Construction site dust fall spraying device based on BIM and using method thereof

Through the BIM-based construction site dust reduction spray device and the use of multi-stage pipe section water delivery mechanisms and positioning components, the existing construction site dust reduction equipment solves the problems of high labor intensity and inability to cover high-rise buildings during manual inspections, and achieves standardized management and more comprehensive construction site dust reduction. Effect.

CN118718628APending Publication Date: 2024-10-01SHANDONG HAOYUE CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410939702.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing construction site dust reduction equipment such as fog cannons require manual inspection, which is highly labor-intensive. BIM technology cannot be effectively used to layout dust reduction devices, and it is difficult to cover high-rise buildings, resulting in poor dust reduction effects.

Method used

A construction site dust reduction spray device based on BIM is designed, including a mobile water storage mechanism and a multi-stage pipe section water delivery mechanism. It adopts straight pipe sections and elbow structures of PVC material. BIM technology is combined with the planning and layout of the dust reduction device. Utilize The positioning components can be fixed and disassembled to facilitate comprehensive dust reduction at the construction site.

Benefits of technology

It has achieved standardized management of dust reduction work on the construction site, with a more comprehensive dust reduction effect. Materials are easily available and easy to assemble. It integrates the advantages of BIM technology and reaches the core location of the construction site directly, improving the efficiency and effect of dust reduction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118718628A_ABST
    Figure CN118718628A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a building site dust fall spraying device based on BIM and a using method thereof.The building site dust fall spraying device comprises a movable water storage mechanism, the movable water storage mechanism is composed of a movable base, a water storage tank installed on the movable base and a water pumping structure connected with the water storage tank, and the water pumping structure comprises a water supply pipe; a movable pipe joint is arranged at the end part of the water supply pipe, and a plurality of water supply joints are arranged on the movable pipe joint; according to the construction site dust fall spraying device based on the BIM, when a building is subjected to BIM construction, the number and positions of the multi-stage pipe joint water supply mechanisms can be arranged according to needs, dust fall work of a construction site is more standardized and convenient to manage, a straight pipe section and elbow structure made of PVC materials is adopted for construction of a dust fall water supply pipeline, and the construction efficiency is improved. On one hand, the structure is simple, materials are easy to obtain, assembling is convenient, on the other hand, the advantages of the BIM technology are fused, dust falling is conducted on the core position of a construction site, and dust falling is more comprehensive and better in effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to a construction site dust reduction spray device based on BIM and a use method thereof. Background Art

[0002] In the modern construction process, BIM, or Building Information Modeling, is a computer-aided design based on three-dimensional graphics, object-oriented, and architecture. In the modern construction process, BIM technology can effectively improve construction efficiency and shorten construction period.

[0003] During the construction process, the use of construction machinery will stir up dust on the construction site, causing the surrounding air environment to deteriorate. Therefore, in order to improve the air quality of the construction site and protect the surrounding environment during modern construction, dust reduction measures are often needed to reduce the dust on the construction site.

[0004] One of the most important means of dust reduction measures in modern construction sites is humidification treatment, and the main method used is to reduce dust on construction sites by means of fog cannons, which are usually scheduled according to data such as the dust concentration on the construction site. The dust reduction method of fog cannons has certain limitations in application. First of all, the use of fog cannon equipment requires manual driving and patrolling of the site for dust removal, which has high labor intensity and cannot effectively utilize the model advantages of BIM technology to layout dust reduction devices in advance, and cannot be effectively applied to the construction of the main body of the building based on BIM technology. Secondly, with the increase in building height, the dust reduction effect of the fog cannon cannot effectively cover the upper buildings.

[0005] Furthermore, at this stage, BIM technology is mainly used in aspects such as material management and drawing comparison during the construction process. However, based on BIM technology, the layout of dust reduction devices on the building model can be planned before construction and further management can be carried out, thereby improving the dust reduction effect. In view of this, in-depth research was conducted on the above-mentioned issues, which led to this case. Summary of the invention

[0006] The present invention aims to solve at least one of the technical problems existing in the prior art or related art.

