Water distribution operation method for secondary cooling section of billet continuous casting machine

By deploying an intelligent control system and a multi-stage spray system in the billet continuous caster, the cooling water flow rate and spray angle are dynamically adjusted, which solves the problem that traditional water distribution operations cannot respond in real time, achieves efficient and accurate cooling water distribution, and improves improve production quality and efficiency.

CN118720083APending Publication Date: 2024-10-01QINGDAO SPECIAL STEEL CO LTD
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410764888.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The traditional water distribution operation in the secondary cooling section of the billet continuous caster cannot respond to changes in the casting process in real time, resulting in poor cooling effects. It cannot accurately adjust according to the size, shape and temperature changes of the billet, resulting in waste of resources and production quality. fluctuation.

Method used

Deploy an intelligent control system, install infrared thermometers, ultrasonic flow meters, pressure sensors and other sensors, use machine learning algorithms to establish a model of the relationship between slab temperature and cooling water flow, and dynamically adjust cooling water distribution parameters, including flow and temperature. and nozzle position, using a multi-stage spray system to adjust the cooling water flow rate and spray angle according to changes in the size and shape of the slab.

Benefits of technology

It realizes the automatic adjustment of cooling water distribution parameters, improves the intelligence level of the production process, accurately predicts the optimal cooling water distribution parameters, improves production quality and resource utilization, and enhances the cooling effect and the stability of the continuous casting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118720083A_ABST
    Figure CN118720083A_ABST
Patent Text Reader

Abstract

The invention discloses a water distribution operation method for a secondary cooling section of a billet continuous casting machine, and relates to the technical field of metallurgy. Real-time monitoring and data feedback of key parameters are realized through an intelligent control system and a sensor, so that traditional manual operation is replaced by water distribution operation, and the water distribution operation is more intelligent and automatic; the intelligent level of the production process is greatly improved, meanwhile, a relation model between the casting blank temperature and the cooling water flow is established through a machine learning algorithm, optimal cooling water distribution parameters are accurately predicted, water distribution operation is more accurate and efficient, the production quality and the resource utilization rate are greatly improved, a multi-stage spraying system is deployed for small square billets, and the production efficiency is improved. The cooling water flow and the spraying angle are dynamically adjusted according to changes of the size and the shape of the casting blank, personalized cooling of different areas is achieved, the cooling effect and the stability of the continuous casting process are effectively improved, and then the production quality and efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of metallurgy, in particular to a water distribution operation method for a secondary cooling section of a small square billet continuous casting machine. Background Art

[0002] In recent years, my country's continuous casting technology has made great progress. According to statistics in the first half of 2003, the continuous casting ratio of domestic large and medium-sized steel enterprises (accounting for more than 85% of the national steel production) was 96.36%, exceeding the average level of 89.70% abroad. Among them, the continuous casting ratio of special steel and alloy steel has also increased to a certain extent. In order to improve the operating rate of continuous casting machines and improve the quality of ingots, various steel mills are constantly improving continuous casting technology. The high operating rate of casting machines and the high quality of ingots are closely related to the solidification process of molten steel. The secondary cooling of continuous casting is to continue to strengthen the cooling of the ingots out of the crystallizer. By improving the secondary cooling system and optimizing the secondary cooling water distribution, the cooling of the ingots can be uniform. Therefore, optimizing secondary cooling is an important measure of efficient continuous casting technology, and the efficiency of continuous casting has become an important technology to promote the optimization of my country's steel industry structure. At present, with the high output of continuous casting ingots, continuously improving the quality of ingots and improving the variety structure has become an urgent task faced by many steel mills.

[0003] For example, a Chinese patent discloses a water distribution operation method for the second cooling section of a small billet continuous casting machine, with the application number CN114406227B, which includes the following steps: controlling the water volume, pulling speed, superheat and temperature of the second cooling section, and obtaining the solidification change status of the billet; obtaining the pressure, valve position and flow signal of the second cooling water branch, obtaining the pressure, valve position and flow signal of the third cooling chamber spray, and displaying them on the host computer; judging the working state of the nozzle according to the relationship between the pressure and flow of the second cooling water in each zone and each flow of the second cooling water continuous casting machine; setting multiple specific water volume curves according to the cross-sectional size of the billet, and controlling and adjusting the specific water volume according to the specific water volume curve. The invention changes the water distribution method of the second cooling section, and the nozzle blockage alarm promptly detects possible nozzle blockage, water leakage and nozzle installation errors, reduces the quality loss caused by nozzle blockage, and makes the nozzle of the second cooling section, the atomization effect, the spray angle, and the water distribution volume reach the optimal state, solving the quality accidents such as billet de-squareness, billet segregation, and billet cracks.

