Testing device and testing method of humidifier for fuel cell engine

By designing a humidifier test device for fuel cell engines, the heating and cooling systems are used to achieve efficient temperature regulation of dry gas and moisture and rapid working mode switching, which solves the problem of imperfect testing in the existing technology and improves efficiency. Test efficiency and accuracy.

CN118730591APending Publication Date: 2024-10-01HENAN UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410739369.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing gas-to-gas humidifier testing technology is not perfect in terms of comprehensiveness and efficiency. It is difficult to effectively adjust the temperature of dry gas and wet gas, and it is unable to quickly switch between different operating conditions.

Method used

A test device for a humidifier for fuel cell engines is designed, including a heating system and a cooling system, through a high-pressure air source, a dryer, a heat exchanger, an electric air heater, a bubbling humidification tank, a humidity control system, and a cooling system. It can realize efficient temperature regulation and rapid switching of working conditions of dry gas and wet gas, and is equipped with sensors and valves for precise control.

Benefits of technology

It achieves efficient adjustment of the dry gas and moisture inlet temperatures, improves test efficiency, can quickly switch between different working conditions, ensures the accuracy and safety of the test, and solves the problems of internal leakage, external leakage and pressure resistance testing. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730591A_ABST
    Figure CN118730591A_ABST
Patent Text Reader

Abstract

The invention discloses a testing device and a testing method for a humidifier for a fuel cell engine, the testing device comprises a first gas path and a second gas path, the first gas path comprises a first heat exchanger and an air electric heater which are sequentially communicated in series through a pipeline; the second gas circuit comprises a second heat exchanger, a bubbling humidifying tank and a humidity control system which are sequentially communicated in series through a pipeline, the testing device further comprises a heating system, the heating system comprises a boiler, a water pump and a water heater, hot water flowing out of the water pump is divided into two parallel branches, one branch is connected with the bubbling humidifying tank through the water heater, and the other branch is connected with the water heater. The second gas entering the bubbling humidifying tank flows out at the target temperature in a saturated moisture state; and the other branch is connected with the first heat exchanger or the second heat exchanger. By arranging the heating system, the temperature of the dry gas inlet and the temperature of the wet gas inlet can be adjusted more efficiently, the testing efficiency is obviously improved, and rapid switching can be conducted according to different working condition points.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of humidifier testing, in particular to a testing device and a testing method for a humidifier used in a fuel cell engine. Background Art

[0002] When the fuel cell is working, the proton exchange membrane needs enough water molecules to conduct protons. If the humidity is too low, the proton exchange membrane will produce a "dry membrane" phenomenon, resulting in a decrease in the conductivity of the membrane and an increase in ohmic loss. If the humidity is too high, it will cause "flooding" inside the fuel cell, and the gas entering the catalyst layer will be reduced or even unable to enter. The electrochemical reaction cannot continue and the battery cannot work. Therefore, the appropriate humidity of the gas at the cathode inlet of the stack is of great significance for improving the performance of the fuel cell, improving the energy conversion efficiency, extending the battery life, and controlling the temperature.

[0003] Humidification technology includes self-humidification and external humidification. Compared with self-humidification technology, external humidification technology has the advantages of strong flexibility, high control accuracy, good reliability, etc. Among them, gas-gas humidifiers have mature preparation technology, high filling density, easy operation, high efficiency and energy saving, good stability, and are widely used in the air supply system of fuel cell auxiliary system (BOP). For the existing test technology of gas-gas humidifiers, the comprehensiveness and efficiency of the test are not perfect. Summary of the invention

[0004] In order to address the deficiencies in the prior art, the present invention provides a test device and a test method for a humidifier for a fuel cell engine. By setting a heating system, the temperatures of the dry gas inlet and the wet gas inlet can be more efficiently adjusted, the test efficiency can be significantly improved, and fast switching can be performed for different operating points.