[0007] In order to solve the above problems, the present application provides a construction site dust suppression spray device based on BIM, including a mobile water storage mechanism, the mobile water storage mechanism is composed of a mobile base, a water storage tank installed on the mobile base, and a water pumping structure connected to the water storage tank, the water pumping structure includes a water supply pipe, the end of the water supply pipe is provided with a movable pipe joint, and the movable pipe joint is provided with a plurality of water supply joints; A multi-stage pipe joint water supply mechanism is connected to the water supply joint, and the multi-stage pipe joint water supply mechanism is composed of a plurality of straight pipe water supply components and a plurality of turning elbow components. Positioning components fixed based on the building main body are arranged on the straight pipe water supply components and the turning elbow components; The main body of the straight pipe water supply component is a straight pipe section made of PVC material, a reducer with a wasp waist structure is arranged on the straight pipe section, the middle section of the reducer is radially provided with water outlet holes, a diverter ring seat is arranged around the reducer, a diverter joint is arranged on the diverter ring seat and is connected to the cavity between the diverter ring seat and the reducer, a water sprinkling and dust reduction structure is connected to the end of the diverter joint, and a swing arm control valve is arranged on the diverter joint.

[0008] The water sprinkling and dust reduction structure comprises a water supply hose, which is connected to a diversion joint, and an end of the water supply hose is connected to an atomizing nozzle seat, on which a plurality of atomizing nozzles are arranged in a circular array.

[0009] The straight pipe water supply assembly also includes a threaded joint and a threaded interface fixed at both ends of the straight pipe section, and the shapes of the threaded joint and the threaded interface cooperate with each other.

[0010] The main body of the diverter ring seat is a plate with a tubular structure, and a pair of concave grooves matching the reducing slope of the reducer are extended from both sides of the main body of the diverter ring seat. The pair of concave grooves are transitionally matched with the middle section of the reducer through a pair of sealing rubber rings.

[0011] The turning elbow assembly includes an elbow body, which is a 90° elbow made of thickened PVC material. A pair of butt joints are movably connected at both ends of the elbow body, and the shapes of the pair of butt joints correspond to matching threaded joints and threaded interfaces respectively.

[0012] The positioning assembly includes a positioning ring fixedly connected to the straight pipe section or the elbow body, the positioning ring is provided with a pin shaft, a square through tube is sleeved on the pin shaft, a pair of telescopic square tubes are inserted at both ends of the square through tube, a pair of threaded holes are opened on the pair of telescopic square tubes, a pair of reverse pull bolts are assembled in the pair of threaded holes, and a pair of reverse pull clamps are sleeved on the pair of reverse pull bolts.

[0013] The number of the diversion joints on the diversion ring seat is not less than one, and the end of the straight pipe section of the straight pipe water supply component at the end is sealed.

[0014] The water pumping structure also includes an extended-range pump, which is assembled on a mobile base, connected to a water supply pipe, and has a plurality of water supply valves arranged on a plurality of water supply joints. The extended-range pump is connected to a water storage tank through a water inlet pipe section, and a water inlet valve and a water inlet flow meter are arranged on the water inlet pipe section.

[0015] A method for using a construction site dust suppression spray device based on BIM, comprising the following steps: BIM model creation, pipe preparation, water intake preparation, pipe connection, dust suppression pipeline diversion, water change connection, and pipe disassembly; BIM model creation: Build the building model components according to the building requirements, enter the dust suppression device into the database of the building model in the form of pipe fittings, and build the dust suppression device according to the building model; Pipe fittings preparation: Prepare the prefabricated straight pipe water supply components and turning elbow components according to the design data, including planning the number and installation location of straight pipe water supply components and turning elbow components, and reserve sufficient backup quantity and installation space; Preparation for water intake: fill the water tank of the mobile water storage mechanism with water and move it to the preset position, and connect the water supply joint on the movable pipe joint to the bottom end of the multi-stage pipe joint water supply mechanism; Pipe connection: Connect the prepared straight pipe water supply components and turning elbow components to form a water supply pipeline by connecting them end to end according to the installation position. The straight pipe water supply component at the top should be sealed. Dust suppression pipeline diversion: connect the watering dust suppression structure to the diversion joint on the straight pipe water supply assembly, open the swing arm control valve corresponding to the diversion joint, and pump water into the atomizing nozzle seat through the booster pump to achieve atomization; Water exchange connection: After the dust reduction in the construction area is completed, when it is necessary to go to the next construction area for dust reduction, close the swing arm control valve of the diversion joint, then remove the water sprinkler dust reduction structure, and then connect it to the diversion joint corresponding to the new construction area; Disassembly of pipe fittings: After dust reduction is completed, remove the water supply pipe assembly and the turning elbow assembly from the top to the bottom.

