Method for measuring mass of waste slurry of slurry shield
By measuring and calculating the density and volume of the sedimentation tank, slurry mixing tank, and waste slurry tank, combined with the law of conservation of mass and multi-point sampling, the problem in the existing technology of being unable to accurately measure the quality of the waste mud of the ultra-large-diameter mud-water shield has been solved, achieving It provides support for high-precision measurement and waste mud reduction research.
Patent Information
- Application Number
- CN202410704988.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2024-10-01
AI Technical Summary
Existing technology cannot accurately measure the quality of waste mud in ultra-large diameter mud-water shields in real time, resulting in the inability to effectively reduce the amount of waste mud and hindering the advancement of green construction.
By measuring the density and volume of the sedimentation tank, slurry mixing tank, and waste slurry tank before and after construction, combined with the law of conservation of mass, multi-point sampling and double integration methods are used to calculate the quality of the waste mud to achieve high-precision measurement.
It achieves accurate measurement of the quality of waste mud in mud-water shields, provides basic conditions for waste mud reduction research, and ensures the efficiency and environmental protection of the construction process.
Smart Images

Figure CN118730813A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering construction, and specifically to a method for measuring the quality of waste slurry applicable to ultra-large diameter slurry shields. Background Art
[0002] At present, with the continuous application and upgrading of green construction technology, especially in the construction of large-diameter shield tunnels, the technical means of reducing the amount of waste mud plays a vital role in the green construction of slurry shield. The key direction of the current research topic is to effectively reduce the amount of waste mud generated by the shield machine by adjusting the tunneling parameters of the shield machine under different geological conditions. Among them, the accurate measurement of the quality of waste mud of the super-large diameter slurry shield is particularly critical.
[0003] However, when measuring the quality of waste slurry from super-large diameter slurry shields, the existing technology usually uses flow meters and densitometers to calculate the discharge volume and the intake volume. But usually, the waste slurry volume is counted once every 12 hours, and the density is recorded once in the morning, noon and evening. The density value cannot be matched with the ring number. The flow meter and densitometer cannot measure and count in real time. They can only take the average value per unit time through multi-point measurement, and the average value is still obtained by estimation. Therefore, the quality of waste slurry cannot be accurately obtained. At present, there is no accurate method for measuring the quality of waste slurry, which has greatly hindered the research on waste slurry reduction.
[0004] In view of this, this patent application is proposed. Summary of the invention
[0005] The method for measuring the quality of waste mud of a slurry shield described in the present application aims to solve the problems existing in the above-mentioned prior art and to propose a high-precision measurement method for the quality of waste mud of a slurry shield with a very large diameter, thereby accurately obtaining a numerical result of the quality of the waste mud.
[0006] In order to achieve the above design objectives, the waste slurry quality measurement method of slurry shield includes the following stages:
[0007] Stage 1: Before the construction of the shield machine;
[0008] Perform the following steps 1 to 15 to measure the density and volume of the sedimentation tank, slurry preparation tank, and waste slurry tank before construction, so as to calculate the total mass of slurry in each tank before shield construction, m 总 =m 沉总 +m 调 +m 废 ;
[0009] Stage 2: After shield construction;
[0010] Execute steps 1 to 15 again to measure the density and volume of the sedimentation tank, slurry mixing tank, and waste slurry tank after construction, so as to calculate the total mass m of slurry in each tank after shield construction. 总 ′, the mass of the clean water tank is m 清 ′;
[0011] The total mass after shield construction minus the total mass before construction plus the mass of make-up water, the mass of the waste slurry of the slurry shield is m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′);
[0012] Step 1: Read the liquid level of the sedimentation tank, slurry mixing tank, waste slurry tank, and clear water tank. The bottom area of each tank is known, and the current storage volume of each tank is calculated;
[0013] Step 2: Use a densitometer to measure the density of the clean water tank. According to m=ρv, multiply the volume by the measured density to get the mass of the clean water tank before construction, which is m. 清 ;
[0014] Step 3: Install a lifting crane on the support platform above the sampling position of the sedimentation tank, and hang the adjustable test tube gripper on the crane hook;
[0015] Step 4, according to the height of the slurry liquid level in the sedimentation tank, the number of fixed-length test tubes and the length of the adjustable-length test tubes in the sampling test tubes are selected to assemble an array of sampling test tubes;
[0016] Step 5, measure the diameter of the branch pipe of the shunt pipe connected to the slurry discharge pipe, and adjust the adjustable test tube gripper to fix the pipe opening position of the sampling test tube;
[0017] Step 6: Place the array of adjustable length test tubes into the adjustable test tube gripper in sequence and fix them;
