Pollution discharge device for coke oven gas fine desulfurization adsorption tower and use method

By designing a sewage device with steam purging and water sealing, combined with submersible pump extraction and screen filtration, the clogging and safety problems of the coke oven gas fine desulfurization adsorption tower were solved, and the stable operation and safety of the system were achieved. .

CN118718649APending Publication Date: 2024-10-01BAOSHAN IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310332763.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

There are clogging problems in the coke oven gas fine desulfurization adsorption tower. In particular, the viscous substances and diamond-shaped precipitates formed after enrichment of tar and naphthalene cause pipe blockage, and are prone to fire, explosion and poisoning risks during operation. It is difficult to use existing technology. Effective solution.

Method used

A sewage device including a sewage pipe, a water-sealed gas collection well, a sewage channel and a phenol puddle is designed. It uses high-temperature steam purging and submersible pump extraction to achieve pipe unblocking and water drainage through electric heating tape and sealing baffle. Seal and screen for particle filtration.

Benefits of technology

It effectively solves the blockage problem of the coke oven gas fine desulfurization system, ensures the safe and stable operation of the system, reduces the risk of fire, explosion and poisoning, and achieves the safety of gas water sealing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118718649A_ABST
    Figure CN118718649A_ABST
Patent Text Reader

Abstract

The invention discloses a blowdown device for a coke oven gas fine desulfurization adsorption tower and a use method. The blowdown device comprises a blowdown pipe, a water-sealing gas water-collecting well, a blowdown channel and a phenol water pit, a blow-off pipe is communicated with a bottom outlet of the fine desulfurization adsorption tower and the bottom of the water collecting well; a tower outlet stop valve and a well inlet stop valve are arranged on the blow-off pipe, and a front end purge valve and a rear end purge valve which are communicated with the high-temperature steam pipeline are respectively arranged on the blow-off pipe on two sides of the tower outlet stop valve; a submersible pump is arranged at the bottom of the water-collecting well and used for pumping and discharging particles at the bottom of the water-collecting well into a blow-off channel, and water return of the sealing baffle is used for maintaining water seal gas of the water-collecting well; the sewage discharge channel is communicated with the upper portion of the water collecting well and the phenol water pit, and a screen is arranged on the sewage discharge channel in an elevated mode. According to the invention, the blockage dredging treatment difficulty that viscous materials in the pipe are formed after tar and naphthalene are enriched, and rhombic flaky precipitates and particulate crystal precipitates are formed at positions such as corners can be solved, and meanwhile, the safety is ensured through the gas water seal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of metallurgical gas, and relates to a sewage discharge device for a coke oven gas fine desulfurization adsorption tower and a use method thereof. Background Art

[0002] Under the background of ultra-low emissions in the steel industry, the combustion and utilization of by-product gas in steel rolling heating furnaces needs to meet more stringent exhaust SO2 emission limits. Therefore, it is necessary to strengthen source control of coke oven gas and implement fine desulfurization treatment; the basic process flow of fine desulfurization of coke oven gas at the source is: the raw coke oven gas first enters the purification section to remove impurities such as naphthalene, tar, and part of H2S, and then the gas passes through the pressurization section and enters the hydrolysis section to convert organic sulfur into H2S and then enters the fine desulfurization section to remove H2S, and the purified gas finally goes to the user.

[0003] As a device for pre-treating coke oven gas in the purification section, the coke oven gas fine desulfurization adsorption tower is mostly in the form of a tower, with the raw gas entering from the bottom and exiting from the top. After removing impurities and part of the water vapor, the adsorbent in the tower is regenerated by back-blowing with clean gas; the regenerated gas enters from the top and exits from the bottom, and a large amount of tar, naphthalene, etc. are precipitated during the hot blowing. The precipitate mixture is difficult to be taken away by the regenerated gas, and it is very easy to block the sewage pipeline; because the sewage discharged from the sewage pipeline is extremely complex, it is also constantly enriched and crystallized during transportation along the way, and it is easy to form diamond-shaped black particles, muddy yellow-black small particles and other viscous materials at corners and small-diameter pipes, causing serious secondary blockage and drainage problems, affecting the stable operation of the system. In addition, a large number of toxic, harmful and flammable and explosive substances are involved in the purification of coke oven gas. If the operation is improper or leakage occurs, it is very easy to cause fire, explosion, poisoning and other production safety accidents. In the sewage treatment process, it is especially necessary to ensure the sealing and leakage prevention of coke oven gas.

