Precise leveling construction device and method for prefabricated inverted arch assembly

Through the design of built-in racks, lifting platforms and lifting beam devices, graded support for prefabricated inverted arch components is achieved, which solves the problem of limited grouting space and improves the grouting treatment effect and the stability of the components.

CN118728428APending Publication Date: 2024-10-01THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410934539.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing precise leveling construction device for prefabricated invert components affects the installation effect due to space limitations during grouting processing, and lacks effective graded support measures, resulting in poor grouting results.

Method used

A construction device including a built-in rack device, a lifting platform device and a lifting beam device is designed. Through these devices, the prefabricated inverted arch components are supported in stages, so that the grouting space is filled step by step to ensure the effectiveness of the grouting treatment. .

Benefits of technology

The post-installation grouting treatment effect of the prefabricated inverted arch component is improved, the stability and compactness of the grouting layer are enhanced, the service life of the grouting layer is extended, and the flatness accuracy of the component is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728428A_ABST
    Figure CN118728428A_ABST
Patent Text Reader

Abstract

The invention discloses a precise leveling construction device and method for a prefabricated inverted arch assembly, the precise leveling construction device comprises a built-in frame device installed on a high-speed tunnel, a lifting platform device arranged on the built-in frame device and a lifting beam device arranged on the lifting platform device, the lifting platform device is supported through the built-in frame device, and the lifting beam device is arranged on the lifting platform device through the lifting platform device. The lifting beam device is supported, the prefabricated inverted arch assembly is supported through the lifting beam device, graded supporting of the prefabricated inverted arch assembly is achieved, and the grouting space of the prefabricated inverted arch assembly is in a step-by-step filling state; the technical problems that leveling cushion blocks of the prefabricated inverted arch assembly are installed in advance, the prefabricated inverted arch assembly is connected with bolts pre-buried in a high-speed tunnel, and then grouting treatment is conducted on the end face of the lower end of the prefabricated inverted arch assembly are solved, and therefore the grouting treatment effect after the prefabricated inverted arch assembly is installed is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a precise leveling construction device and method, in particular to a precise leveling construction device and method for prefabricated inverted arch components. Background Art

[0002] In order to improve the construction efficiency of high-speed tunnels, in accordance with geological conditions, an arch support assembly and a prefabricated inverted arch assembly are assembled to obtain a high-speed tunnel pavement support body. Since the prefabricated inverted arch assembly supports the high-speed pavement as a roadbed, it is necessary to perform precise leveling construction when the prefabricated inverted arch assembly is installed. Therefore, a precise leveling construction device for the prefabricated inverted arch assembly is an important tunnel construction device. Among the existing precise leveling construction devices for prefabricated inverted arch assemblies, there is no precise leveling construction device for the prefabricated inverted arch assembly. After the leveling pads of the prefabricated inverted arch assembly are pre-installed and the prefabricated inverted arch assembly is connected with bolts pre-buried in the high-speed tunnel, grouting treatment is performed on the lower end face of the prefabricated inverted arch assembly. Since the grouting space is in a limited space state under the weight of the prefabricated inverted arch assembly, the grouting treatment effect after the installation of the prefabricated inverted arch assembly is affected. The present invention has the technical feature of making the grouting space of the prefabricated inverted arch assembly be in a step-by-step filling state, and has effectively explored and studied the technical problem of installing the leveling pads of the prefabricated inverted arch assembly in advance and connecting the prefabricated inverted arch assembly with the bolts pre-buried in the high-speed tunnel, and then performing grouting treatment on the lower end surface of the prefabricated inverted arch assembly. The statements here only provide background technology related to the present invention and do not necessarily constitute prior art. The technical solution of the present invention is made based on the technical briefing document provided by the applicant on April 22, 2024, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention

[0003] The object of the present invention is a precise leveling construction device for prefabricated inverted arch components. The object of the present invention is a precision leveling construction method for prefabricated invert assemblies.

[0004] In order to overcome the above technical disadvantages, the object of the present invention is to provide a precise leveling construction device and method for a prefabricated inverted arch assembly, thereby improving the post-installation grouting treatment effect of the prefabricated inverted arch assembly.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a precise leveling construction device for prefabricated inverted arch components, comprising an internal frame device installed on the high-speed tunnel, a lifting platform device arranged on the internal frame device, and a lifting beam device arranged on the lifting platform device.

[0006] Due to the design of the built-in frame device, the lifting platform device and the lifting beam device, the built-in frame device is used to support the lifting platform device, the lifting platform device is used to support the lifting beam device, the lifting beam device is used to support the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is supported in stages, and the grouting space of the prefabricated inverted arch assembly is filled in stages, which solves the technical problems of installing the leveling pads of the prefabricated inverted arch assembly in advance, connecting the prefabricated inverted arch assembly with bolts pre-buried in the high-speed tunnel, and performing grouting treatment on the lower end surface of the prefabricated inverted arch assembly, thereby improving the grouting treatment effect of the prefabricated inverted arch assembly after installation.

[0007] The present invention is designed to interconnect the internal frame device, the lifting platform device and the lifting beam device in a manner that the grouting space of the prefabricated inverted arch assembly is in a step-by-step filling state.

[0008] The present invention is designed to connect the lifting platform device and the lifting beam device with the built-in frame device in a manner of carrying out graded support for the prefabricated inverted arch assembly.

[0009] The present invention designs that the built-in frame device is configured to include a rear support, a lower support leg, an upper support leg and a side support leg.

[0010] The present invention designs that the lifting platform device is arranged to include a moving vehicle, a second lifting and telescopic cylinder and a third lifting and telescopic cylinder.

[0011] The present invention designs that the lifting beam device is arranged to include a front bracket, a fork beam and a first lifting telescopic cylinder.

[0012] The technical effects of the above six technical solutions are: through, forming the basic technical solution of the present invention, solving the technical problem of the present invention.

[0013] The present invention is designed to further include a first accessory device and the first accessory device is arranged on the lifting beam device. The first accessory device is arranged to include a first sliding block, a second sliding block and a power screw.

[0014] The technical effect of the above technical solution is: to realize the integrated installation of other components, and to expand the technical effect of the present invention.

[0015] The present invention is designed such that a moving vehicle, lower support legs, upper support legs, and side support legs are respectively provided on a rear support. A second lifting telescopic cylinder and a third lifting telescopic cylinder are respectively provided between the moving vehicle and the rear support, and a front support is provided on the moving vehicle. A fork beam is provided between the front support and the rear support, and a first lifting telescopic cylinder is provided between the fork beam and the front support. A first sliding block and a second sliding block are respectively provided on the fork beam, and power lead screws are respectively provided between the first sliding block and the second sliding block and the fork beam.

[0016] The technical effects of the above technical solution are as follows: The basic technical solution of the present invention is composed of a moving vehicle, a rear support, a front support, a fork beam, a first lifting telescopic cylinder, a first sliding block, a second sliding block, a power lead screw, lower support legs, upper support legs, side support legs, a second lifting telescopic cylinder, and a third lifting telescopic cylinder, and the technical problem of the present invention is solved.

[0017] The present invention is designed such that stepped bodies are provided on the left and right end faces of the invert portion of a precast invert assembly, and a receiving groove body I is provided on the lower end face of the invert portion. A reserved hole body I, a reserved hole body II, and a reserved hole body III are respectively provided at one end of the invert portion, and a reserved hole body IV, a reserved hole body V, and a reserved hole body VI are respectively provided at the other end of the invert portion. A reserved hole body VII is provided in the middle portion of the invert portion, and grouting hole bodies are respectively provided between the reserved hole body II, the reserved hole body III, the reserved hole body V, the reserved hole body VI, and the receiving groove body I. The invert portion is provided as a块状 body with an arc-shaped lower end face, and the stepped body is provided as an L-shaped end body. The reserved hole body I, the reserved hole body II, the reserved hole body III, the reserved hole body IV, the reserved hole body V, the reserved hole body VI, the reserved hole body VII, and the grouting hole bodies are respectively provided as circular holes, and the receiving groove body I is provided as a匚-shaped groove body. The reserved hole body VII is provided to be arranged at intervals along the vertical center line of the invert portion, and the reserved hole body I, the reserved hole body II, and the reserved hole body III and the reserved hole body IV, the reserved hole body V, and the reserved hole body VI are respectively provided to be arranged at intervals in sequence from the outside to the inside along the horizontal center line of the invert portion.

