Electric heating mining method and system for three-dimensional horizontal well network in heavy oil reservoir

Through the three-dimensional horizontal well network electric heating technology, the problems of large steam heat loss and low recovery rate in heavy oil reservoirs are solved, and high-efficiency, low-energy consumption heavy oil recovery is achieved, which is suitable for thin-layer and heterogeneous oil reservoirs.

CN118669104BActive Publication Date: 2024-10-22XINJIANG PETROLEUM ADMINISTRATION BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411132758.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-22
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

Existing heavy oil reservoir mining technology has problems such as large steam heat loss, high carbon emissions, low recovery rate and high energy consumption, especially in super heavy oil with oil layer thickness of 5 to 10 m and large distribution area length and width. In oil reservoirs, it is difficult to achieve profitable development.

Method used

The three-dimensional horizontal well network electric heating method is adopted. By setting up a three-dimensional horizontal well network with an angular triangular longitudinal section in the oil reservoir, a built-in electric heating system and oil production pump are used. The downhole electric heating device is used to heat clean water to generate high-dry steam, which is directly placed in the oil reservoir. The oil layer is heated downhole to achieve hydrothermal cracking, reduce the viscosity of crude oil, and increase recovery through circulating liquid replacement and flooding production.

Benefits of technology

It achieves zero carbon emissions and zero heat energy loss at the steam injection end, improves recovery rate, reduces mining costs, can efficiently develop and utilize heavy oil reservoirs, and is suitable for thin-layer and heterogeneous super-heavy oil reservoirs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118669104B_ABST
    Figure CN118669104B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of oil production technology, and is a method and system for electric heating production of a three-dimensional horizontal well network in a heavy oil reservoir, the latter comprising a well layout and completion module, an electric heating system design and construction module, a preparation module, an electric heating water injection and clear water throughput production module, and a three-dimensional horizontal well network drainage production module. The present invention has a reasonable and compact structure. Compared with the prior art, the horizontal wells in the three-dimensional horizontal well network of the present invention are arranged vertically in accordance with the inclination direction of the oil layer, so as to form a gravity oil drive of an oblique line. In each oil production stage, the injection and production replacement can be realized without changing the pipe column structure, forming high-level electric heating to generate steam, and bottom-level gravity oil drainage, so as to realize similar dual-horizontal well SAGD production; it does not need to set up a high-cost ground coal / gas steam generator and a ground steam injection pipeline network, and can directly heat clear water underground through each underground electric heating device to produce high-dryness steam, so as to realize zero carbon emission and zero heat energy loss at the steam injection end.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of petroleum exploitation, and is a method and system for exploiting heavy oil reservoirs by electric heating of a three-dimensional horizontal well network. Background Art

[0002] Conventional vertical well steam stimulation is to run a steam injection string into the vertical well, inject high-temperature and high-pressure steam into the oil well according to the construction parameters, and then pull out the steam injection string after well shut-in and blow-out, and then run the production string for production. The development process of steam stimulation is mainly divided into three stages: steam injection stage (steam swallowing), well shut-in stage (well shut-in) and recovery stage (steam exhalation). The main mechanisms of steam stimulation to improve the recovery rate of heavy oil are steam heating to reduce viscosity, gravity drive, oil layer unblocking and solvent extraction.

[0003] The use of steam stimulation to exploit heavy oil reservoirs requires less initial investment, quick production, and significant production increase effects. However, with the in-depth development of heavy oil reservoirs, steam stimulation oil production technology has also exposed a series of problems: ① During steam stimulation oil production, the amount of steam injected into the oil layer is limited, and the injected steam can only heat the 10 to 30 meters of the formation around the wellbore, and the reservoir utilization is low; ② When steam is injected from the wellhead to the bottom of the well, the steam heat loss is large; ③ The production changes greatly during the steam stimulation cycle, and the production decays quickly; ④ Steam stimulation mainly relies on natural energy for oil production, and the recovery rate is only 15% to 20%; ⑤ The cold and hot cycle changes, and the wellbore is severely damaged.

[0004] For extra-heavy oil reservoirs with a surface degassed crude oil viscosity greater than 20,000 mPa.s at 50°C and a continuous oil layer thickness of more than 10 m, steam-assisted gravity drainage (SAGD) can be used for recovery. Steam-assisted gravity drainage (SAGD), as a relatively cutting-edge heavy oil thermal recovery technology, was first proposed by Dr. Butler and has been successfully applied in heavy oil reservoirs in Canada's oil sands mining area, China's Liaohe Oilfield, Xinjiang Oilfield and other places. SAGD technology uses steam as a heat source to heat the oil layer and inject it into the formation, heating the formation crude oil to reduce the viscosity, and using the vertical gravity difference caused by the density difference to recover the heavy oil.

[0005] The Chinese patent document with the announcement number CN205638410U discloses a gravity drainage assisted steam drive three-dimensional well network structure, which includes a steam injection horizontal well horizontally arranged in the middle of the oil layer, and a first oil production horizontal well and a second oil production horizontal well are arranged on both sides thereof, the first oil production horizontal well and the second oil production horizontal well are arranged in parallel and symmetrically, and are both located at the same height position as the steam injection horizontal well, a first internal drainage vertical well group is arranged between the steam injection horizontal well and the first oil production horizontal well, and a first side drainage vertical well group is arranged on the side of the first oil production horizontal well away from the steam injection horizontal well; a second internal drainage vertical well group is arranged between the steam injection horizontal well and the second oil production horizontal well, and a second side drainage vertical well group is arranged on the side of the second oil production horizontal well away from the steam injection horizontal well. This structure can enhance the steam drive drainage and pressure reduction effect, promote the rapid formation of steam cavity, increase the steam swept volume and reserve utilization, and ultimately achieve the purpose of improving the recovery rate. It was found that after preheating the reservoir through steam stimulation, the reservoir temperature can only reach 75℃ to 83℃; for super-heavy oil reservoirs with a crude oil viscosity of 50000 mPa.s or more at 50℃, the flow capacity of super-heavy oil under this temperature condition is still poor, the preheating effect is extremely limited, and the oil-gas ratio is low; in addition, it is necessary to re-perforate and change the perforation trajectory in the later stage, which is difficult to operate and requires the oil layer thickness to be 10m to 15m, and thin oil layers below 10m cannot be effectively mobilized. This method is mainly aimed at continuous oil layers with a thickness of more than 20m thick thick oil layers, and requires a large amount of steam, which is still a high-carbon emission and high-energy consumption heavy oil extraction method.

[0006] For ultra-heavy oil reservoirs with a 50°C ground degassed crude oil viscosity greater than 50,000 mPa.s and a continuous oil layer of 5 to 10 m, especially for reservoirs with poor lateral continuity of the oil layer, strong reservoir heterogeneity, rapid changes in physical properties, and small single-well EUR, it is extremely difficult to achieve efficient development. However, such reservoirs have large reserves, generally accounting for 30% to 40% of the total heavy oil resources. The final recovery rate of conventional thermal recovery methods is generally less than 20%, the oil-gas ratio is generally less than 0.08, and the unit carbon emission reaches more than 2.0 tons of carbon / ton of oil. For ultra-heavy oil reservoirs with relatively thick oil layers (within the range of 5 to 10 m) and large distribution area length and width (flaky distribution), conventional thermal recovery methods and SAGD mining cannot achieve efficient development without changing the pipe string structure. High-cost coal-fired / gas-fired boilers are required on the ground, and the heat loss of injected steam is large and the carbon emission is high. Summary of the invention

[0007] The present invention provides a method and system for electric heating exploitation of a three-dimensional horizontal well network in a heavy oil reservoir, which overcomes the shortcomings of the above-mentioned prior art and can effectively solve the problems of high-cost coal-fired / gas-fired boilers required for the development of ultra-heavy oil reservoirs with an oil layer thickness of 5 to 10 m and a large distribution area length and width, large heat loss of injected steam and high carbon emissions.

[0008] One of the technical solutions of the present invention is achieved by the following measures: A method for electric heating production of a three-dimensional horizontal well network in a heavy oil reservoir, comprising:

[0009] A three-dimensional horizontal well network with a triangular distribution in the longitudinal section is set in the selected target oil reservoir. The three-dimensional horizontal well network includes at least three horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected with the deflection section. The horizontal sections of all horizontal wells are completed with screen pipes. After completion, two oil pipes, one long and one short, are run into each horizontal well in the three-dimensional horizontal well network.

[0010] An electric heating system and an oil production pump are respectively arranged in each horizontal well of the three-dimensional horizontal well network. Each electric heating system includes a downhole electric heating device with a temperature testing device. The continuous oil pipe of the downhole electric heating device with the temperature testing device is lowered from the long oil pipe to the toe end of the corresponding horizontal well. Each downhole electric heating device with the temperature testing device can be connected to the grid power and the green power through the power supply cable. The oil production pump is lowered from the short oil pipe to the deflection section of the corresponding horizontal well. Among them, all downhole electric heating devices are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well.

[0011] Prepare for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbores at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbores is circulated to the ground;

[0012] Start the exploitation of M rounds of electric heating and water injection throughput production cycles, each of which includes: injecting water segment plugs into the annulus of the long oil pipes and the continuous oil pipes of each horizontal well in the three-dimensional horizontal well network; using green electricity and grid electricity to power all downhole electric heating devices in the three-dimensional horizontal well network, and continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time through the cooperation of each downhole electric heating device and the corresponding temperature testing device, so that the crude oil undergoes hydrothermal cracking under high temperature conditions; after hydrothermal cracking, each horizontal well starts circulating fluid production, and after circulating fluid production, it is determined whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%. If so, stop circulating fluid, and if not, continue circulating fluid;

[0013] After each electric heating and clean water injection throughput production cycle is completed, the number of production rounds N of the current electric heating and clean water injection throughput production cycle is determined, and it is judged whether N is greater than or equal to M. If not, the next round of production of electric heating and clean water injection throughput production cycle is entered, and the heating time of each downhole electric heating device in each new electric heating and clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating and clean water injection throughput production cycle. If so, the production of the electric heating and clean water injection throughput production cycle is terminated.

[0014] The following is a further optimization and / or improvement of one of the above-mentioned technical solutions:

[0015] Each of the above processes utilizes green electricity and grid electricity to supply power, starts all downhole electric heating devices in the three-dimensional horizontal well network, and continuously heats the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time through the cooperation of each downhole electric heating device and the corresponding temperature testing device, so that the crude oil undergoes hydrothermal cracking under high temperature conditions. The process can include: starting the downhole electric heating device, and the downhole electric heating device uses full power for heating and heating; the downhole electric heating device determines whether the real-time wellbore ambient temperature collected by the temperature testing device reaches the temperature threshold value; if so, the downhole electric heating device is adjusted to constant temperature heating, so that the crude oil can continue to undergo hydrothermal cracking reaction; determines whether the heating time of the downhole electric heating device reaches the set time, if so, the downhole electric heating device is turned off, if not, the downhole electric heating device continues to heat at a constant temperature.

