A steel pile positioning trolley system and method for a cutter suction dredger
By designing a mobile trolley system driven by slide rails and hydraulic cylinders on a crimp dredger, combined with water pumps and water pump pipe components, the problems of large buoyancy and high difficulty in pile loading during steel pile loading are solved, achieving rapid and efficient The pile-pile-loading and construction efficiency of steel piles are improved.
Patent Information
- Application Number
- CN202411161928.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-23
AI Technical Summary
The existing steel piles of the crimping dredger have great buoyancy and high difficulty in loading piles, especially in the silt soil, which cannot meet the construction needs.
A positioning steel pile trolley system including slide rails, mobile trolleys, rotary parts, winch parts and pile lifting components is designed. The vertical state of the steel pile is realized by driving the mobile trolleys and flipped hydraulic cylinders through hydraulic cylinders, and the water pump and The pump pipe assembly reduces downward buoyancy, separates the mud layer with the slitting knife, and quickly piles and cleans up the mud through the drain pipe and flushing nozzle.
Reduces the overall weight of steel piles and the difficulty of pile lifting, improves the pile lifting speed and working efficiency of steel piles, reduces the workload of manual cleaning, enhances the upward buoyancy of steel piles, and improves the construction efficiency of the crimping dredger. .
Smart Images

Figure CN118686249B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of ship dredging equipment, and in particular to a steel pile positioning trolley system and method for a cutter suction dredger. Background Art
[0002] The cutter suction dredger uses a rotating auger to loosen the soil on the riverbed or seabed, mixes it with cement to form mud, sucks it into the pump body through the mud suction pipe and sends it to the mud discharge area through the mud discharge pipe. When the ship is on the river or sea surface, it will be affected by wind, waves and water flow and deviate. At this time, steel piles will be inserted into the soil on the riverbed or seabed to position the ship. The steel pile trolley positioning system is a common positioning device for modern cutter suction dredgers. It is achieved by setting two steel piles at the stern, supplemented by a walking trolley and a steel pile lifting device, to fix and move the ship during construction. The steel piles are main steel piles and auxiliary steel piles. The main steel pile is installed on the walking trolley. During construction, the ship can be swung with the main steel pile as the center, and the forward movement of the trolley can be used to achieve the forward movement of the ship.
[0003] In order to ensure the smooth sinking of the steel piles, the steel piles have a large mass, but the displacement and flipping of the steel piles require a large driving force, which brings a large load to the hull when sailing.
[0004] In the prior art, a Chinese patent application numbered CN201721552146.2 discloses a pile positioning device for a cutter suction dredger, which makes a steel pile hollow and opens a plurality of through holes on the side wall of the outer cylinder for filling water during lowering to reduce the influence of buoyancy on the downward movement. However, in actual use, when the through holes of the steel pile are not moved out of the water, the water inside will not leak out and will still cause a large load on the steel pile during piling, making it difficult to pull out the steel pile. Moreover, in the working condition of silty soil, the steel pile is prone to penetrate too deep into the mud, making it difficult to pull out the steel pile, which cannot meet the use requirements of the cutter suction dredger for pulling out the steel pile. Summary of the invention
[0005] The purpose of the present invention is to solve the problem that the existing technology cannot meet the demand for steel pile lifting and use of a cutter suction dredger, and to propose a steel pile positioning trolley system and method for a cutter suction dredger.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A steel pile positioning trolley system for a cutter suction dredger comprises a slide rail arranged on a hull, and further comprises:
[0008] A mobile trolley, the mobile trolley slides on a slide rail, and the slide rail is provided with a pushing hydraulic cylinder for pushing the mobile trolley;
[0009] A rotating member, the rotating member is arranged on a moving trolley, a steel pile body is movably connected to the rotating member, a turning hydraulic cylinder for pushing the steel pile body to turn over is hinged on the moving trolley, and a piston rod of the turning hydraulic cylinder is connected to a collar sleeved on the outside of the steel pile body;
[0010] A winch unit, which is fixed on the mobile trolley and is used for lowering and lifting the steel pile body;
[0011] Wherein, the steel pile body is provided with a pile lifting assembly for lifting the steel pile body and an auxiliary upward moving assembly connected to the pile lifting assembly;
[0012] The steel pile body includes an outer pile body fixedly connected to the steel wire rope of the winch part and a conical pile head rotatably connected to the bottom of the outer pile body. A cavity is opened in the outer pile body, a groove connected to the cavity is opened on the outer pile body, an inner pile body with a cavity is connected in the cavity, and a water inlet groove is opened on the lower side of the inner pile body.