[0004] Although the above scheme has the above advantages, the traditional water distribution operation process of the secondary cooling section of the small square billet continuous casting machine usually adopts fixed parameter settings, which cannot respond immediately to real-time changes in the continuous casting process, resulting in the cooling effect not being able to achieve the optimal state. At the same time, it is impossible to make precise adjustments according to the changes in the size, shape and temperature of the small square billet, resulting in waste of resources and fluctuations in production quality. Therefore, there is an urgent need for a water distribution operation method for the secondary cooling section of the small square billet continuous casting machine that can dynamically adjust the cooling water flow and injection angle to solve such problems. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a water distribution operation method for the secondary cooling section of a small square billet continuous casting machine, which solves the problem in the prior art that it is unable to make an immediate response to real-time changes in the continuous casting process.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] The present invention provides a water distribution operation method for a secondary cooling section of a billet continuous casting machine, comprising:

[0008] Step 1. Obtaining casting parameters and deploying intelligent control systems.

[0009] An intelligent control system is deployed on the secondary cooling section of the continuous casting machine, and sensors are installed, including infrared thermometers, ultrasonic flow meters, pressure sensors, and multi-parameter water quality detectors, to monitor the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed, and the cooling water temperature in real time, providing feedback data for the intelligent control system;

[0010] Collect the surface temperature, shape and cooling water flow parameter data of the ingot and transmit them to the intelligent control system to form historical data;

[0011] Step 2. Cooling water distribution simulation,

[0012] Machine learning algorithms are used to optimize water distribution parameters, and historical data are analyzed to establish a relationship model between billet temperature and cooling water flow;

[0013] Based on real-time monitoring data and model prediction results, the intelligent control system automatically sets the cooling water distribution parameters, including flow, temperature and nozzle position;

[0014] Step 3. Diversify cooling water distribution,

[0015] A multi-stage spray system is used to dynamically adjust the cooling water flow and spray angle in different areas according to the changes in the size and shape of the ingot;

[0016] Determine personalized cooling water distribution scheme according to the size, shape and material of the ingot, including setting different cooling water flow rates and nozzle positions for ingots of different sizes and shapes;

[0017] Continuously monitor the temperature and shape changes of the ingot, and adjust the cooling water distribution parameters in real time based on real-time monitoring data and the prediction results of the machine learning model.

[0018] The present invention is further configured as follows: in step 1, the intelligent control system comprises:

[0019] The data acquisition module is responsible for obtaining the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed and the cooling water temperature data from the sensors. By connecting the sensors, the data is collected in real time and transmitted to the intelligent control system.

[0020] The data processing and storage module receives the real-time data from the data acquisition module, processes and stores it, uses the database to store and manage the collected data, and pre-processes the data, including denoising and filtering;

[0021] The historical data management module is used to manage historical data, including storing, retrieving and updating historical data for subsequent analysis and model training;

[0022] Real-time monitoring feedback module monitors the parameters of the casting in real time, and feeds back the monitoring results to the control system in real time to adjust the cooling water distribution parameters. It uses real-time data stream processing technology to analyze and process the real-time monitoring data and feeds back to the intelligent control system in a timely manner;

[0023] Intelligent control algorithm module, which runs intelligent control algorithm based on real-time monitoring data and historical data to optimize cooling water distribution parameters;

[0024] The present invention is further configured as follows: in step 2, the relationship model establishment step specifically includes:

[0025] Based on the monitoring data of the billet surface temperature, the billet internal temperature, the cooling water pressure, the billet speed and the cooling water temperature collected in step 1, data cleaning and preprocessing are performed;

[0026] Extract and select features of monitoring data, and obtain the correlation and impact degree between data by calculating the statistical feature mean, standard deviation, time series features, and frequency domain features;

[0027] Use multiple regression method to establish the relationship model between monitoring data;

[0028] Analyze the correlation between various monitoring parameters and determine the main influencing factors and key parameters;

