Method and system for synchronously filling natural gas and liquid nitrogen into wharf single ship

By connecting temporary pipelines and vaporizers on the ship, the refrigerant pipeline is first purged with liquid nitrogen, and then natural gas is added. This solves the problem of LNG volatilization and cryogenic equipment debugging time, and achieves the efficiency and cost savings of simultaneous operations.

CN118729149AActive Publication Date: 2024-10-01HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410809907.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-01
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

During the ship construction process, the low-temperature operations of LNG and liquid nitrogen need to be carried out at the same time, resulting in an increase in the volatilization of LNG in the cargo hold, prolonging the debugging time of cryogenic equipment, and increasing costs.

Method used

By connecting temporary pipelines to the gas gathering platform on the ship, liquid nitrogen and natural gas vaporizers are used for simultaneous filling. First, liquid nitrogen is used to purge the refrigerant pipeline until the dew point is lower than the preset value, and then the hose is removed for natural gas filling. , to achieve synchronization operations.

Benefits of technology

It reduces the volatilization of LNG, saves the debugging time of cryogenic equipment, ensures reasonable filling of LNG in the warehouse, reduces costs, and ensures the continuity of debugging of cryogenic equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118729149A_ABST
    Figure CN118729149A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a system for synchronously filling natural gas and liquid nitrogen into a wharf single ship, which are characterized in that two low-temperature operations are carried out in the same time period, a marine sweeping pipe is used as a main pipeline for liquid nitrogen purging in the first stage, and the pipeline is inerted in the liquid nitrogen purging process, so that the condition of directly filling the natural gas is met; when natural gas is injected into the warehouse in the second stage, the synchronous operation of natural gas injection and liquid nitrogen injection on the ship can be achieved only by dismantling the metal hose at the related position. According to the invention, the LNG can be filled into the warehouse on the ship at the most appropriate time, so that the volatilization of the LNG is reduced, and a large amount of cost is saved. And meanwhile, liquid nitrogen operation on the ship is not stopped while LNG is injected into the warehouse on the ship, so that the contact of debugging of the cryogenic equipment is ensured, and the debugging time is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of shipbuilding, and in particular to a method and system for synchronously filling a single ship with natural gas and liquid nitrogen at a dock. Background Art

[0002] LNG ships are known as the "crown jewel" of the shipbuilding industry, and the ultra-low temperature cargo operating system has always been the main focus and difficulty of its construction. The refrigerant pipelines of the Cryostar cryogenic device need to use a large amount of pure nitrogen to purge the dew point of the internal pipelines. At the same time, during the cryogenic commissioning, the LNG in the cargo hold needs to be used for functional testing. LNG in the cargo hold will volatilize a certain amount every day, so in order to save costs, the cargo hold LNG will be filled when the dew point purge of the refrigerant pipelines of the cryogenic device is about to be completed, so as to minimize the storage time of natural gas in the cabin, thereby reducing the volatilization of LNG.

[0003] The temperature of LNG is -163℃ and the temperature of liquid nitrogen is -196℃. Due to the particularity of the Cryostar cryogenic device, these two low-temperature operations need to be performed simultaneously during the commissioning of the cryogenic equipment. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a method and system for synchronously filling a single ship with natural gas and liquid nitrogen at a dock, which reduces the volatilization of LNG in the cargo hold and saves the debugging time of the cryogenic equipment.

[0005] The object of the present invention is achieved through the following technical scheme: a method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock, comprising the following steps:

[0006] S1: Connect two temporary pipelines to the first liquid phase pipe at the head and tail of the gas gathering platform on board. One of the two temporary pipelines is a temporary LNG filling pipe, and the other is a temporary liquid nitrogen filling pipe;

[0007] S2: Connect the other end of the temporary liquid nitrogen filling pipe to the outlet of the first vaporizer, and connect the inlet of the first vaporizer to the liquid nitrogen storage source; connect the other side of the temporary LNG filling pipe to the outlet of the second vaporizer, and connect the inlet of the second vaporizer to the LNG gas source;

[0008] S3: Connect the outlet of the sampling tube on the tail liquid phase tube to the sampling tube on the head liquid phase tube through a metal hose;

