Waste gas treatment system of Topcon battery Poly process

By using the design of standpipes and annular pipes in the Topcon battery Poly process exhaust gas treatment system, the problems of silica dust clogging and combustion reaction energy consumption are solved, and the stable operation and safety improvement of the exhaust gas treatment system are achieved.

CN118729299APending Publication Date: 2024-10-01江苏京彦科技有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410959194.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the traditional Topcon battery poly process waste gas treatment, silica dust can easily block pipelines and increase the energy consumption of combustion reactions, affecting stable product output and personnel safety.

Method used

An exhaust gas treatment system including a standpipe, annular pipe and a cleaning ring is designed. Dust is collected through the sedimentation of the standpipe, and the dust is effectively cleaned through the cleaning ring and vibrator of the annular pipe, reducing the energy consumption of the combustion barrel and the risk of pipe blockage. .

Benefits of technology

It effectively reduces the subsequent pipeline blockage and combustion reaction energy consumption, ensures the continuous operation and safety of the system, and reduces the load of the dust removal system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118729299A_ABST
    Figure CN118729299A_ABST
Patent Text Reader

Abstract

The invention relates to the field of waste gas treatment, and provides a waste gas treatment system for a Topcon battery Poly process, aiming at solving the problems that silicon dioxide dust is easy to block a pipeline and the energy consumption of a combustion reaction is increased in the prior art, the waste gas treatment system comprises a combustion treater, a silane combustion barrel, a cyclone dust collector, a bag-type dust collector and a washing tower which are connected in sequence, the pipeline between the combustion treater and the silane combustion barrel comprises a vertical pipe and a vertical pipe, wherein one end of the vertical pipe is communicated with an outlet of the combustion treater; the other end of the vertical pipe is communicated with the silane combustion barrel through the first branch pipe; and two ends of the second branch pipe are communicated with the first branch pipe to form an annular pipeline. Dust is settled and collected through the vertical pipe, blockage of follow-up pipelines and energy consumption of the combustion barrel can be reduced, the first branch pipe and the second branch pipe can be detached and cleaned, when one branch pipe keeps waste gas conveying, the other branch pipe can be taken down and cleaned, and it can be ensured that the system treats waste gas without shutdown through alternate cleaning and using.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of waste gas treatment, and in particular to a waste gas treatment system for a Topcon battery Poly process. Background Art

[0002] Photovoltaic cells will officially enter the era of the new Topcon process in 2022. The new battery poly process uses a large amount of silane gas and hydrogen as process reaction gases. The single-line output of the factory is also twice that of the previous generation of batteries. The cumulative result of the two is a large amount of process waste gas emissions. The traditional treatment method is to remove dust and discharge it after the silane gas is burned. The defect is that the silane gas produces a large amount of silica dust after combustion, which accumulates in the pipes and washing towers and cannot be effectively treated in time. The exhaust gas contains moisture after the burner is washed with water, and there is also some incomplete combustion of waste gas, which will block the pipeline in a week, greatly affecting the stable output of the product and the safety of personnel. Summary of the invention

[0003] The purpose of the present invention is to provide an exhaust gas treatment system for a Topcon battery Poly process, so as to solve the problem in the prior art that silicon dioxide dust easily blocks pipelines and increases the energy consumption of combustion reactions.

[0004] The embodiments of the present invention are implemented by the following technical solutions:

[0005] A waste gas treatment system for a Topcon battery Poly process comprises: a combustion processor, a silane combustion barrel, a cyclone dust collector, a bag dust collector and a washing tower connected in sequence; the pipeline between the combustion processor and the silane combustion barrel comprises: a vertical pipe, one end of which is connected to the outlet of the combustion processor, and the vertical pipe is used for dust sedimentation; a first branch pipe, the other end of which is connected to the silane combustion barrel through the first branch pipe; a second branch pipe, both ends of the second branch pipe are connected to the first branch pipe to form an annular pipeline; the first branch pipe and the second branch pipe are each provided with two valves.

