Industrial air conditioning control optimization method based on scenario requirements

By constructing an industrial air conditioning Internet of Things and grid partitioning, combined with multi-dimensional feature collection and decision fitness analysis, refined control decisions are generated, solving the problem of the disconnect between the control effect of industrial air conditioning and actual needs, and achieving more efficient and accurate control.

CN118669958BActive Publication Date: 2024-11-15江苏众兴永达制冷机械制造有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411171845.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-15
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

In existing technologies, the control effect of industrial air conditioning is out of sync with actual needs, and the control reliability is low.

Method used

Construct a target industrial air conditioning IoT, divide the grid and match air conditioners with grid blocks, generate control decisions through multi-dimensional feature collection, use the decision fitness analysis function to perform fitness analysis and correction, and generate target control schemes.

Benefits of technology

It improves the alignment between industrial air conditioning control effects and scenario requirements, enhancing the accuracy and reliability of control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118669958B_ABST
    Figure CN118669958B_ABST
Patent Text Reader

Abstract

The present invention discloses an industrial air conditioning control optimization method based on scene requirements, which relates to the technical field of industrial air conditioning. The method includes: constructing a target industrial air conditioning Internet of Things; gridding a target area to obtain a target grid block set; matching a first grid block set in multiple grid blocks; generating a first control decision; introducing a decision fitness analysis function to perform fitness analysis on the first control decision to obtain a first fitness; obtaining a second scene requirement of a second grid block, correcting the first fitness to obtain a first target fitness; if the first target fitness meets a predetermined fitness threshold, using the first control decision as a first target control scheme for a first industrial air conditioner. The present invention solves the technical problems in the prior art that the control effect of industrial air conditioners is out of touch with actual needs and the control reliability is low, and achieves the technical effect of improving the fit between the control effect of industrial air conditioners and scene requirements and improving the accuracy of control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial air conditioning, and in particular to an industrial air conditioning control optimization method based on scenario requirements. Background Art

[0002] Due to the complexity and diversity of industrial production scenarios, the requirements for air conditioning control are becoming increasingly higher. At present, in production workshops, due to factors such as equipment operation and personnel activities, the temperature distribution requirements in different areas are often inconsistent, and traditional control methods are often unable to effectively cope with such changes, resulting in a disconnect between the control effect and actual needs.

[0003] The existing technology has the technical problems that the control effect of industrial air conditioning is out of touch with actual needs and the control reliability is low. Summary of the invention

[0004] The present application provides an industrial air conditioning control optimization method based on scenario requirements, which is used to solve the technical problems in the prior art that the industrial air conditioning control effect is out of touch with actual needs and the control reliability is low.

[0005] In view of the above problems, the present application provides an industrial air conditioning control optimization method based on scenario requirements.

[0006] In a first aspect of the present application, a method for optimizing industrial air conditioning control based on scenario requirements is provided, the method comprising:

[0007] Constructing a target industrial air-conditioning Internet of Things, wherein the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area;

[0008] Gridding the target area to obtain a target grid block set, wherein the target grid block set includes a plurality of grid blocks;

[0009] Matching a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks;

[0010] A first scene requirement obtained by performing multi-dimensional feature collection on a first grid block is used as an optimization target to generate a first control decision, wherein the first grid block is any grid block in the first grid block set;

[0011] Introducing a decision fitness analysis function to perform fitness analysis on the first regulation decision to obtain a first fitness;

[0012] Acquire a second scenario requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block;

[0013] Correcting the first fitness based on the regulation effectiveness of the first regulation decision on the second scenario requirement to obtain a first target fitness;

[0014] If the first target fitness meets a predetermined fitness threshold, the first control decision is used as a first target control scheme of the first industrial air conditioner.