[0009] S4: The liquid nitrogen in the liquid nitrogen storage source is gasified into room temperature nitrogen by the first gasifier, enters the liquid phase pipe through the liquid nitrogen temporary filling pipe, and then enters the metal hose through the sampling pipe to gasify the LNG filling path pipeline;

[0010] S5: Connect the sampling tube on the LNG filling path pipeline near the cryogenic equipment to the interface of the cryogenic equipment through a metal hose to purge the refrigerant pipeline of the cryogenic equipment;

[0011] S6: When LNG needs to be refueled on board, use the LNG refueling path pipeline to refuel, close the sampling pipe valve on the LNG refueling path pipeline near the cryogenic equipment, connect the dock LNG gas source with the LNG temporary refueling pipe and the second vaporizer, and carry out LNG refueling operations;

[0012] S7: Remove the metal hose on the sampling tube on the LNG filling route pipeline near the cryogenic equipment, and use multiple metal hoses at the same time to connect the sampling tube on the sweeping pipe near the cryogenic equipment to the inlet of the refrigerant pipeline of the cryogenic equipment end to end. The inlet of the refrigerant pipeline of the cryogenic equipment is temporarily disconnected until the dew point in the metal hose is lower than the preset value, and then connected to the inlet of the refrigerant pipeline of the cryogenic equipment, and the refrigerant pipeline of the cryogenic equipment is purged with liquid nitrogen from the dock.

[0013] Preferably, in S1, the head liquid phase pipe is connected to the LNG temporary filling pipe, and the tail liquid phase pipe is connected to the liquid nitrogen temporary filling pipe.

[0014] Preferably, in S2, the liquid nitrogen storage source includes at least a liquid nitrogen storage tank or a liquid nitrogen tank truck; and the LNG gas source includes at least an LNG tank truck.

[0015] Preferably, in S3, the outlet of the sampling tube on the fourth tail liquid phase tube is connected to the inlet of the metal hose, and the outlet of the metal hose is connected to the sampling tube on the first head liquid phase tube.

[0016] Preferably, in S4, the nitrogen gasification process of the LNG filling path pipeline is terminated until the dew point of the LNG filling path pipeline is lower than -50°C.

[0017] Preferably, in S5, the sampling tube on the LNG filling path pipeline near the cryogenic equipment connected to the metal hose is the sampling tube closest to it, and the interface of the cryogenic equipment connected to the metal hose is the inlet valve of the refrigerant pipeline.

[0018] Preferably, in S7, the preset value of the dew point in the metal hose is -50°C.

[0019] In addition to providing a method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock, the present invention further provides a system for implementing the method, the system comprising:

[0020] A first vaporizer, a second vaporizer, a temporary liquid nitrogen filling pipe, a temporary LNG filling pipe and a plurality of metal hoses.

[0021] The inlets of the first vaporizer and the second vaporizer are connected to the liquid nitrogen storage source and the LNG gas source respectively, and the outlets are connected to the inlets of the liquid nitrogen temporary filling pipe and the LNG temporary filling pipe respectively.

[0022] The outlets of the temporary liquid nitrogen filling pipe and the temporary LNG filling pipe are respectively connected to the first liquid phase pipe at the head and tail of the gas gathering platform on board.

[0023] As needed, multiple metal hoses are used to connect the sampling tube outlet on the tail liquid phase pipe and the head liquid phase pipe, the sampling tube on the LNG filling path pipeline near the cryogenic equipment and the refrigerant pipeline inlet of the cryogenic equipment, and the sampling tube on the tank sweeping pipe near the cryogenic equipment is connected to the refrigerant pipeline inlet of the cryogenic equipment from the metal hose.

[0024] Compared with the prior art, the present invention has the following advantages:

[0025] The present invention provides a method and system for synchronously filling natural gas and liquid nitrogen on a single ship at a dock. By performing two low-temperature operations in the same time period, in the first stage, a ship-type tank sweeping pipe is used as the main pipeline for liquid nitrogen purging. During the liquid nitrogen purging process, the pipeline has been inerted, thereby meeting the conditions for direct filling of natural gas. When filling the cargo hold with natural gas in the second stage, it is only necessary to remove the metal hose at the relevant position to achieve the synchronous operation of filling natural gas and liquid nitrogen on board. The present invention ensures that LNG is added to the cargo hold on board at the most appropriate time, thereby reducing the volatilization of LNG and saving a lot of costs. At the same time, this invention does not stop the liquid nitrogen operation on board while filling the cargo hold on board with LNG, thereby ensuring the connectivity of the deep cold equipment commissioning and saving commissioning time. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a flow chart of a method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock in the present invention;

