Reconnaissance method for quickly determining anti-seepage range of reservoir single watershed

Through comprehensive geophysical prospecting, drilling and geological analysis, the anti-seepage range of the thin watershed of the reservoir is determined, which solves the problems of high drilling difficulty and high cost in pumped storage power stations, achieves rapid and economical determination of the anti-seepage range, and provides information for seepage control projects. Accurate geological basis.

CN118727697APending Publication Date: 2024-10-01CHANGJIANG GEOTECHNICAL ENG CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410912410.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In pumped-storage power station reservoirs, drilling thin watersheds is difficult and costly, and blind hole placement can easily lead to extended exploration cycles. It is difficult to quickly determine the anti-seepage range with existing technology, affecting the design of seepage control projects.

Method used

Using comprehensive geophysical prospecting, drilling and geological analysis methods, through surface topography mapping, high-density electrical geophysical prospecting profiles, drilling point layout and pressure water testing, the depth of the relative aquifer and the length of the anti-seepage section are determined, and the anti-seepage range of the watershed is quickly determined.

Benefits of technology

It saves drilling costs, shortens the exploration cycle, provides rapid geological basis, and provides accurate anti-seepage range information for seepage control engineering design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727697A_ABST
    Figure CN118727697A_ABST
Patent Text Reader

Abstract

The invention discloses a reconnaissance method for rapidly determining an anti-seepage range of a reservoir thin watershed, and relates to the field of engineering geology and hydrogeological reconnaissance. The method comprises the following steps: step 1, carrying out surface topography and geological surveying and mapping on a watershed range, and finding out the distribution range, material composition, water outlet point positions and surface structure exposure conditions of a covering layer; 2, the critical position of the intersection point of the underground watershed elevation and the normal water storage level elevation is explored; 3, a drilling point ZK2 is arranged in the middle of the bealock; a drilling point ZK1 and a drilling point ZK3 are arranged at the two ends of the bealock respectively; step 4, drilling ZK1, ZK2 and ZK3; and 5, determining the depth of the relative water-resisting layer and the length of the anti-seepage section, and quickly determining the anti-seepage range of the watershed. Holes are distributed purposefully and scientifically, the drilling cost is saved, the exploration period is shortened, the watershed anti-seepage range is rapidly determined, and a geological basis is provided for seepage control engineering design.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of engineering geology and hydrogeology survey, and more specifically to a survey method for rapidly determining the anti-seepage range of a thin watershed of a reservoir. Background Art

[0002] As a more economical, more effective and more mature energy storage technology, pumped-storage power stations play a more obvious role in the process of building a new energy system. Due to the particularity of pumped-storage power stations, which pump water to store energy during low electricity consumption and release water to generate electricity during peak electricity consumption, the basic requirements for engineering geological surveys are different from those for large-scale conventional hydropower projects, and engineering geological surveys face huge challenges.

[0003] As the reservoir capacity of pumped-storage power stations is generally small, the problem of reservoir anti-seepage is prominent, especially in the upper reservoirs where there are often thin watersheds. Low passes need to be dammed or anti-seepage walls and curtain grouting need to be used to prevent reservoir water leakage. Geological professionals need to find out the depth of the relative impermeable layer and the length of the anti-seepage section during the survey stage to provide a geological basis for the design of seepage control projects.

[0004] Since the thin watershed of the upper reservoir is generally located in a high and steep mountainous area, drilling is difficult and costly, and blindly placing holes often leads to a waste of drilling work and prolongs the exploration cycle.

[0005] Therefore, it is necessary to develop a survey method for quickly determining the anti-seepage range of the thin watershed of the reservoir, which can save drilling costs, shorten the exploration cycle, quickly determine the anti-seepage range of the watershed, and provide a geological basis for the design of seepage control engineering. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the above-mentioned background technology and to provide a survey method for quickly determining the anti-seepage range of the thin watershed of a reservoir.