[0018] Step 7, screw the adjustable length test tube onto the fixed length test tube to determine its length;
[0019] Step 8: Use a lifting crane to hang and lift the sampling tube through an adjustable tube gripper to complete the connection and sealing between the various parts of the sampling tube;
[0020] Step 9: Use a lifting crane to raise the sampling tube until the lower end of the tube is above the liquid level in the pool;
[0021] Step 10, lower the sampling test tube to the bottom of the pool;
[0022] Step 11, sealing the top of the sampling test tube;
[0023] Step 12: Use a lifting crane to lift the sampling test tube. When it is close to the liquid level in the pool, seal the bottom of the fixed-length test tube and then lift it away from the liquid surface to complete the sampling;
[0024] Step 13, repeat the above steps 3 to 12, complete the sampling in each tank and record the sampling position, and complete the sampling operation at least 5 positions in each sedimentation tank, pulp mixing tank, and waste pulp tank;
[0025] Step 14, reading the silt height and circulating mud height data in the array sampling test tubes in each sampling and calculating the average value, obtaining the silt and circulating mud heights at each sampling position, and at the same time measuring the silt density and circulating mud density in the test tubes, thereby obtaining the silt density and circulating mud density data in the sedimentation tank;
[0026] Step 15: Establish a coordinate system and calculate the current mass data in each pool. The calculation steps are as follows:
[0027] (1) Sedimentation tank;
[0028] A separate coordinate system is established for each sedimentation tank, and the calculation formula for the amount of sedimentation sludge in the sedimentation tank is:
[0029]
[0030] Among them, the coordinates of the center point are (μ1,μ2). When establishing the coordinate system, the grouting position is used as the coordinate origin, so the coordinates of the center position are (0,0), then,
[0031]
[0032] After sampling, the coordinates of the silt sedimentation amount at 5 locations were obtained, and 3 coordinates were brought in to solve, and 2 coordinates were used for verification to obtain the formula for the silt sedimentation amount in the sedimentation tank;
[0033] The volume of sludge in the sedimentation tank is calculated by double integral. The length and width of the sedimentation tank can be obtained by measurement. Assuming that the length of the sedimentation tank is a1 and the width is b1, the volume of sludge in the sedimentation tank is,
[0034]
[0035] In the integration area The double integral of , that is,
[0036]
[0037] The total height of the sludge + circulating mud in the sedimentation tank can be measured. Assuming it is c1, the volume of the sedimentation tank water can be calculated as V. 沉水 =a1b1c1-V 沉淤 ;
[0038] The densities of the silt and the flowing slurry measured by sampling are ρ 沉淤 and ρ 沉水 respectively. Then, the mass m 沉 of each sedimentation tank can be obtained as m 沉淤 + m 沉水 = ρ 沉淤 V 沉淤 + ρ 沉水 V 沉水 ; In this embodiment, there are 4 sedimentation tanks in total, so the total mass of the sedimentation tanks is the sum of the 4 sedimentation tanks, which is m 沉总 ;
[0039] (2) Slurry mixing tank;
[0040] Assume that there are two connection ports in the slurry mixing tank connected to the sedimentation tank. A coordinate system is established with one of the connection ports A as the origin of coordinates;
[0041] The amount of silt sedimentation generated by the flow of the connection port A into the slurry mixing tank is:
[0042]
[0043] By measurement, the length of the slurry mixing tank can be obtained as a2. Since the slurry injected into the slurry mixing tank through the connection port B is the same and the injection position is the same, and the parameters σ1, σ2, and ρ are the same, the amount of silt sedimentation generated by the flow of the connection port B into the slurry mixing tank is:
[0044]
[0045] Therefore, the amount of silt sedimentation generated in the slurry mixing tank is:
[0046]
[0047] After sampling, the coordinates of the silt sedimentation amounts at 5 positions are obtained. Three coordinates are substituted for solution, and 2 coordinates are used for verification to obtain the formula for the silt sedimentation amount in the slurry mixing tank;
[0048] The double integral is used to calculate the silt volume in the slurry mixing tank. The width of the slurry mixing tank can be obtained by measurement. Assume the width of the slurry mixing tank is b2. Then, the silt volume in the slurry mixing tank is:
[0049]
[0050] The double integral over the integration region D = {(x, y)丨0 ≤ x ≤ a2, 0 ≤ y ≤ b2}, that is
[0051]
[0052] The total height of the sludge + circulating slurry in the sizing pond can be measured. Assuming it is c2, the volume of the sizing pond water can be calculated as V 调水 = a2b2c2 - V 调淤 ;
[0053] By sampling, the densities of the sludge and circulating slurry in the sizing pond are measured as ρ 调淤 、ρ 调水 , respectively. Then the mass m of each sizing pond can be obtained 调 = m 调淤 + m 调水 = ρ 调淤 V 调淤 + ρ 调水 V 调水 ;
[0054] (3) Waste slurry pond;
[0055] Taking the connection point between the sedimentation pond and the waste slurry pond as the origin of the coordinate system, the sediment sludge volume in the whole waste slurry pond follows a normal distribution. After measurement, the distance between one end of the waste slurry pond and the origin of the coordinate system is d1, and the distance between the other end and the origin of the coordinate system is d2. The length of the waste slurry pond is a3, and d1 + d2 = a3. When establishing the coordinate system, taking the slurry penetration position as the origin of the coordinate system, so the center position coordinate is (0,0).