[0018] The present invention is designed such that the reserved hole body I and the reserved hole body IV are respectively provided to be connected to the fork beam, and the grouting hole body is provided to be connected to a high-pressure grouting pipe.

[0019] The technical effects of the above two technical solutions are as follows: It realizes the pouring and grouting from the middle to the outside in the invert portion, increasing the grouting area.

[0020] The present invention is designed that the rear bracket is configured to include a block part, a frame part and a guide rail beam part, and the middle edge part of the lower end face of the block part is configured to be connected to the upper end face part of the vertical part of the frame part, the upper end face part of the guide rail beam part is configured to be connected to the middle part of the lower end face of the block part, and the lower end face part of the guide rail beam part is configured to be connected to the inner end face part of the longitudinal part of the frame part, one side part of the lower end face of the block part is configured to be connected to the second lifting and telescopic cylinder, and the other side part of the lower end face of the block part is configured to be connected to the third lifting and telescopic cylinder, the middle part of the upper end face of the block part is configured to be connected to the upper supporting leg, and the vertical part of the frame part is configured to be through-connected to the moving vehicle, the outer side face part of the vertical part of the frame part is configured to be connected to the side supporting legs, and the outer side end face part of the longitudinal part of the frame part is configured to be connected to the lower supporting leg, the guide rail beam part is respectively configured to be through-connected to the moving vehicle and the fork beam, and the block part is configured to be a rectangular seat-shaped body, the frame part is configured to be a U-shaped rod-shaped body, and the guide rail beam part is configured to be a rectangular beam-shaped body.

[0021] The present invention is designed that the lower supporting leg, the upper supporting leg and the side supporting leg are respectively arranged as hydraulic supporting legs, and the inner end surface portion of the outer shell of the lower supporting leg, the inner end surface portion of the outer shell of the upper supporting leg and the inner end surface portion of the outer shell of the side supporting leg are respectively arranged to be connected with the rear support, and the hydraulic port portion of the lower supporting leg, the hydraulic port portion of the upper supporting leg and the hydraulic port portion of the side supporting leg are respectively arranged to be connected in a communicating manner with the output port portion of the high-pressure liquid power source.

[0022] The technical effects of the above two technical solutions are: realizing the installation of fixed brackets in high-speed tunnels and improving the stability of the supports.

[0023] The present invention is designed that the mobile vehicle is configured as a tire-type mobile shuttle vehicle with a through-hole body in the middle part of the frame and the through-hole body of the mobile vehicle is configured to be connected to the rear bracket, the rear side part of the frame of the mobile vehicle is configured to be connected to the second lifting and telescopic cylinder through a pin shaft and the front side part of the frame of the mobile vehicle is configured to be connected to the third lifting and telescopic cylinder through a pin shaft, and the front side part of the upper end face of the mobile vehicle is configured to be connected to the front bracket.

[0024] The present invention is designed that the second lifting and telescopic cylinder and the third lifting and telescopic cylinder are respectively arranged as two-section telescopic cylinders and the hydraulic port parts of the second lifting and telescopic cylinder and the hydraulic port parts of the third lifting and telescopic cylinder are respectively arranged to be connected to the output port parts of the high-pressure liquid power source, one of the ends of the second lifting and telescopic cylinder and one of the ends of the third lifting and telescopic cylinder are respectively arranged to be connected to the rear bracket and the other end of the second lifting and telescopic cylinder and the other end of the third lifting and telescopic cylinder are respectively arranged to be connected to the moving vehicle through a pin shaft.

[0025] The technical effect of the above two technical solutions is that a large-stroke lifting process is achieved for the prefabricated invert arch assembly.

[0026] The present invention designs that the front support is arranged as a U-shaped beam, and the lower end face of the vertical part of the front support is arranged to be connected to the mobile vehicle, the vertical part of the front support is arranged to be in contact connection with the cross beam, and the longitudinal part of the front support is arranged to be connected to the first lifting telescopic cylinder.

[0027] The present invention designs that a receiving hole body I is arranged at the rear end of the extended part of the beam part of the cross beam, and receiving groove bodies II are arranged on the front and rear side faces of the front end of the extended part of the beam part. A receiving hole body II is arranged at the rear end of the contracted part of the beam part, and a receiving hole body III is arranged at the front end of the contracted part of the beam part. A support part I is arranged at the outer end of the receiving hole body II, and a support part II is arranged at the outer end of the receiving hole body III. The receiving hole body I is arranged to be connected to the rear support, and the receiving groove body II is arranged to be connected to the front support. The receiving hole body II and the receiving hole body III are respectively arranged to be connected to the power lead screw, and the support part I is arranged to be in a sunk connection with the first sliding block. The support part II is arranged to be in a sunk connection with the second sliding block, and the front side of the upper end face of the extended part of the beam part is arranged to be connected to the first lifting telescopic cylinder. The beam part is arranged as a convex-shaped shaft body. The receiving hole body I is arranged as a rectangular hole body, and the receiving groove body II is arranged as a U-shaped opening body. The receiving hole body II and the receiving hole body III are respectively arranged as long strip hole bodies, and the support part I and the support part II are respectively arranged as right-angled trapezoidal blocks.

[0028] The present invention designs that the first lifting telescopic cylinder is arranged as a two-stage telescopic cylinder, and the hydraulic port part of the first lifting telescopic cylinder is arranged to be in a communicating connection with the output port part of the high-pressure liquid power source. One end of the first lifting telescopic cylinder is respectively arranged to be connected to the front support, and the other end of the first lifting telescopic cylinder is arranged to be connected to the cross beam.

[0029] The technical effects of the above three technical solutions are as follows: realizing the micro-stroke lifting treatment of the precast inverted arch assembly.

[0030] The present invention designs that the first sliding block and the second sliding block are arranged as seat bodies with a right-angled trapezoidal groove on the outer side face and a convex-shaped blind hole on the inner side face, and the convex-shaped blind holes of the first sliding block and the second sliding block are respectively arranged to be connected to the power lead screw. The right-angled trapezoidal grooves on the first sliding block and the second sliding block are respectively arranged to be in a receiving connection with the cross beam.

[0031] The present invention is designed that the power screw is configured to include a nut portion, a screw portion and a motor portion, and the screw portion is configured to be threadedly connected to the nut portion, the inner end of the screw portion is configured to be connected to the end shaft of the motor portion, and the peripheral side portions of the nut portion and the shell of the motor portion are respectively configured to be connected to the fork beam, the outer end of the screw portion is respectively configured to be embeddedly connected to the first sliding block and the second sliding block and the nut portion is configured to be a cylindrical body with a threaded hole, the screw portion is configured to be a light column bolt with a convex end at the outer end, and the convex end of the screw portion is respectively configured to be rotatably connected to the first sliding block and the second sliding block, and the motor portion is configured to be a control motor.

[0032] The technical effects of the above two technical solutions are: achieving the adjustment of the corner height of the prefabricated inverted arch assembly and ensuring the straightness of the prefabricated inverted arch assembly.

[0033] The present invention is designed that the rear bracket, the lower supporting leg, the upper supporting leg and the side supporting leg are arranged to be distributed in a front-to-rear lifting manner with the moving vehicle, the second lifting telescopic cylinder, the third lifting telescopic cylinder, the front bracket, the fork beam and the first lifting telescopic cylinder, and the rear bracket, the lower supporting leg, the upper supporting leg, the side supporting leg, the moving vehicle, the second lifting telescopic cylinder, the third lifting telescopic cylinder, the front bracket, the fork beam and the first lifting telescopic cylinder are arranged to be distributed in a height adjusting manner with the first sliding block, the second sliding block and the power screw.

[0034] The present invention is designed that the center lines of the mobile vehicle, the center lines of the rear support, the center lines of the second lifting and telescopic cylinder and the center lines of the third lifting and telescopic cylinder are arranged on the same straight line, the lower support legs are arranged to be arranged and distributed along the longitudinal center line of the frame portion, and the upper support legs are arranged to be arranged and distributed along the middle part of the upper end surface of the block portion, the side support legs are arranged to be arranged and distributed along the vertical center line of the frame portion, a guide rail beam portion, a front support, a fork beam, a first lifting and telescopic cylinder, a first sliding block, a second sliding block and two power lead screws are arranged to form a group of supporting rod components, and the two groups of supporting rod components are arranged on the mobile vehicle, the peripheral side surfaces of the nut portion are respectively arranged to be connected to the middle part of the inner wall of the accommodating hole body II and the middle part of the inner wall of the accommodating hole body III, the shell of the motor portion is respectively arranged to be connected to the inner end part of the accommodating hole body II and the inner end part of the accommodating hole body III, the accommodating hole body II and the accommodating hole body III are respectively arranged to be connected to the lead screw portion in an accommodating manner, the accommodating hole body I is arranged to be connected to the guide rail beam portion, and the accommodating groove body II is arranged to be connected to the vertical part of the front support.

