An automatic batching system for asphalt concrete mixing plants based on intelligence
Through the intelligent asphalt concrete mixing station automatic batching system, combined with time and environmental factors, aggregate delivery adjustment and batching regulation are solved, and the problems of insufficient proportion consideration and insufficient batching process control in the existing technology are improved, and the accuracy of batching and Effectiveness ensures production quality and use stability.
Patent Information
- Application Number
- CN202411178657.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-27
AI Technical Summary
The existing asphalt concrete batching technology is insufficient when considering the ratio, only paying attention to static physical characteristics, and failing to fully consider the impact of the physical characteristics of aggregates over time and environment, resulting in insufficient batching accuracy and effectiveness.
Adopt an intelligent automatic batching system of asphalt concrete mixing station, through the material condition monitoring module, environmental condition monitoring module, material measurement confirmation module, raw material treatment monitoring module and raw material treatment analysis module, combining moisture content analysis and image analysis at different times and depths , environmental information monitoring, adjust aggregate delivery and batching regulation to ensure the accuracy and effectiveness of batching.
It significantly improves the accuracy of the ratio setting and the accuracy of the ingredients, avoids static physical characteristics errors, fully considers environmental factors, reduces the impact of the ingredients process on the quality of the mixture, and ensures production quality and use stability.
Smart Images

Figure CN118698413B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of concrete batching, and in particular, relates to an automatic batching system for an asphalt concrete mixing station based on intelligence. Background Art
[0002] Asphalt concrete is a key material for road construction. With its excellent durability and adaptability, it ensures the long-term stability and safety of roads. Its preparation process is precise and complex, ensuring the uniform mixing of asphalt and aggregate so that the road can withstand various traffic loads and adverse weather conditions.
[0003] Prior art, such as a Chinese invention patent application with application publication number CN104260207B, discloses a dynamic control system and method for batching accuracy of a concrete mixing station. The control system compares the real-time collected dynamic weighing data with the expected batching setting value, i.e., the mix ratio parameter. The batching device uses a rough weighing-fine weighing two-stage batching method to step-control the discharge amount, and uses a cyclic control algorithm to automatically correct the real-time head difference and inching control to complete precise batching, thereby having the outstanding advantages of high batching accuracy and good stability.
[0004] Another example of the prior art is the secondary aggregate metering method based on the key screen disclosed in the Chinese invention patent application with application publication number CN106368103B, which determines the key materials in the mix ratio according to the mix ratio, automatically calculates the pre-weighed value of the key materials, and the metering system performs batching according to the set batching sequence and algorithm. The key materials are metered according to the pre-weighed value. After all materials are metered, the metering system calculates the secondary metering value of the key materials according to the actual metering situation of each material, and measures the secondary metering value of the key materials according to the set batching method and algorithm to complete the entire batching process. This ensures that the proportion of the key materials in the mix ratio meets the ratio requirements, maximizes the proportion accuracy of the key materials in the grading, improves the quality and quality of the finished materials, thereby improving the quality and service life of the road construction and reducing the occurrence of road diseases.
[0005] Regarding the above two technical solutions, it is obvious that the current batching management of asphalt concrete mainly focuses on batching accuracy, such as the measurement accuracy and setting accuracy of the ingredients. However, there are still the following deficiencies in the batching accuracy: 1. The current proportioning is insufficient, and the main consideration is the static physical properties, such as aggregate particle size and water content during measurement. The physical properties of aggregates will change with time and environmental conditions, which makes the improvement of batching accuracy still have certain deficiencies, causing great interference to the accuracy of subsequent proportion settings.
[0006] 2. Currently, we only focus on the measurement before batching, and the control during the batching process is insufficient. Changes in the batching process will affect the quality of the final mixture, which in turn makes the effectiveness of the batching lacking, and also has a certain impact on the subsequent actual use. Summary of the invention
[0007] In view of this, in order to solve the problems raised in the above background technology, an automatic batching system for an asphalt concrete mixing station based on intelligence is now proposed.
[0008] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides an automatic batching system for an asphalt concrete mixing station based on intelligence, the system comprising: a batching information import module for importing the batching plan and raw material information of the asphalt concrete to be mixed.
[0009] The material status monitoring module is used to set each aggregate monitoring area, and then monitor the current aggregate status information of each aggregate monitoring area and the water content corresponding to each monitoring depth at each monitoring time point.
[0010] The environmental status monitoring module is used to monitor the environmental information corresponding to the environmental area where the asphalt concrete to be mixed is located at each monitoring time point.
[0011] The material measurement confirmation module is used to confirm the aggregate delivery adjustment type, and at the same time confirm the target delivery amount of aggregate, filler and asphalt, and when the delivery adjustment type is local adjustment, adjust the aggregate delivery setting.
[0012] The raw material processing monitoring module is used to monitor the heating status information of the aggregate during the heating stage after the aggregate is metered.
[0013] The raw material processing and analysis module is used to determine whether the ingredients need to be regulated based on the heating status information. If so, confirm the ingredient regulation information; if not, continue to mix the ingredients according to the ingredient plan.
