Method and device for detecting and warning failure of circuit breaker refusal to operate at generator end

By obtaining the switch position and start information of the circuit breaker at the generator end, combining protection alarm and circuit data, fault information is judged and early warning is made, the problem of untimely identification of circuit breaker at the generator end is solved, and the power grid is ensured safe and reliable operation.

CN118707320BActive Publication Date: 2024-11-08HUANENG LANCANG RIVER HYDROPOWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411179608.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-08
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

The frequent refusal of circuit breaker at the generator end resulted in damage to the generator mechanical mechanism, affecting the safe and reliable operation of the power grid, and the voltage fluctuations in the power grid system due to reactive power shortages, affecting the safety of the power grid.

Method used

By obtaining the switch position information and start-up information of the circuit breaker at the generator end, combining the protection alarm information and circuit data, we can determine whether the three-phase preset conditions are met, determine the fault information and conduct a fault warning, and quickly identify the circuit breaker refusal abnormality. Avoid the accidents expanding.

Benefits of technology

It realizes timely identification and early warning of the circuit breaker refusal fault of the generator terminal circuit breaker, avoids unit damage and grid voltage fluctuations, and ensures the safe and reliable operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118707320B_ABST
    Figure CN118707320B_ABST
Patent Text Reader

Abstract

The present application proposes a method and device for detecting and warning a failure of a generator-end circuit breaker to refuse to operate, which relates to the technical field of fault detection. The method comprises: obtaining switch position information of the generator-end circuit breaker and the start-up information of the generator set; obtaining protection alarm information and circuit data of the generator set within a preset time, and determining whether the circuit data meets the indication information of the three-phase preset conditions according to the start-up information and the switch position information; determining the fault information of the generator-end circuit breaker according to the switch position information, the start-up information, the protection alarm information and the indication information, and performing a fault warning according to the fault information, so as to solve the technical problem in the prior art that the abnormal alarm of the circuit breaker refusal to operate is not timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of fault detection, and in particular to a method and device for detecting and warning a refusal to operate fault of a generator end circuit breaker. Background Art

[0002] At present, pumped storage units, gas turbine units, and hydro-generator units are characterized by frequent start-up and shutdown, and a large number of circuit breaker opening and closing operations. During the start-up and shutdown process of the unit, the generator circuit breaker (GCB) has repeatedly refused to operate. Due to the operation of the unit motor, the adjustment of the excitation system, speed control system and monitoring system fails, and the generator unit is in an out-of-control state. Long-term motor movement will cause the stator and rotor windings of the unit to heat up severely and the vibration to intensify, causing damage to the mechanical structure of the generator. Once seriously damaged, it is difficult to repair and the cycle is long, causing serious economic losses to the power plant. At the same time, due to the reduction of the generator terminal voltage after demagnetization, the absorption system is reactive, causing the unit to enter deep phase-leading operation, resulting in a large shortage of reactive power in the power grid system, causing voltage fluctuations in the power grid system. Once a failure occurs in the power grid system, it will seriously affect the safe and reliable operation of the power grid. Summary of the invention

[0003] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, the first purpose of the present application is to propose a generator end circuit breaker refusal to operate fault detection and early warning method to quickly determine the circuit breaker refusal to operate abnormality and ensure the safe and reliable operation of the power grid.

[0005] The second objective of the present application is to provide a generator end circuit breaker refusal to operate fault detection and early warning device.

[0006] The third objective of the present application is to provide an electronic device.

[0007] A fourth objective of the present application is to provide a computer-readable storage medium.

[0008] A fifth object of the present application is to provide a computer program product.

[0009] To achieve the above-mentioned purpose, the first embodiment of the present application proposes a generator end circuit breaker refusal to operate fault detection and early warning method, comprising:

[0010] Obtaining the switch position information of the generator end circuit breaker and the start command information of the generator set, wherein the switch position information includes opening and closing, and the start command information includes a start command and a stop command;

[0011] Acquire protection alarm information and circuit data of the generator set within a preset time, and determine whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information, wherein the protection alarm information is identification information of whether there is a reverse power protection alarm of the generator;

[0012] According to the switch position information, the start command information, the protection alarm information and the indication information, the fault information of the generator end circuit breaker is determined, and a fault warning is performed according to the fault information.

[0013] To achieve the above-mentioned purpose, the second embodiment of the present application proposes a generator end circuit breaker refusal to operate fault detection and early warning device, comprising:

[0014] A first acquisition module is used to acquire the switch position information of the generator end circuit breaker and the start command information of the generator set, wherein the switch position information includes opening and closing, and the start command information includes a start command and a stop command;

[0015] A second acquisition module is used to obtain protection alarm information and circuit data of the generator set within a preset time, and determine whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information, wherein the protection alarm information is identification information of whether there is a reverse power protection alarm of the generator;

[0016] The early warning module is used to determine the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information, and to perform a fault early warning according to the fault information.

[0017] To achieve the above-mentioned purpose, the third aspect of the present application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;

[0018] The memory stores computer-executable instructions;

[0019] The processor executes the computer-executable instructions stored in the memory to implement the method as described in the embodiment of the first aspect.

[0020] To achieve the above-mentioned purpose, the fourth aspect embodiment of the present application proposes a computer-readable storage medium, in which computer-readable storage medium is stored computer execution instructions, and when the computer execution instructions are executed by a processor, they are used to implement the method described in the first aspect embodiment.

[0021] To achieve the above-mentioned purpose, the fifth aspect of the present application proposes a computer program product, including a computer program, which implements the method described in the first aspect when executed by a processor.

[0022] The generator-end circuit breaker refusal to operate fault detection and early warning method and device provided in the present application determine different judgment scenarios through the switch position information of the generator-end circuit breaker and the generator start command information, and perform fault judgment in the corresponding judgment scenario according to the protection alarm information and circuit data to determine the corresponding fault information, thereby performing fault early warning according to the fault information, solving the problem of untimely recognition of refusal to operate anomalies, avoiding the expansion of accidents, and ensuring safe and reliable operation of the power grid.

[0023] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0025] Figure 1 A flow chart of a method for detecting and warning a generator end circuit breaker refusal to operate fault provided by an embodiment of the present application;

[0026] Figure 2 A flow chart of another generator end circuit breaker refusal to operate fault detection and early warning method provided in an embodiment of the present application;

[0027] Figure 3 A schematic structural diagram of a generator end circuit breaker refusal to operate fault detection and early warning device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0028] Embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.

[0029] A generator end circuit breaker refusal to operate fault detection and early warning method and device according to an embodiment of the present application will be described below with reference to the accompanying drawings.

[0030] Figure 1 The present invention provides a flow chart of a method for detecting and warning a generator end circuit breaker failure failure provided by an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0031] S101, obtaining the switch position information of the circuit breaker at the generator end and the start command information of the generator set.

[0032] Generator-end circuit breakers are suitable for various large power plants such as nuclear power plants, thermal power plants and hydropower plants. They are an electrical component used to control and protect generators and electrical equipment. Their basic function is to prevent electrical equipment from overloading, reduce the failure rate of electrical equipment, and protect electrical equipment from damage. In other words, the circuit breaker can cut off the generator circuit in time to avoid damage to the generator caused by short circuits, grounding and other faults. The circuit breaker can also protect electrical equipment from current overload.

