Formwork erecting device for I-shaped steel hole of outer wall and construction method thereof

Through the cooperation of the outer formwork, the inner formwork and the formwork fastening components, the opening of the I-beam is tightly sealed, and the remaining holes are treated with casings and sealing parts, which solves the problems of material waste and high construction cost of the traditional sealing method, and improves the efficiency Improve the waterproof performance and exterior wall strength of the building.

CN118728065AActive Publication Date: 2024-10-01CHINA FIRST METALLURGICAL GROUP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410861009.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-01
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

The traditional method of sealing I-beam openings in exterior walls is cumbersome, resulting in serious material waste and high construction costs. It may also cause damage to the wall, making it difficult to recycle parts and components, and affecting the waterproof performance and strength of the building.

Method used

The outer formwork, inner formwork and formwork fastening parts are used to tightly close the I-beam opening, and the outer formwork and fastening parts are removed through the casing, and sealing parts are used to deal with the remaining holes, so as to realize the recycling of parts and enhance the building's durability. Waterproof performance and strength.

Benefits of technology

It realizes the recycling of parts and components, reduces construction costs, improves the waterproof performance and exterior wall strength of the building, simplifies the construction process, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728065A_ABST
    Figure CN118728065A_ABST
Patent Text Reader

Abstract

The invention discloses an outer wall I-shaped steel hole formwork erecting device and a construction method thereof. The formwork erecting device comprises an outer side formwork, an inner side formwork, a formwork fastening component and a plugging piece. The outer side template is arranged on the outer side of an I-shaped steel hole; the inner side formwork is arranged on the inner side of a building outer wall. The template fastening part is detachably connected with the outer side template and the inner side template; the plugging piece is fixedly arranged in a hole left by the template fastening part; the outer side formwork, the inner side formwork and the formwork fastening component are matched to tightly close an I-shaped steel hole and are blocked through concrete, then the outer side formwork and the formwork fastening component are removed through a sleeve, and the left hole is treated through the blocking piece and the concrete. Therefore, the outer side formwork and the formwork parts can be conveniently detached, cyclic utilization of parts is achieved, cost is saved, meanwhile, remaining holes are conveniently treated through the plugging pieces, and the waterproof performance and strength of a building are effectively enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of external wall opening construction equipment, and more specifically, relates to an external wall I-beam opening formwork device and a construction method thereof. Background Art

[0002] In the construction of modern high-rise buildings, the unloading platform and the external frame are generally supported by cantilevered I-beams. After the scaffolding and I-beams are removed, the I-beam holes left on the building's exterior walls need to be sealed to ensure the integrity and safety of the building structure. The traditional sealing method usually involves setting up scaffolding outdoors again or using a hanging basket for people to stand on, and then performing formwork sealing operations on the holes. However, the process is cumbersome, wastes materials and is laborious, with high construction risks. In addition, the exterior wall construction space of some high-rise buildings is limited, especially in narrow or difficult-to-reach areas, where hole sealing operations may be difficult.

[0003] In the prior art, a Chinese patent with document number CN115126276A discloses a plugging device and construction method for a reserved opening of a cantilevered I-beam, comprising an outer formwork, an inner formwork, an iron wire and a baffle. Both the outer formwork and the inner formwork are used to plug the reserved opening. A reserved through hole is provided on the inner formwork, and an arc-shaped pouring port is provided on the top of the inner formwork. A material guide trough is provided at the arc-shaped pouring port, and a fixed baffle is provided on the material guide trough where the material guide trough and the arc-shaped pouring port are connected; the rear end of the iron wire is fixed to the outer formwork, and the front end thereof passes through the reserved through hole on the inner formwork and is fastened by a nut; the baffle is detachably clamped between the fixed baffle on the material guide trough and the inner side surface of the wall, and is used to plug the arc-shaped pouring port on the inner formwork.

[0004] Although the blocking device of the Chinese patent with document number CN115126276A has the advantage of not needing to set up external wall brackets, and has a simple overall structure and is easy to install, its outer template cannot be recycled, resulting in material waste and greatly increasing construction costs. Moreover, after the construction is completed, the excess wire extending to the outside of the wall needs to be cut, and this process may cause additional damage to the wall or leave an uneven cross-section, requiring subsequent repairs and adding additional workload. Summary of the invention

[0005] In view of the above defects or improvement needs of the prior art, the present invention provides an external wall I-beam opening formwork device and a construction method thereof, wherein the outer formwork, the inner formwork and the formwork fastening components cooperate to tightly close the I-beam opening and seal it with concrete. Thereafter, the outer formwork and the formwork fastening components are removed by using a sleeve, and the remaining holes are processed by using the sealing member and concrete, thereby conveniently removing the outer formwork and the formwork components, realizing the recycling of parts and saving costs. At the same time, the remaining holes are conveniently processed by using the sealing member, thereby effectively enhancing the waterproof performance of the building and further improving the strength of the building's exterior wall.

