Performance test system and test method for thermal management system of automobile power battery
By designing the battery heat simulation device and flow adjustment device to simulate the working status of the power battery, the problem of high cost and inability to conduct long-term testing of the power battery thermal management system is solved, and testing without a full battery pack is achieved, reducing the cost cost and meets a variety of testing needs.
Patent Information
- Application Number
- CN202410852866.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
AI Technical Summary
Existing power battery thermal management system testing methods are expensive and cannot be carried out for a long time, and cannot meet the functional and performance verification needs of power batteries when the temperature is higher than the upper limit.
A vehicle power battery thermal management system performance testing system is designed, including a battery heat simulation device and a flow adjustment device. By simulating the working state of the power battery, adjusting the heating power and water flow, it is judged whether the cooling capacity of the battery thermal management system meets the requirements. , to achieve testing without a full battery pack.
The test cost is reduced, the long-term test of the power battery thermal management system is realized, the test requirements can be met under various external conditions, and the versatility and safety of the test are improved.
Smart Images

Figure CN118730593A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power batteries, and in particular to a performance testing system and a testing method for a thermal management system of an automobile power battery. Background Art
[0002] With the rapid development of the new energy industry, the demand for new energy vehicles is increasing, and battery swap stations for new energy vehicles have begun to be established regionally. Different from the battery swap of passenger cars, the battery swap of new energy vehicles will be very frequent, which leads to the battery packs being charged in the battery swap stations all the time. In order to improve its charging efficiency and reduce heat loss, the charging temperature is generally controlled within a certain range. Of course, the battery pack also needs to be kept within a certain operating temperature range when working normally.
[0003] The function of the power battery thermal management system in new energy vehicles is to control the temperature of the battery pack during charging or other working conditions. If the temperature of the battery pack is lower than the lower temperature limit, the thermal management system outputs a higher temperature circulating fluid through its temperature control module to exchange heat with the battery pack to increase its temperature; if the temperature of the battery pack is higher than the upper temperature limit, the thermal management system outputs a lower temperature circulating fluid through the thermal management system to exchange heat with the battery pack to reduce its temperature. In particular, if the temperature of the battery pack is higher than the upper temperature limit, if the thermal management system cannot control the temperature in time, it will bring great safety hazards.
[0004] In order to effectively verify the function and performance requirements of the thermal management system when the temperature of the battery pack is higher than the upper temperature limit, the current method is to test and verify under the actual weather and climate of the site and when the battery compartment is full of batteries. However, the current test method has the following disadvantages: 1) The power batteries of new energy vehicles are expensive, and the cost of testing full batteries is too high. When testing the thermal management system, it is necessary to verify its function and performance when the battery pack is fully equipped. This requires that the battery compartment be fully equipped with 24 or more batteries. Since single batteries are expensive, it is too expensive to test with a full battery pack. 2) Thermal management system testing cannot be tested for a long time. The heat released when the power battery is charged is the heat load of the thermal management system. However, when the batteries are fully charged and no longer charged, the heat load of the thermal management system gradually decreases. When the heat load drops to a certain value, the test can no longer be carried out. Therefore, the existing test methods cannot meet the test needs. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides a performance testing system and method for an automobile power battery thermal management system, which can meet the test of the function and performance of the power battery thermal management system even when the battery pack is not fully equipped, thereby reducing the testing cost. Moreover, regardless of the external conditions, the thermal management system can be tested for a long time to meet various testing requirements.
[0006] To achieve the above-mentioned purpose, the technical solution adopted by the present invention to solve its technical problem is: the automobile power battery thermal management system performance test system includes a battery thermal simulation device for simulating the working state of the power battery, the water inlet of the battery thermal simulation device is connected to the water outlet of the battery thermal management system through a flow regulating device, and the drain outlet of the battery thermal simulation device is connected to the water inlet of the battery thermal management system.
