Fixed type welding work station for producing highway prefabricated box girder steel reinforcement framework
By designing a fixed welding workstation in the production of highway box girder steel frame, using stirrup clamps and brackets to fix the stirrup frame, and guiding the positioning of longitudinal bars through an automated system, the problem of loose stirrups affecting welding quality has been solved and improved Production efficiency and quality are achieved, and standardized production is achieved.
Patent Information
- Application Number
- CN202411025122.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-29
AI Technical Summary
In the production of highway box girder steel frame, the stirrups are easy to loosen during the welding process of stirrups and longitudinal bars, which affects the welding efficiency and quality. Moreover, the traditional production process is complicated, inefficient and difficult to guarantee quality.
A fixed welding workstation is designed, including a steel tensioning module and a welding module, which uses stirrup clamps and brackets to fix the stirrup skeleton, and automatically guides the positioning and tensioning of longitudinal bars and stirrups through the gantry beam and guide rail system. Ensure stirrup stability and correct positioning of longitudinal bars during welding.
It effectively avoids loosening of stirrups, improves the welding quality and efficiency of stirrups and longitudinal bars, reduces production difficulty, standardizes the production process, and ensures that the finished product meets industry standards.
Smart Images

Figure CN118720595A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel bar skeleton forming, and in particular relates to a fixed welding workstation used for producing steel bar skeletons of highway prefabricated box girders. Background Art
[0002] The steel skeleton structure of highway box girders is complex. In the traditional production process, after the early parts production is completed, the overall installation and forming process can only be achieved through manual work. The traditional production process is roughly as follows: 1. Install the lower longitudinal reinforcement of the bottom plate (outside the web stirrups): manually place the lower longitudinal reinforcement of the bottom plate on the jig; 2. Install and tie the bottom stirrups: manually place the bottom stirrups on the jig, and manually tie them with the lower longitudinal reinforcement of the bottom plate placed in the first step; 3. Install and tie the web stirrups: manually place the web stirrups on the jig, and lower them to the jig. Manually tie with the bottom plate stirrups placed in the second step; 4. Thread the web longitudinal reinforcement and the upper longitudinal reinforcement of the bottom plate: manually thread the web longitudinal reinforcement and the upper longitudinal reinforcement of the bottom plate, and tie them with the web stirrups; 5. Install the lower longitudinal reinforcement of the bottom plate (inside the web stirrups): manually thread the longitudinal reinforcement of the lower layer of the bottom plate contained in the web stirrups, and tie them with the web stirrups; 6. Tie the web longitudinal reinforcement: manually place and tie the inner longitudinal reinforcement of the web, and tie it with the web stirrups; 7. Adjust the steel bars: manually adjust the spacing and tightness of the above steel bars.
[0003] From the above general process, we can find that the parts currently used in the production of steel skeletons are of various types, the installation steps are complicated, the production efficiency is low and the quality is difficult to guarantee. In particular, during the welding process of stirrups and longitudinal bars, the stirrups are easy to loosen, which affects the welding efficiency and quality of the stirrups and longitudinal bars. Summary of the invention
[0004] In response to the above-mentioned problems in the prior art, the present application proposes a fixed welding workstation for the production of highway prefabricated box girder steel frame, which can effectively solve the problem of loose stirrups affecting welding quality during the welding process of stirrups and longitudinal reinforcements, and can also automatically solve the problem of tightness between the steel bars to be welded.
[0005] The present invention proposes a fixed welding workstation for producing a prefabricated box girder steel bar skeleton for a highway, comprising: a steel bar tensioning module and a welding module; the welding module is arranged at the front end of the steel bar tensioning module; a stirrup magazine for carrying a plurality of stirrup skeletons is arranged at the rear end of the steel bar tensioning module; a longitudinal reinforcement guide tube is arranged at the rear end of the stirrup magazine; the longitudinal reinforcement guide tube is used to support and guide the longitudinal reinforcement to move in the longitudinal direction so that the longitudinal reinforcement passes through the stirrup skeleton;
[0006] The steel bar tensioning module comprises a gantry beam, a gantry beam guide rail and a stirrup positioning mechanism; the gantry beam guide rail is arranged in the longitudinal direction, and the gantry beam moves along the gantry beam guide rail; the stirrup positioning mechanism is arranged on the gantry beam; the stirrup positioning mechanism comprises a clamp fixing frame, a plurality of stirrup clamps and a stirrup support, the clamp fixing frame is connected to the gantry beam, and a plurality of stirrup clamps and the stirrup support are arranged on the clamp fixing frame from top to bottom; the stirrup clamp is used to clamp the side of the stirrup skeleton; the stirrup support is used to support the bottom of the stirrup skeleton;
[0007] The welding module includes a welding robot bracket and a welding robot installed on the welding robot bracket.
[0008] Furthermore, the stirrup clamp comprises a first clamp cylinder and a clamp body connected to the first clamp cylinder; the first clamp cylinder is used to drive the clamp body to move closer to or away from the stirrup skeleton; the clamp body has a slot adapted to the outer diameter of the stirrup skeleton.
[0009] Furthermore, the stirrup support comprises a support second cylinder and a support plate connected to the support second cylinder; the support second cylinder is used to drive the support plate to move closer to or away from the stirrup body; and the support plate is used to support the bottom of the stirrup skeleton.
[0010] Furthermore, there are two stirrup positioning mechanisms, which are arranged at intervals along the length direction of the gantry crossbeam; the stirrup clamps of the two stirrup positioning mechanisms clamp the two sides of the stirrup skeleton.
[0011] Furthermore, the steel bar tensioning module further comprises a steel bar tensioning mechanism; the steel bar tensioning mechanism comprises an outer steel bar tensioning mechanism and an inner steel bar tensioning mechanism;
[0012] The outer steel bar tensioning mechanism is arranged on opposite sides of the two stirrup positioning mechanisms, and is used to tension the longitudinal bars welded to the outer sides of the stirrup skeleton;
[0013] The inner steel bar tensioning mechanism is arranged between the two stirrup positioning mechanisms and is used for tensioning the longitudinal bars welded to the inner side of the stirrup skeleton.
