A cable formation test simulation experiment device and method
The cable formation test simulation device addresses pressure recovery simulation challenges in low permeability reservoirs by employing a multi-component system with controlled fluid injection and pressure measurement, facilitating accurate probe and speed selection for enhanced testing accuracy.
Patent Information
- Application Number
- CN202411133337.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-19
AI Technical Summary
Existing cable formation testing technologies struggle to accurately simulate pressure recovery in low permeability reservoirs with solid phase contamination, leading to confusion between low permeability reservoirs and dense layers, affecting reservoir evaluation and development.
A cable formation test simulation experimental device and method that includes a fluid injection module, full-diameter core module, pressure measurement sampling module, and data acquisition module, with a core holder containing sequential original and contaminated formation cores, plugs with varying outlet diameters, and controlled pressure and fluid injection systems to simulate different test conditions.
The device effectively simulates pressure recovery in low permeability reservoirs with solid phase contamination, enabling the selection of optimal probe sizes and pressure measurement speeds for accurate testing, ensuring ≥99% pressure recovery within 15 seconds and 10 minutes, thereby guiding actual cable formation tests.
Smart Images

Figure CN118671308B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of well logging, and in particular relates to a cable formation test simulation experimental device and method. Background Art
[0002] Cable formation testing technology originated in the 1950s. It is a new technology for directly, quickly and accurately judging the properties of formation fluids and studying reservoirs and oil and gas reservoirs. It can solve some problems such as fluid properties and oil-water interface that are difficult to accurately explain with conventional logging data. At the same time, it can also obtain reservoir fluid, formation pressure and other information in a timely, fast and accurate manner.
[0003] Cable formation testing obtains formation seepage characterization parameters by dynamically pumping formation fluid. The pressure at the test point with good reservoir properties can quickly reach stability after pumping. In test points with poor reservoir properties, especially in low-permeability reservoirs with solid phase contamination, fluid flow is difficult, and a large pressure drop is required to pump the formation fluid. In addition, the pressure propagation speed is very slow, and it is difficult for pressure recovery to produce steady-state flow. If the pre-test pressure drop is not enough, the pressure recovery will be too small or even no pressure recovery. That is, in low-permeability reservoirs with solid phase contamination, only under appropriate pressure measurement conditions can the measurement point achieve a good pressure recovery.
[0004] The tight layer is a type of rock formation with a lower permeability than the low permeability reservoir. The biggest characteristics of the tight layer during cable formation testing are: 1) The reservoir pump cannot pump out fluid or can only pump out a small amount of fluid. At this time, the flow rate at the measuring point will be very low, or the pressure at the measuring point will be much lower than the test pressure at the adjacent point. 2) After the pumping is completed, there is no pressure supply from the periphery, resulting in a very slow pressure recovery at the measuring point, or a very small pressure recovery at the end. That is, due to the limitations of the reservoir's own properties, no matter what the pressure measurement conditions are, the measuring point of the tight layer cannot achieve a suitable pressure recovery degree.
[0005] In the actual cable formation testing process, the mine pressure measurement and extraction process generally does not exceed 15 seconds, and the pressure recovery process generally does not exceed 10 minutes. In the cable formation testing process of low permeability reservoirs with solid phase contamination, if the appropriate pressure measurement conditions are not selected, that is, the appropriate probe size and pressure measurement parameters are not selected, it is very easy to confuse the pressure response characteristics of low permeability reservoirs with solid phase contamination and dense layers, affecting the reservoir effectiveness evaluation and being unfavorable to subsequent reservoir development work.
[0006] Patent document with publication number CN1670533A discloses a formation tester simulation device, which can perform three-dimensional physical simulation of the entire formation test process. However, for low permeability reservoirs with solid phase contamination, the simulation device cannot well simulate the pressure recovery under different test conditions.
[0007] Based on this, there is an urgent need for a cable formation testing simulation experimental device and method to simulate the pressure recovery of low permeability reservoirs with solid contamination under different test conditions, so as to provide theoretical guidance for actual cable formation testing work. Summary of the invention
[0008] The present invention provides a cable formation test simulation experimental device and method, which are used to simulate the pressure recovery of a low permeability reservoir with solid phase contamination under different test conditions, so as to provide theoretical guidance for actual cable formation test work.