[0056]
[0057] After sampling, the sediment sludge volume coordinates at 5 positions are obtained. After substituting 3 coordinates for solution and using 2 coordinates for verification, the sediment sludge volume formula in the waste slurry pond is obtained;
[0058] Using double integral to calculate the sludge volume in the waste slurry pond, the width of the waste slurry pond can be measured. Assuming the width of the waste slurry pond is b3, then the sludge volume in the waste slurry pond is:
[0059]
[0060] The double integral in the integral region D = {(x,y)丨0 ≤ x ≤ b3, -d1 ≤ y ≤ d2}
[0061]
[0062] The total height of the sludge + circulating slurry in the waste slurry pond can be measured. Assuming it is c3, the volume of the waste slurry pond water can be calculated as V 费水 = a3b3c3 - V 费淤 , and by sampling, the densities of the sludge and circulating slurry are measured as ρ 费淤 、ρ 费水 , respectively. Then the mass m of each waste slurry pond can be obtained 费 = m 费淤 + m费水 =ρ 费淤 V 费淤 +ρ 费水 V 费水 ;
[0063] (4) Calculate the total mass of the current stage;
[0064] Before shield construction, the total mass of the sedimentation tank, slurry mixing tank, and waste slurry tank is m 总 =m 沉总 +m 调 +m 废 ;
[0065] After the shield construction is completed, first remove the diversion pipe fixing frame 5, repeat the above steps 1 to 15, and measure and calculate the total mass of the sedimentation tank, slurry mixing tank, and waste slurry tank after the construction is completed. 总 ′, the mass of the clean water tank is m 清 ′, the mass of clean water used is m 清 -m 清 ′, according to the law of conservation of mass, the mass of waste pulp is m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′).
[0066] Furthermore, when sampling mud and slurry, an adjustable test tube gripper is used to simultaneously carry and position an array of sampling test tubes, and the adjustable test tube gripper is hoisted by a lifting crane.
[0067] Furthermore, each group of sampling test tubes includes a group of adjustable-length test tubes and an array of fixed-length test tubes which are threadedly connected end to end in sequence, and a sealing knob at the bottom of the test tube and a sealing knob at the top of the test tube are respectively connected at both ends.
[0068] Furthermore, the adjustable test tube gripper comprises a plurality of test tube adjustment rails for vertically inserting the sampling test tube, a test tube insertion hole is provided in each group of the test tube adjustment rails, and a test tube rail fixing knob for laterally squeezing to fix the test tube is provided on one side of the test tube insertion hole;
[0069] Furthermore, a circular level bubble is arranged on the adjustable test tube gripper, and during the test tube sampling process, the circular level bubble is used to observe and adjust the adjustable test tube gripper to maintain a horizontal state as a whole.
[0070] Furthermore, the free end of the rope of the lifting crane is connected to a crane hook for hanging an adjustable test tube gripper, and a verticality control housing is mounted on the rope. After the rope passes through the verticality control housing, the crane hook can always be lifted and lowered vertically to help keep the adjustable test tube gripper horizontal and the test tube insertion stable.
[0071] As mentioned above, the method for measuring the quality of waste slurry of a slurry shield proposed in this application has the following advantages:
[0072] 1. A complete set of high-precision calculation methods has been developed. Through a complete set of monitoring systems, the density and volume of the mud pool are measured, and then the quality of the waste mud is calculated.