[0014] Furthermore, the outer steel bar tensioning mechanism includes a first movable guide rail, a first mounting frame, a longitudinal bar lifting module and a longitudinal bar tensioning module; the first movable guide rail is installed on the gantry beam in the transverse direction; the first mounting frame moves along the first movable guide rail; the longitudinal bar lifting module and the longitudinal bar tensioning module are installed on the first mounting frame; the longitudinal bar lifting module lifts the longitudinal bars welded to the outer side of the stirrup skeleton; the longitudinal bar tensioning module tightens the longitudinal bars welded to the outer side of the stirrup skeleton.
[0015] Furthermore, the longitudinal reinforcement lifting module comprises: a lifting cylinder, a lifting connecting plate, a lifting push rod, a push rod guide block and a supporting rod;
[0016] The lifting cylinder is installed vertically or obliquely on the first mounting frame; the end of the air rod of the lifting cylinder is connected to the lifting connecting plate, and the lifting connecting plate is connected to the lifting push rod installed vertically or obliquely, and the outer periphery of the lifting push rod is provided with a plurality of push rod guide blocks connected to the first mounting frame at intervals along its length direction, which are used to limit the movement direction of the lifting push rod; the lifting push rod is connected to a plurality of horizontal support rods at intervals along its length direction; and they are used to lift the longitudinal reinforcement.
[0017] Furthermore, the longitudinal reinforcement tensioning module includes a tensioning cylinder, a rack connecting block, a hook rack, a hook gear and a hook body;
[0018] The tensioning cylinder is installed vertically or obliquely on the first mounting frame; the end of the gas rod of the tensioning cylinder is connected to the rack connecting block; the rack connecting block is connected to the vertically or obliquely arranged hook rack; the hook rack is meshed with a plurality of hook gears arranged at intervals along its height direction; each of the hook gears is connected to a hook body; the rotation of the hook gear drives the hook body to rotate until it is parallel or perpendicular to the longitudinal reinforcement.
[0019] Furthermore, the hook body is an L-shaped rod body, including a connecting section and a free section; one end of the connecting section is fixedly connected to the center of the hook gear to rotate with the hook gear, and the other end of the connecting section is connected to the free section, and the free section rotates around the connecting section.
[0020] Furthermore, the inner steel bar tensioning mechanism includes: a second mounting frame and a longitudinal bar tensioning module; the second mounting frame moves along the first movable guide rail; the longitudinal bar tensioning module is installed on the second mounting frame; the longitudinal bar tensioning module tightens the longitudinal bars welded to the inner side of the stirrup skeleton.
[0021] The beneficial effects of the present invention are: the side of the stirrup frame is clamped by the stirrup clamping claws; the bottom of the stirrup frame is supported by the stirrup support, so that the stirrup frame is kept fixed during welding, effectively preventing the stirrup frame from loosening or shaking, and keeping the stirrup frame in a correct posture, and the positioning and fixing of the stirrup frame and the longitudinal reinforcement are improved, thereby improving the welding quality and welding efficiency of the stirrup frame and the longitudinal reinforcement. The difficulty of the stirrup frame installation link is reduced; the standardization of the production process can be achieved, and the finished product can be ensured to meet the industry standards. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1It is a schematic diagram of the main structure of the automated production equipment for the highway prefabricated box girder reinforcement skeleton according to an embodiment of the present invention.
[0023] Figure 2 for Figure 1 Schematic diagram of the top view structure.
[0024] Figure 3 This is a schematic diagram of the three-dimensional structure of an automated production device according to an embodiment of the present invention, in which a longitudinal reinforcement and stirrup skeleton are arranged and the finished bridge frame module is hidden.
[0025] Figure 4 It is a schematic structural diagram of a stirrup skeleton of the present invention.
[0026] Figure 5 It is a schematic diagram of the three-dimensional structure of the steel bar tensioning module of the fixed welding workstation of the present invention.
[0027] Figure 6 for Figure 5 Schematic diagram of the main structure.
[0028] Figure 7 for Figure 5 Schematic diagram of the three-dimensional structure of a stirrup positioning mechanism.
[0029] Figure 8 for Figure 5 Schematic diagram of the three-dimensional structure of the middle and outer steel bar tensioning mechanism.
[0030] Fig. 9 for Figure 8 Schematic diagram of the three-dimensional structure from another perspective.
[0031] Fig.10 for Fig. 9 Another perspective diagram of the three-dimensional structure after the mounting frame is partially hidden.
[0032] Fig.11 for Fig.10 Another perspective diagram of the three-dimensional structure after the mounting frame is partially hidden.
[0033] Fig.12 for Figure 8 A schematic diagram of the main structure of the retractor body after rotating 90 degrees.
[0034] Fig.13 for Figure 5 Schematic diagram of the three-dimensional structure of the middle inner steel bar tensioning mechanism.
[0035] Fig.14 It is a schematic diagram of the three-dimensional structure of the welding module of the fixed welding workstation of the present invention.
[0036] Fig.15It is a schematic diagram of the three-dimensional structure of the finished bridge module at the front end of the fixed welding workstation of the present invention.
[0037] Fig.16 for Fig.15 Schematic diagram of the three-dimensional structure of the finished product transportation line and finished product traction mechanism of the finished product bridge module.
[0038] Fig.17 for Fig.16 A schematic diagram of a partially enlarged three-dimensional structure.
[0039] Fig.18 for Fig.17 Schematic diagram of the three-dimensional structure of the finished product traction mechanism after being hidden.
[0040] Fig.19 for Fig.18 An enlarged three-dimensional structural diagram of a traction longitudinal beam with the roller box hidden.
[0041] Fig. 20 for Fig.15 An enlarged three-dimensional structural diagram of the finished product traction mechanism and the mold entry lifting platform.
[0042] Fig.21 for Fig. 20 Schematic diagram of the three-dimensional structure of the middle mold lifting platform.