[0016] Beneficial Effects A BIM-based construction site dust reduction spray device and a method of using the same are provided in an embodiment of the present invention. The device has the following beneficial effects: The BIM-based construction site dust reduction spray device is designed with a multi-stage pipe joint water supply mechanism. When the building is constructed with BIM, the number and position of the multi-stage pipe joint water supply mechanism can be arranged as needed, so that the dust reduction work on the construction site is more standardized and easier to manage. Based on this, a multi-stage pipe joint water supply mechanism is designed, and a straight pipe section and an elbow structure of PVC material are used to build a dust reduction water supply pipeline. On the one hand, the structure is simple, the material is easily available, and it is easy to assemble. On the other hand, it integrates the advantages of BIM technology, directly reaches the core position of the construction site for dust reduction, and the dust reduction is more comprehensive and effective. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the main structure of a BIM-based construction site dust reduction spray device and a method of using the same as described in the present invention.

[0018] Figure 2 It is a three-dimensional structural schematic diagram of a BIM-based construction site dust suppression spray device and a method of using the same as described in the present invention.

[0019] Figure 3 It is a schematic diagram of a side view and partial cross-section structure of a BIM-based construction site dust suppression spray device and a method of using the same as described in the present invention.

[0020] Figure 4 This is a schematic diagram of the main view and partial cross-section structure of a BIM-based construction site dust reduction spray device and a method of using the same as described in the present invention.

[0021] Figure 5 This is a schematic structural diagram of a straight pipe water supply component of a BIM-based construction site dust suppression spray device and a method of using the same as described in the present invention.

[0022] Figure 6 This is a schematic structural diagram of a turning elbow assembly of a BIM-based construction site dust suppression spray device and a method of using the same as described in the present invention.

[0023] Figure 7 This is a schematic diagram of the positioning component structure of a BIM-based construction site dust suppression spray device and a method of using the same as described in the present invention.

[0024] [Description of Reference Numerals] 1. Mobile water storage mechanism; 2. Multi-stage pipe joint water supply mechanism; 3. Watering and dust reduction structure; 11. Mobile base; 12. Water storage tank; 13. Water supply pipe; 14. Movable pipe joint; 15. Water supply joint; 16. Extended range pump; 17. Water inlet pipe joint; 21. Straight pipe water supply assembly; 22. Turning elbow assembly; 23. Positioning assembly; 31. Water supply hose; 32. Atomizing spray seat; 33. Atomizing nozzle; 21 1. Straight pipe section; 212. Reducer; 213. Diverter ring seat; 214. Swing arm control valve; 215. Threaded joint; 216. Threaded interface; 217. Sealing rubber ring; 221. Elbow body; 222. Butt joint; 231. Positioning ring; 232. Pin shaft; 233. Square through pipe; 234. Telescopic square pipe; 235. Back-pull bolt; 236. Back-pull splint; 237. Fixing plate. DETAILED DESCRIPTION

[0025] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0026] See also Figure 1-7The present invention provides an implementation scheme: in modern construction sites, in order to protect the safety of construction workers and the freshness of the surrounding environment, it is necessary to reduce dust on the buildings. On the one hand, as the height of the buildings increases, equipment such as fog cannons are difficult to reach. On the other hand, although multi-stage pipelines can be extended to the high floors of the buildings, the prefabrication and welding of the pipelines require on-site layout, which not only makes it difficult to prepare materials, but also makes the installation process cumbersome and difficult to disassemble. Traditionally, BIM technology is mainly used in the construction of the main body of the building during the construction process. The existing BIM technology cannot play an effective auxiliary role in the dust reduction work on the construction site. Therefore, this application builds a construction dust reduction device based on BIM technology that can be easily disassembled and extended to any area of ​​the construction site.