[0033] The switch position information of the circuit breaker includes opening and closing. Closing means that the circuit breaker is changed from the opening position to the closing position by human operation in the power system, and opening means that the circuit breaker is changed from the closing position to the disconnecting position by human operation in the power system. When the circuit breaker connecting rod moves to the opening position, the switch position information is the opening position, which means that the power is disconnected, and when the circuit breaker connecting rod moves to the closing position, the switch position information is the closing position, which means that the power is turned on.

[0034] The start command information of the generator set is used to reflect whether the generator set is currently started or stopped. The start command information includes a start command and a stop command; the start command indicates that the generator set is in the start state, and the stop command indicates that the generator set is in the stop state; the start command in the start command information corresponds to the closing command in the switch position information, and the stop command in the start command information corresponds to the opening command in the switch position information.

[0035] S102, obtaining protection alarm information and circuit data of the generator set within a preset time, and determining whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information.

[0036] Optionally, the preset time may be 30 seconds, that is, protection alarm information and circuit data within 30 seconds are collected for analysis and fault judgment.

[0037] In some implementations, the protection alarm information is identification information of whether there is a generator reverse power protection alarm; the generator reverse power protection alarm is also called power direction protection. The power direction of the generator should be from the generator to the bus. When the generator loses magnetism or for some other reason, it may become a generator, that is, drawing active power from the system. This is reverse power. When the reverse power reaches a certain value, the generator's protection action, such as sending a signal or tripping, is performed. Therefore, the generator reverse power protection alarm information can be used to determine whether the current generator set has lost magnetism or other abnormal conditions.

[0038] Furthermore, circuit data refers to data during the operation of the generator, such as current, voltage, active power, reactive power, rotor voltage, rotor current and other data, which can be directly read from the operation of the generator set and used to reflect whether there are actually abnormal conditions during the operation of the generator set.

[0039] Optionally, the circuit data and protection alarm information of the generator set can be determined based on a monitoring system, which is connected to the generator set by wire or wireless means to obtain the circuit data and protection alarm information of the generator set. The monitoring system can also obtain the start-up information of the generator set to realize real-time monitoring of the generator set.

[0040] Optionally, the protection alarm information may include a reverse power protection alarm of generator protection set A and a reverse power protection alarm of generator protection set B. When any reverse power protection alarm occurs in the generator set, it is determined that the protection alarm information of the generator set is the presence of a reverse power protection alarm.

[0041] It can be understood that based on the start command information and the switch position information, it can be determined whether the power is currently on or off, and whether the switch position is closed or open. Since the switch connecting rod moves to the corresponding position but the contact may not have reached it, the circuit data can be combined for analysis and judgment.

[0042] Optionally, the three-phase preset conditions can be based on the conditions that each circuit data needs to meet in accordance with the three-phase refusal to open or three-phase refusal to close conditions. The three-phase refusal to open means that the circuit breaker phases A, B and C fail to open, and the three-phase refusal to close means that the circuit breaker phases A, B and C fail to close.

[0043] In some implementations, a preset threshold for each type of circuit data can be obtained, and when the circuit data meets the range specified by the preset threshold, it is determined that the circuit data meets the preset condition; or a preset interval for each type of circuit data is obtained, and when the circuit data within a preset time is within the preset interval, it is determined that the circuit data meets the three-phase preset condition.

[0044] In some implementations, circuit data under different start command information and different switch position information may correspond to different preset intervals. In some implementations, in order to improve the judgment accuracy, it can be determined that the circuit data meets the three-phase preset condition when all types of circuit data are within the preset interval; wherein the indication information is used to indicate that the circuit data meets the three-phase preset condition, or to indicate that the circuit data does not meet the three-phase preset condition.

[0045] S103, determining the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information, and performing a fault warning according to the fault information.

[0046] It can be understood that the current state of the generator set being on or off can be determined based on the switch position information and the start command information, and the opening or closing of the switch can be determined based on the switch position information. When the generator set is stopped and the switch position is open, protection alarm information and indication information are obtained, that is, it is determined whether the generator set has a reverse power protection alarm and whether the circuit data of the generator set meets the preset conditions for three-phase rejection. If the generator set has a reverse power protection alarm and the circuit data of the generator set meets the preset conditions for three-phase rejection, the fault information of the generator-end circuit breaker is a three-phase rejection abnormality; when the generator set is started and the switch position is closed, protection alarm information and indication information are obtained, that is, it is determined whether the generator set has a reverse power protection alarm and whether the circuit data of the generator set meets the preset conditions for three-phase rejection. If the generator set has a reverse power protection alarm and the circuit data of the generator set meets the preset conditions for three-phase rejection, the fault information of the generator-end circuit breaker is a three-phase rejection abnormality.

[0047] Optionally, when it is determined that the fault information of the generator circuit breaker (GCB) is a three-phase refusal to open abnormality, continuous on-duty personnel can send early warning information for feedback, and the early warning information can be "generator GCB three-phase refusal to open abnormality alarm"; in some implementations, the generators can also be specifically distinguished, such as "No. 1 generator GCB three-phase refusal to open abnormality alarm" or "#1 generator GCB three-phase refusal to open abnormality alarm"; accordingly, when the fault information is a three-phase refusal to close abnormality, the early warning information can be "#1 generator GCB three-phase refusal to close abnormality alarm".

[0048] In some implementations, the early warning information may also include handling suggestions. For example, when the three-phase separation is abnormal, the early warning information may include the handling suggestion of "applying to disconnect the 500kV 5013 circuit breaker and 5014 circuit breaker"; when the three-phase closing is abnormal, the early warning information may include the handling suggestion of "starting the standby unit and notifying professional personnel to check and handle it".

[0049] In this embodiment, different judgment scenarios are determined based on the switch position information of the generator-end circuit breaker and the start-up command information of the generator, and in the corresponding judgment scenarios, fault judgment is performed according to the protection alarm information and circuit data. When the protection alarm information and circuit data meet different conditions, the corresponding fault information is determined, so as to perform a fault warning according to the fault information. This embodiment can timely identify the circuit breaker refusal to operate abnormality, avoid the expansion of accidents, and ensure the safe and reliable operation of the power grid.

[0050] Figure 2 A flow chart of another method for detecting and warning a generator end circuit breaker failure failure provided by an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:

[0051] S201, obtaining the switch position information of the circuit breaker at the generator end and the start command information of the generator set.

[0052] In the embodiment of the present application, the implementation method of step S201 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0053] S202, obtaining protection alarm information and circuit data of the generator set within a preset time, and determining whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information.

[0054] In the embodiment of the present application, the implementation method of step S202 can be implemented by any of the methods in the embodiments of the present disclosure, which is not limited here and will not be repeated.

[0055] S203, when the start command information is a shutdown command and the switch position information is an open position, determine whether there is a first recognition result of a generator reverse power protection alarm according to the protection alarm information.