[0043] In the figure,
[0044] 100-Raw material bridge module;
[0045] 200- stirrup tooling module; 260- stirrup skeleton; 261- bottom plate stirrup; 262- side plate stirrup;
[0046] 300-rebar tensioning module; 310-gantry bracket; 320-gantry beam; 330-gantry driving mechanism; 340-gantry beam guide rail; 350-outer reinforcement tensioning mechanism; 351-mounting frame; 352-longitudinal reinforcement lifting module; 3521-lifting cylinder; 3522-lifting connecting plate; 3523-lifting push rod; 3524-push rod guide block; 3525-support rod; 353-longitudinal reinforcement tensioning module; 3531-tensioning cylinder; 3532-rack connecting block; 3533-drawing hook rack; 3534-drawing hook gear; 3535-drawing hook body; 360-stirrup positioning mechanism; 361-claw fixing frame; 362-stirrup clamping jaw; 3621-claw body; 363-stirrup support; 3631-support plate; 370-inner reinforcement tensioning mechanism;
[0047] 400- welding module; 410 welding robot bracket; 420- welding robot;
[0048] 500-finished bridge module;
[0049] 510-traction bridge; 511-traction longitudinal beam; 512-guide rail assembly; 5121-anti-overturning guide rail; 5122-anti-overturning roller; 5123-supporting guide rail; 5124-roller box; 5125-vertical roller; 5126-horizontal roller; 5127-crossbeam anti-collision block; 513-drag chain slot;
[0050] 520- Finished product transportation line;
[0051] 530- finished traction mechanism; 531- traction drive assembly; 5311- motor mounting seat; 5312- traction drive motor; 5313- traction gear; 5314- traction rack; 532- traction beam; 5321- beam connecting seat; 533- longitudinal reinforcement clamping tool; 5331- longitudinal reinforcement fixing plate; 5332- socket; 5333- beam transition plate; 5334- connecting frame plate;
[0052] 540- finished steel frame;
[0053] 550-mold lifting platform; 551-lifting support frame; 552-lifting assembly; 553-lifting longitudinal beam; 554-reinforced cross beam; 555-lifting motor; 556-sensor. DETAILED DESCRIPTION
[0054] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0055] The fixed welding workstation for producing the steel frame of the highway prefabricated box beam of the present invention belongs to a part of the automatic production equipment of the steel frame of the highway prefabricated box beam. The structure of the automatic production equipment of the steel frame of the highway prefabricated box beam is as follows: Figure 1-Figure 3 shown.
[0056] The automatic production equipment of the steel frame of the highway prefabricated box girder includes: a raw material supply device, a fixed welding workstation and an automatic mold-in device. The steel frame of the highway prefabricated box girder includes a plurality of stirrup frames 260 and a plurality of longitudinal bars. Figure 4 As shown, each stirrup skeleton 260 includes a bottom plate stirrup 261 and side plate stirrups 262 welded to both ends of the bottom plate stirrup 261 .
[0057] The longitudinal direction referred to in the present invention refers to the length direction of the highway prefabricated box girder reinforcement skeleton, the length direction of the longitudinal bars and the arrangement direction of the stirrup skeleton 260. The transverse direction referred to in the present invention refers to the width direction of the highway prefabricated box girder reinforcement skeleton.
[0058] The raw material supply device comprises: a raw material bridge module 100 and a stirrup tooling module 200 .
[0059] The fixed welding workstation of the present invention comprises: a steel bar tensioning module 300 and a welding module 400 .
[0060] The automatic mold-introduction device includes: a finished product bridge module 500. The finished product bridge module 500 includes a finished product feeding device and a mold-introduction lifting platform. In some embodiments, the finished product bridge module 500 also includes a concrete casting mold.
[0061] In summary, the automated production equipment for the steel skeleton of a highway prefabricated box girder includes: a raw material bridge module 100, a stirrup tooling module 200, a steel bar tensioning module 300, a welding module 400 and a finished product bridge module 500 which are arranged in sequence along the longitudinal direction.
[0062] Among them, the raw material bridge frame module 100 is located at the rear end of the stirrup tooling module 200, the stirrup tooling module 200 is located at the rear end of the steel bar tensioning module 300, the steel bar tensioning module 300 is located at the rear end of the welding module 400, and the welding module 400 is located at the rear end of the finished bridge frame module 500. The front end and the rear end of the present invention are the relative positions of the automatic production equipment for the steel bar skeleton of the highway prefabricated box beam in the longitudinal direction.
[0063] Of course, the device of the present invention also includes a controller or control system connected to the above modules or devices by electrical signals, and the controller or control system is used to achieve coordinated control of various modules or devices.
[0064] The fixed welding workstation of the present invention comprises: a steel bar tensioning module 300 and a welding module 400. A finished bridge module 500 is also provided at the front end of the fixed welding workstation.
[0065] like Figure 5 , Figure 6 As shown, the steel bar tensioning module 300 includes a gantry support 310 , a gantry beam 320 , a gantry driving mechanism 330 , a gantry beam guide rail 340 , an outer steel bar tensioning mechanism 350 , a stirrup positioning mechanism 360 and an inner steel bar tensioning mechanism 370 .
[0066] The gantry support 310 includes a pair of spaced-apart gantry frames for providing support for the structure; a gantry beam guide rail 340 is installed at the upper end of the gantry frame, and both ends of the gantry beam 320 are respectively arranged on the gantry beam guide rail 340 and can move along the gantry beam guide rail 340; a gantry drive mechanism 330 is installed on the gantry beam 320 and is used to drive the gantry beam 320 to move along the gantry beam guide rail 340.
[0067] The stirrup positioning mechanism 360 is fixedly mounted on the gantry beam 320; the outer steel bar tensioning mechanism 350 and the inner steel bar tensioning mechanism 370 are both mounted on the gantry beam 320 and can move horizontally along the gantry beam 320. The stirrup positioning mechanism 360 is used to clamp the stirrup skeleton 260 from the stirrup pulling mechanism of the previous station and move the stirrup skeleton 260 to the position to be welded; the outer steel bar tensioning mechanism 350 and the inner steel bar tensioning mechanism 370 are used to provide tension to the longitudinal bars to be welded before welding, ensuring that the overlapped stirrup skeleton 260 is tightly attached to the longitudinal bars.