[0006] In order to achieve the above-mentioned object, the present invention provides, on one hand, a formwork device for an I-beam opening of an exterior wall, comprising: an outer formwork, an inner formwork, a formwork fastening component and a blocking member;

[0007] The outer template includes: a first template, a second template, a hinge and a magnetic adsorption member; the first template is fixedly connected to the second template through a plurality of hinges, and a plurality of magnetic adsorption members are respectively fixedly arranged at corresponding positions outside the first template and the second template to form the outer template base member; two outer template base members constitute the outer template through their two first templates and a plurality of hinges;

[0008] The inner template includes: a third template, a pouring port and a baffle; the third template is arranged on the inner side of the building outer wall, and a through hole is fixedly arranged in the middle; the pouring port is fixedly arranged on the upper side of the middle part of the third template; the baffle is arranged on the side of the pouring port close to the building outer wall, and is adapted to the pouring port;

[0009] The template fastening components include: connecting wires, traction ropes, elastic buckles and sleeves; one end of the connecting wires is detachably connected to the hinges between the first template and the second template, and the other end is detachably connected to the connecting piece; one end of the traction rope is detachably connected to the connecting piece, and the other end is detachably connected to the elastic buckle, and then passes through the sleeve and the through hole in sequence;

[0010] The plugging piece is fixedly arranged in the hole left after the template fastening component is removed, so as to realize the recycling of the parts of the formwork device and conveniently handle the remaining holes, thereby effectively enhancing the waterproof performance and strength of the building.

[0011] Furthermore, the connecting member comprises a metal ring such as a triangular ring, a rectangular ring or a circular ring.

[0012] Furthermore, the length of the traction rope is 1.5 to 2 times the distance between two vertically adjacent I-beam openings on the building exterior wall.

[0013] Furthermore, a plurality of the magnetic adsorption components are fixedly provided on the outer sides of two adjacent first templates in the outer templates which are connected by a plurality of the hinges.

[0014] Furthermore, a notch is fixedly provided at one end of the other sleeve that contacts the sleeve in the hole of the I-beam, and the notch is adapted to the traction rope.

[0015] Furthermore, the inner template includes: a support rod and a stopper; a plurality of the support rods are symmetrically fixed on the inner side of the inner template with the through hole as the center; the stopper is sleeved between the plurality of support rods through a plurality of through holes and a plurality of fastening bolts inside the stopper, and a through hole is fixed in the middle of the stopper to facilitate the passage of the traction rope.

[0016] Furthermore, the template fastening component includes: a rotating rod; the rotating rod is rotatably connected to the traction rope.

[0017] Furthermore, the length of the rotating rod is greater than the distance between two adjacent supporting rods.

[0018] Furthermore, the formwork fastening component includes an inner formwork bracket, which is arranged on the inner side of the inner formwork, and mainly includes a vertical telescopic rod, an oblique telescopic rod and a connecting rod; several of the connecting rods are fixedly connected in sequence to form a support frame adapted to the inner formwork; several of the vertical telescopic rods are fixedly arranged at the bottom end of the support frame; and several of the oblique telescopic rods are rotatably connected to one side of the support frame.

[0019] Another aspect of the present invention provides a construction method of an external wall I-beam opening formwork device, which is implemented by using the formwork device as described above, and is characterized in that it comprises the following steps:

[0020] S1: Check the integrity of the formwork device, and clean the outer formwork, the inner formwork and the sleeve;

[0021] S2: Connect one end of a plurality of the connecting wires to a plurality of hinges between the first template and the second template respectively, and connect the other ends to the connecting piece; connect one end of the traction rope to the connecting piece, and connect the other end to the elastic buckle; then, place the outer template on the outside of the building exterior wall, and manually turn the first template and the second template to be parallel;