[0004] After searching, it was found that the existing technologies involving sewage discharge devices are mostly sewage tower treatment devices in the chemical industry, power desulfurization and other industries, which mostly adopt methods such as arranging filter screens and strengthening stirring. They have limited applicability to the problems of blockage sewage discharge and safety sealing in coke oven gas fine desulfurization adsorption towers. There are currently no detailed reports on sewage discharge devices and methods suitable for coke oven gas adsorption towers. Summary of the invention

[0005] In view of the problem of sewage blockage in the adsorption tower of the coke oven gas fine desulfurization system in the prior art, the purpose of the present invention is to provide a sewage discharge device and a method for using the adsorption tower of the coke oven gas fine desulfurization, which can solve the difficulties in treating the blockage and unblocking of viscous substances formed in the tube after tar and naphthalene are enriched, diamond-shaped precipitates formed at corners and other locations, and crystallized precipitates of particulate matter, while ensuring safety through the gas water seal, thereby ensuring the safe and stable operation of the coke oven gas fine desulfurization system.

[0006] To achieve the above object, the present invention adopts the following technical solution:

[0007] The first aspect of the present invention provides a sewage discharge device for a coke oven gas fine desulfurization adsorption tower, comprising a sewage discharge pipe, a water-sealed gas collection well, a sewage discharge channel and a phenol water pit;

[0008] The sewage pipe is connected to the bottom outlet of the fine desulfurization adsorption tower and the bottom of the water collection well; the sewage pipe is provided with a tower outlet stop valve and a well inlet stop valve, and the sewage pipes on both sides of the tower outlet stop valve are provided with a front end purge valve and a rear end purge valve, respectively, and the front end purge valve and the rear end purge valve are connected to the high-temperature steam pipeline respectively;

[0009] A submersible pump is provided at the bottom of the water collection well, and the submersible pump is used to pump the particles at the bottom of the water collection well into the sewage channel;

[0010] The drainage channel is connected with the upper part of the water collection well and the phenol water pit. A pluggable sealing baffle is vertically arranged at the front end of the drainage channel. A screen is arranged on the drainage channel frame.

[0011] Preferably, the front-end purge valve is purged toward the bottom of the fine desulfurization adsorption tower, and the front-end purge valve is obliquely inserted into the drain pipe and forms an angle of 30 to 60 degrees with the drain pipe.

[0012] Preferably, the rear end purge valve purges toward the upper part of the water collection well, and the front end purge valve is obliquely inserted into the sewage pipe and forms an angle of 30 to 60 degrees with the sewage pipe.

[0013] Preferably, an electric heating belt is provided on the sewage pipe from the bottom outlet of the fine desulfurization adsorption tower to the upper inlet section of the water collection well.

[0014] Preferably, the height of the water collection well is greater than 3m.

[0015] Preferably, the submersible pump is a sand pump or a sand suction pump to pump the diamond-shaped particles at the bottom of the water collection well into the sewage channel.

[0016] Preferably, the height of the sewage channel from the horizontal ground is 0.5 to 1 m.

[0017] Preferably, the mesh size of the sieve is greater than 16 meshes.

[0018] The second aspect of the present invention provides a method for using a sewage discharge device for a coke oven gas fine desulfurization adsorption tower as described in the first aspect of the present invention, wherein the electric heating tape on the sewage pipe is in a normally open state. After the regenerated gas from the fine desulfurization adsorption tower is hot-blown, the tower outlet stop valve and the well inlet stop valve on the sewage pipe are opened to clear the sewage pipe, and during the sewage discharge process, sand is regularly pumped out of the particulate matter at the bottom of the water collection well. At the same time, the sealing baffle in the sewage channel is used to return water to maintain the water seal gas in the water collection well, and during the overflow of the sewage channel, the muddy and sandy particulate matter enriched and precipitated in the sewage channel is regularly screened and cleaned.