[0068] like Figure 7 As shown, the stirrup positioning mechanism 360 mainly includes a clamp fixing frame 361, a plurality of stirrup clamps 362 and a stirrup support 363. The upper end of the clamp fixing frame 361 is fixedly connected to the gantry beam 320. The plurality of stirrup clamps 362 and the stirrup support 363 are arranged on the clamp fixing frame 361 from top to bottom. The stirrup clamp 362 includes a first cylinder and a clamp body 3621 connected to the first cylinder. The clamp body 3621 has a slot adapted to the outer diameter of the stirrup skeleton 260. The clamp body 3621 is driven to extend by the first cylinder so that the slot clamps the side of the stirrup skeleton 260. The stirrup support 363 includes a second cylinder and a support plate 3631 connected to the second cylinder. The support plate 3631 is driven by the second cylinder to extend to the bottom of the stirrup skeleton 260 to support the stirrup skeleton 260.
[0069] A clamp fixing frame 361 includes two stirrup clamps 362 , and the two stirrup positioning mechanisms 360 form a set of stirrup positioning mechanisms, which are used to clamp the two sides of the stirrup skeleton 260 respectively.
[0070] During operation, the gantry beam 320 drives the stirrup positioning mechanism 360 to move backward along the gantry beam guide rail 340 to the stirrup moving mechanism, the stirrup clamping claws 362 clamp the side steel bars of the stirrup skeleton 260, the stirrup support 363 supports the bottom of the stirrup skeleton 260, and then returns to the processing position.
[0071] like Figure 8-Figure 12As shown, the outer steel bar tensioning mechanism 350 includes a first mounting frame 351, a longitudinal bar lifting module 352 and a longitudinal bar tensioning module 353 installed on the first mounting frame 351, and a first movable guide rail. The first movable guide rail is installed on the gantry beam 320, and the first mounting frame 351 is connected to the first movable guide rail so that the whole can move horizontally along the gantry beam 320. The longitudinal reinforcement lifting module 352 includes a lifting cylinder 3521, a lifting connecting plate 3522, a lifting push rod 3523, a plurality of push rod guide blocks 3524 and a plurality of parallel supporting rods 3525. The lifting cylinder 3521 is fixedly mounted on the mounting frame 351. The air rod end of the lifting cylinder 3521 is connected to the lifting connecting plate 3522. The lifting connecting plate 3522 is connected to the lifting push rod 3523. The lifting push rod 3523 is fixedly connected with a plurality of parallel supporting rods 3525. The push rod guide block 3524 is fixedly mounted on the mounting frame 351 and is used to limit the movement direction of the lifting push rod 3523. The push rod guide block 3524 is C-shaped. The plurality of push rod guide blocks 3524 are distributed in a straight line. The lifting push rod 3523 passes through the middle of the plurality of push rod guide blocks 3524, so that the lifting push rod 3523 moves back and forth along the path defined by the push rod guide blocks 3524. The number of push rod guide blocks 3524 is three.
[0072] During operation, the lifting cylinder 3521 drives the lifting connecting plate 3522 to drive the lifting push rod 3523 to reciprocate along the direction specified by the push rod guide block 3524, thereby driving the supporting rod 3525 to move vertically, realizing the lifting and lowering action of the longitudinal reinforcement, ensuring that the longitudinal reinforcement can be at a predetermined height position during welding operation.
[0073] The longitudinal reinforcement tensioning module 353 includes a tensioning cylinder 3531, a rack connecting block 3532, a hook rack 3533, a plurality of hook gears 3534 and a plurality of hook bodies 3535. The tensioning cylinder 3531 is fixed on the first mounting frame 351. The end of the gas rod of the tensioning cylinder 3531 is connected to the rack connecting block 3532. The rack connecting block 3532 is connected to the hook rack 3533. A plurality of parallel hook gears 3534 are meshed with the hook rack 3533. A hook body 3535 is fixedly connected to the gear shaft of each hook gear 3534. The hook body 3535 is an L-shaped rod body, including a connecting section and a free section. One end of the connecting section is fixedly connected to the center of the hook gear 3534 to rotate with the hook gear 3534. The other end of the connecting section is connected to the free section, and the free section rotates around the connecting section.
[0074] The tension cylinder 3531 drives the rack connecting block 3532 to push the hook rack 3533 to move up and down. The hook rack 3533 drives the multiple hook gears 3534 to rotate 90 degrees in both directions through meshing motion, and then drives each hook body 3535 to rotate 90 degrees in both directions, thereby realizing the switching of the two working states of opening and closing of the hook body 3535. The initial state of the hook body 3535 is the hook closing, and the free section of the hook body 3535 is parallel to the longitudinal reinforcement; the working state is the hook opening, and the free section of the hook body 3535 is perpendicular to the longitudinal reinforcement.
[0075] During operation, first, the hook body 3535 is in a closed state (the free section of the hook body 3535 is parallel to the longitudinal reinforcement, so that the free section of the hook body 3535 can pass through the middle of the adjacent longitudinal reinforcement), the outer steel bar tensioning mechanism 350 moves inward, and the lifting cylinder 3521 drives the support rod 3525 to lift up, ensuring that the longitudinal reinforcement is at a predetermined height position; then the tensioning cylinder 3531 drives the hook body 3535 to rotate 90 degrees, so that the hook body 3535 switches to an open state (the free section of the hook body 3535 is perpendicular to the longitudinal reinforcement, so that it can hook the longitudinal reinforcement); finally, the outer longitudinal reinforcement tensioning mechanism 5 moves outward, and the hook body 3535 pulls the longitudinal reinforcement outward to make it fit with the hoop reinforcement skeleton 260.
[0076] like Fig.13 As shown, the structure of the inner steel bar tensioning mechanism 370 is similar to that of the outer steel bar tensioning mechanism 350 , but it lacks the longitudinal bar lifting module, and the action direction of the longitudinal bar tensioning module is opposite to that of the outer steel bar tensioning mechanism 350 .