[0029] The present invention is further configured as follows: in step 2, the step of obtaining the correlation and influence degree between data includes:

[0030] Assume that the original data to be monitored is X, and perform Zscore standardization on the monitored data X: Where X is the original monitoring data, μ is the mean of the data, σ is the standard deviation of the data, and Z is the standardized data;

[0031] Then calculate the mean and standard deviation of the monitoring parameter X:

[0032] Where Xi represents the i-th monitoring data, N is the total number of data, μX is the mean of the data, and σX is the standard deviation of the data;

[0033] The present invention is further configured as follows: in step 2, the step of obtaining the correlation and influence degree between data further includes:

[0034] Extract the time series characteristics of monitoring data X, including mean, variance, and autocorrelation coefficient;

[0035] Perform Fourier transform on the monitoring data X to obtain the frequency domain signal, and then extract the frequency domain features, including spectrum energy and main frequency components;

[0036] Based on the calculated features, the correlation coefficient method is used for feature selection to screen out features with high correlation with the target variables, billet temperature, and cooling water flow rate;

[0037] Using the selected features, the multivariate regression method is used to establish the relationship model between monitoring data. Let the target variable be Y and the features be X1, X2, ...X n , then the model is expressed as: Y = β0 + β1X1 + β2X2 + ... + β n X n +ε, where β0, β1, β2,...,β n is the coefficient of the model, ε is the error term;

[0038] The present invention is further configured as follows: in step 2, the step of analyzing the correlation between the monitoring parameters includes:

[0039] The Pearson correlation coefficient was used to calculate the correlation coefficient between the monitoring parameters: Where X i and Y i Respectively represent the two data of the i-th monitoring data, and Respectively represent the means of the two parameters, and n represents the number of samples;

[0040] Then perform an F hypothesis test on the correlation coefficient rXY to verify whether the correlation coefficient is significant;

[0041] The present invention is further configured as follows: in step 2, the relationship model establishment step further includes:

[0042] Establish a relationship model between the billet temperature and the cooling water flow rate, then divide the historical data into a training set and a test set, use the training set data to train the relationship model, and use the test set data to verify the accuracy and generalization ability of the model;

[0043] The model was validated using cross-validation method;

[0044] The coefficient of determination R 2 Evaluate the model to assess its fit and predictive power;

[0045] Adjust and optimize the model based on the evaluation results;

[0046] Apply the trained relationship model to actual production to analyze and predict monitoring data;

[0047] Integrate the model into intelligent control systems;

[0048] The present invention is further configured as follows: in step 2, the cross-validation step comprises:

[0049] The collected historical data is divided into training set and test set, and the data is divided into k subsets, of which k-1 subsets are used as training sets and the remaining subset is used as test set;

[0050] In each cross-validation, the model is trained using k-1 subsets of data, and then the model is validated using the remaining subset of data;

[0051] Evaluate the model performance obtained from each cross-validation;

[0052] The present invention is further configured as follows: in step 2, the step of evaluating the degree of fit and predictive ability of the model comprises:

[0053] Calculate the total sum of squares SST: Where n is the number of samples, i represents the number of observations and predictions, and y i is the ith observation, is the mean of the observed values;

[0054] Calculate the residual sum of squares SSR: in, is the predicted value of the model;

[0055] Calculate the coefficient of determination R 2 : The coefficient of determination ranges from 0 to 1. 2 When it is close to 1, it indicates that the model fit is good;

[0056] The present invention is further configured as follows: in step 3, the method for dynamically adjusting the cooling water flow and the spray angle in different areas is specifically as follows:

[0057] Use finite element analysis numerical simulation method to calculate the cooling requirements of different areas and adjust the cooling water flow according to the geometric characteristics of the ingot;

[0058] Assume that the ingot is divided into n' zones, and the cooling water flow rate Q in each zone is i(i=1,2,3...,n′), then: Where L i ,W i ,H i represent the length, width, and thickness of the ith region, respectively; a, b, c, d, e, f, and g are parameters in the model, which are determined by data fitting;

[0059] Use machine learning algorithms to learn the relationship between billet shape and cooling effect and predict the optimal injection angle;

[0060] Assume the optimal injection angle is θ, then: θ = hL + i i W+jH+k, where h,i i ,j,k are parameters in the model, which are determined by data fitting;

[0061] The surface temperature and shape changes of the ingot are monitored in real time by the temperature sensor installed in step 1;

[0062] Then adjust the direction and angle of the nozzle based on real-time monitoring data and the predicted optimal spray angle.