[0009] In order to facilitate a clearer understanding of the technical solution of the present invention, the meaning and properties of the low permeability reservoir with solid phase contamination are first explained: in the mining process, mud is a widely used drilling fluid. Due to the filtering effect of the formation, the mud filtrate will enter the permeable layer, causing the flowable formation water to be easily contaminated and replaced by the mud filtrate, and the solid particles in the mud will adhere to the well wall to form a mud cake, resulting in a decrease in the formation permeability. The area contaminated by the mud is usually called a contaminated formation. The permeability of the contaminated formation is generally below 1mD. The formation around the contaminated formation that has not been invaded by the mud filtrate is usually called an uninvaded part or an original formation. The permeability of the original formation is generally below 5mD. The area composed of the contaminated formation and the original formation around it is called a low permeability reservoir with solid phase contamination.
[0010] Based on this, the present invention specifically adopts the following technical solutions:
[0011] A cable formation test simulation experimental device includes a fluid injection module, a full-diameter core module, a pressure measurement sampling module and a data acquisition and processing module.
[0012] The full-diameter core module includes a core holder, a full-diameter core to be simulated arranged in the core holder, a confining pressure control assembly and a plurality of plugs. A confining pressure cavity is arranged between the inner wall of the core holder and the full-diameter core, and the confining pressure control assembly is connected to the confining pressure cavity. The full-diameter core includes an original formation core and a contaminated formation core arranged in sequence along the axial direction of the core holder. The original formation core is connected to the fluid injection module through a liquid inlet pipe, and the contaminated formation core is connected to the pressure measurement sampling module through a liquid outlet pipe. The plug is detachably arranged between the contaminated formation core and the liquid outlet pipe, and a water outlet hole is arranged in the middle of the plug, and the water outlet holes of the plurality of plugs have different diameters. The plug is used to simulate the probe in the cable formation test, and the plugs with different water outlet hole diameters can simulate probes of different sizes.
[0013] The fluid injection module comprises a constant speed and constant pressure pump I and an intermediate container, wherein a simulated fluid is arranged in the intermediate container, wherein the intermediate container is connected between the constant speed and constant pressure pump I and a liquid inlet pipe, wherein a first injection valve is arranged between the intermediate container and the constant speed and constant pressure pump I, and wherein a second injection valve is arranged between the intermediate container and the liquid inlet pipe;
[0014] The pressure measurement sampling module includes a sampler, an emptying tank and a constant speed and pressure pump II. The sampler and the emptying tank are both connected between the constant speed and pressure pump II and a liquid outlet pipe. A first sampling valve is provided between the sampler and the liquid outlet pipe, a second sampling valve is provided between the sampler and the constant speed and pressure pump II, a first emptying valve is provided between the emptying tank and the liquid outlet pipe, and a second emptying valve is provided between the emptying tank and the constant speed and pressure pump II.
[0015] The liquid outlet pipe is also connected to a liquid outlet valve;
[0016] The data acquisition and processing module is connected with the constant speed and constant pressure pump II signal.
[0017] Furthermore, the length of the liquid outlet pipe is ≤5 cm. In low permeability storage with solid phase contamination, the afterflow effect has a greater impact on the cable test results. The present invention greatly reduces the impact of the afterflow effect on the experimental results by setting the length of the liquid outlet pipe to ≤5 cm.
[0018] Furthermore, the intermediate container includes an intermediate container I, an intermediate container II and an intermediate container III, the simulated fluid in the intermediate container I is crude oil, the simulated fluid in the intermediate container II is natural gas, and the simulated fluid in the intermediate container III is drilling fluid. The first injection valve includes a first injection valve I, a first injection valve II and a first injection valve III. The second injection valve includes a second injection valve I, a second injection valve II and a second injection valve III. The first injection valve I is arranged between the intermediate container I and the constant speed and pressure pump I, the first injection valve II is arranged between the intermediate container II and the constant speed and pressure pump I, the first injection valve III is arranged between the intermediate container III and the constant speed and pressure pump I, the second injection valve I is arranged between the intermediate container I and the liquid inlet pipe, the second injection valve II is arranged between the intermediate container II and the liquid inlet pipe, and the second injection valve III is arranged between the intermediate container III and the liquid inlet pipe.