[0013] Preferably, the rotating member comprises a side plate fixedly mounted on the moving trolley, the side plate is rotatably connected to a rotating ring via a rotating shaft, and the rotating ring is sleeved on the outside of the steel pile body and rotatably connected to the steel pile body.
[0014] Preferably, the pile lifting assembly includes a water pump fixedly mounted on the outside of the outer pile body, the output shaft of the water pump passes through the outer pile body and is connected to a main bevel gear, the outer pile body is rotatably connected to a rotating shaft fixedly connected to the conical pile head, the rotating shaft is provided with a secondary bevel gear meshing with the main bevel gear, and a slitting knife is fixedly mounted on the outside of the conical pile head, the slitting knife is rotatably connected to the outside of the outer pile body and fits against the outer side wall of the outer pile body.
[0015] Preferably, an upper piston sleeved on the outside of the rotating shaft is slidably connected in the inner pile body cavity, an elastic element is provided between the upper piston and the inner wall of the cavity, a connecting rod is fixed to the bottom of the upper piston, and the end of the connecting rod away from the upper piston is connected to a lower piston for blocking the water inlet groove, and the lower piston is slidably connected in the inner pile body cavity.
[0016] Preferably, an exhaust passage and an intake passage are provided in the upper piston, and exhaust valves are fixed in the exhaust passage and the intake passage.
[0017] Preferably, the auxiliary upward movement component includes a water pump connected to the water pump, the end of the water pump passes through the outer pile body and the inner pile body and is connected to the upper piston, a connecting groove connected to the cavity is provided in the inner pile body, and the upper piston movably blocks the upper end opening of the connecting groove.
[0018] Preferably, the water pump is also connected to a drain pipe, and one end of the drain pipe away from the water pump is connected to a flushing nozzle facing the steel pile body.
[0019] Preferably, a screw rod is threadedly connected to the outer pile body, an upper end of the screw rod is connected to a knob, and an end of the screw rod away from the knob is rotatably connected to the inner pile body.
[0020] The present invention also discloses a method for positioning a steel pile trolley of a cutter suction dredger, which comprises the following steps by applying a steel pile trolley system for positioning a cutter suction dredger:
[0021] S1: When the steel pile body is in use, the push hydraulic cylinder is controlled to push the mobile trolley to the end of the slide rail, and then the hydraulic cylinder is turned to cooperate with the winch unit to drive the steel pile body to rotate with the rotating part as the center. After the steel pile body and the mobile trolley are in a vertical state, the winch unit is controlled to release the wire rope, so that the steel pile body moves downward relative to the rotating ring and the sleeve ring;
[0022] S2: The steel pile body moves downward and extends into the water. The water passes through the slots of the outer pile body and the water inlet groove of the inner pile body and enters the inner pile body, reducing the downward buoyancy of the steel pile body. After the water enters the inner pile body, the air in the inner pile body is discharged from the exhaust channel. As the steel pile body continues to move downward, the conical pile head at the bottom of the steel pile body extends into the mud at the bottom of the water, positioning the cutter suction dredger hull, so that the cutter suction dredger hull can perform dredging work;
[0023] S3: After the dredging of the cutter suction dredger hull is completed, the staff first controls the water pump to operate. The output shaft of the water pump drives the main bevel gear to mesh with the secondary bevel gear on the rotating shaft. The rotating shaft drives the cone pile head at the bottom to rotate. The slitting knife on the outside of the cone pile head rotates around the outer pile body with the rotating shaft as the center of the circle. The mud layer adhering to the outer pile body is separated from the outer pile body by the slitting knife.
