Method, device and readable storage medium for determining the end time of power supply to a graphitization furnace

By setting up parallel electrodes in the graphitization furnace to measure the current ratio, the bonding time and power ratio, the problem of difficult to determine the end time of power supply of the graphitization furnace is solved, and accurate judgment and efficiency improvement are achieved.

CN118705901BActive Publication Date: 2024-11-19HUNAN HUAXIA TEBIAN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411170956.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-19
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The prior art is difficult to accurately determine the end time of power supply of graphitization furnaces, resulting in waste of electricity and waste of production time.

Method used

By setting parallel horizontally arranged electrodes in the graphitization furnace, the total current and edge current values ​​are measured, and the power supply end conditions are determined using the ratio of the electrode current average value and edge current value, and the actual total power supply time and power ratio are combined. to improve judgment accuracy.

Benefits of technology

The accurate determination of the end of power supply of graphitization furnaces is achieved, which reduces power waste and improves production efficiency and equipment turnover.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118705901B_ABST
    Figure CN118705901B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device and readable storage medium for determining the end time of power transmission to a graphitization furnace, and belongs to the technical field of control or regulation systems. The determination method is: during the power transmission process, the total current passing through the graphitization furnace and the edge current values ​​of all the edge electrodes are measured at preset time intervals, and the electrode current mean is obtained by dividing the total current by the number of electrodes of the furnace head; when the ratio of the edge current values ​​of all the edge electrodes to the electrode current mean is greater than the first empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped; wherein the value range of the first empirical coefficient is (0,1). The method for determining the end time of power transmission to a graphitization furnace of the present invention can avoid waste of electric energy, improve the turnover rate of power transmission equipment, shorten the working cycle of the graphitization furnace, and improve production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of control or regulation systems, and in particular to a method and device for determining the end time of power supply to a graphitization furnace, and a computer-readable storage medium. Background Art

[0002] As a device that uses resistance heating to generate high temperatures to convert carbon materials into graphite, graphitization furnaces are widely used in the production of negative electrode materials for batteries such as lithium-ion batteries and sodium-ion batteries. During the operation of a graphitization furnace, a high temperature of up to about 3000°C can be generated inside to better complete the graphitization conversion of carbon materials, and the top of the furnace is covered with insulation materials to reduce heat loss. Therefore, it is difficult to use a reliable and economical method in the current technical solution to obtain the state of the carbon material in the furnace during the power transmission process, and it is difficult to accurately judge when the carbon raw materials in the furnace have been completely converted into graphite and the power transmission can be stopped. In fact, in the current known technical solutions, a total power transmission power and / or total power transmission time are generally set based on the experience of technicians. When the total power transmission power reaches its set value and / or the total power transmission time reaches its set value, the power transmission is stopped. Obviously, this method mainly relies on manual experience, and for the sake of safety and reliability, the manually set reference values ​​often have a large margin, which makes it impossible to stop power supply in time after the carbon raw materials in the furnace are completely converted into graphite, resulting in a large waste of electricity and production time.

[0003] During the operation of the graphitization furnace, how to accurately determine the end time of power supply so as to stop power supply in time to save electricity consumption and production time is a technical problem that needs to be solved urgently. Summary of the invention

[0004] The main purpose of the present invention is to provide a method, device and computer-readable storage medium for determining the end time of power supply to a graphitization furnace, aiming to solve the technical problem of how to accurately determine the end time of power supply so as to stop power supply in time to save electricity consumption and reduce production time.

[0005] To achieve the above object, the present invention provides a method for determining the end time of power supply to a graphitization furnace, wherein a row of parallel electrodes arranged horizontally at equal intervals are respectively provided at the furnace head and the furnace tail of the graphitization furnace, and the number of electrodes at the furnace head and the furnace tail is equal, and a carbon material is loaded in the furnace, and the determination method comprises the following steps:

[0006] During the power transmission process, the total current passing through the graphitization furnace and the edge current values ​​of all the edge electrodes are measured at preset time intervals, and the average electrode current is obtained by dividing the total current by the number of electrodes at the furnace head;

[0007] When the ratio of the edge current value of all the edge electrodes to the average electrode current is greater than the first empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped;

[0008] The value range of the first empirical coefficient is (0, 1).