[0035] The present invention designs a precise leveling construction method for a prefabricated inverted arch assembly, and the steps are: the lifting platform device is supported by the built-in frame device, the lifting platform device supports the lifting beam device, the lifting beam device supports the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is supported in stages, and the grouting space of the prefabricated inverted arch assembly is filled in stages.

[0036] The technical effect of the above technical solution is: highlighting the technical feature of making the grouting space of the prefabricated inverted arch assembly be in a step-by-step filling state, and introducing the application in the technical field of the precise leveling construction method for the prefabricated inverted arch assembly.

[0037] The invention is designed, and the steps are: when the accurate leveling construction of the prefabricated inverted arch assembly is required, the high-pressure grouting pipe is installed in the grouting hole body, the prefabricated inverted arch assembly is placed on the installation position of the prefabricated inverted arch assembly by a hoisting machine, when the height of the prefabricated inverted arch assembly is greater than the predetermined height, the prefabricated inverted arch assembly is subjected to weighting treatment, so that the prefabricated inverted arch assembly is installed on the bolts pre-buried in the high-speed tunnel, when the height of the prefabricated inverted arch assembly is less than the predetermined height, the grouting raw material is released on the lower end face of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body, so that the prefabricated inverted arch assembly is installed on the bolts pre-buried in the high-speed tunnel, and then the grouting raw material is stopped, the hoisting machine is separated from the prefabricated inverted arch assembly, the moving vehicle is moved, and the prefabricated inverted arch assembly is installed. One of the fork beams is placed in the reserved hole body I, and the other fork beam is placed in the reserved hole body IV, so that the lower support leg, the upper support leg and the side support leg are in an extended state, so that the lower support leg acts on the bottom wall of the high-speed tunnel, the upper support leg acts on the top wall of the high-speed tunnel, and the side support leg acts on the side wall of the high-speed tunnel, and the rear bracket is fixedly installed in the high-speed tunnel, so that the second lifting telescopic cylinder and the third lifting telescopic cylinder are in a telescopic state, so that the through-hole body of the mobile car is lifted upward at the vertical part of the frame part and the guide rail beam part, and the mobile car is separated from the bottom wall of the high-speed tunnel, so that the height of the prefabricated inverted arch assembly is maintained at a predetermined height value, and the lead screw part is driven to rotate in the nut part through the motor part, thereby respectively driving the right-angled trapezoidal groove body of the first sliding block in the bracket part I The right-angled trapezoidal groove body of the second sliding block moves on the bracket part II, and the heights of the four corners of the prefabricated inverted arch assembly are adjusted, and the straightness of the prefabricated inverted arch assembly is adjusted. When the straightness of the prefabricated inverted arch assembly is equal to the predetermined value, the nut is installed on the bolt located between the prefabricated inverted arch assembly and the pre-buried high-speed tunnel, and the prefabricated inverted arch assembly is installed and fixed, and then the grouting raw material is released to the lower end face portion of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body. After the grouting raw material flows out from the lower end face portion of the prefabricated inverted arch assembly, the grouting raw material is stopped. When the grouting raw material located at the lower end face portion of the prefabricated inverted arch assembly is in a solidified state, the second lifting and telescopic cylinder and the third lifting and telescopic cylinder are in an extended state. The mobile vehicle is placed on the bottom wall of the high-speed tunnel, and the first lifting telescopic cylinder is retracted, the accommodating hole body I moves upward on the guide rail beam, and the accommodating trough body II moves upward on the vertical part of the front bracket, and the first sliding block and the second sliding block act on the reserved hole body I and the reserved hole body IV respectively, and the grouting raw material is released on the lower end face portion of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body. After the grouting raw material flows out from the lower end face portion of the prefabricated inverted arch assembly, the grouting raw material is stopped from being added, and when the grouting raw material located at the lower end face portion of the prefabricated inverted arch assembly is in a solidified state, the first lifting telescopic cylinder is extended, and the first sliding block and the second sliding block are separated from the reserved hole body I and the reserved hole body IV, and the high-pressure grouting pipe is separated from the grouting hole body.The lower support leg, upper support leg and side support leg are retracted, the lower support leg is separated from the bottom wall of the high-speed tunnel, the upper support leg is separated from the top wall of the high-speed tunnel, the side support leg is separated from the side wall of the high-speed tunnel, the mobile vehicle moves in the opposite direction, one of the fork beams is taken out from the reserved hole body I and the other fork beam is taken out from the reserved hole body IV, thereby completing the precise leveling construction of the prefabricated invert assembly.

[0038] The technical effect of the above technical solution is that: a step-by-step grouting process is implemented on the prefabricated invert assembly, thereby improving the stability of the grouting layer.

[0039] In the technical solution, the step-by-step filling of the grouting space of the prefabricated invert assembly is achieved by a lifting platform device and a lifting beam device.

[0040] In the present technical scheme, the built-in frame device, the lifting platform device and the lifting beam device that enable the grouting space of the prefabricated inverted arch assembly to be filled step by step are important technical features. In the technical field of precise leveling construction devices and methods for prefabricated inverted arch assemblies, the present technical scheme has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using patent documents in the technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] Figure 1 is a schematic diagram of a precise leveling construction device for prefabricated inverted arch components according to the present invention, Figure 2 This is a schematic diagram of the structure of the prefabricated invert assembly. Mobile vehicle-1, rear support-2, front support-4, fork beam-5, first lifting telescopic cylinder-6, first sliding block-7, second sliding block-8, power screw-9, lower support leg-91, upper support leg-93, side support leg-94, second lifting telescopic cylinder-95, third lifting telescopic cylinder-96, arch part-201, step surface body-202, reserved hole body I-203, reserved hole body II-204, reserved hole body III-205, reserved hole body Ⅳ-209, reserved hole body V-208, reserved hole body VI-207, reserved hole body VII-206, accommodating trough body I-200, grouting hole body-210, block part-21, frame part-22, guide rail beam part-23, beam part-51, accommodating hole body I-52, accommodating trough body II-57, accommodating hole body II-55, accommodating hole body III-56, bracket part I-53, bracket part II-54, nut part-99, screw part-98, motor part-97. DETAILED DESCRIPTION

[0043] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.

[0044] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0045] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] A precise leveling construction device for prefabricated inverted arch components, Figure 1 This is the first embodiment of the present invention, which is specifically described in conjunction with the accompanying drawings. It includes a moving vehicle 1, a rear support 2, a front support 4, a fork beam 5, a first lifting and telescopic cylinder 6, a first sliding block 7, a second sliding block 8, a power screw 9, a lower support leg 91, an upper support leg 93, a side support leg 94, a second lifting and telescopic cylinder 95 and a third lifting and telescopic cylinder 96, and the moving vehicle 1, the lower support leg 91, the upper support leg 93 and the side support leg 94 are respectively arranged on the rear support 2, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 are respectively arranged between the moving vehicle 1 and the rear support 2, and the front support 4 is arranged on the moving vehicle 1, a fork beam 5 is arranged between the front support 4 and the rear support 2, and the first lifting and telescopic cylinder 6 is arranged between the fork beam 5 and the front support 4, the first sliding block 7 and the second sliding block 8 are respectively arranged on the fork beam 5, and the power screw 9 is respectively arranged between the first sliding block 7 and the second sliding block 8 and the fork beam 5.

