is used to obtain the effective reactive power demand of the partition under fault operation:

[0151] Q i,d =1 / 2(Q i,d (PV)+Q i,d (QV)).

[0152] S6. Calculate the reactive power margin Q of each partition i,m , and integrate the grid risk assessment indicators to build a comprehensive reactive margin model;

[0153] S61. Calculate the reactive power margin of each partition. The reactive power margin is the difference between the effective reactive power reserve and the effective reactive power demand in the partition. The reactive power margin of each partition can be expressed as:

[0154] Q i,m =Q i,res -Q i,d

[0155] Among them, Q i,res is the effective reactive power reserve value of node i under normal operation, Q i,d It is the effective reactive power demand value of the power system in response to disturbances or faults;

[0156] S62. Calculate the risk assessment index of power grid;

[0157] Select the overvoltage limit risk index U in the power grid risk assessment index risk_i , which measures the safety level of each partition. The node voltage over-limit risk index can be expressed as the probability of voltage over-limit occurring at the node The node voltage exceeds the limit The product of:

[0158]

[0159] Probability of voltage exceeding limit and voltage limit It can be solved by the following formula:

[0160]

[0161] Where: △U N is the allowable voltage deviation of the distribution network, u i is the voltage of node i;

[0162] S63. Since the reactive margin index and the power grid risk assessment index have different dimensions and value ranges, normalization processing is performed:

[0163]

[0164] S64, constructing a comprehensive reactive power margin model; constructing the model using a weighted sum method, the model can be expressed as:

[0165] Q m =w Q Q i ' ,m +w V ·U′ risk_i

[0166] Where: w Q and w V are the weights of reactive power margin index and power grid risk assessment index respectively;

[0167] S65. Perform sensitivity analysis to determine weights, and define weights to satisfy:

[0168] w Q +w V =1

[0169] Collect reactive power margin values ​​and overvoltage risk index values, and systematically change w Q and w V , and record the Q under each weight combination m , identify the effect of weight change on the comprehensive reactive power margin Q m The area with the greatest impact to determine the weight value;

[0170] S66, perform data screening, set reactive power margin and overvoltage risk index thresholds based on operating experience, and convert the comprehensive reactive power margin Q that meets the threshold conditions into m Stored in the set M{}, it is used to build the reactive power margin evaluation system of S7 zone.

[0171] S7. Establish a zoned reactive power margin evaluation system and determine the participating factors that affect the reactive power output capacity of reactive power sources (including reactive power response time, reactive power support time and reactive power input effect);

[0172] Construct a two-layer classification index as a zone reactive power margin evaluation system:

[0173]

[0174] y0=ω1y1+ω2y2+ω3y3

[0175] Among them, in the criterion layer, Q m is the zone reactive power margin of the power system, is the overall reactive power source output characteristic index of the partition, y0 is the single reactive power source output characteristic index, γ1 and γ2 represent the weights of reactive power margin and reactive power source output characteristic index respectively;

[0176] In the sub-criteria layer, y1, y2 and y3 are the reactive response time, reactive support time and reactive input effect of the reactive source, respectively; ω1, ω2 and ω3 represent the weights of reactive response time, reactive support time and reactive input effect, respectively;

[0177] The stratification of indicators of the zone reactive power margin evaluation system is shown in Table 1:

[0178] Table 1

[0179]

[0180] Reactive response time is chosen as an indicator to measure reactive power output because it can quickly evaluate the equipment's ability to respond to emergencies or voltage fluctuations. Reactive power sources that respond quickly can compensate for voltage fluctuations in a timely manner, which is critical to improving the system's dynamic stability and anti-interference capabilities. Reactive power sources that can respond quickly when a power system fails or a large load changes can help prevent or mitigate voltage collapse and system instability.

[0181] Reactive support time is selected as an indicator to measure reactive source output because support time evaluates the ability of reactive sources to continuously provide reactive support, which is very important for long-term voltage stability; longer reactive support time can maintain stable operation of the grid in grid emergencies, especially during fault clearing and system restoration; certain power system events (such as line faults, generator disconnection) may require reactive sources to provide continuous reactive support to maintain voltage levels and avoid wider power system impacts;

[0182] The reactive power input effect is selected as an indicator to measure the reactive power source output because the indicator measures the actual effect of reactive power input in improving the system voltage quality and stability, and is an intuitive way to evaluate the performance of reactive power sources. By evaluating the effect of reactive power input, reactive resources can be planned and dispatched more effectively to achieve the optimal operation of the power system. The operation of the power system requires not only reactive power support, but more importantly, such support should have practical benefits, such as effectively improving the voltage level or stabilizing the system. The evaluation of the actual effect helps to verify the practical application value of reactive power sources.