[0005] In order to achieve the above object, the specific scheme adopted by the present invention is: On the one hand, the present invention discloses a test device for a humidifier for a fuel cell engine, comprising a first dryer connected to a high-pressure gas source, two gas paths are branched from the gas outlet of the first dryer and finally converged to the humidifier to be tested: one is a first gas path connected to a dry gas inlet of the humidifier to be tested, and the other is a second gas path connected to a wet gas inlet of the humidifier to be tested; a third gas path connected to the dry gas outlet and a fourth gas path connected to the wet gas outlet are provided on the gas outlet side of the humidifier to be tested; The first gas path includes a first heat exchanger and an electric air heater which are connected in series through a pipeline; the first gas outputted by a first dryer connected to a high-pressure gas source is heated by the first heat exchanger and the electric air heater in sequence and then enters the humidifier to be tested from the dry gas inlet of the humidifier to be tested; The second gas circuit includes a second heat exchanger, a bubbling humidification tank and a humidity control system which are sequentially connected in series through a pipeline, and the humidity control system includes a gas mixer having one end connected to the gas outlet of the bubbling humidification tank and the other end connected to the moisture inlet of the humidifier to be tested, and a second dryer having one end connected to the gas outlet of the bubbling humidification tank and the other end connected to the gas inlet of the gas mixer; the gas outlet of the gas mixer is connected to the moisture inlet of the humidifier to be tested, and the second gas outputted by the first dryer connected to the high-pressure gas source enters the humidifier to be tested from the moisture inlet of the humidifier to be tested after sequentially passing through the second heat exchanger, the bubbling humidification tank and the humidity control device; The testing device also includes a heating system, which includes a boiler, a water pump and a water heater. The hot water flowing out of the water pump is divided into two parallel branches through a three-way valve. One branch is connected to the bubbling humidification tank through the water heater to heat the water in the bubbling humidification tank, so that the second gas entering the bubbling humidification tank flows out at the target temperature and saturated humidity; the other branch is connected to the first heat exchanger or the second heat exchanger to preheat the first gas or the second gas. The water outlet of the first heat exchanger, the water outlet of the second heat exchanger, and the water outlet of the bubbling humidification tank are connected to the boiler through a four-way valve.

[0006] Furthermore, it also includes a cooling system for quickly cooling the gas to a target temperature, the cooling system including an intercooler and a water chiller, wherein the intercooler is arranged between the air electric heater and the humidifier to be tested on the first gas path, the air outlet of the intercooler is connected to the dry gas inlet of the humidifier to be tested, the water inlet of the water chiller is respectively connected to the water outlet of the intercooler and the bubbling humidification tank, and the water outlet is respectively connected to the water inlet of the bubbling humidification tank and the intercooler.

[0007] Furthermore, two branches are provided in parallel downstream of the intercooler, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through the first back pressure valve; Two branches are arranged in parallel downstream of the gas mixer, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through a second back pressure valve.

[0008] Furthermore, the testing device also includes an air filter disposed upstream of the first dryer, and the high-pressure gas source first passes through the air filter and then passes through the first dryer.

[0009] Furthermore, a first pressure reducing valve and a first flow controller are provided upstream of the first heat exchanger in the first gas circuit; a first pressure sensor, a first temperature sensor and a first humidity sensor are also provided between the intercooler and the humidifier to be tested in the first gas circuit; A second pressure reducing valve and a second flow controller are provided upstream of the second heat exchanger in the second gas circuit; a second pressure sensor, a second temperature sensor, a second humidity sensor and a third stop valve are also provided on the second gas circuit between the gas mixer and the humidifier to be tested.

[0010] Furthermore, the third gas path is connected to a first stop valve, a third pressure sensor, a third temperature sensor and a third humidity sensor through a pipeline; The fourth gas path is connected to a second stop valve, a fourth pressure sensor, a fourth temperature sensor and a fourth humidity sensor through a pipeline.

[0011] Furthermore, a first pressure-maintaining valve is connected in parallel between the first flow controller and the first pressure sensor on the first gas path; A second pressure-maintaining valve is connected in parallel on the second gas path between the second flow controller and the second pressure sensor.

[0012] On the other hand, the present invention discloses a method for testing a humidifier for a fuel cell engine, which mainly comprises the following steps: S1. Performance test of the humidifier to be tested, including gas leakage and pressure resistance test; S2, presetting a target temperature value for the dry gas inlet, a target humidity value for the wet gas inlet, and a target temperature value for the dry gas inlet of the humidifier to be tested; S3, preheating the first heat exchanger by using a heating system, so that the first gas reaches a target temperature value after passing through the first heat exchanger and the air electric heater; The second heat exchanger and the bubbling humidification tank are heated by a heating system, and the second gas reaches a target temperature value after passing through the second heat exchanger and the bubbling humidification tank. The second gas is controlled by a humidity control device so that the humidity of the second gas reaches the target humidity value. S4, passing the first gas and the second gas that have reached the set working condition into the humidifier to be tested, and calculating the dew point approach temperature and / or the moisture transfer efficiency under the working condition; S5, repeating steps S2-S4, presetting the temperature target value of the dry gas inlet, the humidity target value and the temperature target value of the wet gas inlet under different working conditions for testing; if the preset first gas temperature target value is lower than the previously preset temperature target value, starting the intercooler to cool the first gas so that the first gas temperature reaches the temperature target value; if the preset second gas temperature target value is lower than the previously preset temperature target value, starting the water chiller to cool the water in the bubbling humidification tank, and then cooling the second gas passing through the bubbling humidification tank; S6. After the test is completed, the atmosphere enters the first gas path and the humidifier to be tested through the first back pressure valve, and enters the second gas path and the humidifier to be tested through the second back pressure valve to purge the residual heat and liquid water in the test device.