[0073] 2. This application uses the law of conservation of mass to derive a method for measuring the quality of waste slurry from slurry shields of different specifications and geological conditions through the changes in the liquid levels of sedimentation tanks, slurry mixing tanks, and waste slurry tanks. This enables accurate measurement of the amount of slag and waste slurry from each ring of the shield machine, thereby providing the necessary basic conditions for research on waste slurry reduction. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] The present application is now further described in conjunction with the following drawings;
[0075] Figure 1 This is a schematic diagram of the shield machine mud water treatment system;
[0076] Figure 2 is a schematic diagram of a shunt pipe;
[0077] Figure 3 A schematic diagram of the fixed connection of the shunt pipe;
[0078] Figure 4 is a schematic diagram of an adjustable test tube gripper;
[0079] Figure 5 It is a schematic diagram of the connection between the crane and the adjustable test tube gripper;
[0080] Figure 6 A schematic diagram showing the comparison between a test tube with a fixed length and a test tube with an adjustable length at the top;
[0081] Figure 7 It is a schematic diagram comparing the sealing knob at the bottom of the test tube and the sealing knob at the top of the test tube;
[0082] Figure 8 This is a schematic diagram of the sampling tube after connection;
[0083] Fig. 9 Create a schematic diagram for each pool's coordinate system;
[0084] In the above drawings, 1. shield machine; 2. slurry discharge pipe; 3. slurry inlet pipe; 4. diverter pipe; 41. diverter pipe branch; 5. diverter pipe fixing frame; 6. diverter pipe branch insertion port; 7. adjustable test tube gripper; 71. circular level bubble; 72. test tube adjustment slide rail; 73. test tube insertion hole; 74. test tube slide rail fixing knob; 75. test tube mouth fixing screw; 76. lifting hook; 8. small lifting crane; 81. verticality control housing; 82. crane hook; 9. fixed length test tube; 10. adjustable length test tube; 11. test tube bottom sealing knob; 12. test tube top sealing knob. DETAILED DESCRIPTION
[0085] In order to further explain the technical means adopted by the present application to achieve the predetermined design objectives, the following preferred implementation scheme is proposed in conjunction with the accompanying drawings.
[0086] In the following description, specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in a variety of other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0087] like Figure 1 As shown, the existing shield machine mud and water treatment system is that during the process of tunnel excavation to generate mud, the mud is discharged from the shield machine 1 through the slurry discharge pipe 2 and then enters the sedimentation tank of the mud and water treatment system, and the adjusted mud enters the shield machine 1 from the slurry adjustment tank through the slurry inlet pipe 3, thereby forming a working cycle.
[0088] During the construction of the shield machine 1, the sedimentation tank and the slurry adjustment tank are interconnected, and the discharged slurry flows to the slurry adjustment tank after simple sedimentation. The slurry adjustment tank can be connected to the clean water tank, and gates are set in the clean water tank and the slurry adjustment tank; when the slurry concentration needs to be adjusted, the gate is opened to adjust the slurry concentration. The adjusted slurry is transported to the shield machine 1 through the slurry inlet after treatment. During the shield construction, if the liquid level of the sedimentation tank and the slurry adjustment tank is too high, the gates of the sedimentation tank and the waste slurry tank are opened accordingly to discharge part of the slurry into the waste slurry tank.
[0089] According to the law of conservation of mass, in a complete one or several rings of shield machine excavation process, after the shield machine excavation is completed, the difference in mass between the sedimentation tank, slurry mixing tank, clear water tank, waste slurry tank and each tank before the start of shield machine excavation is the mass of the shield waste slurry.
[0090] like Figure 2 , Figure 3 and Fig. 9As shown, in order to ensure that the mud is uniform during the discharge process and to help accurately calculate the mud quality, the present application proposes a structural design scheme of a diverter pipe 4, which is connected to the two discharge pipes through internal and external threads. The diverter pipe 4 is divided into four groups of diverter pipe branches 41 to evenly discharge the mud into four sedimentation tanks.
[0091] The sedimentation tank is a rectangular parallelepiped structure, and a manifold fixing frame 5 is arranged at the intersection of the diagonal lines of the sedimentation tank. Each group of manifold branches 41 is vertically inserted downward and fixed in the manifold branch insertion port 6 at the center of the manifold fixing frame 5, so that the slurry is vertically injected into the sedimentation tank and the liquid level of the sedimentation tank is ensured to be submerged above the pipe opening of the manifold branch 41. After the shield construction is completed, the manifold fixing frame 5 is removed;
[0092] After the mud is injected into the sedimentation tank, the silt in the mud will gradually settle; near the mud injection position, the amount of mud sedimentation is large, and far away from the mud injection position, the amount of mud sedimentation is small. According to the preliminary sampling calculation and fitting, the mud sedimentation amount obeys the normal distribution.
[0093] The slurry outlet position is impacted by water flow, which causes the amount of slurry sedimentation at the grouting position to decrease. Affected by external force, the slurry outlet position does not obey the normal distribution, but the other positions are not affected by the water flow impact. Therefore, the slurry outlet position does not obey the normal distribution, while the other positions still obey the normal distribution.