[0006] Preferably, the vertical pipe includes: an inlet pipe, one end of which is connected to the outlet of the combustion processor; a dust collecting chamber, the other end of which extends into the dust collecting chamber and is higher than the bottom of the dust collecting chamber; an outlet pipe, one end of which is connected to the top wall of the dust collecting chamber, and the other end of which is connected to the annular duct.

[0007] Preferably, the outlet end of the inlet pipe faces the first side wall of the dust collecting chamber, and the inlet end of the outlet pipe is arranged close to the second side wall of the dust collecting chamber, and the first side wall is opposite to the second side wall.

[0008] Preferably, the bottom wall of the dust collecting chamber gets closer and closer to the top wall of the dust collecting chamber as it extends from the first side wall end to the second side wall end.

[0009] Preferably, it comprises: a orifice plate, which is slidably connected to the inner wall of the outlet pipe, and the sliding direction corresponds to the length direction of the outlet pipe; a vibrator, which is connected to the side wall of the outlet pipe; after the orifice plate rises to abut against the vibrator, the vibrator is started.

[0010] Preferably, the annular tube is tilted, the connection end of the annular tube and the vertical tube is lower than the connection end of the annular tube and the silane combustion barrel, and a cleaning ring is arranged inside the annular tube. The outer ring wall of the cleaning ring is slidably connected to the inner wall of the annular tube.

[0011] Preferably, the inner wall of the annular tube is provided with a first slide rail, the side wall of the first slide rail is provided with an elastic layer, the cleaning ring is connected to the first slider through a connecting rod, the first slider is located between the elastic layer and the bottom wall of the first slide rail, and the first slider is slidably connected to the first slide rail.

[0012] Preferably, the orifice plate is rotatably connected to the second slider via a rotating shaft, the vertical tube is provided with a second slide rail, and the second slider is slidably connected to the second slide rail; the vertical tube is also provided with a third slide rail and a fourth slide rail, and the third slide rail and the fourth slide rail are located on both sides of the rotating shaft; the third slide rail is provided with a third slider, and the fourth slide rail is provided with a fourth slider, the third slider is located below the orifice plate, and the fourth slider is located above the orifice plate, the vibrator is provided at an end of the fourth slide rail away from the combustion processor, the portion between the rotating shaft and the third slide rail in the orifice plate is the first plate body, the portion between the rotating shaft and the third slide rail in the orifice plate is the second plate body, and the weight of the first plate body is greater than the weight of the second plate body.

[0013] Preferably, it comprises: an inclined plate, the inclined plate is connected to the third slide rail side of the vertical pipe, and the orthographic projection of the free end of the inclined plate on the orifice plate is located on the second plate body.

[0014] Preferably, it includes: an exhaust fan, the outlet of the washing tower is connected to the inlet of the exhaust fan, the exhaust fan is provided with a first outlet, a second outlet and a third outlet, the first outlet is connected to the side wall of the first branch pipe away from one end of the vertical pipe through a first return pipe, the second outlet is connected to the side wall of the second branch pipe away from one end of the vertical pipe through a second return pipe, and the third outlet is used for discharging the treated exhaust gas.

[0015] The present invention has at least the following beneficial effects:

[0016] The present invention can reduce the blockage of subsequent pipelines and reduce the energy consumption of the combustion barrel by settling and collecting dust through the vertical pipe. Since the first branch pipe and the second branch pipe are both provided with valves, the first branch pipe and the second branch pipe can be disassembled and cleaned. When one of the branches maintains the exhaust gas transportation, the other branch pipe can be removed for cleaning. Such alternating cleaning and use can ensure that the system can process the exhaust gas without stopping. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 This is a schematic diagram of the exhaust gas treatment system for the Topcon battery Poly process;

[0019] Figure 2 is a top view of the annular tube;

[0020] Figure 3 It is a schematic diagram of the structure of the vertical pipe;

[0021] Figure 4 is a cross-sectional view of the vertical pipe;

[0022] Figure 5 for Figure 4 Detailed view of point A in the middle;

[0023] Figure 6 It is the structural schematic diagram of the orifice plate;

[0024] Figure 7 Figure a is the connection structure diagram of the cleaning ring;

[0025] Figure 8 Figure b is the connection structure diagram of the cleaning ring;