[0015] The second aspect of the present application provides an industrial air conditioning control optimization system based on scene requirements, the system comprising:

[0016] An Internet of Things building module, used to build a target industrial air-conditioning Internet of Things, where the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area;

[0017] A grid block set obtaining module, used for performing grid division on the target area to obtain a target grid block set, wherein the target grid block set includes a plurality of grid blocks;

[0018] A first grid block set matching module is used to match a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks;

[0019] A first control decision generating module, configured to generate a first control decision by taking a first scene requirement obtained by performing multi-dimensional feature collection on a first grid block as an optimization target, wherein the first grid block is any grid block in the first grid block set;

[0020] A first fitness obtaining module, used for introducing a decision fitness analysis function to perform fitness analysis on the first regulation decision to obtain a first fitness;

[0021] A second scene requirement acquisition module, configured to acquire a second scene requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block;

[0022] A first target fitness obtaining module, configured to correct the first fitness based on the control effectiveness of the first control decision on the second scene requirement to obtain a first target fitness;

[0023] The first target control scheme obtaining module is used to use the first control decision as the first target control scheme of the first industrial air conditioner if the first target fitness meets a predetermined fitness threshold.

[0024] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0025] The present application constructs a target industrial air-conditioning Internet of Things, which refers to the Internet of Things of multiple industrial air-conditioning distributed in the target area, and then divides the target area into grids to obtain a target grid block set, which includes multiple grid blocks, and matches the first grid block set corresponding to the first industrial air-conditioning in the target industrial air-conditioning Internet of Things in the multiple grid blocks, and then takes the first scene demand obtained by multi-dimensional feature collection of the first grid block as the optimization target, and generates a first control decision, wherein the first grid block is any grid block in the first grid block set, and the first control decision is analyzed for fitness by introducing a decision fitness analysis function to obtain a first fitness, and then obtains the second scene demand of the second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block, and the first fitness is corrected based on the control efficiency of the first control decision on the second scene demand to obtain the first target fitness, and if the first target fitness meets the predetermined fitness threshold, the first control decision is used as the first target control scheme for the first industrial air-conditioning. The technical effect of improving the fit between the control effect of industrial air-conditioning and the scene demand and improving the accuracy of control is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 A schematic diagram of a process flow of an industrial air conditioning control optimization method based on scenario requirements provided in an embodiment of the present application;

[0028] Figure 2 A schematic diagram of the structure of an industrial air conditioning control and optimization system based on scenario requirements provided in an embodiment of the present application.

[0029] Explanation of the accompanying drawings: Internet of Things construction module 11, grid block set acquisition module 12, first grid block set matching module 13, first control decision generation module 14, first fitness acquisition module 15, second scenario requirement acquisition module 16, first target fitness acquisition module 17, first target control scheme acquisition module 18. DETAILED DESCRIPTION

[0030] The present application provides an industrial air-conditioning control optimization method based on scenario requirements, which is used to solve the technical problems in the prior art that the industrial air-conditioning control effect is out of touch with actual needs and the control reliability is low.

[0031] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0032] It should be noted that the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or inherent to these processes, methods, products or devices.

[0033] Embodiment 1

[0034] like Figure 1 As shown, the present application provides an industrial air conditioning control optimization method based on scenario requirements, which includes:

[0035] S100: constructing a target industrial air-conditioning Internet of Things, where the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area;

[0036] In one possible embodiment, for a target area that needs to be controlled by industrial air conditioners, the Internet of Things technology is used to connect the sensors, actuators, controllers and other devices corresponding to the distributed multiple industrial air conditioners to the Internet, and then the multiple industrial air conditioners are remotely controlled through data communication and cloud computing technology to build the target industrial air conditioner Internet of Things. The target industrial air conditioner Internet of Things refers to the Internet of Things of multiple industrial air conditioners distributed in the target area. The target area can be an industrial park, a production workshop and other areas.

[0037] By constructing the target industrial air-conditioning Internet of Things, multiple industrial air-conditioners in the target area are remotely controlled, and the switch, temperature, wind speed, etc. of the industrial air-conditioners are remotely operated, so as to meet the air-conditioning control needs in different working scenarios, and achieve the technical effect of intelligent management of industrial air-conditioners in the target area and improving the control efficiency of industrial air-conditioning.