[0024] When the water pump is initially running, the upper piston blocks the upper end opening of the connecting groove, so that the water pump generates suction on the upper piston through the water pumping pipe. The upper piston is forced to move upward in the inner pile body. When the upper piston moves upward, the lower piston is driven to move upward synchronously through the connecting rod. After the upper piston moves upward, the water pumping pipe is connected with the upper end opening of the connecting groove, and the lower piston blocks the water inlet groove of the inner pile body, so that a closed cavity is formed inside the inner pile body. At this time, the water pumping pipe can extract the water stored in the inner pile body through the connecting groove, and the upper piston introduces air into the inner pile body through the air intake channel to supplement the space left by the lack of water. The air cavity space in the inner pile body becomes larger, thereby increasing the upward buoyancy of the steel pile body while reducing the overall weight of the steel pile body.
[0025] S4: The staff then controls the operation of the winch unit, so that the winch unit pulls up the steel pile body through the steel wire rope, and the steel pile body that reduces the overall weight and increases the upward buoyancy is quickly pulled up. When the lower side of the steel pile body moves out of the water, the drainage pipe of the water pump flushes the lower side of the steel pile body through the flushing nozzle to clean the mud adhering to the lower side of the steel pile body.
[0026] Compared with the prior art, the present invention provides a steel pile positioning trolley system and method for a cutter suction dredger, which has the following beneficial effects:
[0027] 1. The steel pile positioning trolley system and method of the cutter suction dredger sets the steel pile as an incompletely solid pile to reduce its overall weight and the operating load of the hull without affecting the downward movement speed of the steel pile. The pile lifting component cooperates with the auxiliary upward movement component to reduce the difficulty of steel pile lifting and increase the steel pile lifting speed.
[0028] 2. The steel pile positioning trolley system and method of the cutter suction dredger can clean the mud adhering to the lower side of the steel pile body by using the flushing nozzle of the water pump drainage pipe to flush the lower side of the steel pile body when the steel pile body is lifted, thereby eliminating the need for subsequent manual cleaning procedures, reducing the workload of staff and improving work efficiency.
[0029] 3. The steel pile positioning trolley system and method of the cutter suction dredger rotates the screw to drive the inner pile body to move up or down in the outer pile body, thereby adjusting the height of the water inlet trough of the inner pile body at the outer pile body, so that the water inlet trough is in a suitable position of the outer pile body. This can prevent the water inlet trough of the inner pile body from extending into the mud layer due to the low height of the water inlet trough, and the mud from entering the inner pile body, affecting the work of the subsequent auxiliary upward moving components; it can also prevent the water inlet trough of the inner pile body from extending into the water for a long distance before the water enters the inner pile body due to the high height of the water inlet trough of the inner pile body, thereby reducing the influence of buoyancy on the steel pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 The structure of the present invention is schematically shown Figure 1 ;
[0031] Figure 2 The structure of the present invention is schematically shown Figure 2 ;
[0032] Figure 3 It is a structural schematic diagram of the rotating member of the present invention;
[0033] Figure 4 It is a structural schematic diagram of the steel pile body of the present invention;
[0034] Figure 5 It is a schematic diagram of the cross-sectional structure of the steel pile body of the present invention;
[0035] Figure 6 For the present invention Figure 5 A partial enlarged structural diagram of the middle part;
[0036] Figure 7 For the present invention Figure 5 A schematic diagram of the partially enlarged structure of the middle B part;
[0037] Figure 8It is a schematic diagram of the cross-sectional structure of the inner pile body of the present invention;
[0038] Fig. 9 For the present invention Figure 8 A schematic diagram of the partially enlarged structure of the middle C part;
[0039] Fig.10 For the present invention Figure 8 The schematic diagram of the partial enlarged structure of the middle D part;
[0040] Fig.11 It is a schematic structural diagram of the water pumping pipe and the connecting groove of the present invention.