[0019] The sampler includes sampler I, sampler II and sampler III, the first sampling valve includes first sampling valve I, first sampling valve II and first sampling valve III, the second sampling valve includes second sampling valve I, second sampling valve II and second sampling valve III, the first sampling valve I is arranged between sampler I and the liquid outlet pipe, the first sampling valve II is arranged between sampler II and the liquid outlet pipe, the first sampling valve III is arranged between sampler III and the liquid outlet pipe, the second sampling valve I is arranged between sampler I and constant speed and pressure pump II, the second sampling valve II is arranged between sampler II and constant speed and pressure pump II, and the second sampling valve III is arranged between sampler III and constant speed and pressure pump II.
[0020] Furthermore, the volume of the intermediate container is ≥1500cc, which can better simulate the infinite formation stability pressure, and the volume of the sampler is ≤20cc, which can effectively reduce the influence of the fluid volume expansion coefficient on the pressure measurement experiment.
[0021] Furthermore, sealing covers are provided at both ends of the core holder, and a groove with a through hole is provided on the sealing cover close to the contaminated formation core, and the plug is clamped in the groove.
[0022] Furthermore, the diameters of the plurality of plugs range from 3 to 20 mm.
[0023] Furthermore, the confining pressure control assembly includes a water injection system, a heater and a confining pressure gauge, and the water injection system, the heater and the confining pressure gauge are all connected to the confining pressure chamber.
[0024] The present invention also discloses a cable formation test simulation experimental method, comprising the following steps:
[0025] S1. Load the full-diameter core to be simulated into the core holder, set the core holder vertically so that the original formation core is located below the contaminated formation core, and connect the plug between the contaminated formation core and the liquid outlet pipe;
[0026] S2, opening the first injection valve, the second injection valve, the liquid outlet valve and the constant speed and pressure pump I, and using the fluid injection module to displace the simulated fluid into the full-diameter core;
[0027] Specifically, the first injection valve and the second injection valve corresponding to the intermediate container containing the simulated fluid to be injected are opened, and the liquid outlet valve is opened. At this time, all valves on the pressure measurement sampling module are closed, and the constant speed and constant pressure pump I is opened to drive the simulated fluid in the intermediate container into the core at a constant speed. When the liquid outlet valve is stable, the liquid outlet valve and the constant speed and constant pressure pump I are closed;
[0028] S3, using the confining pressure control assembly to control the temperature and pressure in the confining pressure chamber to simulate the environmental conditions of the full-diameter core;
[0029] Specifically, water is injected into the confining pressure chamber using a water injection system. When the pressure displayed by the confining pressure gauge is equal to the actual confining pressure of the full-diameter core to be simulated, the water injection is stopped, and the heater is turned on to heat the confining pressure chamber until the temperature reaches the actual ambient temperature of the full-diameter core.
[0030] S4, opening the first drain valve and the second drain valve, and simultaneously pressurizing the full-diameter core through the constant speed and pressure pump I and the constant speed and pressure pump II to simulate the formation pressure of the full-diameter core;
[0031] Specifically, the constant speed and constant pressure pump I and the constant speed and constant pressure pump II simultaneously and slowly inject pressure into the full-diameter core, increasing the pressure by 3-8 MPa each time, until the pressures at both ends are synchronized and stable, and then increasing the pressure again until the formation pressure of the full-diameter core to be simulated is reached, which is counted as the initial pressure;
[0032] S5. Keep the pump pressure of the constant speed and constant pressure pump I unchanged, use the constant speed and constant pressure pump II to pump the simulated fluid in the full-diameter core at a constant speed, and initially pump out the fluid into the drain tank. After the flow rate of the pumped simulated fluid is stable, close the first drain valve and the second drain valve, open the first sampling valve and the second sampling valve, pump the fluid into the sampler, continue pumping for N seconds, and then close the constant speed and constant pressure pump II. At this time, the pressure value of the pressure measurement and extraction module is the lowest pressure value, and wait for the pressure of the pressure measurement and extraction module to recover to a stable state. The stable state means that the pressure value does not change within 2 minutes. The pressure of the constant speed and constant pressure pump II can be monitored to characterize the pressure of the pressure measurement and extraction module. At this time, the data acquisition and processing module collects the real-time pressure of the pressure measurement and extraction module, and generates a pressure change curve of the pressure measurement and extraction module with the pressure recovery time, where N≤15S;
[0033] S6, changing the pumping time and / or the pressure measurement and extraction speed, and repeating steps S2 to S5;
[0034] S7. Replace the plug and repeat steps S1 to S6 to simulate the relationship between the plug’s water outlet diameter, pressure measurement extraction speed, pumping time and pressure recovery time, and select the pressure measurement extraction speed and its corresponding plug’s water outlet diameter that can make the pressure recovery degree ≥99% under the conditions of pumping time ≤15S and pressure recovery time ≤10min, where pressure recovery degree = (stable pressure value - minimum pressure value) / (initial pressure value - minimum pressure value) * 100%.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] The present invention can better simulate low permeability reservoirs with solid phase contamination by sequentially arranging the original formation core and the contaminated formation core along the axial direction of the core holder, connecting the original formation core to the fluid injection module, and connecting the contaminated formation core to the pressure measurement sampling module. The fluid injection module can sequentially displace simulated fluid into the original formation core and the contaminated formation core to ensure full saturation of the full diameter core.