[0038] S200: gridding the target area to obtain a target grid block set, where the target grid block set includes a plurality of grid blocks;

[0039] In a possible embodiment, in order to be able to finely control the industrial air conditioning according to different scene requirements in the target area, it is necessary to divide the target area into grids, thereby laying the foundation for subsequent industrial air conditioning control.

[0040] Preferably, the scale of grid division is determined according to the area size of the target area. Exemplarily, the area size of each grid block after grid division is 1 / 120, or 1 / 60, etc. of the area size of the target area. When dividing, a standard grid (such as a rectangular grid, a square grid, a triangular grid, etc.) is used to divide the target area according to the determined grid division scale to obtain the target grid block set. The target grid block set includes multiple grid blocks.

[0041] S300: Matching a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks;

[0042] Furthermore, a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things is matched among the multiple grid blocks. Step S300 of the embodiment of the present application further includes:

[0043] Obtaining a first layout position of the first industrial air conditioner based on the target industrial air conditioner Internet of Things;

[0044] Obtaining any grid block from the plurality of grid blocks, and collecting the coordinate position of the any grid block;

[0045] If a first spatial distance between the coordinate position and the first layout position reaches a predetermined distance threshold, the arbitrary grid block corresponding to the coordinate position is added to the first grid block set.

[0046] In an embodiment of the present application, the target industrial air-conditioning Internet of Things is interacted, and the first air-conditioning coordinate position and the first industrial air-conditioning basic information of the first industrial air-conditioning are extracted. Among them, the first industrial air-conditioning is any one of the multiple industrial air-conditioning in the target area. The basic information of the first industrial air-conditioning is used to describe the model and working capacity of the first industrial air-conditioning, including data such as the model and the working impact radius. The working impact radius is the farthest distance that the first industrial air-conditioning can be controlled. The coordinate position of the first industrial air-conditioning is matched with the coordinate positions of the multiple grid blocks to obtain the first grid block set. Among them, the first grid block set is the grid blocks in the target area that can be controlled by the first industrial air-conditioning.

[0047] Optionally, a first layout position of the first industrial air conditioner is determined according to the target industrial air conditioner Internet of Things, wherein the first layout position describes a fixed position of the first industrial air conditioner in the target area, including a first air conditioner coordinate position.

[0048] Optionally, a grid block is randomly extracted from the multiple grid blocks, and the coordinate position of any grid block is determined according to the grid division result, and the distance difference between the coordinate position and the first layout position is calculated to obtain the first spatial distance. The first spatial distance is used to describe the spatial measurement between the arbitrary grid block and the first industrial air conditioner. The predetermined distance threshold is a working influence radius determined according to the first industrial air conditioner basic information of the first industrial air conditioner. When the first spatial distance between the coordinate position and the first layout position reaches the predetermined distance threshold, the arbitrary grid block corresponding to the coordinate position is added to the first grid block set.

[0049] Optionally, after multiple random grid block extractions of the multiple grid blocks, any grid block whose spatial distance reaches a predetermined distance threshold is added to the first grid block set, thereby obtaining an area range in which the first industrial air conditioner can regulate the target area.

[0050] S400: Taking a first scene requirement obtained by performing multi-dimensional feature collection on a first grid block as an optimization target, generating a first control decision, wherein the first grid block is any grid block in the first grid block set;

[0051] Furthermore, the first scenario requirement includes a demand target and a weight coefficient of a predetermined dimension, and the predetermined dimension includes ambient temperature, ambient humidity, air quality, and ambient noise.

[0052] In a possible embodiment, based on the first grid block as a scene demand analysis object, multi-dimensional feature collection is performed on the first grid block to obtain the first scene demand. The first scene demand is a site environment demand determined according to the purpose of the first grid block, including a demand target and a weight coefficient of a predetermined dimension. The demand target is a target value of a predetermined dimension that needs to be met by a predetermined dimension in the first grid block. The weight coefficient is the importance of the demand of different predetermined dimensions in the first grid block. The larger the weight coefficient, the more important the corresponding predetermined dimension is in the first scene demand in the first grid block. The predetermined dimensions include ambient temperature, ambient humidity, air quality, and ambient noise.