[0041] In the figure: 1, slide rail; 101, push hydraulic cylinder; 2, mobile trolley; 3, rotating part; 301, side plate; 302, rotating ring; 4, steel pile body; 401, outer pile body; 4011, cavity; 4012, slot; 402, conical pile head; 4021, slitting knife; 403, rotating shaft; 4031, auxiliary bevel gear; 5, turning hydraulic cylinder; 501, collar; 6, winch unit; 7 , inner pile body; 701, water inlet groove; 7011, pressure hole; 8, upper piston; 801, elastic element; 802, connecting rod; 9, lower piston; 10, exhaust channel; 1001, air inlet channel; 1002, exhaust valve; 11, water suction pipe; 12, connecting groove; 13, drain pipe; 131, flushing nozzle; 14, screw; 141, knob; 15, water pump; 151, main bevel gear. DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0043] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0044] Example 1: Reference Figure 1-Figure 5 A steel pile positioning trolley system for a cutter suction dredger comprises a slide rail 1 arranged on the hull, and further comprises:
[0045] A mobile trolley 2, the mobile trolley 2 slides on the slide rail 1, and the slide rail 1 is provided with a pushing hydraulic cylinder 101 for pushing the mobile trolley 2;
[0046] A rotating member 3 is arranged on the mobile trolley 2, a steel pile body 4 is movably connected to the rotating member 3, a turning hydraulic cylinder 5 for pushing the steel pile body 4 to turn over is hinged on the mobile trolley 2, and a piston rod of the turning hydraulic cylinder 5 is connected to a collar 501 sleeved on the outside of the steel pile body 4;
[0047] The winch part 6 is fixed on the mobile trolley 2 and is used for lowering and lifting the steel pile body 4;
[0048] The steel pile body 4 is provided with a pile lifting component for lifting the steel pile body 4 and an auxiliary upward moving component connected to the pile lifting component.
[0049] Furthermore, the rotating member 3 includes a side plate 301 fixed on the mobile trolley 2 , and a rotating ring 302 is rotatably connected to the side plate 301 via a rotating shaft. The rotating ring 302 is sleeved on the outside of the steel pile body 4 and is rotatably connected to the steel pile body 4 .
[0050] Furthermore, the steel pile body 4 includes an outer pile body 401 fixedly connected to the steel wire rope of the winch part 6 and a conical pile head 402 rotatably connected to the bottom of the outer pile body 401, a cavity 4011 is provided in the outer pile body 401, a groove 4012 connected to the cavity 4011 is provided on the outer pile body 401, an inner pile body 7 with a cavity is connected to the cavity 4011, and a water inlet groove 701 is provided on the lower side of the inner pile body 7.
[0051] Specifically, when the steel pile body 4 is in use, the push hydraulic cylinder 101 is controlled to push the mobile trolley 2 to the end of the slide rail 1, and then the hydraulic cylinder 5 is turned to cooperate with the winch part 6 to drive the steel pile body 4 to rotate with the rotating member 3 as the center. After the steel pile body 4 and the mobile trolley 2 are in a vertical state, the winch part 6 is controlled to release the wire rope, so that the steel pile body 4 moves downward relative to the rotating ring 302 and the ring 501, and the steel pile body 4 moves downward and extends into the water, and the water passes through the slot 4012 of the outer pile body 401 and the water inlet groove 701 of the inner pile body 7. And enter the inner pile body 7, reducing the downward buoyancy of the steel pile body 4. As the steel pile body 4 continues to move downward, the conical pile head 402 at the bottom of the steel pile body 4 extends into the mud on the bottom of the water, positioning the suction dredging hull, and facilitating the dredging work of the suction dredging hull. The present invention reduces its overall weight and the operating load of the hull by setting the steel pile body 4 as an incomplete solid pile without affecting the downward moving speed of the steel pile body 4, and reduces the difficulty of steel pile lifting and increases the steel pile lifting speed by cooperating with the pile lifting component and the auxiliary upward moving component.
[0052] Example 2: Reference Figure 4-Figure 8, a steel pile positioning trolley system for a cutter suction dredger, based on Example 1, further, a pile lifting assembly includes a water pump 15 fixedly mounted on the outside of an outer pile body 401, the output shaft of the water pump 15 passes through the outer pile body 401 and is connected to a main bevel gear 151, a rotating shaft 403 fixedly connected to a conical pile head 402 is rotatably connected inside the outer pile body 401, a secondary bevel gear 4031 meshing with the main bevel gear 151 is provided on the rotating shaft 403, a slitting knife 4021 is fixedly mounted on the outside of the conical pile head 402, and the slitting knife 4021 is rotatably connected to the outside of the outer pile body 401 and fits against the outer wall of the outer pile body 401.