[0027] Specifically, the present application discloses a construction site dust reduction spray device based on BIM, the equipment is divided into a mobile water storage mechanism 1, a multi-stage pipe section water delivery mechanism 2 and a water spraying and dust reduction structure 3; The specific mobile water storage mechanism 1 is composed of a mobile base 11, a water storage tank 12 installed on the mobile base 11, and a water pumping structure connected to the water storage tank 12, wherein the water pumping structure includes a water supply pipe 13, and a movable pipe joint 14 is provided at the end of the water supply pipe 13, and a plurality of water supply joints 15 are provided on the movable pipe joint 14; the water pumping structure also includes an extended-range pump 16, which is assembled on the mobile base 11, connected to the water supply pipe 13, and a plurality of water supply valves are provided on the plurality of water supply joints 15, and the extended-range pump 16 is connected to the water storage tank 12 through a water inlet pipe joint 17, and a water inlet valve and a water inlet flow meter are provided on the water inlet pipe joint 17.

[0028] During the specific implementation process, the mobile base 11 is used as a vehicle body to carry the water tank 12 for movement, which is convenient for supplying water to the dust suppression devices of different building entities. The mobile base 11 is the vehicle body, and the water tank 12 can be moved by the vehicle body. The water in the water tank 12 is pumped into the water delivery pipe 13 through the water pumping structure and then diverted through the movable pipe joint 14. The movable pipe joint 14 can play a diversion role on the one hand, and then the orientation of the pipeline can be flexibly adjusted through the movable pipe joint 14 to facilitate operation. The water supply joint 15 is connected to the multi-stage pipe joint water delivery mechanism 2 through a fire water pipe. The range-extending pump 16 in the water pumping structure is connected to the water tank 12 through the water inlet pipeline. The water flow is switched on and off and monitored by the water inlet valve and the water inlet flowmeter. The water in the water tank 12 enters the multi-stage pipe joint water delivery mechanism 2 through the water delivery pipe 13 and the movable pipe joint 14 under the pressurization action of the range-extending pump 16.

[0029] According to the instruction manual Figure 1-5It can be seen that the water supply joint 15 is connected to the multi-stage pipe joint water supply mechanism 2, which is composed of a plurality of straight pipe water supply components 21 and a plurality of turning elbow components 22. Positioning components 23 based on the main body of the building are arranged on the straight pipe water supply components 21 and the turning elbow components 22. The installation and positioning of the multi-stage pipe joint water supply mechanism 2 are realized by the positioning components 23. In the application of BIM technology, the straight pipe water supply components 21 and the turning elbow components 22 are added to the construction of the building model as standard parts. According to the construction plan, on the building model, according to the building layout, the straight pipe water supply components 21 and the turning elbow components 22 are connected and constructed so that they are integrated with the model of the building. In this way, during construction, the construction personnel assemble the prefabricated multi-stage pipe joint water supply mechanism 2 at the corresponding position of the building according to the drawings, and then the external water sprinkling and dust reduction structure 3 can be used to sprinkle water and reduce dust on the high building structure. The positioning component 23 is used to position and connect with the main body of the building, which plays a role in fixing the pipeline and is convenient for disassembly and assembly. Specifically, in order to facilitate prefabrication as a standard part, improve construction efficiency and facilitate data entry during the BIM construction process, the following is a specific structure of the straight pipe water supply component 21. The structure of the straight pipe water supply component 21 is designed based on a straight pipe section 211 of PVC material. The reason for choosing PVC pipes is that the material is easy to obtain and has a light weight and good strength. On the other hand, it is easy to shape and make. Threaded joints 215 and threaded interfaces 216 with matching shapes are set at both ends of the straight pipe section 211. In this way, when extending to a higher place, the end to end can be connected through the straight pipe section 211 to extend the length of the straight pipe water supply component 21; In order to be able to divert the pipeline at the corresponding floor height, a reducer 212 with a bee waist structure is arranged on the straight pipe section 211. The diameter of the middle section of the reducer 212 is smaller than the diameter of the main section of the straight pipe section 211. A water outlet is radially opened in the middle section of the reducer 212. A diverter ring seat 213 is arranged around the reducer 212. A diverter joint is arranged on the diverter ring seat 213 to communicate with the cavity between the diverter ring seat 213 and the reducer 212. When water is transported from the straight pipe section 211 to the reducer 212, if the swing arm control valve 21 on the diverter joint is closed at this time, the diverter 212 will be opened. 4 is opened, water under pressure enters the water sprinkling and dust reduction structure 3 through the shunt joint on the shunt ring seat 213 to complete the atomization and dust reduction of the building height. If there is no construction at the height and dust reduction is not required, the swing arm control valve 214 is closed to allow water to pass through the straight pipe section 211. In this way, the shunt ring seat 213 plays a shunt role. Since the shunt ring seat 213 adopts a wrapped structure and is movably connected, the shunt ring seat 213 can be rotated to adjust the direction of its shunt interface, so as to facilitate the specific connection position of the water sprinkling and dust reduction structure 3 according to the specific conditions during the construction process.