[0019] Preferably, the process of dredging the sewage pipe is as follows:

[0020] First, introduce high-temperature steam from the front purge valve to heat and soften the dirt in the sewage pipe on the bottom outlet side of the fine desulfurization adsorption tower, and then introduce high-temperature steam from the rear purge valve to clear the sewage pipe on the side of the water collection well; when there is visible steam overflowing from the liquid surface in the water collection well, close the front purge valve and the rear purge valve.

[0021] Preferably, the periodic sand extraction of the particulate matter at the bottom of the water collection well is:

[0022] First, insert the sealing baffle into the sewage channel to seal it, start the submersible pump, and pump the particles at the bottom of the water collection well to the front end of the sewage channel. The particles are deposited on the screen of the sewage channel, and the sewage is sealed by the sealing baffle and flows back into the water collection well;

[0023] After the particulate matter in the water collection well is completely pumped out, the submersible pump is turned off, the sealing baffle is pulled out, and the sewage in the sewage channel flows into the phenol water pit.

[0024] The sewage discharge device for the coke oven gas fine desulfurization adsorption tower of the present invention has the following beneficial effects:

[0025] 1. Aiming at the problem of sewage blockage in the adsorption tower of the coke oven gas fine desulfurization system, the present invention innovatively proposes a sewage pipe with steam purge, a water-sealed gas collection well, and a sewage channel with water return and filtration. The sewage device specifically solves the difficulties of blockage and dredging of viscous substances in the pipeline formed after tar and naphthalene enrichment, rhombic flaky precipitates at the bottom of the water collection well, and granular crystalline precipitates in the sewage channel. At the same time, the gas water seal is well coordinated to ensure safety;

[0026] 2. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower of the present invention has a simple on-site structural layout, low cost, excellent treatment effect, and can effectively ensure the safe and stable operation of the overall coke oven gas fine desulfurization system. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0028] Figure 1 It is a structural schematic diagram of a sewage discharge device for a coke oven gas fine desulfurization adsorption tower according to the present invention;

[0029] Figure 2 It is a structural schematic diagram of a sewage discharge device for a coke oven gas fine desulfurization adsorption tower in a certain embodiment of the present invention;

[0030] Among them, 1 is a fine desulfurization adsorption tower, 2 is a water collection well, 3 is a sewage channel, 4 is a phenol water pit, 101 is a raw gas main pipe, 102 is a sewage pipe, 103 is a front-end purge valve, 104 is a tower outlet stop valve, 105 is a rear-end purge valve, 106 is a well inlet stop valve, 107 is a submersible pump, 108 is a sealing baffle, and 109 is a screen. DETAILED DESCRIPTION

[0031] In order to better understand the above technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with embodiments.

[0032] Combination Figure 1As shown, the sewage discharge device for the coke oven gas fine desulfurization adsorption tower provided by the present invention includes a sewage discharge pipe 102, a water-sealed gas collection well 2, a sewage discharge channel 3 and a phenol water pit 4. The sewage pipe 102 connects the bottom outlet of the fine desulfurization adsorption tower 1 and the bottom of the water collecting well 2; the sewage pipe 102 is respectively provided with a tower outlet stop valve 104 and an inlet well stop valve 106, wherein the tower outlet stop valve 104 is used to control whether the fine desulfurization adsorption tower 1 discharges sewage as needed, and the tower outlet stop valve 104 is closed when sewage is not needed, so as to prevent gas leakage and heat loss in the fine desulfurization adsorption tower 1; the purpose of setting the inlet well stop valve 106 is to provide double protection near the water collecting well 2 to prevent gas leakage, and also to increase the flexibility of handling the dirt in the sewage pipe 102 and the particulate matter at the bottom of the water collecting well 2; the sewage pipes 102 on both sides of the tower outlet stop valve 104 are respectively provided with a front end purge valve 103 and a rear end purge valve 105, and the front end purge valve 103 and the rear end purge valve 105 are respectively connected to the high-temperature steam pipeline, wherein the front end purge valve 103 is arranged near the bottom outlet of the fine desulfurization adsorption tower 1. A submersible pump 107 is provided at the bottom of the water collection well 2, and the submersible pump 107 is used to pump the particles at the bottom of the water collection well 2 into the sewage channel 3 to prevent the particles in the water collection well 2 from clogging the outlet of the sewage pipe 102. The sewage channel 3 connects the upper part of the water collection well 2 with the phenol water pit 4. A pluggable sealing baffle 108 is vertically arranged at the front end of the sewage channel 3. A screen 109 is arranged on the sewage channel 3. The screen 109 is arranged along the cross section of the entire sewage channel 3 to screen the particles pumped out from the water collection well 2 (the screen 109 at the front end of the sealing baffle 108 of the sewage channel 3) and the particles crystallized due to the continuous increase in the dirt concentration in the sewage channel 3 (the crystallized particles grow on the screen 109). The particles enriched in the above-mentioned screen can be directly cleaned regularly to ensure the flow under the screen 109.