[0037] In the cable formation test of low permeability reservoirs with solid phase contamination, the size of the probe and the pressure measurement extraction speed have a great influence on the pressure recovery degree of the measuring point. The present invention can simulate the influence of probes of different sizes on the pressure recovery degree of the measuring point by setting "a detachable plug is set between the contaminated formation core and the liquid outlet pipe, and the number of plugs is multiple, and the outlet hole diameters of the multiple plugs are different", so as to select a probe suitable for the full-diameter core cable formation test to be simulated. At the same time, the pressure measurement sampling module of the present invention can also simulate the influence of different pressure measurement extraction speeds on the pressure recovery degree of the measuring point. Therefore, the simulation experimental device and method of the present invention can screen out the pressure measurement extraction speed and probe size that can make the pressure recovery degree of the low permeability reservoir with solid phase contamination ≥99% under the conditions of pumping time ≤15S and pressure recovery time ≤10min, which is used to guide the actual cable formation test work of low permeability storage with solid phase contamination, and can also avoid confusing the pressure response characteristics of low permeability reservoirs and dense layers with solid phase contamination. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 This is a schematic diagram of the structure of a cable formation test simulation experimental device according to Example 1 of the present invention;
[0039] Figure 2 This is a schematic structural diagram of a plug according to Embodiment 1 of the present invention;
[0040] Figure 3 This is a schematic structural diagram of another plug according to Embodiment 1 of the present invention;
[0041] Figure 4 This is a schematic structural diagram of another plug according to Embodiment 1 of the present invention;
[0042] Figure 5 This is a curve showing the change of pressure of the pressure measuring and extraction module with the pressure recovery time under the conditions of the full-diameter core to be simulated in Example 2 of the present invention, with the water outlet diameter of the plug being 10 mm, the pumping speed being 10 CC / min, and the pumping time being 10 s.
[0043] Among them, 1-data acquisition and processing module, 2-core clamp, 3-plug, 301-water outlet, 4-original formation core, 5-contaminated formation core, 6-liquid inlet pipe, 7-liquid outlet pipe, 8-constant speed and pressure pump I, 9-emptying tank, 10-constant speed and pressure pump II, 11-first emptying valve, 12-second emptying valve, 13-liquid outlet valve, 14-intermediate container I, 15-intermediate container II, 16-intermediate container III, 17-first injection valve I , 18-first injection valve II, 19-first injection valve III, 20-second injection valve I, 21-second injection valve II, 22-second injection valve III, 23-sampler I, 24-sampler II, 25-sampler III, 26-first sampling valve I, 27-first sampling valve II, 28-first sampling valve III, 29-second sampling valve I, 30-second sampling valve II, 31-second sampling valve III, 32-heater, 33-confining pressure gauge. DETAILED DESCRIPTION
[0044] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings.
[0045] Example 1
[0046] like Figures 1 to 4 As shown, this embodiment discloses a cable formation test simulation experimental device, including a fluid injection module, a full-diameter core module, a pressure measurement sampling module and a data acquisition and processing module 1.
[0047] The full-diameter core module comprises a core holder 2 , a full-diameter core to be simulated arranged in the core holder 2 , a confining pressure control assembly and a plurality of plugs 3 .