[0027] Figure 2 This is a schematic diagram of the arrangement of a system for synchronously filling natural gas and liquid nitrogen for a single ship at a dock according to an embodiment of the present invention;

[0028] Figure 3 This is a schematic diagram of the arrangement of interfaces and pipelines on board a ship in an embodiment of the present invention. DETAILED DESCRIPTION

[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0030] The technical solution of the present invention provides a method for synchronously filling natural gas and liquid nitrogen on a single ship at a dock. This method is for installation and commissioning of cryogenic equipment (or similar equipment) at docks. Before the cryogenic equipment is debugged for LNG status, it is necessary to lower the dew point of the cryogenic device refrigerant pipeline and fill the refrigerant. When the dew point of the cryogenic device refrigerant main pipeline is lowered, pure nitrogen after liquid nitrogen is gasified is needed to replenish nitrogen and lower the dew point of the refrigerant main pipeline. In order to ensure the continuity of commissioning, during a series of operations on the cryogenic device refrigerant pipeline, the cargo hold LNG (liquefied natural gas) filling work will be interspersed. When two parallel operating conditions occur, special operating methods are adopted, such as Figures 1 to 3 As shown, the method comprises the following steps:

[0031] S1: Two temporary pipelines are connected to the first and last liquid phase pipes of the gas gathering platform on board. One of the two temporary pipelines is a temporary LNG filling pipe and the other is a temporary liquid nitrogen filling pipe. The two pipelines extend to the shore. The first liquid phase pipe is connected to the temporary LNG filling pipe, and the tail liquid phase pipe is connected to the temporary liquid nitrogen filling pipe.

[0032] S2: Connect the other end of the temporary liquid nitrogen filling pipe to the outlet of the first vaporizer, and connect the inlet of the first vaporizer to the liquid nitrogen storage source; connect the other side of the temporary LNG filling pipe to the outlet of the second vaporizer, and connect the inlet of the second vaporizer to the LNG gas source, which can be a liquid nitrogen storage tank or a liquid nitrogen tank truck; the LNG gas source is an LNG tank truck.

[0033] S3: Connect the outlet of the sampling tube on the tail liquid phase tube to the sampling tube on the head liquid phase tube through a metal hose. Specifically, connect the outlet CPV04 of the sampling tube on the fourth tail liquid phase tube to the inlet of the metal hose, and connect the outlet of the metal hose to the sampling tube CPV01 on the first head liquid phase tube;

[0034] S4: The liquid nitrogen in the liquid nitrogen storage source is gasified into room temperature nitrogen through the first gasifier, enters the liquid phase pipe through the liquid nitrogen temporary filling pipe, and then enters the metal hose through the sampling pipe, and the entire LNG filling path pipeline (sweeping pipe) is nitrogenized until the dew point of the LNG filling path pipeline (sweeping pipe) is lower than -50°C;

[0035] S5: Connect the sampling tube on the LNG filling path pipeline near the cryogenic equipment to the interface of the cryogenic equipment through a metal hose to purge the refrigerant pipeline of the cryogenic equipment. Specifically, the sampling tube on the LNG filling path pipeline near the cryogenic equipment connected by the metal hose is the sampling tube CSV01 closest to it, and the interface of the cryogenic equipment connected by the metal hose is the inlet valve MV02 of the refrigerant pipeline;

[0036] S6: When LNG needs to be refueled on board, use the LNG refueling path pipeline for refueling. Since the stripping pipeline was previously used to purge the refrigerant pipeline with nitrogen, the stripping pipeline already meets the LNG refueling conditions (dew point < -40 ° C, oxygen content < 4%). Close the sampling pipe valve CSV01 valve on the LNG refueling path pipeline near the cryogenic equipment, connect the dock LNG gas source with the LNG temporary refueling pipe and the second vaporizer, and carry out LNG refueling operations;

[0037] S7: Remove the metal hoses on the sampling tubes of CSV01 and CPV01 on the LNG filling route pipeline near the cryogenic equipment, and use multiple metal hoses at the same time to connect the sampling tube CPV01 on the sweeping pipe near the cryogenic equipment to the position of the refrigerant pipeline inlet MV02 of the cryogenic equipment. The refrigerant pipeline inlet MV02 of the cryogenic equipment is temporarily disconnected until the dew point in the metal hose is lower than -50℃, and then connect it to the refrigerant pipeline inlet MV02 of the cryogenic equipment, and use liquid nitrogen from the dock to purge the refrigerant pipeline of the cryogenic equipment.