[0094] After calculation, the sampling position should be set at a distance from the slurry outlet that is twice the diameter of the diversion pipe 4. The attenuation of the normal distribution of the mud sedimentation here is complementary to the mud sedimentation overflow at the slurry outlet, that is, the mud sedimentation height here is equivalent to the peak value of the normal distribution of the mud. This is set as the mud sampling position. The average value calculated by sampling 4 groups of sampling test tubes can obtain the mud volume at the peak of the normal distribution.
[0095] Except for the slurry outlet, the other positions are not affected by the impact of water flow. The amount of mud sedimentation here can be obtained by calculating the average value through sampling from 4 groups of sampling test tubes.
[0096] The outer walls of the sedimentation tank, slurry mixing tank, waste slurry tank and clean water tank are all equipped with scales to directly read the liquid level of the slurry and water in the tank; since the bottom areas of the sedimentation tank, slurry mixing tank, waste slurry tank and clean water tank are known, the volume of slurry and water in each tank can be directly calculated; the density of clean water is known to be 1g / cm 3 In order to ensure the accuracy of the clean water pool density, a density meter is used to measure and check before and after the shield construction, and the precise density obtained from the measurement is used to calculate the clean water quality.
[0097] There is flowing mud and settled sludge in sedimentation tanks, slurry mixing tanks, and waste slurry tanks. In this regard, the present application proposes mud and slurry sampling equipment that can be applied to a variety of site conditions to collect the flowing mud and settled sludge in the tanks, and then calculate the density of the flowing mud and settled sludge in each tank.
[0098] like Figures 4 to 8 As shown, the mud and slurry sampling equipment includes 4 groups of sampling test tubes, an adjustable test tube gripper 7 for simultaneously carrying and positioning the 4 groups of sampling test tubes, and a lifting crane 8 for hoisting the adjustable test tube gripper 7.
[0099] Each set of sampling test tubes includes a set of adjustable length test tubes 10 and a set of fixed length test tubes 9 which are screwed together end to end, and a sealed knob 11 at the bottom of the test tube and a sealed knob 12 at the top of the test tube are respectively connected at both ends.
[0100] The bottom thread of the adjustable-length test tube 10 is longer than the top thread, and a scale value is set at the thread. The depth of the adjustable-length test tube 10 embedded in the fixed-length test tube 9 can be adjusted by continuously rotating the thread, so as to obtain a test tube length consistent with the liquid level height at the sampling position; a thread for tightening a sealed knob 12 on the top of the sample is set on the outer side of the top of the adjustable-length test tube 10. After the test tube sampling is completed, the sealed knob 12 on the top of the sample can be tightened to ensure that the adjustable-length test tube 10 is watertight.
[0101] The bottom end of a set of fixed-length test tubes 9 at the bottom is screwed to the sealed knob 11 at the bottom of the test tube. After the sample is collected, the lifting crane 8 is used to lift the sampling test tube to a height close to the liquid surface. At this time, the sample in the test tube is subjected to atmospheric pressure and the sample will not flow out of the test tube. Tighten the sealed knob 11 at the bottom of the test tube near the liquid surface. After tightening, there will be no water leakage. At this time, the test tube can be taken out as a whole and completely out of the liquid surface for testing;
[0102] The adjustable test tube gripper 7 comprises 4 groups of test tube adjustment rails 72 for vertically inserting sampling test tubes, each group of test tube adjustment rails 72 is provided with a test tube insertion hole 73, and a test tube rail fixing knob 74 for lateral squeezing to fix the test tube is provided on one side of the test tube insertion hole 73;
[0103] After the four groups of sampling test tubes are respectively inserted into the test tube insertion holes 73 of the test tube adjustment rail 72, the test tubes are squeezed against the test tube adjustment rail 72 from the side by the test tube rail fixing knob 74 to coordinately complete the vertical positioning of each group of test tubes at the sampling position.
[0104] Furthermore, a circular bubble level 71 is provided on the adjustable test tube gripper 7 , so that the circular bubble level 71 can be used to observe and adjust the adjustable test tube gripper 7 to maintain a horizontal state as a whole during the test tube sampling process.
[0105] The free end of the rope of the lifting crane 8 is connected to a crane hook 82 for hanging the adjustable test tube gripper 7, and a verticality control housing 81 is mounted on the rope. After the rope passes through the verticality control housing 81, the crane hook 82 can always be lifted and lowered vertically to help the adjustable test tube gripper 7 remain horizontal and the test tube insertion remain stable.