[0077] Specifically, the inner steel bar tensioning mechanism 370 includes a second mounting frame, a longitudinal bar tensioning module 353 mounted on the second mounting frame, and a second movable guide rail mounted on the gantry beam 320. The second mounting frame is connected to the second movable guide rail, so that the inner steel bar tensioning mechanism as a whole can move horizontally along the gantry beam 320. In some embodiments, the second movable guide rail can be replaced by the first movable guide rail.
[0078] During operation, first the hook body of the inner steel bar tensioning mechanism 370 is in a closed state, and the inner steel bar tensioning mechanism 370 moves outward; then the hook body of the inner steel bar tensioning mechanism 370 is switched to an open state; finally, the inner steel bar tensioning mechanism 370 moves inward, and the hook body pulls the longitudinal bar inward to make it fit with the hoop reinforcement skeleton 260.
[0079] The workflow of the above steel bar tensioning module is as follows:
[0080] The gantry beam 320 drives the stirrup positioning mechanism 360 to move backward along the gantry beam guide rail 340 to the stirrup removing mechanism, and the stirrup positioning mechanism 360 picks up the stripped stirrup skeleton 260;
[0081] The gantry beam 320 drives the stirrup positioning mechanism 360 to return to the welding position along the gantry beam guide rail 340;
[0082] The outer steel bar tensioning mechanism 350 moves along the gantry beam 320 to pull the longitudinal bars outwards to fit with the stirrup skeleton 260 , while the inner steel bar tensioning mechanism 370 moves in the opposite direction along the gantry beam 320 to pull the longitudinal bars inwards to fit with the stirrup skeleton 260 .
[0083] The steel bar tensioning module of the present invention solves the problem of positioning and tensioning contact between the stirrup skeleton 260 and the longitudinal bars before welding; compared with the manual operation method, the automated solution greatly improves the production efficiency and ensures the subsequent welding quality.
[0084] like Fig.14 As shown, the welding module 400 includes a welding robot bracket 410 and a welding robot 420 mounted on the welding robot bracket 410. There are three sets of welding robots 420. The welding robot bracket 410 includes a portal frame, and a set of welding robots 420 are respectively arranged on the crossbeam and two columns of the portal frame. The stirrup skeleton 260 includes a bottom plate stirrup 261 and a side plate stirrup 262 welded to both ends of the bottom plate stirrup 261. The welding robot 420 on the crossbeam of the portal frame is responsible for the welding operation of the bottom plate stirrup 261 and the longitudinal reinforcement, and the welding robots 420 on the two columns are responsible for the welding of the two side plate stirrups 262 and the longitudinal reinforcement.
[0085] The finished product bridge module comprises: a finished product feeding device, a mold-entering lifting platform and a concrete pouring mold; the mold-entering lifting platform is arranged at the front end of the finished product feeding device; and the concrete pouring mold is arranged at the front end of the mold-entering lifting platform.
[0086] like Figure 15-19 As shown, the finished product feeding device includes: a traction bridge 510, a finished product transportation line 520 and a finished product traction mechanism 530.
[0087] The finished product transportation line 520 is used to carry the finished steel frame product 540; the finished product transportation line 520 passes through the bottom of the mold entry lifting platform and extends into the concrete casting mold.
[0088] The finished steel skeleton 540 includes longitudinal bars and stirrups. There are multiple stirrups, which are arranged in sequence along the length direction of the longitudinal bars. There are multiple longitudinal bars, which are arranged along the circumference of each stirrup. The finished steel skeleton 540 or the semi-finished steel skeleton are both arranged on the finished product transportation line 520. When the number of stirrups welded on the longitudinal bars has not reached the designed number, the steel skeleton is a semi-finished product, which is called a semi-finished steel skeleton. The finished product conveying line includes multiple conveying modules connected end to end, and each conveying module is a plate chain conveying line structure.
[0089] Traction bridges 510 are arranged on both sides of the finished product transport line 520 ; the traction bridge 510 includes a traction longitudinal beam 511 ; a guide rail assembly 512 is arranged on the traction longitudinal beam 511 ; a bridge support column is connected to the bottom of the traction longitudinal beam 511 for supporting the traction longitudinal beam 511 .
[0090] Both ends of the finished product traction mechanism 530 are arranged on the traction longitudinal beams 511 on both sides of the finished product transportation line 520. Under the coordinated action of the finished product transportation line, the steel skeleton finished product 540 is dragged along the traction longitudinal beams 511 as a whole and moves toward the front end of the traction longitudinal beams 511.
[0091] The finished product traction mechanism 530 includes a traction drive assembly 531 , a traction beam 532 and a longitudinal reinforcement clamping tool 533 .
[0092] When producing the steel bar skeleton of the highway prefabricated box girder, the rear end of the traction longitudinal beam 511 is also provided with a stirrup magazine and a welding station, wherein the welding station is also called a welding module. A plurality of stirrup skeletons arranged in sequence are hung on the stirrup magazine. The front end of the longitudinal bars of the steel bar skeleton of the highway prefabricated box girder passes through the stirrup skeleton on the stirrup magazine in sequence and is connected to the longitudinal bar clamping tool 533, so that the finished product traction mechanism 530 can traction the longitudinal bars and the finished steel bar skeleton 540 or the semi-finished product as a whole to move toward the front end of the traction longitudinal beam 511.
[0093] Traction drive assemblies 531 are respectively provided at both ends of the traction beam 532. The traction drive assembly 531 cooperates with the guide rail assembly 512 to pull the finished traction mechanism 530 to move along the traction longitudinal beam 511; the longitudinal reinforcement clamping tooling 533 is connected to the traction beam 532 and is located between the traction drive assemblies 531 at both ends.
[0094] The longitudinal reinforcement clamping tool 533 includes a longitudinal reinforcement fixing plate 5331, a plurality of insertion holes 5332 arranged on the longitudinal reinforcement fixing plate 5331, and a locking piece arranged at the end of the insertion hole 5332 facing away from the longitudinal reinforcement. The number and position of the insertion holes 5332 correspond one-to-one to the number and position of the longitudinal reinforcement of the steel frame finished product 540; the locking piece is connected to the longitudinal reinforcement passing through the insertion hole 5332.