[0014] The batching processing execution terminal is used to control the corresponding batching control terminal to perform batching control based on the batching control information.
[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention analyzes the difference in aggregate moisture changes by combining the moisture content at different times and depths, and analyzes the aggregate particle size distribution by combining images taken from different angles, and then analyzes the type of aggregate placement adjustment, thereby effectively solving the problem of insufficient consideration of current proportions, avoiding the errors that only consider static physical properties, and thus greatly improving the accuracy of subsequent proportion settings and the precision of ingredients, providing convenience for the production of asphalt concrete, and also providing a strong guarantee for the production quality of asphalt concrete.
[0016] (2) The present invention sets environmental interference factors according to the monitored temperature and humidity of environmental information, and performs aggregate moisture change difference analysis in combination with the water content change, fully considering the impact of the environment on the water content of the aggregate, thereby improving the reliability and rationality of the aggregate moisture difference analysis results, and also improving the effectiveness of the aggregate status analysis.
[0017] (3) The present invention also analyzes the moisture change patterns and moisture content of aggregates at different depths in detail when conducting aggregate moisture change difference analysis, accurately quantifies the change trend of moisture content over time, and can objectively evaluate the severity of moisture abnormalities. At the same time, it can also more accurately assess whether the moisture changes are caused by external environmental factors, thereby reducing misjudgment, thereby ensuring the accuracy of aggregate property assessment, and also improving the reference and persuasiveness of the aggregate placement adjustment type confirmation results.
[0018] (4) The present invention makes batching control judgments based on the heating state of aggregates during the heating stage and confirms the control information when control is needed. This effectively avoids the shortcomings of the current practice of focusing only on the measurement before batching, and fully pays attention to the impact of the batching process on the batching results, thereby minimizing the impact of changes in the batching process on the quality of the mixture, thereby ensuring the effectiveness of the batching, while also ensuring the reliability and stability of subsequent actual use. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0020] Figure 1 This is a diagram of the system composition of the present invention.
[0021] Figure 2 The figure is a schematic diagram of the automatic batching process of the present invention.
[0022] Figure 3 It is a schematic diagram of the material measurement confirmation process of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] See also Figure 1 to Figure 2As shown, the present invention provides an automatic batching system for an asphalt concrete mixing station based on intelligence, the system comprising: a batching information import module, a material status monitoring module, an environmental status monitoring module, a material measurement confirmation module, a raw material processing monitoring module, a raw material processing analysis module and a batching processing execution terminal.
[0025] Among them, the ingredient information import module is connected to the material status monitoring module and the material measurement confirmation module respectively, the material measurement confirmation module is also connected to the material status monitoring module, the environmental status monitoring module and the raw material processing monitoring module respectively, and the raw material processing analysis module is connected to the ingredient information import module, the raw material processing monitoring module and the ingredient processing execution terminal respectively.
[0026] The batching information importing module is used to import the batching plan and raw material information of the asphalt concrete to be mixed.
[0027] Specifically, the batching plan records include but is not limited to the planned grading curve, the planned total weight of aggregate, the planned amount of aggregate, filler and asphalt, the particle size of each planned batching aggregate, and the planned ratio and planned weight of each planned batching aggregate particle size.
[0028] In yet another specific aspect, the raw material information includes but is not limited to recording the particle size range of the aggregates stored in each aggregate storage area.
[0029] The material status monitoring module is used to set each aggregate monitoring area, and then monitor the current aggregate status information of each aggregate monitoring area and the water content corresponding to each monitoring depth at each monitoring time point.
[0030] The aggregate status information includes but is not limited to aggregate images under various monitoring viewing angles.
[0031] Further, setting each aggregate monitoring area includes: extracting the aggregate particle size of each planned batching from the batching plan.
[0032] The particle size range of the aggregate piled corresponding to each aggregate piled area is extracted from the raw material information.
[0033] If the particle size of a planned batching aggregate is within the particle size range of the corresponding aggregate in the aggregate stacking area, the aggregate stacking area is marked as the aggregate monitoring area, thereby obtaining each aggregate monitoring area.
[0034] The environmental status monitoring module is used to monitor the environmental information corresponding to the environmental area where the asphalt concrete to be mixed is located at each monitoring time point.
[0035] Specifically, the environmental information includes but is not limited to monitoring temperature and monitoring humidity. The monitoring temperature is monitored by a temperature sensor, and the monitoring humidity is monitored by a humidity sensor.
[0036] The material measurement confirmation module is used to confirm the aggregate placement adjustment type, and simultaneously confirm the target placement amounts of aggregate, filler and asphalt, and when the placement adjustment type is local adjustment, make aggregate placement setting adjustments.
[0037] Specifically, the aggregate placement adjustment type is confirmed, including: S1, extracting aggregate images under each monitoring perspective from the current aggregate state information, extracting the particle size and surface roughness of each aggregate in the aggregate image through a computer vision algorithm, and analyzing the aggregate distribution deviation of each aggregate monitoring area, recorded as , Indicates the monitoring area number. .