[0053] Optionally, site characteristics are collected for the first grid block to obtain first grid block characteristics, wherein the first grid block characteristics include site usage characteristics, site open environment characteristics, etc. The site usage characteristics include product storage, food production, parts processing and manufacturing, etc. Different uses correspond to different scene requirements. For example, a low temperature and dry environment is required for food production, and constant temperature and humidity are required for precision parts processing. The site open environment includes ventilation conditions, space sealing conditions, etc.

[0054] Optionally, the first scene demand is analyzed using a control decision network layer to output the first control decision. The first control decision is a scheme for controlling the first industrial air conditioner, including adjusting temperature, adjusting air volume, output power, and adjusting air volume. By obtaining multiple sample scene demands and multiple sample control decisions as construction data, a convolutional neural network layer is used to perform supervised learning on the mapping relationship between scene demands and control decisions until the model converges, thereby obtaining the trained control decision network layer.

[0055] S500: introducing a decision fitness analysis function to perform fitness analysis on the first control decision to obtain a first fitness;

[0056] Further, a decision fitness analysis function is introduced to perform fitness analysis on the first control decision to obtain a first fitness. Step S500 in the embodiment of the present application further includes:

[0057] Simulating the first control decision to obtain a first simulation record, wherein the first simulation record is first simulation information of a first position, wherein the first position refers to a position of the first grid block, and the first simulation information includes a first simulation temperature, a first simulation humidity, a first simulation air quality, and a first simulation noise;

[0058] The decision fitness analysis function analyzes the first simulated temperature, the first simulated humidity, the first simulated air quality, and the first simulated noise in combination with the first scenario requirement to obtain the first fitness.

[0059] Furthermore, the expression of the decision fitness analysis function is as follows:

[0060] ;

[0061] in, Characterizing the First Regulatory Decision The first fitness, and and and respectively characterize the environmental temperature requirement target, environmental humidity requirement target, air quality requirement target and environmental noise requirement target in the first scenario requirement, and and and respectively characterize the first simulated temperature, the first simulated humidity, the first simulated air quality and the first simulated noise, and and and Characterize the ambient temperature weight coefficient, ambient humidity weight coefficient, air quality weight coefficient and ambient noise weight coefficient in the first scenario requirement, and .

[0062] In one embodiment, the decision fitness analysis function is used to quantitatively analyze the control effect that can be achieved by the first control decision to obtain a first fitness. The first fitness is used to describe the control quality of the first control decision. The larger the first fitness is, the higher the degree of satisfaction of the demand of the first grid block after the first industrial air conditioner is controlled according to the first control decision.

[0063] In one embodiment, a simulation program is constructed using simulation software (such as EnergyPlus, TRNSYS, Python, etc.), and a control simulation is performed according to the spatial conditions (including spatial dimensions and confinement conditions) of the first grid block set, the rated capacity of the first industrial air conditioner, and the first control decision, so as to obtain the first simulation record. The first simulation record describes the simulated working conditions of the first industrial air conditioner under the control of the first control decision, including the first simulation information of the first position, and the first simulation information includes the first simulation temperature, the first simulation humidity, the first simulation air quality, and the first simulation noise. The first position refers to the position of the first grid block.

[0064] Extract the demand target and weight coefficient of the predetermined dimension in the first scene demand, wherein the demand target includes the ambient temperature demand target, the ambient humidity demand target, the air quality demand target and the ambient noise demand target. The weight coefficient includes the ambient temperature weight coefficient, the ambient humidity weight coefficient, the air quality weight coefficient and the ambient noise weight coefficient in the first scene demand. The demand target and the weight coefficient, as well as the first simulated temperature, the first simulated humidity, the first simulated air quality and the first simulated noise are input into the decision fitness analysis function to perform fitness calculation to obtain the first fitness.

