A foundation pit support device with detection function and construction method thereof
By using elastic material bag body and through-hole closure mechanism in the foundation pit support device, combined with pressure sensors and controllable valves, the problems of expansion and collapse of the drill hole are solved, and the full filling and infiltration of cement mortar is achieved, and the anchoring is improved. Structural strength and stability.
Patent Information
- Application Number
- CN202411155802.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-22
AI Technical Summary
During the anchor support process, the weak and broken rock and soil at the bottom of the drill hole leads to easy expansion, collapse and deformation when the cement mortar is injected, making it difficult to completely fill and penetrate to the bottom of the drill hole, affecting the formation of the anchor structure.
Design a foundation pit support device with detection function, and a bag body and through-hole closure mechanism made of elastic material. The injection and expansion of cement mortar is controlled through pressure sensors and controllable valves to ensure that the cement mortar is fully filled and penetrates into the drill. At the bottom of the hole, the fixing effect is enhanced by expansion.
The uniform filling and infiltration of cement mortar is achieved, forming a solid and tight anchoring structure, simplifying the electrical structure, suitable for drilling holes with narrow space, and improving the shear strength and viscosity of anchoring.
Smart Images

Figure CN118686198B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of foundation pit supporting devices, and in particular to a foundation pit supporting device with a detection function and a construction method thereof. Background Art
[0002] Foundation pit support is to reinforce the tunnel surrounding rock through supporting tools, so that it has a higher bearing capacity, and interact with the bedrock in the corresponding range to form a joint solid, which can not only resist the deformation of the tunnel surrounding rock, but also greatly improve the strength of the surrounding rock. Anchor support is a type of foundation pit support. Anchor support plays a role by supporting the surface surrounding rock and reinforcing the internal surrounding rock. The surface support is mainly manifested in improving the stress state of the surrounding rock by installing anchors, so that the radial compressive strength of the surrounding rock is improved; the internal reinforcement is mainly manifested in the shear strength of the anchor itself far exceeding that of the surrounding rock. At the same time, the friction resistance generated by the mutual action enhances the cohesion of the anchor body, thereby improving the shear strength of the anchor body.
[0003] Anchor support generally involves placing a rod body in a borehole in the surrounding rock, and then injecting cement mortar into the borehole to solidify the cement mortar, rod body, and borehole wall together to form a support structure. However, when the rock and soil at the bottom of the borehole are soft and broken, the bottom of the borehole is prone to expansion, collapse, and deformation during the process of injecting cement mortar into the borehole. When injecting cement mortar into the borehole, the grouting pipe is generally withdrawn outward along the bottom of the anchor rod at a uniform speed while outputting cement mortar. If expansion, collapse, or deformation occurs at the bottom of the borehole, the operator cannot know whether the cement mortar is completely filled in the space where expansion, collapse, or deformation occurs. Also, after the cement mortar is injected into the bottom of the borehole, it is difficult for it to penetrate into the space around the borehole and cover the bottom of the anchor support, so that the formed anchoring structure cannot meet the requirements.
[0004] In view of the above problems existing in the prior art, the purpose of the present invention is to design a foundation pit support device with detection function and a construction method thereof. Summary of the invention
[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a foundation pit supporting device with a detection function and a construction method thereof, which can effectively solve at least one problem existing in the above-mentioned prior art.
[0006] The technical solution of the present invention is:
[0007] A foundation pit supporting device with a detection function, comprising:
[0008] Rod body;
[0009] The bag body is a straight cylindrical structure, the bottom and top of the bag body are respectively fixedly connected to the bottom of the rod body, a plurality of through holes are arranged on the side of the bag body, a grouting hole is arranged on the top of the bag body, and the bag body is made of elastic material;
[0010] A grouting pipe, passing through the grouting hole and extending into the bag body, wherein the grouting pipe is provided with a controllable valve;
[0011] A through hole closing mechanism is arranged at each through hole, the through hole closing mechanism comprises a circular connecting seat, a blocking block is fixedly arranged at the center of the connecting seat, a circle of first bladders is arranged in the inner circle of the connecting seat, the first bladders are inflated and fit the blocking blocks to block the through holes, and the first bladders are deflated and move away from the blocking blocks to open the through holes, and the first bladders are connected to the inflation device;
[0012] A clamping mechanism is arranged on the side of the bag body;
[0013] A pressure sensor is disposed in the bag body;
[0014] A control system is connected to the pressure sensor, the controllable valve and the inflation device, and is used to: control the inflation device to deflate the first bladder before the data of the pressure sensor reaches a first preset threshold value, so that the cement mortar input into the bag body by the grouting pipe flows to the outside of the bag body through the through hole; and control the inflation device to inflate the first bladder when the data of the pressure sensor reaches a first preset threshold value, so that the cement mortar input into the bag body by the grouting pipe causes the bag body to expand, and the clamping mechanism is inserted into the cement mortar outside the bag body.