[0038] It should be added that the computer vision algorithm is a relatively mature algorithm currently available, and its specific extraction process will not be described here. At the same time, the particle size and surface roughness of each aggregate can also be extracted through image processing tools.
[0039] S2. Based on the moisture content at each monitoring depth at each monitoring time point, the moisture variation deviation of each aggregate monitoring area is analyzed and recorded as .
[0040] S3. Set the weights of aggregate distribution and moisture change, and obtain the aggregate state deviation degree of each monitoring area through weighted summation.
[0041] S4. The aggregate monitoring areas where the aggregate state deviation is greater than 0 are recorded as deviation areas, the number of deviation areas is counted, and compared with the number of monitoring areas to obtain the aggregate deviation ratio.
[0042] S5. If the aggregate deviation ratio is 0, no adjustment will be made as the placement adjustment type.
[0043] S6. If the aggregate deviation ratio is greater than 0 and less than the set reference aggregate deviation ratio, local adjustment is used as the placement adjustment type.
[0044] It should be added that the reference aggregate deviation ratio can be taken as 0.3.
[0045] S7. If the aggregate deviation ratio is greater than or equal to the set reference aggregate deviation ratio, the overall adjustment is used as the placement adjustment type.
[0046] The embodiment of the present invention analyzes the difference in aggregate moisture changes by combining the moisture content at different times and depths, and analyzes the aggregate particle size distribution by combining images taken from different angles, and then analyzes the type of aggregate placement adjustment, thereby effectively solving the problem of insufficient consideration of the current proportioning, avoiding the errors that only consider static physical properties, and thus greatly improving the accuracy of subsequent proportioning settings and the precision of ingredients, providing convenience for the production of asphalt concrete, and also providing a strong guarantee for the production quality of asphalt concrete.
[0047] Furthermore, in step S1, the aggregate distribution deviation of each aggregate monitoring area is analyzed, including: S11, calculating the standard deviation of the particle size of each aggregate in the aggregate image, if it is 0, taking 1 as the particle size distribution concentration, otherwise, taking the inverse of the standard deviation as the particle size distribution concentration.
[0048] S12, comparing the particle size distribution concentration at each monitoring angle with the set reference particle size distribution concentration By comparison, the statistical particle size distribution concentration is less than The number of monitoring viewing angles is calculated and compared with the number of monitoring viewing angles, and the ratio is recorded as the particle size concentration deviation monitoring ratio.
[0049] S13, counting the number of aggregates whose surface roughness is less than the set aggregate surface roughness, and comparing it with the number of aggregates in the corresponding aggregate image, and recording the ratio as the surface deviation aggregate ratio.
[0050] S14. Count the number of monitoring viewing angles at which the surface deviation-to-aggregate ratio exceeds the preset surface deviation-to-aggregate ratio, and compare it with the number of monitoring viewing angles to obtain a surface deviation monitoring ratio.
[0051] S15, the particle size concentration monitoring ratio and surface deviation monitoring ratio of each monitoring area are recorded as and , calculate the aggregate distribution deviation of each aggregate monitoring area , , and They represent the weights corresponding to the particle size concentration deviation and surface roughness deviation, .
[0052] It should be added that in concrete ingredients, for the particle size distribution of aggregates in the same particle size range, the more concentrated it is, that is, the closer to the average particle size, the better, which can ensure that the aggregates put into use are as close to actual needs as possible. This is specifically reflected in the following aspects: 1) Stability of working performance: If the particle size distribution is concentrated, the slump of concrete is easier to control, making the concrete more stable during pouring and construction, and able to meet the slump requirements of the design, which is beneficial to construction operations and quality control.
[0053] 2) Strength and durability of concrete: A concentrated particle size distribution helps reduce voids and unevenness in concrete, thereby improving the density and strength of concrete. This is because a uniform particle size distribution can more effectively fill voids, reduce local stress concentration, and help improve the compressive strength and durability of concrete.
[0054] 3) Controllability of batching process: When the particle size distribution is concentrated, the batching process is easier to control and adjust, and the input amount of aggregates of different particle sizes can be controlled more accurately to ensure the accuracy and consistency of the concrete mix ratio.
[0055] It should be added that the reference intensity distribution concentration described in step S12 , the setting of the reference surface roughness of the batch aggregate described in step S13 and the preset surface deviation aggregate ratio described in step S14 can be extracted from the batch specification. By way of example, the reference force distribution concentration can be specifically taken as 0.5, the preset surface deviation aggregate ratio can be taken as 0.7, and the setting of the reference surface roughness of the batch aggregate can be adjusted accordingly according to the aggregate particle size range. For example, when the aggregate particle size is large, the value range of the reference surface roughness of the batch aggregate is set to 1.5 mm to 3.0 mm. By way of example, the setting of the reference surface roughness of the batch aggregate can be specifically taken as 1.5 mm. For another example, when the aggregate particle size is small, the value range of the reference surface roughness of the batch aggregate is set to 0.5 mm to 1.0 mm. By way of example, the setting of the reference surface roughness of the batch aggregate can be taken as 0.5 mm.