[0016] The above-mentioned preparation for oil production may also include: obtaining the oil layer fracture pressure to ensure that each time a clean water plug is injected into each horizontal well in the three-dimensional horizontal well network, the bottom hole injection pressure of the clean water is 0.5 MPa to 1 MPa less than the oil layer fracture pressure.

[0017] The distance between the top of the above-mentioned three-dimensional horizontal well network and the top boundary of the oil layer can be 2 m to 3 m, and the distance between the bottom of the three-dimensional horizontal well network and the bottom boundary of the oil layer can be 0.5 m to 1 m.

[0018] The above may also include that after the exploitation of M rounds of electric heating and water injection and huff-and-puff production cycles, when the horizontal section of each horizontal well in the three-dimensional horizontal well network is utilized more than 75%, the temperature field is connected and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network is switched to flooding production, and the flooding production of the three-dimensional horizontal well network includes: after the horizontal wells located at the top of the three-dimensional horizontal well network stop producing liquid, it is judged whether the green electricity supply is compatible with the total heating power of all downhole electric heating devices; if so, clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer; if not, each downhole electric heating device located at the top of the three-dimensional horizontal well network continues to heat with the grid electricity; it is judged whether the grid electricity is in the valley electricity period, if not, the horizontal wells located at the bottom of the three-dimensional horizontal well network are closed and the wells are stewed, and if so, the horizontal wells located at the bottom of the three-dimensional horizontal well network use the grid electricity to start the oil production pump production.

[0019] The second technical solution of the present invention is achieved by the following measures:

[0020] Well arrangement and completion module, a three-dimensional horizontal well network with a vertical cross-section in a triangular distribution is set in the selected target reservoir. The three-dimensional horizontal well network includes at least three horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected to the deflection section. The horizontal sections of all horizontal wells are completed with screen pipes. After completion, two oil pipes, one long and one short, are run into each horizontal well in the three-dimensional horizontal well network;

[0021] The electric heating system design and construction module is to respectively set an electric heating system and an oil production pump in each horizontal well of the three-dimensional horizontal well network. Each electric heating system includes a downhole electric heating device with a temperature testing device. The continuous oil pipe of the downhole electric heating device with the temperature testing device is lowered from the long oil pipe to the toe end of the corresponding horizontal well. Each downhole electric heating device with the temperature testing device can be connected to the grid power and the green power through the power supply cable. The oil production pump is lowered from the short oil pipe to the deflection section of the corresponding horizontal well. Among them, all downhole electric heating devices are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well.

[0022] Preparation module, preparing for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbores at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbore is circulated to the ground;

[0023] The electric heating clean water injection throughput production module starts the exploitation of M rounds of electric heating clean water injection throughput production cycles. Each electric heating clean water injection throughput production cycle includes: injecting clean water segment plugs into the annulus of the long oil pipes and the continuous oil pipes of each horizontal well in the three-dimensional horizontal well network; using green electricity and grid electricity to power all downhole electric heating devices in the three-dimensional horizontal well network, and through the cooperation of each downhole electric heating device and the corresponding temperature testing device, continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time, so that the crude oil undergoes hydrothermal cracking under high temperature conditions; after hydrothermal cracking, each horizontal well starts circulating fluid production, and after circulating fluid production, it is determined whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%. If so, the circulating fluid is stopped, and if not, the circulating fluid is continued;

[0024] After each electric heating and clean water injection throughput production cycle is completed, the number of production rounds N of the current electric heating and clean water injection throughput production cycle is determined, and it is judged whether N is greater than or equal to M. If not, the next round of production of electric heating and clean water injection throughput production cycle is entered, and the heating time of each downhole electric heating device in each new electric heating and clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating and clean water injection throughput production cycle. If so, the production of the electric heating and clean water injection throughput production cycle is terminated.

[0025] The following is a further optimization and / or improvement of the second technical solution of the above invention:

[0026] It also includes a three-dimensional horizontal well network drainage production module. After the production of M rounds of electric heating and water injection and huff-and-puff production cycles, when the horizontal section utilization of each horizontal well in the three-dimensional horizontal well network is greater than 75%, the temperature field is connected, and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network is switched to drainage production. The three-dimensional horizontal well network drainage production includes: after the horizontal wells located at the top of the three-dimensional horizontal well network stop producing liquid, it is judged whether the green electricity supply is compatible with the total heating power of all downhole electric heating devices; if so, clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating devices in each horizontal well are turned on to heat the clean water to produce high-dryness steam, so that high-temperature water vapor enters the oil reservoir to heat the oil layer; if not, each downhole electric heating device located at the top of the three-dimensional horizontal well network continues to heat with the grid electricity; it is judged whether the grid electricity is in the valley electricity period. If not, the horizontal wells located at the bottom of the three-dimensional horizontal well network are closed and the wells are stewed. If so, the horizontal wells located at the bottom of the three-dimensional horizontal well network use the grid electricity to start oil production pumps.

[0027] Compared with the prior art, the horizontal wells in the three-dimensional horizontal well network of the present invention are arranged vertically in the direction of the oil layer inclination, so as to form a diagonal gravity oil drive. It does not need to set up a high-cost ground coal / gas steam generator and a ground steam injection pipeline network. Through the underground electric heating device set in each horizontal well of the three-dimensional horizontal well network, it can directly heat clean water underground to produce high-dryness steam, so that the thermal energy utilization rate of steam is higher, thereby achieving zero carbon emission and zero heat energy loss at the steam injection end. In the early stage, it can be exploited by repeating the production cycle of electric heating and water injection, so that the high-dryness steam continues to react with crude oil by hydrothermal cracking. After the light components of crude oil and some soluble gases produced by hydrothermal cracking are dissolved in crude oil, low-viscosity foam oil can be generated, and the crude oil is modified to make the viscosity of crude oil irreversibly decrease. The crude oil after viscosity reduction can sink into the screen pipe under the action of gravity, gather in the curved section of each horizontal well, and finally be discharged from the wellhead through circulating displacement fluid. In the later stage of the three-dimensional horizontal well network flooding and drainage production process, injection and production replacement can be achieved without changing the pipe string structure, forming high-level electric heating to generate steam and bottom-level gravity drainage, realizing similar dual-horizontal well SAGD production. It uses grid electricity and green electricity to cooperate with each other, can realize the local consumption of clean energy, and can develop and utilize heavy oil reservoirs to the greatest extent while reducing energy consumption, and realizes efficient development for super-heavy oil reservoirs with oil layer thickness of 5 to 10 m and large distribution area length and width. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Attached Figure 1 Schematic diagram of the trajectory and tubing string of any horizontal well in the three-dimensional horizontal well network of Examples 1-10 of the present invention.

[0029] Attached Figure 2 Schematic diagram of the three-dimensional horizontal well network deployment and mining method of Examples 1-10 of the present invention.

[0030] Attached Figure 3 The present invention provides a flow chart of the electric heating production method for a three-dimensional horizontal well network in a heavy oil reservoir.

[0031] Attached Figure 4 It is a mining flow chart of the production cycle of electric heating and water injection in the present invention.

[0032] Attached Figure 5 This is a flow chart of Example 2 of the present invention.

[0033] Attached Figure 6 This is a flow chart of Example 5 of the present invention.

[0034] The codes in the accompanying drawings are: 1 is a screen pipe, 2 is a long oil pipe, 3 is a short oil pipe, 4 is a downhole electric heating device, 5 is a power supply cable, 6 is a steam chamber, 7 is a steam-liquid interface, 8 is an oil layer, 9 is an oil layer bottom boundary, 10 is an oil layer top boundary, 11 is a crude oil production end, 12 is a fluid injection end, 13 is an oil pump, 14 is the first horizontal well, 15 is the second horizontal well, 16 is the third horizontal well, 17 is a curved section, 18 is a cap layer, 19 is an oil layer casing, and 20 is a temperature field. DETAILED DESCRIPTION

[0035] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0036] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached Figure 1 The positional relationships such as front, back, top, bottom, left, and right are described according to the layout directions of the drawings in the specification.

[0037] The present invention will be further described below in conjunction with embodiments and drawings:

[0038] Embodiment 1: As attached Figure 1-5 As shown, the electric heating production method for the three-dimensional horizontal well network of heavy oil reservoirs includes:

[0039] S1, a three-dimensional horizontal well network with a vertical cross-section in a triangular distribution is set in the selected target oil reservoir. The three-dimensional horizontal well network includes at least 3 horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected with the deflection section. The horizontal sections of all horizontal wells are completed with screen pipe 1. After completion, two oil pipes, one long and one short, are lowered into each horizontal well in the three-dimensional horizontal well network.

[0040] In the above technical scheme, the reservoir parameters of the target reservoir may include: the thickness of the continuous oil layer in the reservoir is 5 m to 10 m; the reservoir is more than 50 m away from the edge water or bottom water or is not affected by the edge water or bottom water; the horizontal permeability is greater than 500 mD, and the vertical permeability is greater than 300 mD; the oil saturation is greater than 45%; the viscosity of the ground degassed crude oil at 50°C is 20,000 mPa.s to 500,000 mPa.s.

[0041] Such an oil reservoir is selected mainly because the three-dimensional horizontal well network far away from bottom water and edge water has a better heating effect; the oil layer 8 with a horizontal permeability of more than 500 mD and a vertical permeability greater than 300 mD is more conducive to the penetration of high-temperature water vapor into the oil layer 8 and the development of steam chamber 6.

[0042] During use, the horizontal distances of the horizontal wells are consistent, which can make the target reservoir more uniformly utilized. According to the requirements, the three-dimensional horizontal well network in this embodiment includes three horizontal wells with parallel drilling directions. The three horizontal wells can be distributed in an equilateral triangle in the oil layer 8. The first horizontal well 14 and the second horizontal well 15 are arranged at the two ends of the bottom of the triangle. The well spacing L between the two can be 70 m to 80 m, and the distance H1 between the bottom boundary 9 of the oil layer can be 0.5 m to 1 m, the third horizontal well 16 is located at the top of the acute triangle, and its distance H2 from the top boundary 10 of the oil layer is 2 to 3 meters, wherein the top boundary 10 of the oil layer is located at the lower side of the cap rock 18; the first third of the horizontal sections of the three horizontal wells near the heel end are bent downward and connected with the deflection section to form a curved section 17, and the last two thirds of the horizontal sections away from the heel end are arranged horizontally, and the curved section 17 can store the produced fluid, thereby forming a gas-liquid interface in the deflection section of each horizontal well, and sealing the gaseous fluid in the steam chamber 6 of each horizontal well. The horizontal sections of the three horizontal wells are The well is completed by using a screen pipe 1 so that steam can diffuse into the oil layer near the wellbore, wherein the left end of each screen pipe 1 is connected to the lower end of the corresponding oil layer casing 19; after the well is completed, two oil pipes, one long and one short, are respectively lowered into each horizontal well, the long oil pipe 2 is lowered into the horizontal section after the curved section 17 of the horizontal well, and the long oil pipe 2 located in the horizontal section is evenly perforated, the upper end of the long oil pipe 2 is connected to the fluid injection end 12 on the ground, the short oil pipe 3 is lowered into the deflection section of the horizontal well, and its lower end is located below the gas-liquid interface, and the upper end of the short oil pipe 3 is connected to the crude oil production end 11 on the ground.