[0033] Combination Figure 1 As shown, a front-end purge valve 103 and a rear-end purge valve 105 are arranged on both sides of the tower stop valve 104 on the sewage pipe 102, and both the front-end purge valve 103 and the rear-end purge valve 105 can be connected to high-temperature steam above 130°C through a high-pressure steam pipeline for purge. Specifically, whether steam is input for purge can be realized through program control; wherein the front-end purge valve 103 purges toward the bottom of the fine desulfurization adsorption tower 1, and the front-end purge valve 103 is obliquely inserted into the sewage pipe 102, and forms an angle of 30 to 60° with the sewage pipe 102, so as to heat and soften the dirt at the bottom pipeline of the fine desulfurization adsorption tower 1; the rear-end purge valve 105 purges toward the upper part of the water collection well 2, and the front-end purge valve 103 is obliquely inserted into the sewage pipe 102, and forms an angle of 30 to 60° with the sewage pipe 102, so as to dredge the sewage pipe 102 on the side of the water collection well 2. When steam overflow is visible in the water collection well 2, it means that the sewage pipe 102 is dredged smoothly.

[0034] In a specific embodiment, an electric heating tape is provided on the sewage pipe 102 from the bottom outlet of the fine desulfurization adsorption tower 1 to the upper inlet section of the water collection well 2, wherein the electric heating tape can be a resistance heating electric heating tape, wherein the electric heating temperature can be set to be greater than 110°C.

[0035] Combination Figure 1 As shown, the height of the water collection well 2 is greater than 3m. In a specific embodiment, a single water collection well 2 can correspond to the sewage discharged from the sewage pipe 102 at the bottom outlet of multiple fine desulfurization adsorption towers 1 of the fine desulfurization system. After the sewage is collected, the sewage liquid level is maintained to meet the gas water seal pressure requirement, and excess sewage is discharged from the top of the water collection well 2 through the sewage channel 3.

[0036] In a specific embodiment, the submersible pump 107 can be a sand pump or a sand suction pump, not limited to vertical or horizontal types, to pump the diamond-shaped particles at the bottom of the collection well 2 to the front end of the sewage channel 3 to prevent the particles from clogging the outlet of the sewage pipe 102.

[0037] Combination Figure 1 As shown, a removable sealing baffle 108 is vertically arranged at the front end of the sewage channel 3. When the submersible pump 107 at the bottom of the sump 2 is working, the sealing baffle 108 is inserted into the sewage channel 3 to seal the front end of the sewage channel 3, so that while the sewage is being pumped out from the bottom of the sump 2, the sewage is blocked by the sealing baffle 108 and flows back into the sump 2, thereby maintaining the liquid level in the sump 2 to seal the gas and prevent gas leakage. When the submersible pump 107 is on standby, the sealing baffle is pulled out from the sewage channel 3 to achieve overflow drainage of the sump 2.

[0038] Combination Figure 1 As shown, the drainage channel 3 has an inclination with the horizontal direction. Specifically, the end of the drainage channel 3 connected to the water collection well 2 is higher than the end of the drainage channel 3 connected to the phenol water pit 4, so that after the sewage in the water collection well 2 overflows to the drainage channel 3, it flows to the phenol water pit 4 through the drainage channel 3. In a specific embodiment, the height of the drainage channel 3 from the horizontal ground is 0.5 to 1m; the drainage channel 3 is equipped with a fine-mesh screen 109 along the flow channel section, and the screen 109 is used to screen out large-size diamond-shaped particles when the submersible pump 107 in the water collection well 2 pumps sand; in addition, when the drainage channel 3 overflows normally for a long time, the muddy and sandy particles precipitated due to the enrichment of the sewage can also be deposited on the screen 109, and the particles on the screen 109 can be regularly cleaned and recovered; in a specific embodiment, the mesh number of the screen 109 is greater than 16 meshes, for example, the mesh number of the screen 109 is 30 meshes.