[0056] It should also be added that the weight selection of the particle size concentration deviation and surface roughness deviation described in step S15 depends on multiple factors, including but not limited to the specific requirements of the project, engineering goals, cost considerations, etc. The particle size concentration deviation reflects the consistency of the aggregate particle size and has a significant impact on the fluidity and density of the concrete. Larger particle size variations may lead to poor fluidity of the concrete mixture, while also increasing the void content and reducing the density of the concrete. Surface roughness affects the bond strength between aggregate and cement paste. A rough surface can provide better mechanical bite, thereby improving the overall strength and durability of the concrete.
[0057] For example, if the project requires the concrete to have good fluidity and high density, the weight of particle size concentration deviation should be higher, i.e. , specifically, and The values can be 0.6 and 0.4 respectively. If the project focuses on improving the long-term durability and strength of concrete, the weight of surface roughness deviation should be higher, that is, ,at this time and The values can be 0.4 and 0.6 respectively.
[0058] As another example, suppose the project states that the fluidity and density of concrete are very important, while the strength and durability of concrete also need to be guaranteed. In this case, we can consider the following weight distribution: , .
[0059] Furthermore, the analysis of the moisture variation deviation of each aggregate monitoring area in step S2 includes: S21, taking the monitoring time point as the horizontal coordinate and the moisture content as the vertical coordinate, drawing a moisture content variation curve over time, and extracting the slope of the variation curve as the moisture content variation rate.
[0060] S22. For the same aggregate monitoring area, calculate the standard deviation of the water content change rate at different monitoring depths, and use the calculation result as the water content change difference. The water content change difference of each aggregate monitoring area is recorded as .
[0061] S23, comparing the water content of each monitoring depth corresponding to each aggregate monitoring area at the current monitoring time point with the set interference water content, counting the number of monitoring depths with water content higher than the set interference water content, and comparing it with the number of monitoring depths, taking the ratio as the water interference monitoring depth ratio, recorded as .
[0062] S24, extracting the monitoring temperature and the monitoring humidity from the environmental information, and setting the environmental interference factor according to the pre-set environmental compensation rule .
[0063] The specific setting process of setting the environmental interference factor by the pre-set environmental compensation rule is as follows: U1. Take the monitoring time point as the horizontal coordinate, and the temperature and humidity as the vertical coordinates, respectively, to construct the temperature curve and the humidity curve, and extract the slopes of the temperature curve and the humidity curve, which are recorded as and .
[0064] U2, record the temperature and humidity at the current monitoring time point as and .
[0065] U3. Interference ambient temperature with set reference For comparison, Interference with the set reference ambient humidity for comparison.
[0066] U4, if and or and , taking 0 as the environmental interference factor.
[0067] U5, if and ,Will As the environmental interference factor, , is a natural constant.
[0068] U6, if and , taking 1 as the environmental interference factor, we can get the environmental interference factor , The value is 0 or or 1, where .
[0069] It should be added that the reference interference environment temperature should be set and set reference interference ambient humidity Obtained by extraction from storage specifications of aggregates.
[0070] The embodiment of the present invention sets the environmental interference factor according to the monitored temperature and monitored humidity of the environmental information, and performs aggregate moisture change difference analysis in combination with the water amount change, fully considering the influence of the environment on the water amount of the aggregate, thereby improving the reliability and rationality of the aggregate moisture difference analysis results, and also improving the effectiveness of the aggregate status analysis.
[0071] S25. Calculate the moisture variation deviation of each aggregate monitoring area , , and They are respectively the reference water volume change difference and the water volume interference monitoring depth ratio.
[0072] It should be added that the setting of the interference moisture content, the setting of the reference water volume change difference and the water volume interference monitoring depth ratio are mainly comprehensively set based on historical data, engineering experience, aggregate storage specifications and actual application scenarios. For example, The value can be 0.005. The value can be 0.3, and the interference moisture content can be specifically set to 0.05.
[0073] In a specific embodiment, the calculation process of the moisture content deviation is as follows: Assuming that the moisture content change rates of the aggregate monitoring area A at three different depths (D1, D2, D3) are 0.02, 0.03, and 0.01 respectively, the environmental interference factor given by the environmental compensation model .
[0074] The standard deviation of the moisture content change rate can be calculated using the standard formula, that is, the difference in moisture content change in aggregate monitoring area A .
[0075] The moisture content of aggregate monitoring area A at the monitoring depth D1 at the current monitoring time point is 0.06, which is higher than the set interference moisture content of 0.05, while the moisture content at the other two depths is lower than 0.05, that is, the water content in aggregate monitoring area A interferes with the monitoring depth. .
[0076] Calculate the moisture variation deviation of aggregate monitoring area A , .