[0009] Optionally, when the ratio of the edge current value to the electrode current average of all edgemost electrodes is greater than the first empirical coefficient, the step of determining that the power transmission end condition is reached at the current moment and stopping the power transmission includes:

[0010] When the ratio of the edge current value of all the edge electrodes to the average value of the electrode current is greater than the first empirical coefficient, the ratio of the actual total power transmission time at the current moment to the reference total time is determined;

[0011] When the ratio of the actual total power transmission time to the reference total power transmission time at the current moment is greater than the second empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped;

[0012] The value range of the second empirical coefficient is (0, 1).

[0013] Optionally, the actual total power transmission time at the current moment is the total time from the start of power transmission to the current moment.

[0014] Optionally, the value range of the second empirical coefficient is (0.85, 0.99).

[0015] Optionally, when the ratio of the edge current value to the electrode current average of all edgemost electrodes is greater than the first empirical coefficient, the step of determining that the power transmission end condition is reached at the current moment and stopping the power transmission includes:

[0016] When the ratio of the edge current value of all the edge electrodes to the electrode current average value is greater than the first empirical coefficient, the ratio of the actual total power transmission work at the current moment to the reference total power transmission work is determined;

[0017] When the ratio of the actual total power transmission work to the reference total power transmission work at the current moment is greater than the third empirical coefficient, determining that the power transmission end condition is reached at the current moment and stopping the power transmission;

[0018] The value range of the third empirical coefficient is (0, 1).

[0019] Optionally, the actual total electric power delivered at the current moment is the total electric power delivered to the furnace from the start of power delivery to the current moment.

[0020] Optionally, the value range of the third empirical coefficient is (0.90, 0.99).

[0021] Optionally, the value range of the first empirical coefficient is (0.95, 1.00).

[0022] The present invention also provides a device for determining the end time of power transmission to a graphitization furnace, the device being used to implement the method for determining the end time of power transmission to a graphitization furnace as described in any one of the above items; the device comprising a measuring module, a storage module, a computing module and a communication module, wherein:

[0023] The measuring module includes a total ammeter, a voltmeter and four sub-ammeters: the total ammeter is used to measure the total current passing through the graphitization furnace; the voltmeter is electrically connected to the furnace head power supply bus and the furnace tail power supply bus respectively, and is used to measure the total voltage of the graphitization furnace; the four sub-ammeters correspond to the four edge electrodes respectively, and are used to measure the edge current value passing through each edge electrode;

[0024] The storage module is used to store the data obtained by the measurement module;

[0025] The calculation module is used to obtain data from the storage module for calculation to determine whether the conditions required for the power transmission end time are met;

[0026] The communication module is used to obtain the determination result from the calculation module and transmit it to the display screen for the user to perceive.

[0027] The present invention also provides a computer-readable storage medium, which stores a program for determining the time when power supply to a graphitization furnace ends. The program for determining the time when power supply to a graphitization furnace ends is loaded and run by a processor to execute the method for determining the time when power supply to a graphitization furnace ends as described in any one of the above items.

[0028] The following is an introduction to the beneficial effects of the technical solution of the present invention:

[0029] Since the carbon material is inside the graphitization furnace, there is also a thermal insulation covering material on the top, and the maximum temperature of the graphitization process is as high as about 3000°C, which exceeds the measurement upper limit of the commonly used industrial temperature measuring instruments. At the same time, considering that high-temperature materials are also very destructive to measuring instruments, the current known technical means do not have an economical and practical means to accurately measure the temperature and other physical and chemical characteristics of carbon materials at various locations online. At present, the usual means in the industry is that before the graphitization furnace works, the user inputs the planned curve of power supply according to the amount of furnace charge in advance, and plans the power input of the graphitization furnace at each moment. The duration of a cycle of graphitization treatment is usually 2 to 3 days. When the total electric power input to the graphitization furnace reaches the quota standard, that is, the reference total power supply, it is considered that all carbon materials in the furnace have completed the graphitization conversion and the power supply is stopped. Since the operation of each furnace is affected by various random factors such as the physical and chemical properties of raw materials, furnace loading process, ambient temperature fluctuations, and the experience of operators varies, in order to ensure that all materials in the furnace have completed the graphitization process, it is necessary to set a reference total power supply with a large margin to ensure that all carbon materials in the furnace have completed the graphitization conversion when the power supply is stopped. Obviously, this often results in a waste of electricity and time.

