System and method for Bailey beam incremental launching construction
By using components such as steel pipe columns, load-bearing beams, track trolleys and hydraulic forklifts in the Bailey beam pushing construction, combined with the traction device of the hand chain hoist, the problem of insufficient working space for hoisting machines in high-rise structures is solved and the construction efficiency is improved. Efficiency and stability ensure the safety and cost-effectiveness of construction.
Patent Information
- Application Number
- CN202411032349.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-01
AI Technical Summary
During the bridge demolition process of tall structures, the crane lacks working space, resulting in low efficiency of Bailey beam pushing construction, and it is impossible to adopt the method of overall removal and then hoisting.
A system including steel pipe columns, load-bearing beams, rail trolleys, hydraulic forklifts and hand chain hoists is used. Through the cooperation of rail trolleys and hand chain hoists, the pushing and movement of Bailey beams is achieved to ensure stability and safety.
It solves the problem of insufficient working space for hoisting machines, improves the construction efficiency and stability of Bailey beam dismantling, avoids center of gravity shift and dumping, and ensures the safety and cost-effectiveness of construction.
Smart Images

Figure CN118727622A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal bridge engineering, and specifically relates to a system and method for Bailey beam jacking construction. Background Art
[0002] With the improvement of infrastructure, bridge structures have developed rapidly. It is common to see bridges across tall structures constructed using a combination of steel pipe piles, steel distribution beams and Bailey beams. This combined support construction technology not only improves construction efficiency, but also ensures the stability and safety of the bridge.
[0003] However, due to the influence of the towering structures and the limited space at the bottom of the beams, there is not enough working space for the crane hoist during demolition, which makes it impossible to adopt the method of overall unloading and then hoisting, which leads to low demolition construction efficiency.
[0004] To this end, the present invention provides a system and method for Bailey beam jacking construction. Summary of the invention
[0005] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0006] The technical solution adopted by the present invention to solve the technical problem is as follows: a system for Bailey beam top-pushing construction described in the present invention comprises a steel pipe column, a load-bearing beam, a Bailey beam body and a hanging beam, wherein the Bailey beam body is installed on the load-bearing beam, the steel pipe column is used to support the load-bearing beam, and a hanging beam is installed at one end of the steel pipe column away from the load-bearing beam;
[0007] A track trolley, wherein wheels are arranged on the surface of the track trolley, the track trolley is placed on the surface of the load-bearing beam, and is used to support the Bailey beam body and move the Bailey beam body through the wheels, and rectangular rings are fixedly connected on both sides of the track;
[0008] A hydraulic forklift is used to push the Bailey beam body vertically upward;
[0009] Hand chain hoists, two of which are provided, one end of which is installed on a rectangular ring, and the other end is fixedly installed on one side of the load-bearing beam, and one end of the other hand chain hoist is fixedly installed on the surface of the rectangular ring, and the other end is installed on the Bailey beam body, and the two hand chain hoists form a traction device.
[0010] Preferably, the wheels are arranged in three groups, each group includes two wheels, and each group of wheels is symmetrically arranged in pairs around the central bearing of the rail trolley, one group of wheels is arranged in the middle position of the rail trolley, and the other two groups are located on both sides and are at the same distance from the middle position of the rail trolley.
[0011] Preferably, a storage groove is provided on the surface of the track trolley, and a lever is slidably connected to the storage groove through a spring, a rope groove and a sliding cavity are provided in the track trolley, and a support rod is slidably connected to the track trolley through an elastic member, and four support rods are provided, and are symmetrically designed in pairs, and the number of sliding cavities provided corresponds to the support rods, and an insertion rod is slidably connected to each of the sliding cavities through a spring, and a connecting rope is fixedly connected to the end of the insertion rod, and the connecting rope connects the insertion rods in pairs, and a pull rope is fixedly connected to the surface of the connecting rope, and the end of the pull rope away from the connecting rope passes through the side wall of the storage groove and is fixedly connected to the surface of the lever, and a notch is provided on the surface of the support rod.
[0012] Preferably, the side wall of the storage groove is slidably connected with a sliding rod, the cross-section of the sliding rod is rectangular, the end of the sliding rod is fixedly connected with a rotating shaft, the surface of the rotating shaft is provided with a ball spring, the rotating shaft is inserted into the surface of the lever and is rotatably connected through the ball spring.
