Temperature and humidity control cement curing box for building detection
By introducing heaters, thermal plates and coolers into the cement curing box, combined with hydraulic telescopic rods, the problems of long temperature control time and poor insulation effect in the existing technology are solved, and rapid temperature control and efficient temperature and humidity control are achieved.
Patent Information
- Application Number
- CN202323337582.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-08
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-08
AI Technical Summary
The existing cement curing boxes lack thermal conductivity components when controlling the temperature, resulting in long temperature control time, low cooling efficiency and poor insulation effect.
A cement curing box for building inspection including heater, thermal plate, cooler and hydraulic telescopic rod was designed. The heater heater is heated, the thermal plate heated, and the cooler cooler cooled to achieve rapid temperature control and good insulation effect, and The hydraulic telescopic rod adjusts the sample height for easy temperature and humidity control.
It achieves the effect of short time required for temperature control, high cooling efficiency and strong insulation effect, ensuring the precise temperature and humidity control of cement samples in the curing box.
Smart Images

Figure CN222079599U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of equipment for building inspection, in particular to a temperature- and humidity-controlled cement curing box for building inspection. Background Art
[0002] The cement curing box is specially used for standard curing of cement test blocks. It is made of all stainless steel. The spray device adopts ultrasonic humidification, the refrigeration adopts high-power compressor, temperature and humidity, and can be equipped with a micro printer. It is an ideal equipment for laboratories and quality inspection departments to maintain cement concrete specimens.
[0003] The prior art discloses a temperature and humidity controlled cement curing box for building inspection with publication number: CN218083327U, which includes a metal outer shell, a first curing chamber and a second curing chamber are provided in the metal outer shell, an ultrasonic atomizer is provided in the first curing chamber and the second curing chamber, a cooling plate and a heating plate are provided in the first curing chamber and the second curing chamber, a temperature sensor and an air humidity sensor are provided at the top of the first curing chamber and the second curing chamber, an exhaust pipe is provided at the rear side of the metal outer shell, and an exhaust fan is provided at the rear side of the metal outer shell. The advantages of the utility model compared with the prior art are: the equipment can carry out corresponding curing experiments by setting multiple curing chambers, increase air humidity by ultrasonic atomizer, exhaust air humidity and cool down by exhaust fan, and can accurately control temperature by cooling plate and heating plate. At the same time, the device can also control the curing environment pressure, further improving the curing accuracy.
[0004] However, the above-mentioned cement curing box is equipped with a refrigeration plate and a heating plate for temperature control during processing, but the above-mentioned temperature control structure is not equipped with a heat conduction element when in use, resulting in a long time required for temperature control, low heat conduction or cooling efficiency, and poor thermal insulation effect. The effect during use is not good, and this needs to be improved. Utility Model Content
[0005] The purpose of the utility model is to provide a temperature and humidity controlled cement curing box for building inspection to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a temperature and humidity controlled cement curing box for building inspection, comprising a curing box body, a detection device is arranged on the surface of the curing box body, and an internal placement device is arranged inside the curing box body.
[0007] The detection device includes an air pump, a connecting seat, an air pipe, a heater, a plate rack, a temperature conduit, a heat conducting plate and a cooler. The heater is fixedly connected to the right side of the curing box, the plate rack is fixedly connected to the right side of the curing box, the heater is fixedly connected to the top of the plate rack, the temperature conduit is fixedly connected to the bottom of the heater, the heat conducting plate is fixedly connected to the inner left side of the plate rack, the cooler is fixedly connected to the top of the right side of the curing box, and the cooler is fixedly connected to the right side of the upper plate rack.
[0008] Preferably, the internal placement device includes a placement chamber, a hydraulic telescopic rod, a first pallet and a second pallet, the placement chamber is opened on the right side of the interior of the maintenance box, the hydraulic telescopic rod is fixedly connected to the interior of the placement chamber, the first pallet is fixedly connected to the top of the hydraulic telescopic rod, and the second pallet is fixedly connected to the bottom of the hydraulic telescopic rod.
[0009] Preferably, a box door is provided on the front of the curing box body, and the box door is convenient for opening and closing to place the cement sample, and is also convenient for sealing when placing to ensure the placement effect.
[0010] Preferably, the number of the heat conducting plates is twelve, and the twelve heat conducting plates are evenly spaced and distributed on the right side of the plate rack.