[0053] Specifically, after the dredging of the suction dredger hull is completed, the staff first controls the operation of the water pump 15. The output shaft of the water pump 15 drives the main bevel gear 151 to engage with the secondary bevel gear 4031 on the rotating shaft 403. The rotating shaft 403 drives the conical pile head 402 at the bottom to rotate. The cutting knife 4021 on the outside of the conical pile head 402 rotates around the outer pile body 401 with the rotating shaft 403 as the center. The mud layer adhering to the outer pile body 401 is separated from the outer pile body 401 by the cutting knife 4021, which facilitates the rapid lifting of the steel pile body 4 and improves the efficiency of dredging work.
[0054] Example 3: Reference Figure 4-Figure 11 , a positioning steel pile trolley system for a cutter suction dredger, based on Example 2, further, an upper piston 8 sleeved on the outside of a rotating shaft 403 is slidably connected in the cavity of an inner pile body 7, an elastic element 801 is arranged between the upper piston 8 and the inner wall of the cavity 4011, a connecting rod 802 is fixedly provided at the bottom of the upper piston 8, and the end of the connecting rod 802 away from the upper piston 8 is connected to a lower piston 9 for blocking a water inlet trough 701, and the lower piston 9 is slidably connected in the cavity of the inner pile body 7.
[0055] Furthermore, an exhaust passage 10 and an intake passage 1001 are provided in the upper piston 8 , and an exhaust valve 1002 is fixedly provided in both the exhaust passage 10 and the intake passage 1001 .
[0056] Furthermore, the auxiliary upward movement component includes a water pump 11 connected to the water pump 15, and one end of the water pump 11 away from the water pump 15 passes through the outer pile body 401 and the inner pile body 7 and is connected to the upper piston 8. A connecting groove 12 connected to the cavity is provided in the inner pile body 7, and the upper piston 8 movably blocks the upper end opening of the connecting groove 12.
[0057] Specifically, the steel pile body 4 moves downward and extends underwater, and the water passes through the slot 4012 of the outer pile body 401 and the water inlet groove 701 of the inner pile body 7 and enters the inner pile body 7, reducing the downward buoyancy of the steel pile body 4. After the water enters the inner pile body 7, the air in the inner pile body 7 is discharged from the exhaust channel 10;
[0058] After the dredging of the suction dredger hull is completed, the staff controls the water pump 15 to operate. At the beginning of the operation of the water pump 15, the upper piston 8 blocks the upper end opening of the connecting groove 12, so that the water pump 15 generates suction to the upper piston 8 through the suction pipe 11. The upper piston 8 is forced to move upward in the inner pile body 7. When the upper piston 8 moves upward, the lower piston 9 is driven to move upward synchronously through the connecting rod 802. After the upper piston 8 moves upward, the suction pipe 11 is connected with the upper end opening of the connecting groove 12, and at this time, the lower piston 9 blocks the inner pile body The water inlet groove 701 of 7 forms a closed cavity inside the inner pile body 7. At this time, the water pumping pipe 11 can extract the water stored in the inner pile body 7 through the connecting groove 12, and the upper piston 8 introduces air into the inner pile body 7 through the air inlet channel 1001 to supplement the space formed due to the lack of water. The air cavity space in the inner pile body 7 becomes larger, while reducing the overall weight of the steel pile body 4, the upward buoyancy of the steel pile body 4 is increased, which makes it easier for the steel pile body 4 to quickly start the pile and improves the efficiency of dredging work.
[0059] Example 4: Reference Figure 4 , Figure 5 and Figure 8 A steel pile positioning trolley system for a cutter suction dredger, based on Example 3, further, the water pump 15 is also connected to a drain pipe 13, and the end of the drain pipe 13 away from the water pump 15 is connected to a flushing nozzle 131 toward the steel pile body 4.