[0013] Preferably, a cavity is provided in the rail trolley, an air groove is provided in the support rod, the elastic member is a hollow elastic block, the elastic block is fixedly connected in the cavity, a pressure plate is fixedly connected to the surface of the elastic block, the pressure plate is slidably connected in the cavity by a spring, an air duct is connected through the surface of the elastic block, one end of the air duct away from the elastic block passes through the pressure plate, the support rod and is connected to the air groove, and the notch is a through groove.
[0014] Preferably, a rotating ring is rotatably connected to the surface of the lever, a spring driving the lever to slide is fixedly connected to the surface of the rotating ring, and a portion of the support rod located in the cavity is fitted with the pressure plate through a rotating wheel.
[0015] Preferably, a main magnetic block is fixedly connected to the surface of the rail trolley, a fixed shaft is fixedly connected in the air groove, a baffle is slidably connected to the surface of the fixed shaft through a spring, a rubber plug is fixedly connected to one side of the baffle, a secondary magnetic block is fixedly connected to the surface of the baffle, and the baffle is fixedly connected to a rubber ring at the position of the fixed shaft.
[0016] Preferably, a top shaft is fixedly connected to the surface of the support rod, and the top shaft is made of rubber material.
[0017] A construction method of a system for Bailey beam top-pushing construction, the method adopts the above-mentioned system for Bailey beam top-pushing construction, and comprises the following steps:
[0018] S1: First, use a hydraulic forklift to push the Bailey beam body vertically upward on one side of the Bailey beam body to be removed. When the Bailey beam is lifted up and separated from the load-bearing beam by a certain distance, slowly push the rail trolley under the Bailey beam body;
[0019] S2: Then, when the rail trolley moves to the bottom of the Bailey beam body, the lever is squeezed to make the support rod pop out, and the rail trolley is positioned to prevent random sliding;
[0020] S3: Then, the hand chain hoist is installed on the rail trolley, the load-bearing beam and the Bailey beam body respectively to pull the Bailey beam body;
[0021] S4: Finally, the workers synchronize and balance the hand winch to pull the rail trolley to support the Bailey beam body and move slowly at the same time, so that the rail trolley drives the Bailey beam body to move to the target position for subsequent lifting construction.
[0022] The beneficial effects of the present invention are as follows:
[0023] 1. The system and method for Bailey beam jacking construction described in the present invention solve the problem in the prior art that the lifting and hoisting machine does not have enough working space when dismantling the Bailey beam body through the cooperation of the rail trolley, hand winch and support rod. At the same time, the stability of the rail trolley during movement is improved through the design of three sets of wheels. The wheels designed with equal distance on both sides can avoid the center of gravity shift and tipping.
[0024] 2. The system and method for Bailey beam jacking construction described in the present invention squeeze the pressure plate through the rotating wheel at the bottom, forcing the pressure plate to squeeze the elastic block, so that the gas in the elastic block is sprayed to the surface of the track trolley through the air duct and the slot, and the surface of the track trolley is cleaned to prevent impurities on the surface of the track trolley from lifting the Bailey beam body, resulting in unstable placement of the Bailey beam body and danger. At the same time, the spring on one side of the pressure plate can increase the recovery speed of the elastic block, and the rotating wheel can change the sliding friction into rotational friction, thereby reducing the friction and increasing the service life of the pressure plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described below in conjunction with the accompanying drawings.
[0026] Figure 1 It is a schematic diagram of the position of the hydraulic forklift in the present invention;
[0027] Figure 2 It is a schematic diagram of the position of the rail trolley in the present invention;
[0028] Figure 3 It is a schematic diagram of the structure of the rail trolley in the present invention;
[0029] Figure 4 It is a schematic diagram of a partial cross-section structure of the rail trolley in the present invention;
[0030] Figure 5 The present invention Figure 4 Schematic diagram of the structure at A in the middle;
[0031] Figure 6 It is a schematic diagram of the elastic block structure in the present invention;
[0032] Figure 7 The present invention Figure 6 Schematic diagram of the structure at B in the middle;
[0033] Figure 8 This is a schematic diagram of the top shaft structure in the second embodiment of the present invention;
[0034] Fig. 9 It is a schematic flow chart of the method of the present invention.