[0065] Optionally, the decision fitness analysis function is used to perform weighted calculation according to the weight coefficient on the difference between the first simulated temperature, the first simulated humidity, the first simulated air quality and the first simulated noise corresponding to the first control decision and the ambient temperature requirement target, ambient humidity requirement target, air quality requirement target and ambient noise requirement target in the first scene requirement, so as to obtain the first fitness. The technical effect of simulating the first control decision, analyzing the control effect according to the simulation results, and providing analysis data for industrial air conditioning control optimization is achieved.

[0066] S600: Acquire a second scenario requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block;

[0067] S700: Correcting the first fitness based on the regulation effectiveness of the first regulation decision on the second scene requirement to obtain a first target fitness;

[0068] Furthermore, based on the control effectiveness of the first control decision on the second scene requirement, the first fitness can be corrected. In the embodiment of the present application, step S700 further includes:

[0069] Extracting second simulation information from the first simulation record, where the second simulation information refers to simulation information of the first control decision on a second position corresponding to the second grid block;

[0070] The second simulation information and the second scenario requirement are combined to obtain a second fitness, and the second fitness is used as the control efficiency.

[0071] In one possible implementation, based on the same acquisition method as the first scenario requirement of the first grid block, multi-dimensional feature collection is performed on the second grid block to obtain the second scenario requirement. The second grid block is any grid block in the first grid block set that is different from the first grid block.

[0072] Optionally, the simulation software extracts the first simulation record generated after regulating the first industrial air conditioner according to the first regulation decision, and extracts the second simulation information at the second position according to the position of the second grid block. The second fitness is obtained by quantitatively analyzing the degree of difference between the second simulation information and the second scene requirement of the second grid block using the decision fitness analysis function, and then the second fitness is used as the regulation effectiveness. Among them, the regulation effectiveness is the degree of effect of the first regulation decision on the second grid block. The first fitness is corrected according to the regulation effectiveness, and the effect of the first regulation decision on other grid blocks in the first grid block set that can be regulated by the first industrial air conditioner except the first grid block is achieved. The goal of correcting the first fitness is achieved, and the technical effect of improving the optimization quality of air conditioning regulation and the overall regulation is achieved.

[0073] In a possible embodiment, the second simulation information refers to the simulation information of the second position corresponding to the second grid block by the first control decision, including the second simulation temperature, the second simulation humidity, the second simulation air quality and the second simulation noise. The second simulation temperature, the second simulation humidity, the second simulation air quality and the second simulation noise are input into the decision fitness analysis function with the second scene requirement corresponding to the second grid block to obtain the second fitness. Optionally, the first fitness and the second fitness are averaged to obtain the first target fitness. The first target fitness reflects the overall control of the first control decision on the first grid block set corresponding to the first industrial air conditioner.

[0074] Further, the second fitness is used as the control efficiency, and step S700 of the embodiment of the present application further includes:

[0075] Extracting a target grid block from the first grid block set, wherein the target grid block refers to any grid block in the first grid block set that is also present in the second grid block set of the second industrial air conditioner;

[0076] Acquire a second control decision of the second industrial air conditioner, and analyze and obtain the target coupling control effectiveness of the second control decision on the target grid block;

[0077] The control effectiveness capability is corrected based on the target coupled control effectiveness capability.

[0078] In another possible implementation, when multiple grid blocks in the target area are located within the working influence radius of two industrial air conditioners, the degree to which the scene demand is met by the grid blocks is affected by the two industrial air conditioners, and it is necessary to correct the control situation of one industrial air conditioner in combination with the control situation of the grid blocks by another industrial air conditioner.

[0079] Optionally, a target grid block in the first grid block set that is simultaneously within the working influence radius of the first industrial air conditioner and the second industrial air conditioner is extracted. The target grid block refers to any grid block in the first grid block set that is simultaneously present in the second grid block set of the second industrial air conditioner. The second grid block set is a plurality of grid blocks in the target area that can be controlled and affected by the second industrial air conditioner.