[0026] Fig. 9 It is a schematic diagram of the structure of a silane combustion barrel;

[0027] Figure markings: 1-combustion processor, 2-silane combustion barrel, 3-cyclone dust collector, 4-bag dust collector, 5-washing tower, 6-vertical pipe, 61-inlet pipe, 62-dust collecting chamber, 621-dust exhaust pipe, 622-first side wall, 623-second side wall, 63-outlet pipe, 631-second slide rail, 632-third slide rail, 633-fourth slide rail, 7-annular pipe, 71-first branch pipe, 72-second branch pipe, 73-valve, 74-first slide rail, 741-elastic layer, 8-orifice plate, 81-first plate body, 82-second plate body, 9-vibrator, 10-cleaning ring, 101-connecting rod, 102-first slider, 11-rotating shaft, 12-second slider, 13-third slider, 14-fourth slider, 15-inclined plate, 16-exhaust fan, 17-guide plate. DETAILED DESCRIPTION

[0028] In order to make the purpose, method scheme and advantages of the embodiments of the present invention clearer, the method scheme in the embodiments of the present invention is clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0029] Photovoltaic cells will officially enter the era of the new Topcon process in 2022. The new cell poly process uses a large amount of silane gas and hydrogen as process reaction gases. The single-line output of the factory is also twice that of the previous generation of batteries. The cumulative result of the two is a large amount of process waste gas emissions. The traditional treatment method is to remove dust and discharge it after the silane gas is burned. Its defect is that the silane gas produces a large amount of silica dust after combustion, which accumulates in the pipeline and the washing tower and cannot be effectively treated in time. The exhaust gas after the burner is washed with water contains moisture, and there is also some incomplete combustion of waste gas. The pipeline will be blocked in a week, which has a great impact on the stable output of the product and the safety of personnel. In addition, silica dust absorbs a lot of heat and increases the energy consumption of the combustion reaction. The applicant hopes to realize the collection and discharge of silica dust in the combustion reaction stage, reduce the energy consumption of the silane gas combustion reaction, reduce the possibility of pipeline blockage, and reduce the load of the subsequent dust removal system. The technical solution disclosed in the following embodiment is conceived.

[0030] Example 1

[0031] like Figure 1-2As shown, a waste gas treatment system for a Topcon battery Poly process comprises: a combustion processor 1, a silane combustion barrel 2, a cyclone dust collector 3, a bag filter 4 and a washing tower 5 connected in sequence; the pipeline between the combustion processor 1 and the silane combustion barrel 2 comprises: a vertical pipe 6, one end of which is connected to the outlet of the combustion processor 1, and the vertical pipe 6 is used for dust sedimentation; a first branch pipe 71, the other end of which is connected to the silane combustion barrel 2 through the first branch pipe 71; a second branch pipe 72, both ends of the second branch pipe 72 are connected to the first branch pipe 71 to form a ring pipe 7; the first branch pipe 71 and the second branch pipe 72 are each provided with two valves 73.