[0013] Furthermore, the specific method of the performance test in step S1 is: S11, external leakage detection: close the first stop valve and the second stop valve, maintain the pressure to the test pressure through the first pressure maintaining valve and the second pressure maintaining valve, set the test time, and monitor the pressure decay of the dry gas inlet and the wet gas inlet of the humidifier to be tested through the first pressure sensor and the second pressure sensor respectively; S12, internal leakage detection: close the third stop valve and the first stop valve, let the gas into the dry gas inlet side through the first pressure maintaining valve to maintain the pressure, set the test time, and monitor the leakage flow rate of the wet gas outlet side through the flow meter; S13, pressure resistance test: close the first stop valve and the second stop valve, maintain the pressure to the test pressure through the first pressure maintaining valve and the second pressure maintaining valve, set the test time, and after the pressure resistance test, repeat steps S11 and S12 to perform internal leakage detection and external leakage detection again.

[0014] Further, in step S4, the dry-out dew point temperature is calculated according to the dew point measured by the third humidity sensor, the wet-in dew point temperature is calculated according to the dew point measured by the second humidity sensor, and the dew point approach temperature is calculated according to the wet-in dew point temperature and the dry-out dew point temperature; Or; query the air enthalpy humidity diagram, find the moisture content corresponding to the wet inlet dew point temperature and the moisture content corresponding to the dry outlet dew point temperature, and calculate the moisture transfer efficiency.

[0015] Beneficial effects: 1) The temperature of the dry gas inlet and the wet gas inlet can be adjusted more efficiently. The test device of the present invention includes a heating system, which includes a boiler, a water pump and a water heater. The hot water flowing out of the water pump is divided into two parallel branches through a three-way valve. One branch is connected to the bubbling humidification tank through the water heater to heat the water in the bubbling humidification tank, so that the gas entering the bubbling humidification tank flows out at the target temperature and saturated humidity; the other branch is connected to the first heat exchanger or the second heat exchanger to preheat the gas passing through the first heat exchanger or the second heat exchanger. On the dry side, the burden of the air electric heater and the temperature overshoot can be reduced; on the wet side, after preheating, the target temperature is reached faster in the bubbling humidification tank to obtain saturated humidity at the target temperature.

[0016] 2) The test device of the present invention also includes a cooling system, which includes an intercooler arranged on the first gas path and a chiller connected to the bubbling humidification tank. On the dry side, the intercooler can more quickly reduce the gas temperature in the first gas path to the target temperature; on the wet side, the chiller can quickly adjust the temperature of the water in the bubbling humidification tank, thereby quickly reducing the gas temperature in the second gas path to the target temperature, which is convenient for temperature conversion at different operating points during testing.

[0017] 3) The present invention has two branches connected in parallel downstream of the intercooler, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through the first back pressure valve; two branches are connected in parallel downstream of the gas mixer, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through the second back pressure valve. On the one hand, after the test is completed, the atmosphere enters the first gas path through the first back pressure valve, and enters the second gas path through the second back pressure valve to purge the residual heat and liquid water in the test device. The purge operation can be carried out simultaneously with the disassembly and assembly of the humidifier to be tested, thereby improving the test efficiency. On the other hand, when the pressure difference between the dry and wet sides is too large, it plays a role in pressure relief to avoid damage to the membrane. Furthermore, by adding the first back pressure valve and the second back pressure valve, a certain back pressure is provided during the purge or pressure relief process to avoid damage to the equipment caused by a sudden drop in pressure, thereby improving the efficiency and safety of the test.

[0018] 4) By adding a pressure-maintaining valve and a stop valve on the dry and wet sides, the device can be used to detect internal leakage, external leakage and pressure resistance of the humidifier, solving the problem that the existing test device needs to be connected to an external test instrument for internal leakage, external leakage and pressure resistance detection.

[0019] 5) The testing method based on the testing device can complete the test safely, reliably, accurately and efficiently, and has strong practical significance. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the testing device in the present invention.

[0021] Figure 2 It is a schematic diagram of the first gas path.

[0022] Figure 3 It is a schematic diagram of the second gas path.

[0023] Figure 4 It is a schematic diagram of the third gas path.

[0024] Figure 5 It is a schematic diagram of the fourth gas path.

[0025] Figure 6 is a schematic diagram of the cooling system.

[0026] Figure 7 This is a schematic diagram of the automatic control and information acquisition system, as well as the power supply system.