[0011] Preferably, the temperature conduit is connected to the right side of the heat conducting plate, so that the temperature conduit is heated up, and then the heat conduction of the heat conducting plate causes the interior of the placement chamber to be heated up and gradually reaches the set temperature, which is more convenient for heat preservation.
[0012] Preferably, the connecting seat is fixedly connected to the top of the maintenance box, the air pump is fixedly connected to the top of the connecting seat, and the air pipe is fixedly connected to the right side of the air pump.
[0013] Preferably, the bottom of the maintenance box is fixedly connected with a supporting tripod, and the number of the supporting tripods is four. The four supporting tripods are evenly distributed at the four corners of the bottom of the maintenance box. The supporting tripods play a stabilizing role and can ensure the stability of the device when in use.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The temperature and humidity controlled cement curing box for building inspection is equipped with a detection device. When heating is needed, the heater can be started to heat up the temperature conduit, and then the heat conduction of the heat conduction plate makes the interior of the placement room heat up and gradually reaches the set temperature. It is convenient when heat preservation is required, and a cooler is needed when cooling is required. Like the above situation, it can cool down in time, and the temperature control structure is equipped with a heat conduction element when in use. The time required for temperature control is short, the heat conduction or cooling efficiency is low, and the heat preservation effect is strong, and the effect is good when in use.
[0016] 2. The temperature and humidity controlled cement curing box for building inspection is equipped with an internal placement device. When in use, the cement samples to be placed can be placed on the first tray or the second tray, and then the height can be adjusted by the hydraulic telescopic rod. The samples can be arranged according to actual needs, while ensuring the contact between the samples and the temperature and humidity control system, which is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall three-dimensional side view structure of the utility model;
[0018] Figure 2 For this utility model Figure 1 The enlarged structural diagram at A in the middle;
[0019] Figure 3 This is a three-dimensional front view of the internal structure of the maintenance box of the utility model;
[0020] Figure 4 For this utility model Figure 3 Enlarged structural diagram at B in the middle.
[0021] In the figure: 1. maintenance box; 2. detection device; 201. air pump; 202. connecting seat; 203. air pipe; 204. heater; 205. plate rack; 206. temperature conduit; 207. heat conduction plate; 208. cooler; 3. internal placement device; 301. placement room; 302. hydraulic telescopic rod; 303. first tray; 304. second tray. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-4 , the utility model provides the following technical solutions:
[0024] A temperature and humidity controlled cement curing box for building inspection comprises a curing box body 1, a detection device 2 is arranged on the surface of the curing box body 1, an internal placement device 3 is arranged inside the curing box body 1, and a supporting tripod is fixedly connected to the bottom of the curing box body 1. The number of the supporting tripods is four, and the four supporting tripods are evenly distributed at the four corners of the bottom of the curing box body 1. The supporting tripods play a stabilizing role and can ensure the stability of the device when in use. A box door is arranged on the front of the curing box body 1. The box door is arranged to facilitate opening and closing for placing cement samples, and it is also convenient to seal when placing to ensure the placement effect.
[0025] The detection device 2 includes an air pump 201, a connecting seat 202, an air pipe 203, a heater 204, a plate rack 205, a temperature conduit 206, a heat conducting plate 207 and a cooler 208. The heater 204 is fixedly connected to the right side of the curing box 1, the plate rack 205 is fixedly connected to the right side of the curing box 1, the heater 204 is fixedly connected to the top of the plate rack 205, the temperature conduit 206 is fixedly connected to the bottom of the heater 204, the heat conducting plate 207 is fixedly connected to the inner left side of the plate rack 205, the cooler 208 is fixedly connected to the top of the right side of the curing box 1, and the cooler 208 It is fixedly connected to the right side of the upper plate rack 205, there are twelve heat conducting plates 207, and the twelve heat conducting plates 207 are evenly spaced on the right side of the plate rack 205. The temperature conduit 206 is connected to the right side of the heat conducting plate 207 to heat up the temperature of the temperature conduit 206, and then the heat conduction of the heat conducting plate 207 causes the interior of the placement chamber 301 to heat up and gradually reach the set temperature, which is convenient for heat preservation. The connecting seat 202 is fixedly connected to the top of the curing box 1, the air pump 201 is fixedly connected to the top of the connecting seat 202, and the air pipe 203 is fixedly connected to the right side of the air pump 201.