[0032] In the specific implementation process, the combustion processor 1 can adopt a scrubber burner. Figure 1 As shown, multiple parallel combustion processors 1 and annular pipes 7 are set, and finally converge into the flow-balancing pipe and enter the cyclone dust collector 3. The cyclone dust collector 3, the bag dust collector 4 and the washing tower 5 can all be as shown in FIG. Figure 1 As shown, two cyclone dust collectors 3 are connected in parallel, two bag dust collectors 4 are connected in parallel, and two washing towers 5 are connected in series. The diameter of the outlet pipe 63 of the combustion processor 1 can be 80mm-100m, and the diameter of the outlet pipe 63 of the silane combustion barrel 2 can be 200mm. The cyclone dust collector 3 and the bag dust collector are connected in series, one cyclone dust collector 3 is used and one is reserved, and one bag dust collector is used and one is reserved. Each bag dust collector is equipped with online non-stop cleaning, and the semi-automatic packaging of the ash bag reduces the labor and reduces the risk factor. The dust removal efficiency of the cyclone dust collector 3 is 50%. After the preliminary filtration of the cyclone dust collector 3, the filtering load of the bag dust collector 4 is reduced, and the voltage is stabilized, which is conducive to the stable operation of the subsequent bag dust collector 4. By switching the maintenance function without stopping the machine, the load of the washing tower 5 is minimized to the greatest extent, ensuring that environmental protection standards are met, the safe operation of the exhaust gas treatment facilities is guaranteed, and the impact on the production line capacity is reduced by about 80%. The tail gas treated by the bag filter 4 enters the washing tower 5 for water washing and spraying. The washing tower 5 increases the effective water volume of the bottom water tank, increases the effective load, and reduces the maintenance frequency of the washing tower 5. The water tank of the washing tower 5 is equipped with a high-efficiency filtration system to prevent the spray pipeline from being blocked, and the water outlet aperture of the spray head is increased to reduce the blockage rate. The silane combustion barrel 2 is a prior art, and its structure can be referred to Fig. 9 As shown, compressed air and nitrogen inlets can be set. Compressed air can increase the oxygen content in the combustion barrel and promote the combustion reaction of silane. Nitrogen can control the temperature and pressure inside the combustion barrel to avoid dangerous situations such as overheating or explosion. An ash collecting barrel can be set under the silane combustion barrel 2, and the solid waste can be discharged from the combustion barrel into the ash collecting barrel through a plug valve.

[0033] When the combustion processor 1 burns the silane gas once, a large amount of silicon dioxide will be produced. After collecting most of the silicon dioxide through the vertical pipe 6, the silane gas is sent to the silane combustion barrel 2 for secondary combustion reaction, which can reduce the blockage of subsequent pipelines and greatly reduce the energy consumption of the silane combustion barrel 2. After the combustion processor 1 and the silane combustion barrel 2 are connected by the annular pipe 7, the first branch pipe 71 or the second branch pipe 72 can be disassembled and assembled through the valve 73 to achieve the cleaning of the annular pipe 7. The removal rate of waste gas in the combustion processor 1 is about 95%. Due to the dangerousness, flammability and explosiveness of the gas, the remaining gas that is not fully burned still has the risk of explosion, thereby increasing the silane combustion barrel 2 to ensure that there is no residue and the combustion is complete. The first washing tower 5 of the two washing towers 5 connected in series can be washed with sodium hydroxide, and the second washing tower 5 can be washed with water. The liquid in the gas enters the washing tower 5, and after concentration, it is regularly discharged into the wastewater station. Optimized design of washing tower 5: increase the water tank volume, strengthen the tower body (increase wall thickness + add reinforcing ribs), increase the width and thickness of the connecting parts at the connection, and wash tower 5 is designed with multi-layer spraying and multi-layer fillers to increase the residence time.

[0034] Example 2

[0035] In order to realize dust collection of the vertical pipe 6, improvements are made on the basis of Example 1, such as Figure 3-4 As shown, in this embodiment, the vertical pipe 6 includes: an inlet pipe 61, one end of which is connected to the outlet of the combustion processor 1; a dust collecting chamber 62, the other end of which extends into the dust collecting chamber 62 and is higher than the bottom of the dust collecting chamber 62; an outlet pipe 63, one end of which is connected to the top wall of the dust collecting chamber 62, and the other end of which is connected to the annular pipe 7.

[0036] In the specific implementation process, the top of the inlet pipe 61 is higher than the bottom wall of the dust collecting chamber 62 so that the collected dust will not affect the entry of gas and dust etc. after being processed by the combustion processor 1. Figure 3 As shown, a dust exhaust pipe 621 can be arranged below the dust collecting chamber 62 and an electric valve can be arranged on the dust exhaust pipe 621, and then a distance sensor can be arranged on the inner top wall of the dust collecting chamber 62 to detect the height of the collected dust through the distance sensor. When the height reaches a set threshold, the electric valve is opened to discharge the dust. The cross-sectional area of ​​the dust collecting chamber 62 is larger than that of the inlet pipe 61, which can reduce the gas flow rate and increase the dust reduction effect of the dust.