[0080] The target simulation information is obtained by extracting the first simulation record according to the position of the target grid block, wherein the target simulation information is the control situation of the first industrial air conditioner on the target grid block under the first control decision, including the target simulation temperature, target simulation humidity, target simulation air quality and target simulation noise. The target scene requirements of the target grid block are collected, and the fitness of the target scene requirements and the target simulation information is calculated using the decision fitness analysis function to obtain the target fitness. The target fitness is used as the control effectiveness of the target grid block.

[0081] Based on the same acquisition principle as the first regulation, the target scenario requirements of the target grid block are analyzed by using the regulation decision network layer to generate a second regulation decision. The working condition of the second industrial air conditioner is simulated according to the second regulation decision, and the target coupling regulation effectiveness of the target grid block is obtained by the second regulation decision according to the same acquisition principle as the regulation effectiveness of the target grid block. The regulation effectiveness is corrected using the target coupling regulation effectiveness, and optionally, the environmental conditions of the target grid block under the influence of the simultaneous regulation of the first industrial air conditioner and the second industrial air conditioner are determined according to the target coupling regulation effectiveness.

[0082] S800: If the first target fitness meets a predetermined fitness threshold, the first control decision is used as a first target control scheme of the first industrial air conditioner.

[0083] In one possible embodiment, it is determined whether the first target fitness is less than the predetermined fitness threshold. If so, the first target fitness satisfies the preset fitness threshold. The predetermined fitness threshold is the maximum difference between the scene requirements of multiple grid blocks in the target area pre-set by a technician in the field and the environmental conditions that can be achieved after the industrial air conditioner is regulated. At this time, the first regulation decision is used as the first target regulation scheme of the first industrial air conditioner. The goal of fine-tuning and reliable regulation and optimization of industrial air conditioners according to the scene requirements of the target area is achieved.

[0084] In summary, the embodiments of the present application have at least the following technical effects:

[0085] This application achieves the goal of improving the efficiency of industrial air conditioning control by constructing a target industrial air conditioning Internet of Things, then gridding the target area to obtain a target grid block set, paving the way for subsequent refined industrial air conditioning control, and then matching the first grid block set corresponding to the first industrial air conditioner in the target industrial air conditioning Internet of Things in multiple grid blocks, taking the first scene demand obtained by multi-dimensional feature collection of the first grid block as the optimization target, generating a first control decision, using the decision fitness analysis function to perform fitness analysis on the first control decision, and then collecting the second scene demand of the second grid block, correcting the first fitness according to the control efficiency of the first control decision on the second scene demand, and obtaining the first target fitness, if the first target fitness meets the predetermined fitness threshold, the first control decision is used as the first target control scheme for the first industrial air conditioner. The technical effect of making control decisions on industrial air conditioners according to scene requirements and improving control reliability is achieved.

[0086] Embodiment 2

[0087] Based on the same inventive concept as the industrial air conditioning control optimization method based on scene requirements in the aforementioned embodiment, Figure 2 As shown, the present application provides an industrial air conditioning control optimization system based on scene requirements, and the system and method embodiments in the embodiments of the present application are based on the same inventive concept. The system includes:

[0088] An Internet of Things construction module 11 is used to construct a target industrial air-conditioning Internet of Things, where the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area;

[0089] A grid block set obtaining module 12 is used to perform grid division on the target area to obtain a target grid block set, wherein the target grid block set includes a plurality of grid blocks;

[0090] A first grid block set matching module 13 is used to match a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks;

[0091] A first control decision generating module 14 is configured to generate a first control decision by taking a first scene requirement obtained by performing multi-dimensional feature collection on a first grid block as an optimization target, wherein the first grid block is any grid block in the first grid block set;

[0092] A first fitness obtaining module 15 is used to introduce a decision fitness analysis function to perform fitness analysis on the first control decision to obtain a first fitness;

[0093] A second scene requirement acquisition module 16, configured to acquire a second scene requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block;

[0094] A first target fitness obtaining module 17, configured to correct the first fitness based on the control effectiveness of the first control decision on the second scene requirement to obtain a first target fitness;

[0095] The first target control scheme obtaining module 18 is configured to use the first control decision as a first target control scheme for the first industrial air conditioner if the first target fitness meets a predetermined fitness threshold.