[0039] The method of using the above-mentioned sewage discharge device for the coke oven gas fine desulfurization adsorption tower is as follows: the electric heating tape on the sewage pipe 102 is in a normally open state. After the regenerated gas of the fine desulfurization adsorption tower 1 is hot-blown, the tower outlet stop valve 104 and the well inlet stop valve 106 on the sewage pipe 102 are opened, the sewage pipe 102 is cleared, and the particulate matter at the bottom of the water collection well 2 is regularly sanded during the sewage discharge process. At the same time, the sealing baffle 108 in the sewage channel 3 is used to return water to maintain the water seal of the water collection well 2. During the overflow of the sewage channel 3, the silty particulate matter enriched and precipitated in the sewage channel 3 is regularly screened and cleaned.

[0040] The specific process is as follows: the electric heating tape on the sewage pipe 102 is in a normally open state, and the electric heating temperature is maintained above 110°C (in a further preferred implementation, the electric heating temperature can be maintained above 120°C); after the regenerated gas in the fine desulfurization adsorption tower 1 is hot-blown, the tower outlet stop valve 104 and the well inlet stop valve 106 on the sewage pipe 102 are opened, the sewage pipe 102 is cleared, and the high-temperature steam is connected and input to the front-end purge valve 103 and the rear-end purge valve 105, and the high-temperature steam is preferentially introduced from the front-end purge valve 103 to heat and soften the fine desulfurization. The dirt in the sewage pipe 102 on the bottom outlet side of the adsorption tower 1 is cleared by introducing high-temperature steam from the rear end purge valve 105 to clear the sewage pipe 102 on the side of the water collection well 2. When steam overflow is visible in the water collection well 2, the surface sewage pipe 102 is cleared smoothly, and the front end purge valve 103 and the rear end purge valve 105 are closed to stop the high-pressure steam purge; at this time, the area from the bottom outlet of the fine desulfurization adsorption tower 1 to the water collection well 2 has been cleared, and the dirt has been softened. The dirt discharged from the bottom outlet of the fine desulfurization adsorption tower 1 can smoothly enter the water collection well 2 through the sewage pipe 102.

[0041] Regularly pump out the particles (such as diamond-shaped particles) at the bottom of the water collection well 2. First, insert the sealing baffle into the sewage channel 3 to seal it. Turn on the submersible pump 107 to pump the particles at the bottom of the water collection well 2 to the front end of the sewage channel 3. The particles are deposited on the screen 109 of the sewage channel 3. The sewage is sealed by the sealing baffle 108 and flows back into the water collection well 2 to maintain the sewage level in the water collection well 2 to meet the gas water seal condition.

[0042] After the particulate matter in the water collection well 2 is extracted, the submersible pump 107 is closed, the sealing baffle is pulled out, and the sewage in the sewage channel 3 flows into the phenol water pit 4; the diamond-shaped particulate matter and the silt-like particulate matter enriched and precipitated in the sewage channel 3 are mostly deposited on the drying net, which is cleaned and recovered, and a small amount of dirt is naturally washed from the bottom of the screen 109 to the phenol water pit 4 by the overflow of the sewage from the water collection well 2, and is finally collected from the phenol water pit 4 for centralized treatment.

[0043] The sewage discharge device for the coke oven gas fine desulfurization adsorption tower of the present invention is further introduced below with reference to specific examples.