[0037] Example 3

[0038] In order to further increase the dust reduction effect, improvements were made based on Example 2, such as Figure 4As shown, in this embodiment, the outlet end of the inlet pipe 61 faces the first side wall 622 of the dust collecting chamber 62, and the inlet end of the outlet pipe 63 is arranged close to the second side wall 623 of the dust collecting chamber 62, and the first side wall 622 is opposite to the second side wall 623.

[0039] During the specific implementation process, the outlet end of the inlet pipe 61 is facing the first side wall 622, which can reduce the gas flow rate and enhance the dust reduction effect through the first side wall 622. The inlet pipe 61 and the outlet pipe 63 are staggered left and right to avoid the influence of the air outlet of the inlet pipe 61 on the dust removal effect of the outlet pipe 63.

[0040] Example 4

[0041] In order to better discharge dust from the dust collecting chamber 62, improvements are made on the basis of Example 3, such as Figure 3 or Figure 4 As shown, in this embodiment, the bottom wall of the dust collecting chamber 62 gets closer and closer to the top wall of the dust collecting chamber 62 during the process of extending from the end of the first side wall 622 to the end of the second side wall 623 .

[0042] In the specific implementation process, the bottom wall of the dust collecting chamber 62 is inclined and when the dust in the outlet pipe 63 falls back, it falls to the high part of the bottom wall and can slide down along the bottom wall, so that the dust in the dust collecting chamber 62 will not accumulate on one side. For example, when the dust in the outlet pipe 63 falls back to the low part of the bottom wall, the accumulation of dust in the dust collecting chamber 62 will be concentrated on Figure 4 On the left side, the distribution is extremely uneven, which affects the capacity utilization of the dust collecting chamber 62.

[0043] Example 5

[0044] In order to increase the dust collection effect of the vertical pipe 6, improvements are made on the basis of embodiments 1-4, such as Figure 4-6 As shown, in this embodiment, it includes: a orifice plate 8, which is slidably connected to the inner wall of the outlet pipe 63, and the sliding direction corresponds to the length direction of the outlet pipe 63; a vibrator 9, which is connected to the side wall of the outlet pipe 63; after the orifice plate 8 rises to abut against the vibrator 9, the vibrator 9 starts.

[0045] In the specific implementation process, the orifice plate 8 can be Figure 5 or Figure 6 As shown, a circular plate is provided, the holes of which can be Figure 5The arrangement shown is a truncated cone hole, the large diameter end of the truncated cone hole is the inlet end, and the small diameter end is the outlet end. The orifice plate 8 can reduce the cross-sectional area of ​​the airflow channel and increase the airflow velocity, and the arrangement of the truncated cone hole can further increase the airflow velocity. In addition, the orifice plate 8 can also intercept dust and reduce the amount of dust entering the silane combustion barrel 2. When dust blocks part or all of the holes on the orifice plate 8, the orifice plate 8 will move upward under the action of air pressure. When the orifice plate 8 abuts against the vibrator 9, the vibrator 9 is turned on to shake off the dust in the hole. The orifice plate 8 can be made of lightweight material, and a spring can be set on the side wall of the outlet pipe 63. The spring abuts against the bottom wall of the orifice plate 8. When the orifice plate 8 falls back and resets, the spring can achieve buffering. The activation of the vibrator 9 can be achieved by a touch switch. When the orifice plate 8 squeezes the touch switch, the vibrator 9 is turned on. After the orifice plate 8 is separated from the touch switch, the vibrator 9 is turned off. The vibrator 9 can also be started by a sensor, for example, by detecting the rising height of the orifice plate 8 through a sensor. When the orifice plate 8 rises to a certain distance, the vibrator 9 is turned on by the existing control system. The control module can use a single-chip microcomputer or a PLC control cabinet.

[0046] Example 6

[0047] In order to reduce the possibility of blockage of the annular tube 7, improvements are made on the basis of Example 5, such as Figure 4 As shown, in this embodiment, the annular tube 7 is tilted, the connection end of the annular tube 7 and the vertical tube 6 is lower than the connection end of the annular tube 7 and the silane combustion barrel 2, and a cleaning ring 10 is provided in the annular tube 7. The outer ring wall of the cleaning ring 10 is slidably connected to the inner side wall of the annular tube 7.