[0063] Compared with the prior art, the present invention has the following beneficial effects:

[0064] The present invention deploys an intelligent control system in the secondary cooling section of a continuous casting machine and installs a variety of sensors, including infrared thermometers, ultrasonic flow meters, pressure sensors, etc., to monitor key parameters such as the surface temperature, internal temperature, and cooling water pressure of the ingot in real time. The intelligent control system uses the detection data to collect, process, and store in real time, and manages and analyzes the historical data through a data processing and storage module and a historical data management module. In terms of cooling water distribution, a machine learning algorithm is used to optimize the distribution parameters, and a relationship model between the ingot temperature and the cooling water flow rate is established. By extracting and selecting features of the monitoring data, features with a high correlation with the ingot temperature and the cooling water flow rate are determined, and a relationship model between the monitoring data is established using a multiple regression method. Subsequently, a cross-validation method is used to evaluate and optimize the model to ensure the accuracy and generalization ability of the model. Finally, the trained relationship model is integrated into the intelligent control system to realize the automatic adjustment of the cooling water distribution parameters and improve the intelligence level of the production process.

[0065] The present invention adopts a multi-stage spray system to meet the cooling needs of different areas in the continuous casting process, and dynamically adjusts the cooling water flow and spray angle of different areas according to the changes in the size and shape of the ingot. The cooling needs of different areas are calculated by the finite element analysis numerical simulation method, and the cooling water flow is adjusted according to the geometric characteristics of the ingot. At the same time, the relationship between the ingot shape and the cooling effect is learned through a machine learning algorithm, and the optimal spray angle is predicted, so that the real-time adjustment of the cooling water distribution parameters can be achieved, thereby improving production efficiency.

[0066] In summary, the present invention realizes real-time monitoring and data feedback of key parameters through intelligent control systems and sensors, so that water distribution operations can replace traditional manual operations, become more intelligent and automated, and greatly improve the intelligence level of the production process. At the same time, a relationship model between the temperature of the ingot and the cooling water flow rate is established through a machine learning algorithm to accurately predict the optimal cooling water distribution parameters, making the water distribution operation more accurate and efficient, greatly improving the production quality and resource utilization. A multi-stage spray system is deployed for small square billets, and the cooling water flow rate and spray angle are dynamically adjusted according to changes in the size and shape of the ingot, so as to realize personalized cooling of different areas, effectively improve the cooling effect and the stability of the continuous casting process, and thus improve the production quality and efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] Figure 1 It is a flow chart of the water distribution operation method of the secondary cooling section of the small square billet continuous casting machine of the present invention;

[0068] Figure 2 This is a framework diagram of the intelligent control system in the water distribution operation method for the secondary cooling section of the small square billet continuous casting machine of the present invention. DETAILED DESCRIPTION

[0069] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0070] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0071] The present invention is further described in detail below in conjunction with the accompanying drawings:

[0072] Example

[0073] See also Figure 1-Figure 2The present invention provides a water distribution operation method for a secondary cooling section of a billet continuous casting machine, comprising:

[0074] Step 1. Obtaining casting parameters and deploying intelligent control systems.

[0075] An intelligent control system is deployed on the secondary cooling section of the continuous casting machine, and sensors are installed, including infrared thermometers, ultrasonic flow meters, pressure sensors, and multi-parameter water quality detectors, to monitor the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed, and the cooling water temperature in real time, providing feedback data for the intelligent control system;

[0076] Collect the surface temperature, shape and cooling water flow parameter data of the ingot and transmit them to the intelligent control system to form historical data;

[0077] In step 1, the intelligent control system includes:

[0078] The data acquisition module is responsible for obtaining the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed and the cooling water temperature data from the sensors. By connecting the sensors, the data is collected in real time and transmitted to the intelligent control system.

[0079] The data processing and storage module receives the real-time data from the data acquisition module, processes and stores it, uses the database to store and manage the collected data, and pre-processes the data, including denoising and filtering;

[0080] The historical data management module is used to manage historical data, including storing, retrieving and updating historical data for subsequent analysis and model training. It is combined with the data processing and storage module to ensure the integrity and availability of historical data.