[0106] The method for measuring the quality of waste slurry of a slurry shield proposed in this application includes the following stages:
[0107] Stage 1: Before the construction of the shield machine;
[0108] Perform the following steps 1 to 15 to measure the density and volume of the sedimentation tank, slurry preparation tank, and waste slurry tank before construction, so as to calculate the total mass of slurry in each tank before shield construction, m 总 =m 沉总 +m 调 +m 废 ;
[0109] Stage 2: After shield construction;
[0110] Execute steps 1 to 15 again to measure the density and volume of the sedimentation tank, slurry mixing tank, and waste slurry tank after construction, so as to calculate the total mass m of slurry in each tank after shield construction. 总 ′, the mass of the clean water tank is m 清 ′.
[0111] The total mass after shield construction minus the total mass before construction plus the mass of supplementary water is the mass of the waste slurry of the slurry shield, m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′).
[0112] Step 1: Read the liquid level of the sedimentation tank, slurry mixing tank, waste slurry tank, and clear water tank. The bottom area of each tank is known, and the current storage volume of each tank is calculated;
[0113] Step 2: Use a densitometer to measure the density of the clean water tank. According to m=ρv, multiply the volume by the measured density to get the mass of the clean water tank before construction, which is m. 清 ;
[0114] Step 3: Install a lifting crane 8 on the support platform above the sampling position of the sedimentation tank, and hang the adjustable test tube gripper 7 on the crane hook 82;
[0115] Step 4, according to the height of the slurry liquid level in the sedimentation tank, the number of fixed-length test tubes 9 and the length of the adjustable-length test tubes 10 in the sampling test tubes are selected, and 4 groups of sampling test tubes are assembled;
[0116] Step 5, measure the diameter of the branch pipe 41 connected to the slurry discharge pipe 2, adjust the adjustable test tube gripper 7 to fix the pipe opening position of the sampling test tube; if sampling is performed at the branch pipe opening position, the pipe opening position of the sampling test tube is set at a position that is twice the diameter of the branch pipe 41 from the slurry outlet; if sampling is performed at other positions, the pipe openings of the four groups of sampling test tubes are tightly fitted;
[0117] Step 6, put the four groups of adjustable length test tubes 10 into the adjustable test tube gripper 7 in sequence and fix them;
[0118] Step 7, screw the adjustable length test tube 10 onto the fixed length test tube 9, and adjust the length of the adjustable length test tube embedded in the fixed length test tube by continuously rotating the thread, thereby obtaining a determined length;
[0119] Step 8: Use the lifting crane 8 to hang and lift the sampling test tube through the adjustable test tube gripper 7 to complete the connection and sealing between the various parts of the sampling test tube;
[0120] Step 9, using the lifting crane 8 to raise the sampling test tube until the lower end of the tube mouth is above the liquid level in the pool;
[0121] Step 10, lower the sampling test tube to the bottom of the pool; when the sampling test tube cannot be lowered due to the resistance of the silt at the bottom of the pool, it can be lowered mechanically or manually, while keeping the sampling test tube always in an upright downward position;
[0122] Step 11, sealing the top of the sampling test tube;
[0123] Step 12: Use the lifting crane 8 to lift the sampling test tube. When it is close to the liquid level in the pool, seal the bottom of the fixed-length test tube 9 and then lift it away from the liquid level to complete the sampling;
[0124] Step 13, repeat the above steps 3 to 12, complete the sampling in each tank and record the sampling position, and complete the sampling operation at least 5 positions in each sedimentation tank, pulp mixing tank, and waste pulp tank;
[0125] Step 14, reading the silt height and circulating mud height data in the four groups of sampling test tubes in each sampling and calculating the average value, obtaining the silt and circulating mud heights at each sampling position, and at the same time measuring the silt density and circulating mud density in the test tubes, thereby obtaining the silt density and circulating mud density data in the sedimentation tank;
[0126] Step 15: Establish a coordinate system and calculate the current mass data in each pool. The calculation steps are as follows:
[0127] (1) Sedimentation tank;
[0128] A separate coordinate system is established for each sedimentation tank. Although a connecting port is set between each sedimentation tank, since the mud can flow, but the sludge in the sedimentation tank does not flow, the amount of sedimented sludge in each sedimentation tank obeys the normal distribution (when the mud fluidity is good, the mud flows from the center to the surroundings, and the mud flow process still obeys the normal distribution. After the mud flows, the parameters in the formula will change accordingly, which does not affect the calculation of the waste mud quality); that is,
[0129]
[0130] Among them, the coordinates of the center point are (μ1,μ2). When establishing the coordinate system, the grouting position is used as the coordinate origin, so the coordinates of the center position are (0,0), then,
[0131]
[0132] After sampling, the coordinates of the silt sedimentation amount at 5 locations were obtained, and 3 coordinates were brought in to solve, and 2 coordinates were used for verification to obtain the formula for the silt sedimentation amount in the sedimentation tank;