[0183] S8. Establish mathematical models of various participating factors;

[0184] S81. Reactive response time can measure the ability of dynamic reactive source to respond to system regulation. Its calculation method is as follows:

[0185]

[0186] in, represents the average distribution coefficient of dynamic reactive power source, Indicates the maximum average time specified by the system, t max Indicates the maximum response time required by the system, t * represents the actual response time of the dynamic reactive power source, and d represents the compensation distribution coefficient;

[0187] The compensation allocation coefficient should increase with the decrease of the actual response time, which means that as the response time of the dynamic reactive power source is shorter, the system can obtain compensation faster, and the availability of the reactive power source in the face of disturbances or faults will be higher;

[0188] S82. The reactive power support time of a dynamic reactive power source refers to the length of time that the reactive power source can provide reactive power to support the power grid and maintain the voltage level when a disturbance occurs in the power system. The reactive power support time of a reactive power source is fuzzily evaluated and divided into three cases for discussion:

[0189] Case 1: Type 1 (y 21 ) The reactive power support time of the reactive power source is much shorter than the reactive power support time required by the power system, and basically does not play a role in maintaining the system voltage level;

[0190] Case 2: Type 2 (y 22 ) The reactive power support time of the reactive power source meets the minimum reactive power support time required by the power system, but is lower than the reactive power support time required by the power system;

[0191] Case 3: Type 3 (y 23 ) The reactive power support time of the reactive power source is greater than the reactive power support time required by the power system;

[0192] The priority of the reactive power source in the three cases when facing disturbance is case 3> case 2> case 1; the S-type membership function is selected to distinguish the three cases, and the membership function value m(t′) of the reactive power support time is defined as follows:

[0193]

[0194] Among them, t′ is the actual reactive support time, T is the system required reactive support time, k is a positive constant, the slope of the control function, and represents the sensitivity of the membership function;

[0195] The reactive support time is expressed as:

[0196] y2=m1y 21 +m2y 22 +m3y 23

[0197] Wherein, the distribution coefficient m1=0(t′<T c ), distribution coefficient m2=m(t′)(Tc <t′<T max ), distribution coefficient m3=1(T max <t′), T c is the minimum reactive power support time, T max The maximum reactive power support time required by the system;

[0198] S83. Under the premise of meeting the reactive response time and reactive support time, the reactive input effect of the reactive source determines whether the reactive source can support the grid voltage;

[0199] Similar to the reactive power support time, the reactive power input effect of the reactive power source can be analyzed in three stages:

[0200] Phase 1 (y 31 ): Low investment effect

[0201] In this case, the input effect of reactive power source is not enough to affect the voltage of the power system, and its contribution to maintaining the voltage level of the power system is very small;

[0202] Phase 2 (y 32 ): Medium input effect

[0203] In this case, reactive power sources can provide partial support for power system voltage stability and improve system stability, but may not be sufficient to provide adequate reactive power compensation;

[0204] Phase 3 (y 33 ): High investment effect

[0205] In this case, the reactive power source has sufficient reactive power compensation capacity to exceed the reactive power compensation demand of the power system under unstable conditions, making a significant contribution to maintaining the voltage of the power system.

[0206] Because the reactive power input effect is similar to the reactive power support time, the S-type membership function is also used to express the three stages; the membership function of the reactive power input effect is:

[0207]

[0208] Among them, μ(C) represents the membership function value of the reactive input effect, which changes with the reactive compensation capacity C; C is the actual reactive compensation capacity, and C0 is the minimum reactive compensation capacity required by the system;

[0209] The effect of reactive power source input is:

[0210] y3=μ1y 31 +μ2y 32 +μ3y 33

[0211] Among them, the distribution coefficient μ1=0(C<C0), μ2=μ(C)(C0<C<C max ), μ3=1(C max <C), C max It is the maximum reactive power compensation capacity required by the system.

[0212] Weight calculation of the criterion layer and sub-criterion layer in steps S9 and S7;

[0213] S91. Use the analytic hierarchy process to build a hierarchical structure, compare the importance of the participating factors of the sub-criteria layer, and construct the judgment matrix A:

[0214] A=[a ij ] n×m

[0215] S92, normalize each factor of the judgment matrix A:

[0216]

[0217] Average the unitized values ​​in each row to get the weight of the sub-criteria layer;

[0218] S93. Calculate the consistency index CI:

[0219]

[0220] Among them, γ max is the maximum eigenvalue of the judgment matrix A, n is the number of participating factors in the sub-criteria layer;

[0221] S94. The consistency ratio CR is usually used to determine whether the consistency test is satisfied:

[0222]

[0223] If CR≤0.1 is satisfied, it means that the consistency of the judgment matrix is ​​acceptable;

[0224] After the sub-criteria layer weight calculation is completed, the weight of the criterion layer is calculated using the same method;