[0056] It is understandable that the protection alarm information can be obtained according to monitoring of the monitoring system, and the protection alarm information can be a reverse power protection alarm of generator protection set A, or a reverse power protection alarm of generator protection set B. The first identification result is used to reflect whether there is a reverse power protection alarm of the generator. When the generator has a reverse power protection alarm of generator protection set A and / or a reverse power protection alarm of generator protection set B, the first identification result indicates that there is a reverse power protection alarm of the generator.

[0057] S204, in response to the first identification result indicating that there is a generator reverse power protection alarm and the indication information indicating that the circuit data meets the three-phase preset conditions, determining that the fault information is a three-phase disconnection abnormality.

[0058] It can be understood that the indication information is used to indicate whether the circuit data meets the three-phase preset conditions. When the start-up command information is a shutdown command and the switch position information is the open position, the three-phase preset conditions are actually the three-phase rejection preset conditions, that is, to determine whether the circuit data meets the three-phase rejection preset conditions.

[0059] In some implementations, a first target interval corresponding to the generator set power, a second target interval corresponding to the rotor voltage, a third target interval corresponding to each phase current, and a fourth target interval corresponding to each phase voltage can be obtained; the target interval is a preset interval corresponding to each type of circuit data. If each type of circuit data is within the corresponding target interval, it is determined that the circuit data meets the three-phase preset conditions.

[0060] That is to say, in response to the generator set power being in the first target range, the rotor voltage being in the second target range, each phase current being in the corresponding third target range, and each phase voltage being in the corresponding fourth target range, it is determined that the circuit data meets the three-phase preset conditions.

[0061] In some implementations, the generator set power may include the active power and reactive power of the generator set, and the first target intervals corresponding to the active power and the reactive power may be the same or different; optionally, the target interval corresponding to each type of circuit data may be determined based on the rated data of the generator set.

[0062] For example, for generator set No. 1, the generator end stator rated phase constant voltage Ue is 10.39 kV, the generator end stator rated current Ie is 24948 A, the generator rated power Pe is 700 MW, the generator maximum phase leading depth reactive power Qe is -300 Mvar, the generator no-load excitation voltage Uf0 is 210 V and the generator no-load excitation current If0 is 2140 A.

[0063] Based on generator No. 1, the first target interval of the active power of the generator set can be an interval less than or equal to -3%Pe, and the first target interval of the reactive power of the generator can be an interval less than or equal to -10%Qe; the second target interval of the rotor voltage can be an interval less than -10%Uf0; the third target interval corresponding to the A-phase current, the B-phase current and the C-phase current can be an interval greater than 10%Ie; the fourth target interval corresponding to the A-phase voltage, the B-phase voltage and the C-phase voltage can be an interval of (70%Ue, 90%Ue).

[0064] That is to say, when the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the machine-end IA phase current>10%Ie, the machine-end IB phase current>10%Ie, the machine-end IC phase current>10%Ie, the rotor voltage Uf0<-10%Uf0, 70%Ue<machine-end UA voltage<90%Ue, 70%Ue<machine-end UB voltage<90%Ue, 70%Ue<machine-end UC voltage<90%Ue are met at the same time, it is determined that the circuit data meets the three-phase preset conditions.

[0065] When the first identification result indicates that there is a generator reverse power protection alarm and the indication information indicates that the circuit data meets the three-phase preset conditions, it is determined that the fault information is a three-phase disconnection exception.

[0066] S205, when the start command information is a start command and the switch position information is a closing position, in response to the indication information indicating that the circuit data meets the three-phase preset conditions, it is determined that the fault information is a three-phase refusal to close abnormality.

[0067] In some implementations, the fifth target interval corresponding to the generator set power, the sixth target interval corresponding to the rotor voltage, the seventh target interval corresponding to the rotor current, the eighth target interval corresponding to each phase current, and the ninth target interval corresponding to each phase voltage can be obtained; the voltage of each phase on the low-voltage side of the main transformer of the generator is obtained, and the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer is calculated, and the i-phase is one of the A-phase, the B-phase and the C-phase; the tenth target interval corresponding to the absolute value of the voltage difference of the i-phase is obtained. The target interval is the preset interval corresponding to each type of circuit data. If each type of circuit data is within the corresponding target interval, it is determined that the circuit data meets the three-phase preset conditions.

[0068] That is to say, in response to the generator set power being in the fifth target range, the rotor voltage being in the sixth target range, the rotor current being in the seventh target range, each current being in the corresponding eighth target range, each phase voltage being in the corresponding ninth target range, and the absolute value of the voltage difference of phase i being in the corresponding tenth target range, it is determined that the circuit data meets the three-phase preset conditions.

[0069] For example, for generator set No. 1, the generator end stator rated phase constant voltage Ue is 10.39 kV, the generator end stator rated current Ie is 24948 A, the generator rated power Pe is 700 MW, the generator maximum phase leading depth reactive power Qe is -300 Mvar, the generator no-load excitation voltage Uf0 is 210 V and the generator no-load excitation current If0 is 2140 A.

[0070] Based on generator No. 1, the fifth target interval of the active power of the generator set can be an interval less than 1%Pe; the sixth target interval of the rotor voltage can be an interval greater than 50%Uf0; the seventh target interval of the rotor current can be an interval greater than 50%If0; the eighth target interval corresponding to the A-phase current, the B-phase current and the C-phase current can be an interval less than 1%Ie; the ninth target interval corresponding to the A-phase voltage, the B-phase voltage and the C-phase voltage can be an interval greater than 90%Ue; the tenth target interval corresponding to the absolute value of the voltage difference |ΔUA| between the A-phase voltage and the A-phase voltage on the low-voltage side of the main transformer, the absolute value of the voltage difference |ΔUB| between the B-phase voltage and the B-phase voltage on the low-voltage side of the main transformer, and the absolute value of the voltage difference |ΔUC| between the C-phase voltage and the C-phase voltage on the low-voltage side of the main transformer can be an interval less than 0.27kV.

[0071] That is to say, when the unit active power P is less than 1%Pe, the machine-end IA phase current is less than 1%Ie, the machine-end IB phase current is less than 1%Ie, the machine-end IC phase current is less than 1%Ie, the rotor voltage Uf0 is greater than 50%Uf0e, the rotor current If is greater than 50%If0, the machine-end UA voltage is greater than 90%Ue, the machine-end UB voltage is greater than 90%Ue, the machine-end UC voltage is greater than 90%Ue, the voltage difference between phase A at the generator end and phase A on the low-voltage side of the main transformer |ΔUA| is less than 0.27kV, the voltage difference between phase B at the generator end and phase B on the low-voltage side of the main transformer |ΔUB| is less than 0.27kV, and the voltage difference between phase C at the generator end and phase C on the low-voltage side of the main transformer |ΔUC| is less than 0.27kV, it is determined that the circuit data meets the three-phase preset conditions.

[0072] When the indication information indicates that the circuit data meets the three-phase preset conditions, it is determined that the fault information is a three-phase refusal to close abnormality.

[0073] S206, when the start command information is a stop command and the switch position information is an open position, obtain a second recognition result of whether the generator has a non-full-phase protection alarm.