[0096] Furthermore, the first grid block set matching module 13 is used to perform the following steps:

[0097] Obtaining a first layout position of the first industrial air conditioner based on the target industrial air conditioner Internet of Things;

[0098] Obtaining any grid block from the plurality of grid blocks, and collecting the coordinate position of the any grid block;

[0099] If a first spatial distance between the coordinate position and the first layout position reaches a predetermined distance threshold, the arbitrary grid block corresponding to the coordinate position is added to the first grid block set.

[0100] Furthermore, the first scenario requirement includes a demand target and a weight coefficient of a predetermined dimension, and the predetermined dimension includes ambient temperature, ambient humidity, air quality, and ambient noise.

[0101] Furthermore, the first fitness obtaining module 15 is used to perform the following steps:

[0102] Simulating the first control decision to obtain a first simulation record, wherein the first simulation record is first simulation information of a first position, wherein the first position refers to a position of the first grid block, and the first simulation information includes a first simulation temperature, a first simulation humidity, a first simulation air quality, and a first simulation noise;

[0103] The decision fitness analysis function analyzes the first simulated temperature, the first simulated humidity, the first simulated air quality, and the first simulated noise in combination with the first scenario requirement to obtain the first fitness.

[0104] Furthermore, the expression of the decision fitness analysis function is as follows:

[0105] ;

[0106] in, Characterizing the First Regulatory Decision The first fitness, and and and respectively characterize the environmental temperature requirement target, environmental humidity requirement target, air quality requirement target and environmental noise requirement target in the first scenario requirement, and and and respectively characterize the first simulated temperature, the first simulated humidity, the first simulated air quality and the first simulated noise, and and and Characterize the ambient temperature weight coefficient, ambient humidity weight coefficient, air quality weight coefficient and ambient noise weight coefficient in the first scenario requirement, and .

[0107] Furthermore, the first target fitness obtaining module 17 is used to perform the following steps:

[0108] Extracting second simulation information from the first simulation record, where the second simulation information refers to simulation information of the first control decision on a second position corresponding to the second grid block;

[0109] The second simulation information and the second scenario requirement are combined to obtain a second fitness, and the second fitness is used as the control efficiency.

[0110] Furthermore, the first target fitness obtaining module 17 is used to perform the following steps:

[0111] Extracting a target grid block from the first grid block set, wherein the target grid block refers to any grid block in the first grid block set that is also present in the second grid block set of the second industrial air conditioner;

[0112] Obtaining a second control decision of the second industrial air conditioner, and analyzing to obtain the target coupling control effectiveness of the second control decision on the target grid block;

[0113] The control effectiveness capability is corrected based on the target coupled control effectiveness capability.

[0114] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0115] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