[0043] In this embodiment, the horizontal section refers to the horizontal section of the horizontal well, the inclination section refers to the inclination section of the horizontal well, and the curved section 17 refers to the downward curved part of the heel of the horizontal well, and the same applies below.

[0044] S2, an electric heating system and an oil production pump 13 are respectively set in each horizontal well of the three-dimensional horizontal well network, each electric heating system includes a downhole electric heating device 4 with a temperature testing device, and the continuous oil pipe of the downhole electric heating device 4 with the temperature testing device is lowered from the long oil pipe 2 to the toe end of the corresponding horizontal well, and each downhole electric heating device 4 with the temperature testing device can be connected to the grid power and the green power through the power supply cable 5 respectively; the oil production pump 13 is lowered from the short oil pipe 3 to the inclination section of the corresponding horizontal well; wherein all the downhole electric heating devices 4 are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump 13 is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well.

[0045] Through the above technical solution, the grid electricity and green electricity are used to power each downhole electric heating device 4. There is no need to set up a coal-fired / gas-fired boiler on the ground. The water in the horizontal section of the wellbore can be directly heated underground to produce high-temperature steam, so that the high-temperature steam and crude oil undergo a hydrothermal cracking reaction, which can effectively avoid heat loss during steam injection, is safer and more environmentally friendly, and effectively reduces carbon emissions. In addition, each downhole electric heating device 4 can also directly heat the crude oil in the near-well oil layer of the horizontal section of the corresponding horizontal well, quickly establish an oil leakage channel, and promote the development of the steam chamber 6. The temperature testing device can monitor the ambient temperature of the horizontal section of the wellbore in real time, which is more conducive to adjusting the heating power of the downhole electric heating device 4, so that the ambient temperature of the horizontal section of the wellbore is always kept above the temperature at which the crude oil can undergo a hydrothermal cracking reaction.

[0046] During use, the lower end of the oil pump 13 is located below the short oil pipe 3, so that the lower end of the oil pump 13 is always located below the gas-liquid interface, so that the non-condensable gases such as CH4 and CO2 generated by the high-temperature steam and the water-thermal cracking reaction of crude oil can be sealed in the steam chamber 6, reducing heat dissipation, preventing the high-temperature steam from escaping to the wellhead or being taken out of the wellhead by the produced liquid to form steam channeling, thereby ensuring that the heat of the steam is fully used to heat the oil layer 8, avoiding the loss of steam heat energy, greatly improving the heating efficiency of each downhole electric heating device 4, and also enabling the oil pump 13 to have a higher lifting efficiency. The closed steam chamber 6 is more conducive to the heat preservation of high-temperature steam, can promote the water-thermal cracking reaction of steam and crude oil under high temperature conditions, accelerate the development speed of the steam chamber 6, so that the steam chamber 6 can form a predetermined scale, thereby ensuring the stability of continuous crude oil production. The use of grid electricity and green electricity to cooperate with each other can realize the local consumption of clean energy, and can maximize the development and utilization of heavy oil reservoirs while reducing energy consumption, and realize efficient development.

[0047] According to the requirements, the downhole electric heating device 4 with the temperature testing device can be insulated and sealed with the continuous oil pipe by magnesium oxide. The power density of the downhole electric heating device 4 can be greater than 1000 W / m, and the long-term temperature resistance is above 400°C. The temperature testing device can withstand a long-term temperature resistance of above 350°C. The electric heating system can also be equipped with a ground control device and a fluid injection system. The fluid injection system, the downhole electric heating device 4 and the temperature testing device are respectively connected to the ground control device. The ground control device is the existing technology in this technical field. It can make the downhole electric heating device 4 and the temperature testing device cooperate with each other to continuously heat the horizontal section of each horizontal well within a set time, and can also adjust the heating power of the downhole electric heating device 4 according to the real-time wellbore ambient temperature fed back by the temperature testing device. The fluid injection system can inject fluid into the well according to the production process requirements of the present invention under the control of the ground control system.

[0048] S3, preparing for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbores at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbores is circulated to the ground.

[0049] In the above technical scheme, the method for obtaining the total number of production rounds M in the electric heating and water injection production cycle is a prior art in this technical field. In this implementation, a fine three-dimensional geological model can be used to determine the total number of production rounds M in the electric heating and water injection production cycle of all horizontal wells in the three-dimensional horizontal well network through numerical simulation, that is, the number of cyclic production times of the electric heating and water injection production cycle of all horizontal wells in the three-dimensional horizontal well network.

[0050] During use, the wellbore of each horizontal well in the three-dimensional horizontal well network is cleaned separately, and the drilling mud and mud cake in the wellbore are circulated and discharged to the ground. When the content of drilling mud in the discharged fluid is less than 0.1%, the wellbore cleaning operation is stopped. The main reason for cleaning the wellbore is that the crude oil has a high viscosity and is easy to condense and block the gap of the screen tube 1, occupying space, which is not conducive to increasing the water saturation of the near-well oil layer.

[0051] S4, start the mining of M rounds of electric heating and water injection throughput production cycle, each electric heating and water injection throughput production cycle includes:

[0052] Compared with the existing technology, this technical solution can make crude oil and water vapor undergo continuous aquathermal cracking reaction without using a catalyst, which can effectively reduce the exploitation cost of heavy oil reservoirs.

[0053] S41, injecting a clear water slug into the annulus between the long oil pipe 2 and the coiled tubing of each horizontal well in the three-dimensional horizontal well network.

[0054] During use, the water injection plug can fill the horizontal section of the wellbore with water. When the water is heated by the downhole electric heating device 4, water vapor can be generated. The water vapor can be used as a hydrogen supply agent. When the water vapor enters the oil layer 8, it can continuously contact with the crude oil, prompting the crude oil to undergo aquathermal cracking reaction, that is, hydrogenation, ring opening, desulfurization, denitrification and water-gas conversion reactions of the heavy oil under the action of high-temperature water vapor. In addition, the high-temperature water vapor can also directly heat the near-well oil layer to increase the temperature and reduce the viscosity of the crude oil.

[0055] In this embodiment, the clean water is preferably room temperature low-mineralization clean water with a mineralization of less than 200 mg / L. The room temperature low-mineralization clean water can effectively prevent the mineralization in the clean water from generating a large amount of scale on the surface of the downhole electric heating device 4, thereby avoiding affecting the heating efficiency and service life of the downhole electric heating device 4 and saving mining costs. The bottom hole pressure of the clean water injection is 0.5 MPa less than the fracture pressure of the oil layer 8 in the target reservoir.

[0056] S42, using green electricity and grid electricity to power all downhole electric heating devices 4 in the three-dimensional horizontal well network, and through the cooperation of each downhole electric heating device 4 and the corresponding temperature testing device, the horizontal sections of all horizontal wells in the three-dimensional horizontal well network are continuously heated within a set time, so that the crude oil undergoes hydrothermal cracking under high temperature conditions.

[0057] During use, the green electrode is easily restricted by environmental factors and can usually only be powered intermittently. Therefore, when the green electricity supply matches the heating power of all downhole electric heating devices 4 in the three-dimensional horizontal well network, the green electricity can be used to drive each downhole electric heating device 4 to heat the clean water in the horizontal section of the wellbore of the corresponding horizontal well; when the green electricity supply is not enough to drive all downhole electric heating devices 4, some of the downhole electric heating devices 4 can be powered by green electricity, and some of the downhole electric heating devices 4 can be powered by grid electricity; when the green electricity supply is completely unable to drive each downhole electric heating device 4, all downhole electric heating devices 4 can be powered by grid electricity.

[0058] In the process of heating clean water, each downhole electric heating device 4 can convert clean water into high-dryness water vapor. After the water vapor contacts the crude oil, a hydrothermal cracking reaction can occur. At this time, some crude oil components such as organic sulfides, organic oxides and organic nitrogen compounds react with water vapor or hot water for a long time under high temperature to generate non-condensable gases such as CH4 and CO2 and light components of crude oil such as light hydrocarbons. After the non-condensable gases and light components of crude oil are transported to the top of the steam chamber 6, the light components of crude oil and some soluble gases can be dissolved in the crude oil to generate low-viscosity foam oil, forcing the crude oil to be upgraded and causing the viscosity of the crude oil to decrease irreversibly. The crude oil after viscosity reduction will sink into the corresponding screen pipe 1 under the action of gravity and converge to the bottom of the horizontal well (i.e., the horizontal well bending section 17). When the crude oil contacts the high-temperature water in the horizontal wellbore, the high-temperature hydrothermal cracking reaction can continue to occur, decomposing more light components of crude oil, further expanding the steam chamber 6. The expansion of the steam chamber 6 can accelerate the hydrothermal cracking reaction between the crude oil and the high-temperature water vapor and increase the crude oil production.

[0059] S43, after aquathermal cracking, each horizontal well starts circulating replacement fluid production.

[0060] During the plugging and huffing production process, as each downhole electric heating device 4 continues to heat for a long time, the crude oil and high-temperature steam continue to undergo a hydrothermal cracking reaction. After a period of time, the horizontal wellbore of each horizontal well and the near-well reservoir are filled with high-saturation high-temperature crude oil. It is difficult or impossible for the downhole electric heating device 4 to continue heating to effectively expand the heating radius, resulting in ineffective heating. At this time, the displacement medium is injected from the annulus of the long oil pipe 2 and the continuous oil pipe, and the oil pump 13 is used to drain the short oil pipe 3 or the annulus of the oil casing. By circulating the displacement fluid, the crude oil produced in this round of electric heating and clear water injection huffing and puffing production cycle can be discharged from the ground. In this embodiment, the displacement medium can be one or two of N2, CH4, and clean water, the mineralization of the displacement medium is not more than 200 mg / L, and the temperature is less than 150°C.

[0061] After the crude oil is produced, due to the existence of the vapor-liquid interface 7, a larger low-pressure cavity (steam cavity 6) will be formed downhole in each horizontal well. The more crude oil is produced, the more conducive it is to injecting clean water plugs in the next round of electric heating clean water injection production cycle. The larger the amount of clean water injected, the more conducive it is to expand the contact area between clean water and crude oil, and expand the volume of the steam cavity 6.