[0081] Real-time monitoring feedback module monitors the parameters of the casting in real time, and feeds back the monitoring results to the control system in real time to adjust the cooling water distribution parameters. It uses real-time data stream processing technology to analyze and process the real-time monitoring data and feeds back to the intelligent control system in a timely manner;

[0082] Intelligent control algorithm module, based on real-time monitoring data and historical data, runs intelligent control algorithms to optimize cooling water distribution parameters and achieve the best cooling effect. This module uses machine learning and deep learning algorithms to analyze and model data to achieve intelligent control decisions;

[0083] Step 2. Cooling water distribution simulation,

[0084] Machine learning algorithms are used to optimize water distribution parameters, and historical data are analyzed to establish a relationship model between billet temperature and cooling water flow;

[0085] Based on real-time monitoring data and model prediction results, the intelligent control system automatically sets the cooling water distribution parameters, including flow, temperature and nozzle position;

[0086] In step 2, the relationship model establishment steps specifically include:

[0087] Based on the monitoring data of the billet surface temperature, the billet internal temperature, the cooling water pressure, the billet speed and the cooling water temperature collected in step 1, data cleaning and preprocessing are performed;

[0088] Extract and select features of monitoring data, and obtain the correlation and impact degree between data by calculating the statistical feature mean, standard deviation, time series features, and frequency domain features;

[0089] Use multiple regression method to establish the relationship model between monitoring data;

[0090] Analyze the correlation between various monitoring parameters and determine the main influencing factors and key parameters;

[0091] In step 2, the steps of obtaining the correlation and influence degree between data include:

[0092] Assume that the original data to be monitored is X, and perform Zscore standardization on the monitored data X: Where X is the original monitoring data, μ is the mean of the data, σ is the standard deviation of the data, and Z is the standardized data;

[0093] Then calculate the mean and standard deviation of the monitoring parameter X:

[0094] Where Xi represents the i-th monitoring data, N is the total number of data, μX is the mean of the data, and σX is the standard deviation of the data;

[0095] In step 2, the step of obtaining the correlation and influence degree between data also includes:

[0096] Extract the time series characteristics of monitoring data X, including mean, variance, and autocorrelation coefficient;

[0097] Perform Fourier transform on the monitoring data X to obtain the frequency domain signal, and then extract the frequency domain features, including spectrum energy and main frequency components;

[0098] Based on the calculated features, the correlation coefficient method is used for feature selection to screen out features with high correlation with the target variables, billet temperature, and cooling water flow rate;

[0099] Using the selected features, the multivariate regression method is used to establish the relationship model between monitoring data. Let the target variable be Y and the features be X1, X2, ...X n, then the model is expressed as: Y = β0 + β1X1 + β2X2 + ... + β n X n +ε, where β0, β1, β2,...,β n is the coefficient of the model, ε is the error term;

[0100] By extracting and selecting features from monitoring data and establishing a relationship model between monitoring data, data support is provided for intelligent cooling water distribution, and the correlation and impact between data are obtained;

[0101] In step 2, the step of analyzing the correlation between the monitoring parameters includes:

[0102] The Pearson correlation coefficient was used to calculate the correlation coefficient between the monitoring parameters: Where X i and Y i Respectively represent the two data of the i-th monitoring data, and Respectively represent the means of the two parameters, and n represents the number of samples;

[0103] Then perform an F hypothesis test on the correlation coefficient rXY to verify whether the correlation coefficient is significant;

[0104] In step 2, the relationship model building step also includes:

[0105] Establish a relationship model between the billet temperature and the cooling water flow rate, then divide the historical data into a training set and a test set, use the training set data to train the relationship model, and use the test set data to verify the accuracy and generalization ability of the model;

[0106] Cross-validation method was used to verify the stability and reliability of the model;

[0107] The coefficient of determination R 2 Evaluate the model to assess its fit and predictive power;

[0108] According to the evaluation results, adjust and optimize the model parameters to improve the accuracy and generalization ability of the model;

[0109] Apply the trained relationship model to actual production to analyze and predict monitoring data;

[0110] Integrate the model into the intelligent control system to realize automatic adjustment of cooling water distribution parameters and improve the intelligence level of the production process;

[0111] Through step 2, intelligent cooling water distribution, a relationship model between monitoring data is established to achieve modeling and analysis of the complex relationship between parameters such as billet temperature and cooling water flow, providing data support for intelligent cooling water distribution;

[0112] In step 2, the cross-validation step includes:

[0113] The collected historical data is divided into training set and test set. The data is divided into k subsets, of which k-1 subsets are used as training sets and the remaining subset is used as test set. K cross validations are performed, and each subset is used as a test set.