[0049] In this embodiment, stepped bodies 202 are provided on the left and right end faces of the invert portion 201 of the precast invert assembly, and a receiving groove body I 200 is provided on the lower end face of the invert portion 201. A reserved hole body I 203, a reserved hole body II 204, and a reserved hole body III 205 are respectively provided at one end of the invert portion 201, and a reserved hole body IV 209, a reserved hole body V 208, and a reserved hole body VI 207 are respectively provided at the other end of the invert portion 201. A reserved hole body VII 206 is provided in the middle portion of the invert portion 201, and grouting hole bodies 210 are respectively provided between the reserved hole body II 204, the reserved hole body III 205, the reserved hole body V 208, the reserved hole body VI 207 and the receiving groove body I 200. The invert portion 201 is provided as a块状体 with an arc-shaped lower end face, and the stepped body 202 is provided as an L-shaped end body. The reserved hole body I 203, the reserved hole body II 204, the reserved hole body III 205, the reserved hole body IV 209, the reserved hole body V 208, the reserved hole body VI 207, the reserved hole body VII 206, and the grouting hole body 210 are respectively provided as circular holes, and the receiving groove body I 200 is provided as a匚-shaped groove body. The reserved hole body VII 206 is provided to be arranged at intervals along the vertical center line of the invert portion 201, and the reserved hole body I 203, the reserved hole body II 204, the reserved hole body III 205, the reserved hole body IV 209, the reserved hole body V 208, and the reserved hole body VI 207 are respectively provided to be arranged at intervals in sequence from the outside to the inside along the horizontal center line of the invert portion 201.

[0050] Its technical purpose is: to be used as a component for supporting the high-speed tunnel pavement.

[0051] In this embodiment, the reserved hole body I 203 and the reserved hole body IV 209 are respectively provided to be connected to the fork beam 5, and the grouting hole body 210 is provided to be connected to the high-pressure grouting pipe.

[0052] Its technical purpose is: to realize grouting treatment of the invert portion 201 under the lifting force.

[0053] In this embodiment, the rear bracket 2 is configured to include a block 21, a frame 22 and a guide rail beam 23, and the middle edge of the lower end face of the block 21 is configured to be connected to the upper end face of the vertical portion of the frame 22, the upper end face of the guide rail beam 23 is configured to be connected to the middle of the lower end face of the block 21, and the lower end face of the guide rail beam 23 is configured to be connected to the inner end face of the longitudinal portion of the frame 22, one side of the lower end face of the block 21 is configured to be connected to the second lifting and telescopic cylinder 95, and the other side of the lower end face of the block 21 is configured to be connected to the second lifting and telescopic cylinder 95. It is connected to the third lifting and telescopic cylinder 96, the middle part of the upper end face of the block part 21 is arranged to be connected to the upper supporting leg 93 and the vertical part of the frame part 22 is arranged to be connected to the moving vehicle 1 in a through-type manner, the outer side face of the vertical part of the frame part 22 is arranged to be connected to the side supporting leg 94 and the outer end face of the longitudinal part of the frame part 22 is arranged to be connected to the lower supporting leg 91, the guide rail beam part 23 is respectively arranged to be connected to the moving vehicle 1 and the fork beam 5 in a through-type manner and the block part 21 is arranged to be a rectangular seat-shaped body, the frame part 22 is arranged to be a U-shaped rod-shaped body and the guide rail beam part 23 is arranged to be a rectangular beam-shaped body.

[0054] Through the rear bracket 2, a supporting connection point is formed for the mobile vehicle 1, the fork beam 5, the lower supporting leg 91, the upper supporting leg 93, the side supporting leg 94, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96. The frame part 22 and the guide rail beam part 23 realize the connection with the mobile vehicle 1, the guide rail beam part 23 realizes the connection with the fork beam 5, the frame part 22 realizes the connection with the lower supporting leg 91, the connection with the side supporting leg 94, the block part 21 realizes the connection with the upper supporting leg 93, the connection with the second lifting and telescopic cylinder 95, and the connection with the third lifting and telescopic cylinder 96. The technical purpose is to serve as a supporting carrier for the mobile vehicle 1, the fork beam 5, the lower supporting leg 91, the upper supporting leg 93, the side supporting leg 94, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96.

[0055] In this embodiment, the lower support leg 91, the upper support leg 93 and the side support leg 94 are respectively configured as hydraulic support legs, and the outer shell body inner end surface of the lower support leg 91, the outer shell body inner end surface of the upper support leg 93 and the outer shell body inner end surface of the side support leg 94 are respectively configured to be connected to the rear bracket 2, and the hydraulic port part of the lower support leg 91, the hydraulic port part of the upper support leg 93 and the hydraulic port part of the side support leg 94 are respectively configured to be connected to the output port part of the high-pressure liquid power source.

[0056] A supporting connection point for the rear bracket 2 is formed by the lower supporting leg 91, the upper supporting leg 93 and the side supporting leg 94. The connection with the rear bracket 2 is realized by the lower supporting leg 91, the upper supporting leg 93 and the side supporting leg 94. The technical purpose is to be used as a component for fixing the rear bracket 2 in a high-speed tunnel.

[0057] In this embodiment, the mobile vehicle 1 is configured as a tire-type mobile shuttle vehicle having a through-hole body in the middle portion of the frame and the through-hole body of the mobile vehicle 1 is configured to be connected to the rear bracket 2, the rear side portion of the frame of the mobile vehicle 1 is configured to be connected to the second lifting and telescopic cylinder 95 through a pin shaft and the front side portion of the frame of the mobile vehicle 1 is configured to be connected to the third lifting and telescopic cylinder 96 through a pin shaft, and the front side portion of the upper end face of the mobile vehicle 1 is configured to be connected to the front bracket 4.

[0058] Through the mobile vehicle 1, supporting connection points for the rear bracket 2, the front bracket 4, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 are formed. The mobile vehicle 1 realizes the connection with the rear bracket 2, the connection with the front bracket 4, the connection with the second lifting and telescopic cylinder 95, and the connection with the third lifting and telescopic cylinder 96. Its technical purpose is to serve as a moving support carrier for the rear bracket 2, the front bracket 4, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96.

[0059] In this embodiment, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 are respectively arranged as two-section telescopic cylinders and the hydraulic port parts of the second lifting and telescopic cylinder 95 and the hydraulic port parts of the third lifting and telescopic cylinder 96 are respectively arranged to be connected to the output port parts of the high-pressure liquid power source, one of the ends of the second lifting and telescopic cylinder 95 and one of the ends of the third lifting and telescopic cylinder 96 are respectively arranged to be connected to the rear bracket 2 and the other end of the second lifting and telescopic cylinder 95 and the other end of the third lifting and telescopic cylinder 96 are respectively arranged to be connected to the moving vehicle 1 through a pin shaft.

[0060] A supporting connection point between the mobile vehicle 1 and the rear support 2 is formed by the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96. The second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 realize the connection with the mobile vehicle 1 and the connection with the rear support 2. The technical purpose is to serve as a component for driving the mobile vehicle 1 to move on the rear support 2.

[0061] In this embodiment, the front bracket 4 is configured as a U-shaped beam and the lower end surface portion of the vertical portion of the front bracket 4 is configured to be connected to the moving vehicle 1, the vertical portion of the front bracket 4 is configured to be contact-connected to the fork beam 5 and the longitudinal portion of the front bracket 4 is configured to be connected to the first lifting and telescopic cylinder 6.

[0062] Through the front bracket 4, a supporting connection point for the mobile vehicle 1, the fork beam 5 and the first lifting and telescopic cylinder 6 is formed. The front bracket 4 realizes the connection with the mobile vehicle 1, the connection with the fork beam 5, and the connection with the first lifting and telescopic cylinder 6. Its technical purpose is to serve as a supporting carrier for the fork beam 5 and the first lifting and telescopic cylinder 6.

[0063] In this embodiment, a receiving hole body I 52 is provided at the rear end of the extension part of the beam part 51 of the fork beam 5, and receiving groove bodies II 57 are provided on the front and rear side faces of the front end of the extension part of the beam part 51. A receiving hole body II 55 is provided at the rear end of the contraction part of the beam part 51, and a receiving hole body III 56 is provided at the front end of the contraction part of the beam part 51. A support seat part I 53 is provided at the outer end of the receiving hole body II 55, and a support seat part II 54 is provided at the outer end of the receiving hole body III 56. The receiving hole body I 52 is set to be connected to the rear bracket 2, and the receiving groove body II 57 is set to be connected to the front bracket 4. The receiving hole body II 55 and the receiving hole body III 56 are respectively set to be connected to the power lead screw 9, and the support seat part I 53 is set to be connected to the first sliding block 7 in a sunk manner. The support seat part II 54 is set to be connected to the second sliding block 8 in a sunk manner, and the front side of the upper end of the extension part of the beam part 51 is set to be connected to the first lifting telescopic cylinder 6. The beam part 51 is set to be a convex-shaped shaft body. The receiving hole body I 52 is set to be a rectangular hole body, and the receiving groove body II 57 is set to be a C-shaped opening body. The receiving hole body II 55 and the receiving hole body III 56 are respectively set to be long hole bodies, and the support seat part I 53 and the support seat part II 54 are respectively set to be right-angled trapezoidal blocks.