[0062] S44, after the circulating displacement fluid production, determine whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%.

[0063] S45, if yes, stop circulating the replacement fluid, if no, continue circulating the replacement fluid.

[0064] In the above technical scheme, during the circulation and replacement process of each horizontal well, when there is no produced fluid or the crude oil content in the produced fluid is less than 5%, it means that the modified crude oil produced after aquathermal cracking in the current electric heating and water injection production cycle has been completely or basically exhausted, and there is no benefit in continuing to exploit it. At this time, a new round of electric heating and water injection production cycle is needed to make more crude oil undergo aquathermal cracking reaction, improve and reduce viscosity, so as to maintain the benefits of heavy oil exploitation.

[0065] S5, after each electric heating and clean water injection throughput production cycle is completed, determine the number of mining rounds N of the current electric heating and clean water injection throughput production cycle, and judge whether N is greater than or equal to M.

[0066] When step S4 is executed in a loop, it can be determined whether the mining round number N of the current electric heating clean water injection throughput production cycle is greater than or equal to the total mining round number M of the electric heating clean water injection throughput production cycle, so as to determine whether the mining of all electric heating clean water injection throughput production cycles has been completed according to the predetermined total mining round number M.

[0067] S6, if not, then enter the next round of electric heating clean water injection throughput production cycle, and the heating time of each downhole electric heating device 4 in each new electric heating clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating clean water injection throughput production cycle.

[0068] During use, since only the clean water injection segment plug is used in the electric heating clean water injection production cycle, and no catalyst is added to the clean water, each round of electric heating clean water injection production cycle can only cause the crude oil in the small range near the horizontal section of each horizontal well to undergo a hydrothermal cracking reaction. In actual operation, it is usually necessary to repeat six to nine rounds of electric heating clean water injection production cycles in order for the steam chamber 6 to gradually develop and reach the expected volume. In the production process, only when the steam chamber 6 has formed a certain scale can the stability of subsequent crude oil production be guaranteed and efficient development be achieved.

[0069] During the cycle of the electric heating and water injection production cycle, the steam chamber 6 will expand gradually. Therefore, after each new round of electric heating and water injection production cycle, more clean water needs to be injected and the heating time is extended to fully respond to the clean water in the horizontal well and the surrounding reservoirs, generate enough high-temperature water vapor, so that a sufficient amount of water vapor can fully react with the crude oil for hydrothermal cracking, promote more crude oil modification and viscosity reduction, so that the steam chamber 6 can develop more perfectly and achieve the purpose of improving the ultimate recovery rate of the target oil reservoir.

[0070] S7, if yes, then the mining of the electric heating and water injection production cycle is terminated.

[0071] Compared with the prior art, the horizontal wells in the three-dimensional horizontal well network of the present invention are arranged vertically in high and low directions according to the inclination direction of the oil layer 8, so as to form a diagonal gravity oil drive; the present invention does not need to set up a high-cost ground coal / gas steam generating device and a ground steam injection pipeline network. By setting up a downhole electric heating device 4 in each horizontal well of the three-dimensional horizontal well network, clean water can be directly heated underground to produce high-dryness steam, so that the thermal energy utilization rate of the steam is higher, thereby achieving zero carbon emission and zero heat energy loss at the steam injection end; in the early stage, through the production cycle of repeated electric heating and injection of clean water, the high-dryness steam continues to react with the crude oil by hydrothermal cracking. After the light components of the crude oil and some soluble gases produced by the hydrothermal cracking are dissolved in the crude oil, low-viscosity foam oil can be generated, and the crude oil is modified to cause an irreversible decrease in the viscosity of the crude oil. The crude oil after viscosity reduction can sink into the screen pipe 1 under the action of gravity, and gather in the curved section 17 of each horizontal well, and finally discharged from the wellhead through circulating displacement fluid. By using grid electricity and green electricity in coordination with each other, clean energy can be consumed on-site, and heavy oil reservoirs can be developed and utilized to the greatest extent possible while reducing energy consumption, thereby achieving efficient development.

[0072] According to actual needs, the above-mentioned three-dimensional horizontal well pattern electric heating production method for heavy oil reservoirs can be further optimized and / or improved:

[0073] Embodiment 2: As attached Figure 1-5 As shown, in step S42, each utilizing green electricity and grid electricity to power, turning on all downhole electric heating devices 4 in the three-dimensional horizontal well network, and continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time by cooperating with each downhole electric heating device 4 and the corresponding temperature testing device, so that the crude oil undergoes aquathermal cracking under high temperature conditions, all of which include:

[0074] S421, turn on the downhole electric heating device 4, and the downhole electric heating device 4 uses full power to heat and increase the temperature.

[0075] During use, the downhole electric heating device 4 works at full power, and can quickly heat the clean water in the horizontal section of the corresponding horizontal wellbore, so that the ambient temperature of the horizontal section of the wellbore reaches the temperature threshold value for the aquathermal cracking reaction of the crude oil.

[0076] S422, the downhole electric heating device 4 determines whether the real-time wellbore ambient temperature collected by the temperature testing device reaches the temperature threshold value.

[0077] During use, if the real-time ambient temperature of the wellbore has not reached the temperature threshold value, the downhole electric heating device 4 can continue to use full power heating until the ambient temperature in the horizontal section of the wellbore of the corresponding horizontal well reaches the threshold temperature value.

[0078] According to the requirements, since the temperature range suitable for crude oil water thermal cracking reaction is 280°C to 350°C, the temperature threshold value in this embodiment can be any temperature value within the temperature range of 280°C to 350°C. Under the condition of eliminating the risk of crude oil coking, the upper limit of the wellbore temperature of each electric heating and water injection production cycle can gradually approach 350°C.

[0079] S423: If yes, the downhole electric heating device 4 is adjusted to constant temperature heating so that the crude oil can continue to undergo aquathermal cracking reaction.

[0080] In the above technical solution, if the real-time wellbore ambient temperature in the corresponding horizontal well does not reach the temperature threshold value, the downhole electric heating device 4 continues to use full power heating.

[0081] S424, determining whether the heating time of the downhole electric heating device 4 reaches the set time.

[0082] During the constant temperature heating process, the wellbore ambient temperature needs to be maintained in a temperature range suitable for the hydrothermal cracking reaction. Since no catalyst is used in the plugging process of the present invention, in order to enable the crude oil to undergo a hydrothermal cracking reaction better, to allow more crude oil to be upgraded and reduced in viscosity, and to allow the steam chamber 6 to develop and improve, the heating and cracking process of each downhole electric heating device 4 usually needs to be maintained for 20 to 60 days. When the electric heating clear water injection production cycle is implemented for the first time, the heating setting time of each downhole electric heating device 4 can be set according to actual needs, such as selecting between 20 to 60 days.

[0083] S425, if yes, then turn off the downhole electric heating device 4, if no, then the downhole electric heating device 4 continues to heat at a constant temperature.

[0084] During the circulation and replacement of fluids in each horizontal well, heating is not required, and the corresponding downhole electric heating device 4 is turned off, which can reduce mining energy consumption and save mining costs.

[0085] Embodiment 3: The preparation for oil production further comprises:

[0086] The fracture pressure of the oil layer 8 is obtained to ensure that the bottom hole injection pressure of the clean water is 0.5 MPa to 1 MPa less than the fracture pressure of the oil layer 8 each time a clean water segment plug is injected into each horizontal well in the three-dimensional horizontal well network.

[0087] By such an arrangement, during the clean water plugging process, it can effectively prevent the clean water pressure from being greater than the fracture pressure of the oil layer 8, thereby breaking the boundary of the oil layer 8 and destroying the closed state of the oil layer 8, affecting the cyclic implementation of the subsequent electric heating clean water injection throughput production cycle.

[0088] In the above technical scheme, the method for obtaining the fracture pressure of the oil layer 8 is a well-known technology in the technical field. In this embodiment, the fracture pressure of the oil layer 8 can be determined by the following method: closed coring is performed in the target oil reservoir, several typical samples are selected, indoor rock stress experiments are carried out, and the minimum fracture pressure of the target oil reservoir is determined through experimental analysis.

[0089] Embodiment 4: As attached Figure 1-2 As shown, the distance between the top of the three-dimensional horizontal well network and the top boundary 10 of the oil layer is 2 m to 3 m, and the distance between the bottom of the three-dimensional horizontal well network and the bottom boundary 9 of the oil layer is 0.5 m to 1 m.

[0090] During use, the horizontal sections of each horizontal well at the top of the three-dimensional horizontal well network can maintain a distance of 2m to 3m from the top boundary 10 of the oil layer, and the horizontal sections of each horizontal well at the bottom of the three-dimensional horizontal well network can maintain a distance of 0.5m to 1m from the bottom boundary 9 of the oil layer, which can effectively prevent the top boundary 10 and the bottom boundary 9 of the oil layer from bursting due to sudden heating or uneven heating during the electric heating process, and avoid destroying the closed state of the steam chamber 6.

[0091] Embodiment 5: As attached Figure 1-3 As shown in 6, S8 also includes that after the production of M rounds of electric heating and water injection huff-and-puff production cycle, when the horizontal section of each horizontal well in the three-dimensional horizontal well network is used more than 75%, the temperature field 20 is connected and the well-to-well temperature is greater than the set temperature, the three-dimensional horizontal well network is switched to flooding production, and the three-dimensional horizontal well network flooding production includes:

[0092] In technical solution S8, after M rounds of electric heating and water injection production cycles, when the utilization rate of the horizontal sections of each horizontal well in the three-dimensional horizontal well network is greater than 75% and the temperature between wells is greater than the set temperature, it means that the temperature field 20 between the horizontal wells in the three-dimensional horizontal well network has been connected, the steam chamber 6 of each horizontal well has been basically developed, and the reservoir around the horizontal section of each horizontal well is farther and farther away from the heat radiation area of ​​the corresponding downhole electric heating device 4. The high-temperature water vapor generated by the heating of each downhole electric heating device 4 is difficult to heat the crude oil quickly and efficiently. The reaction efficiency of the crude oil water thermal cracking reaction is getting lower and lower, the mining cost is getting higher and higher, and the mining efficiency is getting worse and worse. However, at this time, the target oil reservoir still has a large mining value. Technical solution S8 provides a method that can use green electricity and grid electricity to cooperate with each other to continue to exploit the target oil reservoir.

[0093] During use, how to determine whether the temperature fields 20 of each horizontal well are connected is a prior art in the art. In this embodiment, the connectivity of the temperature fields 20 of each horizontal well can be determined by monitoring data or numerical simulation analysis. According to demand, in order to save mining costs and reduce mining energy consumption, green electricity is used as the main power supply, and grid electricity can be used as a backup power supply. Green electricity can be photovoltaic power supply, wind power generation, or wind and solar combined power supply. In this embodiment, photovoltaic power generation can be preferred, and photovoltaic power supply and grid power can be automatically allocated through a ground control device. In this embodiment, the set temperature of the well temperature can be selected in the range of 80°C to 100°C.