[0007] In order to achieve the above object, the technical solution of the present invention is: a survey method for quickly determining the anti-seepage range of a thin watershed of a reservoir, characterized in that it includes the following steps:

[0008] Step 1: Carry out surface topography and geological mapping of the watershed to find out the distribution range, material composition, water outlet location, and surface structural exposure of the covering layer;

[0009] Step 2: According to the terrain conditions, high-density electrical geophysical profiles are arranged along the ridges at both ends of the pass to explore the distribution depth of the underground watershed;

[0010] According to the interpretation results of geophysical profile, the critical position of the intersection of the underground watershed elevation and the normal water level elevation was preliminarily explored. There are two critical positions of the intersection, the left one is the first critical point, and the right one is the second critical point.

[0011] Step 3: Arrange a drilling point ZK2 in the middle of the pass; arrange a drilling point ZK1 and ZK3 at both ends of the pass; ZK1 is arranged 2d above the first critical point, and ZK3 is arranged 2d above the second critical point; d represents the distance between the poles of the geophysical profile layout;

[0012] Step 4: Drilling ZK1, ZK2, and ZK3; closely observe the water level changes during drilling and conduct water pressure tests. The drilling depth is controlled based on three consecutive test sections entering the lower limit of anti-seepage;

[0013] Step 5: Integrate the results of geophysical exploration, drilling and geological analysis to determine the relative depth of the impermeable layer and the length of the anti-seepage section, and quickly determine the anti-seepage range of the watershed.

[0014] In the above technical solution, in step 2, due to the limited accuracy of qualitative exploration by high-density electrical method, inversion differentiation is mainly based on apparent resistivity; water-rich strata such as overburden, strongly weathered layer, structural fracture zone and fissure-intensive zone appear as low-resistance areas; micro-permeable strata appear as high-resistance areas.

[0015] In the above technical solution, in step 4, if the geophysical profile does not match the drilling exposure at the drilling point, it is necessary to continue to drill holes upward for exploration.

[0016] Compared with the prior art, the present invention has the following advantages:

[0017] 1) The present invention combines geophysical exploration, drilling and geological multi-professional and multi-methods, arranges holes in a purposeful and scientific manner, saves drilling costs, shortens exploration cycles, quickly determines the anti-seepage range of watersheds, and provides a geological basis for the design of seepage control projects. Under normal circumstances, one geophysical profile and three geological boreholes can determine the anti-seepage range of a thin watershed. If there are abnormal parts of the geophysical profile, drilling exploration can be appropriately increased.

[0018] 2) The present invention uses this method to save drilling costs, shorten the exploration period, quickly determine the watershed anti-seepage range, and provide a geological basis for the design of seepage control engineering. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A cross-sectional view of the exploration arrangement of the present invention.

[0020] Figure 2 It is a schematic diagram of the plan layout of exploration drilling and geophysical profiles in an embodiment of the present invention.

[0021] Figure 3 It is a schematic diagram of an exploration profile according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The following detailed description of the implementation of the present invention is made in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention and are only given as examples. At the same time, the advantages of the present invention will become clearer and easier to understand through the description.

[0023] Referring to the attached drawings, it can be seen that a survey method for quickly determining the anti-seepage range of a thin watershed of a reservoir is characterized by comprising the following steps:

[0024] Step 1: Carry out surface topography and geological mapping of the watershed to find out the distribution range, material composition, location of water outlets (springs), and surface structural exposures of the covering layer;

[0025] Step 2: According to the terrain conditions, high-density electrical geophysical profiles are arranged along the ridges at both ends of the pass to explore the distribution depth of the underground watershed;

[0026] According to the interpretation results of geophysical profile, the critical position of the intersection of the underground watershed elevation and the normal water level elevation was preliminarily explored. There are two critical positions of the intersection, the left one is the first critical point, and the right one is the second critical point.

[0027] Step 3: Arrange a drilling point ZK2 in the middle of the pass; arrange a drilling point ZK1 and ZK3 at both ends of the pass; considering that the interpretation of high-density electrical profiles has a certain error, ZK1 is arranged 2d above the first critical point, and ZK3 is arranged 2d above the second critical point; d represents the distance between the poles of the geophysical profile layout;

[0028] Step 4: Drill ZK1, ZK2, and ZK3; closely observe the water level changes during drilling and conduct water pressure tests. The drilling depth is controlled based on three consecutive test sections entering the lower limit of anti-seepage (generally, the upper reservoir of a pumped storage power station requires permeability q≤1Lu);

[0029] Step 5: Integrate the results of geophysical exploration, drilling and geological analysis to determine the relative depth of the impermeable layer and the length of the anti-seepage section, and quickly determine the anti-seepage range of the watershed.