[0074] In some implementations, the non-full-phase protection alarm may include the non-full-phase protection alarm of generator protection set A and the non-full-phase protection alarm of generator protection set B. In response to the presence of a non-full-phase protection alarm of generator protection set A or a non-full-phase protection alarm of generator protection set B in the generator, it is determined that the second identification result is that a non-full-phase protection alarm exists in the generator.

[0075] Optionally, the monitoring system may monitor and obtain a second identification result of the generator, that is, monitor and obtain whether there is a non-full-phase protection alarm of the generator.

[0076] S207, in response to the first identification result indicating the presence of a generator reverse power protection alarm, the second identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, determining that the fault information is a non-full-phase rejection abnormality.

[0077] In some implementations, the non-full-phase preset condition may be a pre-set condition, and whether the circuit data satisfies the preset condition is determined by judging whether the circuit data satisfies the preset condition.

[0078] Optionally, the current difference between each two phases in each phase current can be obtained, and the maximum current difference between each two phases can be obtained; the voltage of each phase on the low-voltage side of the main transformer of the generator is obtained, and the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer is calculated, and the i-phase is one of the A-phase, B-phase and C-phase; the eleventh target interval corresponding to the maximum current difference and the twelfth target interval corresponding to the absolute value of the voltage difference of the i-phase are obtained; the target interval is the preset interval corresponding to each type of circuit data. If each type of circuit data is within the corresponding target interval, it is determined that the circuit data meets the non-full-phase preset condition.

[0079] That is to say, in response to the generator set power being in the first target range, the rotor voltage being in the second target range, the maximum current difference being in the eleventh target range, and the absolute value of the voltage difference of phase i being in the corresponding twelfth target range, it is determined that the circuit data meets the non-full-phase preset conditions.

[0080] For example, for generator set No. 1, the generator end stator rated phase constant voltage Ue is 10.39 kV, the generator end stator rated current Ie is 24948 A, the generator rated power Pe is 700 MW, the generator maximum phase leading depth reactive power Qe is -300 Mvar, the generator no-load excitation voltage Uf0 is 210 V and the generator no-load excitation current If0 is 2140 A.

[0081] Based on generator No. 1, the first target interval of the active power of the generator set can be an interval less than or equal to -3%Pe, and the first target interval of the reactive power of the generator can be an interval less than or equal to -10%Qe; the second target interval of the rotor voltage can be an interval less than -10%Uf0; the eleventh target interval of the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|} can be an interval greater than 3%Ie; the twelfth target interval corresponding to the absolute value of the voltage difference of phase i can include a marked interval and an unmarked interval, the marked interval is an interval greater than 0.54kV, and the unmarked interval is an interval less than 0.27kV.

[0082] That is to say, when the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end|IA-IB|, machine end|IB-IC|, machine end|IC-IA|}>3%Ie and the absolute value of the voltage difference of phase i is in the corresponding twelfth target interval, it is determined that the circuit data meets the non-full-phase preset conditions.

[0083] In some implementations, non-full-phase preset conditions can be specifically divided into A-phase preset conditions, B-phase preset conditions and C-phase preset conditions. When other circuit data are in the corresponding target interval, if the absolute value of the voltage difference of phase A is in the marked interval, and the absolute value of the voltage difference between phases B and C is in the non-marked interval, then the circuit data correspondingly satisfies the A-phase preset condition; if the absolute value of the voltage difference of phase B is in the marked interval, and the absolute value of the voltage difference between phases A and C is in the non-marked interval, then the circuit data correspondingly satisfies the B-phase preset condition; accordingly, if the absolute value of the voltage difference of phase C is in the marked interval, and the absolute value of the voltage difference between phases A and B is in the marked interval, then the circuit data correspondingly satisfies the C-phase preset condition.

[0084] Specifically, when the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, the voltage difference between phase A at the generator end and phase A at the low-voltage side of the main transformer |ΔUA|>0.54kV, the voltage difference between phase B at the generator end and phase B at the low-voltage side of the main transformer |ΔUB|<0.27kV, and the voltage difference between phase C at the generator end and phase C at the low-voltage side of the main transformer |ΔUC|<0.27kV, it is determined that the circuit data meets the preset conditions of phase A.

[0085] When the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, |ΔUB|>0.54kV, |ΔUA|<0.27kV and |ΔUC|<0.27kV, it is determined that the circuit data meets the preset conditions of phase B.

[0086] When the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, |ΔUC|>0.54kV, |ΔUA|<0.27kV and |ΔUB|<0.27kV, it is determined that the circuit data meets the preset conditions of phase C.

[0087] Further, when the first identification result indicates the existence of a generator reverse power protection alarm, the second identification result indicates the existence of a non-full-phase protection alarm, and the circuit data meets the non-full-phase preset conditions, the fault information is determined to be a non-full-phase rejection abnormality; it can be understood that if the circuit data is determined to meet the A phase preset conditions, the fault information is the A phase rejection abnormality; if the circuit data meets the B phase preset conditions, the fault information is the B phase rejection abnormality; if the circuit data meets the C phase preset conditions, the fault information is the C phase rejection abnormality.

[0088] S208, when the start command information is a start command and the switch position information is a closing position, a third recognition result of whether the generator has a non-full-phase protection alarm is obtained.

[0089] The non-full-phase protection alarm includes the non-full-phase protection alarm of generator protection set A and the non-full-phase protection alarm of generator protection set B. When the generator has the non-full-phase protection alarm of generator protection set A or the non-full-phase protection alarm of generator protection set B, it is determined that the third identification result is that the generator has a non-full-phase protection alarm.

[0090] Optionally, the monitoring system may monitor and obtain a third identification result of the generator, that is, monitor and obtain whether there is a non-full-phase protection alarm of the generator.

[0091] S209, in response to the first identification result indicating the presence of a generator reverse power protection alarm, the third identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, determining that the fault information is a non-full-phase refusal exception.

[0092] Optionally, the current difference between each two phases in each phase current can be obtained, and the maximum current difference between each two phases can be obtained; the thirteenth target interval corresponding to the maximum current difference is obtained; the fourteenth target interval corresponding to the generator set power is obtained; in response to the generator set power being in the fourteenth target interval, the rotor voltage being in the sixth target interval, the rotor current being in the seventh target interval, the absolute value of the voltage difference of the i-phase being in the corresponding tenth target interval and the maximum current difference being in the corresponding thirteenth target interval, it is determined that the circuit data meets the non-full-phase preset condition.

[0093] For example, for generator set No. 1, the generator end stator rated phase constant voltage Ue is 10.39 kV, the generator end stator rated current Ie is 24948 A, the generator rated power Pe is 700 MW, the generator maximum phase leading depth reactive power Qe is -300 Mvar, the generator no-load excitation voltage Uf0 is 210 V and the generator no-load excitation current If0 is 2140 A.

[0094] Based on generator No. 1, the fourteenth target interval of the active power of the generator set can be an interval greater than 2%Pe; the sixth target interval of the rotor voltage can be an interval greater than 50%Uf0; the seventh target interval of the rotor current can be an interval greater than 50%If0; the tenth target interval corresponding to the absolute value of the voltage difference of phase i can also include a marked interval and an unmarked interval, the unmarked interval is an interval less than 0.27kV, and the marked interval is an interval greater than 0.54kV; the thirteenth interval corresponding to the maximum current difference can be an interval greater than 3%Ie.