[0030] The applicant found in practical work that although the electrode rows at the furnace head and furnace tail of the graphitization furnace are arranged at equal intervals during the design and construction process, so that the current distribution in the furnace is kept uniform to achieve the highest possible working efficiency. However, in the actual graphitization process, due to the large natural convection heat transfer between the furnace walls around the graphitization furnace and the surrounding environment, the carbon material in the furnace always has a high temperature distribution in the middle and low temperature around: this causes the carbon material in the middle to have a higher graphitization conversion rate and can complete the graphitization conversion earlier; while the carbon material in the surrounding area has a lower graphitization conversion rate due to the lower temperature, and has to complete the graphitization conversion later. Therefore, whether the carbon material in the surrounding area has completed the graphitization conversion is actually an indicator of whether the power transmission can be terminated.

[0031] Furthermore, by observing the changes in the current values ​​of each electrode during the power transmission process, the applicant found that in a power transmission cycle: the current values ​​of each electrode are relatively close in the initial stage; then large differences begin to appear, and the current value flowing through the outermost electrode is significantly lower than that of the electrode in the middle area; and in the final stage, the proportion of the current value of the outermost electrode to the total current value begins to increase, until the end time when the current values ​​of each electrode are approximately equal.

[0032] The reason for the above phenomenon is related to the resistivity change of carbon materials during the graphitization process. The graphitization process of carbon materials is a process of converting non-graphite carbon into graphite carbon with a three-dimensional regular and ordered structure of graphite by high-temperature heat treatment through resistance heat generation. In this process, the carbon with amorphous chaotic layer structure is converted into an ordered graphite crystalline structure, accompanied by atomic rearrangement and structural transformation, which requires a lot of energy. As the heat treatment temperature increases, the spacing between graphite layers gradually decreases, generally between 0.343 and 0.346 nm. When the temperature reaches 2500°C, the change is significant, and at 3000°C, the change gradually slows down until the entire graphitization process is completed. This process reduces the resistivity of carbon materials because the conversion of amorphous carbon into graphite crystals is conducive to the flow of free electrons, thereby reducing the resistivity of the material.

[0033] Therefore, in a power transmission cycle: in the initial stage, the physical and chemical properties of the carbon materials in various parts of the furnace are the same, and the resistivity is consistent, so the current values ​​of each electrode are relatively close; later, due to the high temperature in the middle area and the low temperature in the surrounding area, the material in the middle area undergoes graphitization at a faster rate, so the resistivity drops faster, and more current input is obtained, causing the electrodes in the middle area in contact with it to also bear a larger current flow value; finally, when the materials in the surrounding areas also complete the graphitization transformation, the resistivity of the materials in the surrounding areas also drops to a lower level, the materials in various places have completed the graphitization transformation and the resistance furnaces are not much different, and the current values ​​flowing through each electrode are also basically equal.

[0034] The present invention utilizes the above characteristics to realize the determination of the end time of power supply to the graphitization furnace: when the ratio of the current value of all the edge electrodes to the average current of each electrode is greater than the first empirical coefficient, it means that the materials flowing through the surrounding areas of the furnace have completed the graphitization transformation, causing the current value of the edge electrode to be close to the average current of each electrode. Therefore, it can be considered that the materials in the furnace have completed the graphitization transformation and the power supply can be stopped.