[0133] The volume of sludge in the sedimentation tank is calculated by double integral. The length and width of the sedimentation tank can be obtained by measurement. Assuming that the length of the sedimentation tank is a1 and the width is b1, the volume of sludge in the sedimentation tank is,
[0134]
[0135] In the integration area The double integral of , that is,
[0136]
[0137] The total height of the sludge + circulating mud in the sedimentation tank can be measured. Assuming it is c1, the volume of the sedimentation tank water can be calculated as V. 沉水 =a1b1c1-V 沉淤 ;
[0138] The density of sludge and circulating mud measured by sampling is ρ 沉淤 , 沉水 , then the mass m of each sedimentation tank can be obtained 沉 =m 沉淤 +m 沉水 =ρ 沉淤 V 沉淤 +ρ 沉水 V 沉水 In this embodiment, there are 4 sedimentation tanks, and the total mass of the sedimentation tanks is the sum of the 4 sedimentation tanks, which is m 沉总 ;
[0139] (2) Slurry mixing tank;
[0140] If there is only one connection port between the pulp mixing tank and the sedimentation tank, the sedimentation amount of the sludge follows a normal distribution at the connection port position. However, there are two connection ports between the pulp mixing tank and the sedimentation tank in the pulp mixing tank. Therefore, the total sedimentation amount of the sludge in the pulp mixing tank is the superposition of two normal distributions;
[0141] There are two connection ports between the pulp mixing tank and the sedimentation tank. A coordinate system is established with one of the connection ports A as the origin of coordinates. The coordinate system is established as shown in Fig. 9 shown;
[0142] The sedimentation amount of the sludge generated by the flow through connection port A into the pulp mixing tank is:
[0143]
[0144] Through measurement, the length of the pulp mixing tank can be obtained as a2. Since the slurry injected into the pulp mixing tank through connection port B is the same and the injection position is also the same, the parameters σ1, σ2, and ρ are all the same, only the centers are different. Therefore, the sedimentation amount of the sludge generated by the flow through connection port B into the pulp mixing tank is:
[0145]
[0146] Therefore, the sedimentation amount of the sludge generated in the pulp mixing tank is:
[0147]
[0148] After sampling, the sedimentation amount coordinates at 5 positions are obtained. Three coordinates are substituted and solved, and two coordinates are used for verification to obtain the sludge sedimentation amount formula in the pulp mixing tank;
[0149] Using double integral to calculate the sludge volume in the pulp mixing tank, the width of the pulp mixing tank can be obtained through measurement. Assuming the width of the pulp mixing tank is b2, the sludge volume in the pulp mixing tank is:
[0150]
[0151] The double integral in the integration region D = {(x, y)丨0 ≤ x ≤ a2, 0 ≤ y ≤ b2}, that is
[0152]
[0153] Through measurement, the total height of the sludge + flowing slurry in the pulp mixing tank can be obtained. Assuming it is c2, then the volume of the water in the pulp mixing tank can be calculated as V 调水 = a2b2c2 - V 调淤 ;
[0154] By sampling, the densities of the sludge and the flowing slurry in the pulp mixing tank are measured as ρ 调淤 、ρ 调水 , then the mass m of each pulp mixing tank can be obtained 调 = m调淤 +m 调水 = ρ 调淤 V 调淤 + ρ 调水 V 调水 ;
[0155] (3), waste slurry pit;
[0156] Taking the connection port between the sedimentation tank and the waste slurry pit as the coordinate origin to establish a coordinate system, the sediment sludge volume in the entire waste slurry pit follows a normal distribution, and the coordinate system is established as shown Fig. 9 ; After measurement, it can be obtained that the distance between one end of the waste slurry pit and the coordinate origin is d1, the distance between the other end and the coordinate origin is d2, the length of the waste slurry pit is a3, and d1 + d2 = a3. When establishing the coordinate system, the slurry penetration position is taken as the coordinate origin, so the center position coordinate is (0, 0),
[0157]
[0158] The sludge precipitation amount coordinates at 5 positions are obtained through sampling. After substituting 3 coordinates for solution and using 2 coordinates for verification, the sludge precipitation amount formula in the waste slurry pit is obtained;
[0159] Using double integral to calculate the sludge volume in the waste slurry pit, the width of the waste slurry pit can be obtained through measurement. Assuming the width of the waste slurry pit is b3, then the sludge volume in the waste slurry pit is:
[0160]
[0161] The double integral in the integration region D = {(x, y)丨0 ≤ x ≤ b3, -d1 ≤ y ≤ d2},
[0162]
[0163] Through measurement, the total height of the sludge + flowing slurry in the waste slurry pit can be obtained. Assuming it is c3, then the volume of the water in the waste slurry pit can be calculated as V 费水 = a3b3c3 - V 费淤 , and the densities of the sludge and the flowing slurry are measured as ρ 费淤 、ρ 费水 , respectively. Then the mass m of each waste slurry pit can be obtained 费 = m 费淤 + m 费水 = ρ 费淤 V 费淤 + ρ 费水 V 费水 ;
[0164] (4), Calculate the total mass at the current stage;
[0165] Before shield tunneling construction, the total mass of the sedimentation tank, slurry mixing tank, and waste slurry pit is m总 =m 沉总 +m 调 +m 废 ;
[0166] After the shield construction is completed, first remove the diversion pipe fixing frame 5, repeat the above steps 1 to 15, and measure and calculate the total mass of the sedimentation tank, slurry mixing tank, and waste slurry tank after the construction is completed. 总 ′, the mass of the clean water tank is m 清 ′, the mass of clean water used is m 清 -m 清 ′, according to the law of conservation of mass, the mass of waste pulp is m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′).