[0038] The method provided in this embodiment is an important part of the commissioning of Cryostar's first set of marine cryogenic equipment in the world. The core is to perform two low-temperature operations in the same time period. In the first stage, the marine tank sweeping pipe is used as the main line for liquid nitrogen purge. During the liquid nitrogen purge process, the pipeline has been inerted, thus meeting the conditions for direct natural gas filling. When filling the cargo hold with natural gas in the second stage, it is only necessary to remove the metal hose at the relevant position to achieve the simultaneous operation of filling the ship with natural gas and liquid nitrogen.

[0039] In this embodiment, the pure nitrogen on board after gasification enters the sweeping pipe through the head liquid phase pipe, is connected to a metal hose at the sweeping pipe CSV01 position, and is thus sent to the cryogenic room for purging the refrigerant pipelines of the cryogenic equipment.

[0040] After the dew point of the refrigerant pipeline of the cryogenic equipment meets the standard, the metal hose between CPV01 and CPV04 is removed, the LNG tank truck on the dock is connected to the 2# vaporizer, the 2# vaporizer is connected to the LNG filling temporary pipe, and LNG is added to the ship.

[0041] Connect one end of the metal hose to CPV04, use multiple metal hoses to connect the ends, and connect the hose to the inside of the cryogenic room to continue to provide pure nitrogen to the cryogenic equipment.

[0042] In the present invention, in the first stage, the nitrogen gas after the liquid nitrogen is gasified is connected to the LNG filling pipeline through a metal hose, so that the ship's sweeping pipe is used as the main pipeline for nitrogen purging. During the nitrogen purging process, the sweeping pipe is inerted, so that the sweeping pipe has the conditions for directly filling LNG. When the ship needs to be filled with LNG, it only needs to follow the S7 step to directly fill the ship with LNG. The present invention connects one end of the metal hose to CPV04, uses multiple metal hoses to connect the ends, and connects the hose to the inside of the cryogenic room, so as to continue to provide pure nitrogen at the dock to the cryogenic equipment.

[0043] In addition to providing a method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock, the present invention further provides a system for implementing the method, the system comprising:

[0044] A first vaporizer, a second vaporizer, a temporary liquid nitrogen filling pipe, a temporary LNG filling pipe and a plurality of metal hoses.

[0045] The inlets of the first vaporizer and the second vaporizer are connected to the liquid nitrogen storage source and the LNG gas source respectively, and the outlets are connected to the inlets of the liquid nitrogen temporary filling pipe and the LNG temporary filling pipe respectively.

[0046] The outlets of the temporary liquid nitrogen filling pipe and the temporary LNG filling pipe are respectively connected to the first liquid phase pipe at the head and tail of the gas gathering platform on board.

[0047] As needed, multiple metal hoses are used to connect the sampling tube outlet on the tail liquid phase pipe and the head liquid phase pipe, the sampling tube on the LNG filling path pipeline near the cryogenic equipment and the refrigerant pipeline inlet of the cryogenic equipment, and the sampling tube on the tank sweeping pipe near the cryogenic equipment is connected to the refrigerant pipeline inlet of the cryogenic equipment from the metal hose.