[0035] Furthermore, in order to be more reliable and to absorb the experience of on-site operators to a certain extent, it can also be stipulated that at least one of the other two conditions must be met at the same time: (1) the ratio of the actual total power transmission time at the current moment to the reference total power transmission time is greater than the second empirical coefficient; (2) the ratio of the actual total power transmission work at the current moment to the reference total power transmission work is greater than the third empirical coefficient. The value of the first empirical coefficient can be between 0.95 and 1.00; the value of the second empirical coefficient can be between 0.85 and 0.99; the value of the third empirical coefficient can be between 0.90 and 0.99.

[0036] The above-mentioned method for determining the end time of power transmission of the graphitization furnace is scientific, reasonable, safe and reliable. Based on the experience of users, the end time of power transmission is determined in time by observing the change of the current value of the edgemost electrode, thereby reducing the total power transmission power margin, avoiding the waste of electric energy, improving the turnover rate of power transmission equipment, shortening the working cycle of the graphitization furnace, and improving production efficiency. This method only needs to add current and voltage measuring instruments and related storage, calculation, communication and other electronic modules on the basis of the existing graphitization furnace to achieve low cost and wide applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a flow chart of an embodiment of a method for determining the end time of power supply to a graphitization furnace according to the present invention;

[0038] Figure 2 A schematic diagram of the system structure of a graphitization furnace and a device for determining the end time of power transmission thereof according to the present invention;

[0039] Figure 3 for Figure 2 A view of the graphitization furnace and its power supply end time determination device from the AA direction;

[0040] Figure 4 It is a schematic diagram of the framework structure of the device for determining the end time of power supply to the graphitization furnace of the present invention.

[0041] Description of reference numerals:

[0042] 1. DC power supply; 2. Graphitization furnace; 3. Furnace head busbar; 4. Furnace head electrode row; 5. Furnace tail busbar; 6. Furnace tail electrode row; 7. Voltmeter; 8. Sub-ammeter; 9 is total ammeter; 41. Furnace head electrode; 61. Furnace tail electrode; 21. Furnace wall; 22. Carbon material; 100. Measurement module; 200. Storage module; 300. Calculation module; 400. Communication module; 500. Display screen. DETAILED DESCRIPTION

[0043] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0044] like Figure 2 and Figure 3 As shown, a method for determining the end time of power supply to a graphitization furnace is provided, in which a row of parallel electrodes arranged horizontally at equal intervals are respectively arranged at the furnace head and the furnace tail of the graphitization furnace 2, and the number of electrodes at the furnace head and the furnace tail is equal, and the furnace is filled with carbon material 22. The equal-interval arrangement design of the graphitization furnace electrodes can achieve the following effect: if the resistivity of the materials installed in various places in the furnace is consistent, the current values ​​flowing through each electrode are equal.

[0045] Specifically, a furnace head is provided with a furnace head busbar, and a furnace tail is provided with a furnace tail busbar. The furnace head busbar is electrically connected to the electrode row of the furnace head, and the furnace tail busbar is electrically connected to the electrode row of the furnace tail. A passage is formed with the graphitization furnace through the furnace head busbar and the furnace tail busbar, so that the electrodes of the graphitization furnace and the carbon materials therein are electrically heated. The electrode rows of the furnace head and the furnace tail are composed of a number of parallel electrodes arranged at equal intervals horizontally.

[0046] Please refer to Figure 1 , Figure 1 This is a flow chart of an embodiment of a method for determining the end time of power supply to a graphitization furnace according to the present invention; the determination method comprises the following steps:

[0047] Step S10, during the power transmission process, at every preset time interval, measure the total current passing through the graphitization furnace and the edge current values ​​of all the edge electrodes, and divide the total current by the number of electrodes at the furnace head to obtain the electrode current average;

[0048] Step S20, when the ratio of the edge current value of all the edge electrodes to the electrode current average value is greater than the first empirical coefficient, determining that the power transmission end condition is reached at the current moment and stopping the power transmission;

[0049] The value range of the first empirical coefficient is (0, 1).

[0050] Preferably, in the above-mentioned method for determining the timing of power supply termination of the graphitization furnace, the value of the first empirical coefficient is between 0.95 and 1.00.

[0051] Specifically, the graphitization furnace 2 may be in a rectangular parallelepiped shape.