[0027] Graphic markings: 1, twelfth electric three-way valve, 2, first dryer, 3, first pressure reducing valve, 4, air filter, 5, first flow controller, 6, first electric three-way valve, 7, second electric three-way valve, 8, third electric three-way valve, 9, first heat exchanger, 10, second heat exchanger, 11, fourth electric three-way valve, 12, safety valve, 13, air electric heater, 14, fifth temperature sensor, 15, intercooler, 16, fifth electric three-way valve, 17, first dryer, 18, first pressure maintaining valve, 19, sixth electric three-way valve, 20, first pressure sensor, 21, first temperature sensor, 22, first humidity sensor, 23, second pressure sensor, 24, second temperature sensor, 25, second humidity sensor, 26, seventh electric three-way valve, 27, first back pressure valve, 28, first stop valve, 29, third pressure sensor, 3 0. The third temperature sensor, 31. The third humidity sensor, 32. The flow meter, 33. The fourth humidity sensor, 34. The fourth temperature sensor, 35. The fourth pressure sensor, 36. The second stop valve, 37. The humidifier to be tested, 38. The second back pressure valve, 39. The eighth electric three-way valve, 40. The third stop valve, 41. The ninth electric three-way valve, 42. The gas mixer, 43. The second pressure maintaining valve, 44. The tenth electric three-way valve, 45. The eleventh electric three-way valve, 46. The water heater, 47. The chiller, 48. The bubbling humidification tank, 49. The water pump, 50. The sensor module, 51. The four-way valve, 52. The boiler, 53. The second flow controller, 54. The second pressure reducing valve, 55. The first gas path, 56. The second gas path, 57. The third gas path, 58. The fourth gas path, 59. The automatic control and information acquisition system, 60. The power supply system. DETAILED DESCRIPTION

[0028] The technical solution of the present invention will be clearly and completely described below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0029] In the description of this application, it should be noted that the terms "inside", "outside", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the application is usually placed when in use, which is only for the convenience of describing this application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0030] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0031] The present invention provides a test device for a humidifier for a fuel cell engine, please refer to Figure 1 and Figure 7 , the humidifier 37 to be tested includes a dry gas inlet, a wet gas inlet, a dry gas outlet and a wet gas outlet. The test device includes a first gas circuit 55, a second gas circuit 56, a third gas circuit 57, a fourth gas circuit 58, a heating system, an automatic control and information acquisition system 59, and a power supply system 60. Among them, the first gas circuit 55 is connected to the dry gas inlet, the second gas circuit 56 is connected to the wet gas inlet, the third gas circuit 57 is connected to the dry gas outlet, and the fourth gas circuit 58 is connected to the wet gas outlet. The upstream of the first gas circuit 55 and the second gas circuit 56 is connected to the first dryer 2 through the twelfth electric three-way valve 1, and the first dryer 2 is connected to the high-pressure gas source to output high-pressure gas to the first gas circuit 55 and the second gas circuit 56. Let the high-pressure gas passing through the first gas circuit 55 be the first gas, and the gas passing through the second gas circuit 56 be the second gas. Each gas circuit and system is described in detail below.

[0032] First gas path 55, please refer to Figure 2 The first gas circuit 55 includes a first pressure reducing valve 3, a first flow controller 5, a first heat exchanger 9, an air electric heater 13, a first pressure sensor 20, a second temperature sensor 21, and a first humidity sensor 22, which are sequentially connected through pipelines. The first gas flows through the elements in sequence and is connected to the dry gas inlet of the humidifier 37 to be tested.

[0033] Second gas path 56, please refer to Figure 3 The second gas circuit 56 includes a second pressure reducing valve 54, a second flow controller 53, a second heat exchanger 10, a bubbling humidification tank 48, a humidity control system, a second pressure sensor 23, a second temperature sensor 24, a second humidity sensor 25, and a third stop valve 40, which are connected in sequence through pipelines. The second gas flows through the elements in sequence and is connected to the moisture inlet of the humidifier to be tested 37.

[0034] Third gas path 57, please refer to Figure 4The third gas circuit 57 includes a first stop valve 28, a third pressure sensor 29, a third temperature sensor 30, and a third humidity sensor 31 which are sequentially connected to the dry gas outlet of the humidifier to be tested 37. The third gas circuit 57 is connected to the dry side outlet of the humidifier to be tested 37 and can be controlled to be on and off by the first stop valve 28. The third pressure sensor 29 measures the pressure of the dry gas side outlet of the humidifier to be tested 37, the third temperature sensor 30 measures the temperature of the dry gas side outlet of the humidifier to be tested 37, and the third humidity sensor 31 measures the humidity of the dry gas side outlet of the humidifier to be tested 37.

[0035] Fourth gas path 58, please refer to Figure 5 The fourth gas path 58 includes a second stop valve 36, a fourth pressure sensor 35, a fourth temperature sensor 34, a fourth humidity sensor 33 and a flow meter 32 which are sequentially connected to the wet gas outlet of the humidifier to be tested 37. The fourth gas path 58 is connected to the wet side outlet of the humidifier to be tested 37 and can be controlled to be on and off by the second stop valve 36. The fourth pressure sensor 35 measures the pressure of the wet gas outlet of the humidifier to be tested 37, the fourth temperature sensor 34 measures the temperature of the wet gas outlet of the humidifier to be tested 37, the fourth humidity sensor 33 measures the humidity of the wet gas outlet of the humidifier to be tested 37, and the flow meter 32 measures the flow rate of the wet gas outlet of the humidifier to be tested 37.