[0114] In each cross-validation, the model is trained using k-1 subsets of data, and then the model is validated using the remaining subset of data;

[0115] Evaluate the model performance obtained from each cross-validation;

[0116] In step 2, the steps to evaluate the model's fit and predictive ability include:

[0117] Calculate the total sum of squares SST: Where n is the number of samples, i represents the number of observations and predictions, and y i is the ith observation, is the mean of the observed values;

[0118] Calculate the residual sum of squares SSR: in, is the predicted value of the model;

[0119] Calculate the coefficient of determination R 2 : The coefficient of determination ranges from 0 to 1. 2 When it is close to 1, it indicates that the model fit is good;

[0120] If R 2 If it is close to 0, it means that the explanatory power of the model is poor and the prediction effect is not ideal. The degree of fit and prediction ability of the model are evaluated by calculating the coefficient of determination.

[0121] Step 3. Diversify cooling water distribution,

[0122] A multi-stage spray system is used to dynamically adjust the cooling water flow and spray angle in different areas according to the changes in the size and shape of the ingot;

[0123] Determine personalized cooling water distribution scheme according to the size, shape and material of the ingot, including setting different cooling water flow rates and nozzle positions for ingots of different sizes and shapes;

[0124] Continuously monitor the temperature and shape changes of the ingot, and adjust the cooling water distribution parameters in real time based on the real-time monitoring data and the prediction results of the machine learning model;

[0125] Dynamically adjust the water distribution strategy according to the changes in production process and the real-time situation of the ingot, so as to ensure stable and reliable cooling effect during continuous production;

[0126] In step 3, the method for dynamically adjusting the cooling water flow and injection angle in different areas is as follows:

[0127] Use finite element analysis numerical simulation method to calculate the cooling requirements of different areas and adjust the cooling water flow according to the geometric characteristics of the ingot;

[0128] Assume that the ingot is divided into n' zones, and the cooling water flow rate Q in each zone is i (i=1,2,3...,n′), then: Where L i ,W i ,H i represent the length, width, and thickness of the ith region, respectively; a, b, c, d, e, f, and g are parameters in the model, which are determined by data fitting;

[0129] The relationship between the shape of the ingot and the cooling effect is learned by machine learning algorithm to predict the optimal injection angle. Assuming the optimal injection angle is θ, then: θ = hL + i i W+jH+k, where h,i i ,j,k are parameters in the model, which are determined by data fitting;

[0130] The surface temperature and shape changes of the ingot are monitored in real time by the temperature sensor installed in step 1;

[0131] Then adjust the direction and angle of the nozzle according to the real-time monitoring data and the predicted optimal spray angle;

[0132] Based on the changes in the size and shape of the ingot, the cooling water flow and spray angle in different areas are dynamically adjusted to improve the cooling effect and production quality during the continuous casting process.

[0133] The present invention deploys an intelligent control system in the secondary cooling section of a continuous casting machine and installs a variety of sensors, including infrared thermometers, ultrasonic flow meters, pressure sensors, etc., to monitor key parameters such as the surface temperature, internal temperature, and cooling water pressure of the ingot in real time. The intelligent control system uses the detection data to collect, process, and store in real time, and manages and analyzes the historical data through a data processing and storage module and a historical data management module. In terms of cooling water distribution, a machine learning algorithm is used to optimize the distribution parameters, and a relationship model between the ingot temperature and the cooling water flow rate is established. By extracting and selecting features of the monitoring data, features with a high correlation with the ingot temperature and the cooling water flow rate are determined, and a relationship model between the monitoring data is established using a multiple regression method. Subsequently, a cross-validation method is used to evaluate and optimize the model to ensure the accuracy and generalization ability of the model. Finally, the trained relationship model is integrated into the intelligent control system to realize the automatic adjustment of the cooling water distribution parameters and improve the intelligence level of the production process.