[0095] That is to say, when the unit active power P>2%Pe, machine-end IA phase current<1%Ie, machine-end IB phase current<1%Ie, machine-end IC phase current<1%Ie, rotor voltage Uf0>50%Uf0e, rotor current If>50%If0, maximum current difference max{machine-end|IA-IB|, machine-end|IB-IC|, machine-end|IC-IA|}>3%Ie and the absolute value of the voltage difference of phase i corresponds to the tenth target interval, it is determined that the circuit data meets the non-full-phase preset conditions.

[0096] In some implementations, non-full-phase preset conditions can be specifically divided into A-phase preset conditions, B-phase preset conditions and C-phase preset conditions. When other circuit data are in the corresponding target interval, if the absolute value of the voltage difference of phase A is in the marked interval, and the absolute value of the voltage difference between phases B and C is in the non-marked interval, then the circuit data correspondingly satisfies the A-phase preset condition; if the absolute value of the voltage difference of phase B is in the marked interval, and the absolute value of the voltage difference between phases A and C is in the non-marked interval, then the circuit data correspondingly satisfies the B-phase preset condition; accordingly, if the absolute value of the voltage difference of phase C is in the marked interval, and the absolute value of the voltage difference between phases A and B is in the marked interval, then the circuit data correspondingly satisfies the C-phase preset condition.

[0097] Specifically, when the unit active power P>2%Pe, the machine-end IA phase current<1%Ie, the machine-end IB phase current<1%Ie, the machine-end IC phase current<1%Ie, the rotor voltage Uf0>50%Uf0e, the rotor current If>50%If0, the maximum current difference max{machine-end|IA-IB|, machine-end|IB-IC|, machine-end|IC-IA|}>3%Ie, the voltage difference between phase A at the generator end and phase A at the low-voltage side of the main transformer |ΔUA|>0.54kV, the voltage difference between phase B at the generator end and phase B at the low-voltage side of the main transformer |ΔUB|<0.27kV, and the voltage difference between phase C at the generator end and phase C at the low-voltage side of the main transformer |ΔUC|<0.27kV, it is determined that the circuit data meets the preset conditions of phase A.

[0098] When the unit active power P is greater than 2%Pe, the machine-end IA phase current is less than 1%Ie, the machine-end IB phase current is less than 1%Ie, the machine-end IC phase current is less than 1%Ie, the rotor voltage Uf0 is greater than 50%Uf0e, the rotor current If is greater than 50%If0, the maximum current difference max{machine-end |IA-IB|, machine-end |IB-IC|, machine-end |IC-IA|} is greater than 3%Ie, |ΔUA| is less than 0.27kV, |ΔUB| is greater than 0.54kV and |ΔUC| is less than 0.27kV, it is determined that the circuit data meets the preset conditions of phase B.

[0099] When the unit active power P is greater than 2%Pe, the machine-end IA phase current is less than 1%Ie, the machine-end IB phase current is less than 1%Ie, the machine-end IC phase current is less than 1%Ie, the rotor voltage Uf0 is greater than 50%Uf0e, the rotor current If is greater than 50%If0, the maximum current difference max{machine-end |IA-IB|, machine-end |IB-IC|, machine-end |IC-IA|} is greater than 3%Ie, |ΔUA| is less than 0.27kV, |ΔUB| is less than 0.27kV, and |ΔUC| is greater than 0.54kV, it is determined that the circuit data meets the preset conditions of phase C.

[0100] Furthermore, when the first identification result indicates the existence of a generator reverse power protection alarm, the third identification result indicates the existence of a non-full-phase protection alarm, and the circuit data meets the non-full-phase preset conditions, the fault information is determined to be a non-full-phase rejection abnormality; it can be understood that if the circuit data is determined to meet the A phase preset conditions, the fault information is the A phase rejection abnormality; if the circuit data meets the B phase preset conditions, the fault information is the B phase rejection abnormality; if the circuit data meets the C phase preset conditions, the fault information is the C phase rejection abnormality.

[0101] S210, generating a corresponding early warning strategy according to the fault information, and performing a fault early warning based on the early warning strategy.

[0102] The early warning strategy includes early warning information and handling suggestions; the early warning information is used to reflect the specific warning content, and the handling suggestions are suggestions given in response to the current abnormal situation.

[0103] For example, for generator No. 1, when it is determined that the three-phase GCB of the generator refuses to disconnect abnormally, the early warning strategy can be to issue a "three-phase GCB of generator No. 1 refuses to disconnect abnormally alarm" and issue a disposal suggestion of "please contact the dispatcher on duty immediately to apply for disconnection of 500kV5013 circuit breaker and 5014 circuit breaker".

[0104] When it is determined that the generator GCB A phase rejection is abnormal, the early warning strategy can be to issue a "No. 1 generator GCB A phase rejection abnormal alarm" or "No. 1 generator GCB non-full phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of 500kV5013 circuit breakers and 5014 circuit breakers".

[0105] When it is determined that the generator GCB B phase rejection is abnormal, the early warning strategy can be to issue a "No. 1 generator GCB B phase rejection abnormal alarm" or a "No. 1 generator GCB non-full phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of 500kV5013 circuit breakers and 5014 circuit breakers".

[0106] When it is determined that the generator GCB C phase rejection is abnormal, the early warning strategy can be to issue a "No. 1 generator GCB C phase rejection abnormal alarm" or a "No. 1 generator GCB non-full phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of the 500kV5013 circuit breaker and 5014 circuit breaker".

[0107] When it is determined that the three-phase closing of the generator GCB is abnormal, the early warning strategy can be to issue a "No. 1 generator GCB three-phase closing abnormality alarm" and issue a disposal suggestion of "please contact the dispatcher on duty immediately, start the standby unit, and notify professional personnel to check and handle it."

[0108] When it is determined that the generator A phase refuses to close abnormally, the early warning strategy can be to issue a "No. 1 generator GCB A phase refuses to close abnormally alarm" or a "No. 1 generator GCB non-full-phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of the 500kV5013 circuit breaker and 5014 circuit breaker".

[0109] When it is determined that the generator B phase refuses to close abnormally, the early warning strategy can be to issue a "No. 1 generator GCB B phase refuses to close abnormally alarm" or a "No. 1 generator GCB non-full-phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of the 500kV5013 circuit breaker and 5014 circuit breaker".

[0110] When it is determined that the generator C phase refuses to close abnormally, the early warning strategy can be to issue a "No. 1 generator GCB C phase refuses to close abnormally alarm" or a "No. 1 generator GCB non-full-phase abnormal alarm", and issue a disposal suggestion of "Please contact the dispatcher on duty immediately to apply for disconnection of the 500kV5013 circuit breaker and 5014 circuit breaker".