[0036] Please refer to Figure 3 The heating system includes a boiler 52, a water pump 49 and a water heater 46. The hot water flowing out of the water pump is divided into two parallel branches through the tenth electric three-way valve 44. One branch is connected to the bubbling humidification tank 48 through the water heater 46 (the fifth temperature sensor 14 is also provided on the branch to monitor the temperature of the branch) to heat the water in the bubbling humidification tank 48, so that the second gas entering the bubbling humidification tank 48 flows out in the state of "target temperature and saturated humidity"; the other branch is connected to the third electric three-way valve 8 through the tenth electric three-way valve 44, and the third electric three-way valve 8 is respectively connected to the first heat exchanger 9 and the second heat exchanger 10 to preheat the first gas or the second gas. The water outlet of the first heat exchanger 9, the water outlet of the second heat exchanger 10, and the water outlet of the bubbling humidification tank 48 are connected to the boiler 52 through the four-way valve 51.

[0037] Preferably, the test device also includes a cooling system for quickly cooling the gas to the target temperature, see Figure 6It should be noted that, in general, the temperature of the gas can be raised to the target temperature by the heating system. The cooling system is generally used when the test condition is changed and the temperature of the next test condition is lower than that of the current test condition. In other words, it is used to quickly cool the gas path and can also be used to cool the test device after the test. The cooling system includes an intercooler 15 and a chiller 47, wherein the intercooler 15 is arranged between the air electric heater 13 and the humidifier 37 to be tested on the first gas path 55, the gas outlet of the intercooler 15 is connected to the dry gas inlet of the humidifier 37 to be tested, the water inlet of the chiller 47 is connected to the water outlet of the intercooler 15 and the water outlet of the bubbling humidification tank 48 through the fourth electric three-way valve 11, and the water outlet of the chiller 47 is connected to the water inlet of the bubbling humidification tank 48 and the water inlet of the intercooler 15 through the eleventh electric three-way valve 45. The water chiller 47 can not only cool the bubbling humidification tank 48 , but also cool the intercooler 15 .

[0038] Under the action of the heating system, the second gas is output in the state of "target temperature and saturated humidity" through the bubbling humidification tank 48 and then enters the humidity control system. The gas outlet of the bubbling humidification tank 48 is connected to the fifth electric three-way valve 16. The humidity control system includes a gas mixer 42 connected to the fifth electric three-way valve 16 at one end and connected to the moisture inlet of the humidifier to be tested 37 at the other end, and a second dryer 17 connected to the fifth electric three-way valve 16 at one end and connected to the gas inlet of the gas mixer 42 at the other end; the gas outlet of the gas mixer 17 is connected to the moisture inlet of the humidifier to be tested 37. The second gas with the required temperature and humidity can be obtained through mixing in the humidity control system.

[0039] The first gas circuit 55 is connected to the dry side inlet of the humidifier to be tested 37, and provides dry gas with set flow rate, temperature, humidity and pressure for the humidifier to be tested 37. The adjustment process of flow rate, temperature and pressure of the first gas circuit is as follows: the gas of the high-pressure gas source is filtered by the air filter 4 and dried by the first dryer 2 before entering the first gas circuit, the water pump 49 delivers the hot water in the boiler 52 to the first heat exchanger 9 through the tenth electric three-way valve 44 and the third electric regulating valve 8 to preheat the first gas, the air electric heater 13 heats the air and raises the temperature of the first gas to the target temperature through the first heat exchanger 9 and the air electric heater 13, the first pressure sensor 20 measures the pressure at the dry gas inlet of the humidifier to be tested 37, the first temperature sensor 21 measures the temperature at the dry gas inlet of the humidifier to be tested 37, and the first humidity sensor 22 measures the dew point at the dry gas inlet of the humidifier to be tested 37 and calculates the humidity based on the dew point.

[0040] The second gas circuit 56 is connected to the moisture inlet of the humidifier 37 to be tested and can be switched on and off by the third stop valve 40, and provides the humidifier to be tested with moisture of set flow rate, temperature, humidity and pressure. The regulation process of the flow rate, temperature, humidity and pressure of the second gas circuit is as follows: the gas of the high-pressure gas source is filtered by the air filter 4 and dried by the first dryer 2 before entering the second gas circuit 56, the second pressure reducing valve 54 regulates the pressure of the compressed air for the wet side channel of the humidifier 37 to be tested, the second flow controller 53 controls the flow rate of the compressed air, the water pump 49 delivers the hot water in the boiler 52 to the second heat exchanger 10 through the tenth electric three-way valve 44 and the third electric regulating valve 8 on the one hand to preheat the second gas, and on the other hand delivers it to the bubbling humidification tank 48 through the tenth electric three-way valve 44 for heating, so that the second gas flowing through the bubbling humidification tank 48 flows out in the state of "target temperature-saturated moisture", and there is The sensor module 50 is used to monitor temperature, pressure, and liquid level. When the pressure is too high, the safety valve 12 acts as a pressure relief protection device. The second gas flows out in the state of "target temperature-saturated moisture" and enters the humidity control system. A part of the second gas passes through the fifth electric three-way valve 16 and the second dryer 17 and then enters the gas mixer 42 after dehumidification, and the other part directly enters the gas mixer 42. After being mixed in the gas mixer 42, the target humidity is obtained. The second pressure sensor 23 measures the pressure at the moisture inlet of the humidifier 37 to be tested, the second temperature sensor 24 measures the temperature at the moisture inlet of the humidifier 37 to be tested, and the second humidity sensor 25 measures the humidity at the moisture inlet of the humidifier 37 to be tested.