[0048] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock. Features: The method comprises the following steps: S1: Connect two temporary pipelines to the first liquid phase pipe at the head and tail of the gas gathering platform on board. One of the two temporary pipelines is a temporary LNG filling pipe, and the other is a temporary liquid nitrogen filling pipe; S2: Connect the other end of the temporary liquid nitrogen filling pipe to the outlet of the first vaporizer, and connect the inlet of the first vaporizer to the liquid nitrogen storage source; connect the other side of the temporary LNG filling pipe to the outlet of the second vaporizer, and connect the inlet of the second vaporizer to the LNG gas source; S3: Connect the outlet of the sampling tube on the tail liquid phase tube to the sampling tube on the head liquid phase tube through a metal hose; S4: The liquid nitrogen in the liquid nitrogen storage source is gasified into room temperature nitrogen by the first gasifier, enters the liquid phase pipe through the liquid nitrogen temporary filling pipe, and then enters the metal hose through the sampling pipe to gasify the LNG filling path pipeline; S5: Connect the sampling tube on the LNG filling path pipeline near the cryogenic equipment to the interface of the cryogenic equipment through a metal hose to purge the refrigerant pipeline of the cryogenic equipment; S6: When LNG needs to be refueled on board, use the LNG refueling path pipeline to refuel, close the sampling pipe valve on the LNG refueling path pipeline near the cryogenic equipment, connect the dock LNG gas source with the LNG temporary refueling pipe and the second vaporizer, and carry out LNG refueling operations; S7: Remove the metal hose on the sampling tube on the LNG filling route pipeline near the cryogenic equipment, and use multiple metal hoses at the same time to connect the sampling tube on the sweeping pipe near the cryogenic equipment to the inlet of the refrigerant pipeline of the cryogenic equipment end to end. The inlet of the refrigerant pipeline of the cryogenic equipment is temporarily disconnected until the dew point in the metal hose is lower than the preset value, and then connected to the inlet of the refrigerant pipeline of the cryogenic equipment, and the refrigerant pipeline of the cryogenic equipment is purged with liquid nitrogen from the dock.

2. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 1, Features: In S1, the head liquid phase pipe is connected to the LNG temporary filling pipe, and the tail liquid phase pipe is connected to the liquid nitrogen temporary filling pipe.

3. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 2, Features: In S2, the liquid nitrogen storage source includes at least a liquid nitrogen storage tank or a liquid nitrogen tank truck; the LNG gas source includes at least an LNG tank truck.

4. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 3, Features: In the above 3, the outlet of the sampling tube on the fourth tail liquid phase tube is connected to the inlet of the metal hose, and the outlet of the metal hose is connected to the sampling tube on the first head liquid phase tube.

5. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 4, Features: In the above S4, the nitrogen gasification process of the LNG filling path pipeline is terminated when the dew point of the LNG filling path pipeline is lower than -50°C.

6. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 5, Features: In S5, the sampling tube on the LNG filling path pipeline near the cryogenic equipment connected by the metal hose is the sampling tube closest to it, and the interface of the cryogenic equipment connected by the metal hose is the inlet valve of the refrigerant pipeline.

7. A method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock as claimed in claim 6, Features: In S7, the preset dew point value in the metal hose is -50°C.

8. A system for synchronously filling natural gas and liquid nitrogen for a single ship at a dock. Features: The system is used to implement the method for synchronously filling a single ship with natural gas and liquid nitrogen at a dock according to any one of claims 1 to 7, and the system comprises: A first vaporizer, a second vaporizer, a temporary liquid nitrogen filling pipe, a temporary LNG filling pipe, and a plurality of metal hoses; The inlets of the first vaporizer and the second vaporizer are connected to the liquid nitrogen storage source and the LNG gas source respectively, and the outlets are connected to the inlets of the liquid nitrogen temporary filling pipe and the LNG temporary filling pipe respectively; The outlets of the temporary liquid nitrogen filling pipe and the temporary LNG filling pipe are respectively connected to the first and last liquid phase pipes of the gas gathering platform on board; As needed, multiple metal hoses are used to connect the sampling tube outlet on the tail liquid phase pipe and the head liquid phase pipe, the sampling tube on the LNG filling path pipeline near the cryogenic equipment and the refrigerant pipeline inlet of the cryogenic equipment, and the sampling tube on the tank sweeping pipe near the cryogenic equipment is connected to the refrigerant pipeline inlet of the cryogenic equipment from the metal hose.

Citation Information

Patent Citations

  • Method and system for inerting a wall of a liquefied fuel gas-storage tank

    CN106068418A

  • Method for first-time filling of gas of non-LNG pre-cooling ship

    CN107023748A

  • No-power LNG fixed-type refueling ship

    CN107472465A

  • Refrigerant fluid for refrigerant fluid circuit of natural gas treatment system

    CN114746709A

  • Filling method of LNG (Liquefied Natural Gas) ship

    CN115978433A