[0022] S3: Assemble the sleeve to the inner template, pull the traction rope, fully unfold the outer template, and pass the elastic buckle through the sleeve and the through hole, so that the elastic buckle elastically opens to clamp the inner template, thereby completing the fixing of the outer template and the inner template;

[0023] S4: pouring concrete into the I-beam hole through the pouring port, accelerating the setting by a vibrator, and sealing the pouring port with the baffle after the concrete is fully poured;

[0024] S5: After the concrete is completely solidified, the elastic buckle is pushed into the sleeve, the inner formwork is removed, the sleeve in the I-beam opening is supported by another sleeve, and the sleeve in the I-beam opening is knocked out to the outside of the building outer wall by knocking, and then the outer formwork and the sleeve in the I-beam opening are removed. At the same time, the outer formwork and the sleeve are removed by the traction rope and fall to the I-beam opening of the next layer for subsequent construction there.

[0025] S6: placing the plugging member into the hole left after the casing is removed in step S5, injecting grout from the inside, and plugging it with the inner template, and completing the plugging construction of the I-beam hole after the concrete solidifies;

[0026] S7: After checking that the blocked I-beam opening is normal, repeat steps S3 to S6 to block the I-beam opening below it until all construction is completed.

[0027] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0028] 1. The formwork device of the present invention tightly closes the I-beam hole through the cooperation of the outer formwork, the inner formwork and the formwork fastening components and seals it with concrete. Afterwards, the outer formwork and the formwork fastening components are removed by using a sleeve, and the remaining holes are processed by using the sealing components and concrete, thereby conveniently removing the outer formwork and the formwork components, realizing the recycling of parts and saving costs. At the same time, the remaining holes are conveniently processed by the sealing components, effectively enhancing the waterproof performance of the building, and further improving the strength of the building's exterior wall.

[0029] 2. The formwork device of the present invention uses another sleeve to support the sleeve in the I-beam hole, and knocks the sleeve in the I-beam hole to the outside of the building's exterior wall, thereby removing the outer formwork and the sleeve in the I-beam hole. Due to the traction of the traction rope, the outer formwork and the sleeve can fall to the I-beam hole of the next layer after removal, thereby realizing the recycling of the formwork device and improving construction efficiency.

[0030] 3. The formwork device of the present invention ensures the stability of the outer template structure through the cooperation of a plurality of hinges and the magnetic adsorption parts, and has a simple structure and is easy to operate.

[0031] 4. The formwork device of the present invention, by auxiliary support of the inner formwork by the inner formwork bracket, further enhances the stability of the formwork device during the pouring process and improves the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 A cross-sectional view of the formwork device in a tightened state according to an embodiment of the present invention;

[0033] Figure 2 It is a cross-sectional view of an embodiment of the present invention when the outer template is not unfolded;

[0034] Figure 3 It is a cross-sectional view of an embodiment of the present invention when the inner template is removed;

[0035] Figure 4 This is a cross-sectional view of an embodiment of the present invention when a plugging piece is used for repair;

[0036] Figure 5 A schematic diagram of the steps of the construction method of an embodiment of the present invention;

[0037] Figure 6 This is a schematic diagram of the structure of using a rotating rod and two supporting rods for fastening in Example 5 of the present invention;

[0038] Figure 7 This is a schematic diagram of the structure of using a rotating rod and three supporting rods for fastening in Example 5 of the present invention;

[0039] Figure 8 This is a schematic diagram of the structure of the inner formwork support used in Example 6 of the present invention.

[0040] In all the drawings, the same figure marks represent the same technical features, specifically: 1-I-beam opening, 2-outer formwork, 21-first formwork, 22-second formwork, 23-hinge, 24-magnetic adsorption part, 3-inner formwork, 31-third formwork, 311-through hole, 32-pouring mouth, 33-baffle, 34-support rod, 35-block, 41-connecting wire, 411-connecting part, 42-traction rope, 43-elastic buckle, 44-sleeve, 441-notch, 45-rotating rod, 46-inner formwork bracket, 461-vertical telescopic rod, 462-oblique telescopic rod, 463-connecting rod, 5-blocking part. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0042] Example 1