[0041] Two branches are separated downstream of the first flow controller 5 through the first electric three-way valve 6, one of which includes the first heat exchanger 9, the air electric heater 13 and the intercooler 15, and the intercooler 15 is connected to the sixth electric three-way valve 19. The other branch includes a first pressure-maintaining valve 18 connected to the electric three-way valve 6 at one end and to the electric three-way valve 19 at the other end.

[0042] The downstream of the second flow controller 53 is divided into two branches through the second electric three-way valve 7, one of which includes the second heat exchanger 10, the bubbling humidification tank 48 and the gas mixer 42, and the gas mixer 42 is connected to the ninth electric three-way valve 41. The other branch includes a second pressure-maintaining valve 43 connected to the electric three-way valve 7 at one end and to the electric three-way valve 41 at the other end.

[0043] Two branches are provided in parallel downstream of the intercooler 15, one branch is connected to the humidifier 37 to be tested, and the other branch is directly connected to the atmosphere through the first back pressure valve 27; two branches are provided in parallel downstream of the gas mixer 42, one branch is connected to the humidifier 37 to be tested, and the other branch is directly connected to the atmosphere through the second back pressure valve 38. On the one hand, after the test is completed, the atmosphere enters the first gas path 55 through the first back pressure valve 27, and enters the second gas path 56 through the second back pressure valve 38 to purge the residual heat and liquid water in the test device. The purge operation can be carried out simultaneously with the disassembly and assembly of the humidifier 37 to be tested, thereby improving the test efficiency. On the other hand, when the pressure difference between the dry and wet sides is too large, the back pressure valves 27 and 38 play a role in pressure relief to avoid damage to the membrane. By adding back pressure valves 27 and 38, a certain back pressure is provided during the purge or pressure relief process to avoid equipment damage caused by a sudden drop in pressure.

[0044] The test device further includes an air filter 4 disposed upstream of the first dryer 2, and the high-pressure air source first passes through the air filter 4 and then passes through the first dryer 2. The air filter 4 filters impurities in the atmosphere, and the first dryer 2 dries the air to avoid interference with humidity due to factors such as region and weather.

[0045] The power supply system 60 is used to supply power to each component. The automatic control and information acquisition system 59 is electrically connected to each component in the first to fourth gas circuits, the heating system, the cooling system and the power supply system 60.

[0046] A method for testing a humidifier for a fuel cell engine mainly comprises the following steps: S1. Performance test of the humidifier to be tested, including gas leakage and pressure resistance test; S11, external leakage detection: close the first stop valve 28 of the third gas path 57 and the second stop valve 36 of the fourth gas path 58, maintain the pressure to the test pressure through the first pressure maintaining valve 18 and the second pressure maintaining valve 43, set the test time, and monitor the inlet pressure decay through the first pressure sensor 20 and the second pressure sensor 23; S12, internal leakage detection: close the third stop valve 40 of the second gas path 56 and the first stop valve 28 of the third gas path 58, the first gas is pressurized through the first pressure-maintaining valve 18, the test time is set, and the leakage flow rate of the wet side outlet is monitored by the flow meter 32; S13, pressure resistance test: close the first stop valve 28 of the third gas circuit 57 and the second stop valve 36 of the fourth gas circuit 58, and maintain the pressure to the test pressure through the first pressure maintaining valve 18 and the second pressure maintaining valve 43. Because the pressure resistance test is generally at a high pressure, the internal and external leakage may increase after the high pressure, so it is necessary to repeat steps S11 and S12, and perform internal leakage test and external leakage test again; if the test is qualified, perform subsequent tests, if the test is unqualified, replace a new humidifier and test again; S2, presetting a target temperature value of the dry gas inlet, a target humidity value and a target temperature value of the wet gas inlet of the humidifier 37 to be tested; S3, preheating the first heat exchanger 9 by using a heating system, so that the first gas outputted from the first dryer 2 reaches the target temperature after passing through the first heat exchanger 9 and the electric air heater 13; The second heat exchanger 10 and the bubbling humidification tank 48 are heated by a heating system, and the second gas outputted from the first dryer 2 reaches the target temperature value after passing through the second heat exchanger 10 and the bubbling humidification tank 48, and the second gas is controlled by a humidity control system so that the humidity of the second gas reaches the target humidity value; S4, passing the first gas and the second gas that have reached the set working condition into the humidifier to be tested 37, and calculating the dew point approach temperature and / or the moisture transfer efficiency under the working condition; S5, repeating steps S2-S4, presetting the temperature target value of the dry gas inlet, the humidity target value and the temperature target value of the wet gas inlet under different working conditions for testing; if the preset first gas temperature target value is lower than the previously preset temperature target value, starting the intercooler 15 to cool the first gas so that the first gas temperature reaches the temperature target value; if the preset second gas temperature target value is lower than the previously preset temperature target value, starting the water chiller 47 to cool the water in the bubbling humidification tank 48, and then cooling the second gas passing through the bubbling humidification tank 48; S6. After the test is completed, the atmosphere enters the first gas path 55 through the first back pressure valve 27 and enters the second gas path 56 through the second back pressure valve 38 to purge the residual heat and liquid water in the test device.