[0048] A confining pressure chamber is provided between the inner wall of the core holder 2 and the full-diameter core. The confining pressure control assembly includes a water injection system, a heater 32 and a confining pressure gauge 33. The water injection system, the heater 32 and the confining pressure gauge 33 are all connected to the confining pressure chamber to control the pressure and temperature of the confining pressure chamber to simulate the environmental conditions of the full-diameter core.
[0049] The full-diameter core includes an original formation core 4 and a contaminated formation core 5 sequentially arranged along the axial direction of the core holder 2. The original formation core 4 is connected to the fluid injection module through a liquid inlet pipe 6, and the contaminated formation core 5 is connected to the pressure measurement sampling module through a liquid outlet pipe 7. The length of the liquid outlet pipe 7 is ≤5 cm. Specifically, the original formation core 4 and the contaminated formation core 5 are arranged in a sealing rubber sleeve in the core holder 2, and one end of the sealing rubber sleeve is connected to the liquid inlet pipe 6, and the other end is connected to the liquid outlet pipe 7.
[0050] Sealing covers are provided at both ends of the core holder 2. A groove with a through hole is provided on the sealing cover close to the contaminated formation core 5. The plug 3 is detachably connected to the groove, such as by snapping. A water outlet 301 is provided in the middle of the plug 3. The water outlet holes 301 of the plugs 3 have different diameters. The diameter range of the water outlet holes 301 of the plugs 3 is 3-20 mm. Figures 2~4 Several plugs 3 with different water outlet diameters are shown. Figures 2~4 The diameters of the water outlet holes 301 of the plug 3 are 3 mm, 5 mm and 10 mm respectively, and the contaminated formation core 5 is connected to the liquid outlet pipe 7 through the plug 3. When the simulated fluid is pumped, the simulated fluid flows into the liquid outlet pipe 7 after passing through the plug 3. The plug 3 is used to simulate the probe of the cable formation test. By replacing the plug 3, the influence of probes of different sizes (diameters) on the pressure measurement results of the cable formation test can be simulated.
[0051] The fluid injection module includes a constant speed constant pressure pump I8 and intermediate containers I14, II15 and III16 filled with simulated fluids, wherein the simulated fluid in the intermediate container I14 is crude oil, the simulated fluid in the intermediate container II15 is natural gas, and the simulated fluid in the intermediate container III16 is drilling fluid. The volumes of the intermediate containers I14, II15 and III16 are all ≥1500cc, which can better simulate the infinite formation stable pressure.
[0052] The intermediate container I14, the intermediate container II15 and the intermediate container III16 are all arranged between the constant speed and constant pressure pump I8 and the liquid inlet pipe 6. A first injection valve I17 is provided between the intermediate container I14 and the constant speed and constant pressure pump I8, a first injection valve II18 is provided between the intermediate container II15 and the constant speed and constant pressure pump I8, a first injection valve III19 is provided between the intermediate container III16 and the constant speed and constant pressure pump I8, a second injection valve I20 is provided between the intermediate container I14 and the liquid inlet pipe 6, a second injection valve II21 is provided between the intermediate container II15 and the liquid inlet pipe 6, and a second injection valve III22 is provided between the intermediate container III16 and the liquid inlet pipe 6.
[0053] The pressure measurement sampling module includes an emptying tank 9, a constant speed and pressure pump II 10, a sampler I 23, a sampler II 24 and a sampler III 25. The volumes of the samplers I 23, II 24 and III 25 are all ≤20cc, which can effectively reduce the influence of the fluid volume expansion coefficient on the pressure measurement experiment.
[0054] The sampler I23, sampler II24, sampler III25 and emptying tank 9 are all connected between constant speed and constant pressure pump II10 and liquid outlet pipe 7, a first sampling valve I26 is provided between the sampler I23 and liquid outlet pipe 7, a first sampling valve II27 is provided between the sampler II24 and liquid outlet pipe 7, a first sampling valve III28 is provided between the sampler III25 and liquid outlet pipe 7, a second sampling valve I29 is provided between the sampler I23 and constant speed and constant pressure pump II10, a second sampling valve II30 is provided between the sampler II24 and constant speed and constant pressure pump II10, a second sampling valve III31 is provided between the sampler III25 and constant speed and constant pressure pump II10, a first emptying valve 11 is provided between the emptying tank 9 and liquid outlet pipe 7, and a second emptying valve 12 is provided between the emptying tank 9 and constant speed and constant pressure pump II10;
[0055] The liquid outlet pipe 7 is also connected to a liquid outlet valve 13;
[0056] The data acquisition and processing module 1 is signal-connected to the constant-speed and constant-pressure pump II 10 .