[0077] Furthermore, in step S3, when setting the weights of aggregate distribution and moisture change, the weight of aggregate distribution is set to be greater than the weight of moisture change.
[0078] It should be added that aggregate distribution involves aggregate particle size, aggregate shape and aggregate roughness. Among them, aggregate particle size is related to aggregate grading, which determines the density, fluidity and strength of the mixture. Good grading can improve the filling efficiency of the mixture, reduce voids and improve density, while poor grading will cause the mixture to be too loose or difficult to construct. Aggregate coarseness affects the friction and adhesion between aggregates. Aggregates with high surface roughness can provide better adhesion. Changes in aggregate moisture content directly affect the water-cement ratio of the mixture, thereby affecting the strength of the mixture. Changes in the water-cement ratio have a direct impact on the strength and durability of concrete. At the same time, changes in aggregate moisture content will affect the slump and stability of the mixture.
[0079] In summary, aggregate distribution mainly affects the structural properties of the mixture, while moisture changes more affect the fluidity, workability and water-cement ratio of the mixture. Therefore, the weight of aggregate distribution is set greater than the weight of moisture change. For example, the weights of aggregate distribution and moisture change can be 0.55 and 0.45, respectively.
[0080] In a specific embodiment, when the asphalt concrete construction conditions are more stringent, such as when long-distance pumping is required, the moisture change will more affect the fluidity, workability and water-cement ratio of the mixture. At this time, the weight of aggregate distribution can be set smaller than the weight of moisture change. In this scenario, the weights of moisture change and aggregate distribution can be 0.55 and 0.45, respectively.
[0081] Specifically, confirm the target delivery amount of aggregate, filler and asphalt, including: J1. If the delivery adjustment type is no adjustment or partial adjustment, extract the planned delivery amount of aggregate, filler and asphalt from the batching plan and use it as the target delivery amount.
[0082] J2. If the input adjustment type is overall adjustment, the aggregate deviation ratio is recorded as .
[0083] J3. Calculate the mean of the aggregate state deviation in each deviation area and obtain the average aggregate state deviation, recorded as .
[0084] J4. Set the overall adjustment factor , , To set the reference aggregate deviation ratio, To set the reference aggregate state deviation.
[0085] J5. Match and compare the overall adjustment factor with the adjustment factor intervals corresponding to the set adjustment ratios to obtain the matching adjustment ratios. .
[0086] J6. Record the planned amount of aggregate as ,Will Target amount of aggregate ,according to The target amount of filler and asphalt can be confirmed in the same way.
[0087] It should be added that the overall adjustment factor It is set with reference to the Sigmoid function to ensure that the value range of the adjustment factor is (0, 1).
[0088] It should also be added that the reference aggregate state deviation is specifically set with 0 as the boundary. For example, the reference aggregate state deviation can be taken as 0.5, and the adjustment factor interval corresponding to each adjustment ratio can be extracted from the asphalt concrete batching adjustment specification.
[0089] The embodiment of the present invention also analyzes the moisture change rules and moisture content of aggregates at different depths in detail when performing aggregate moisture change difference analysis, accurately quantifies the change trend of moisture content over time, and can objectively evaluate the severity of moisture abnormalities. At the same time, it can also more accurately evaluate whether the moisture change is caused by external environmental factors, thereby reducing misjudgment, thereby ensuring the accuracy of aggregate property assessment, and also improving the reference and persuasiveness of the aggregate placement adjustment type confirmation results.
[0090] In yet another specific embodiment, the aggregate placement setting adjustment is performed, including: Y1. The planned batching aggregate particle size within the deviation area is recorded as the adjusted particle size.
[0091] Y2. Extract the planned grading curve, the planned total weight of aggregate, and the planned ratio and weight of each planned aggregate particle size from the batching plan.
[0092] Y3. Calculate the adjustment ratio of the adjusted particle size, filter out the adjusted particle size from each planned batching aggregate particle size, and use the remaining planned batching aggregate particle sizes as each supplementary particle size.
[0093] Y4. Based on each supplementary particle size, set each supplementary group, and set the supplementary ratio of each supplementary group and the adjusted release ratio under the corresponding supplementary ratio.
[0094] Y5. Based on the adjusted delivery ratio, draw the grading curve of each supplementary group, and compare it with the planned grading curve to obtain the length of the overlapping curve, and take the ratio of the length of the overlapping curve to the length of the planned grading curve as the supplementary fit.
[0095] Y6. Select the supplement group with the highest supplement fit from the supplement fit of each supplement group and record it as the target supplement group. Adjust the aggregate placement settings based on the adjusted placement ratios of each supplement particle size within the target supplement group and the adjusted placement ratios of the adjusted particle sizes.
[0096] Furthermore, the calculation of the adjusted particle size adjustment ratio in step Y3 includes: extracting the aggregate state deviation degree in the deviation area, recorded as , calculate the adjustment ratio of the adjusted particle size , .
[0097] The planned weight of the adjusted particle size is recorded as , the total weight of the planned aggregate is recorded as , and then As the adjustment ratio for adjusting the particle size.