[0043] like Figures 1 to 4 As shown, embodiment 1 of the present invention provides an external wall I-beam opening formwork device, which includes: an outer formwork 2, an inner formwork 3, a formwork fastening component and a plugging component 5; the outer formwork 2 is arranged on the outside of the I-beam opening 1; the inner formwork 3 is arranged on the inside of the building exterior wall; the formwork fastening component is detachably connected to the outer formwork 2 and the inner formwork 3; the plugging component 5 is fixed in the hole left by the formwork fastening component; the I-beam opening 1 is tightly closed by the outer formwork 2, the inner formwork 3 and the formwork fastening component and sealed with concrete, and then the outer formwork 2 and the formwork fastening component are removed by using a sleeve, and the remaining holes are processed by the plugging component 5 and concrete, so that the outer formwork and the formwork component are conveniently removed, the recycling of parts is realized, and the cost is saved. At the same time, the remaining holes are conveniently processed by the plugging component 5, the waterproof performance of the building is effectively enhanced, and the strength of the building exterior wall is further improved.

[0044] Specifically, Figures 1 to 3 As shown, the outer template 2 is arranged outside the I-beam opening 1, and is used to tightly seal the outer side of the I-beam opening 1, and includes: a first template 21, a second template 22, a hinge 23 and a magnetic adsorption member 24;

[0045] The first template 21 is fixedly connected to the second template 22 through a plurality of hinges 23, and a plurality of magnetic adsorption members 24 are respectively fixedly arranged at corresponding positions outside the first template 21 and the second template 22 to form the base member of the outer template 2;

[0046] The two outer formwork 2 base members constitute the outer formwork 2 through the two first formworks 21 and a plurality of hinges 23;

[0047] Preferably, the magnetic adsorption member 24 further enhances the connection stability between the first template 21 and the second template 22;

[0048] Preferably, the first template 21 and the second template 22 are square aluminum alloy plates as a whole;

[0049] Preferably, the hinge 23 is mainly composed of non-magnetic metal materials such as aluminum alloy or zinc alloy;

[0050] During the plugging process, after the outer template 2 is unfolded, its size is larger than the size of the I-beam opening 1, thereby completely closing the I-beam opening 1;

[0051] Specifically, Figures 1 to 3As shown, the inner template 3 is arranged on the inner side of the building outer wall, and is used to tightly seal the outer side of the I-beam opening 1 and pour concrete to seal the I-beam opening 1, and it includes: a third template 31, a pouring port 32 and a baffle 33;

[0052] The third template 31 is arranged on the inner side of the building outer wall;

[0053] Preferably, a through hole 311 is fixedly provided in the middle of the third template 31;

[0054] Preferably, the through hole 311 is circular;

[0055] The pouring port 32 is fixedly arranged on the upper middle side of the third template 31 and is used for pouring concrete;

[0056] Preferably, the pouring port 32 is a groove in the shape of a triangular square column or a triangular circular column;

[0057] The baffle 33 is disposed on a side of the pouring port 32 close to the building outer wall, adapted to the pouring port 32, and used to block the contact surface between the pouring port 32 and the building outer wall;

[0058] Specifically, Figures 1 to 3 As shown, the template fastening component is detachably connected to the outer template 2 and the inner template 3, and is used to fasten the outer template 2 and the inner template 3 to seal the I-beam opening 1, which includes: a connecting wire 41, a traction rope 42, an elastic buckle 43 and a sleeve 44;

[0059] One end of the plurality of connecting wires 41 is detachably connected to a plurality of hinges between the first template 21 and the second template 22, and the other end is detachably connected to the connecting member 411;

[0060] Preferably, the connecting member 411 comprises a metal ring such as a triangular ring, a rectangular ring or a circular ring;

[0061] One end of the traction rope 42 is detachably connected to the connecting member 411, and the other end is detachably connected to the elastic buckle 43, and then passes through the sleeve 44 and the through hole 311 in sequence;

[0062] Preferably, the length of the traction rope 42 is 1.5 to 2 times the distance between two vertically adjacent I-beam openings 1 on the building exterior wall;

[0063] Preferably, the sleeve 44 is adapted to the through hole 311, and the length of the sleeve 44 is greater than the distance from the inner side of the outer template 2 to the outer side of the inner template 3;

[0064] During the plugging process, by pulling the traction rope 42, the elastic buckle 43 is passed through the sleeve 44 and the through hole 311 in sequence, thereby clamping the outer template 2 and the inner template, which is convenient to operate and increases construction efficiency;

[0065] Specifically, Figure 1 and Figure 4 As shown, the blocking member 5 is fixedly arranged in the hole left after the template fastening component is removed, and is used to block the remaining hole;