[0030] It should be noted that the main body of the diverter ring seat 213 is a plate of a tubular structure, and a pair of concave grooves matching the variable diameter slope of the reducer 212 are extended from both sides of the main body of the diverter ring seat 213. The pair of concave grooves and the middle section of the reducer 212 are transitionally matched through a pair of sealing rubber rings 217. The diverter ring seat 213 forms a cylindrical body through the pair of concave grooves and the tubular body for the reducer 212 to pass through. The opening of the cylindrical body and the reducer 212 are transitioned through the sealing rubber ring 217, and then the end of the straight pipe section 211 of the straight pipe water supply assembly 21 at the end is sealed during water supply. Processing (or making a special straight pipe water supply component 21 with one end as a blind end) to avoid pressure relief, and because the wall thickness of the diverter ring seat 213 is greater than the wall thickness of the straight pipe section 211, under the action of water pressure, the truncated cone parts at both ends of the reducer 212 can be further sealed with the concave groove position when the water pressure expands to avoid leakage problems. The number of diverter joints on the diverter ring seat 213 is not less than one, and multiple water sprinkling and dust reduction structures 3 can be connected as needed, but it should be noted that the number of diverter joints should not be too many, so as to maintain pressure stability and the structural strength of the diverter ring seat 213.

[0031] Furthermore, the turning elbow assembly 22 includes an elbow body 221, which is a 90° elbow made of thickened PVC material. A pair of butt joints 222 are movably connected at both ends of the elbow body 221. The shapes of the pair of butt joints 222 correspond to the threaded joints 215 and the threaded interfaces 216 respectively. Although the material of the elbow body 221 is also PVC, the structural strength needs to be strengthened to cope with problems such as water pressure. Therefore, the wall thickness of the elbow body 221 needs to be greater than the wall thickness of the straight pipe section 211. Therefore, the turning elbow assembly 22 is used in conjunction with the straight pipe section 211, passing through the turning or special-shaped parts of the building, or changing the direction of the water supply pipe 13. Therefore, in order to connect the straight pipe section 211, a pair of movable butt joints 222 are arranged at both ends of the elbow body 221. When connecting, fix the elbow angle and rotate the butt joints 222.

[0032] Further, according to the instructions attached Figure 6 It can be seen that the water sprinkling and dust reduction structure 3 includes a water supply hose 31, which is connected to a diversion joint, and the end of the water supply hose 31 is connected to an atomizing nozzle seat 32, on which a plurality of atomizing nozzles 33 are arranged in a circular array. The high-pressure water flowing out through the diversion joint is sprayed out through the atomizing nozzle seat 32 under the action of the water supply hose 31, and the plurality of atomizing nozzles 33 further expand the atomization area and form water mist through the atomizing nozzle.

[0033] Further, according to the instructions attached Figure 7It can be seen that the positioning assembly 23 includes a positioning ring 231 fixedly connected to the straight pipe section 211 or the elbow body 221, a pin shaft 232 is provided on the positioning ring 231, a square through pipe 233 is sleeved on the pin shaft 232, a pair of telescopic square pipes 234 are inserted at both ends of the square through pipe 233, a pair of threaded holes are opened on the pair of telescopic square pipes 234, a pair of back-pull bolts 235 are assembled in the pair of threaded holes, and a pair of back-pull clamps 236 are sleeved on the pair of back-pull bolts 235; During the specific implementation process, in order to fix the straight pipe section 211 or the elbow body 221 on the building, a positioning ring 231 fixedly connected to the straight pipe section 211 or the elbow body 221 is used as a supporting structure. The square through pipe 233 can be rotated by the pin shaft 232 to adjust the orientation of a pair of telescopic square tubes 234. The orientation of a pair of back-pull clamps 236 can be adjusted by the telescopic square tubes 234, so that the back-pull clamps 236 on the pair of telescopic square tubes 234 are aligned with the position where they need to be installed, and then the back-pull bolts 235 are rotated to move the back-pull clamps 236, so that the back-pull clamps 236 and the fixed plates 237 extending from the telescopic square tubes 234 form a pulling effect to tighten the straight pipe section 211 or the elbow body 221.