[0048] In the specific implementation process, the cleaning ring 10 is provided in both the first branch pipe 71 and the second branch pipe 72. The cleaning ring 10 can peel off the dust attached to the pipe wall and loosen the dust in the pipe so that it falls back to the dust collecting chamber 62 along the inclined annular pipe 7. A pressure sensor can be provided in the annular pipe 7 and a threshold value can be set. When the air pressure reaches the threshold value, the cleaning ring 10 is started to send the dust accumulated in the annular pipe 7 to the dust collecting chamber 62. The thickness of the end of the cleaning ring 10 used for peeling dust should not be too thick to affect its peeling effect, and the thickness is between 0.5-1mm.

[0049] Example 7

[0050] In order to prevent dust from accumulating on the moving mechanism of the cleaning ring 10 and affecting the operation of the cleaning ring 10, improvements are made based on Example 6, such as Figure 7-8As shown, in this embodiment, the inner wall of the annular tube 7 is provided with a first slide rail 74, the side wall of the first slide rail 74 is provided with an elastic layer 741, the cleaning ring 10 is connected to the first slider 102 through a connecting rod 101, the first slider 102 is located between the elastic layer 741 and the bottom wall of the first slide rail 74, and the first slider 102 is slidably connected to the first slide rail 74.

[0051] In the specific implementation process, the elastic layer 741 can be made of rubber or silicone material, such as Figure 8 As shown, the elastic layers 741 on both sides of the first slide rail 74 seal the inside of the first slide rail 74 under the action of their own resilience. When the cleaning ring 10 needs to slide, the elastic layer 741 can be squeezed to both sides by the connecting rod 101. While ensuring that the annular tube 7 can slide, dust is prevented from accumulating in the first slide rail 74 and affecting the movement of the cleaning ring 10.

[0052] Example 8

[0053] In order to better allow the dust in the annular tube 7 to enter the dust collecting chamber 62, improvements are made based on Example 7, such as Figure 5-6 As shown, in this embodiment, the orifice plate 8 is rotatably connected with the second slider 12 through the rotating shaft 11, the vertical tube 6 is provided with a second slide rail 631, and the second slider 12 is slidably connected with the second slide rail 631; the vertical tube 6 is also provided with a third slide rail 632 and a fourth slide rail 633, and the third slide rail 632 and the fourth slide rail 633 are located on both sides of the rotating shaft 11; the third slide rail 632 is provided with a third slider 13, and the fourth slide rail 633 is provided with a fourth slider 14, the third slider 13 is located below the orifice plate 8, and the fourth slider 14 is located above the orifice plate 8, the vibrator 9 is provided at the end of the fourth slide rail 633 away from the combustion processor 1, the portion between the rotating shaft and the third slide rail 632 in the orifice plate 8 is the first plate body 81, and the portion between the rotating shaft and the third slide rail 632 in the orifice plate 8 is the second plate body 82, and the weight of the first plate body 81 is greater than the weight of the second plate body 82.

[0054] In the specific implementation process, the orifice plate 8 can be rotated so that the dust in the annular tube 7 falls on the orifice plate 8, and then the orifice plate 8 flips over to make room for the dust to fall. However, if the orifice plate 8 is fixed in position only by the connection between the rotating shaft 11 and the second slider 12, it is difficult to maintain balance when the annular tube 7 is not discharging dust. Therefore, in this embodiment, a third slider 13 and a fourth slider 14 are also provided to limit the two ends of the orifice plate 8. At the same time, Figure 5 In the embodiment, the weight of the left side of the orifice plate 8 is greater than the weight of the right side of the orifice plate 8, so that under the action of its own weight, the first plate body 81 abuts against the third slider 13, and the second plate body 82 abuts against the fourth slider 14. In order to prevent the airflow from lifting the first plate body 81 and causing the orifice plate 8 to flip, it is also possible to Figure 4As shown, a guide plate 17 is provided at the inlet end of the outlet pipe 63 to guide the airflow to the side of the second plate body 82. When the air pressure in the outlet pipe 63 increases, the third slider 13 can slide upward. Similarly, a spring can be provided under the third slider 13 to achieve buffering when the third slider 13 falls back.