[0094] S81, after each horizontal well located at the top of the three-dimensional horizontal well network stops producing fluid, it is determined whether the green electricity supply is compatible with the total heating power of all downhole electric heating devices 4.

[0095] During use, after M rounds of electric heating and water injection production cycles, the liquid production of each horizontal well located at the top of the three-dimensional horizontal well network is greatly reduced, the mining cost is getting higher and higher, and the mining efficiency is getting worse and worse. At this time, stopping the production of liquid can effectively save the mining cost.

[0096] Usually, the power generation of photovoltaic power generation is affected by the light intensity. When the light intensity is sufficient during the day, photovoltaic power generation can supply power normally, but at night, the light intensity is seriously insufficient and photovoltaic power generation stops supplying power. Therefore, when the power supply of photovoltaic power generation is compatible with the total heating power of each downhole electric heating device 4, that is, the power supply of photovoltaic power generation can enable each downhole electric heating device 4 to heat normally, photovoltaic power generation can be used to drive each downhole electric heating device 4 to continuously heat the horizontal section wellbore environment of the corresponding horizontal well; when the power supply of the photovoltaic power generation device is not enough to drive all downhole electric heating devices 4, only the normal heating of each horizontal well located at the top of the three-dimensional horizontal well network can be retained, and the heating of each horizontal well located at the bottom of the three-dimensional horizontal well network can be stopped; when the power supply of photovoltaic power generation is completely unable to drive any downhole electric heating device 4 in the three-dimensional horizontal well network, the downhole electric heating device 4 in each horizontal well located at the top of the three-dimensional horizontal well network can continue to heat through the grid power drive, and the remaining horizontal wells can be shut down and stewed. According to demand, the downhole electric heating device 4 in each electric heating system has the largest operating power and consumes the most energy. Therefore, green electricity is mainly used to power each downhole electric heating device 4. However, when the green electricity generation is sufficient, the entire electric heating system can be powered by green electricity.

[0097] S82, if yes, then inject clean water into each horizontal well of the three-dimensional horizontal well network, turn on the downhole electric heating device 4 in each horizontal well, heat the clean water to produce high-dryness steam, and allow the high-temperature water vapor to enter the oil reservoir to heat the oil layer 8.

[0098] During use, the electric heating device 4 of each well can be driven by green electricity to heat the clean water in the horizontal section of the wellbore of the corresponding horizontal well to produce high-dryness steam, and the high-dryness steam can be used to continuously heat the oil layer 8 to improve the fluidity of the crude oil. During this period, the high-dryness steam and the crude oil can still undergo a hydrothermal cracking reaction under the action of high temperature, so that the crude oil is modified and the viscosity is reduced. The modified and reduced-viscosity crude oil can flow to each horizontal well at the bottom of the three-dimensional horizontal well network under the action of gravity. According to demand, high-dryness steam is usually steam with a dryness greater than 70%, and steam with a dryness greater than 80% can be used in this embodiment.

[0099] S83, if not, each downhole electric heating device 4 located at the top of the three-dimensional horizontal well network continues to heat using the grid electricity.

[0100] During use, the grid electricity can be used as a backup heating power source. Since the electricity prices of the grid electricity vary greatly in different time periods, the valley electricity price in the early morning is usually the lowest electricity price of the day. Therefore, in order to reduce oil production costs, it is necessary to determine the start time and start power of each downhole electric heating device 4 according to the peak and valley periods of the grid electricity.

[0101] At this time, in order to continuously heat the top of the oil layer 8, form a three-dimensional horizontal well network with high-level electric heating to generate steam, and gravity drain oil at the bottom, to achieve similar dual-horizontal well SAGD production, each downhole electric heating device 4 at the top of the three-dimensional horizontal well network is switched to the grid power connection, and continues to heat with grid power, and the remaining downhole electric heating devices 4 in the three-dimensional horizontal well network are turned off. According to demand, each downhole electric heating device 4 at the top of the three-dimensional horizontal well network needs to be powered uninterruptedly around the clock according to the power supply status of green power and grid power, so as to continuously and uninterruptedly heat the top of the oil layer 8 and achieve uninterrupted oil production throughout the day.

[0102] S84, determining whether the grid power is in a low-power period.

[0103] S85, if not, then close all horizontal wells located at the bottom of the three-dimensional horizontal well network and then soak the wells.

[0104] S86, if yes, each horizontal well located at the bottom of the three-dimensional horizontal well network uses the grid power to start the oil production pump 13 for production.

[0105] The above technical solution, based on the inherent characteristics of sustainable resources such as solar energy, comprehensively considers the peak-valley difference of grid electricity, and uses the cheap electricity during the valley period to drive the oil pump 13 in each horizontal well at the bottom of the three-dimensional horizontal well network to produce oil. Through the coordinated cooperation of green electricity and grid electricity, low-energy oil production can be achieved, and heavy oil reservoirs can be developed and utilized to the greatest extent.

[0106] During the mining process, when the grid electricity is in the evening non-valley period, the peak electricity price is usually at the highest level of the day, and the photovoltaic power supply device has just stopped supplying power. During the day, the photovoltaic power supply is used, and the underground electric heating device 4 has been heated for a whole day. The temperature in each horizontal well at the bottom of the three-dimensional horizontal well network is still at a peak state. At this stage, the well is shut down and the latent heat carried by the high-temperature steam can be more effectively transferred to the oil reservoir, so that the crude oil can be continuously heated, and the hydrothermal cracking reaction continues to occur, and the quality is continuously improved and the viscosity is reduced, which saves heating energy consumption and reduces mining costs. According to demand, the well-shutting time can be 2 to 4 hours before the valley electricity in the early morning.

[0107] When the grid electricity enters the valley electricity period in the early morning, after the horizontal wells at the bottom of the three-dimensional horizontal well network are opened, the oil production pump 13 is used to produce oil, and the modified and reduced-viscosity crude oil produced by the three-dimensional horizontal well network is discharged to the ground, which can effectively reduce the production cost. In this process, each downhole electric heating device 4 located at the top of the three-dimensional horizontal well network is in a continuous heating state, which can continuously supply heat to the three-dimensional horizontal well network. Compared with the existing technology, the above technical solution can effectively prevent the thermal expansion and contraction caused by the sharp drop in the downhole ambient temperature during the oil production process, and can effectively avoid damage to the horizontal wellbore of each horizontal well, greatly improving the service life of each horizontal wellbore and the downhole electric heating device 4, and effectively reducing the production cost.

[0108] The following three specific embodiments are used to illustrate the implementation process of the electric heating production method for a three-dimensional horizontal well network in a heavy oil reservoir provided by the present invention.

[0109] Embodiment 6: As attached Figure 1-6 As shown, this embodiment provides a method for electric heating production of a three-dimensional horizontal well network of a heavy oil reservoir of a target oil reservoir, which may specifically include the following steps:

[0110] (1) Select a heavy oil reservoir with appropriate reservoir parameters: The situation of target reservoir 1 is as follows:

[0111] ① The middle part of the target oil layer 8 of the reservoir is buried at a depth of 280 m. A three-dimensional horizontal well network is implemented. The three-dimensional horizontal well network includes 3 horizontal wells. The horizontal sections of the oil layer 8 of the 3 horizontal wells are all sand layers. The permeability difference within the layer is 7, the thickness of the continuous oil layer reaches 10 m, and there is no edge water or bottom water in the reservoir;

[0112] ② The horizontal permeability is 1000 mD and the vertical permeability is 650 mD;

[0113] ③ The viscosity of degassed crude oil at 50°C is 20,000 mPa.s.

[0114] ④ The oil reservoir is undeveloped, there are no faults around the horizontal wells, and the reservoir as a whole is a monocline of 2° to 6°, which meets the mining conditions of the electric heating mining method for the three-dimensional horizontal well network of heavy oil reservoirs provided by the present invention.

[0115] (2) Obtaining the fracture pressure of oil layer 8: Closed coring was performed in the target reservoir 1, and 4 typical samples were selected to carry out indoor rock stress experiments. Through experimental analysis, it was determined that the minimum fracture pressure of oil layer 8 in the reservoir was 6.8 MPa.

[0116] (3) Optimization of well layout and drilling design: Determine that there are no faults in the horizontal well deployment area, and the length of the horizontal section is 400 m. Use a five-segment trajectory of “straight well section – inclination increase section – stable inclination section – inclination increase section – stable inclination section”. The drilling directions of the three horizontal wells are parallel, and the first third of the horizontal section of each horizontal well near the inclination section is concave to form a curved section17 (e.g. Figure 1 As shown in the figure, the last two-thirds of the section remains horizontal. The first horizontal well 14 and the second horizontal well 15 are spaced 70 m to 80 m apart, and the vertical distance from the bottom boundary of the oil layer 9H1 is 1 meter. The third horizontal well 16 is located between the first horizontal well 14 and the second horizontal well 15, and the vertical distance from the top boundary of the oil layer 10H2 is 2 meters. The three wells can be combined into a triangular three-dimensional horizontal well network (as shown in the figure). Figure 2 as shown).

[0117] (4) Optimization of completion and tubing structure design: The horizontal section of each horizontal well is completed with a screen pipe 1. After completion, a long oil pipe 2 and a short oil pipe 3 are run into each horizontal well. The horizontal section of the long oil pipe 2 is evenly perforated, and a continuous oil pipe is run into the long oil pipe 2. The continuous oil pipe is insulated with magnesium oxide and filled with a downhole electric heating device with a temperature testing device. The power density of the downhole electric heating device 4 is 1 kW / m, and the long-term temperature resistance is above 400°C. The long-term temperature resistance of the temperature testing device is above 350°C. Eight temperature measuring points are evenly spaced along the axial direction of the horizontal section of the horizontal well; an oil production pump 13 that can be laid to the deflection section is run into the short oil pipe 3. The tail end of the oil production pump 13 is connected to the tail pipe and is run into the horizontal section.

[0118] (5) Preparation for oil production: Through numerical simulation methods, it is determined that the total number of production rounds in the production cycle of electric heating and water injection is 6 rounds; clean the wellbore by injecting clean water or softened water from the annulus between the long oil pipe 2 and the continuous oil pipe, and draining the short oil pipe 3 for 5 days until the wellbore is clean.

[0119] (6) Injection of clean water plug: In each round of electric heating clean water injection production cycle, saturated clean water is injected until the clean water returns to the wellhead. The maximum injection pressure at the bottom of the well is 6.3 MPa, and the optimized production-injection ratio is about 0.95.