[0034] The present application also discloses a method for using a construction site dust suppression spray device based on BIM, comprising the following steps: BIM model creation: constructing components of a building model according to building requirements, entering the dust suppression device in the form of pipe fittings into a database of the building model, and constructing the dust suppression device according to the building model; Pipe fitting preparation: prepare the prefabricated straight pipe water supply assembly 21 and the turning elbow assembly 22 according to the design data, including planning the quantity and installation position of the straight pipe water supply assembly 21 and the turning elbow assembly 22, and reserving sufficient backup quantity and installation space; Preparation for water intake: fill the water storage tank 12 of the mobile water storage mechanism 1 with water and move it to a preset position, and connect the water supply connector 15 on the movable pipe joint 14 to the bottom end of the multi-stage pipe joint water supply mechanism 2; Pipe connection: The prepared straight pipe water supply assembly 21 and the turning elbow assembly 22 are connected end to end according to the installation position to form a water supply pipe 13, wherein the top straight pipe water supply assembly 21 is to be sealed; Dust suppression pipeline diversion: connect the watering dust suppression structure 3 to the diversion joint on the straight pipe water supply component 21, and open the swing arm control valve 214 corresponding to the diversion joint, and pump water into the atomizing nozzle seat 32 through the booster pump to achieve atomization; Water exchange connection: After dust reduction in the construction area is completed, when dust reduction in the next construction area is required, the swing arm control valve 214 of the diversion joint is closed, and then the water sprinkling dust reduction structure 3 is removed and then connected to the diversion joint corresponding to the new construction area; Disassembly of pipe fittings: After dust reduction is completed, remove the pipe water supply assembly and the turning elbow assembly 22 from the top to the bottom in sequence.

[0035] To sum up, it can be generally known that the BIM-based construction site dust reduction spray device is designed with a multi-stage pipe section water supply mechanism 2. When the building is constructed by BIM, the number and position of the multi-stage pipe section water supply mechanism 2 can be arranged as needed, so that the dust reduction work on the construction site is more standardized and easy to manage. Based on this, a multi-stage pipe section water supply mechanism 2 is designed, and a straight pipe section 211 of PVC material and an elbow structure are used to build a dust reduction water supply pipe 13. On the one hand, the structure is simple, the materials are easy to obtain, and it is easy to assemble. On the other hand, it integrates the advantages of BIM technology and directly reaches the core position of the construction site for dust reduction, and the dust reduction is more comprehensive and the effect is better.

[0036] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0037] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.

[0039] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0040] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A construction site dust suppression spray device based on BIM, comprising a mobile water storage mechanism (1), wherein the mobile water storage mechanism (1) is composed of a mobile base (11), a water storage tank (12) mounted on the mobile base (11), and a water pump structure connected to the water storage tank (12), characterized in that: The water pump structure comprises a water supply pipe (13), the end of the water supply pipe (13) is provided with a movable pipe joint (14), and the movable pipe joint (14) is provided with a plurality of water supply joints (15); A multi-stage pipe joint water supply mechanism (2) is provided in connection with the water supply joint (15), wherein the multi-stage pipe joint water supply mechanism (2) is composed of a plurality of straight pipe water supply components (21) and a plurality of turning elbow components (22) connected together, and a positioning component (23) fixed based on the building main body is provided on both the straight pipe water supply components (21) and the turning elbow components (22); The main body of the straight pipe water supply component (21) is a straight pipe section (211) made of PVC material, a reducing pipe (212) with a wasp waist structure is arranged on the straight pipe section (211), a water outlet hole is radially opened in the middle section of the reducing pipe (212), a diverter ring seat (213) is arranged around the reducing pipe (212), a diverter joint is arranged on the diverter ring seat (213) and is connected to the cavity between the diverter ring seat (213) and the reducing pipe (212), the end of the diverter joint is connected to a water sprinkling and dust reduction structure (3), and a swing arm control valve (214) is arranged on the diverter joint.