[0044] Example

[0045] This embodiment takes a coke oven gas fine desulfurization system with a processing capacity of 200,000 Nm3 / h built in a steel plant as an example. The coke oven gas fine desulfurization system includes pre-adsorption, pressurization, hydrolysis, desulfurization and other sections. Among them, the pre-adsorption uses eight adsorption towers to switch alternately for adsorption and regeneration. The raw coke oven gas first enters the pre-adsorption tower, and enters from the bottom and exits from the top. The tower is equipped with a degreasing agent (coke) and an adsorbent to remove impurities such as H2S, naphthalene, benzene and part of the water vapor, and the bottom of the tower is filled with white porcelain balls for distributing the airflow. When the impurities in the adsorbent bed are saturated, the hydrogen production analysis gas in the steel plant is used as the "regeneration gas" to heat and desorb the impurities entering the inner pores of the adsorbent, and the regeneration gas is reversed and heated (150-170°C) for desorption. After the regeneration is complete, the regeneration gas is used to cool the adsorbent bed to bring it down to room temperature. The adsorption and regeneration process is controlled by switching the programmable valve, and the regeneration time of a single tower is 6-7 days.

[0046] The fine desulfurization adsorption tower adopts the sewage discharge device scheme of the present invention to discharge sewage. The bottoms of the eight fine desulfurization adsorption towers 1 are connected to the water collection well 2 through eight sewage pipes 102, and the top of the water collection well 2 is connected to the phenol water pit 4 through the sewage channel 3. Each sewage pipe 102 is arranged with a tower outlet stop valve 104, a front purge valve 103, a rear purge valve 105, and a well entry stop valve 106. The front purge valve 103 faces the bottom of the adsorption tower 1, and the rear purge valve 105 faces the upper part of the water collection well 2. Both are inserted into the sewage pipe 102 at an angle of 45°, and can be quickly connected to the existing 130°C high-temperature steam pipeline of the steel plant for steam purging. Each sewage pipe 102 is paved with a resistance heating electric heating belt from the outlet of the fine desulfurization adsorption tower to the upper entrance of the water collection well 2, and the electric heating temperature is 120°C. The total height of the water collection well 2 is 4m, and a high-suction vertical submersible sand pump 107 is arranged at the bottom. The sewage level in the water collection well 2 meets the gas water seal pressure requirements, and excess sewage overflows and is discharged from the sewage channel 3. The sewage channel 3 is 0.6m above the horizontal ground, and a pluggable sealing baffle 108 is vertically arranged at the front end. A screen 109 is arranged along the flow channel section, and the number of holes in the screen 109 is 30 meshes.

[0047] The method of using the sewage discharge device of the coke oven gas fine desulfurization adsorption tower is as follows: the electric heating on the eight sewage pipes 102 is in a normally open state, and the electric heating temperature is maintained above 120°C. After the regeneration gas of the fine desulfurization adsorption tower 1 is hot-blown, the tower outlet stop valve 104 and the well inlet stop valve 106 on the sewage pipe 102 are opened, and the high-temperature steam main pipeline is connected to the front-end purge valve 103 and the rear-end purge valve 105. The front-end purge valve 103 is first connected to steam purge the bottom side pipeline of the adsorption tower 1, and then the rear-end purge valve 105 is connected to dredge the side of the water collection well 2. The viscous material in the sewage pipe 102 is softened by steam heating and discharged to the water collection well 2. At this time, when the liquid level in the water collection well 2 can be seen to overflow steam, the purge valves 103 and 105 are closed to stop steam purge.

[0048] The diamond-shaped particles at the bottom of the water collection well 2 are regularly pumped out and dredged. The sealing baffle 108 on the sewage channel 3 is first dropped to seal it, and the submersible sand pump 107 is turned on to pump the particles to the front end of the sewage channel 3. The sewage is sealed by the sealing baffle 108 and flows back to the water collection well 2, thereby maintaining the sewage level in the water collection well 2 to meet the gas water seal pressure requirements. After the particles in the water collection well 2 are completely pumped out, the submersible sand pump 107 is turned off, and the sealing baffle 108 in the sewage channel 3 is pulled out to allow the sewage channel 3 to overflow smoothly. The diamond-shaped particles at the bottom of the water collection well 2 and the sand-like particles enriched and precipitated in the sewage channel 3 are mostly deposited on the screen 109, and the two are regularly cleaned and recycled. A small amount of dirt is naturally washed from the overflow of the sewage from the water collection well 2 from the bottom of the screen 109 to the phenol water pit 4, and is finally collected from the phenol water pit 4 for centralized wastewater treatment.