[0007] The battery heat simulation device comprises a containing chamber for containing circulating fluid, a heater and a temperature sensor are installed in the containing chamber, and the temperature sensor is connected to the heater through a control unit.
[0008] The containing bin is configured as a cylindrical bin body, the heaters are configured in multiple groups and are connected in parallel with each other, and the multiple groups of heaters are arranged at intervals along the circumference of the containing bin.
[0009] A plurality of groups of the heaters are connected to the control unit via solid-state relays, and the control unit and the solid-state relays are installed in an electric control cabinet.
[0010] A three-way pipe communicating with the interior is installed on the top of the containing bin, a water inlet is arranged at one side port of the three-way pipe, and an automatic exhaust valve is installed at the top port of the three-way pipe.
[0011] A liquid level sensor is installed on the upper part of the containing bin, an overflow port is provided on the top of the containing bin, an overflow valve is installed at the overflow port, and the liquid level sensor is connected to the alarm unit and the overflow valve through a control unit; a drain port is provided at the bottom of the containing bin, and the drain port is connected to the water inlet of the battery thermal management system through pipe I.
[0012] The flow regulating device includes a connecting pipe and a flow regulator installed thereon, one end of the connecting pipe is connected to the water inlet through pipe II, and the other end of the connecting pipe is connected to the water outlet of the battery thermal management system through pipe III.
[0013] The battery thermal management system is communicatively connected to an external digital display controller to display the cooling capacity of the battery thermal management system.
[0014] A method for testing the performance of a thermal management system of an automobile power battery, using the testing system, comprises:
[0015] 1) According to the number of battery cells tested N, adjust the heating power Q output by the battery heat simulation device 需 and the water flow rate q entering the battery thermal simulator 总 ;
[0016] 2) The battery thermal management system runs and automatically collects the outlet temperature T 出 and water inlet temperature T进 ;
[0017] 3) The entire test system runs stably for a set time and controls the internal temperature of the battery thermal simulation device to reach the set temperature range;
[0018] 4) Calculate the cooling capacity Q of the battery thermal management system 测 =q 总 *(T 进 -T 出 ), and judge Q 测 With Q 需 The size between 测 ≥Q 需 , then the battery thermal management system performance meets the requirements, if Q 测 需 , the battery thermal management system performance does not meet the requirements.
[0019] In step 1), the heat generation power of a battery cell is P, and the required cooling circulation fluid flow rate is q, then Q 需 =P*N*110%,q 总 =q*N;
[0020] The conditions for the operation of the battery thermal management system include: 1) the liquid level of the circulating fluid inside the battery thermal simulation device covers the internal heater; 2) T 出 The range is 9-12℃.
[0021] The beneficial effects of the present invention are:
[0022] 1. The present invention provides a performance test system and test method for a thermal management system of an automobile power battery. A battery thermal simulation device is designed to simulate the working state of the power battery, that is, the heating power of the battery thermal simulation device can be adjusted according to the number of battery cells. The battery thermal simulation device is connected to the battery thermal management system through a flow regulating device, and the water flow rate flowing into the battery thermal simulation device can be adjusted according to the number of battery cells. Therefore, the entire test system can simulate the working state of the battery thermal management system when the temperature of the power battery is higher than the upper limit of the working temperature. By detecting the cooling capacity of the battery thermal management system and comparing it with the heating power output by the battery thermal simulation device, it can be determined whether the performance of the battery thermal management system meets the requirements. Therefore, the entire test system can meet the test of the function and performance of the power battery thermal management system without a full battery pack, and the test cost is reduced. Moreover, regardless of the external conditions, the thermal management system can be tested for a long time, which can meet various test requirements and has strong versatility.