[0060] Specifically, when the steel pile body 4 is lifted, the drainage pipe 13 of the water pump 15 uses the flushing nozzle 131 to flush the lower side of the steel pile body 4, and the mud adhering to the lower side of the steel pile body 4 is cleaned, thereby reducing the subsequent cleaning workload of the staff and improving work efficiency.
[0061] Example 5: Reference Figure 5 and Figure 6 A positioning steel pile trolley system for a cutter suction dredger, based on Example 4, further, a screw 14 is threadedly connected to the outer pile body 401, the upper end of the screw 14 is connected to a knob 141, and the end of the screw 14 away from the knob 141 is rotatably connected to the inner pile body 7.
[0062] Specifically, by rotating the screw rod 14, the screw rod 14 drives the inner pile body 7 to move up or down in the outer pile body 401, thereby adjusting the height of the water inlet groove 701 of the inner pile body 7 at the outer pile body 401, to avoid the water inlet groove 701 of the inner pile body 7 being too low, causing the water inlet groove 701 to extend into the mud layer, and the mud to enter the inner pile body 7, affecting the work of the subsequent auxiliary upward movement component; and to avoid the water inlet groove 701 of the inner pile body 7 being too high, causing the steel pile body 4 to extend a long distance underwater before the water enters the inner pile body 7, thereby reducing the influence of buoyancy on the steel pile.
[0063] The present invention also discloses a method for using a positioning steel pile trolley system of a cutter suction dredger, comprising the aforementioned positioning steel pile trolley system of a cutter suction dredger, and comprising the following steps:
[0064] S1: When the steel pile body 4 is in use, the push hydraulic cylinder 101 is controlled to push the mobile trolley 2 to the end of the slide rail 1, and then the flip hydraulic cylinder 5 cooperates with the winch part 6 to drive the steel pile body 4 to rotate with the rotating member 3 as the center. After the steel pile body 4 and the mobile trolley 2 are in a vertical state, the winch part 6 is controlled to release the wire rope, so that the steel pile body 4 moves downward relative to the rotating ring 302 and the ring 501;
[0065] S2: The steel pile body 4 moves downward and extends into the water, and the water passes through the slot 4012 of the outer pile body 401 and the water inlet groove 701 of the inner pile body 7 and enters the inner pile body 7, reducing the downward buoyancy of the steel pile body 4. After the water enters the inner pile body 7, the air in the inner pile body 7 is discharged from the exhaust passage 10. As the steel pile body 4 continues to move downward, the conical pile head 402 at the bottom of the steel pile body 4 extends into the mud at the bottom of the water, positioning the cutter suction dredger hull, so that the cutter suction dredger hull can perform dredging work;
[0066] S3: After the dredging of the suction dredger hull is completed, the staff first controls the water pump 15 to operate, the output shaft of the water pump 15 drives the main bevel gear 151 to mesh with the secondary bevel gear 4031 on the rotating shaft 403, the rotating shaft 403 drives the cone pile head 402 at the bottom to rotate, the slitting knife 4021 on the outside of the cone pile head 402 rotates around the outer pile body 401 with the rotating shaft 403 as the center, and the mud layer adhering to the outer pile body 401 is separated from the outer pile body 401 by the slitting knife 4021;
[0067] At the beginning of the operation of the water pump 15, the upper piston 8 blocks the upper end opening of the connecting groove 12, so that the water pump 15 generates suction on the upper piston 8 through the pumping pipe 11, and the upper piston 8 is forced to move upward in the inner pile body 7. When the upper piston 8 moves upward, the lower piston 9 is driven to move upward synchronously through the connecting rod 802 (it should be noted that the cavity of the inner pile body 7 at the bottom of the lower piston 9 is connected to the water inlet groove 701 with a pressure hole 7011, so that the lower piston 9 can move upward smoothly). After the upper piston 8 moves upward, the pumping pipe 11 It is connected with the upper end opening of the connecting groove 12, and at this time, the lower piston 9 blocks the water inlet groove 701 of the inner pile body 7, so that a closed cavity is formed inside the inner pile body 7. At this time, the water extraction pipe 11 can extract the water stored in the inner pile body 7 through the connecting groove 12, and the upper piston 8 introduces air into the inner pile body 7 through the air inlet channel 1001 to supplement the space formed by the lack of water. The air cavity space in the inner pile body 7 becomes larger, thereby reducing the overall weight of the steel pile body 4 while increasing the upward buoyancy of the steel pile body 4;
[0068] S4: Then the staff controls the operation of the winch part 6, so that the winch part 6 pulls up the steel pile body 4 through the steel wire rope, and the steel pile body 4 is quickly pulled up. When the lower side of the steel pile body 4 moves out of the water, the drainage pipe 13 of the water pump 15 flushes the lower side of the steel pile body 4 through the flushing nozzle 131, and cleans the mud adhering to the lower side of the steel pile body 4.