[0066] Preferably, the length of the blocking member 5 is the same as the thickness of the I-beam opening 1;

[0067] Preferably, the blocking member 5 is a porous, hollow round rod with one end closed;

[0068] In an optional embodiment, the blocking member 5 mainly includes a steel bar and a disc fixedly connected to the steel bar, and the disc is adapted to the hole;

[0069] During the blocking process, since the I-beam openings 1 of each floor are basically corresponding, when constructing from top to bottom, after removing the inner formwork 3, another sleeve 44 is used to support the sleeve 44 in the I-beam opening 1, and the sleeve 44 in the I-beam opening 1 is knocked out to the outside of the building outer wall by knocking, and then the outer formwork 2 and the sleeve 44 in the I-beam opening 1 are removed. Due to the traction of the traction rope 42, the outer formwork 2 and the sleeve 44 can be removed and fall to the I-beam opening 1 of the next floor, so that the formwork device can be recycled and the construction efficiency is improved;

[0070] Example 2

[0071] like Figure 5 As shown, based on Example 1, Example 2 of the present invention provides a construction method of an external wall I-beam opening formwork device, comprising the following steps:

[0072] S1: Check the integrity of the formwork device, and clean the outer formwork 2, the inner formwork 3 and the sleeve 44;

[0073] S2: Connect one end of the plurality of connecting wires 41 to the plurality of hinges between the first template 21 and the second template 22 respectively, and connect the other ends to the connecting member 411; connect one end of the traction rope 42 to the connecting member 411, and connect the other end to the elastic buckle 43; then, place the outer template 2 on the outside of the building outer wall, and manually turn the first template 21 and the second template 22 to be parallel;

[0074] S3: Assemble the sleeve 44 to the inner template 3, pull the traction rope 42, fully unfold the outer template 2, and pass the elastic buckle 43 through the sleeve 44 and the through hole 311, so that the elastic buckle 43 elastically opens to clamp the inner template 3, thus completing the fixing of the outer template 2 and the inner template 3;

[0075] S4: pouring concrete into the I-beam hole 1 through the pouring port 32, and accelerating the setting by a vibrating rod, and after the concrete is fully poured, the baffle 33 is used to seal the pouring port 32;

[0076] S5: After the concrete is completely solidified, the elastic buckle 43 is pushed into the sleeve 44 to remove the inner formwork 3, and the sleeve 44 in the I-beam opening 1 is pressed against another sleeve 44, and the sleeve 44 in the I-beam opening 1 is knocked out to the outside of the building outer wall by knocking, and then the outer formwork 2 and the sleeve 44 in the I-beam opening 1 are removed. At the same time, the outer formwork 2 and the sleeve 44 are pulled by the traction rope 42, and then fall to the I-beam opening 1 of the next layer for subsequent construction there.

[0077] S6: inserting the plugging member 5 into the hole left after the sleeve 44 is removed in step S5, injecting grout from the inside thereof, and plugging it with the inner template 3, and completing the plugging construction of the I-beam opening 1 after the concrete solidifies;

[0078] S7: After checking that the blocked I-beam opening 1 is normal, repeat steps S3 to S6 to block the I-beam opening 1 below it until all construction is completed.

[0079] Example 3

[0080] On the basis of Example 1, in Example 3 of the present invention,

[0081] A plurality of magnetic adsorption components 24 are fixedly disposed on the outer sides of two adjacent first templates 21 in the outer template 3 connected by a plurality of hinges 23 , so as to further enhance the structural stability of the outer template 3 .

[0082] Other technical features are the same as those in Example 1 and can achieve the same technical effects, which will not be described in detail here.

[0083] Example 4

[0084] like Figure 3 As shown, based on Example 1, in Example 4 of the present invention,

[0085] A notch 441 is fixedly provided at one end of the other sleeve 44 that contacts the sleeve 44 in the I-beam hole 1 , and the notch 441 is adapted to the traction rope 42 to reduce damage to the traction rope 42 when struck.

[0086] Other technical features are the same as those in Example 1 and can achieve the same technical effects, which will not be described in detail here.