[0035] In the figure: 1. steel pipe column; 2. load-bearing beam; 3. rail trolley; 4. hydraulic forklift; 5. Bailey beam body; 6. hand chain hoist; 7. hanging beam; 8. support rod; 9. lever; 10. storage groove; 11. slide rod; 12. wheel; 13. rectangular ring; 14. pull rope; 15. rope groove; 16. connecting rope; 17. sliding cavity; 18. swivel; 19. rotating shaft; 20. rotating wheel; 21. plug rod; 22. elastic block; 23. wave ball spring; 24. pressure plate; 25. air guide tube; 26. cavity; 27. main magnetic block; 28. notch; 29. rubber plug; 30. baffle; 32. fixed shaft; 33. air groove; 34. auxiliary magnetic block; 35. rubber ring; 36. top shaft. DETAILED DESCRIPTION
[0036] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0037] Embodiment 1: Figures 1 to 7 As shown, a system for Bailey beam jacking construction according to an embodiment of the present invention comprises a steel pipe column 1, a load-bearing beam 2, a Bailey beam body 5 and a hanging beam 7, wherein the Bailey beam body 5 is installed on the load-bearing beam 2, the steel pipe column 1 is used to support the load-bearing beam 2, and the hanging beam 7 is installed at one end of the steel pipe column 1 away from the load-bearing beam 2;
[0038] A track trolley 3, wherein wheels 12 are arranged on the surface of the track trolley 3, and the track trolley 3 is placed on the surface of the load-bearing beam 2, and is used to support the Bailey beam body 5 and move the Bailey beam body 5 through the wheels 12, and rectangular rings 13 are fixedly connected to both sides of the track;
[0039] A hydraulic forklift 4 is used to push the Bailey beam body 5 vertically upward;
[0040] Hand chain hoists 6, two of which are provided, one end of which is mounted on a rectangular ring 13, and the other end is fixedly mounted on one side of the load-bearing beam 2, one end of the other hand chain hoist 6 is fixedly mounted on the surface of the rectangular ring 13, and the other end is mounted on the Bailey beam body 5, the two hand chain hoists 6 form a traction device, the wheels 12 are provided in three groups, each group includes two wheels 12, and each group of wheels 12 is symmetrically arranged in pairs with the central bearing of the rail trolley 3, one group of wheels 12 is arranged in the middle position of the rail trolley 3, and the other two groups are located on both sides, and the distance from the middle position of the rail trolley 3 is the same;
[0041] During operation, the Bailey beam body 5 is pushed vertically upward on one side of the Bailey beam body 5 to be removed by the hydraulic forklift 4. When the Bailey beam body 5 is lifted up and separated from the load-bearing beam 2 by a certain distance, the rail trolley 3 is slowly pushed under the Bailey beam body 5. Then, one of the two hand chain hoists 6 is installed on one side of the load-bearing beam 2, and the other side is installed on the rectangular ring 13 on the surface of the rail trolley 3. One end of the other hand chain hoists is installed on the Bailey beam body 5, and the other end is installed on the rectangular ring 13 on the other side of the rail trolley 3. Then, the hydraulic forklift 4 pushes the Bailey beam body 5 vertically upward on the other side of the Bailey beam body 5 to be removed, and after the Bailey beam body 5 is separated from the load-bearing beam 2, the rail trolley 3 is slowly pushed under the Bailey beam, and then the other hand chain hoists 6 are installed on the other side of the load-bearing beam 2. A rail trolley 3 is placed at the bottom, and two hand winches 6 are also installed. On both sides of the same Bailey beam body 5, workers synchronously and evenly pull the hand winches 6 to pull the rail trolley 3 to support the Bailey beam body 5 and move slowly at the same time, so that the rail trolley 3 drives the Bailey beam body 5 to move to the target position for subsequent lifting construction. The system structure has the advantages of low cost, easy on-site construction, safety and reliability. It solves the problem that the lifting and hoisting machine does not have enough working space when dismantling the Bailey beam body 5 in the prior art. The design of three sets of wheels 12 improves the stability of the rail trolley 3 when moving. The wheels 12 designed with equal distances on both sides can avoid the center of gravity shift and tipping.