[0057] Example 2
[0058] This embodiment discloses a cable formation test simulation experimental method, which uses the cable formation test simulation device of embodiment 1. The cable formation test simulation experimental method comprises the following steps:
[0059] S1. Load the full-diameter core to be simulated into the core holder 2, and set the core holder 2 vertically so that the original formation core 4 is located below the contaminated formation core 5 (when testing, Figure 1 The core holder 2 is rotated counterclockwise by 90 degrees), and the plug 3 is connected between the contaminated formation core 5 and the liquid outlet pipe 7, and the water outlet hole diameter of the plug 3 is 10 mm;
[0060] S2. This embodiment simulates the process of displacing crude oil. Open the first injection valve I17, the second injection valve I20, and the liquid outlet valve 13, ensure that all valves on the pressure measurement sampling module are in a closed state, open the constant speed and constant pressure pump I8, and displace the simulated fluid in the intermediate container I14 into the full-diameter core at a constant speed. When the liquid outlet valve 13 is stable, close the liquid outlet valve 13 and the constant speed and constant pressure pump I8;
[0061] S3, inject water into the confining pressure chamber using the water injection system, stop injecting water when the pressure displayed by the confining pressure gauge 33 is the same as the actual confining pressure of the full-diameter core to be simulated, turn on the heater 32 to heat the confining pressure chamber until the temperature reaches the actual ambient temperature of the full-diameter core. In this embodiment, the actual confining pressure of the full-diameter core to be simulated is: 35MPa, and the actual ambient temperature is: 80°C.
[0062] S4. Open the first drain valve 11 and the second drain valve 12, and slowly and synchronously inject pressure into the full-diameter core through the constant speed and constant pressure pump I8 and the constant speed and constant pressure pump II10, pressurizing by 5 MPa each time until the pressures at both ends are synchronized and stable, and then pressurize again until the formation pressure of the full-diameter core to be simulated is reached, which is counted as the initial pressure; the formation pressure of the full-diameter core to be simulated in this embodiment is: 32 MPa.
[0063] S5. Keep the pump pressure of the constant speed and constant pressure pump Ⅰ8 unchanged, use the constant speed and constant pressure pump Ⅱ10 to pump the simulated fluid in the full-diameter core at a constant speed (pressure measurement extraction speed: 10CC / min), and initially pump out the fluid into the drain tank 9. After the flow rate of the pumped simulated fluid is stable, close the first drain valve 11 and the second drain valve 12, open the first sampling valve Ⅰ26 and the second sampling valve Ⅰ29, pump the fluid into the sampler Ⅰ23, continue pumping for 10 seconds and then close the constant speed and constant pressure pump Ⅱ10. At this time, the pressure value of the pressure measurement extraction module is the lowest pressure value, wait for the pressure of the pressure measurement extraction module to recover to a stable state, and the data acquisition and processing module 1 collects the real-time pressure of the pressure measurement extraction module (i.e., the pressure of the constant speed and constant pressure pump Ⅱ10), and generates a pressure change curve of the pressure measurement extraction module with the pressure recovery time, such as Figure 5 As shown;
[0064] S6, changing the pumping time and / or the pressure measurement extraction speed, repeating steps S2 to S5, and replacing the pressure measurement extraction speed with 3CC / min, 4CC / min, 5CC / min, 7CC / min, 8CC / min, and 9CC / min;
[0065] S7. Replace the plug 3 with one with a water outlet 301 of 3 mm or 5 mm in diameter, and repeat steps S1 to S6 in sequence, simulate the relationship between the water outlet diameter, pressure measurement extraction speed, pumping time and pressure recovery time of the test plug, and select the pressure measurement extraction speed and probe size that can make the pressure recovery degree ≥99% under the conditions of pumping time ≤15S and pressure recovery time ≤10min.