[0087] Example 5

[0088] like Figure 6 and Figure 7 As shown, based on Example 1, in Example 4 of the present invention,

[0089] The length of the sleeve 44 is greater than the distance from the inner side of the outer template 2 to the inner side of the inner template 3;

[0090] The inner template 3 includes: a support rod 34 and a stopper 35;

[0091] A plurality of support rods 34 are symmetrically fixed on the inner side of the inner template 3 with the through hole 311 as the center;

[0092] Preferably, the support rod 34 is a metal rod with external threads;

[0093] Preferably, a protective sleeve is provided at one end of the support rod 34 to enhance construction safety;

[0094] The stopper 35 is sleeved between the support rods 34 through a plurality of through holes and a plurality of fastening bolts therein, and is used to limit the sleeve 44 and assist in removing the sleeve 44 during the demoulding process;

[0095] Preferably, a through hole is fixedly provided in the middle of the stopper 35 for the traction rope 42 to pass through;

[0096] The template fastening component includes: a rotating rod 45;

[0097] The rotating rod 45 is rotatably connected to the traction rope 42;

[0098] Preferably, the length of the rotating rod 45 is greater than the distance between two adjacent supporting rods 34;

[0099] During the blocking process, after the block 35 is sleeved between the support rods 34, the rotating rod 45 is rotatably connected to the traction rope 42 passing through the block 35 on the outside of the support rods 34; the traction rope 42 between the outer template 2 and the inner template 3 is pulled by rotating the rotating rod 45 until the block 35 cannot slide with the support rods 34. At this time, the rotating rod is close to two adjacent support rods 34, thereby completing the fastening operation of the outer template 2 and the inner template 3.

[0100] Other technical features are the same as those in Example 1 and can achieve the same technical effects, which will not be described in detail here.

[0101] Example 6

[0102] like Figure 8 As shown, based on Example 1, in Example 6 of the present invention,

[0103] The template fastening component includes an inner template support 46, and the inner template support 46 is arranged inside the inner template 3 and is used to support and fix the inner template 3;

[0104] The inner formwork support 46 mainly includes a vertical telescopic rod 461, an oblique telescopic rod 462 and a connecting rod 463;

[0105] A plurality of the connecting rods 463 are sequentially fixedly connected to form a supporting frame adapted to the inner template 3;

[0106] A plurality of the vertical telescopic rods 461 are fixedly arranged at the bottom end of the support frame;

[0107] A plurality of the oblique telescopic rods 462 are rotatably connected to one side of the support frame.

[0108] Other technical features are the same as those in Example 1 and can achieve the same technical effects, which will not be described in detail here.

[0109] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0110] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0111] In this patent, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, the elements defined by the sentence "includes..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0112] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Those skilled in the art will readily understand that the above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.

Claims

1. An external wall I-beam opening formwork device, characterized in that: include: An outer template (2), an inner template (3), a template fastening component and a blocking component (5); The outer template (2) comprises: a first template (21), a second template (22), a hinge (23) and a magnetic adsorption component (24); the first template (21) is fixedly connected to the second template (22) via a plurality of the hinges (23); a plurality of the magnetic adsorption components (24) are respectively fixedly arranged at corresponding positions outside the first template (21) and the second template (22) to form a base component of the outer template (2); two base components of the outer template (2) form the outer template (2) via the two first templates (21) and the plurality of the hinges (23); The inner template (3) comprises: a third template (31), a pouring port (32) and a baffle (33); the third template (31) is arranged on the inner side of the building outer wall, and a through hole (311) is fixedly arranged in the middle; the pouring port (32) is fixedly arranged on the upper side of the middle part of the third template (31); the baffle (33) is arranged on the side of the pouring port (32) close to the building outer wall, and is adapted to the pouring port (32); The template fastening component comprises: a connecting wire (41), a traction rope (42), an elastic buckle (43) and a sleeve (44); one end of a plurality of the connecting wires (41) are detachably connected to a plurality of hinges between the first template (21) and the second template (22), and the other end is detachably connected to a connecting piece (411); one end of the traction rope (42) is detachably connected to the connecting piece (411), and the other end is detachably connected to the elastic buckle (43), and then passes through the sleeve (44) and the through hole (311) in sequence; The plugging member (5) is fixedly arranged in the hole left after the template fastening component is removed, so as to realize the recycling of the parts of the template device and conveniently handle the remaining hole, thereby effectively enhancing the waterproof performance and strength of the building.

2. The formwork device according to claim 1, characterized in that: The connecting member (411) comprises a metal ring such as a triangular ring, a rectangular ring or a circular ring.

3. The formwork device according to claim 1, characterized in that: The length of the traction rope (42) is 1.5 to 2 times the distance between two vertically adjacent I-beam openings (1) on the building's exterior wall.