[0049] This embodiment solves the drainage and clogging problems of the coke oven gas fine desulfurization pre-adsorption tower by adopting the sewage discharge device and treatment scheme of the present invention, and has good applicability. In practice, the operation effect of the fine desulfurization system is stable, the total sulfur removal rate of coal gas is above 90%, and the flue gas SO2 emission is reduced by 50%.

[0050] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.

Claims

1. A sewage discharge device for a coke oven gas fine desulfurization adsorption tower, characterized in that: Includes sewage pipes, water-sealed gas collection wells, sewage channels and phenol pits; The sewage pipe is connected to the bottom outlet of the fine desulfurization adsorption tower and the bottom of the water collection well; the sewage pipe is provided with a tower outlet stop valve and a well inlet stop valve, and the sewage pipes on both sides of the tower outlet stop valve are provided with a front end purge valve and a rear end purge valve, respectively, and the front end purge valve and the rear end purge valve are connected to the high-temperature steam pipeline respectively; A submersible pump is provided at the bottom of the water collection well, and the submersible pump is used to pump the particles at the bottom of the water collection well into the sewage channel; The drainage channel is connected with the upper part of the water collection well and the phenol water pit. A pluggable sealing baffle is vertically arranged at the front end of the drainage channel. A screen is arranged on the drainage channel frame.

2. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1 is characterized in that: The front end purge valve purges toward the bottom of the fine desulfurization adsorption tower. The front end purge valve is obliquely inserted into the sewage pipe and forms an angle of 30 to 60 degrees with the sewage pipe.

3. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1 is characterized in that: The rear end purge valve purges toward the upper part of the water collection well, and the front end purge valve is obliquely inserted into the sewage pipe and forms an angle of 30 to 60 degrees with the sewage pipe.

4. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1, characterized in that: An electric heating belt is provided on the sewage pipe from the bottom outlet of the fine desulfurization adsorption tower to the upper inlet section of the water collection well.

5. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1, characterized in that: The height of the water collection well is greater than 3m.

6. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1, characterized in that: The submersible pump is a sand pump or a sand suction pump, which is used to pump the diamond-shaped particles at the bottom of the water collection well to the sewage channel.

7. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1, characterized in that: The height of the sewage channel from the horizontal ground is 0.5 to 1 m.

8. The sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 1, characterized in that: The mesh number of the sieve is greater than 16 meshes.

9. A method for using the sewage discharge device for a coke oven gas fine desulfurization adsorption tower according to any one of claims 1 to 8, characterized in that: The electric heating tape on the sewage pipe is in the normally open state. After the regenerated gas from the fine desulfurization adsorption tower is hot-blown, the tower outlet stop valve and the well inlet stop valve on the sewage pipe are opened to dredge the sewage pipe. During the sewage discharge process, the particulate matter at the bottom of the collection well is regularly sanded. At the same time, the sealing baffle in the sewage channel is used to return water to maintain the water-sealed gas in the collection well. During the overflow of the sewage channel, the silty particulate matter enriched and precipitated in the sewage channel is regularly screened and cleaned.

10. The method for using the sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 9, characterized in that: The pipeline dredging of the sewage pipe is as follows: First, introduce high-temperature steam from the front purge valve to heat and soften the dirt in the sewage pipe on the bottom outlet side of the fine desulfurization adsorption tower, and then introduce high-temperature steam from the rear purge valve to clear the sewage pipe on the side of the water collection well; when there is visible steam overflowing from the liquid surface in the water collection well, close the front purge valve and the rear purge valve.

11. The method for using the sewage discharge device for the coke oven gas fine desulfurization adsorption tower according to claim 9, characterized in that: The method of regularly pumping sand from the particles at the bottom of the water collection well is as follows: First, insert the sealing baffle into the sewage channel to seal it, start the submersible pump, and pump the particles at the bottom of the water collection well to the front end of the sewage channel. The particles are deposited on the screen of the sewage channel, and the sewage is sealed by the sealing baffle and flows back into the water collection well; After the particulate matter in the water collection well is completely pumped out, the submersible pump is turned off, the sealing baffle is pulled out, and the sewage in the sewage channel flows into the phenol water pit.