[0047] It should be noted that in step S4, the dew point temperature DewT is calculated according to the dew point measured by the third humidity sensor 22. dryout , calculate the wet dew point temperature DewT according to the dew point measured by the second humidity sensor 25 wetin , calculate the dew point approach temperature ADT based on the wet inlet dew point temperature and the dry outlet dew point temperature; or; query the air enthalpy humidity diagram to find the water content Wt corresponding to the wet inlet dew point temperature wetin And the moisture content Wt corresponding to the dry dew point temperature dryout , calculate the water transfer efficiency WTE.

[0048] According to the dew point temperature, the air enthalpy and humidity diagram can be used to obtain the water content at the corresponding temperature, and the moisture transfer efficiency can be calculated according to the following formula: Where WTE stands for water transfer efficiency (%), Wt dryout Represents the dry water content (g / kg(a)), Wt wetin Represents the wet moisture content (g / kg(a)).

[0049] The calculation formula for dew point approach temperature is: Where ADT represents the dew point approach temperature (℃), DewT wetin DewT represents the wet dew point temperature (℃), dryout Represents the dry dew point temperature (℃).

[0050] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any equivalent changes or modifications made according to the essence of the present invention should be included in the protection scope of the present invention.

Claims

1. A test device for a humidifier for a fuel cell engine, characterized in that: It includes a first dryer connected to a high-pressure gas source, and two gas paths are branched from the gas outlet of the first dryer and finally converged to the humidifier to be tested: one is a first gas path connected to the dry gas inlet of the humidifier to be tested, and the other is a second gas path connected to the wet gas inlet of the humidifier to be tested; a third gas path connected to the dry gas outlet and a fourth gas path connected to the wet gas outlet are provided on the gas outlet side of the humidifier to be tested; The first gas path includes a first heat exchanger and an electric air heater which are connected in series through a pipeline; the first gas outputted by a first dryer connected to a high-pressure gas source is heated by the first heat exchanger and the electric air heater in sequence and then enters the humidifier to be tested from the dry gas inlet of the humidifier to be tested; The second gas circuit includes a second heat exchanger, a bubbling humidification tank and a humidity control system which are sequentially connected in series through a pipeline, and the humidity control system includes a gas mixer having one end connected to the gas outlet of the bubbling humidification tank and the other end connected to the moisture inlet of the humidifier to be tested, and a second dryer having one end connected to the gas outlet of the bubbling humidification tank and the other end connected to the gas inlet of the gas mixer; the gas outlet of the gas mixer is connected to the moisture inlet of the humidifier to be tested, and the second gas outputted by the first dryer connected to the high-pressure gas source enters the humidifier to be tested from the moisture inlet of the humidifier to be tested after sequentially passing through the second heat exchanger, the bubbling humidification tank and the humidity control device; The testing device also includes a heating system, which includes a boiler, a water pump and a water heater. The hot water flowing out of the water pump is divided into two parallel branches through a three-way valve. One branch is connected to the bubbling humidification tank through the water heater to heat the water in the bubbling humidification tank, so that the second gas entering the bubbling humidification tank flows out at the target temperature and saturated humidity; the other branch is connected to the first heat exchanger or the second heat exchanger to preheat the first gas or the second gas. The water outlet of the first heat exchanger, the water outlet of the second heat exchanger, and the water outlet of the bubbling humidification tank are connected to the boiler through a four-way valve.

2. The test device for a humidifier for a fuel cell engine according to claim 1, characterized in that: It also includes a cooling system for quickly cooling the gas to a target temperature, the cooling system including an intercooler and a water chiller, wherein the intercooler is arranged between the air electric heater and the humidifier to be tested on the first gas path, the air outlet of the intercooler is connected to the dry gas inlet of the humidifier to be tested, the water inlet of the water chiller is respectively connected to the water outlets of the intercooler and the bubbling humidification tank, and the water outlet is respectively connected to the water inlet of the bubbling humidification tank and the intercooler.