[0069] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A steel pile positioning trolley system for a cutter suction dredger, comprising a slide rail (1) arranged on the hull, It is characterized in that Also includes: A mobile trolley (2), the mobile trolley (2) slides on a slide rail (1), and the slide rail (1) is provided with a pushing hydraulic cylinder (101) for pushing the mobile trolley (2); A rotating member (3), the rotating member (3) is arranged on the mobile trolley (2), a steel pile body (4) is movably connected to the rotating member (3), a turning hydraulic cylinder (5) for pushing the steel pile body (4) to turn over is hinged on the mobile trolley (2), and a piston rod of the turning hydraulic cylinder (5) is connected to a collar (501) sleeved on the outside of the steel pile body (4); A winch unit (6), the winch unit (6) being fixedly mounted on the mobile trolley (2) and used for lowering and lifting the steel pile body (4); Wherein, the steel pile body (4) is provided with a pile lifting component used for lifting the steel pile body (4) and an auxiliary upward moving component connected to the pile lifting component; The steel pile body (4) comprises an outer pile body (401) fixedly connected to a steel wire rope of a winch part (6) and a conical pile head (402) rotatably connected to the bottom of the outer pile body (401); a cavity (4011) is provided in the outer pile body (401); a groove (4012) connected to the cavity (4011) is provided on the outer pile body (401); an inner pile body (7) having a cavity is connected to the cavity (4011); a water inlet groove (701) is provided on the lower side of the inner pile body (7); The pile lifting assembly comprises a water pump (15) fixedly arranged on the outside of the outer pile body (401), the output shaft of the water pump (15) passes through the outer pile body (401) and is connected to a main bevel gear (151), a rotating shaft (403) fixedly connected to the conical pile head (402) is rotatably connected inside the outer pile body (401), a secondary bevel gear (4031) meshing with the main bevel gear (151) is arranged on the rotating shaft (403), and a slitting knife (4021) is fixedly arranged on the outside of the conical pile head (402), and the slitting knife (4021) is rotatably connected to the outside of the outer pile body (401) and is in contact with the outer side wall of the outer pile body (401); An upper piston (8) sleeved on the outside of the rotating shaft (403) is slidably connected in the cavity of the inner pile body (7), an elastic element (801) is arranged between the upper piston (8) and the inner wall of the cavity (4011), a connecting rod (802) is fixedly arranged at the bottom of the upper piston (8), and a lower piston (9) for blocking the water inlet groove (701) is connected to the end of the connecting rod (802) away from the upper piston (8), and the lower piston (9) is slidably connected in the cavity of the inner pile body (7); An exhaust passage (10) and an intake passage (1001) are provided in the upper piston (8), and an exhaust valve (1002) is fixedly provided in each of the exhaust passage (10) and the intake passage (1001); The auxiliary upward movement component comprises a water pump (11) connected to a water pump (15); an end of the water pump (11) away from the water pump (15) passes through the outer pile body (401) and the inner pile body (7) and is connected to the upper piston (8); a connecting groove (12) connected to the cavity is provided in the inner pile body (7); and the upper piston (8) movably blocks the upper end opening of the connecting groove (12); The water pump (15) is also connected to a drainage pipe (13), and one end of the drainage pipe (13) away from the water pump (15) is connected to a flushing nozzle (131) directed toward the steel pile body (4).