[0023] 2. The present invention designs a battery heat simulation device, which includes a containing chamber and multiple groups of heaters, temperature sensors, liquid level sensors, automatic exhaust valves, and overflow valves inside. The entire device can simulate the state of heat release from the power battery without being affected by the external environment. It has low production cost, high test safety, complete functions, and can be reused, further reducing the test cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The following is a brief description of the contents expressed in the drawings of the present invention and the symbols in the drawings:
[0025] Figure 1 It is a structural schematic diagram of the power battery thermal management system performance test system of the present invention;
[0026] Figure 2 for Figure 1 Schematic diagram of the structure of the battery thermal simulation device;
[0027] Figure 3 for Figure 1 A schematic diagram of the structure of the medium flow regulating device;
[0028] Figure 4 This is a control flow chart of the performance testing method of the power battery thermal management system of the present invention;
[0029] The marks in the above figures are: 1. Battery thermal simulation device, 11. Holding chamber, 12. Heater, 13. Temperature sensor, 14. Tee pipe, 141. Water inlet, 15. Automatic exhaust valve, 16. Liquid level sensor, 17. Overflow valve, 18. Drain, 2. Flow regulating device, 21. Connecting pipe, 22. Flow regulator, 3. Battery thermal management system, 4. Electric control cabinet, 5. Pipeline I, 6. Pipeline II, 7. Pipeline III. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.
[0031] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as “upper”, “lower”, “front”, “back”, “left”, “right”, “vertical”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] In the prior art, when the temperature of the battery pack is higher than the upper temperature limit, if the thermal management system cannot control the temperature in time, it will bring great safety hazards. In order to effectively verify the functions and performance requirements of the thermal management system under the above circumstances, the current method is to test and verify the battery thermal management system under the actual weather and climate of the site and when the battery compartment is full of batteries. However, the above method has the problems that the power batteries of new energy vehicles are expensive, the cost of fully equipped battery testing is too high, and the thermal management system test cannot be carried out for a long time, which cannot meet the testing needs.
[0034] In order to solve the above technical problems, such as Figure 1 As shown, the present invention provides a performance test system for a thermal management system 3 of an automobile power battery, including a battery heat simulation device 1 for simulating the working state of a power battery, that is, the heating power of the battery heat simulation device 1 can be adjusted according to the number of battery cells, so as to simulate the state of heat release of the power battery; the water inlet 141 of the battery heat simulation device 1 is connected to the water outlet of the battery heat management system 3 through the flow regulating device 2, and the drain outlet 18 of the battery heat simulation device 1 is connected to the water inlet of the battery heat management system 3, so that the water path between the battery heat management system 3 and the battery heat simulation device 1 is connected, simulating the cooling water path for heat exchange of the battery pack, and the water flow rate flowing into the battery heat simulation device 1 can be adjusted by the flow regulating device 2 to simulate the water flow rate for cooling the power battery with a corresponding number of cells. Therefore, the entire test system can simulate the working state of the battery heat management system 3 when the temperature of the power battery (including the corresponding number of cells) is higher than the upper limit of the working temperature, and the performance of the battery heat management system 3 can be judged whether it meets the requirements through the relevant performance indicators. Therefore, the entire test system can meet the test of the functions and performance of the power battery thermal management system 3 without a full battery pack, the test cost is reduced, and regardless of the external conditions, the thermal management system can be tested for a long time, which can meet various test requirements and has strong versatility.
[0035] Specifically, Figure 2As shown, the battery heat simulation device 1 includes a storage chamber 11 for containing circulating fluid, and the storage chamber 11 is set as a sealed chamber and has a certain heat preservation function. A heater 12 and a temperature sensor 13 are installed in the storage chamber 11. The heater 12 can be set as an electric heater 12. The operation of the heater 12 can simulate the state of heat release of the power battery. The temperature sensor 13 is used to detect the temperature in the storage chamber 11, that is, to simulate the temperature inside the power battery; the temperature sensor 13 is connected to the heater 12 through a control unit, and the temperature sensor 13 transmits the detected temperature signal to the control unit. The control unit controls the heating power of the heater 12 according to the temperature range or temperature change gradient set before the test, which can truly simulate the state of heat release of the power battery or simulate different test conditions without being affected by external conditions.