[0042] The surface of the rail trolley 3 is provided with a storage groove 10, and a lever 9 is slidably connected to the storage groove 10 through a spring. A rope groove 15 and a sliding cavity 17 are provided in the rail trolley 3. A support rod 8 is slidably connected to the rail trolley 3 through an elastic member. Four support rods 8 are provided, and they are designed to be symmetrical in pairs. The number of sliding cavities 17 provided corresponds to the support rod 8. An insertion rod 21 is slidably connected to each of the sliding cavities 17 through a spring. The ends of the insertion rods 21 are fixedly connected to a connecting rope 16, and the connecting rope 16 connects the insertion rods 21 in pairs. A pull rope 14 is fixedly connected to the surface of the connecting rope 16. One end of the pull rope 14 away from the connecting rope 16 passes through the side wall of the storage groove 10 and is fixedly connected to the surface of the lever 9. A notch 28 is provided on the surface of the support rod 8;
[0043] During operation, after the rail trolley 3 moves to the bottom of the Bailey beam body 5, the Bailey beam body 5 will squeeze the support rod 8, causing the support rod 8 to slide in the storage groove 10, and then the pull rope 14 will be driven to pull the connecting rope 16 while the support rod 8 slides, and the connecting rope 16 will pull the insertion rod 21 at the same time, so that the insertion rod 21 is separated from the slot 28. At this time, the support rod 8 is driven by the elastic member to pop out and fit on the bottom surface of the Bailey beam body 5 to position the rail trolley 3. At this time, when the Bailey beam body 5 is lowered, it avoids deviation in left and right translation, which causes the Bailey beam body 5 to tilt. At the same time, through the design of multiple support rods 8, the high rail trolley 3 can be balanced and supported, and will not tip over.
[0044] The side wall of the storage slot 10 is slidably connected with a slide bar 11, the cross section of the slide bar 11 is rectangular, the end of the slide bar 11 is fixedly connected with a rotating shaft 19, the surface of the rotating shaft 19 is provided with a wave ball spring 23, the rotating shaft 19 is inserted on the surface of the lever 9 and is rotatably connected through the wave ball spring 23, the surface of the lever 9 is rotatably connected with a rotating ring 18, and the spring that drives the lever 9 to slide is fixedly connected to the surface of the rotating ring 18;
[0045] During operation, after the rail trolley 3 is used, the lever 9 is directly rotated to make the lever 9 rotate around the rotating shaft 19. At the same time, through the design of the ball spring 23, the lever 9 can have a damping feeling when rotating. At the same time, the ball spring 23 can position the lever 9 to avoid random shaking. By storing the lever 9 in the storage groove 10, the integrity of the rail trolley 3 is improved for easy storage. Through the swivel 18, the spring will not twist when the lever 9 rotates, thereby extending the service life of the spring.
[0046] A cavity 26 is provided in the rail trolley 3, an air groove 33 is provided in the support rod 8, the elastic member is a hollow elastic block 22, the elastic block 22 is fixedly connected in the cavity 26, a pressure plate 24 is fixedly connected to the surface of the elastic block 22, the pressure plate 24 is slidably connected in the cavity 26 by a spring, an air guide tube 25 is connected through the surface of the elastic block 22, one end of the air guide tube 25 away from the elastic block 22 passes through the pressure plate 24, the support rod 8 and the air groove 33 are connected, the notch 28 is a through groove, and the part of the support rod 8 located in the cavity 26 is fitted with the pressure plate 24 through the rotating wheel 20;
[0047] During operation, when the support rod 8 is pressed down, the pressing plate 24 is squeezed by the rotating wheel 20 at the bottom, so that the pressing plate 24 is forced to squeeze the elastic block, so that the gas in the elastic block 22 is sprayed to the surface of the track trolley 3 through the air guide pipe 25 and the notch 28, so as to clean the surface of the track trolley 3 and prevent impurities on the surface of the track trolley 3 from padding the Bailey beam body 5, causing the Bailey beam body 5 to be placed unstable and dangerous. At the same time, the spring on one side of the pressing plate 24 can increase the recovery speed of the elastic block 22, and the rotating wheel 20 can change the sliding friction into rotational friction, thereby reducing the friction force and increasing the service life of the pressing plate 24.