4. The formwork device according to any one of claims 1 to 3, characterized in that: A plurality of magnetic adsorption components (24) are fixedly provided on the outside of two adjacent first templates (21) in the outer template (3) connected by a plurality of hinges (23).

5. The formwork device according to any one of claims 1 to 3, characterized in that: The other sleeve (44) is fixedly provided with a notch (441) at one end in contact with the sleeve (44) in the I-beam hole 1, and the notch (441) is adapted to the traction rope (42).

6. The formwork device according to any one of claims 1 to 3, characterized in that: The inner template (3) comprises: a support rod (34) and a stopper (35); a plurality of the support rods (34) are symmetrically fixed on the inner side of the inner template (3) with the through hole (311) as the center; the stopper (35) is sleeved between the plurality of the support rods (34) through a plurality of through holes and a plurality of fastening bolts therein, and a through hole is fixedly provided in the middle of the stopper (35) for facilitating the passage of the traction rope (42).

7. The formwork device according to claim 6, characterized in that: The template fastening component comprises: a rotating rod (45); the rotating rod (45) is rotatably connected to the traction rope (42).

8. The formwork device according to claim 7, characterized in that: The length of the rotating rod (45) is greater than the distance between two adjacent supporting rods (34).

9. The formwork device according to any one of claims 1 to 3, characterized in that: The template fastening component includes an inner template support (46), and the inner template support (46) is arranged on the inner side of the inner template (3), and mainly includes a vertical telescopic rod (461), an oblique telescopic rod (462) and a connecting rod (463); a plurality of the connecting rods (463) are fixedly connected in sequence to form a supporting frame adapted to the inner template (3); a plurality of the vertical telescopic rods (461) are fixedly arranged at the bottom end of the supporting frame; and a plurality of the oblique telescopic rods (462) are rotatably connected to one side of the supporting frame.

10. A construction method of an external wall I-beam opening formwork device, implemented by using the formwork device according to any one of claims 1 to 9, characterized in that: The steps include: S1: Check the integrity of the formwork device, and clean the outer formwork (2), the inner formwork (3) and the sleeve (44); S2: Connect one end of a plurality of connecting wires (41) to a plurality of hinges between the first template (21) and the second template (22), respectively, and connect the other ends to the connecting piece (411); connect one end of the traction rope (42) to the connecting piece (411), and connect the other end to the elastic buckle (43); then, place the outer template (2) on the outer side of the building outer wall, and manually turn the first template (21) and the second template (22) to be parallel; S3: Assemble the sleeve (44) to the inner template (3), pull the traction rope (42), fully unfold the outer template (2), and pass the elastic buckle (43) through the sleeve (44) and the through hole (311), so that the elastic buckle (43) elastically opens to clamp the inner template (3), thereby completing the fixation of the outer template (2) and the inner template (3); S4: pouring concrete into the I-beam hole (1) through the pouring port (32), accelerating the setting by using a vibrator, and after the concrete is fully poured, sealing the pouring port (32) with the baffle (33); S5: After the concrete is completely solidified, the elastic buckle (43) is pushed into the sleeve (44), the inner formwork (3) is removed, the sleeve (44) in the I-beam opening (1) is pressed against another sleeve (44), and the sleeve (44) in the I-beam opening (1) is knocked out to the outside of the building exterior wall, and then the outer formwork (2) and the sleeve (44) in the I-beam opening (1) are removed. At the same time, the outer formwork (2) and the sleeve (44) are pulled by the traction rope (42) and fall to the I-beam opening (1) of the next layer for subsequent construction; S6: placing the plugging member (5) into the hole left after the sleeve (44) is removed in step S5, injecting grout from the inside, and plugging it with the inner template (3). After the concrete solidifies, the plugging construction of the I-beam hole (1) is completed; S7: After checking that the blocked I-beam opening (1) is normal, repeat steps S3 to S6 to block the I-beam opening (1) below it until all construction is completed.

Citation Information

Patent Citations

  • Exterior wall hole blocking umbrella and construction method

    CN109505408A

  • Formwork device for plugging outer wall hole in floor edge and construction method thereof

    CN112900855A

  • Foldable vertical model hoisting device

    CN207620371U

  • Outer wall cantilever I-shaped steel reserved hole concrete filling device

    CN209040566U

  • High-rise outer wall hole plugging template

    CN216340904U