[0120] (7) Continuous electric heating to increase the temperature and crack the crude oil: Turn on all downhole electric heating devices 4, first use full power to quickly heat the environment in the horizontal section of each horizontal well to above 280°C, and then switch to constant temperature heating. The first round of constant temperature heating lasts for 20 days. During this period, the ambient temperature of the horizontal section of each horizontal well needs to be maintained in the range of 280°C to 350°C, but the highest temperature cannot exceed 350°C.

[0121] (8) Circulating fluid replacement production: shut down all downhole electric heating devices 4, and continuously inject clean water with a salinity of less than 200 mg / L and a temperature of less than 150°C from the annulus between the long oil pipe 2 and the coiled oil pipe, so that the produced fluid (i.e., the oil-water mixture in the wellbore) is discharged from the casing annulus to the surface until there is no produced fluid or the crude oil content of the produced fluid is less than 5%. Stop circulating fluid replacement and end the production cycle of this round of electric heating and clean water injection.

[0122] (9) Mining in subsequent electric heating and clean water injection production cycles: The mining process of the second to sixth rounds of electric heating and clean water injection production cycles is the same as the mining process of the first round of electric heating and clean water injection production cycles, that is, the mining process of each round of electric heating and clean water injection production cycle can be achieved by repeating steps (6) to (8), but the constant temperature heating time of each downhole electric heating device 4 in each new electric heating and clean water injection production cycle is extended by 15% compared with the previous electric heating and clean water injection production cycle.

[0123] (10) Switching to three-dimensional horizontal well flooding production: After completing six rounds of electric heating and water injection production cycles, when the inter-well temperature of each horizontal well is greater than 80°C and the horizontal well production rate reaches 75%, the horizontal well at the top of the three-dimensional horizontal well network stops producing fluid, and the ground control equipment of the horizontal well is connected to the photovoltaic power generation equipment, using green electricity during the day and grid electricity at night to produce steam with a dryness greater than 80% underground in the well to heat the top oil layer 8 around the clock; the ground control equipment of the two horizontal wells at the bottom of the three-dimensional horizontal well network is connected to the photovoltaic power generation equipment, using green electricity during the day and grid electricity at night to produce steam with a dryness greater than 80% underground in the well, and heating the top oil layer 8 around the clock; the ground control equipment of the two horizontal wells at the bottom of the three-dimensional horizontal well network is connected to the photovoltaic power generation equipment, using green electricity during the day and grid electricity at night. The surface control equipment is connected to the photovoltaic power supply. When the photovoltaic power generation can supply power normally during the day, clean water matching the power of the downhole electric heating device 4 of the two wells is injected, and the photovoltaic power generation is used to drive the two downhole electric heating devices 4 to heat the clean water, and steam with a dryness greater than 80% is produced in the two wells to fully heat the surrounding oil layer 8. At night, when the photovoltaic power generation stops supplying power and the grid power is in the non-off-peak period, the two wells are shut in and kept warm for 2 to 4 hours. When the grid power is in the off-peak period, they are switched to the grid power and the oil pump 13 is started for production.

[0124] In this embodiment, after adopting the electric heating production method of the three-dimensional horizontal well network of the heavy oil reservoir, compared with the conventional steam huff-and-puff production in the prior art, the recovery factor of the target reservoir 1 increased from 18.3% to 46.8%, and the daily oil production during the peak oil production period increased from 10.5 t / d to 18.6 t / d, which greatly improved the oil recovery efficiency and the utilization degree of the heavy oil reservoir.

[0125] Embodiment 7: As attached Figure 1-6 As shown, this embodiment provides a method for electric heating production of a three-dimensional horizontal well network of a heavy oil reservoir of target reservoir 2, which may specifically include the following steps:

[0126] (1) Select a heavy oil reservoir with appropriate reservoir parameters: The situation of target reservoir 2 is as follows:

[0127] ① The middle part of the target oil layer 8 of the reservoir is buried at a depth of 360 m. A three-dimensional horizontal well network is implemented. The three-dimensional horizontal well network includes 3 horizontal wells. The horizontal sections of the oil layer 8 of the 3 horizontal wells are all sand layers. The permeability difference within the layer is 10, and the thickness of the continuous oil layer reaches 8 m. There is no edge water or bottom water in the reservoir;

[0128] ② The horizontal permeability is 800 mD and the vertical permeability is 500 mD;

[0129] ③ The viscosity of degassed crude oil at 50°C is 100,000 mPa.s.

[0130] ④ The oil reservoir is undeveloped, there are no faults around the horizontal wells, and the reservoir as a whole is a monocline of 2° to 8°, which meets the mining conditions of the electric heating mining method for the three-dimensional horizontal well network of heavy oil reservoirs provided by the present invention.

[0131] (2) Obtaining the fracture pressure of oil layer 8: Closed coring was performed in the target reservoir 1, and three typical samples were selected to carry out indoor rock stress experiments. Through experimental analysis, it was determined that the minimum fracture pressure of oil layer 8 in the reservoir was 8.2 MPa.

[0132] (3) Optimization of well layout and drilling design: Determine that there are no faults in the horizontal well deployment area, and the length of the horizontal section is 400 m. Use a five-segment trajectory of “straight well section – inclination increase section – stable inclination section – inclination increase section – stable inclination section”. The drilling directions of the three horizontal wells are parallel, and the first third of the horizontal section of each horizontal well near the inclination section is concave to form a curved section17 (e.g. Figure 1 As shown in the figure, the last two-thirds of the section remains horizontal. The first horizontal well 14 and the second horizontal well 15 are spaced 70 m to 80 m apart, and the vertical distance from the bottom boundary of the oil layer 9H1 is 1 meter. The third horizontal well 16 is located between the first horizontal well 14 and the second horizontal well 15, and the vertical distance from the top boundary of the oil layer 10H2 is 2 meters. The three wells can be combined into a triangular three-dimensional horizontal well network (as shown in the figure). Figure 2 as shown).

[0133] (4) Optimizing completion and tubing structure design: The horizontal section of each horizontal well is completed with a screen pipe 1. After completion, a long oil pipe 2 and a short oil pipe 3 are run into each horizontal well. The horizontal section of the long oil pipe 2 is evenly perforated, and a coiled tubing is run into the long oil pipe 2. The coiled tubing is insulated and potted with a downhole electric heating device with a temperature testing device through magnesium oxide. The power density of the downhole electric heating device 4 is 2 kW / m, and the long-term temperature resistance is above 400°C. The long-term temperature resistance of the temperature testing device is above 350°C. Eight temperature measuring points are evenly spaced along the axial direction of the horizontal section of the horizontal well; an oil production pump 13 that can be laid to the deflection section is run into the short oil pipe 3. The tail end of the oil production pump 13 is connected to the tail pipe and is run into the horizontal section.

[0134] (5) Preparation for oil production: Through numerical simulation methods, it is determined that the total number of production rounds in the electric heating and water injection production cycle is 9 rounds; clean the wellbore by injecting clean water or softened water from the annulus between the long oil pipe 2 and the continuous oil pipe, and draining the short oil pipe 3 for 5 days until the wellbore is clean.

[0135] (6) Injection of clean water plug: In each round of electric heating clean water injection production cycle, saturated clean water is injected until the clean water returns to the wellhead. The maximum injection pressure at the bottom of the well is 7.7 MPa, and the optimized production-injection ratio is about 0.95.

[0136] (7) Continuous electric heating to heat up the temperature and crack the crude oil: Turn on all downhole electric heating devices 4, first use full power to quickly heat the environment in the horizontal section of each horizontal well to above 280°C, and then switch to constant temperature heating. The first round of constant temperature heating lasts for 40 days. During this period, the ambient temperature of the horizontal section of each horizontal well needs to be maintained in the range of 280°C to 350°C, but the highest temperature cannot exceed 350°C.

[0137] (8) Circulating fluid replacement production: shut down all downhole electric heating devices 4, and continuously inject clean water with a salinity of less than 200 mg / L and a temperature of less than 150°C from the annulus between the long oil pipe 2 and the coiled oil pipe, so that the produced fluid (i.e., the oil-water mixture in the wellbore) is discharged from the casing annulus to the surface until there is no produced fluid or the crude oil content of the produced fluid is less than 5%. Stop circulating fluid replacement and end the production cycle of this round of electric heating and clean water injection.

[0138] (9) Mining in subsequent electric heating and clean water injection production cycles: The mining process of the second to ninth rounds of electric heating and clean water injection production cycles is the same as the mining process of the first round of electric heating and clean water injection production cycles, that is, the mining process of each round of electric heating and clean water injection production cycle can be achieved by repeating steps (6) to (8), but the constant temperature heating time of each downhole electric heating device 4 in each new electric heating and clean water injection production cycle is extended by 15% compared with the previous electric heating and clean water injection production cycle.

[0139] (10) Switching to three-dimensional horizontal well flooding production: After completing 9 rounds of electric heating and water injection production cycles, when the inter-well temperature of each horizontal well is greater than 100°C and the horizontal well recovery rate reaches 75%, the horizontal well at the top of the three-dimensional horizontal well network stops producing fluid, and the ground control equipment of the horizontal well is connected to the photovoltaic power generation equipment, using green electricity during the day and grid electricity at night to produce steam with a dryness greater than 80% underground in the well to heat the top oil layer 8 around the clock; the two horizontal wells at the bottom of the three-dimensional horizontal well network The ground control equipment is connected to the photovoltaic power supply. When the photovoltaic power generation can supply power normally during the day, clean water matching the power of the downhole electric heating device 4 of the two wells is injected, and the photovoltaic power generation is used to drive the two downhole electric heating devices 4 to heat the clean water, and steam with a dryness greater than 80% is produced in the two wells to fully heat the surrounding oil layer 8. At night, when the photovoltaic power generation stops supplying power and the grid power is in the non-off-peak period, the two wells are shut in and kept warm for 2 to 4 hours. When the grid power is in the off-peak period, they are switched to the grid power and the oil production pump 13 is started for production.

[0140] In this embodiment, after adopting the electric heating production method of the three-dimensional horizontal well network of the heavy oil reservoir, compared with the conventional steam huff-and-puff production in the prior art, the recovery factor of the target reservoir 2 increased from 13.6% to 41.5%, and the daily oil production during the peak oil production period increased from 7.6 t / d to 15.2 t / d, which greatly improved the oil recovery efficiency and the utilization degree of the heavy oil reservoir.