[0036] The storage bin 11 is configured as a cylindrical bin body, and the shape can be a cylindrical structure such as a cylindrical or prismatic structure, which is not limited here. The above-mentioned heater 12 is provided with multiple groups, and the corresponding number and power of heaters 12 can be selected according to the heat released by the power battery containing a certain number of single cells to meet the test requirements. Multiple groups of heaters 12 are connected in parallel with each other and arranged at intervals along the circumference of the storage bin 11, so that the overall structural layout of the battery heat simulation device 1 is more compact. Moreover, multiple groups of heaters 12 are connected to the control unit through solid-state relays, and the control unit and the solid-state relays are both installed in the electric control cabinet 4, wherein the control unit can be configured as a PLC, and the solid-state relay is equivalent to a control switch. The temperature sensor 13 transmits the detected temperature signal to the control unit, and the control unit gives instructions to the solid-state relay according to the temperature range or temperature change gradient set before the test to stably control the heating power of the heater 12.
[0037] In addition, a through hole is provided at the top of the containing bin 11, and a three-way pipe 14 connected to the inside of the containing bin 11 is installed at the through hole. A water inlet 141 of the containing bin 11 is provided at one side port of the three-way pipe 14, and an automatic exhaust valve 15 is installed at the top port of the three-way pipe 14. Since the containing bin 11 is a sealed bin, when the internal multiple sets of heaters 12 are working, the temperature and pressure in the bin body will increase. In order to ensure the safety of the test, by setting the pressure value of the automatic exhaust valve 15, when the pressure in the containing bin 11 exceeds the set pressure, the containing bin 11 can be automatically exhausted and depressurized.
[0038] A liquid level sensor 16 is installed on the upper part of the storage bin 11. The liquid level sensor 16 is used to detect whether the liquid level in the storage bin 11 covers the heating tube of the heater 12. An overflow port is also provided on the top of the storage bin 11. An overflow valve 17 is installed at the overflow port. The liquid level sensor 16 is connected to the alarm unit and the overflow valve 17 through a control unit. When the liquid level sensor 16 detects that the liquid level in the storage bin 11 exceeds the upper limit of the liquid level, the control unit controls the overflow valve 17 to open automatically to discharge the excess cooling circulating liquid; when the liquid level sensor 16 detects that the liquid level in the storage bin 11 does not cover the heating tube of the heater 12, the control unit controls the alarm unit to alarm and remind the staff to replenish the liquid in time to prevent the heater 12 from burning dry.
[0039] A drain outlet 18 is provided at the bottom of the storage chamber 11 , and the drain outlet 18 is connected to the water inlet of the battery thermal management system 3 through the pipe Ⅰ5 . During the operation of the battery thermal management system 3 , the circulation of the cooling circulating fluid is realized to effectively cool down the battery thermal simulation device 1 .
[0040] Specifically, Figure 1 and Figure 3 As shown, the flow regulating device 2 includes a connecting pipe 21 and a flow regulator 22 installed thereon. One end of the connecting pipe 21 is connected to the water inlet 141 through a pipe II6, and the other end of the connecting pipe 21 is connected to the water outlet of the battery thermal management system 3 through a pipe III7. The flow regulator 22 integrates a flow meter, a controller and a regulating valve. The flow meter monitors the water flow entering the connecting pipe 21 in real time and feeds back the flow signal to the controller. The controller controls the opening of the regulating valve to adjust the water flow entering the connecting pipe 21 to meet the set flow range.
[0041] In addition, the battery thermal management system 3 is connected to the external digital display controller to display the cooling capacity of the battery thermal management system 3. Specifically, the digital display controller includes a control unit and a digital display unit that communicate with each other. The battery thermal management system 3 feeds back the real-time monitored temperature signal to the digital display controller. The control unit of the digital display controller calculates the cooling capacity of the battery thermal management system 3 and displays it through the digital display unit, making the display more intuitive.