[0015] Furthermore, the block is of a structure that is thick at the upper and lower ends and thin in the middle, and the first sac is of an annular structure. After the first sac is inflated, the aperture of the inner circle is reduced to cover the block.
[0016] Furthermore, the clamping mechanism includes a plurality of connecting ropes and clamping blocks, the connecting ropes are arranged along the axial direction of the bag body, the length of the connecting ropes is greater than the distance between the upper and lower ends of the bag body, and the clamping blocks are fixedly arranged on the connecting ropes.
[0017] Furthermore, the clamping block is triangular in shape.
[0018] Furthermore, a base is provided at one end of the clamping block close to the connecting rope, and the bag body expands to open the connecting rope, thereby driving the clamping block to move outward.
[0019] Furthermore, the rod body is fixedly provided with a pair of connection plates at its bottom end, and the bottom end and the top end of the bag body are fixedly connected to the connection plates respectively.
[0020] Furthermore, a second annular bladder is provided at the outer periphery of the connecting disk corresponding to the top end of the bag body, the second bladder is connected to the first bladder, and the second bladder blocks the space between the connecting disk and the corresponding drill hole after being inflated.
[0021] A construction method of a foundation pit supporting device with a detection function is further provided. Based on the foundation pit supporting device with a detection function, the construction method comprises the following steps:
[0022] S1, controlling the inflation device to deflate the first bladder, and injecting cement mortar into the bag body through the grouting pipe, so that the cement mortar is filled inside and outside the bag body, and continuing until the data of the pressure sensor reaches a first preset threshold;
[0023] S2, when the data of the pressure sensor reaches a first preset threshold, controlling the inflation device to inflate the first bag, allowing the grouting pipe to input cement mortar into the bag body to expand the bag body, and allowing the clamping mechanism to insert the cement mortar outside the bag body.
[0024] Furthermore, after S2, execute:
[0025] S3, when the data of the pressure sensor reaches a second preset threshold, control the inflation device to deflate the first bag; if the data of the pressure sensor is less than a third preset threshold, return to S1.
[0026] Furthermore, the first preset threshold is 1 MPa, the second preset threshold is 1.5 MPa, and the third preset threshold is 1.3 MPa.
[0027] Therefore, the present invention provides the following effects and / or advantages:
[0028] The present application can realize the closure or opening of the bag body by cooperating with the structure of the bag body through the through hole closing mechanism. With the pressure sensor, the cement mortar can be input into the space inside and outside the bag body when the bag body is opened, so that the cement mortar can be initially filled and infiltrated into the space at the bottom of the borehole, and then the through hole is closed to expand the bag body, and the expansion effect of the bag body is used to more evenly apply the outward expansion force to the cement mortar at the bottom of the borehole, so that the cement mortar can be fully filled and infiltrated into the space at the bottom of the borehole, forming a strict and tight structure. At the same time, with the clamping mechanism that can be stretched out of the outer periphery of the bag body, it can be inserted into the cement mortar or the side wall of the borehole, and cooperate to form an anchoring structure with a higher fixing effect.
[0029] The through-hole closing mechanism of the present application realizes the technical effect of closing or opening by controlling the first bag body, which can simplify the structure of the foundation pit support device and reduce the complex electrical structure, thereby realizing the control of the through-hole of the bag body in a narrow borehole.
[0030] The clamping mechanism of the present application includes a number of connecting ropes and clamping blocks. The connecting ropes can control the maximum expansion of the bag body to prevent the bag body from being damaged due to excessive expansion. At the same time, the clamping blocks connected by the connecting ropes can make the clamping blocks have swingable and twistable states when the bag body is not expanded, which is convenient for the foundation pit support device to enter the drill hole. At the same time, the clamping blocks can be controlled to stand up when needed, so as to be inserted into the cement mortar.