[0095] The longitudinal reinforcement clamping tool 533 also includes a cross beam transition plate 5333 and a connecting frame plate 5334; the longitudinal reinforcement fixing plate 5331 is connected to the connecting frame plate 5334, and the socket 5332 on the longitudinal reinforcement fixing plate 5331 passes through the connecting frame plate 5334; the locking piece is arranged at the end of the connecting frame plate 5334 that is opposite to the longitudinal reinforcement fixing plate 5331; the connecting frame plate 5334 is connected to the cross beam transition plate 5333, and the cross beam transition plate 5333 is connected to the traction cross beam 532. The connecting frame plate 5334 has a cross-sectional profile that is similar to the hoop reinforcement skeleton. The locking piece can be a locking bolt or a locking nut. After the front end of the longitudinal reinforcement passes through the longitudinal reinforcement fixing plate 5331 and the socket 5332 on the connecting frame plate 5334 in turn, it is connected to the locking piece, thereby fixing the longitudinal reinforcement to the longitudinal reinforcement clamping tool 533.
[0096] The connecting frame plate 5334 is detachably connected to the longitudinal reinforcement fixing plate 5331; the cross beam transition plate 5333 is detachably connected to the connecting frame plate 5334. By disassembling the connecting frame plate 5334, the cross beam transition plate 5333 and the longitudinal reinforcement fixing plate 5331, different types of longitudinal reinforcement fixing plates 5331 can be replaced, so that the positions and quantities of the jacks 5332 on the longitudinal reinforcement fixing plate 5331 are different, so as to be suitable for the production of box beam reinforcement skeletons of different sizes.
[0097] The traction drive assembly 531 includes a motor mounting seat 5311, a traction drive motor 5312, a traction gear 5313 and a traction rack 5314; the motor mounting seat 5311 is connected to the traction beam 532; the traction drive motor 5312 is installed on the motor mounting seat 5311, and the output shaft of the traction drive motor 5312 is connected to the traction gear 5313; the traction gear 5313 is meshed with the traction rack 5314 fixed to one side of the traction longitudinal beam 511.
[0098] The guide rail assembly 512 includes an anti-overturning guide rail 5121, an anti-overturning roller 5122, a supporting guide rail 5123, a roller box 5124 and a roller assembly; the anti-overturning guide rail 5121 is fixed to one side of the traction longitudinal beam 511; the anti-overturning roller 5122 cooperates with the anti-overturning guide rail 5121 and is connected to the motor mounting seat 5311. The supporting guide rail 5123 is arranged on the top of the traction longitudinal beam 511; the roller box 5124 is connected to the traction crossbeam 532, and the roller assembly is built in the roller box 5124, and the roller assembly cooperates with the supporting guide rail 5123.
[0099] The anti-overturning guide rail 5121 is disposed below the traction rack 5314 and arranged parallel thereto. The anti-overturning roller 5122 is located below the anti-overturning guide rail 5121 .
[0100] The roller assembly includes a vertical roller 5125 rolling on a vertical plane and a horizontal roller 5126 rolling on a horizontal plane; the vertical roller 5125 cooperates with the top of the support rail 5123; the horizontal roller 5126 cooperates with both sides of the support rail 5123. The rotation center axis of the horizontal roller 5126 is vertically arranged, and the rotation center axis of the vertical roller 5125 is horizontally arranged.
[0101] Both ends of the traction beam 532 are fixedly connected with beam connecting seats 5321 ; the lower part of the beam connecting seat 5321 is connected with a roller box 5124 and a motor mounting seat 5311 .
[0102] The end of the traction longitudinal beam 511 is also provided with a cross beam anti-collision block 5127. One end of the cross beam anti-collision block 5127 is also provided with anti-collision rubber to play a buffering role. The cross beam anti-collision block 5127 can prevent the cross beam connecting seat 5321 from being separated from the traction cross beam 532.
[0103] A drag chain groove 513 is also provided on one side of the traction longitudinal beam 511 .
[0104] The workflow of the finished product feeding device includes the following steps:
[0105] Q1. Before welding the longitudinal reinforcement and hoop reinforcement skeleton, move the finished product traction mechanism 530 to the rear end of the traction bridge 510, which is also the rear end of the production line, insert the front ends of all longitudinal reinforcements into the sockets 5332 of the longitudinal reinforcement clamping tooling 533, and fix them with locking pieces.
[0106] Q2. The previous process (i.e., welding process) performs welding operation between the first stirrup skeleton and the longitudinal reinforcement. After completing the welding between the first stirrup skeleton and the longitudinal reinforcement, driven by the traction drive motor 5312, the traction crossbeam 532 and the longitudinal reinforcement clamping tooling 533 are synchronously moved forward along the traction longitudinal beam 511 by a stirrup spacing (this spacing is the designed spacing between adjacent stirrups of the finished steel skeleton product 540 of the box beam), thereby driving the entire semi-finished steel skeleton product to move forward by a stirrup spacing. At this time, the front end of the semi-finished steel skeleton product moves from the previous process to the finished product conveyor line.
[0107] Q3. The previous process further performs welding of the second stirrup skeleton and the longitudinal reinforcement. After the welding of the second stirrup skeleton and the longitudinal reinforcement is completed, the entire steel bar skeleton semi-finished product is driven to move forward by one stirrup spacing under the coordinated action of the finished product traction mechanism 530 and the finished product conveying line;
[0108] Q4. Repeat the action of step Q3 to weld the next stirrup skeleton and the longitudinal reinforcement until all the stirrup skeletons and the longitudinal reinforcement are welded to form a finished steel skeleton product 540. At this time, the entire finished steel skeleton product 540 is located on the finished product conveyor line, and the finished product traction mechanism 530 is located at the rightmost end, i.e., the front end, of the traction bridge 510.
[0109] Q5. The longitudinal reinforcement clamping tool 533 releases all longitudinal reinforcements, and separates the finished product traction mechanism 530 from the steel skeleton finished product 540. The finished product transport line 520 can be used to transport the steel skeleton finished product 540 to the target location.
[0110] The finished product feeding device can realize the automatic feeding of longitudinal reinforcement according to the production rhythm of the previous process, thereby completing the production and transportation of the steel skeleton finished product 540; compared with the manual operation method, the automated solution greatly improves the production efficiency.