[0055] Working process: In the initial state, the orifice plate 8 is subjected to a deflection force under the action of its own gravity, the first plate body 81 abuts against the third slider 13, and the second plate body 82 abuts against the fourth slider 14. When some or all holes of the orifice plate 8 are blocked, resulting in an increase in the air pressure in the outlet pipe 63, the third slider 13, the orifice plate 8 and the fourth slider 14 rise synchronously. When the fourth slider 14 abuts against the vibrator 9, the vibrator 9 starts, the dust in the pores of the orifice plate 8 is shaken off, the air pressure in the outlet pipe 63 decreases, and the third slider 13, the orifice plate 8 and the fourth slider 14 fall back and reset. When it is necessary to clean the dust in the annular tube 7, move the cleaning ring 10 to peel off the dust attached to the wall of the annular tube 7, and the dust extends from the annular tube 7 to slide to the second plate body 82. After being pressed, the second plate body 82 deflects downward to make room for the dust to slide, and finally the dust enters the dust collecting chamber 62. After the second plate 82 is no longer compressed, under the action of the gravity of the first plate 81 , the second plate 82 is deflected upward again until it contacts the fourth slider 14 .

[0056] Example 9

[0057] In order to ensure that the dust in the annular tube 7 falls onto the second plate 82, an improvement is made on the basis of Example 8, such as Figure 4 As shown, in this embodiment, it includes: an inclined plate 15, which is connected to the third slide rail 632 side of the vertical pipe 6, and the orthographic projection of the free end of the inclined plate 15 on the orifice plate 8 is located on the second plate body 82.

[0058] In the specific implementation process, the arrangement of the inclined plate 15 can make the dust in the annular tube 7 slide down the second plate body 82 as much as possible, and prevent it from sliding to the first plate body 81, so that the orifice plate 8 cannot be deflected. Figure 4 The arrangement shown is two sections, the first section has a smaller inclination than the second section, the first section is connected to the upper side wall of the annular tube 7, and the second section is connected to the first section. The first section is used to guide the dust on the upper side of the annular tube 7 to the top of the second plate 82, so that the sliding direction is toward the second plate 82 side, that is, Figure 4 The purpose of the second section is to prevent the dust on the lower side of the annular tube 7 from falling onto the first plate 81. The speed direction of the dust in the annular tube 7 when sliding down is toward the first plate 81, that is, Figure 4 In the lower left middle section, in order to reduce the influence of the second section on the flow of silane gas into the annular tube 7, the slope of the second section is set to be greater than that of the first section in this embodiment.

[0059] Example 10

[0060] In order to better clean the dust in the annular tube 7, improvements are made on the basis of Example 5, such as Figure 1 As shown, in this embodiment, it includes: an exhaust fan 16, the outlet of the washing tower 5 is connected to the inlet of the exhaust fan 16, the exhaust fan 16 is provided with a first outlet, a second outlet and a third outlet, the first outlet is connected to the side wall of the first branch pipe 71 away from the end of the vertical pipe 6 through a first return pipe, the second outlet is connected to the side wall of the second branch pipe 72 away from the end of the vertical pipe 6 through a second return pipe, and the third outlet is used for discharging the treated exhaust gas.

[0061] During the specific implementation process, after the exhaust gas is treated by the washing tower 5, it is discharged by the exhaust fan 16. This embodiment uses the fluid power provided by the exhaust fan 16 to recycle part of the treated exhaust gas to the annular pipe 7. When the annular pipe 7 needs to be cleaned, the first outlet or the second outlet is opened to further clean the dust by wind power. When the annular pipe 7 does not need to be cleaned, the three outlets are opened together to realize the discharge of the treated gas.

[0062] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A waste gas treatment system for Topcon battery Poly process, characterized in that: include: The combustion processor, silane combustion barrel, cyclone dust collector, bag dust collector and scrubber are connected in sequence; The pipeline between the combustion processor and the silane combustion barrel includes: A vertical pipe, one end of which is connected to the outlet of the combustion processor, and the vertical pipe is used for dust settling; A first branch pipe, the other end of the vertical pipe is connected to the silane combustion barrel through the first branch pipe; A second branch pipe, wherein both ends of the second branch pipe are connected to the first branch pipe to form an annular pipe; The first branch pipe and the second branch pipe are each provided with two valves.