[0031] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description and the drawings.
[0032] It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the invention as claimed. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic structural diagram of an embodiment of the present invention.
[0034] Figure 2 for Figure 1 Top view of the .
[0035] Figure 3 for Figure 2 AA section view.
[0036] Figure 4 It is a schematic diagram of the structure of the through hole closing mechanism and the second capsule.
[0037] Figure 5 It is a schematic diagram of the deflated state of the first sac of the through hole closing mechanism.
[0038] Figure 6 It is a schematic diagram of the inflation state of the first sac of the through hole closing mechanism.
[0039] Figure 7 This is a schematic diagram of the status of the bag body, the drill hole, and the cement mortar after the step S1 is completed.
[0040] Figure 8 This is a schematic diagram of the status of the bag body, the drill hole, and the cement mortar after the step S2 is completed.
[0041] Description of reference numerals:
[0042] Rod body 1, connecting plate 101, bag body 2, through hole 201, through hole closing mechanism 4, connecting seat 401, blocking block 402, first bag body 403, clamping mechanism 5, connecting rope 501, clamping block 502, base 503, second bag body 6. DETAILED DESCRIPTION
[0043] In order to facilitate understanding by those skilled in the art, the structure of the present invention is further described in detail with reference to the embodiments in conjunction with the accompanying drawings:
[0044] refer to Figure 1-8 , a foundation pit supporting device with detection function, comprising:
[0045] Rod body 1;
[0046] The bag body 2 is a straight cylindrical structure. The bottom and top of the bag body 2 are respectively fixedly connected to the bottom of the rod body 1. The side of the bag body 2 is provided with a plurality of through holes 201. The top of the bag body 2 is provided with a grouting hole. The bag body 2 is made of an elastic material.
[0047] In this embodiment, the bag body 2 is made of elastic material, and has the characteristics of being soft, bendable, and expandable when the internal pressure increases.
[0048] A grouting pipe 3, passing through the grouting hole and extending into the bag body 2, wherein the grouting pipe 3 is provided with a controllable valve;
[0049] In this embodiment, the controllable valve is used to control the grouting pipe 3 to start or stop outputting cement mortar.
[0050] A through hole closing mechanism 4 is provided at each through hole 201, and the through hole closing mechanism 4 comprises a circular connecting seat 401, a blocking block 402 is fixedly provided at the center of the connecting seat 401, and a circle of first capsules 403 is provided in the inner circle of the connecting seat 401, and the first capsules 403 are inflated and fit the blocking block 402 to block the through hole 201, and the first capsules 403 are deflated and move away from the blocking block 402 to open the through hole 201, and the first capsules 403 are connected to the inflation device;
[0051] In this embodiment, the through hole 201 is a circular structure, the outer ring of the connecting seat 401 is fixedly arranged on the through hole 201, the upper and lower end surfaces of the blocking block 402 are also circular structures, the diameter of the blocking block 402 is smaller than the inner ring of the connecting seat 401, and the blocking block 402 can be fixedly connected to the inner ring of the connecting seat 401 by a connecting rod or other structure. When the first capsule 403 is deflated, the diameter of its inner ring is larger than the diameter of the blocking block 402, so that a certain space is left between the blocking block 402 and the first capsule 403. After the first capsule 403 is inflated, the first capsule 403 expands and increases in volume, so that it fits on the edge of the blocking block 402 and blocks the space around the blocking block 402.
[0052] When the first bladder 403 is deflated, the through hole 201 of the bag 2 is opened, and the cement mortar inside the bag 2 can flow out to fill the space between the bag 2 and the bottom of the drill hole. If the bottom of the drill hole expands, collapses, or deforms, the space between the bag 2 and the bottom of the drill hole becomes larger, and the cement mortar inside the bag 2 can flow out. When the first bladder 403 is inflated, the through hole of the bag 2 is closed, and the cement mortar inside the bag 2 is confined inside the bag 2, and the bag 2 receives the cement mortar and expands.
[0053] A clamping mechanism 5 is arranged on the side of the bag body 2;
[0054] In this embodiment, the bag body 2 is supported by an elastic material, so that when the clamping mechanism 5 enters the drill hole, the clamping mechanism 5 can squeeze the bag body 2 so that the center of the bag body 2 sinks, making it easier for the clamping mechanism 5 to enter the drill hole.