[0064] Through the fork beam 5, support connection points for the rear bracket 2, the front bracket 4, the first lifting telescopic cylinder 6, the first sliding block 7, the second sliding block 8, and the power lead screw 9 are formed. Through the receiving hole body I 52, the connection with the rear bracket 2 is achieved. Through the receiving groove body II 57, the connection with the front bracket 4 is achieved. Through the beam part 51, the connection with the first lifting telescopic cylinder 6 is achieved. Through the support seat part I 53, the connection with the first sliding block 7 is achieved. Through the support seat part II 54, the connection with the second sliding block 8 is achieved. Through the receiving hole body II 55 and the receiving hole body III 56, the connection with the power lead screw 9 is achieved. Its technical purpose is: to be used as a support carrier for the first sliding block 7, the second sliding block 8, and the power lead screw 9.

[0065] In this embodiment, the first lifting telescopic cylinder 6 is set to be a two-section telescopic cylinder, and the hydraulic port part of the first lifting telescopic cylinder 6 is set to be connected in a communicating manner with the output port part of the high-pressure liquid power source. One end of the first lifting telescopic cylinder 6 is respectively set to be connected to the front bracket 4, and the other end of the first lifting telescopic cylinder 6 is set to be connected to the fork beam 5.

[0066] Through the first lifting telescopic cylinder 6, support connection points for the front bracket 4 and the fork beam 5 are formed. Through the first lifting telescopic cylinder 6, the connection with the front bracket 4 is achieved, and the connection with the fork beam 5 is achieved. Its technical purpose is: to be used as a component for driving the fork beam 5 to move on the front bracket 4.

[0067] In this embodiment, the first sliding block 7 and the second sliding block 8 are configured as a seat-shaped body having a right-angled trapezoidal groove body on the outer side surface and a convex-shaped blind hole on the inner side surface, and the convex-shaped blind hole of the first sliding block 7 and the convex-shaped blind hole of the second sliding block 8 are respectively configured to be connected to the power screw 9, and the right-angled trapezoidal groove body located on the first sliding block 7 and the right-angled trapezoidal groove body located on the second sliding block 8 are respectively configured to be connected to the fork beam 5 in an accommodating manner.

[0068] A supporting connection point for the fork beam 5 and the power screw 9 is formed by the first sliding block 7 and the second sliding block 8. The connection with the fork beam 5 and the power screw 9 are realized by the first sliding block 7 and the second sliding block 8. The technical purpose is to serve as a component for supporting the inner wall of the reserved hole body Ⅰ203 and the inner wall of the reserved hole body Ⅳ209.

[0069] In this embodiment, the power screw 9 is configured to include a nut portion 99, a screw portion 98 and a motor portion 97, and the screw portion 98 is configured to be threadedly connected to the nut portion 99, the inner end of the screw portion 98 is configured to be connected to the end shaft of the motor portion 97, and the peripheral side surface of the nut portion 99 and the shell of the motor portion 97 are respectively configured to be connected to the fork beam 5, the outer end of the screw portion 98 is respectively configured to be embeddedly connected to the first sliding block 7 and the second sliding block 8 and the nut portion 99 is configured to be a cylindrical body with a threaded hole, the screw portion 98 is configured to be a light column bolt with a convex end at the outer end and the convex end of the screw portion 98 is respectively configured to be rotatably connected to the first sliding block 7 and the second sliding block 8, and the motor portion 97 is configured to be a control motor.

[0070] A supporting connection point for the fork beam 5, the first sliding block 7 and the second sliding block 8 is formed by the power screw 9. The connection with the fork beam 5 is realized by the nut part 99 and the motor part 97. The connection with the first sliding block 7 and the connection with the second sliding block 8 are realized by the screw part 98. The technical purpose is to serve as a component for driving the first sliding block 7 and the second sliding block 8 to move on the fork beam 5.

[0071] In this embodiment, the rear bracket 2, the lower supporting leg 91, the upper supporting leg 93 and the side supporting leg 94 are arranged to be distributed in a front-to-rear lifting manner with the mobile vehicle 1, the second lifting and telescopic cylinder 95, the third lifting and telescopic cylinder 96, the front bracket 4, the fork beam 5 and the first lifting and telescopic cylinder 6, and the rear bracket 2, the lower supporting leg 91, the upper supporting leg 93, the side supporting leg 94, the mobile vehicle 1, the second lifting and telescopic cylinder 95, the third lifting and telescopic cylinder 96, the front bracket 4, the fork beam 5 and the first lifting and telescopic cylinder 6 are arranged to be distributed in a height-adjusting manner with the first sliding block 7, the second sliding block 8 and the power screw 9, the center line of the mobile vehicle 1, the center line of the rear bracket 2, the center line of the second lifting and telescopic cylinder 95 and the center line of the third lifting and telescopic cylinder 96 are arranged on the same straight line, the lower supporting leg 91 is arranged to be arranged to be spaced apart and distributed along the longitudinal center line of the frame portion 22, and the upper supporting leg 93 is arranged to be arranged along the block The middle part of the upper end surface of the part 21 is arranged at intervals, the side support legs 94 are arranged to be arranged at intervals along the center line of the vertical part of the frame part 22, a guide rail beam part 23, a front bracket 4, a fork beam 5, a first lifting and telescopic cylinder 6, a first sliding block 7, a second sliding block 8 and two power screws 9 are arranged to form a group of supporting rod components, and two groups of supporting rod components are arranged on the mobile vehicle 1, the peripheral side parts of the nut part 99 are respectively arranged to be connected with the middle part of the inner wall of the accommodating hole body II55 and the middle part of the inner wall of the accommodating hole body III56, the shell of the motor part 97 is respectively arranged to be connected with the inner end part of the accommodating hole body II55 and the inner end part of the accommodating hole body III56, the accommodating hole body II55 and the accommodating hole body III56 are respectively arranged to be accommodatingly connected with the screw part 98, the accommodating hole body I52 is arranged to be connected with the guide rail beam part 23, and the accommodating groove body II57 is arranged to be connected with the vertical part of the front bracket 4.

[0072] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.

[0073] A method for accurately leveling a prefabricated inverted arch assembly comprises the following steps: when accurate leveling of the prefabricated inverted arch assembly is required, a high-pressure grouting pipe is installed in a grouting hole 210, the prefabricated inverted arch assembly is placed on an installation position of the prefabricated inverted arch assembly by a hoisting machine, when the height of the prefabricated inverted arch assembly is greater than a predetermined height, a weighting process is performed on the prefabricated inverted arch assembly, so that the prefabricated inverted arch assembly is installed on a bolt pre-buried in a high-speed tunnel, when the height of the prefabricated inverted arch assembly is less than the predetermined height, grouting raw materials are released on the lower end face of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole 210, so that the prefabricated inverted arch assembly is installed on the bolt pre-buried in the high-speed tunnel, then the injection of the grouting raw materials is stopped, and the hoisting machine is separated from the prefabricated inverted arch assembly, Move the mobile vehicle 1, place one of the fork beams 5 in the reserved hole body I 203, place the other fork beam 5 in the reserved hole body IV 209, make the lower support leg 91, the upper support leg 93 and the side support leg 94 in an extended state, make the lower support leg 91 act on the bottom wall of the high-speed tunnel, make the upper support leg 93 act on the top wall of the high-speed tunnel, make the side support leg 94 act on the side wall of the high-speed tunnel, fix the rear support 2 in the high-speed tunnel, make the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 in a telescopic state, lift the through-hole body of the mobile vehicle 1 upward at the vertical part of the frame part 22 and the guide rail beam part 23, separate the mobile vehicle 1 from the bottom wall of the high-speed tunnel, keep the height of the prefabricated inverted arch assembly at a predetermined height value, and The motor part 97 drives the lead screw part 98 to rotate in the nut part 99, thereby driving the right-angled trapezoidal groove body of the first sliding block 7 to move on the bracket part I 53 and the right-angled trapezoidal groove body of the second sliding block 8 to move on the bracket part II 54, respectively, to adjust the heights of the four corners of the prefabricated inverted arch assembly, and to adjust the straightness of the prefabricated inverted arch assembly. When the straightness of the prefabricated inverted arch assembly is equal to a predetermined value, the nut is installed on the bolt located between the prefabricated inverted arch assembly and the bolt pre-buried in the high-speed tunnel, and the prefabricated inverted arch assembly is installed and fixed, and then the grouting raw material is released to the lower end face portion of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body 210. After the grouting raw material flows out from the lower end face portion of the prefabricated inverted arch assembly, the grouting raw material is stopped. The material is added, and when the grouting material at the lower end face of the prefabricated inverted arch assembly is in a solidified state, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 are extended, and the mobile vehicle 1 is placed on the bottom wall of the high-speed tunnel. Then the first lifting and telescopic cylinder 6 is retracted, and the receiving hole body I52 moves upward on the guide rail beam portion 23, and the receiving groove body II57 moves upward on the vertical portion of the front bracket 4. Then the first sliding block 7 and the second sliding block 8 act on the reserved hole body I203 and the reserved hole body IV209 respectively, and the grouting material is released on the lower end face of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body 210. After the grouting material flows out from the lower end face of the prefabricated inverted arch assembly, the grouting material is stopped. When the grouting material on the lower end surface of the inverted arch assembly is in a solidified state, the first lifting and telescopic cylinder 6 is extended, and the first sliding block 7 and the second sliding block 8 are separated from the reserved hole body I203 and the reserved hole body IV209, and the high-pressure grouting pipe is separated from the grouting hole body 210, and the lower supporting leg 91, the upper supporting leg 93 and the side supporting leg 94 are in a contracted state, and the lower supporting leg 91 is separated from the bottom wall of the high-speed tunnel, the upper supporting leg 93 is separated from the top wall of the high-speed tunnel, and the side supporting leg 94 is separated from the side wall of the high-speed tunnel, and the mobile vehicle 1 is moved in the opposite direction, and one of the fork beams 5 is taken out of the reserved hole body I203 and the other fork beam 5 is taken out of the reserved hole body IV209, thereby completing the precise leveling construction of the prefabricated inverted arch assembly.