[0048] The surface of the rail trolley 3 is fixedly connected with a main magnetic block 27, the air groove 33 is fixedly connected with a fixed shaft 32, the surface of the fixed shaft 32 is slidably connected with a baffle 30 through a spring, one side of the baffle 30 is fixedly connected with a rubber plug 29, the surface of the baffle 30 is fixedly connected with a secondary magnetic block 34, and the baffle 30 is sleeved on the position of the fixed shaft 32 and fixedly connected with a rubber ring 35; during operation, when the support rod 8 moves to squeeze the elastic block 22, the gas enters the air groove 33, and the gas will not be ejected immediately due to the design of the baffle 30, and the support rod 8 will drive the secondary magnetic block 34 to move. When the auxiliary magnetic block 34 moves to the position of the main magnetic block 27, the main magnetic block 27 and the auxiliary magnetic block 34 attract each other out of phase, so that the auxiliary magnetic block 34 approaches the main magnetic block 27, and at the same time, the auxiliary magnetic block 34 drives the baffle 30 to separate from the slot 28, and the gas will be ejected at this time, and the pressure of the gas ejection is increased by the baffle 30, thereby improving the cleaning effect, and then when the support rod 8 pops up upward, the spring drives the baffle 30 to reset, and the rubber ring 35 can slow down the speed of the baffle 30 to reset, so that the gas has sufficient time to enter the elastic block 22, and the rubber plug 29 can improve the sealing effect of the baffle 30.
[0049] Embodiment 2: Figure 8 As shown, compared with Example 1, another implementation of the present invention is: a top shaft 36 is fixedly connected to the surface of the support rod 8, and the top shaft 36 is made of rubber; when working, the friction between the support rod 8 and the Bailey beam can be increased through the top shaft 36 on the surface of the support rod 8, thereby further improving the stability of the rail trolley 3.
[0050] like Fig. 9 As shown, a construction method of a system for Bailey beam top-pushing construction, the method adopts the above-mentioned system for Bailey beam top-pushing construction, and comprises the following steps:
[0051] S1: First, use the hydraulic forklift 4 to push the Bailey beam body 5 vertically upward on one side of the Bailey beam body 5 to be removed. When the Bailey beam body 5 is lifted up and separated from the load-bearing beam 2 by a certain distance, the rail trolley 3 is slowly pushed under the Bailey beam body 5;
[0052] S2: Then, when the rail trolley 3 moves to the bottom of the Bailey beam body 5, the lever 9 is squeezed to make the support rod 8 pop out, so as to position the rail trolley 3 and prevent it from sliding randomly;
[0053] S3: Next, the hand chain hoist 6 is installed on the rail trolley 3, the load-bearing beam 2 and the Bailey beam body 5 respectively to pull the Bailey beam body 5;
[0054] S4: Finally, the workers synchronize and balance the hand winch 6 to pull the rail trolley 3 to support the Bailey beam body 5 and move slowly at the same time, so that the rail trolley 3 drives the Bailey beam body 5 to move to the target position for subsequent lifting construction.
[0055] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.
[0056] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.
[0057] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A system for Bailey beam jacking construction, characterized in that: It comprises a steel pipe column (1), a load-bearing beam (2), a Bailey beam body (5) and a hanging beam (7), wherein the Bailey beam body (5) is installed on the load-bearing beam (2), the steel pipe column (1) is used to support the load-bearing beam (2), and the hanging beam (7) is installed at one end of the steel pipe column (1) away from the load-bearing beam (2); A track trolley (3), wherein wheels (12) are arranged on the surface of the track trolley (3), the track trolley (3) is placed on the surface of the load-bearing beam (2), and is used to support the Bailey beam body (5) and move the Bailey beam body (5) through the wheels (12), and rectangular rings (13) are fixedly connected to both sides of the track; A hydraulic forklift (4) is used to push the Bailey beam body (5) vertically upward; A hand chain hoist (6), wherein two hand chain hoists (6) are provided, wherein one end of the hand chain hoist (6) is mounted on a rectangular ring (13), and the other end is fixedly mounted on one side of a load-bearing beam (2); and one end of the other hand chain hoist (6) is fixedly mounted on the surface of the rectangular ring (13), and the other end is mounted on a Bailey beam body (5). The two hand chain hoists (6) form a traction device.
2. A system for Bailey beam jacking construction according to claim 1, characterized in that: The wheels (12) are provided in three groups, each group comprising two wheels (12), and each group of wheels (12) is symmetrically arranged in pairs around the central bearing of the rail trolley (3), one group of the wheels (12) is arranged in the middle position of the rail trolley (3), and the other two groups are located on both sides and are at the same distance from the middle position of the rail trolley (3).