[0055] A pressure sensor (not shown), disposed in the bag body 2;
[0056] A control system is connected to the pressure sensor, the controllable valve and the inflation device, and is used to: before the data of the pressure sensor reaches a first preset threshold, control the inflation device to deflate the first bladder 403, so that the cement mortar input into the bag body 2 by the grouting pipe 3 flows to the outside of the bag body 2 through the through hole 201; when the data of the pressure sensor reaches a first preset threshold, control the inflation device to inflate the first bladder 403, so that the cement mortar input into the bag body by the grouting pipe 3 causes the bag body 2 to expand, and the clamping mechanism 5 is inserted into the cement mortar outside the bag body 2.
[0057] In this embodiment, a pressure sensor is provided in the bag body 2. At the beginning of loading cement mortar into the bag body 2, the through hole of the bag body 2 is controlled to be in an open state. Figure 7 At this time, the space inside the bag body 2 and the space at the bottom of the borehole are connected, and cement mortar is input into the space at the bottom of the borehole. If expansion occurs in the borehole, cement mortar can be continuously input into the space at the bottom of the borehole. When the cement mortar fills the space at the bottom of the borehole, the data of the pressure sensor reaches the first preset threshold value. Figure 8 Since the space at the bottom of the borehole is in a relatively loose condition, the space at the bottom of the borehole can still be expanded. At this time, the through hole 201 of the bag body 2 is closed and cement mortar is continuously input to expand the bag body 2. The bag body 2 expands and exerts pressure on the space at the bottom of the borehole, so that the cement mortar fully penetrates into the bottom of the borehole, and the loose area at the bottom of the borehole becomes tight. On the other hand, the clamping mechanism 5 can be driven to move around the bag body 2, so that it is inserted into the cement mortar outside the bag body 2 to form a better anchor body.
[0058] Furthermore, the block is a structure that is thick at the upper and lower ends and thin in the middle, and the first sac 403 is an annular structure. After the first sac 403 is inflated, the aperture of the inner circle is reduced to cover the block.
[0059] In this embodiment, the structure of the block can facilitate the first sac 403 to be connected to the concave shape in the middle of the block 402 after inflation. At the same time, the bottom and top surfaces of the block 402 are connected to the connecting seat through a connecting rod, and the connecting rod can limit the expansion direction of the first sac 403 after inflation.
[0060] Furthermore, the clamping mechanism 5 includes a plurality of connecting ropes 501 and clamping blocks 502 . The connecting ropes 501 are distributed along the axial direction of the bag body 2 . The length of the connecting ropes 501 is greater than the distance between the upper and lower ends of the bag body 2 . The clamping blocks 502 are fixedly arranged on the connecting ropes 501 .
[0061] Furthermore, the clamping block 502 is triangular in shape.
[0062] Furthermore, a base 503 is provided at one end of the clamping block 502 close to the connecting rope 501 , and after the bag body 2 expands, the connecting rope 501 is opened to drive the clamping block 502 to move outward.
[0063] In this embodiment, the triangular shape of the clamping block 502 can be easily inserted into the cement mortar or the inner wall of the drill hole after the clamping block 502 protrudes outward. When the bag body 2 is not expanded by the cement mortar, the bag body 2 maintains a cylindrical shape. After the bag body 2 is expanded by the cement mortar, the bag body 2 expands and expands to form a shape that bulges outward in the middle, thereby driving the clamping block 502 to move in all directions.
[0064] At the same time, a base 503 is provided at one end of the clamping block 502, and the base 503 can be a plate-shaped or arc-shaped shape that matches the bag body 2, so that when the bag body 2 expands, the clamping block 502 can be kept in the radial direction of the bag body 2 through the base 503 to prevent the clamping block 502 from collapsing.
[0065] In addition, a guide tube is provided on the side of the bag body 2 to limit several points of the connecting rope 501. The connecting rope 501 passes through the guide tube, and the connecting rope 501 can pass under the guidance of the guide tube. The guide tube can limit the shape of the connecting rope 501 after being stretched, preventing it from moving freely and being offset after being stretched by the bag body 2.
[0066] Furthermore, the rod body 1 is fixedly provided with a pair of connection disks 101 at the bottom end thereof, and the bottom end and the top end of the bag body 2 are fixedly connected to the connection disks 101 respectively.