[0066] Under the conditions of pumping time ≤15S and pressure recovery time ≤10min selected in this embodiment, the pressure measurement extraction speed with a pressure recovery degree ≥99% can be 3~5CC / min, and the corresponding probe diameter is 10mm. In addition, the experiment found that under the same pressure measurement time and pressure measurement speed, the larger the probe size, the smaller the pressure drop and the shorter the pressure recovery time, indicating that a large probe size can effectively reduce the core seepage resistance and effectively avoid the pumping phenomenon, and is more suitable for low permeability reservoirs.
[0067] The experimental results of this embodiment can provide a theoretical reference for the selection of pressure measurement extraction speed and probe size in actual cable formation testing in the area where the full-diameter core to be simulated is located, thereby avoiding the adverse consequence of excessively small pressure drop and confusion with the pressure response characteristics of the dense layer due to unreasonable selection of pressure measurement extraction speed and probe size during actual mining.
Claims
1. A cable formation test simulation experimental device, characterized in that: It includes a fluid injection module, a full-diameter core module, a pressure measurement sampling module and a data acquisition and processing module (1). The full-diameter core module comprises a core holder (2), a full-diameter core to be simulated arranged in the core holder (2), a confining pressure control assembly and a plurality of plugs (3); a confining pressure cavity is arranged between the inner wall of the core holder (2) and the full-diameter core; the confining pressure control assembly is connected to the confining pressure cavity; the full-diameter core comprises an original formation core (4) and a contaminated formation core (5) arranged in sequence along the axial direction of the core holder (2); the original formation core (4) is connected to the fluid injection module via a liquid inlet pipe (6); the contaminated formation core (5) is connected to the pressure measurement sampling module via a liquid outlet pipe (7); the plug (3) is detachably arranged between the contaminated formation core (5) and the liquid outlet pipe (7); a water outlet hole (301) is arranged in the middle of the plug (3); and the water outlet holes (301) of the plurality of plugs (3) have different diameters; The fluid injection module comprises a constant speed and constant pressure pump I (8) and an intermediate container, wherein a simulated fluid is arranged in the intermediate container, wherein the intermediate container is connected between the constant speed and constant pressure pump I (8) and a liquid inlet pipe (6), wherein a first injection valve is arranged between the intermediate container and the constant speed and constant pressure pump I (8), and wherein a second injection valve is arranged between the intermediate container and the liquid inlet pipe (6); The pressure measurement sampling module comprises a sampler, an emptying tank (9) and a constant speed and constant pressure pump II (10); the sampler and the emptying tank (9) are both connected between the constant speed and constant pressure pump II (10) and a liquid outlet pipe (7); a first sampling valve is provided between the sampler and the liquid outlet pipe (7); a second sampling valve is provided between the sampler and the constant speed and constant pressure pump II (10); a first emptying valve (11) is provided between the emptying tank (9) and the liquid outlet pipe (7); and a second emptying valve (12) is provided between the emptying tank (9) and the constant speed and constant pressure pump II (10); The liquid outlet pipe (7) is also connected to a liquid outlet valve (13); The data acquisition and processing module (1) is signal-connected to the constant-speed and constant-pressure pump II (10); The length of the liquid outlet pipe (7) is ≤5 cm; The volume of the intermediate container is ≥1500cc, and the volume of the sampler is ≤20cc; The diameters of the plurality of plugs (3) range from 3 to 20 mm.