[0111] In summary, the embodiments of the present application can identify and judge specific fault information based on protection alarm information and circuit data; when the start command information is shutdown and the switch position is the open position, that is, the shutdown command = 1 and the switch is open, within 30 seconds, the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the machine-end IA phase current>10%Ie, the machine-end IB phase current>10%Ie, the machine-end IC phase current>10%Ie, the rotor voltage Uf0<-10%Uf0, 70%Ue<machine-end UA voltage<90%Ue, 70%Ue<machine-end UB voltage<90%Ue, 70%Ue<machine-end UC voltage<90%Ue and there is a reverse power protection alarm of the generator protection A set / the reverse power protection alarm of the generator protection B set is met at the same time, it is determined that the fault information is a three-phase refusal to separate abnormality, and the monitoring system issues an early warning according to the early warning strategy of the three-phase refusal to separate abnormality.

[0112] When the shutdown order = 1 and the switch is opened, within 30 seconds, the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, |ΔUA|>0.54kV, |ΔUB|<0.27kV and |ΔUC|<0.27kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is A phase rejection abnormality, and the monitoring system issues an early warning according to the early warning strategy of the A phase rejection abnormality.

[0113] When the shutdown order = 1 and the switch is opened, within 30 seconds, the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, |ΔUB|>0.54kV, |ΔUA|<0.27kV, |ΔUC|<0.27kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is B phase rejection abnormality, and the monitoring system issues an early warning according to the early warning strategy of B phase rejection abnormality.

[0114] When the shutdown order = 1 and the switch is opened, within 30 seconds, the unit active power P≤-3%Pe, the unit reactive power Q≤-10%Qe, the rotor voltage Uf0<-10%Uf0, the maximum current difference max{machine end |IA-IB|, machine end |IB-IC|, machine end |IC-IA|}>3%Ie, |ΔUC|>0.54kV, |ΔUA|<0.27kV, |ΔUB|<0.27kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is C phase rejection abnormality, and the monitoring system issues an early warning according to the early warning strategy of C phase rejection abnormality.

[0115] When the start command information is on and the switch position is in the closing position, that is, the start command = 1 and the switch is closed, within 30 seconds, the unit active power P is less than 1%Pe, the machine-end IA phase current is less than 1%Ie, the machine-end IB phase current is less than 1%Ie, the machine-end IC phase current is less than 1%Ie, the rotor voltage Uf0 is greater than 50%Uf0e, the rotor current If is greater than 50%If0, the machine-end UA voltage is greater than 90%Ue, the machine-end UB voltage is greater than 90%Ue, the machine-end UC voltage is greater than 90%Ue, |ΔUA| is less than 0.27kV, |ΔUB| is less than 0.27kV, and |ΔUC| is less than 0.27kV, the fault information is determined to be a three-phase refusal to close abnormality, and the monitoring system issues an early warning according to the early warning strategy for the three-phase refusal to close abnormality. When the start command = 1 and the switch is closed, within 30 seconds, the unit active power P>2%Pe, the machine-end IA phase current <1%Ie, the machine-end IB phase current <1%Ie, the machine-end IC phase current <1%Ie, the rotor voltage Uf0>50%Uf0e, the rotor current If>50%If0, the maximum current difference max{machine-end |IA-IB|, machine-end |IB-IC|, machine-end |IC-IA|}>3%Ie, |ΔUA|>0.54kV, |ΔUB|<0.27kV, |ΔUC|<0.27kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is A phase refusal to close abnormality, and the monitoring system issues an early warning according to the early warning strategy of the A phase refusal to close abnormality.

[0116] When the start command = 1 and the switch is closed, within 30 seconds, the unit active power P>2%Pe, the machine-end IA phase current<1%Ie, the machine-end IB phase current<1%Ie, the machine-end IC phase current<1%Ie, the rotor voltage Uf0>50%Uf0e, the rotor current If>50%If0, the maximum current difference max{machine-end|IA-IB|, machine-end|IB-IC|, machine-end|IC-IA|}>3%Ie, |ΔUA|<0.27kV, |ΔUB|>0.54kV, |ΔUC|<0.27kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is B phase refusal to close abnormality, and the monitoring system issues an early warning according to the early warning strategy of the B phase refusal to close abnormality.

[0117] When the start command = 1 and the switch is closed, within 30 seconds, the unit active power P>2%Pe, the machine-end IA phase current<1%Ie, the machine-end IB phase current<1%Ie, the machine-end IC phase current<1%Ie, the rotor voltage Uf0>50%Uf0e, the rotor current If>50%If0, the maximum current difference max{machine-end|IA-IB|, machine-end|IB-IC|, machine-end|IC-IA|}>3%Ie, |ΔUA|<0.27kV, |ΔUB|<0.27kV, |ΔUC|>0.54kV, there is a reverse power protection alarm of generator protection A set / generator protection B set reverse power protection alarm, and there is a non-full-phase protection alarm of generator protection A set / generator protection B set non-full-phase protection alarm, it is determined that the fault information is C phase refusal to close abnormality, and the monitoring system issues an early warning according to the early warning strategy of C phase refusal to close abnormality.

[0118] In this embodiment, by judging whether each type of data in the circuit data satisfies the corresponding target interval, it is determined whether the circuit data satisfies the three-phase preset conditions, and accurately judges the abnormal three-phase refusal to open or three-phase refusal to close fault conditions at the generator end; further, each type of data in the circuit data is further judged to judge whether the circuit data satisfies the non-full-phase preset conditions, so as to determine different refusal to open / refusal to close conditions according to different protection alarm information and the values ​​of each type of data in the circuit data, and can judge the A-phase / B-phase / C-phase / three-phase refusal to open of the generator-end circuit breaker, as well as the A-phase / B-phase / C-phase / three-phase refusal to close, and generate different early warning strategies according to different fault information for early warning, and obtain fault information and fault early warning through the monitoring system, so that the fault information of the circuit breaker can be obtained in time without adding new equipment, and the operation duty personnel are assisted to quickly isolate the fault, avoid damage to the unit, and prevent the accident from expanding.

[0119] In order to implement the above-mentioned embodiment, the present application also proposes a generator end circuit breaker refusal to operate fault detection and early warning device.

[0120] Figure 3 The present invention provides a schematic diagram of a generator end circuit breaker refusal to operate fault detection and early warning device. Figure 3 As shown, the generator end circuit breaker refusal to operate fault detection and early warning device 300 includes:

[0121] The first acquisition module 301 is used to acquire the switch position information of the generator end circuit breaker and the start command information of the generator set, the switch position information includes opening and closing, and the start command information includes start command and stop command;

[0122] The second acquisition module 302 is used to obtain the protection alarm information and circuit data of the generator set within a preset time, and determine whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information, wherein the protection alarm information is the identification information of whether there is a reverse power protection alarm of the generator;

[0123] The early warning module 303 is used to determine the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information, and to perform a fault early warning according to the fault information.

[0124] Furthermore, in a possible implementation of the embodiment of the present application, the early warning module 303 includes:

[0125] When the start command information is a stop command and the switch position information is an open switch position, a first identification result is determined based on the protection alarm information whether there is a generator reverse power protection alarm;

[0126] In response to the first identification result indicating that there is a generator reverse power protection alarm and the indication information indicating that the circuit data meets the three-phase preset conditions, determining that the fault information is a three-phase disconnection abnormality;

[0127] The start command information is a power-on command, the switch position information is a closing position, and in response to the indication information indicating that the circuit data meets the three-phase preset conditions, it is determined that the fault information is a three-phase refusal to close abnormality.