[0042] The present invention also provides a method for testing the performance of a thermal management system of an automobile power battery. Figure 4 As shown, the specific method includes:
[0043] 1) According to the number of battery cells N to be tested, set the heating power Q output by the battery heat simulation device 1 需 and the water flow rate q entering the battery thermal simulation device 1 总That is, the heating power of a battery cell is P, and the required cooling circulation fluid flow rate is q. The size of P and q depends on the model of the battery cell. For example, the heating power of a battery cell in a general commercial vehicle is P = 6KW, q = 15L / min. Then Q 需 =P*N*110%, 10% of which is reserved for the heating power of the heating device connected to the battery, and q 总 =q*N.
[0044] 2) When the liquid level of the circulating fluid inside the battery thermal simulation device 1 covers the internal heater 12, and T 出 When the temperature is not less than 10°C, the battery thermal management system 3 operates. When the above two conditions cannot be met at the same time, the battery thermal management system 3 does not operate. That is, when the liquid level of the internal circulating fluid of the battery thermal simulation device 1 does not cover the internal heater 12, in order to prevent dry burning, an alarm is issued to remind timely replenishment of liquid; when T 出 When the temperature is between 9 and 12°C, the battery thermal management system 3 is in the start-stop state. When the battery thermal management system 3 works stably, T 出 The range is 9.5-10.5℃. 出 When the temperature is not within the range of 9-12℃, the performance of the battery thermal management system 3 is unstable, which will make the test results unreliable. To ensure the reliability of the test results, T 出 The required range is 9 to 12°C.
[0045] 3) When the conditions are met, the battery thermal management system 3 operates. Since the temperature sensors 13 are installed at the water inlet and outlet of the battery thermal management system 3, the outlet temperature T can be automatically collected during the operation of the battery thermal management system 3. 出 and water inlet temperature T 进 ;
[0046] 4) The entire test system runs stably for a set time and controls the internal temperature of the battery thermal simulation device 1 to reach a set temperature range. That is, the flow regulating device is set with a water flow rate q 总 Open the corresponding opening, the battery heat simulation device heats the battery at the set heating power Q 需 Work. The specific control method is that the temperature sensor 13 inside the battery thermal simulation device 1 monitors the temperature inside the storage compartment 11 in real time, and feeds back the temperature signal to the battery thermal management system 3. The temperature control module inside the battery thermal management system 3 works to output the circulating fluid in the corresponding temperature range to exchange heat with the power battery, so as to control the internal temperature of the battery thermal simulation device 1 to reach the set temperature range, generally meeting 10-40°C. At the same time, the electric control cabinet 4 controls the multiple groups of heaters 12 to work at the set power to ensure that the heating power of the battery thermal simulation device 1 meets the test requirements.
[0047] 5) Calculate the cooling capacity Q of the battery thermal management system 3 测 =q 总 *(T 进 -T 出 ), and judge Q 测 With Q 需 The size between 测 ≥Q 需 , then the performance of the battery thermal management system 3 meets the requirements. If Q 测 需 , the performance of the battery thermal management system 3 does not meet the requirements. The battery thermal management system 3 can be connected to an external digital display controller, which includes a control unit and a digital display unit that communicate with each other. The battery thermal management system 3 feeds back the real-time monitored temperature signal to the digital display controller. The control unit of the digital display controller calculates the cooling capacity of the battery thermal management system 3 according to the above formula and displays it through the digital display unit. 测 With Q 需 By comparison, it can be determined whether the performance of the battery thermal management system 3 meets the requirements. The test results can also be displayed through a digital display unit, making the test results more intuitive.
[0048] In summary, the present invention can meet the test of the function and performance of the power battery thermal management system without a full battery pack, the test cost is reduced, and regardless of the external conditions, the thermal management system can be tested for a long time, which can meet various test requirements and has strong versatility.