[0067] Furthermore, a second annular capsule 6 is provided on the outer periphery of the connecting disk 101 corresponding to the top of the bag body 2. The second capsule 6 is connected to the first capsule 403. The second capsule 6 blocks the space between the connecting disk 101 and the corresponding drill hole after being inflated.
[0068] In this embodiment, the second bladder 6 is in a contracted state when not inflated, which can facilitate the entry of the foundation pit support device into the borehole. When the cement mortar enters the borehole through the through hole 201 and fills the borehole, the second bladder 6 is inflated to seal the bottom space of the borehole together with the connecting plate 101 at the top, and then the cement mortar is continued to be input into the bag body 2, so that the expansion of the bag body 2 can better exert pressure on the space at the bottom of the borehole, so that the cement mortar can fully penetrate into the bottom of the borehole.
[0069] A construction method of a foundation pit supporting device with a detection function is further provided. Based on the foundation pit supporting device with a detection function, the construction method comprises the following steps:
[0070] S1, controlling the inflation device to deflate the first bladder 403, inputting cement mortar into the bag body 2 through the grouting pipe 3, so that the cement mortar is filled inside and outside the bag body 2, and continuing until the data of the pressure sensor reaches a first preset threshold;
[0071] refer to Figure 7 In this step, the first bag 403 is deflated to open the through hole 201, so that the cement mortar can pass through the bag 2 to the outside of the bag 2, thereby filling the space corresponding to the drill hole outside the bag 2. Until the data of the pressure sensor reaches the first preset threshold, it means that the cement mortar has been initially squeezed to the bottom of the drill hole, thereby initially penetrating to the bottom of the drill hole, so that the bottom of the drill hole is filled.
[0072] S2, when the data of the pressure sensor reaches a first preset threshold, controls the inflation device to inflate the first bag 403, so that the grouting pipe 3 inputs the cement mortar in the bag body 2 to expand the bag body 2, and the clamping mechanism 5 is inserted into the cement mortar outside the bag body 2.
[0073] refer to Figure 8 In this step, the first bag body 403 is inflated to close the through hole 201, so that the cement mortar can only be loaded into the bag body 2, and the expansion of the bag body 2 is used to fully squeeze the cement mortar between the drill hole and the bag body 2, so that the cement mortar is fully filled and penetrated into the bottom of the drill hole. In addition, the clamping mechanism 5 is driven by the expansion of the bag body 2 to open outwards and insert into the cement mortar or the side wall of the drill hole to form a clamping structure.
[0074] Furthermore, after S2, execute:
[0075] S3, when the data of the pressure sensor reaches a second preset threshold, control the inflation device to deflate the first bladder 403; if the data of the pressure sensor is less than a third preset threshold, return to S1.
[0076] In this step, the data of the pressure sensor reaches the second preset threshold value, indicating that the bag body 2 has been filled with cement mortar and fully expanded. At this time, the first bag body 403 is deflated to open the through hole 201. If most of the cement mortar flows out of the outside of the bag body 2, it indicates that the cement mortar has not yet filled the bottom of the borehole. At this time, return to S1. After multiple cycles of S1-S3, the cement mortar can fully fill the bottom of the borehole.
[0077] Furthermore, the first preset threshold is 1 MPa, the second preset threshold is 1.5 MPa, and the third preset threshold is 1.3 MPa.
[0078] In this embodiment, the second preset threshold is 1.5 MPa, which is the grouting pressure that the bottom of the borehole should be subjected to after the cement mortar is fully injected. Only when the pressure at the bottom of the borehole is close to the second preset threshold, can it be shown that the loose structure at the bottom of the borehole becomes tight. The first preset threshold is 1 MPa, which is the pressure after the bottom of the borehole is initially filled with cement mortar. In this state, the surrounding structure is still a little loose. After the bag body 2 expands, the cement mortar can be further squeezed and penetrated into the surrounding of the borehole. The third preset threshold is 1.3 MPa, which is a reasonable range in which a small amount of cement mortar will be released from the through hole 201 to the outside of the bag body 2 after the through hole 201 of the bag body 2 is opened, and its internal pressure will be reduced.
[0079] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.