2. A steel pile positioning trolley system for a cutter suction dredger according to claim 1, It is characterized in that The rotating member (3) comprises a side plate (301) fixedly mounted on the mobile trolley (2); a rotating ring (302) is rotatably connected to the side plate (301) via a rotating shaft; the rotating ring (302) is sleeved on the outside of the steel pile body (4) and is rotatably connected to the steel pile body (4).
3. A steel pile positioning trolley system for a cutter suction dredger according to claim 2, It is characterized in that The outer pile body (401) is threadedly connected with a screw rod (14), the upper end of the screw rod (14) is connected with a knob (141), and one end of the screw rod (14) away from the knob (141) is rotationally connected to the inner pile body (7).
4. A method for using the steel pile positioning trolley system of a cutter suction dredger according to claim 3, It is characterized in that The following steps are involved: S1: When the steel pile body (4) is in use, the pushing hydraulic cylinder (101) is controlled to push the moving trolley (2) to the end of the slide rail (1), and then the turning hydraulic cylinder (5) cooperates with the winch unit (6) to drive the steel pile body (4) to rotate with the rotating member (3) as the center. After the steel pile body (4) and the moving trolley (2) are in a vertical state, the winch unit (6) is controlled to release the steel wire rope, so that the steel pile body (4) moves downward relative to the rotating ring (302) and the sleeve ring (501); S2: The steel pile body (4) moves downward and extends into the water, and the water passes through the slot (4012) of the outer pile body (401) and the water inlet groove (701) of the inner pile body (7) and enters the inner pile body (7), thereby reducing the downward buoyancy of the steel pile body (4). After the water enters the inner pile body (7), the air in the inner pile body (7) is discharged from the exhaust passage (10). As the steel pile body (4) continues to move downward, the conical pile head (402) at the bottom of the steel pile body (4) extends into the mud at the bottom of the water, positioning the cutter suction dredger hull, so that the cutter suction dredger hull can perform dredging work; S3: After the dredging of the suction dredger hull is completed, the staff first controls the water pump (15) to operate, and the output shaft of the water pump (15) drives the main bevel gear (151) to mesh with the secondary bevel gear (4031) on the rotating shaft (403) for transmission, and the rotating shaft (403) drives the conical pile head (402) at the bottom to rotate, and the slitting knife (4021) on the outside of the conical pile head (402) rotates around the outer pile body (401) with the rotating shaft (403) as the center of the circle, and the mud layer adhering to the outer pile body (401) is separated from the outer pile body (401) by the slitting knife (4021); At the beginning of the operation of the water pump (15), the upper piston (8) blocks the upper end opening of the communication groove (12), so that the water pump (15) generates suction force on the upper piston (8) through the water pumping pipe (11), and the upper piston (8) is forced to move upward in the inner pile body (7). When the upper piston (8) moves upward, the lower piston (9) is driven to move upward synchronously through the connecting rod (802). After the upper piston (8) moves upward, the water pumping pipe (11) is connected to the upper end opening of the communication groove (12), and the lower piston (9) blocks the upper end opening of the communication groove (12). The water inlet groove (701) of the inner pile body (7) forms a closed cavity inside the inner pile body (7), and the water extraction pipe (11) can extract the water stored in the inner pile body (7) through the connecting groove (12), and the upper piston (8) introduces air into the inner pile body (7) through the air inlet channel (1001) to supplement the space left by the lack of water. The air cavity space in the inner pile body (7) becomes larger, thereby reducing the overall weight of the steel pile body (4) and increasing the upward buoyancy of the steel pile body (4); S4: Then the staff controls the winch unit (6) to operate, so that the winch unit (6) pulls up the steel pile body (4) through the steel wire rope, and the steel pile body (4) is quickly pulled up. When the lower side of the steel pile body (4) moves out of the water surface, the drainage pipe (13) of the water pump (15) flushes the lower side of the steel pile body (4) through the flushing nozzle (131), thereby cleaning the mud adhering to the lower side of the steel pile body (4).