[0128] Furthermore, in a possible implementation of the embodiment of the present application, the early warning module 303 includes:

[0129] Obtaining a first target interval corresponding to the power of the generator set, a second target interval corresponding to the rotor voltage, a third target interval corresponding to each phase current, and a fourth target interval corresponding to each phase voltage;

[0130] In response to the generator set power being in the first target interval, the rotor voltage being in the second target interval, each phase current being in the corresponding third target interval, and each phase voltage being in the corresponding fourth target interval, it is determined that the circuit data meets the three-phase preset conditions.

[0131] Furthermore, in a possible implementation of the embodiment of the present application, the early warning module 303 includes:

[0132] Obtaining a fifth target interval corresponding to the power of the generator set, a sixth target interval corresponding to the rotor voltage, a seventh target interval corresponding to the rotor current, an eighth target interval corresponding to each phase current, and a ninth target interval corresponding to each phase voltage;

[0133] Obtain the voltage of each phase on the low-voltage side of the main transformer of the generator, and calculate the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer, where the i-phase is one of the A-phase, the B-phase and the C-phase;

[0134] Obtaining the tenth target interval corresponding to the absolute value of the voltage difference of phase i;

[0135] In response to the generator set power being in the fifth target range, the rotor voltage being in the sixth target range, the rotor current being in the seventh target range, each current being in the corresponding eighth target range, each phase voltage being in the corresponding ninth target range, and the absolute value of the voltage difference of phase i being in the corresponding tenth target range, it is determined that the circuit data meets the three-phase preset conditions.

[0136] Furthermore, in a possible implementation of the embodiment of the present application, the apparatus 300 further includes:

[0137] When the start command information is a stop command and the switch position information is an open switch position, a second identification result of whether the generator has a non-full-phase protection alarm is obtained, and it is determined whether the circuit data meets the non-full-phase preset condition;

[0138] In response to the first identification result indicating the presence of a generator reverse power protection alarm, the second identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, determining that the fault information is a non-full-phase rejection abnormality;

[0139] When the start command information is a start command and the switch position information is a closing position, a third identification result of whether the generator has a non-full-phase protection alarm is obtained, and it is determined whether the circuit data meets the non-full-phase preset condition;

[0140] In response to the first identification result indicating the presence of a generator reverse power protection alarm, the third identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, the fault information is determined to be a non-full-phase refusal exception.

[0141] Furthermore, in a possible implementation of the embodiment of the present application, the apparatus 300 includes:

[0142] Obtain the current difference between every two phases in each phase current, and obtain the maximum current difference between every two phases;

[0143] Obtain the voltage of each phase on the low-voltage side of the main transformer of the generator, and calculate the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer, where the i-phase is one of the A-phase, the B-phase and the C-phase;

[0144] Obtaining an eleventh target interval corresponding to the maximum current difference and a twelfth target interval corresponding to the absolute value of the voltage difference of phase i;

[0145] In response to the generator set power being in the first target interval, the rotor voltage being in the second target interval, the maximum current difference being in the eleventh target interval, and the absolute value of the voltage difference of phase i being in the corresponding twelfth target interval, it is determined that the circuit data meets the non-full-phase preset condition.

[0146] Furthermore, in a possible implementation of the embodiment of the present application, the apparatus 300 further includes:

[0147] Obtain the current difference between every two phases in each phase current, and obtain the maximum current difference between every two phases;

[0148] Obtaining a thirteenth target interval corresponding to the maximum current difference;

[0149] Obtaining a fourteenth target interval corresponding to the power of the generator set;

[0150] In response to the generator set power being in the fourteenth target interval, the rotor voltage being in the sixth target interval, the rotor current being in the seventh target interval, the absolute value of the voltage difference of phase i being in the corresponding tenth target interval, and the maximum current difference being in the corresponding thirteenth target interval, it is determined that the circuit data meets the non-full-phase preset conditions.

[0151] Furthermore, in a possible implementation of the embodiment of the present application, the early warning module 303 includes:

[0152] Generate corresponding warning strategies according to fault information, and perform fault warning based on the warning strategies, where the warning strategies include warning information and handling suggestions.

[0153] It should be noted that the above explanation of the generator end circuit breaker refusal to operate fault detection and early warning method embodiment is also applicable to the generator end circuit breaker refusal to operate fault detection and early warning device of this embodiment, and will not be repeated here.

[0154] In the embodiment of the present application, by judging whether each type of data in the circuit data satisfies the corresponding target interval, it is determined whether the circuit data satisfies the three-phase preset condition, and the abnormal fault condition of three-phase refusal to open or three-phase refusal to close at the generator end is accurately judged; further, each type of data in the circuit data is further judged to judge whether the circuit data satisfies the non-full-phase preset condition, so as to determine different refusal to open / refusal to close conditions according to different protection alarm information and the values ​​of each type of data in the circuit data, and it is possible to judge the A-phase / B-phase / C-phase / three-phase refusal to open of the generator-end circuit breaker, as well as the A-phase / B-phase / C-phase / three-phase refusal to close, and generate different early warning strategies according to different fault information for early warning, and obtain fault information and fault early warning through the monitoring system, so that the fault information of the circuit breaker can be obtained in time without adding new equipment, and the operation duty personnel can be assisted to quickly isolate the fault, avoid damage to the unit, and prevent the accident from expanding.

[0155] In order to implement the above embodiments, the present application also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.

[0156] In order to implement the above embodiments, the present application also proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.

[0157] In order to implement the above embodiments, the present application also proposes a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.

[0158] The collection, storage, use, processing, transmission, provision and disclosure of user personal information involved in this application are in compliance with relevant laws and regulations and do not violate public order and good morals.

[0159] It should be noted that personal information from users should be collected for legitimate and reasonable purposes and should not be shared or sold outside of these legitimate uses. In addition, such collection / sharing should be carried out after receiving the user's informed consent, including but not limited to notifying the user to read the user agreement / user notice and sign the agreement / authorization including authorization of relevant user information before the user uses the function. In addition, any necessary steps should be taken to protect and safeguard access to such personal information data and ensure that others who have access to personal information data comply with its privacy policy and procedures.

[0160] The present application is expected to provide an implementation scheme for users to selectively block the use or access of personal information data. That is, the present disclosure is expected to provide hardware and / or software to prevent or block access to such personal information data. Once the personal information data is no longer needed, the risk can be minimized by limiting data collection and deleting the data. In addition, when applicable, such personal information is de-identified to protect the privacy of the user.

[0161] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they contradict each other.