[0074] When verifying the present invention, the inventor abandoned the prior art features of installing the leveling pads of the prefabricated inverted arch assembly in advance, connecting the prefabricated inverted arch assembly with bolts pre-buried in the high-speed tunnel, and then performing grouting treatment on the lower end surface of the prefabricated inverted arch assembly. Firstly, a technical feature of making the grouting space of the prefabricated inverted arch assembly be filled step by step was proposed, and a first unexpected technical effect was obtained: hierarchical support of the grouting layer of the prefabricated inverted arch assembly was achieved, and the straightness accuracy of the prefabricated inverted arch assembly was improved; a second unexpected technical effect was obtained: shared support of the grouting layer of the prefabricated inverted arch assembly was achieved, and the stability of the prefabricated inverted arch assembly was improved; a third unexpected technical effect was obtained: grouting operation was achieved under different grouting pressures, the density of the grouting layer under the prefabricated inverted arch assembly was improved, and the service life of the grouting layer was extended; a fourth unexpected technical effect was obtained: the rear bracket 2, the lower support leg 91, the upper support leg 93 and the side support leg 94 were achieved Installing the support frame in the high-speed tunnel meets the needs of high-speed tunnels of different specifications and obtains the fifth unexpected technical effect: the mobile vehicle 1, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96 realize the platform lifting processing of the prefabricated inverted arch assembly, which meets the large lifting stroke requirement of the prefabricated inverted arch assembly, and obtains the sixth unexpected technical effect: the front bracket 4, the fork beam 5 and the first lifting and telescopic cylinder 6 realize the beam lifting processing of the prefabricated inverted arch assembly, which meets the small lifting stroke requirement of the prefabricated inverted arch assembly, and obtains the seventh unexpected technical effect: the first sliding block 7, the second sliding block 8 and the power screw 9 realize the adjustment of the inclination angle of the prefabricated inverted arch assembly, and improves the straightness accuracy of the prefabricated inverted arch assembly, and obtains the eighth unexpected technical effect: it creates a way to fix the grouting body of the prefabricated inverted arch assembly under the condition of external interference force, ensures that the grouting body is in a sufficient state to solidify, and increases the bonding time and bonding strength of the grouting body and the prefabricated inverted arch assembly.

[0075] In a second embodiment of the present invention, the internal frame device, the lifting platform device and the lifting beam device are connected to each other in such a manner that the grouting space of the prefabricated invert assembly is filled step by step.

[0076] In this embodiment, the lifting platform device and the lifting beam device are connected to the internal frame device in a manner of providing staged support for the prefabricated inverted arch components.

[0077] In this embodiment, the built-in rack device is configured to include a rear support 2, a lower support leg 91, an upper support leg 93 and a side support leg 94.

[0078] In this embodiment, the lifting platform device is configured to include a moving vehicle 1 , a second lifting and telescopic cylinder 95 and a third lifting and telescopic cylinder 96 .

[0079] In this embodiment, the lifting beam device is configured to include a front bracket 4 , a fork beam 5 and a first lifting and telescopic cylinder 6 .

[0080] In this embodiment, a first accessory device is also included and is arranged on the lifting beam device. The first accessory device is arranged to include a first sliding block 7 , a second sliding block 8 and a power screw 9 .

[0081] The second embodiment of the present invention is based on the first embodiment. The second embodiment of the present invention comprises the following steps: the lifting platform device is supported by the built-in frame device, the lifting platform device supports the lifting beam device, the lifting beam device supports the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is supported in stages, and the grouting space of the prefabricated inverted arch assembly is filled in stages.

[0082] The second embodiment of the present invention is based on the first embodiment.

[0083] The present invention has the following characteristics: 1. Due to the design of the built-in frame device, the lifting platform device and the lifting beam device, the built-in frame device is used to support the lifting platform device, the lifting platform device is used to support the lifting beam device, the lifting beam device is used to support the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is supported in stages, and the grouting space of the prefabricated inverted arch assembly is filled in stages, which solves the technical problems of installing the leveling pads of the prefabricated inverted arch assembly in advance, connecting the prefabricated inverted arch assembly with the bolts pre-buried in the high-speed tunnel, and performing grouting treatment on the lower end surface of the prefabricated inverted arch assembly, thereby improving the grouting treatment effect of the prefabricated inverted arch assembly after installation.

[0084] 2. Due to the design of the rear support 2, the lower support leg 91, the upper support leg 93 and the side support leg 94, the frame can be installed in a high-speed tunnel.

[0085] 3. Due to the design of the mobile vehicle 1, the second lifting and telescopic cylinder 95 and the third lifting and telescopic cylinder 96, it is possible to set up a lifting platform on the built-in frame device.

[0086] 4. Due to the design of the front bracket 4, the fork beam 5 and the first lifting and telescopic cylinder 6, the lifting beam can be set on the lifting platform device.

[0087] 5. Due to the design of the first sliding block 7, the second sliding block 8 and the power lead screw 9, small displacement adjustment is achieved.

[0088] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.

[0089] 7. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.

[0090] There are other technical features connected with the built-in frame device, the lifting platform device and the lifting beam device that enable the grouting space of the prefabricated arch assembly to be filled step by step, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, the Patent Implementing Rules and the Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0091] The above embodiment is only one implementation form of the precise leveling construction device and method for prefabricated inverted arch assemblies provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the protection scope of the present invention.

Claims

1. A precise leveling construction device for prefabricated inverted arch assemblies, characterized by: The utility model comprises an inner frame device installed on the high-speed tunnel, a lifting platform device arranged on the inner frame device, and a lifting beam device arranged on the lifting platform device.

2. The precise leveling construction device for prefabricated inverted arch assembly according to claim 1 is characterized in that: The internal frame device, the lifting platform device and the lifting beam device are connected to each other in such a way that the grouting space of the prefabricated invert assembly is in a step-by-step filling state.

3. The precise leveling construction device for prefabricated inverted arch assembly according to claim 2 is characterized in that: The lifting platform device and the lifting beam device are connected to the built-in frame device in a manner of providing graded support for the prefabricated inverted arch assembly.

4. The precise leveling construction device for prefabricated inverted arch assembly according to claim 1 is characterized in that: The built-in frame device is configured to include a rear support (2), a lower support leg (91), an upper support leg (93) and a side support leg (94). Alternatively, the lifting platform device is configured to include a moving vehicle (1), a second lifting and telescopic cylinder (95) and a third lifting and telescopic cylinder (96), Or, the lifting beam device is configured to include a front bracket (4), a fork beam (5) and a first lifting telescopic cylinder (6), Or, it further comprises a first accessory device and the first accessory device is arranged on the lifting beam device, and the first accessory device is arranged to comprise a first sliding block (7), a second sliding block (8) and a power lead screw (9).