[0134] The present invention adopts a multi-stage spray system to meet the cooling needs of different areas in the continuous casting process, and dynamically adjusts the cooling water flow and spray angle of different areas according to the changes in the size and shape of the ingot. The cooling needs of different areas are calculated by the finite element analysis numerical simulation method, and the cooling water flow is adjusted according to the geometric characteristics of the ingot. At the same time, the relationship between the ingot shape and the cooling effect is learned through a machine learning algorithm, and the optimal spray angle is predicted, so that the real-time adjustment of the cooling water distribution parameters can be achieved, thereby improving production efficiency.

[0135] In summary, the present invention realizes real-time monitoring and data feedback of key parameters through intelligent control systems and sensors, so that water distribution operations can replace traditional manual operations, become more intelligent and automated, and greatly improve the intelligence level of the production process. At the same time, a relationship model between the temperature of the ingot and the cooling water flow rate is established through a machine learning algorithm to accurately predict the optimal cooling water distribution parameters, making the water distribution operation more accurate and efficient, greatly improving the production quality and resource utilization. A multi-stage spray system is deployed for small square billets, and the cooling water flow rate and spray angle are dynamically adjusted according to changes in the size and shape of the ingot, so as to realize personalized cooling of different areas, effectively improve the cooling effect and the stability of the continuous casting process, and thus improve the production quality and efficiency.

[0136] The above contents are only for explaining the technical idea of ​​the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.

Claims

1. A method for operating water distribution in the secondary cooling section of a billet continuous casting machine, characterized in that: include: Step 1. Obtaining casting parameters and deploying intelligent control systems. An intelligent control system is deployed on the secondary cooling section of the continuous casting machine, and sensors are installed, including infrared thermometers, ultrasonic flow meters, pressure sensors, and multi-parameter water quality detectors, to monitor the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed, and the cooling water temperature in real time, providing feedback data for the intelligent control system; Collect the surface temperature, shape and cooling water flow parameter data of the ingot and transmit them to the intelligent control system to form historical data; Step 2. Cooling water distribution simulation, Machine learning algorithms are used to optimize water distribution parameters, and historical data are analyzed to establish a relationship model between billet temperature and cooling water flow; Based on real-time monitoring data and model prediction results, the intelligent control system automatically sets the cooling water distribution parameters, including flow, temperature and nozzle position; Step 3. Diversify cooling water distribution, A multi-stage spray system is used to dynamically adjust the cooling water flow and spray angle in different areas according to the changes in the size and shape of the ingot; Determine personalized cooling water distribution scheme according to the size, shape and material of the ingot, including setting different cooling water flow rates and nozzle positions for ingots of different sizes and shapes; Continuously monitor the temperature and shape changes of the ingot, and adjust the cooling water distribution parameters in real time based on real-time monitoring data and the prediction results of the machine learning model.

2. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 1, characterized in that: In step 1, the intelligent control system includes: The data acquisition module is responsible for obtaining the surface temperature of the ingot, the internal temperature of the ingot, the cooling water pressure, the ingot speed and the cooling water temperature data from the sensors. By connecting the sensors, the data is collected in real time and transmitted to the intelligent control system. The data processing and storage module receives the real-time data from the data acquisition module, processes and stores it, uses the database to store and manage the collected data, and pre-processes the data, including denoising and filtering; The historical data management module is used to manage historical data, including storing, retrieving and updating historical data for subsequent analysis and model training; Real-time monitoring feedback module monitors the parameters of the casting in real time, and feeds back the monitoring results to the control system in real time to adjust the cooling water distribution parameters. It uses real-time data stream processing technology to analyze and process the real-time monitoring data and feeds back to the intelligent control system in a timely manner; The intelligent control algorithm module runs the intelligent control algorithm based on real-time monitoring data and historical data to optimize the cooling water distribution parameters.

3. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 2, characterized in that: In step 2, the relationship model establishment step specifically includes: Based on the monitoring data of the billet surface temperature, the billet internal temperature, the cooling water pressure, the billet speed and the cooling water temperature collected in step 1, data cleaning and preprocessing are performed; Extract and select features of monitoring data, and obtain the correlation and impact degree between data by calculating the statistical feature mean, standard deviation, time series features, and frequency domain features; Use multiple regression method to establish the relationship model between monitoring data; Analyze the correlation between various monitoring parameters and determine the main influencing factors and key parameters.

4. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 3, characterized in that: In step 2, the step of obtaining the correlation and influence degree between data includes: Assume that the original data to be monitored is X, and perform Zscore standardization on the monitored data X: Where X is the original monitoring data, μ is the mean of the data, σ is the standard deviation of the data, and Z is the standardized data; Then calculate the mean and standard deviation of the monitoring parameter X: Where X i represents the i-th monitoring data, N is the total number of data, μX is the mean of the data, and σX is the standard deviation of the data.

5. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 4, characterized in that: In step 2, the step of obtaining the correlation and influence degree between data also includes: Extract the time series characteristics of monitoring data X, including mean, variance, and autocorrelation coefficient; Perform Fourier transform on the monitoring data X to obtain the frequency domain signal, and then extract the frequency domain features, including spectrum energy and main frequency components; Based on the calculated features, the correlation coefficient method is used for feature selection to screen out features with high correlation with the target variables, billet temperature, and cooling water flow rate; Using the selected features, the multivariate regression method is used to establish the relationship model between monitoring data. Let the target variable be Y and the features be X1, X2, ...X n , then the model is expressed as: Y = β0 + β1X1 + β2X2 + ... + β n X n +ε, where β0, β1, β2,...,β n is the coefficient of the model and ε is the error term.

6. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 5, characterized in that: In step 2, the step of analyzing the correlation between the monitoring parameters includes: The Pearson correlation coefficient was used to calculate the correlation coefficient between the monitoring parameters: Where X i and Y i They represent the two data of the i-th monitoring data, X and Y represent the means of the two parameters, and n represents the number of samples; Then, an F hypothesis test is performed on the correlation coefficient rXY to verify whether the correlation coefficient is significant.

7. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 6, characterized in that: In step 2, the relationship model establishment step further includes: Establish a relationship model between the billet temperature and the cooling water flow rate, then divide the historical data into a training set and a test set, use the training set data to train the relationship model, and use the test set data to verify the accuracy and generalization ability of the model; The model was validated using cross-validation method; The coefficient of determination R 2 Evaluate the model to assess its fit and predictive power; Adjust and optimize the model based on the evaluation results; Apply the trained relationship model to actual production to analyze and predict monitoring data; Integrate the model into an intelligent control system.

8. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 7, characterized in that: In step 2, the cross-validation step includes: The collected historical data is divided into training set and test set, and the data is divided into k subsets, of which k-1 subsets are used as training sets and the remaining subset is used as test set; In each cross-validation, the model is trained using k-1 subsets of data, and then the model is validated using the remaining subset of data; The model performance obtained from each cross-validation was evaluated.

9. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 8, characterized in that: In step 2, the step of evaluating the degree of fit and predictive ability of the model includes: Calculate the total sum of squares SST: Where n is the number of samples, i represents the number of observations and predictions, and y i is the ith observation, is the mean of the observed values; Calculate the residual sum of squares SSR: in, is the predicted value of the model; Calculate the coefficient of determination R 2 : The coefficient of determination ranges from 0 to 1. 2 When it is close to 1, it indicates that the model fit is good.

10. The method for operating water distribution in the secondary cooling section of a billet continuous casting machine according to claim 9, characterized in that: In step 3, the method for dynamically adjusting the cooling water flow and injection angle in different areas is specifically as follows: Use finite element analysis numerical simulation method to calculate the cooling requirements of different areas and adjust the cooling water flow according to the geometric characteristics of the ingot; Assume that the ingot is divided into n' zones, and the cooling water flow rate Q in each zone is i (i=1,2,3...,n'), then: Where L i ,W i ,H i represent the length, width, and thickness of the ith region, respectively; a, b, c, d, e, f, and g are parameters in the model, which are determined by data fitting; Use machine learning algorithms to learn the relationship between billet shape and cooling effect and predict the optimal injection angle; Assume the optimal injection angle is θ, then: θ = hL + i i W+jH+k, where h,i i ,j,k are parameters in the model, which are determined by data fitting; The surface temperature and shape changes of the ingot are monitored in real time by the temperature sensor installed in step 1; Then adjust the direction and angle of the nozzle based on real-time monitoring data and the predicted optimal spray angle.

Citation Information

Cited By

  • Method for controlling element segregation in industrial silicon casting process and control system

    CN119512288A

  • A method and control system for controlling element segregation in industrial silicon casting process

    CN119512288B

  • Intelligent detection system and method for casting cooling system

    CN119703042A