2. The exhaust gas treatment system of the Topcon battery Poly process according to claim 1 is characterized in that: The vertical pipe comprises: an inlet pipe, one end of which is connected to the outlet of the combustion processor; A dust collecting chamber, wherein the other end of the inlet pipe extends into the dust collecting chamber and is higher than the bottom of the dust collecting chamber; An outlet pipe, one end of which is communicated with the top wall of the dust collecting chamber, and the other end of which is communicated with the annular duct.

3. The exhaust gas treatment system of the Topcon battery Poly process according to claim 2 is characterized in that: The outlet end of the inlet pipe faces the first side wall of the dust collecting chamber, and the inlet end of the outlet pipe is arranged close to the second side wall of the dust collecting chamber, and the first side wall is opposite to the second side wall.

4. The exhaust gas treatment system of the Topcon battery Poly process according to claim 3 is characterized in that: The bottom wall of the dust collecting chamber gets closer and closer to the top wall of the dust collecting chamber during the process of extending from the first side wall end to the second side wall end.

5. The exhaust gas treatment system of the Topcon battery Poly process according to any one of claims 1 to 4, characterized in that: include: An orifice plate, wherein the orifice plate is slidably connected to the inner wall of the outlet pipe, and the sliding direction corresponds to the length direction of the outlet pipe; a vibrator connected to a side wall of the outlet pipe; After the orifice plate rises to abut against the vibrator, the vibrator is started.

6. The exhaust gas treatment system of the Topcon battery Poly process according to claim 5 is characterized in that: The annular tube is tilted, the connecting end between the annular tube and the vertical tube is lower than the connecting end between the annular tube and the silane combustion barrel, a cleaning ring is arranged inside the annular tube, and the outer ring wall of the cleaning ring is slidably connected to the inner wall of the annular tube.

7. The exhaust gas treatment system of the Topcon battery Poly process according to claim 6, characterized in that: The inner wall of the annular tube is provided with a first slide rail, the side wall of the first slide rail is provided with an elastic layer, the cleaning ring is connected to the first slider through a connecting rod, the first slider is located between the elastic layer and the bottom wall of the first slide rail, and the first slider is slidably connected to the first slide rail.

8. The exhaust gas treatment system of the Topcon battery Poly process according to claim 7 is characterized in that: The orifice plate is rotatably connected to the second slider via a rotating shaft, the vertical tube is provided with a second slide rail, and the second slide rail is slidably connected to the second slide rail; the vertical tube is also provided with a third slide rail and a fourth slide rail, and the third slide rail and the fourth slide rail are located on both sides of the rotating shaft; the third slide rail is provided with a third slider, and the fourth slide rail is provided with a fourth slider, the third slider is located below the orifice plate, and the fourth slider is located above the orifice plate, the vibrator is provided at an end of the fourth slide rail away from the combustion processor, the portion between the rotating shaft and the third slide rail in the orifice plate is the first plate body, the portion between the rotating shaft and the third slide rail in the orifice plate is the second plate body, and the weight of the first plate body is greater than the weight of the second plate body.

9. The exhaust gas treatment system of the Topcon battery Poly process according to claim 8, characterized in that: include: An inclined plate is connected to the third slide rail side of the vertical pipe, and the orthographic projection of the free end of the inclined plate on the orifice plate is located on the second plate body.

10. The exhaust gas treatment system of the Topcon battery Poly process according to claim 5, characterized in that: include: An exhaust fan, the outlet of the washing tower is connected to the inlet of the exhaust fan, and the exhaust fan is provided with a first outlet, a second outlet and a third outlet, the first outlet is connected to the side wall of the first branch pipe away from one end of the vertical pipe through a first return pipe, the second outlet is connected to the side wall of the second branch pipe away from one end of the vertical pipe through a second return pipe, and the third outlet is used for discharging the treated exhaust gas.

Citation Information

Cited By

  • Silane-containing waste gas treatment system

    CN224292834U