5. The precise leveling construction device for prefabricated inverted arch assembly according to claim 4 is characterized in that: A moving vehicle (1), a lower supporting leg (91), an upper supporting leg (93) and a side supporting leg (94) are respectively arranged on the rear support (2); a second lifting and telescopic cylinder (95) and a third lifting and telescopic cylinder (96) are respectively arranged between the moving vehicle (1) and the rear support (2); and a front support (4) is arranged on the moving vehicle (1); a fork beam (5) is arranged between the front support (4) and the rear support (2); and a first lifting and telescopic cylinder (6) is arranged between the fork beam (5) and the front support (4); a first sliding block (7) and a second sliding block (8) are respectively arranged on the fork beam (5); and a power screw (9) is respectively arranged between the first sliding block (7) and the second sliding block (8) and the fork beam (5).

6. The precise leveling construction device for prefabricated inverted arch assembly according to claim 5 is characterized in that: The left and right end surfaces of the inverted arch part (201) of the prefabricated inverted arch assembly are provided with a step surface body (202), and the lower end surface of the inverted arch part (201) is provided with a receiving groove body I (200), and one end of the inverted arch part (201) is provided with a reserved hole body I (203), a reserved hole body II (204) and a reserved hole body III (205), and the other end of the inverted arch part (201) is provided with a reserved hole body I (203), a reserved hole body II (204) and a reserved hole body III (205). A reserved hole body IV (209), a reserved hole body V (208) and a reserved hole body VI (207) are provided in the middle of the inverted arch part (201), and a grouting hole body (210) is provided between the reserved hole body II (204), the reserved hole body III (205), the reserved hole body V (208) and the reserved hole body VI (207) and the receiving tank body I (200), respectively. The inverted arch part (201) is provided with a reserved hole body VII (206). The lower end face of the block body has an arc surface and the step surface body (202) is set as an L-shaped end head body, the reserved hole body I (203), the reserved hole body II (204), the reserved hole body III (205), the reserved hole body IV (209), the reserved hole body V (208), the reserved hole body VI (207) and the reserved hole body VII (206) and the grouting hole body (210) are respectively set as circular holes, and the receiving groove body I (200) is set as The reserved hole body VII (206) is arranged to be spaced and distributed along the vertical center line of the inverted arch part (201), and the reserved hole body I (203), the reserved hole body II (204), the reserved hole body III (205), the reserved hole body IV (209), the reserved hole body V (208) and the reserved hole body VI (207) are respectively arranged to be spaced and distributed in sequence from the outside to the inside along the transverse center line of the inverted arch part (201). Alternatively, the reserved hole body I (203) and the reserved hole body IV (209) are respectively configured to be connected to the fork beam (5) and the grouting hole body (210) is configured to be connected to the high-pressure grouting pipe.

7. The precise leveling construction device for prefabricated inverted arch assembly according to claim 5, characterized in that: The rear support (2) is configured to include a block portion (21), a frame portion (22) and a guide rail beam portion (23), and the middle edge portion of the lower end face of the block portion (21) is configured to be connected to the upper end face portion of the vertical portion of the frame portion (22), the upper end face portion of the guide rail beam portion (23) is configured to be connected to the middle portion of the lower end face of the block portion (21), and the lower end face portion of the guide rail beam portion (23) is configured to be connected to the inner end face portion of the longitudinal portion of the frame portion (22), one side portion of the lower end face of the block portion (21) is configured to be connected to the second lifting telescopic cylinder (95), and the other side portion of the lower end face of the block portion (21) is configured to be connected to the third lifting telescopic cylinder (95). The middle part of the upper end face of the block part (21) is arranged to be connected with the upper support leg (93), and the vertical part of the frame part (22) is arranged to be connected with the moving vehicle (1) in a through-type manner, the outer side face of the vertical part of the frame part (22) is arranged to be connected with the side support leg (94), and the outer end face of the longitudinal part of the frame part (22) is arranged to be connected with the lower support leg (91), the guide rail beam part (23) is arranged to be connected with the moving vehicle (1) and the fork beam (5) respectively in a through-type manner, and the block part (21) is arranged to be a rectangular seat-shaped body, the frame part (22) is arranged to be a U-shaped rod-shaped body, and the guide rail beam part (23) is arranged to be a rectangular beam-shaped body, Or, the lower support leg (91), the upper support leg (93) and the side support leg (94) are respectively configured as hydraulic support legs, and the outer shell body inner end surface of the lower support leg (91), the outer shell body inner end surface of the upper support leg (93) and the outer shell body inner end surface of the side support leg (94) are respectively configured to be connected to the rear bracket (2), and the hydraulic port portion of the lower support leg (91), the hydraulic port portion of the upper support leg (93) and the hydraulic port portion of the side support leg (94) are respectively configured to be connected in a communication manner with the output port portion of the high-pressure liquid power source, Alternatively, the mobile vehicle (1) is configured as a tire-type mobile shuttle vehicle having a through-hole body in the middle portion of the vehicle frame, and the through-hole body of the mobile vehicle (1) is configured to be connected to the rear bracket (2), the rear side portion of the frame of the mobile vehicle (1) is configured to be connected to the second lifting and telescopic cylinder (95) through a pin shaft, and the front side portion of the frame of the mobile vehicle (1) is configured to be connected to the third lifting and telescopic cylinder (96) through a pin shaft, and the front side portion of the upper end face of the mobile vehicle (1) is configured to be connected to the front bracket (4), Or, the second lifting telescopic cylinder (95) and the third lifting telescopic cylinder (96) are respectively configured as two-section telescopic cylinders and the hydraulic port portion of the second lifting telescopic cylinder (95) and the hydraulic port portion of the third lifting telescopic cylinder (96) are respectively configured to be connected to the output port portion of the high-pressure liquid power source, one end of the second lifting telescopic cylinder (95) and one end of the third lifting telescopic cylinder (96) are respectively configured to be connected to the rear bracket (2) and the other end of the second lifting telescopic cylinder (95) and the other end of the third lifting telescopic cylinder (96) are respectively configured to be connected to the moving vehicle (1) through a pin shaft, Or, the front support (4) is arranged as a C-shaped beam, and the lower end face of the vertical part of the front support (4) is arranged to be connected to the mobile vehicle (1). The vertical part of the front support (4) is arranged to be in contact connection with the cross beam (5), and the longitudinal part of the front support (4) is arranged to be connected to the first lifting telescopic cylinder (6). Or, a receiving hole body I (52) is arranged at the rear end of the extended part of the beam part (51) of the cross beam (5), and receiving groove bodies II (57) are arranged on the front and rear side faces of the front end of the extended part of the beam part (51). A receiving hole body II (55) is arranged at the rear end of the contracted part of the beam part (51), and a receiving hole body III (56) is arranged at the front end of the contracted part of the beam part (51). A support part I (53) is arranged at the outer end of the receiving hole body II (55), and a support part II 54 is arranged at the outer end of the receiving hole body III (56). The receiving hole body I (52) is arranged to be connected to the rear support (2), and the receiving groove body II (57) is arranged to be connected to the front support (4). The receiving hole body II (55) and the receiving hole body III (56) are respectively arranged to be connected to the power lead screw (9), and the support part I (53) is arranged to be in a sunk connection with the first sliding block (7). The support part II 54 is arranged to be in a sunk connection with the second sliding block (8), and the front side of the upper end of the extended part of the beam part (51) is arranged to be connected to the first lifting telescopic cylinder (6). The beam part (51) is arranged as a convex-shaped shaft body. The receiving hole body I (52) is arranged as a rectangular hole body, and the receiving groove body II (57) is arranged as a C-shaped opening body. The receiving hole body II (55) and the receiving hole body III (56) are respectively arranged as long strip hole bodies, and the support part I (53) and the support part II 54 are respectively arranged as right-angled trapezoidal blocks. Or, the first lifting telescopic cylinder (6) is arranged as a two-section telescopic cylinder, and the hydraulic port part of the first lifting telescopic cylinder (6) is arranged to be in a communicating connection with the output port part of the high-pressure liquid power source. One end of the first lifting telescopic cylinder (6) is respectively arranged to be connected to the front support (4), and the other end of the first lifting telescopic cylinder (6) is arranged to be connected to the cross beam (5). Or, the first sliding block (7) and the second sliding block (8) are arranged as seat bodies with a right-angled trapezoidal groove on the outer side face and a convex-shaped blind hole on the inner side face. The convex-shaped blind holes of the first sliding block (7) and the second sliding block (8) are respectively arranged to be connected to the power lead screw (9). The right-angled trapezoidal grooves on the first sliding block (7) and the right-angled trapezoidal grooves on the second sliding block (8) are respectively arranged to be in a receiving connection with the cross beam (5). Or, the power screw (9) is configured to include a nut portion (99), a screw portion (98) and a motor portion (97), and the screw portion (98) is configured to be threadedly connected to the nut portion (99), the inner end of the screw portion (98) is configured to be connected to the end shaft of the motor portion (97), and the peripheral side surface of the nut portion (99) and the shell of the motor portion (97) are respectively configured to be connected to the fork beam (5), the outer end of the screw portion (98) is respectively configured to be embeddedly connected to the first sliding block (7) and the second sliding block (8), and the nut portion (99) is configured to be a cylindrical body with a threaded hole, the screw portion (98) is configured to be a light column bolt with a convex end portion, and the convex end portion of the screw portion (98) is respectively configured to be rotatably connected to the first sliding block (7) and the second sliding block (8), and the motor portion (97) is configured to be a control motor.