[0052] Preferably, in one embodiment, step S20, when the ratio of the edge current value of all the edgemost electrodes to the electrode current average is greater than the first empirical coefficient, determines that the power transmission end condition is reached at the current moment and stops the power transmission, including:

[0053] When the ratio of the edge current value of all the edge electrodes to the average value of the electrode current is greater than the first empirical coefficient, the ratio of the actual total power transmission time at the current moment to the reference total time is determined;

[0054] When the ratio of the actual total power transmission time to the reference total power transmission time at the current moment is greater than the second empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped;

[0055] The value range of the second empirical coefficient is (0, 1).

[0056] On the basis of saving electricity consumption and shortening production time, in order to make the power transmission process more stable and reliable and the power transmission end time more accurate, the experience of on-site operators is absorbed to a certain extent. When the ratio of the edge current value of all the edge electrodes to the average electrode current is greater than the first empirical coefficient, the power transmission will be stopped only when the ratio of the actual total power transmission time to the reference total time is greater than the second empirical coefficient; preferably, the value of the second empirical coefficient can be between 0.85 and 0.99.

[0057] The actual total power transmission time at the current moment is the total time from the start of power transmission to the current moment.

[0058] Preferably, in another embodiment, step S20, when the ratio of the edge current value to the electrode current average of all edgemost electrodes is greater than the first empirical coefficient, determines that the power transmission end condition is reached at the current moment and stops power transmission, including:

[0059] When the ratio of the edge current value of all the edge electrodes to the electrode current average value is greater than the first empirical coefficient, the ratio of the actual total power transmission work at the current moment to the reference total power transmission work is determined;

[0060] When the ratio of the actual total power transmission work to the reference total power transmission work at the current moment is greater than the third empirical coefficient, determining that the power transmission end condition is reached at the current moment and stopping the power transmission;

[0061] The value range of the third empirical coefficient is (0, 1).

[0062] On the basis of saving electricity consumption and shortening production time, in order to make the power transmission process more stable and reliable and the power transmission end time more accurate, the experience of on-site operators is absorbed to a certain extent. When the ratio of the edge current value of all the edge electrodes to the average electrode current is greater than the first empirical coefficient, the power transmission is stopped only when the ratio of the actual total power transmission power to the reference total power transmission power is greater than the third empirical coefficient; preferably, the value of the third empirical coefficient can be between 0.9 and 0.99.

[0063] The actual total electric power delivered at the current moment is the total electric power delivered to the furnace from the start of power delivery to the current moment.

[0064] In combination with the above two preferred embodiments, when the ratio of the edge current value of all the edge electrodes to the average electrode current is greater than the first empirical coefficient, the ratio of the actual total power transmission time at the current moment to the reference total time is greater than the second empirical coefficient, and the ratio of the actual total power transmission work at the current moment to the reference total power transmission work is greater than the third empirical coefficient, and these three conditions are met at the same time, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped, so that there is a certain large margin to make the graphitization of the carbon material more complete, the power transmission process is more stable and reliable, and a certain amount of electricity consumption can be saved, reducing production time.

[0065] Preferably, in the above-mentioned method for determining the end time of power supply to the graphitization furnace, based on production experience, the preset time interval may be between 10 seconds and 10 minutes.

[0066] Preferably, in the above-mentioned method for determining the end time of power supply to the graphitization furnace, the edgemost electrodes include two electrodes at the edge of the furnace head and furnace tail areas respectively, for a total of four electrodes.

[0067] Specifically, the actual total power transmission at the current moment is the integral of the power transmission power at each moment over the time period from the start of power transmission to the current moment. The power transmission power at each moment is the product of the total current passing through the graphitization furnace 2 at each moment and the voltage between the furnace head bus and the furnace tail bus of the graphitization furnace 2.