[0080] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0081] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0082] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms should not be understood as necessarily being directed to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
Claims
1. A foundation pit support device with detection function, characterized in that: include: Rod body (1); A bag body (2), the bag body (2) being a straight cylindrical structure, the bottom end and the top end of the bag body (2) being respectively fixedly connected to the bottom end of the rod body (1), a plurality of through holes (201) being arranged on the side of the bag body (2), a grouting hole being arranged on the top end of the bag body (2), and the bag body (2) being made of an elastic material; A grouting pipe (3) passing through the grouting hole and extending into the bag body (2), wherein the grouting pipe (3) is provided with a controllable valve; A through hole closing mechanism (4) is arranged at each through hole (201), the through hole closing mechanism (4) comprising a circular connecting seat (401), a blocking block (402) being fixedly arranged at the center of the connecting seat (401), a circle of first capsules (403) being arranged in the inner circle of the connecting seat (401), the first capsules (403) being inflated and abutting against the blocking block (402) to block the through hole (201), and the first capsules (403) being deflated and moving away from the blocking block (402) to open the through hole (201), the first capsules (403) being connected to an inflation device; A clamping mechanism (5) is arranged on a side surface of the bag body (2); A pressure sensor is arranged in the bag body (2); A control system is connected to the pressure sensor, the controllable valve, and the inflation device, and is used to: before the data of the pressure sensor reaches a first preset threshold, control the inflation device to deflate the first sac (403), so that the cement mortar input into the bag (2) by the grouting pipe (3) flows to the outside of the bag (2) through the through hole (201); when the data of the pressure sensor reaches the first preset threshold, control the inflation device to inflate the first sac (403), so that the cement mortar input into the bag (2) by the grouting pipe (3) causes the bag (2) to expand, and the clamping mechanism (5) is inserted into the cement mortar outside the bag (2).
2. A foundation pit supporting device with detection function according to claim 1, characterized in that: The block (402) is a structure with thick ends at the top and bottom and thin in the middle. The first sac (403) is a ring-shaped structure. When the first sac (403) is inflated, the aperture of the inner circle is reduced so as to cover the block (402).
3. The foundation pit supporting device with detection function according to claim 1, characterized in that: The clamping mechanism (5) comprises a plurality of connecting ropes (501) and clamping blocks (502); the connecting ropes are arranged along the axial direction of the bag body (2); the length of the connecting ropes (501) is greater than the distance between the upper and lower ends of the bag body (2); and the clamping blocks (502) are fixedly arranged on the connecting ropes (501).
4. A foundation pit supporting device with detection function according to claim 3, characterized in that: The clamping block (502) is in a triangular shape.
5. A foundation pit supporting device with detection function according to claim 4, characterized in that: A base (503) is provided at one end of the clamping block (502) close to the connecting rope (501), and when the bag body (2) expands, it stretches the connecting rope (501) to drive the clamping block (502) to move outward.
6. The foundation pit supporting device with detection function according to claim 1, characterized in that: The rod body (1) is fixedly provided with a pair of connection plates (101) at its bottom end, and the bottom end and the top end of the bag body (2) are respectively fixedly connected to the connection plates (101).
7. A foundation pit supporting device with detection function according to claim 6, characterized in that: A second annular sac (6) is provided on the outer periphery of the connection disk (101) corresponding to the top end of the bag body (2); the second sac (6) is connected to the first sac (403); and the second sac (6) blocks the space between the connection disk (101) and the corresponding drill hole after being inflated.
8. A construction method of a foundation pit support device with a detection function, characterized in that: A foundation pit supporting device with a detection function according to any one of claims 1 to 7 comprises the following steps: S1, controlling the inflation device to deflate the first bladder (403), injecting cement mortar into the bag body (2) through the grouting pipe (3), so that the cement mortar is filled inside and outside the bag body (2), and continuing until the data of the pressure sensor reaches a first preset threshold value; S2, when the data of the pressure sensor reaches a first preset threshold, controlling the inflation device to inflate the first bag (403), so that the grouting pipe (3) inputs cement mortar into the bag (2) to expand the bag (2), and the clamping mechanism (5) is inserted into the cement mortar outside the bag (2).
9. The construction method of a foundation pit supporting device with a detection function according to claim 8, characterized in that: After S2, execute: S3, when the data of the pressure sensor reaches a second preset threshold, control the inflation device to deflate the first bladder (403); if the data of the pressure sensor is less than a third preset threshold, return to S1.
10. The construction method of a foundation pit supporting device with a detection function according to claim 9, characterized in that: The first preset threshold is 1 MPa, the second preset threshold is 1.5 MPa, and the third preset threshold is 1.3 MPa.