[0162] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0163] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0164] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples (non-exhaustive list) of computer-readable media include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0165] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0166] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0167] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0168] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A method for detecting and warning a failure of a generator end circuit breaker failure, characterized in that: The following steps are involved: Obtaining the switch position information of the generator end circuit breaker and the start command information of the generator set, wherein the switch position information includes opening and closing, and the start command information includes a start command and a stop command; Acquire protection alarm information and circuit data of the generator set within a preset time, and determine whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information, wherein the protection alarm information is identification information of whether there is a reverse power protection alarm of the generator; Determine the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information, and perform a fault warning according to the fault information; Wherein, determining the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information includes: When the start command information is a shutdown command and the switch position information is an open switch position, a first identification result of determining whether there is a generator reverse power protection alarm is present according to the protection alarm information; In response to the first identification result indicating that there is a generator reverse power protection alarm and the indication information indicating that the circuit data meets the three-phase preset condition, determining that the fault information is a three-phase disconnection abnormality; In view of the fact that the start command information is a start command, the switch position information is a closing position, and in response to the indication information indicating that the circuit data meets the three-phase preset condition, it is determined that the fault information is a three-phase refusal to close abnormality; For the start command information being a stop command, and the switch position information being an open switch position, obtaining a second identification result of whether the generator has a non-full-phase protection alarm, and determining whether the circuit data meets a non-full-phase preset condition; In response to the first identification result indicating the presence of a generator reverse power protection alarm, the second identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, determining that the fault information is a non-full-phase rejection abnormality; For the start command information being a start command, and the switch position information being a closing position, obtaining a third recognition result of whether the generator has a non-full-phase protection alarm, and determining whether the circuit data meets a non-full-phase preset condition; In response to the first identification result indicating the presence of a generator reverse power protection alarm, the third identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, the fault information is determined to be a non-full-phase refusal exception.

2. The method according to claim 1, characterized in that The circuit data includes the power of the generator set, the rotor voltage, the current of each phase and the voltage of each phase. When the start command information is a shutdown command and the switch position information is an open switch position, the indication information for determining whether the circuit data meets the three-phase preset conditions includes: Obtaining a first target interval corresponding to the power of the generator set, a second target interval corresponding to the rotor voltage, a third target interval corresponding to each phase current, and a fourth target interval corresponding to each phase voltage; In response to the generator set power being in the first target range, the rotor voltage being in the second target range, each phase current being in the corresponding third target range, and each phase voltage being in the corresponding fourth target range, it is determined that the circuit data meets the three-phase preset conditions.

3. The method according to claim 1, characterized in that: The circuit data includes the power of the generator set, the rotor voltage, the rotor current, the current of each phase and the voltage of each phase. When the start command information is a start command and the switch position information is a closing position, the indication information for determining whether the circuit data meets the three-phase preset conditions includes: Obtaining a fifth target interval corresponding to the power of the generator set, a sixth target interval corresponding to the rotor voltage, a seventh target interval corresponding to the rotor current, an eighth target interval corresponding to each phase current, and a ninth target interval corresponding to each phase voltage; Obtain the voltage of each phase on the low-voltage side of the main transformer of the generator, and calculate the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer, where the i-phase is one of the A-phase, the B-phase and the C-phase; Obtaining the tenth target interval corresponding to the absolute value of the voltage difference of phase i; In response to the generator set power being in the fifth target range, the rotor voltage being in the sixth target range, the rotor current being in the seventh target range, each current being in the corresponding eighth target range, each phase voltage being in the corresponding ninth target range, and the absolute value of the voltage difference of phase i being in the corresponding tenth target range, it is determined that the circuit data meets the three-phase preset conditions.

4. The method according to claim 2, characterized in that: When the start command information is a shutdown command and the switch position information is an open switch position, determining whether the circuit data meets a non-full-phase preset condition includes: Obtain the current difference between every two phases in each phase current, and obtain the maximum current difference between every two phases; Obtain the voltage of each phase on the low-voltage side of the main transformer of the generator, and calculate the absolute value of the voltage difference between the i-phase voltage and the i-phase voltage on the low-voltage side of the main transformer, where the i-phase is one of the A-phase, the B-phase and the C-phase; Obtaining an eleventh target interval corresponding to the maximum current difference and a twelfth target interval corresponding to the absolute value of the voltage difference of the i-phase; In response to the generator set power being in the first target range, the rotor voltage being in the second target range, the maximum current difference being in the eleventh target range, and the absolute value of the voltage difference of the i-phase being in the corresponding twelfth target range, it is determined that the circuit data meets the non-full-phase preset condition.

5. The method according to claim 3, characterized in that: When the start command information is a start command and the switch position information is a closing position, determining whether the circuit data meets a non-full-phase preset condition, the method further includes: Obtain the current difference between every two phases in each phase current, and obtain the maximum current difference between every two phases; Obtaining a thirteenth target interval corresponding to the maximum current difference; Obtaining a fourteenth target interval corresponding to the power of the generator set; In response to the generator set power being in the fourteenth target interval, the rotor voltage being in the sixth target interval, the rotor current being in the seventh target interval, the absolute value of the voltage difference of phase i being in the corresponding tenth target interval, and the maximum current difference being in the corresponding thirteenth target interval, it is determined that the circuit data satisfies the non-full-phase preset condition.

6. The method according to claim 1, characterized in that Performing a fault warning according to the fault information includes: A corresponding early warning strategy is generated according to the fault information, and a fault early warning is performed based on the early warning strategy, wherein the early warning strategy includes early warning information and handling suggestions.

7. A generator end circuit breaker refusal to operate fault detection and early warning device, characterized in that: include: A first acquisition module is used to acquire the switch position information of the generator end circuit breaker and the start command information of the generator set, wherein the switch position information includes opening and closing, and the start command information includes a start command and a stop command; A second acquisition module is used to obtain protection alarm information and circuit data of the generator set within a preset time, and determine whether the circuit data meets the indication information of the three-phase preset conditions according to the start command information and the switch position information, wherein the protection alarm information is identification information of whether there is a reverse power protection alarm of the generator; an early warning module, configured to determine the fault information of the generator end circuit breaker according to the switch position information, the start command information, the protection alarm information and the indication information, and to perform a fault early warning according to the fault information; The early warning module is also used for: When the start command information is a shutdown command and the switch position information is an open switch position, a first identification result of determining whether there is a generator reverse power protection alarm is present according to the protection alarm information; In response to the first identification result indicating that there is a generator reverse power protection alarm and the indication information indicating that the circuit data meets the three-phase preset condition, determining that the fault information is a three-phase disconnection abnormality; In view of the fact that the start command information is a start command, the switch position information is a closing position, and in response to the indication information indicating that the circuit data meets the three-phase preset condition, it is determined that the fault information is a three-phase refusal to close abnormality; For the start command information being a stop command, and the switch position information being an open switch position, obtaining a second identification result of whether the generator has a non-full-phase protection alarm, and determining whether the circuit data meets a non-full-phase preset condition; In response to the first identification result indicating the presence of a generator reverse power protection alarm, the second identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, determining that the fault information is a non-full-phase rejection abnormality; For the start command information being a start command, and the switch position information being a closing position, obtaining a third recognition result of whether the generator has a non-full-phase protection alarm, and determining whether the circuit data meets a non-full-phase preset condition; In response to the first identification result indicating the presence of a generator reverse power protection alarm, the third identification result indicating the presence of a non-full-phase protection alarm, and the circuit data satisfying a non-full-phase preset condition, the fault information is determined to be a non-full-phase refusal exception.

8. An electronic device comprising: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 6.