[0141] Embodiment 8: As attached Figure 1-6 As shown, this embodiment provides a method for electric heating production of a three-dimensional horizontal well network of a heavy oil reservoir of target reservoir 3, which may specifically include the following steps:

[0142] (1) Select a heavy oil reservoir with appropriate reservoir parameters: The situation of target reservoir 3 is as follows:

[0143] ① The middle part of the target oil layer 8 of the reservoir is buried at a depth of 450 m. A three-dimensional horizontal well network is implemented. The three-dimensional horizontal well network includes 3 horizontal wells. The horizontal sections of the oil layer 8 of the 3 horizontal wells are all sand layers. The permeability difference within the layer is 10, and the thickness of the continuous oil layer reaches 8 m. There is no edge water or bottom water in the reservoir;

[0144] ② The horizontal permeability is 600 mD and the vertical permeability is 380 mD;

[0145] ③ The viscosity of degassed crude oil at 50°C is 500,000 mPa.s.

[0146] ④ The oil reservoir is undeveloped, there are no faults around the horizontal wells, and the reservoir as a whole is a monocline of 2° to 8°, which meets the mining conditions of the electric heating mining method for the three-dimensional horizontal well network of heavy oil reservoirs provided by the present invention.

[0147] (2) Obtaining the fracture pressure of oil layer 8: Closed coring was performed in the target reservoir 1, and three typical samples were selected to carry out indoor rock stress experiments. Through experimental analysis, it was determined that the minimum fracture pressure of oil layer 8 in the reservoir was 9.7 MPa.

[0148] (3) Optimization of well layout and drilling design: Determine that there are no faults in the horizontal well deployment area, and the length of the horizontal section is 400 m. Use a five-segment trajectory of “straight well section – inclination increase section – stable inclination section – inclination increase section – stable inclination section”. The drilling directions of the three horizontal wells are parallel, and the first third of the horizontal section of each horizontal well near the inclination section is concave to form a curved section17 (e.g. Figure 1 As shown in the figure, the last two-thirds of the section remains horizontal. The first horizontal well 14 and the second horizontal well 15 are spaced 70 m to 80 m apart, and the vertical distance from the bottom boundary of the oil layer 9H1 is 1 meter. The third horizontal well 16 is located between the first horizontal well 14 and the second horizontal well 15, and the vertical distance from the top boundary of the oil layer 10H2 is 2 meters. The three wells can be combined into a triangular three-dimensional horizontal well network (as shown in the figure). Figure 2 as shown).

[0149] (4) Optimizing completion and tubing structure design: The horizontal section of each horizontal well is completed with a screen pipe 1. After completion, a long oil pipe 2 and a short oil pipe 3 are run into each horizontal well. The horizontal section of the long oil pipe 2 is evenly perforated, and a coiled tubing is run into the long oil pipe 2. The coiled tubing is insulated and potted with a downhole electric heating device with a temperature testing device through magnesium oxide. The power density of the downhole electric heating device 4 is 2 kW / m, and the long-term temperature resistance is above 400°C. The long-term temperature resistance of the temperature testing device is above 350°C. Eight temperature measuring points are evenly spaced along the axial direction of the horizontal section of the horizontal well; an oil production pump 13 that can be laid to the deflection section is run into the short oil pipe 3. The tail end of the oil production pump 13 is connected to the tail pipe and is run into the horizontal section.

[0150] (5) Preparation for oil production: Through numerical simulation methods, it is determined that the total number of production rounds in the electric heating and water injection production cycle is 9 rounds; clean the wellbore by injecting clean water or softened water from the annulus between the long oil pipe 2 and the continuous oil pipe, and draining the short oil pipe 3 for 5 days until the wellbore is clean.

[0151] (6) Injection of clean water plug: In each round of electric heating clean water injection production cycle, saturated clean water is injected until the clean water returns to the wellhead. The maximum injection pressure at the bottom of the well is 9.2 MPa, and the optimized production-injection ratio is about 0.95.

[0152] (7) Continuous electric heating to increase the temperature and crack the crude oil: Turn on all downhole electric heating devices 4, first use full power to quickly heat the environment in the horizontal section of each horizontal well to above 280°C, and then switch to constant temperature heating. The first round of constant temperature heating lasts for 60 days. During this period, the ambient temperature of the horizontal section of each horizontal well needs to be maintained in the range of 280°C to 350°C, but the highest temperature cannot exceed 350°C.

[0153] (8) Circulating fluid replacement production: shut down all downhole electric heating devices 4, and continuously inject clean water with a salinity of less than 200 mg / L and a temperature of less than 150°C from the annulus between the long oil pipe 2 and the coiled oil pipe, so that the produced fluid (i.e., the oil-water mixture in the wellbore) is discharged from the casing annulus to the surface until there is no produced fluid or the crude oil content of the produced fluid is less than 5%. Stop circulating fluid replacement and end the production cycle of this round of electric heating and clean water injection.

[0154] (9) Mining in subsequent electric heating and clean water injection production cycles: The mining process of the second to ninth rounds of electric heating and clean water injection production cycles is the same as the mining process of the first round of electric heating and clean water injection production cycles, that is, the mining process of each round of electric heating and clean water injection production cycle can be achieved by repeating steps (6) to (8), but the constant temperature heating time of each downhole electric heating device 4 in each new electric heating and clean water injection production cycle is extended by 15% compared with the previous electric heating and clean water injection production cycle.

[0155] (10) Switching to three-dimensional horizontal well flooding production: After completing 9 rounds of electric heating and water injection production cycles, when the inter-well temperature of each horizontal well is greater than 100°C and the horizontal well recovery rate reaches 75%, the horizontal well at the top of the three-dimensional horizontal well network stops producing fluid, and the ground control equipment of the horizontal well is connected to the photovoltaic power generation equipment, using green electricity during the day and grid electricity at night to produce steam with a dryness greater than 80% underground in the well to heat the top oil layer 8 around the clock; the two horizontal wells at the bottom of the three-dimensional horizontal well network The ground control equipment is connected to the photovoltaic power supply. When the photovoltaic power generation can supply power normally during the day, clean water matching the power of the downhole electric heating device 4 of the two wells is injected, and the photovoltaic power generation is used to drive the two downhole electric heating devices 4 to heat the clean water, and steam with a dryness greater than 80% is produced in the two wells to fully heat the surrounding oil layer 8. At night, when the photovoltaic power generation stops supplying power and the grid power is in the non-off-peak period, the two wells are shut in and kept warm for 2 to 4 hours. When the grid power is in the off-peak period, they are switched to the grid power and the oil production pump 13 is started for production.

[0156] In this embodiment, after adopting the electric heating production method of the three-dimensional horizontal well network of the heavy oil reservoir, compared with the conventional steam huff-and-puff production in the prior art, the recovery factor of the target reservoir three increased from 10.3% to 37.2%, and the daily oil production during the peak oil production period increased from 4.1 t / d to 11.5 t / d, which greatly improved the oil recovery efficiency and the utilization degree of the heavy oil reservoir.

[0157] Embodiment 9: As attached Figure 1-2 As shown, the heavy oil reservoir three-dimensional horizontal well network electric heating production system includes:

[0158] The well arrangement and completion module is to arrange a three-dimensional horizontal well network with a vertical cross-section in a triangular distribution in the selected target oil reservoir. The three-dimensional horizontal well network includes at least three horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected with the deflection section. The horizontal sections of all horizontal wells are completed with a screen pipe 1. After completion, two oil pipes, one long and one short, are run into each horizontal well in the three-dimensional horizontal well network.

[0159] The electric heating system design and construction module sets an electric heating system and an oil production pump 13 in each horizontal well of the three-dimensional horizontal well network. Each electric heating system includes a downhole electric heating device 4 with a temperature testing device. The continuous oil pipe of the downhole electric heating device 4 with the temperature testing device is lowered from the long oil pipe 2 to the toe end of the corresponding horizontal well. Each downhole electric heating device 4 with the temperature testing device can be connected to the grid power and the green power through the power supply cable 5 respectively; the oil production pump 13 is lowered from the short oil pipe 3 to the deflection section of the corresponding horizontal well; wherein all the downhole electric heating devices 4 are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump 13 is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well;

[0160] Preparation module, preparing for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbores at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbore is circulated to the ground;

[0161] The electric heating clean water injection throughput production module starts the exploitation of M rounds of electric heating clean water injection throughput production cycles. Each electric heating clean water injection throughput production cycle includes: injecting clean water segment plugs into the annulus of the long oil pipe 2 and the continuous oil pipe of each horizontal well in the three-dimensional horizontal well network; using green electricity and grid electricity to power, start all downhole electric heating devices 4 in the three-dimensional horizontal well network, and continuously heat the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time through the cooperation of each downhole electric heating device 4 and the corresponding temperature testing device, so that the crude oil undergoes hydrothermal cracking under high temperature conditions; after hydrothermal cracking, each horizontal well starts circulating fluid production, and after circulating fluid production, it is determined whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%. If so, stop circulating fluid, if not, continue circulating fluid;

[0162] After each electric heating clean water injection throughput production cycle is completed, the number of production rounds N of the current electric heating clean water injection throughput production cycle is determined, and it is judged whether N is greater than or equal to M. If not, the next round of production of electric heating clean water injection throughput production cycle is entered, and the heating time of each downhole electric heating device 4 in each new electric heating clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating clean water injection throughput production cycle. If so, the production of the electric heating clean water injection throughput production cycle is terminated.

[0163] According to actual needs, the above-mentioned heavy oil reservoir three-dimensional horizontal well pattern electric heating production system can be further optimized and / or improved:

[0164] Embodiment 10: As attached Figure 1-2 As shown, it also includes a three-dimensional horizontal well network flooding production module. After the production of M rounds of electric heating and water injection huff-and-puff production cycles, when the horizontal section utilization of each horizontal well in the three-dimensional horizontal well network is greater than 75%, the temperature field 20 is connected, and the well-to-well temperature is greater than the set temperature, the three-dimensional horizontal well network flooding production is switched. The three-dimensional horizontal well network flooding production includes:

[0165] After the horizontal wells at the top of the three-dimensional horizontal well network stop producing fluid, it is determined whether the green electricity supply is compatible with the total heating power of all downhole electric heating devices 4;

[0166] If yes, then clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device 4 in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer 8;

[0167] If not, each downhole electric heating device 4 located at the top of the three-dimensional horizontal well network continues to heat using grid electricity;

[0168] It is determined whether the grid power is in the off-peak period. If not, the horizontal wells at the bottom of the three-dimensional horizontal well network are closed and then soaked. If so, the horizontal wells at the bottom of the three-dimensional horizontal well network use the grid power to start the oil production pump 13 for production.