[0116] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. Optimization method of industrial air conditioning control based on scenario requirements, It is characterized in that include: Constructing a target industrial air-conditioning Internet of Things, wherein the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area; Gridding the target area to obtain a target grid block set, wherein the target grid block set includes a plurality of grid blocks; Matching a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks; A first scene requirement obtained by performing multi-dimensional feature collection on a first grid block is used as an optimization target to generate a first control decision, wherein the first grid block is any grid block in the first grid block set; Introducing a decision fitness analysis function to perform fitness analysis on the first regulation decision to obtain a first fitness; Acquire a second scenario requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block; Correcting the first fitness based on the regulation effectiveness of the first regulation decision on the second scene requirement to obtain a first target fitness; If the first target fitness meets a predetermined fitness threshold, taking the first control decision as a first target control scheme for the first industrial air conditioner; The first scenario requirement includes a requirement target and a weight coefficient of a predetermined dimension, and the predetermined dimension includes ambient temperature, ambient humidity, air quality, and ambient noise; In which, introducing a decision fitness analysis function to perform fitness analysis on the first regulation decision to obtain a first fitness includes: Simulating the first control decision to obtain a first simulation record, wherein the first simulation record is first simulation information of a first position, wherein the first position refers to a position of the first grid block, and the first simulation information includes a first simulation temperature, a first simulation humidity, a first simulation air quality, and a first simulation noise; The decision fitness analysis function analyzes the first simulated temperature, the first simulated humidity, the first simulated air quality, and the first simulated noise in combination with the first scenario requirement to obtain the first fitness; The expression of the decision fitness analysis function is as follows: ; in, Characterizing the First Regulatory Decision The first fitness, and and and respectively characterize the environmental temperature requirement target, environmental humidity requirement target, air quality requirement target and environmental noise requirement target in the first scenario requirement, and and and respectively characterize the first simulated temperature, the first simulated humidity, the first simulated air quality and the first simulated noise, and and and Characterize the ambient temperature weight coefficient, ambient humidity weight coefficient, air quality weight coefficient and ambient noise weight coefficient in the first scenario requirement, and ; The first fitness is corrected based on the control effectiveness of the first control decision on the second scene requirement, including: Extracting second simulation information from the first simulation record, where the second simulation information refers to simulation information of the first control decision on a second position corresponding to the second grid block; Combining the second simulation information with the second scenario requirement to obtain a second fitness, and using the second fitness as the control efficiency; Wherein, using the second fitness as the control efficiency also includes: Extracting a target grid block from the first grid block set, wherein the target grid block refers to any grid block in the first grid block set that is also present in the second grid block set of the second industrial air conditioner; Obtaining a second control decision of the second industrial air conditioner, and analyzing to obtain the target coupling control effectiveness of the second control decision on the target grid block; The control effectiveness capability is corrected based on the target coupled control effectiveness capability.

2. According to the industrial air conditioning control optimization method based on scene requirements according to claim 1, It is characterized in that Matching a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks includes: Obtaining a first layout position of the first industrial air conditioner based on the target industrial air conditioner Internet of Things; Obtaining any grid block from the plurality of grid blocks, and collecting the coordinate position of the any grid block; If a first spatial distance between the coordinate position and the first layout position reaches a predetermined distance threshold, the arbitrary grid block corresponding to the coordinate position is added to the first grid block set.

3. Industrial air conditioning control optimization system based on scenario requirements, It is characterized in that For executing the method according to any one of claims 1 to 2, the system comprises: An Internet of Things building module, used to build a target industrial air-conditioning Internet of Things, where the target industrial air-conditioning Internet of Things refers to the Internet of Things of multiple industrial air-conditioning distributed in a target area; A grid block set obtaining module, used for performing grid division on the target area to obtain a target grid block set, wherein the target grid block set includes a plurality of grid blocks; A first grid block set matching module is used to match a first grid block set corresponding to a first industrial air conditioner in the target industrial air conditioner Internet of Things among the multiple grid blocks; A first control decision generating module, configured to generate a first control decision by taking a first scene requirement obtained by performing multi-dimensional feature collection on a first grid block as an optimization target, wherein the first grid block is any grid block in the first grid block set; A first fitness obtaining module, used for introducing a decision fitness analysis function to perform fitness analysis on the first regulation decision to obtain a first fitness; A second scene requirement acquisition module, configured to acquire a second scene requirement of a second grid block, wherein the second grid block is any grid block in the first grid block set that is different from the first grid block; A first target fitness obtaining module, configured to correct the first fitness based on the control effectiveness of the first control decision on the second scene requirement to obtain a first target fitness; The first target control scheme obtaining module is used to use the first control decision as the first target control scheme of the first industrial air conditioner if the first target fitness meets a predetermined fitness threshold.