[0030] In step 2, due to the limited accuracy of qualitative exploration by high-density electrical method, inversion differentiation is mainly based on apparent resistivity; water-rich strata (upper stagnant water) such as overburden, strongly weathered layer, structural fracture zone and fracture-intensive zone appear as low-resistance areas; micro-permeable strata appear as high-resistance areas.

[0031] In step 4, a drilling point is set at each end of the watershed pass on both sides, which can basically control the anti-seepage endpoint. If the geophysical profile does not match the drilling point drilling exposure, it is necessary to continue to set up drilling holes upward for exploration.

[0032] Example

[0033] like Figure 2As shown, the normal water level of the upper reservoir of a domestic pumped storage power station is 830m. There is a thin watershed in the northeast of the reservoir. The lowest point of the pass is 833m and 25m long. The thickness of the narrowest part of the watershed at the normal water level is only 29m. Leakage investigation and design are required, and a combination of anti-seepage wall + anti-seepage curtain construction is adopted.

[0034] In order to find out the anti-seepage range of the thin watershed, the survey project department successfully used the survey method of the present invention, combined with geophysical exploration, geology, drilling and other professional means, to quickly determine the lower limit of anti-seepage, saving survey workload and shortening the survey cycle.

[0035] The specific survey process is as follows:

[0036] First, a high-density electrical geophysical profile was arranged to interpret the underground watershed. The horizontal distance between the first critical point and the second critical point was L1. Based on the normal water level elevation and the geophysical interpretation results, boreholes ZK1, ZK2, and ZK3 were arranged. The relevant parameters of the boreholes are shown in Table 1 and the exploration profile diagram. Figure 3 As shown; Based on the results of the water pressure test, the lower limit of anti-seepage is determined, and the horizontal width of anti-seepage is L2=L1+4d (this is the most ideal and economical situation; if the lower limit of anti-seepage is still lower than the normal water storage level, drilling exploration will continue upwards).

[0037] Table 1 Exploration drilling parameters

[0038]

[0039] Other parts not described belong to the prior art.

Claims

1. A survey method for quickly determining the anti-seepage range of a reservoir's thin watershed, characterized in that: The following steps are involved: Step 1: Carry out surface topography and geological mapping of the watershed to find out the distribution range, material composition, water outlet location, and surface structural exposure of the covering layer; Step 2: According to the terrain conditions, high-density electrical geophysical profiles are arranged along the ridges at both ends of the pass to explore the distribution depth of the underground watershed; According to the interpretation results of geophysical profile, the critical position of the intersection of the underground watershed elevation and the normal water level elevation was preliminarily explored. There are two critical positions of the intersection, the left one is the first critical point, and the right one is the second critical point. Step 3: Arrange a drilling point ZK2 in the middle of the pass; arrange a drilling point ZK1 and ZK3 at both ends of the pass; ZK1 is arranged 2d above the first critical point, and ZK3 is arranged 2d above the second critical point; d represents the distance between the poles of the geophysical profile layout; Step 4: Drilling ZK1, ZK2, and ZK3; closely observe the water level changes during drilling and conduct water pressure tests. The drilling depth is controlled based on three consecutive test sections entering the lower limit of anti-seepage; Step 5: Integrate the results of geophysical exploration, drilling and geological analysis to determine the relative depth of the impermeable layer and the length of the anti-seepage section, and quickly determine the anti-seepage range of the watershed.

2. A survey method for quickly determining the anti-seepage range of a thin watershed of a reservoir according to claim 1, characterized in that: In step 2, due to the limited accuracy of qualitative exploration by high-density electrical method, inversion differentiation is mainly based on apparent resistivity; water-rich strata such as overburden, strongly weathered layer, structural fracture zone and dense fracture zone appear as low-resistance areas; micro-permeable strata appear as high-resistance areas.

3. A survey method for quickly determining the anti-seepage range of a thin watershed of a reservoir according to claim 1, characterized in that: In step 4, if the geophysical profile does not match the drilling exposure at the drilling point, it is necessary to continue to drill upwards for exploration.