[0098] It should be added that the specific setting method of setting each supplement group in step Y4 is as follows: each supplement particle size is taken as each single supplement group, and randomly combined to obtain each combined supplement group, and each single supplement group and each combined supplement group are taken as each supplement group.
[0099] In a specific embodiment, assuming that the supplementary particle sizes are particle size Q, particle size B, particle size C and particle size F in sequence, particle size Q, particle size B, particle size C and particle size F are taken as each single supplementary group.
[0100] Among them, examples of each combination supplement group are as follows: particle size Q + particle size B, particle size Q + particle size C, particle size Q + particle size F, particle size Q + particle size B + particle size C, particle size Q + particle size B + particle size F, particle size Q + particle size C + particle size F, particle size Q + particle size B + particle size C + particle size F, particle size B + particle size C, particle size B + particle size F, particle size B + particle size C + particle size F, and particle size C and particle size F.
[0101] It should also be added that the specific settings of the supplement ratio of each supplement group and the adjusted delivery ratio under the corresponding supplement ratio in step Y4 are as follows: the supplement ratio of each single supplement group is recorded as 1, and the supplement ratios of each combination supplement group are randomly assigned to obtain the supplement ratios of each combination supplement group, and the sum of each supplement ratio is 1.
[0102] When a supplement group is a single supplement group, As the gram weight of the supplementary aggregate, the adjusted ratio of the supplementary group is calculated in the same way as the adjusted ratio of the adjusted particle size.
[0103] When a supplement group is a combined supplement group, based on the supplement ratio of the combined supplement group, According to the supplementary ratio, it is allocated to each supplementary particle size in the combined supplementary group in sequence. As the supplementary aggregate gram weight of each supplementary particle size in the combined supplementary group, the adjusted delivery ratio of each supplementary ratio under the combined supplementary group is calculated in the same way as the calculation method of the adjusted delivery ratio of the adjusted particle size.
[0104] The raw material processing monitoring module is used to monitor the heating state information of the aggregate in the heating stage after the aggregate is measured.
[0105] Specifically, the heating status information includes but is not limited to the heating temperature value and the monitored moisture content corresponding to each temperature monitoring point.
[0106] The heating temperature value can be obtained by monitoring the temperature sensor, and the moisture content can be obtained by monitoring the infrared moisture meter.
[0107] The raw material processing and analysis module is used to determine whether the ingredients need to be regulated based on the heating status information. If so, confirm the ingredient regulation information; if not, continue to mix the ingredients according to the ingredient plan.
[0108] Specifically, judging whether the ingredients need to be regulated includes: extracting the heating temperature value and monitoring the moisture content corresponding to each temperature monitoring point from the heating state information.
[0109] Calculate the standard deviation of the heating temperature value and the monitored moisture content as the heating temperature non-uniformity and moisture removal unevenness .
[0110] like and , will be no as the judgment result, otherwise, it will be as the judgment result, and are the set heating temperature and the interference non-uniformity of moisture removal, respectively.
[0111] It should be added that and The specific value of can be extracted from the aggregate heating specification. For example, The value can be 5℃. The value can be 0.5%.
[0112] In another specific embodiment, the confirming of batching control information includes: N1, extracting the target heating temperature of aggregate from the batching plan At the same time, the maximum heating temperature value is selected from the heating temperature values corresponding to each temperature monitoring point .
[0113] N2, if , the asphalt mixing flow rate is used as the control item, otherwise, the heating time is used as the control item. It is the safety margin for setting the reference heating temperature.
[0114] It should be added that The specific values can be extracted from the aggregate heating technical table. For example, The specific value may be 50°C.
[0115] N3. If the control item is asphalt mixing flow rate, extract the asphalt mixing flow rate from the batching plan , calculate the control value of asphalt mixing flow rate , , and Represent the weights of temperature and moisture respectively.
[0116] It should be added that the uniformity of the heating temperature directly affects the bonding effect between asphalt and aggregate. If the heating is uneven, some aggregates may fail to reach the ideal heating temperature, thus affecting the bonding effect between asphalt and aggregate, and may also cause the density, strength and durability of certain areas in the mixture to decrease. The uniformity of water content directly affects the water-cement ratio of the mixture, which in turn affects the density, strength and durability of the mixture. Since the uniformity of the heating temperature directly affects the bonding effect between asphalt and aggregate, it is crucial to the performance of the mixture. The uniformity of water content mainly affects the performance of the mixture indirectly by affecting the water-cement ratio. Therefore, under normal circumstances, the uniformity of the heating temperature has a more direct and significant effect on the performance of the mixture, that is, the weight of temperature is higher than the weight of water. For example, and The values can be 0.55 and 0.45 respectively.
[0117] It should also be added that by setting and It is for placement or The influence of the asphalt mixing flow rate control value setting on the heating temperature is ensured and moisture removal unevenness The uniqueness of the calculations is ensured to be independent of each other.