[0225] S95, use the direct scoring method to assign points to each participating factor, and the initial total score is 100 points;

[0226] The method for determining the scores of each participation factor of the single reactive source output characteristic index y0 at the sub-criteria layer is as follows:

[0227] Reactive response time: The reactive response time must be normalized first, and then multiplied by 100 to determine the reactive response time score;

[0228] The reactive support time and reactive input effect are directly obtained by multiplying the membership function value by 100 points to obtain the reactive support time and reactive input effect scores;

[0229] The participation factor score of the criterion layer is determined as follows:

[0230] For the zone reactive margin, select the maximum reactive margin value of each zone as the benchmark margin value, record it as unit value 1, calculate the relative coefficient of other zones relative to the benchmark margin value, ranging from 0 to 1, and then multiply it by 100 to get the reactive margin score.

[0231] For the overall reactive power source output characteristic score of the partition, it is obtained by taking the average value of all y0 obtained by the mathematical formula of the sub-criteria layer.

[0232] The scores obtained from the above process are combined with the weights and the mathematical model of the zone reactive power margin evaluation system to obtain the zone reactive power margin level score.

[0233] Each zone independently solves the reactive margin level score, and finally realizes the calculation and evaluation of the reactive margin of the entire power system.

[0234] The present invention also provides a reactive margin calculation and evaluation system taking into account wind and solar access, comprising a memory and a processor, wherein the memory stores a computer program, and when the program is executed by the processor, the reactive margin calculation and evaluation method taking into account wind and solar access can be implemented.

[0235] The present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the program is executed by a processor, the reactive power margin calculation and evaluation method taking into account wind and solar access can be implemented.

[0236] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.

Claims

1. A reactive power margin calculation and evaluation method taking into account wind and solar access, characterized by: Cluster and partition reactive source nodes, merge load nodes, realize reactive voltage partitioning, and identify key nodes of partitioning; Construct wind and solar uncertainty probability model and load uncertainty model, perform partition probability flow calculation, and then use Newton-Raphson flow calculation method to obtain the expected value of partition node voltage and branch power flow; Based on the expected value of the distribution of the partition node voltage and the branch power flow, the fusion QV-PV curve method is used to obtain the partition effective reactive power reserve under normal operation and the partition effective reactive power demand under fault operation. The reactive power margin of each partition is calculated by the effective reactive power reserve of the partition under the normal operation state and the effective reactive power demand of the partition under the fault operation state, and a comprehensive reactive power margin model is constructed by integrating the risk evaluation index of the power grid to determine the comprehensive reactive power margin used to construct the reactive power margin evaluation system of the partition; Establish a zoned reactive power margin evaluation system, determine the participating factors that affect the reactive power output capacity of reactive sources, and establish a mathematical model for each participating factor; Calculating the weight values ​​of the partition reactive power margin evaluation system, assigning values ​​to the indicators of the partition reactive power margin evaluation system, and then obtaining the partition reactive power margin level score; Each zone independently solves the reactive margin level score, and finally realizes the calculation and evaluation of the reactive margin of the entire power system; The partitioned effective reactive power reserve under the normal operating state is: Q i,res =1 / 2(Q i,res (PV)+Q i,res (QV)) Among them, Q i,res (QV) is the partition effective reactive power reserve calculated using the QV curve, and Represents the expected value of reactive power at the operating point, Represents the expected value of reactive power at the nose point; Q i,res (PV) is the effective reactive power reserve of the partition calculated using the PV curve, and its value is the absolute value of the difference between the reactive power at the power system operation point and the reactive power at the voltage stability limit point; The effective reactive power demand of the partition under the fault operation condition is: Q i,d =1 / 2(Q i,d (PV)+Q i,d (QV)) Among them, Q i,d (QV) is the effective reactive power demand of the partition calculated using the QV curve, and is the expected value of reactive power generated by the reactive source at the operating point under fault operation, is the expected value of reactive power generated by the reactive source at the nose point under fault operation; Q i,d (PV) is the effective reactive power demand of the partition calculated using the PV curve, and its value is the absolute value of the difference between the reactive power at the power system operating point and the reactive power at the voltage stability limit point under fault operation; The comprehensive reactive power margin model is: Q m =w Q ·Q i ′ ,m +w V ·U′ risk_i Where: Q' i,m is the normalized value of reactive power margin in each partition, U' risk_i is the normalized value of the overvoltage risk index, w Q and w V Q' i,m and U' risk_i The weight of The partition reactive power margin evaluation system is: y0=ω1y1+ω2y2+ω3y3 Among them, in the criteria layer, is the overall reactive power output characteristic index of the partition, γ1 and γ2 are Q m and In the sub-criteria layer, y0 is the output characteristic index of a single reactive source, y1, y2 and y3 represent the reactive response time, reactive support time and reactive input effect of the reactive source respectively, ω1, ω2 and ω3 represent the weights of reactive response time, reactive support time and reactive input effect respectively; The mathematical model of reactive power response time is: in, represents the average distribution coefficient of dynamic reactive power source, Indicates the maximum average time specified by the system, t max Indicates the maximum response time required by the system, t * represents the actual response time of the dynamic reactive power source, and d represents the compensation distribution coefficient; The mathematical model of reactive support time is: <h2 style=";text-align:left;direction:ltr">y2 = m1y<h2 style=";text-align:left;direction:ltr"> 21 <h2 style=";text-align:left;direction:ltr"> +m2y<h2 style=";text-align:left;direction:ltr"> 22 <h2 style=";text-align:left;direction:ltr"> +m3y<h2 style=";text-align:left;direction:ltr"> 23 Among them, m1, m2, and m3 are all distribution coefficients, and the actual reactive support time t′<T c When m1=0, T c <t′<T max When m2=m(t′), T max <t′, m3=1, T c is the minimum reactive power support time, T max is the maximum reactive power support time required by the system, m(t′) is the membership function value of the reactive power support time; y 21 Indicates that the reactive power support time of the reactive power source is much shorter than the reactive power support time required by the power system, y 22 Indicates that the reactive power support time of the reactive power source meets the minimum reactive power support time required by the power system, but is lower than the reactive power support time required by the power system. 23 Indicates the situation where the reactive power support time of the reactive power source is greater than the reactive power support time required by the power system; The mathematical model of reactive power input effect is: y3=μ1y 31 +μ2y 32 +μ3y 33 Among them, μ1, μ2, and μ3 are all distribution coefficients, and when the actual reactive power compensation capacity C<C0, μ1=0, C0<C<C max When μ2=μ(C), C max When <C, μ3=1, C0 is the minimum reactive power compensation capacity required by the system, C max is the maximum reactive power compensation capacity required by the system, μ(C) represents the membership function value of the reactive power input effect; y 31 Indicates that the input effect of reactive power source is not enough to affect the voltage of the power system, y 32 It means that the reactive power source can provide partial support for the voltage stability of the power system, but it is not enough to provide sufficient reactive power compensation. 33 Indicates that the reactive power compensation capacity of the reactive power source is sufficient.