3. The test device for a humidifier for a fuel cell engine according to claim 2, characterized in that: Two branches are arranged in parallel downstream of the intercooler, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through the first back pressure valve; Two branches are arranged in parallel downstream of the gas mixer, one branch is connected to the humidifier to be tested, and the other branch is directly connected to the atmosphere through a second back pressure valve.

4. The test device for a humidifier for a fuel cell engine according to claim 1, characterized in that: The testing device further comprises an air filter arranged upstream of the first dryer, and the high-pressure gas source first passes through the air filter and then passes through the first dryer.

5. The test device for a humidifier for a fuel cell engine according to claim 1, characterized in that: A first pressure reducing valve and a first flow controller are provided upstream of the first heat exchanger in the first gas circuit; a first pressure sensor, a first temperature sensor and a first humidity sensor are also provided between the intercooler and the humidifier to be tested on the first gas circuit; A second pressure reducing valve and a second flow controller are provided upstream of the second heat exchanger in the second gas circuit; a second pressure sensor, a second temperature sensor, a second humidity sensor and a third stop valve are also provided on the second gas circuit between the gas mixer and the humidifier to be tested.

6. The test device for a humidifier for a fuel cell engine according to claim 5, characterized in that: The third gas path is connected to a first stop valve, a third pressure sensor, a third temperature sensor and a third humidity sensor through a pipeline; The fourth gas path is connected to a second stop valve, a fourth pressure sensor, a fourth temperature sensor and a fourth humidity sensor through a pipeline.

7. A test device for a humidifier for a fuel cell engine according to claim 6, characterized in that: A first pressure-maintaining valve is connected in parallel between the first flow controller and the first pressure sensor on the first gas path; A second pressure-maintaining valve is connected in parallel on the second gas path between the second flow controller and the second pressure sensor.

8. A method for testing a fuel cell engine humidifier using the testing device according to any one of claims 1 to 7, characterized in that: The main steps are as follows: S1. Performance test of the humidifier to be tested, including gas leakage and pressure resistance test; S2, presetting a target temperature value for the dry gas inlet, a target humidity value for the wet gas inlet, and a target temperature value for the dry gas inlet of the humidifier to be tested; S3, preheating the first heat exchanger by using a heating system, so that the first gas reaches a target temperature value after passing through the first heat exchanger and the air electric heater; The second heat exchanger and the bubbling humidification tank are heated by a heating system, and the second gas reaches a target temperature value after passing through the second heat exchanger and the bubbling humidification tank. The second gas is controlled by a humidity control device so that the humidity of the second gas reaches the target humidity value. S4, passing the first gas and the second gas that have reached the set working condition into the humidifier to be tested, and calculating the dew point approach temperature and / or the moisture transfer efficiency under the working condition; S5, repeating steps S2-S4, presetting the temperature target value of the dry gas inlet, the humidity target value and the temperature target value of the wet gas inlet under different working conditions for testing; if the preset first gas temperature target value is lower than the previously preset temperature target value, starting the intercooler to cool the first gas so that the first gas temperature reaches the temperature target value; if the preset second gas temperature target value is lower than the previously preset temperature target value, starting the water chiller to cool the water in the bubbling humidification tank, and then cooling the second gas passing through the bubbling humidification tank; S6. After the test is completed, the atmosphere enters the first gas path and the humidifier to be tested through the first back pressure valve, and enters the second gas path and the humidifier to be tested through the second back pressure valve to purge the residual heat and liquid water in the test device.

9. The method for testing a humidifier for a fuel cell engine according to claim 8, characterized in that: The specific method of performance testing in step S1 is: S11, external leakage detection: close the first stop valve and the second stop valve, maintain the pressure to the test pressure through the first pressure maintaining valve and the second pressure maintaining valve, set the test time, and monitor the pressure decay of the dry gas inlet and the wet gas inlet of the humidifier to be tested through the first pressure sensor and the second pressure sensor respectively; S12, internal leakage detection: close the third stop valve and the first stop valve, let the gas into the dry gas inlet side through the first pressure maintaining valve to maintain the pressure, set the test time, and monitor the leakage flow rate of the wet gas outlet side through the flow meter; S13, pressure resistance test: close the first stop valve and the second stop valve, maintain the pressure to the test pressure through the first pressure maintaining valve and the second pressure maintaining valve, set the test time, and after the pressure resistance test, repeat steps S11 and S12 to perform internal leakage detection and external leakage detection again.

10. The method for testing a humidifier for a fuel cell engine according to claim 8, characterized in that: In step S4, the dry-out dew point temperature is calculated according to the dew point measured by the third humidity sensor, the wet-in dew point temperature is calculated according to the dew point measured by the second humidity sensor, and the dew point approach temperature is calculated according to the wet-in dew point temperature and the dry-out dew point temperature; Or; query the air enthalpy humidity diagram, find the moisture content corresponding to the wet inlet dew point temperature and the moisture content corresponding to the dry outlet dew point temperature, and calculate the moisture transfer efficiency.