3. A system for Bailey beam jacking construction according to claim 2, characterized in that: The surface of the rail trolley (3) is provided with a storage groove (10), and a lever (9) is slidably connected to the storage groove (10) through a spring. The rail trolley (3) is provided with a rope groove (15) and a sliding cavity (17). The rail trolley (3) is slidably connected to a support rod (8) through an elastic member. Four support rods (8) are provided, and are designed to be symmetrical in pairs. The number of the sliding cavities (17) corresponds to the number of the support rods (8). An insertion rod (21) is slidably connected to each of the sliding cavities (17) through a spring. The ends of the insertion rods (21) are fixedly connected to a connecting rope (16). The connecting rope (16) connects the insertion rods (21) in pairs. A pull rope (14) is fixedly connected to the surface of the connecting rope (16). The end of the pull rope (14) away from the connecting rope (16) passes through the side wall of the storage groove (10) and is fixedly connected to the surface of the lever (9). A notch (28) is provided on the surface of the support rod (8).
4. A system for Bailey beam jacking construction according to claim 3, characterized in that: The side wall of the storage groove (10) is slidably connected to a slide rod (11), the cross section of the slide rod (11) is rectangular, the end of the slide rod (11) is fixedly connected to a rotating shaft (19), the surface of the rotating shaft (19) is provided with a ball spring (23), the rotating shaft (19) is inserted into the surface of the shifting rod (9), and is rotatably connected via the ball spring (23).
5. A system for Bailey beam jacking construction according to claim 4, characterized in that: A cavity (26) is provided in the rail trolley (3), an air groove (33) is provided in the support rod (8), the elastic member is a hollow elastic block (22), the elastic block (22) is fixedly connected in the cavity (26), a pressure plate (24) is fixedly connected to the surface of the elastic block (22), the pressure plate (24) is slidably connected in the cavity (26) via a spring, an air guide tube (25) is connected through the surface of the elastic block (22), one end of the air guide tube (25) away from the elastic block (22) passes through the pressure plate (24), the support rod (8) and is connected to the air groove (33), and the notch (28) is a through groove.
6. A system for Bailey beam jacking construction according to claim 5, characterized in that: The surface of the lever (9) is rotatably connected to a rotating ring (18), a spring driving the lever (9) to slide is fixedly connected to the surface of the rotating ring (18), and the portion of the support rod (8) located in the cavity (26) is fitted with the pressure plate (24) through a rotating wheel (20).
7. A system for Bailey beam jacking construction according to claim 6, characterized in that: The surface of the rail trolley (3) is fixedly connected to a main magnetic block (27); a fixed shaft (32) is fixedly connected inside the air groove (33); a baffle (30) is slidably connected to the surface of the fixed shaft (32) via a spring; a rubber plug (29) is fixedly connected to one side of the baffle (30); a secondary magnetic block (34) is fixedly connected to the surface of the baffle (30); and a rubber ring (35) is fixedly connected to the baffle (30) at a position where the baffle (30) is sleeved on the fixed shaft (32).
8. A system for Bailey beam jacking construction according to claim 7, characterized in that: A top shaft (36) is fixedly connected to the surface of the support rod (8), and the top shaft (36) is made of rubber material.
9. A method for Bailey beam top-pushing construction, the method adopts the system for Bailey beam top-pushing construction according to claim 8, characterized in that: The following steps are involved: S1: First, a hydraulic forklift (4) is used to vertically push the Bailey beam body (5) upward on one side of the Bailey beam body (5) to be removed. When the Bailey beam body (5) is lifted up and separated from the load-bearing beam (2) by a certain distance, the rail trolley (3) is slowly pushed under the Bailey beam body (5); S2: Then, when the rail trolley (3) moves to the bottom of the Bailey beam body (5), the lever (9) is squeezed to make the support rod (8) pop out, thereby positioning the rail trolley (3) to prevent it from sliding randomly; S3: Next, the hand chain hoist (6) is installed on the rail trolley (3), the load-bearing beam (2) and the Bailey beam body (5) respectively to pull the Bailey beam body (5); S4: Finally, the worker synchronizes and balances the hand chain hoist (6) to pull the rail trolley (3) to support the Bailey beam body (5) and move slowly at the same time, so that the rail trolley (3) drives the Bailey beam body (5) to move to the target position, so as to facilitate the subsequent lifting construction.
Citation Information
Patent Citations
Modular longitudinal system for bridge decks for double-track railways
CA3113893A1
Rail detection vehicle provided with stable supporting wheels
CN111098883A
Bailey beam translation device in limited space and construction method thereof
CN111877165A
Construction method of variable-width and variable-height steel box girder support system in complex navigable water area
CN113699894A
Bailey cast-in-place support dismantling device
CN214116296U