2. The reactive power margin calculation and evaluation method taking into account wind and solar access according to claim 1 is characterized in that: The identification partition key nodes are specifically: (1) Determine the sensitivity of nodes in each partition to reactive power output; Calculate the output change of other reactive sources in the partition under the same power change condition: ΔQ ts (Q gi )=Q ts (Q gi )-Q ts (Q gi ′) Among them, Q ts (Q gi ) is the sum of the outputs of other reactive sources in the front partition, Q ts (Q gi ′) is the sum of the outputs of other reactive sources in the partition after regulation, Q gi represents the reactive power output of the parallel reactive source at node i; Then we can get the sensitivity k of each node to the reactive output of reactive source: i : (2) Using node betweenness to distinguish node criticality; The node betweenness is calculated by the following formula: Among them, B(k) represents the central value of the node betweenness, σ ij is the number of shortest or most efficient paths for transferring power between nodes i and j, σ ij (k) is the number of nodes passing through k in the shortest path or the most efficient path between nodes i and j, G * , L * They refer to the generation node set and the load node set respectively; Calculate the comprehensive contribution of nodes: T i =C ij +B(k) Among them, the node electrical coupling Y ij is the corresponding element in the admittance matrix, representing the mutual admittance from node i to node j, Y ii and Y jj are the diagonal elements in the admittance matrix, representing the self-admittance of node i and node j respectively; (3) Construct partition key node merging model: Among them, η1 and η2 are the node’s sensitivity to reactive power output k respectively. i And the node comprehensive contribution T i The weight factor is set as η1 = η2 = 1 / 2; select N i The largest node is the partition key node.

3. The reactive power margin calculation and evaluation method taking into account wind and solar access according to claim 1 is characterized in that: The reactive power margin of each partition is: Q i,m =Q i,res -Q i,d .

4. A reactive power margin calculation and evaluation system taking into account wind and solar access, characterized in that: It comprises a memory and a processor; wherein the memory stores a computer program, and when the program is executed by the processor, it can implement the reactive power margin calculation and evaluation method taking into account wind and solar access as described in any one of claims 1-3.

5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, it is capable of implementing the reactive margin calculation and evaluation method taking into account wind and solar access as described in any one of claims 1 to 3.

Citation Information

Patent Citations

  • Deep learning model generation method for dynamic reactive power reserve demand calculation of power grid

    CN112865118A

  • Regional reactive power reserve multi-objective optimization method for wind-light-storage hybrid system

    CN113708380A