[0118] N4. If the control item is heating time, extract the aggregate heating time from the batching plan. , calculate the control value of the planned heating time of aggregate , .
[0119] N5. Use the control item and the control value of the control item as ingredient control information.
[0120] The embodiment of the present invention makes batching control judgment according to the heating state of aggregate in the heating stage and confirms the control information when control is needed, thereby effectively avoiding the shortcomings of the current focus on measurement before batching, paying full attention to the impact of the batching process on the batching results, and thus minimizing the impact of changes in the batching process on the quality of the mixture, thereby ensuring the effectiveness of the batching, and also ensuring the reliability and stability of subsequent actual use.
[0121] The batching processing execution terminal is used to control the corresponding batching control terminal to perform batching control based on the batching control information.
[0122] It should be added that the batching control terminal is composed of a metering pump, an automatic valve, a heating drum and the like, wherein the heating time can be controlled by controlling the rotation speed of the heating drum, and the asphalt mixture flow rate can be controlled by a metering pump or an automatic valve.
[0123] The above contents are merely examples and explanations of the concept of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they should all fall within the protection scope of the present invention.
Claims
1. An intelligent automatic batching system for asphalt concrete mixing station, characterized by: include: The batching information import module is used to import the batching plan and raw material information of the asphalt concrete to be mixed; The material status monitoring module is used to set each aggregate monitoring area, and then monitor the current aggregate status information of each aggregate monitoring area and the water content corresponding to each monitoring depth at each monitoring time point; Environmental status monitoring module, used to monitor the environmental information corresponding to the environmental area where the asphalt concrete to be mixed is located at each monitoring time point; The material measurement confirmation module is used to confirm the type of aggregate placement adjustment and the target amount of aggregate, filler and asphalt. If the type of placement adjustment is no adjustment or partial adjustment, the planned amount of aggregate, filler and asphalt is extracted from the batching plan and used as the target amount. If the adjustment type is overall adjustment, the target amount of aggregate, filler and asphalt is calculated based on the deviation ratio of aggregate, filler and asphalt; The raw material processing monitoring module is used to monitor the heating status information of the aggregate during the heating stage after the aggregate is metered; A raw material processing and analysis module, for determining whether the ingredients need to be regulated based on the heating state information, and if so, confirming the ingredient regulation information, and if not, continuing to mix the ingredients according to the ingredient plan; The batching processing execution terminal is used to control the corresponding batching control terminal to perform batching control based on the batching control information; The process of confirming the aggregate placement adjustment type is as follows: The aggregate images under each monitoring perspective are extracted from the current aggregate status information. The particle size and surface roughness of each aggregate in the aggregate image are extracted through a computer vision algorithm. The aggregate distribution deviation of each aggregate monitoring area is analyzed and recorded as , Indicates the monitoring area number. ; Based on the moisture content at each monitoring depth at each monitoring time point, the moisture variation deviation of each aggregate monitoring area is analyzed and recorded as ; Set the weights of aggregate distribution and moisture change, and obtain the aggregate state deviation degree of each monitoring area through weighted summation; The aggregate monitoring area where the aggregate state deviation is greater than 0 is recorded as the deviation area, the number of deviation areas is counted, and compared with the number of monitoring areas to obtain the aggregate deviation ratio; If the aggregate deviation ratio is 0, no adjustment will be made as the placement adjustment type; If the aggregate deviation ratio is greater than 0 and less than the set reference aggregate deviation ratio, local adjustment is used as the placement adjustment type; If the aggregate deviation ratio is greater than or equal to the set reference aggregate deviation ratio, the overall adjustment will be used as the delivery adjustment type.
2. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1, characterized in that: The process of setting each aggregate monitoring area is as follows: Extract the aggregate particle size of each planned batch from the batching plan; Extract the particle size range of the aggregate piled corresponding to each aggregate piled area from the raw material information; If the particle size of a planned batching aggregate is within the particle size range of the corresponding aggregate in the aggregate stacking area, the aggregate stacking area is marked as the aggregate monitoring area, thereby obtaining each aggregate monitoring area.
3. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1 is characterized in that: The process of analyzing the aggregate distribution deviation of each aggregate monitoring area is as follows: Calculate the standard deviation of the particle size of each aggregate in the aggregate image. If it is 0, take 1 as the particle size distribution concentration. Otherwise, take the inverse of the standard deviation as the particle size distribution concentration. The particle size distribution concentration at each monitoring angle is compared with the set reference particle size distribution concentration. By comparison, the statistical particle size distribution concentration is less than The number of monitoring viewing angles is compared with the number of monitoring viewing angles, and the ratio is recorded as the particle size concentration deviation monitoring ratio; The number of aggregates whose surface roughness is less than the set aggregate surface roughness is counted and compared with the number of aggregates in the corresponding aggregate image, and the ratio is recorded as the surface deviation aggregate ratio; Counting the number of monitoring viewing angles where the surface deviation aggregate ratio exceeds the preset surface deviation aggregate ratio, and comparing it with the number of monitoring viewing angles to obtain the surface deviation monitoring ratio; The particle size concentration monitoring ratio and surface deviation monitoring ratio of each monitoring area are recorded as and , calculate the aggregate distribution deviation of each aggregate monitoring area , , and They represent the weights corresponding to the particle size concentration deviation and surface roughness deviation, .
4. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1 is characterized in that: The process of analyzing the moisture variation deviation of each aggregate monitoring area is as follows: With the monitoring time point as the abscissa and the water content as the ordinate, a curve of the change of water content over time is drawn, and the slope of the change curve is extracted as the water content change rate; For the same aggregate monitoring area, calculate the standard deviation of the water content change rate at different monitoring depths, and use the calculation result as the water content change difference. The water content change difference of each aggregate monitoring area is recorded as ; Compare the water content of each monitoring depth in each aggregate monitoring area at the current monitoring time point with the set interference water content, count the number of monitoring depths with water content higher than the set interference water content, and compare it with the number of monitoring depths. The ratio is taken as the water interference monitoring depth ratio, recorded as ; The monitoring temperature and the monitoring humidity are extracted from the environmental information, and the environmental interference factor is set by a pre-set environmental compensation rule. ; Calculate the moisture variation deviation of each aggregate monitoring area , , and They are respectively the reference water volume change difference and the water volume interference monitoring depth ratio.
5. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1, characterized in that: The process of confirming the target amount of aggregate, filler and asphalt is as follows: If the input adjustment type is overall adjustment, the aggregate deviation ratio is recorded as ; Calculate the mean of the aggregate state deviation in each deviation area and get the average aggregate state deviation, which is recorded as ; Set the overall adjustment factor , , To set the reference aggregate deviation ratio, To set the reference aggregate state deviation, is a natural constant; Match and compare the overall adjustment factor with the adjustment factor intervals corresponding to the set adjustment ratios to obtain the matching adjustment ratios. ; The planned amount of aggregate is recorded as ,Will Target amount of aggregate ,according to The target amount of filler and asphalt can be confirmed in the same way.
6. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1, characterized in that: The process of adjusting the aggregate placement setting is as follows: The planned batching aggregate particle size within the deviation area is recorded as the adjusted particle size; Extract the planned grading curve, the planned total weight of aggregate, and the planned proportion and weight of each planned aggregate particle size from the batching plan; Calculate the adjustment ratio of the adjusted particle size, filter out the adjusted particle size from the particle sizes of each planned batching aggregate, and use the remaining particle sizes of each planned batching aggregate as each supplementary particle size; Based on each supplementary particle size, each supplementary group is set, and the supplementary ratio of each supplementary group and the adjusted delivery ratio under the corresponding supplementary ratio are set; Based on the adjusted delivery ratio, the gradation curve of each supplementary group is drawn, and the gradation curve is overlapped and compared with the planned gradation curve to obtain the length of the overlapped curve, and the ratio of the length of the overlapped curve to the length of the planned gradation curve is used as the supplementary fit; The supplement group with the highest supplement fit is selected from the supplement fit of each supplement group and recorded as the target supplement group. The aggregate placement setting is adjusted based on the adjusted placement ratio of each supplement particle size in the target supplement group and the adjusted placement ratio of the adjusted particle size.
7. The intelligent automatic batching system for asphalt concrete mixing station according to claim 6, characterized in that: The process of calculating the adjusted particle size adjustment ratio is as follows: The aggregate state deviation degree of the extracted deviation area is denoted as , calculate the adjustment ratio of the adjusted particle size , ; The planned weight of the adjusted particle size is recorded as , the total weight of the planned aggregate is recorded as , and then As the adjustment ratio for adjusting the particle size.
8. The intelligent automatic batching system for asphalt concrete mixing station according to claim 1 is characterized in that: The process of judging whether the ingredients need to be regulated is as follows: Extracting the heating temperature value and the monitored water content corresponding to each temperature monitoring point from the heating state information; Calculate the standard deviation of the heating temperature value and the monitored moisture content as the heating temperature non-uniformity and moisture removal unevenness ; like and , will be no as the judgment result, otherwise, it will be as the judgment result, and are the set heating temperature and the interference non-uniformity of moisture removal, respectively.
9. The intelligent automatic batching system for asphalt concrete mixing station according to claim 8, characterized in that: The process of confirming the ingredient control information is as follows: Extracting the target heating temperature of aggregate from the batching plan At the same time, the maximum heating temperature value is selected from the heating temperature values corresponding to each temperature monitoring point ; like , the asphalt mixing flow rate is used as the control item, otherwise, the heating time is used as the control item. To set the reference heating temperature safety margin; If the control item is asphalt mixing flow rate, extract the asphalt mixing flow rate from the batching plan , calculate the control value of asphalt mixing flow rate , , and denote the weights of temperature and moisture respectively; If the control item is heating time, extract the aggregate heating time from the batching plan , calculate the control value of the planned heating time of aggregate , ; The control items and their control values are used as ingredient control information.