8. The precise leveling construction device for prefabricated inverted arch assembly according to any one of claims 1 to 7, characterized in that: The rear support (2), the lower support leg (91), the upper support leg (93) and the side support leg (94) are arranged to be distributed in a front-to-rear lifting manner with the mobile vehicle (1), the second lifting telescopic cylinder (95), the third lifting telescopic cylinder (96), the front support (4), the fork beam (5) and the first lifting telescopic cylinder (6), and the rear support (2), the lower support leg (91), the upper support leg (93), the side support leg (94), the mobile vehicle (1), the second lifting telescopic cylinder (95), the third lifting telescopic cylinder (96), the front support (4), the fork beam (5) and the first lifting telescopic cylinder (6) are arranged to be distributed in a height-adjusting manner with the first sliding block (7), the second sliding block (8) and the power lead screw (9). Or, the center line of the moving vehicle (1), the center line of the rear support (2), the center line of the second lifting and telescopic cylinder (95) and the center line of the third lifting and telescopic cylinder (96) are arranged on the same straight line, the lower support legs (91) are arranged to be arranged and distributed along the longitudinal center line of the frame part (22) at intervals, and the upper support legs (93) are arranged to be arranged and distributed along the middle part of the upper end surface of the block part (21), the side support legs (94) are arranged to be arranged and distributed along the vertical center line of the frame part (22), a guide rail beam part (23), a front support (4), a fork beam (5), a first lifting and telescopic cylinder (6), a first sliding block (7), a second sliding block (8) and The two power lead screws (9) are arranged to form a group of supporting rod components, and the two groups of supporting rod components are arranged on the mobile vehicle (1). The peripheral side parts of the nut part (99) are respectively arranged to be connected to the middle part of the inner wall of the receiving hole body II (55) and the middle part of the inner wall of the receiving hole body III (56). The shell of the motor part (97) is respectively arranged to be connected to the inner end part of the receiving hole body II (55) and the inner end part of the receiving hole body III (56). The receiving hole body II (55) and the receiving hole body III (56) are respectively arranged to be connected to the lead screw part (98). The receiving hole body I (52) is arranged to be connected to the guide rail beam part (23). The receiving groove body II (57) is arranged to be connected to the vertical part of the front bracket (4).

9. A method for accurate leveling of a prefabricated invert assembly, characterized in that the steps are: The built-in frame device supports the lifting platform device, the lifting platform device supports the lifting beam device, the lifting beam device supports the prefabricated inverted arch assembly, the prefabricated inverted arch assembly is supported in stages, and the grouting space of the prefabricated inverted arch assembly is filled in stages.

10. The precise leveling construction method for prefabricated inverted arch assembly according to claim 4, characterized in that the steps are: When precise leveling construction of the prefabricated inverted arch assembly is required, a high-pressure grouting pipe is installed in the grouting hole body (210), and the prefabricated inverted arch assembly is placed at the installation position of the prefabricated inverted arch assembly by a hoisting machine. When the height of the prefabricated inverted arch assembly is greater than a predetermined height, a weighting process is performed on the prefabricated inverted arch assembly, so that the prefabricated inverted arch assembly is installed on the bolts pre-buried in the high-speed tunnel. When the height of the prefabricated inverted arch assembly is less than the predetermined height, grouting raw materials are released onto the lower end face of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body (210), so that the prefabricated inverted arch assembly is installed on the bolts pre-buried in the high-speed tunnel. Then, the injection of the grouting raw materials is stopped, the hoisting machine is separated from the prefabricated inverted arch assembly, and the moving vehicle (1) is moved. The vehicle (1) is moved to move, one of the fork beams (5) is placed in the reserved hole body I (203), and the other fork beam (5) is placed in the reserved hole body IV (209), so that the lower support leg (91), the upper support leg (93) and the side support leg (94) are in an extended state, so that the lower support leg (91) acts on the bottom wall of the high-speed tunnel, the upper support leg (93) acts on the top wall of the high-speed tunnel, and the side support leg (94) acts on the side wall of the high-speed tunnel, and the rear support (2) is fixedly installed in the high-speed tunnel, and the second lifting and telescopic cylinder (95) and the third lifting and telescopic cylinder (96) are in a telescopic state, so that the through hole body of the moving vehicle (1) is lifted upward at the vertical part of the frame part (22) and the guide rail beam part (23), and the moving vehicle (1) and the high-speed tunnel are connected. The bottom wall of the high-speed tunnel is separated to keep the height of the prefabricated inverted arch assembly at a predetermined height value. The lead screw part (98) is driven to rotate in the nut part (99) through the motor part (97), thereby driving the right-angled trapezoidal groove body of the first sliding block (7) to move on the bracket part I (53) and the right-angled trapezoidal groove body of the second sliding block (8) to move on the bracket part II 54, respectively, to adjust the height of the four corners of the prefabricated inverted arch assembly and adjust the straightness of the prefabricated inverted arch assembly. When the straightness of the prefabricated inverted arch assembly is equal to the predetermined value, the nut is installed on the bolt located between the prefabricated inverted arch assembly and the bolt pre-buried in the high-speed tunnel, the prefabricated inverted arch assembly is installed and fixed, and then the grouting raw material is passed through the high-pressure grouting pipe and the grouting hole body ( 210) is released on the lower end face of the prefabricated inverted arch assembly, and after the grouting material flows out from the lower end face of the prefabricated inverted arch assembly, the grouting material is stopped. When the grouting material on the lower end face of the prefabricated inverted arch assembly is in a solidified state, the second lifting and telescopic cylinder (95) and the third lifting and telescopic cylinder (96) are extended, the mobile vehicle (1) is placed on the bottom wall of the high-speed tunnel, and the first lifting and telescopic cylinder (6) is retracted. The receiving hole body I (52) moves upward on the guide rail beam part (23), and the receiving groove body II (57) moves upward on the vertical part of the front bracket (4). Then, the first sliding block (7) and the second sliding block (8) act on the reserved hole body I (203) and the reserved hole body IV (209) respectively.The grouting material is released to the lower end face of the prefabricated inverted arch assembly through the high-pressure grouting pipe and the grouting hole body (210). After the grouting material flows out from the lower end face of the prefabricated inverted arch assembly, the grouting material is stopped. When the grouting material at the lower end face of the prefabricated inverted arch assembly is in a solidified state, the first lifting telescopic cylinder (6) is extended, and the first sliding block (7) and the second sliding block (8) are separated from the reserved hole body I (203) and the reserved hole body IV (209). The high-pressure grouting pipe and the grouting hole body (210) are separated. The lower support leg (91), the upper support leg (93) and the side support leg (94) are in a retracted state, the lower support leg (91) is separated from the bottom wall of the high-speed tunnel, the upper support leg (93) is separated from the top wall of the high-speed tunnel, and the side support leg (94) is separated from the side wall of the high-speed tunnel. The mobile vehicle (1) moves in the opposite direction to remove one of the fork beams (5) from the reserved hole body I (203) and the other fork beam (5) from the reserved hole body IV (209), thereby completing the precise leveling construction of the prefabricated invert assembly.