[0026] The internal placement device 3 includes a placement chamber 301, a hydraulic telescopic rod 302, a first pallet 303 and a second pallet 304. The placement chamber 301 is opened on the right side of the interior of the maintenance box 1, the hydraulic telescopic rod 302 is fixedly connected to the interior of the placement chamber 301, the first pallet 303 is fixedly connected to the top of the hydraulic telescopic rod 302, and the second pallet 304 is fixedly connected to the bottom of the hydraulic telescopic rod 302.
[0027] When in use, the curing box is equipped with a temperature and humidity control system. The temperature and humidity in the box can be accurately controlled by heating, cooling, humidification or dehumidification. The required temperature and humidity parameters can be set, and the environmental conditions can be monitored and adjusted in real time. When heating is required, the heater 204 can be started to heat up the temperature conduit 206, and then the heat conduction of the heat conducting plate 207 makes the interior of the placement chamber 301 heat up and gradually reach the set temperature. It is more convenient when keeping warm. When cooling is required, the cooler 208 needs to be used. As in the above case, it can cool down in time, and the temperature control structure is provided with a heat conducting element when in use. The time required for temperature control is short, the heat conduction or cooling efficiency is low, and the heat preservation effect is strong. The effect is good when in use. An internal placement device 3 is provided inside the curing box 1. When in use, the cement sample to be placed can be placed on the first tray 303 or the second tray 304, and then the height can be adjusted by the hydraulic telescopic rod 302. The sample can be arranged according to actual needs, and the contact between the sample and the temperature and humidity control system is ensured, which is convenient to use.
[0028] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A temperature and humidity controlled cement curing box for building inspection, comprising a curing box body (1), characterized in that: The surface of the curing box (1) is provided with a detection device (2), and the interior of the curing box (1) is provided with an internal placement device (3); The detection device (2) comprises an air pump (201), a connecting seat (202), an air pipe (203), a heater (204), a plate rack (205), a temperature conduit (206), a heat conducting plate (207) and a cooler (208); the heater (204) is fixedly connected to the right side of the curing box (1); the plate rack (205) is fixedly connected to the right side of the curing box (1); the heater (204) is fixedly connected to the top of the plate rack (205); the temperature conduit (206) is fixedly connected to the bottom of the heater (204); the heat conducting plate (207) is fixedly connected to the inner left side of the plate rack (205); the cooler (208) is fixedly connected to the top of the right side of the curing box (1); and the cooler (208) is fixedly connected to the right side of the upper plate rack (205).
2. A temperature and humidity controlled cement curing box for building inspection according to claim 1, characterized in that: The internal placement device (3) comprises a placement chamber (301), a hydraulic telescopic rod (302), a first tray (303) and a second tray (304); the placement chamber (301) is opened on the right side inside the maintenance box (1); the hydraulic telescopic rod (302) is fixedly connected to the inside of the placement chamber (301); the first tray (303) is fixedly connected to the top of the hydraulic telescopic rod (302); and the second tray (304) is fixedly connected to the bottom of the hydraulic telescopic rod (302).
3. The temperature and humidity controlled cement curing box for building inspection according to claim 1 is characterized in that: The front of the maintenance box (1) is provided with a box door.
4. The temperature and humidity controlled cement curing box for building inspection according to claim 1, characterized in that: The number of the heat conducting plates (207) is twelve, and the twelve heat conducting plates (207) are distributed at equal intervals on the right side of the plate frame (205).
5. The temperature and humidity controlled cement curing box for building inspection according to claim 1, characterized in that: The temperature conduit (206) is connected to the right side of the heat conducting plate (207).
6. The temperature and humidity controlled cement curing box for building inspection according to claim 1, characterized in that: The connecting seat (202) is fixedly connected to the top of the curing box (1), the air pump (201) is fixedly connected to the top of the connecting seat (202), and the air pipe (203) is fixedly connected to the right side of the air pump (201).
7. The temperature and humidity controlled cement curing box for building inspection according to claim 1, characterized in that: The bottom of the maintenance box (1) is fixedly connected with a supporting stand, and the number of the supporting stands is four, and the four supporting stands are evenly spaced and distributed at the four corners of the bottom of the maintenance box (1).
Citation Information
Cited By
Temperature and humidity controllable curing box for cement setting time detection
CN224060080U