2. The cable formation test simulation experimental device according to claim 1 is characterized in that: The intermediate container comprises an intermediate container I (14), an intermediate container II (15) and an intermediate container III (16); the simulated fluid in the intermediate container I (14) is crude oil, the simulated fluid in the intermediate container II (15) is natural gas, and the simulated fluid in the intermediate container III (16) is drilling fluid; the first injection valve comprises a first injection valve I (17), a first injection valve II (18) and a first injection valve III (19); the second injection valve comprises a second injection valve I (20), a second injection valve II (21) and a second injection valve III (22); the first injection valve I (17) is between the intermediate container I (14) and the constant speed and constant pressure pump I (8), the first injection valve II (18) is disposed between the intermediate container II (15) and the constant speed and constant pressure pump I (8), the first injection valve III (19) is disposed between the intermediate container III (16) and the constant speed and constant pressure pump I (8), the second injection valve I (20) is disposed between the intermediate container I (14) and the liquid inlet pipe (6), the second injection valve II (21) is disposed between the intermediate container II (15) and the liquid inlet pipe (6), the second injection valve III (22) is disposed between the intermediate container III (16) and the liquid inlet pipe (6), The sampler comprises a sampler I (23), a sampler II (24) and a sampler III (25); the first sampling valve comprises a first sampling valve I (26), a first sampling valve II (27) and a first sampling valve III (28); the second sampling valve comprises a second sampling valve I (29), a second sampling valve II (30) and a second sampling valve III (31); the first sampling valve I (26) is arranged between the sampler I (23) and the liquid outlet pipe (7); the first sampling valve II (27) ) is arranged between the sampler II (24) and the liquid outlet pipe (7), the first sampling valve III (28) is arranged between the sampler III (25) and the liquid outlet pipe (7), the second sampling valve I (29) is arranged between the sampler I (23) and the constant speed and pressure pump II (10), the second sampling valve II (30) is arranged between the sampler II (24) and the constant speed and pressure pump II (10), and the second sampling valve III (31) is arranged between the sampler III (25) and the constant speed and pressure pump II (10).
3. The cable formation test simulation experimental device according to claim 1 is characterized in that: The core holder (2) is provided with sealing covers at both ends, and the sealing cover close to the contaminated formation core (5) is provided with a groove with a through hole, and the plug (3) is clamped in the groove.
4. The cable formation test simulation experimental device according to claim 1, characterized in that: The confining pressure control assembly comprises a water injection system, a heater (32) and a confining pressure gauge (33), and the water injection system, the heater (32) and the confining pressure gauge (33) are all connected to the confining pressure chamber.
5. A cable formation test simulation experiment method using the cable formation test simulation experiment device according to any one of claims 1 to 4, characterized in that: The steps include: S1. Load the full-diameter core to be simulated into the core holder (2), vertically arrange the core holder (2) so that the original formation core (4) is located below the contaminated formation core (5), and connect the plug (3) between the contaminated formation core (5) and the liquid outlet pipe (7); S2, opening the first injection valve, the second injection valve, the liquid outlet valve (13) and the constant speed and constant pressure pump I (8), using the fluid injection module to displace the simulated fluid into the full-diameter core, and when the liquid outlet valve (13) is stable, closing the liquid outlet valve (13) and the constant speed and constant pressure pump I (8); S3, using the confining pressure control assembly to control the temperature and pressure in the confining pressure chamber to simulate the environmental conditions of the full-diameter core; S4, opening the first drain valve (11) and the second drain valve (12), and simultaneously pressurizing the full-diameter core through the constant speed and pressure pump I (8) and the constant speed and pressure pump II (10) to simulate the formation pressure of the full-diameter core, which is calculated as the initial pressure; S5. Keep the pump pressure of the constant speed and constant pressure pump I (8) unchanged, use the constant speed and constant pressure pump II (10) to pump the simulated fluid in the full-diameter core at a constant speed, and after the flow rate of the pumped simulated fluid is stable, close the first drain valve (11) and the second drain valve (12), open the first sampling valve and the second sampling valve, continue pumping for N seconds, and then close the constant speed and constant pressure pump II (10). At this time, the pressure value of the pressure measurement and extraction module is the lowest pressure value, and wait for the pressure of the pressure measurement and extraction module to recover to a stable state. The stable state is that the pressure value does not change within 2 minutes. At this time, the data acquisition and processing module (1) collects the real-time pressure of the pressure measurement and extraction module, and generates a curve of the pressure change of the pressure measurement and extraction module with the pressure recovery time, where N≤15S; S6, changing the pumping time and / or the pressure measurement and extraction speed, and repeating steps S2 to S5; S7. Replace the plug (3), repeat steps S1 to S6, simulate the relationship between the water outlet diameter, pressure measurement extraction speed, pumping time and pressure recovery time of the test plug (3), and select the pressure measurement extraction speed and its corresponding water outlet diameter of the plug (3) that can make the pressure recovery degree ≥99% under the conditions of pumping time ≤15S and pressure recovery time ≤10min, where the pressure recovery degree = (pressure value in stable state - minimum pressure value) / (initial pressure value - minimum pressure value) * 100%.