[0049] The above description is only used to illustrate some principles of the present invention. This specification is not intended to limit the present invention to the specific structure and application scope shown and described. Therefore, all corresponding modifications and equivalents that may be used belong to the patent scope applied for by the present invention.
Claims
1. A vehicle power battery thermal management system performance test system, characterized in that: It comprises a battery heat simulation device for simulating the working state of a power battery, wherein the water inlet of the battery heat simulation device is connected to the water outlet of the battery thermal management system through a flow regulating device, and the drain outlet of the battery heat simulation device is connected to the water inlet of the battery thermal management system.
2. The automotive power battery thermal management system performance test system according to claim 1, characterized in that: The battery heat simulation device comprises a containing chamber for containing circulating fluid, a heater and a temperature sensor are installed in the containing chamber, and the temperature sensor is connected to the heater through a control unit.
3. The automotive power battery thermal management system performance test system according to claim 2, characterized in that: The containing bin is configured as a cylindrical bin body, the heaters are configured in multiple groups and are connected in parallel with each other, and the multiple groups of heaters are arranged at intervals along the circumference of the containing bin.
4. The automotive power battery thermal management system performance test system according to claim 3 is characterized in that: A plurality of groups of the heaters are connected to the control unit via solid-state relays, and the control unit and the solid-state relays are installed in an electric control cabinet.
5. The automotive power battery thermal management system performance test system according to claim 2, characterized in that: A three-way pipe communicating with the interior is installed on the top of the containing bin, a water inlet is arranged at one side port of the three-way pipe, and an automatic exhaust valve is installed at the top port of the three-way pipe.
6. The automotive power battery thermal management system performance test system according to claim 2, characterized in that: A liquid level sensor is installed on the upper part of the containing bin, an overflow port is provided on the top of the containing bin, an overflow valve is installed at the overflow port, and the liquid level sensor is connected to the alarm unit and the overflow valve through a control unit; A drain outlet is provided at the bottom of the storage compartment, and the drain outlet is connected to the water inlet of the battery thermal management system through pipeline I.
7. The automotive power battery thermal management system performance test system according to claim 1, characterized in that: The flow regulating device includes a connecting pipe and a flow regulator installed thereon, one end of the connecting pipe is connected to the water inlet through pipe II, and the other end of the connecting pipe is connected to the water outlet of the battery thermal management system through pipe III.
8. The automotive power battery thermal management system performance test system according to claim 1, characterized in that: The battery thermal management system is communicatively connected to an external digital display controller to display the cooling capacity of the battery thermal management system.
9. A method for testing the performance of a thermal management system of an automobile power battery, using the testing system according to any one of claims 1 to 8, characterized in that: include: 1) According to the number of battery cells tested N, set the heating power Q output by the battery heat simulation device 需 and the water flow rate q entering the battery thermal simulator 总 ; 2) The battery thermal management system runs and automatically collects the outlet temperature T 出 and water inlet temperature T 进 ; 3) The entire test system runs stably for a set time and controls the internal temperature of the battery thermal simulation device to reach the set temperature range; 4) Calculate the cooling capacity Q of the battery thermal management system 测 =q 总 *(T 进 -T 出 ), and judge Q 测 With Q 需 The size between 测 ≥Q 需 , then the battery thermal management system performance meets the requirements, if Q 测 需 , the battery thermal management system performance does not meet the requirements. 10. The automotive power battery thermal management system performance testing method according to claim 9, characterized in that: In step 1), the heat generation power of a battery cell is P, and the required cooling circulation fluid flow rate is q, then Q 需 =P*N*110%,q 总 =q*N; The conditions for the operation of the battery thermal management system include: 1) the liquid level of the circulating fluid inside the battery thermal simulation device covers the internal heater; 2) T 出 The range is 9-12℃.