[0111] like Figure 20-21 As shown, the mold entry lifting platform is located at the front end of the finished product traction mechanism 530. The finished product transport line 520 can be used to transport the steel skeleton finished product 540 to the concrete casting mold, and there is no need to hoist the steel skeleton finished product 540. However, since the finished product traction mechanism 530 is located at the front end of the steel skeleton finished product 540, the finished product traction mechanism 530 hinders the steel skeleton finished product 540 from entering the concrete casting mold. In order to solve this problem, the mold entry lifting platform is set at the front end of the finished product traction mechanism 530, and the finished product traction mechanism 530 is lifted by the mold entry lifting platform to facilitate the steel skeleton finished product 540 to pass from under the finished product traction mechanism 530. After the steel skeleton finished product 540 passes, the finished product traction mechanism 530 is lowered to facilitate the production of the next box girder steel skeleton, thereby realizing the continuous operation of the box girder steel skeleton production and improving the production efficiency.
[0112] The mold-entering lifting platform includes: a lifting support frame 551, a lifting assembly 552, a lifting longitudinal beam 553 and a reinforcing cross beam 554; the lifting assembly 552 is installed on one side of the lifting support frame 551, and the lifting assembly 552 is connected to the lifting longitudinal beam 553, which is used to drive the lifting longitudinal beam 553 to move up and down; when the lifting longitudinal beam 553 is at the first height, it is longitudinally connected to the traction longitudinal beam 511, and is used to carry the finished product traction mechanism 530 moved out from the traction longitudinal beam 511.
[0113] The lifting assembly 552 includes: a lifting motor 555, a lifting transmission assembly and a lifting guide assembly.
[0114] The lifting transmission assembly includes meshing lifting gears and lifting racks; the lifting motor 555 is connected to the lifting longitudinal beam 553, and the output shaft of the lifting motor 555 is connected to the lifting gear; the lifting rack is vertically installed on one side of the jacking support frame 551.
[0115] There are two groups of lifting guide components, which are distributed on both sides of the lifting transmission component. Each group of lifting guide components includes a lifting guide rail and a lifting slider; the lifting guide rail is vertically installed on one side of the jacking support frame 551, the lifting slider is slidably matched with the lifting guide rail, and the lifting slider is connected to the lifting longitudinal beam 553.
[0116] The lifting support frame 551 is a frame structure, the front and rear side surfaces are trapezoidal, the inner side is rectangular, and the two lifting guide rails on each side are fixedly arranged on the two inner side columns.
[0117] There are two lifting support frames 551, which are distributed on both sides of the finished product transportation line 520. The two ends of the reinforcing crossbeam 554 are respectively connected to the lifting longitudinal beams 553 on the two lifting support frames 551. There can be two reinforcing crossbeams 554, which are arranged at intervals along the length direction of the lifting longitudinal beams 553. The two reinforcing crossbeams 554 and the two lifting longitudinal beams 553 are connected as a whole. The distance between the two lifting longitudinal beams 553 is the same as the distance between the two traction longitudinal beams 511. The two lifting longitudinal beams 553 are respectively connected to the two traction longitudinal beams 511, so that the finished product traction mechanism 530 on the traction longitudinal beam 511 can be smoothly transitioned to the lifting longitudinal beam 553.
[0118] Support rails are respectively provided on the traction longitudinal beam 511 and the lifting longitudinal beam 553. The traction drive assembly of the finished product traction mechanism 530 cooperates with the support rails to move the finished product traction mechanism 530 along the support rails.
[0119] A sensor 556 is provided on the lifting longitudinal beam 553 to detect the position of the finished product traction mechanism 530 on the lifting longitudinal beam 553 and the height of the lifting.
[0120] A limiting member is provided at one end of the lifting longitudinal beam 553 away from the traction longitudinal beam 511 , so as to prevent the finished product traction mechanism 530 from being separated from the end of the lifting longitudinal beam 553 away from the traction longitudinal beam 511 .
[0121] The lifting stroke of the lifting beam 553 is more than twice the height from the top of the finished product traction mechanism 530 on the traction bridge 510 to the ground. For example, if the height from the top of the finished product traction mechanism 530 on the traction bridge 510 to the ground is h, the lifting stroke of the lifting beam 553 is at least 2h. The lifting beam 553 is lifted high enough to ensure that the finished steel frame 540 can pass smoothly from under the finished product traction mechanism 530.
[0122] The workflow of the mold lifting table includes the following steps:
[0123] M1, initial state, the lifting longitudinal beam 553 is at the high position of the lifting assembly 552;
[0124] M2. After receiving the lifting signal, the lifting longitudinal beam 553 is lowered to the same height as the traction longitudinal beam 511 of the traction bridge 510. At this time, the lifting longitudinal beam 553 is completely connected with the traction longitudinal beam 511;
[0125] M3. The finished product traction mechanism 530 originally located on the traction longitudinal beam 511 moves forward to the lifting longitudinal beam 553 of the mold-entering lifting platform, and the sensor 556 ensures the precise position of the finished product traction mechanism 530 on the lifting longitudinal beam 553;
[0126] M4. After the finished product traction mechanism 530 stops moving and maintains a stable position, the lifting motor 555 is started, and the finished product traction mechanism 530 is lifted through the lifting assembly 552. The lifting height is controlled by the sensor 556 and kept stable, so as to make enough horizontal space for the finished steel frame 540 below to pass through;
[0127] M5, the finished product conveying line conveys the finished steel skeleton product 540 forward, so that the finished steel skeleton product 540 passes under the finished product traction mechanism 530, and continues to move forward to the next station to enter the mold;
[0128] M6. After the finished steel skeleton product 540 below has completely passed, the lifting longitudinal beam 553 descends along the lifting assembly 552 to a position at the same height as the traction longitudinal beam 511 of the traction bridge frame 510, and the finished product traction mechanism 530 moves backward to the traction longitudinal beam 511 to complete the operation of this stage.