[0068] Furthermore, if Figure 4 As shown, the present invention provides a device for determining the end time of power supply to a graphitization furnace, the device comprising a measuring module 100, a storage module 200, a calculation module 300 and a communication module 400, wherein:

[0069] The measuring module 100 includes a total ammeter 9, a voltmeter 7 and four sub-ammeters 8: the total ammeter 9 is used to measure the total current passing through the graphitization furnace 2; the voltmeter 7 is electrically connected to the furnace head power supply bus and the furnace tail power supply bus respectively, and is used to measure the total voltage of the graphitization furnace 2, so as to obtain the electric power input into the graphitization furnace 2 by multiplying the measured total voltage value with the total current value; the four sub-ammeters 8 correspond to the four edge electrodes one by one, respectively, and are used to measure the edge current passing through each edge electrode;

[0070] The storage module 200 is used to store the data obtained by the measurement module 100;

[0071] The calculation module 300 is used to obtain data from the storage module 200 for calculation to determine whether the conditions required for the power transmission end time are met;

[0072] The communication module 400 is used to obtain the determination result from the calculation module 300 and transmit it to the display screen 500 for the user to perceive. The communication method is wired communication or wireless communication.

[0073] Preferably, the total ammeter 9 and the sub-ammeter 8 can both be Hall clamp ammeters and are located in the external space of the graphitization furnace 2 .

[0074] Preferably, the display screen 500 may be located in a central control room of a graphitization furnace operation workshop.

[0075] Furthermore, the present invention also provides a computer-readable storage medium, which stores a program for determining the time when power supply to a graphitization furnace ends. The program for determining the time when power supply to a graphitization furnace ends is loaded and run by a processor to execute the method for determining the time when power supply to a graphitization furnace ends as described in the above embodiment.

[0076] In a specific embodiment:

[0077] Please refer to Figures 2 to 4 Understand this specific embodiment.

[0078] The values ​​of the relevant parameters in this embodiment are: t=1min, the first empirical coefficient a=0.96, the second empirical coefficient b=0.95, and the third empirical coefficient c=0.95. In this embodiment, the furnace head electrode row 4 is composed of 5 furnace head electrodes 41, and the furnace tail electrode row 6 is composed of 5 furnace tail electrodes 61. The current transmission path is: the current starts from the DC power supply 1 and flows to the furnace head busbar 3. The current of the furnace head busbar 3 is divided into five streams and flows into the furnace head electrode 41 respectively, and then flows into the carbon material 22 in the graphitization furnace 2 for its graphitization process; the current in the carbon material 22 is divided into five streams and flows into the furnace tail electrode 61 respectively, and finally converges to the furnace tail busbar 5 and then returns to the DC power supply 1. Among them, a clamp (not shown in the figure) can be provided between the furnace head busbar 3 and the furnace head electrode 41, and between the furnace tail busbar 5 and the furnace tail electrode 61 to achieve the purpose of clamping and current transmission.

[0079] Depend on Figure 3 It is easy to see that the furnace head electrodes 41 at the upper left and lower left and the furnace tail electrodes 61 at the upper right and lower right are the edge electrodes, and each edge electrode corresponds to a sub-ammeter 8. The total ammeter 9 is used to measure the current value of the furnace head busbar 3.

[0080] When a furnace is powered up to a certain moment, the ratios of the edge current values ​​of the four edge electrodes to the average current values ​​of each electrode are 0.965, 0.961, 0.963 and 0.962 respectively, which satisfies the condition that the ratios of the edge current values ​​of all edge electrodes to the average current values ​​of the electrodes are greater than a; at the same time, the ratio of the actual total power transmission time to the reference total time is 0.966, and the ratio of the total power transmission work to the reference total power transmission work is 0.953, which also satisfies the conditions that the ratio of the actual total power transmission time to the reference total time is greater than b and the ratio of the actual total power transmission work to the reference total power transmission work at this moment is greater than c. Therefore, it is determined that the power transmission end time has been reached at this moment, so it is displayed on the display screen 500 to notify the user to stop power transmission or automatically cut off the power.

[0081] In this embodiment, the method for determining the end time of power transmission of the graphitization furnace is scientific, reasonable, safe and reliable. Based on the experience of users, the end time of power transmission is determined in time by observing the change of the current value of the edgemost electrode, thereby saving the total power transmission power margin, avoiding the waste of electric energy, improving the turnover rate of power transmission equipment, shortening the working cycle of the graphitization furnace, and improving production efficiency. This method can be realized by adding current and voltage measuring instruments and related electronic modules such as storage, calculation, and communication on the basis of the existing graphitization furnace 2, with low cost and wide applicability.