[0169] The above technical features constitute the embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

Claims

1. A method for electric heating production of a three-dimensional horizontal well pattern in a heavy oil reservoir, characterized in that: include: A three-dimensional horizontal well network with a triangular distribution in the longitudinal section is set in the selected target oil reservoir. The three-dimensional horizontal well network includes at least three horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected with the deflection section. The horizontal sections of all horizontal wells are completed with screen pipes. After completion, two oil pipes, one long and one short, are run into each horizontal well in the three-dimensional horizontal well network. An electric heating system and an oil production pump are respectively arranged in each horizontal well of the three-dimensional horizontal well network. Each electric heating system includes a downhole electric heating device with a temperature testing device. The continuous oil pipe of the downhole electric heating device with the temperature testing device is lowered from the long oil pipe to the toe end of the corresponding horizontal well. Each downhole electric heating device with the temperature testing device can be connected to the grid power and the green power through the power supply cable. The oil production pump is lowered from the short oil pipe to the deflection section of the corresponding horizontal well. Among them, all downhole electric heating devices are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well. Prepare for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbores at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbores is circulated to the ground; Start the exploitation of M rounds of electric heating and water injection throughput production cycles, each of which includes: injecting water segment plugs into the annulus of the long oil pipes and the continuous oil pipes of each horizontal well in the three-dimensional horizontal well network; using green electricity and grid electricity to power all downhole electric heating devices in the three-dimensional horizontal well network, and continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time through the cooperation of each downhole electric heating device and the corresponding temperature testing device, so that the crude oil undergoes hydrothermal cracking under high temperature conditions; after hydrothermal cracking, each horizontal well starts circulating fluid production, and after circulating fluid production, it is determined whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%. If so, stop circulating fluid, and if not, continue circulating fluid; After each electric heating and clean water injection throughput production cycle is completed, the number of production rounds N of the current electric heating and clean water injection throughput production cycle is determined, and it is judged whether N is greater than or equal to M. If not, the next round of production of electric heating and clean water injection throughput production cycle is entered, and the heating time of each downhole electric heating device in each new electric heating and clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating and clean water injection throughput production cycle. If so, the production of the electric heating and clean water injection throughput production cycle is terminated.

2. The method for producing heavy oil reservoirs by electric heating of three-dimensional horizontal well patterns according to claim 1, characterized in that: Each of the processes of using green electricity and grid electricity to power, turning on all downhole electric heating devices in the three-dimensional horizontal well network, and continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time by cooperating with each downhole electric heating device and the corresponding temperature testing device to cause aquathermal cracking of crude oil under high temperature conditions, all includes: Turn on the underground electric heating device, which uses full power to heat and increase the temperature; The underground electric heating device determines whether the real-time wellbore ambient temperature collected by the temperature testing device reaches the temperature threshold value; If yes, adjust the downhole electric heating device to constant temperature heating so that the crude oil can continue to undergo aquathermal cracking reaction; Determine whether the heating time of the downhole electric heating device reaches the set time. If so, turn off the downhole electric heating device. If not, the downhole electric heating device continues to heat at a constant temperature.

3. The method for electric heating production of heavy oil reservoirs in three-dimensional horizontal well patterns according to claim 1 or 2, characterized in that: The preparation for oil production also includes: Obtain the oil layer fracture pressure to ensure that each time a clean water plug is injected into each horizontal well in the three-dimensional horizontal well network, the bottom hole injection pressure of the clean water is 0.5 MPa to 1 MPa less than the oil layer fracture pressure.

4. The method for electric heating production of heavy oil reservoirs in three-dimensional horizontal well patterns according to claim 1 or 2, characterized in that: The distance between the top of the three-dimensional horizontal well network and the top boundary of the oil layer is 2 m to 3 m, and the distance between the bottom of the three-dimensional horizontal well network and the bottom boundary of the oil layer is 0.5 m to 1 m.

5. The method for electric heating production of heavy oil reservoirs in three-dimensional horizontal well patterns according to claim 3 is characterized in that: The distance between the top of the three-dimensional horizontal well network and the top boundary of the oil layer is 2 m to 3 m, and the distance between the bottom of the three-dimensional horizontal well network and the bottom boundary of the oil layer is 0.5 m to 1 m.

6. The method for producing heavy oil reservoirs by electric heating of three-dimensional horizontal well patterns according to claim 1, 2 or 5, characterized in that: It also includes the following: after the production of M rounds of electric heating and water injection and huff-and-puff production cycle, when the horizontal sections of each horizontal well in the three-dimensional horizontal well network are utilized more than 75%, the temperature field is connected, and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network is switched to flooding production. The flooding production of the three-dimensional horizontal well network includes: After the horizontal wells at the top of the three-dimensional horizontal well network stop producing fluid, determine whether the green electricity supply is compatible with the total heating power of all underground electric heating devices; If yes, then clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer; If not, each downhole electric heating device located at the top of the three-dimensional horizontal well network will continue heating using grid electricity; Determine whether the grid power is in the off-peak period. If not, close the horizontal wells at the bottom of the three-dimensional horizontal well network and then soak the wells. If so, use the grid power to start the oil pump production at the horizontal wells at the bottom of the three-dimensional horizontal well network.

7. The method for electric heating production of heavy oil reservoirs in three-dimensional horizontal well patterns according to claim 3 is characterized in that: It also includes the following: after the production of M rounds of electric heating and water injection and huff-and-puff production cycle, when the horizontal sections of each horizontal well in the three-dimensional horizontal well network are utilized more than 75%, the temperature field is connected, and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network is switched to flooding production. The flooding production of the three-dimensional horizontal well network includes: After the horizontal wells at the top of the three-dimensional horizontal well network stop producing fluid, determine whether the green electricity supply is compatible with the total heating power of all underground electric heating devices; If yes, then clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer; If not, each downhole electric heating device located at the top of the three-dimensional horizontal well network will continue heating using grid electricity; Determine whether the grid power is in the off-peak period. If not, close the horizontal wells at the bottom of the three-dimensional horizontal well network and then soak the wells. If so, use the grid power to start the oil pump production at the horizontal wells at the bottom of the three-dimensional horizontal well network.

8. The method for producing heavy oil reservoirs by electric heating of three-dimensional horizontal well patterns according to claim 4, characterized in that: It also includes the following: after the production of M rounds of electric heating and water injection and huff-and-puff production cycle, when the horizontal sections of each horizontal well in the three-dimensional horizontal well network are utilized more than 75%, the temperature field is connected, and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network is switched to flooding production. The flooding production of the three-dimensional horizontal well network includes: After the horizontal wells at the top of the three-dimensional horizontal well network stop producing fluid, determine whether the green electricity supply is compatible with the total heating power of all underground electric heating devices; If yes, then clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer; If not, each downhole electric heating device located at the top of the three-dimensional horizontal well network will continue heating using grid electricity; Determine whether the grid power is in the off-peak period. If not, close the horizontal wells at the bottom of the three-dimensional horizontal well network and then soak the wells. If so, use the grid power to start the oil pump production at the horizontal wells at the bottom of the three-dimensional horizontal well network.

9. A three-dimensional horizontal well pattern electric heating production system for heavy oil reservoirs using the method described in any one of claims 1 to 8, characterized in that: include: Well arrangement and completion module, a three-dimensional horizontal well network with a vertical cross-section in a triangular distribution is set in the selected target reservoir. The three-dimensional horizontal well network includes at least three horizontal wells with parallel drilling directions. The heel end of the horizontal section of each horizontal well is bent downward and connected to the deflection section. The horizontal sections of all horizontal wells are completed with screen pipes. After completion, two oil pipes, one long and one short, are run into each horizontal well in the three-dimensional horizontal well network; The electric heating system design and construction module is to respectively set an electric heating system and an oil production pump in each horizontal well of the three-dimensional horizontal well network. Each electric heating system includes a downhole electric heating device with a temperature testing device. The continuous oil pipe of the downhole electric heating device with the temperature testing device is lowered from the long oil pipe to the toe end of the corresponding horizontal well. Each downhole electric heating device with the temperature testing device can be connected to the grid power and the green power through the power supply cable. The oil production pump is lowered from the short oil pipe to the deflection section of the corresponding horizontal well. Among them, all downhole electric heating devices are located in the horizontal section of the corresponding horizontal well, and the tail end of the oil production pump is connected to the tail pipe that can be laid to the horizontal section of the corresponding horizontal well. Preparation module, preparing for oil production, including: obtaining the total number of production rounds M of the electric heating and water injection throughput production cycle, cleaning the wellbore at each level in the three-dimensional horizontal well network, until all the drilling mud in the wellbore is circulated to the ground; The electric heating clean water injection throughput production module starts the exploitation of M rounds of electric heating clean water injection throughput production cycles. Each electric heating clean water injection throughput production cycle includes: injecting clean water segment plugs into the annulus of the long oil pipes and the continuous oil pipes of each horizontal well in the three-dimensional horizontal well network; using green electricity and grid electricity to power all downhole electric heating devices in the three-dimensional horizontal well network, and through the cooperation of each downhole electric heating device and the corresponding temperature testing device, continuously heating the horizontal sections of all horizontal wells in the three-dimensional horizontal well network within a set time, so that the crude oil undergoes hydrothermal cracking under high temperature conditions; after hydrothermal cracking, each horizontal well starts circulating fluid production, and after circulating fluid production, it is determined whether there is no produced fluid or the crude oil content in the produced fluid is less than 5%. If so, the circulating fluid is stopped, and if not, the circulating fluid is continued; After each electric heating and clean water injection throughput production cycle is completed, the number of production rounds N of the current electric heating and clean water injection throughput production cycle is determined, and it is judged whether N is greater than or equal to M. If not, the next round of production of electric heating and clean water injection throughput production cycle is entered, and the heating time of each downhole electric heating device in each new electric heating and clean water injection throughput production cycle is extended by 10% to 15% compared with the previous electric heating and clean water injection throughput production cycle. If so, the production of the electric heating and clean water injection throughput production cycle is terminated.

10. The heavy oil reservoir three-dimensional horizontal well pattern electric heating production system according to claim 9, characterized in that: It also includes a three-dimensional horizontal well network flooding production module. After the production of M rounds of electric heating and water injection and huff-and-puff production cycles, when the horizontal sections of each horizontal well in the three-dimensional horizontal well network are used more than 75%, the temperature field is connected, and the temperature between wells is greater than the set temperature, the three-dimensional horizontal well network flooding production is switched. The three-dimensional horizontal well network flooding production includes: After the horizontal wells at the top of the three-dimensional horizontal well network stop producing fluid, determine whether the green electricity supply is compatible with the total heating power of all underground electric heating devices; If yes, then clean water is injected into each horizontal well of the three-dimensional horizontal well network, and the downhole electric heating device in each horizontal well is turned on to heat the clean water to produce high-dryness steam, so that the high-temperature water vapor enters the oil reservoir to heat the oil layer; If not, each downhole electric heating device located at the top of the three-dimensional horizontal well network will continue heating using grid electricity; Determine whether the grid power is in the off-peak period. If not, close the horizontal wells at the bottom of the three-dimensional horizontal well network and then soak the wells. If so, use the grid power to start the oil pump production at the horizontal wells at the bottom of the three-dimensional horizontal well network.