[0129] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A fixed welding workstation for the production of prefabricated highway box girder steel frame. It is characterized in that include: A steel bar tensioning module and a welding module; the welding module is arranged at the front end of the steel bar tensioning module; a stirrup magazine for carrying a plurality of stirrup skeletons is arranged at the rear end of the steel bar tensioning module; a longitudinal reinforcement guide tube is arranged at the rear end of the stirrup magazine; the longitudinal reinforcement guide tube is used to support and guide the longitudinal reinforcement to move in the longitudinal direction so that the longitudinal reinforcement passes through the stirrup skeleton; The steel bar tensioning module comprises a gantry beam, a gantry beam guide rail and a stirrup positioning mechanism; the gantry beam guide rail is arranged in the longitudinal direction, and the gantry beam moves along the gantry beam guide rail; the stirrup positioning mechanism is arranged on the gantry beam; the stirrup positioning mechanism comprises a clamp fixing frame, a plurality of stirrup clamps and a stirrup support, the clamp fixing frame is connected to the gantry beam, and a plurality of stirrup clamps and the stirrup support are arranged on the clamp fixing frame from top to bottom; the stirrup clamp is used to clamp the side of the stirrup skeleton; the stirrup support is used to support the bottom of the stirrup skeleton; The welding module includes a welding robot bracket and a welding robot installed on the welding robot bracket.
2. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 1, It is characterized in that The stirrup clamp comprises a first clamp cylinder and a clamp body connected to the first clamp cylinder; the first clamp cylinder is used to drive the clamp body to approach or move away from the stirrup frame; the clamp body has a slot adapted to the outer diameter of the stirrup frame.
3. A fixed welding workstation for producing a prefabricated highway box girder steel frame according to claim 1, It is characterized in that The stirrup support comprises a support second cylinder and a support plate connected to the support second cylinder; the support second cylinder is used to drive the support plate to approach or move away from the stirrup body; the support plate is used to support the bottom of the stirrup skeleton.
4. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 1, It is characterized in that There are two stirrup positioning mechanisms, which are arranged at intervals along the length direction of the gantry crossbeam; the stirrup clamping claws of the two stirrup positioning mechanisms clamp the two sides of the stirrup skeleton.
5. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 4, It is characterized in that The steel bar tensioning module further comprises a steel bar tensioning mechanism; the steel bar tensioning mechanism comprises an outer steel bar tensioning mechanism and an inner steel bar tensioning mechanism; The outer reinforcement tensioning mechanism is arranged on opposite sides of the two stirrup positioning mechanisms, and is used to tension the longitudinal reinforcement welded to the outer side of the stirrup skeleton; The inner steel bar tensioning mechanism is arranged between the two stirrup positioning mechanisms and is used for tensioning the longitudinal bars welded to the inner side of the stirrup skeleton.
6. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 5, It is characterized in that The outer steel bar tensioning mechanism includes a first movable guide rail, a first mounting frame, a longitudinal bar lifting module and a longitudinal bar tensioning module; the first movable guide rail is installed on the gantry beam in the transverse direction; the first mounting frame moves along the first movable guide rail; the longitudinal bar lifting module and the longitudinal bar tensioning module are installed on the first mounting frame; the longitudinal bar lifting module lifts the longitudinal bars welded to the outer side of the stirrup skeleton; the longitudinal bar tensioning module tightens the longitudinal bars welded to the outer side of the stirrup skeleton.
7. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 6, It is characterized in that The longitudinal reinforcement lifting module comprises: a lifting cylinder, a lifting connecting plate, a lifting push rod, a push rod guide block and a supporting rod; The lifting cylinder is installed vertically or obliquely on the first mounting frame; the end of the air rod of the lifting cylinder is connected to the lifting connecting plate, and the lifting connecting plate is connected to the lifting push rod installed vertically or obliquely, and the outer periphery of the lifting push rod is provided with a plurality of push rod guide blocks connected to the first mounting frame at intervals along its length direction, which are used to limit the movement direction of the lifting push rod; the lifting push rod is connected to a plurality of horizontal support rods at intervals along its length direction; and they are used to lift the longitudinal reinforcement.
8. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 6, It is characterized in that The longitudinal reinforcement tensioning module includes a tensioning cylinder, a rack connecting block, a hook rack, a hook gear and a hook body; The tensioning cylinder is installed vertically or obliquely on the first mounting frame; the end of the gas rod of the tensioning cylinder is connected to the rack connecting block; the rack connecting block is connected to the vertically or obliquely arranged hook rack; the hook rack is meshed with a plurality of hook gears arranged at intervals along its height direction; each of the hook gears is connected to a hook body; the rotation of the hook gear drives the hook body to rotate until it is parallel or perpendicular to the longitudinal reinforcement.
9. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 8, It is characterized in that The hook body is an L-shaped rod body, including a connecting section and a free section; one end of the connecting section is fixedly connected to the center of the hook gear to rotate with the hook gear, and the other end of the connecting section is connected to the free section, and the free section rotates around the connecting section.
10. A fixed welding workstation for producing a prefabricated highway box girder reinforcement skeleton according to claim 5, It is characterized in that The inner steel bar tensioning mechanism includes: a second mounting frame and a longitudinal bar tensioning module; the second mounting frame moves along the first movable guide rail; the longitudinal bar tensioning module is installed on the second mounting frame; the longitudinal bar tensioning module tightens the longitudinal bars welded to the inner side of the stirrup skeleton.
Citation Information
Patent Citations
Steel bar rapid in-place installation system based on construction integration platform and construction method of steel bar rapid in-place installation system
CN115680290A
Box girder framework sheet production line and production method
CN115837441A
Box girder reinforcement cage forming device and method
CN116968171A
Method and apparatus for forming metal frames for reinforced concrete
EP1378302A2
Welding device of concrete-reinforcing reinforcement
JP2018069329A
Cited By
Adjustable welding mechanism for prefabricated box girder reinforcement cage
CN119140994A
Movable welding device for highway prefabricated box girder reinforcement cage
CN119870822A
Intelligent welding equipment for box girder bottom web steel reinforcement framework
CN120155727A
Automatic welding device and welding method for steel bars of bridge cover beam framework
CN120244336A
Steel box girder welding tool and welding process
CN121199448A