2. A construction site dust suppression spray device based on BIM according to claim 1, characterized in that: The water sprinkling and dust reduction structure (3) comprises a water supply hose (31), the water supply hose (31) being connected to a diversion joint, the end of the water supply hose (31) being connected to an atomizing nozzle seat (32), and a plurality of atomizing nozzles (33) being arranged in a circular array on the atomizing nozzle seat (32).

3. A construction site dust suppression spray device based on BIM according to claim 2, characterized in that: The straight pipe water supply assembly (21) further comprises a threaded joint (215) and a threaded interface (216) fixed at both ends of the straight pipe section (211), and the shapes of the threaded joint (215) and the threaded interface (216) cooperate with each other.

4. The construction site dust suppression spray device based on BIM according to claim 3 is characterized in that: The main body of the diverter ring seat (213) is a plate with a tubular structure, and a pair of inner concave grooves matching the reducing slope of the reducing tube (212) are extended from both sides of the main body of the diverter ring seat (213), and the pair of inner concave grooves are transitionally matched with the middle section of the reducing tube (212) via a pair of sealing rubber rings (217).

5. A construction site dust suppression spray device based on BIM according to claim 4, characterized in that: The turning elbow assembly (22) comprises an elbow body (221), the elbow body (221) being a 90° elbow made of thickened PVC material, a pair of butt joints (222) being movably connected at both ends of the elbow body (221), the shapes of the pair of butt joints (222) corresponding to the threaded joints (215) and the threaded interface (216) respectively.

6. A construction site dust suppression spray device based on BIM according to claim 5, characterized in that: The number of flow diversion joints on the flow diversion ring seat (213) is not less than one, and the end of the straight pipe section (211) of the straight pipe water supply assembly (21) at the end is sealed.

7. The construction site dust suppression spray device based on BIM according to claim 3 is characterized in that: The water pump structure further comprises a range-extending pump (16), the range-extending pump (16) being mounted on the mobile base (11), the range-extending pump (16) being connected to the water supply pipe (13), a plurality of water supply valves being arranged on the plurality of water supply joints (15), the range-extending pump (16) being connected to the water storage tank (12) via a water supply pipe section (17), and a water supply valve and a water supply flow meter being arranged on the water supply pipe section (17).

8. A method for using a construction site dust suppression spray device based on BIM according to claims 1-7, characterized in that: It includes the following steps: BIM model creation, pipe preparation, water intake preparation, pipe connection, dust suppression pipeline diversion, water change connection, and pipe disassembly; BIM model creation: Build the building model components according to the building requirements, enter the dust suppression device into the database of the building model in the form of pipe fittings, and build the dust suppression device according to the building model; Preparation of pipe fittings: The prefabricated straight pipe water supply components (21) and turning elbow components (22) are prepared according to the design data, including planning the quantity and installation positions of the straight pipe water supply components (21) and the turning elbow components (22), and reserving sufficient backup quantity and installation space; Preparation for water collection: fill the water storage tank (12) of the mobile water storage mechanism (1) with water and move it to a preset position, and connect the water supply joint (15) on the movable pipe joint (14) to the bottom end of the multi-stage pipe joint water supply mechanism (2); Pipe connection: the prepared straight pipe water supply assembly (21) and the turning elbow assembly (22) are connected end to end according to the installation position to form a water supply pipe (13), wherein the top straight pipe water supply assembly (21) needs to be sealed; Dust suppression pipeline diversion: connecting the watering dust suppression structure (3) to the diversion joint on the straight pipe water supply component (21), and opening the swing arm control valve (214) corresponding to the diversion joint, and pumping water into the atomizing nozzle seat (32) through the booster pump to achieve atomization; Water exchange connection: After dust reduction is completed in the construction area, when dust reduction needs to be carried out in the next construction area, the swing arm control valve (214) of the diversion joint is closed, and then the water sprinkling dust reduction structure (3) is removed and then connected to the diversion joint corresponding to the new construction area; Disassembly of pipe fittings: After dust reduction is completed, remove the pipe water supply assembly and the turning elbow assembly (22) from the top downward in sequence.