[0082] It should be understood by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0083] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (apparatus), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0084] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0085] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0086] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0087] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0088] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A method for determining the end time of power supply to a graphitization furnace, characterized in that: The furnace head and furnace tail of the graphitization furnace are respectively provided with a row of parallel electrodes arranged at equal intervals horizontally, and the number of electrodes at the furnace head and furnace tail is equal. The furnace is filled with carbon material. The determination method comprises the following steps: During the power transmission process, the total current passing through the graphitization furnace and the edge current values ​​of all the edge electrodes are measured at preset time intervals, and the average electrode current is obtained by dividing the total current by the number of electrodes at the furnace head; When the ratio of the edge current value of all the edge electrodes to the average electrode current is greater than the first empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped; The value range of the first empirical coefficient is (0.95, 1.00).

2. The method for determining the end time of power supply to a graphitization furnace according to claim 1, characterized in that: The step of determining that the power transmission end condition is reached at the current moment and stopping power transmission when the ratio of the edge current value to the electrode current average value of all edgemost electrodes is greater than the first empirical coefficient comprises: When the ratio of the edge current value of all the edge electrodes to the average value of the electrode current is greater than the first empirical coefficient, the ratio of the actual total power transmission time at the current moment to the reference total time is determined; When the ratio of the actual total power transmission time to the reference total power transmission time at the current moment is greater than the second empirical coefficient, it is determined that the power transmission end condition is reached at the current moment and the power transmission is stopped; Among them, the value range of the second empirical coefficient is (0.85, 0.99).

3. The method for determining the end time of power supply to a graphitization furnace according to claim 2, characterized in that: The actual total power transmission time at the current moment is the total time from the start of power transmission to the current moment.

4. The method for determining the end time of power supply to a graphitization furnace according to claim 1, characterized in that: The step of determining that the power transmission end condition is reached at the current moment and stopping power transmission when the ratio of the edge current value to the electrode current average value of all edgemost electrodes is greater than the first empirical coefficient comprises: When the ratio of the edge current value of all the edge electrodes to the electrode current average value is greater than the first empirical coefficient, the ratio of the actual total power transmission work at the current moment to the reference total power transmission work is determined; When the ratio of the actual total power transmission work to the reference total power transmission work at the current moment is greater than the third empirical coefficient, determining that the power transmission end condition is reached at the current moment and stopping the power transmission; Among them, the value range of the third empirical coefficient is (0.90, 0.99).

5. The method for determining the end time of power supply to a graphitization furnace according to claim 4, characterized in that: The actual total electric power delivered at the current moment is the total electric power delivered into the furnace from the start of power delivery to the current moment.

6. A device for determining the end time of power supply to a graphitization furnace, characterized in that: The determination device is used to implement the method for determining the end time of power supply to the graphitization furnace according to any one of claims 1 to 5; The determination device includes a measurement module, a storage module, a calculation module and a communication module, wherein: The measuring module includes a total current meter, a voltage meter and four sub-current meters: The total ammeter is used to measure the total current passing through the graphitization furnace; the voltmeter is electrically connected to the furnace head power supply bus and the furnace tail power supply bus respectively, and is used to measure the total voltage of the graphitization furnace; the four sub-ammeters correspond to the four edge electrodes respectively, and are used to measure the edge current value passing through each edge electrode; The storage module is used to store the data obtained by the measurement module; The calculation module is used to obtain data from the storage module for calculation to determine whether the conditions required for the power transmission end time are met; The communication module is used to obtain the determination result from the calculation module and transmit it to the display screen for the user to perceive.

7. A computer-readable storage medium, characterized in that: A graphitization furnace power supply end time determination program is stored therein, and the graphitization furnace power supply end time determination program is loaded and run by a processor to execute the graphitization furnace power supply end time determination method as described in any one of claims 1 to 5.