[0167] As described above, similar technical solutions can be derived from the solutions given in the drawings and descriptions. However, any solution content that does not deviate from the structure of the present invention still belongs to the scope of rights of the technical solution of this application.
Claims
1. A method for measuring the quality of waste slurry of a slurry shield, characterized by: The implementation phase includes the following: Stage 1: Before the construction of the shield machine; Perform the following steps 1 to 15 to measure the density and volume of the sedimentation tank, slurry preparation tank, and waste slurry tank before construction, so as to calculate the total mass of slurry in each tank before shield construction, m 总 =m 沉总 +m 调 +m 废 ; Stage 2: After shield construction; Execute steps 1 to 15 again to measure the density and volume of the sedimentation tank, slurry mixing tank, and waste slurry tank after construction, so as to calculate the total mass m of slurry in each tank after shield construction. 总 ′, the mass of the clean water tank is m 清 ′; The total mass after shield construction minus the total mass before construction plus the mass of make-up water, the mass of the waste slurry of the slurry shield is m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′); Step 1: Read the liquid level of the sedimentation tank, slurry mixing tank, waste slurry tank, and clear water tank. The bottom area of each tank is known, and the current storage volume of each tank is calculated; Step 2: Use a densitometer to measure the density of the clean water tank. According to m=ρv, multiply the volume by the measured density to get the mass of the clean water tank before construction, which is m. 清 ; Step 3: Install a lifting crane on the support platform above the sampling position of the sedimentation tank, and hang the adjustable test tube gripper on the crane hook; Step 4, according to the height of the slurry liquid level in the sedimentation tank, the number of fixed-length test tubes and the length of the adjustable-length test tubes in the sampling test tubes are selected to assemble an array of sampling test tubes; Step 5, measure the diameter of the branch pipe of the shunt pipe connected to the slurry discharge pipe, and adjust the adjustable test tube gripper to fix the pipe opening position of the sampling test tube; Step 6: Place the array of adjustable length test tubes into the adjustable test tube gripper in sequence and fix them; Step 7, screw the adjustable length test tube onto the fixed length test tube to determine its length; Step 8: Use a lifting crane to hang and lift the sampling tube through an adjustable tube gripper to complete the connection and sealing between the various parts of the sampling tube; Step 9: Use a lifting crane to raise the sampling tube until the lower end of the tube is above the liquid level in the pool; Step 10, lower the sampling test tube to the bottom of the pool; Step 11, sealing the top of the sampling test tube; Step 12: Use a lifting crane to lift the sampling test tube. When it is close to the liquid level in the pool, seal the bottom of the fixed-length test tube and then lift it away from the liquid surface to complete the sampling; Step 13, repeat the above steps 3 to 12, complete the sampling in each tank and record the sampling position, and complete the sampling operation at least 5 positions in each sedimentation tank, pulp mixing tank, and waste pulp tank; Step 14, reading the silt height and circulating mud height data in the array sampling test tubes in each sampling and calculating the average value, obtaining the silt and circulating mud heights at each sampling position, and at the same time measuring the silt density and circulating mud density in the test tubes, thereby obtaining the silt density and circulating mud density data in the sedimentation tank; Step 15: Establish a coordinate system and calculate the current mass data in each pool. The calculation steps are as follows: (1) Sedimentation tank; A separate coordinate system is established for each sedimentation tank, and the calculation formula for the amount of sedimentation sludge in the sedimentation tank is: Among them, the coordinates of the center point are (μ1,μ2). When establishing the coordinate system, the grouting position is used as the coordinate origin, so the coordinates of the center position are (0,0), then, After sampling, the coordinates of the silt sedimentation amount at 5 locations were obtained, and 3 coordinates were brought in to solve, and 2 coordinates were used for verification to obtain the formula for the silt sedimentation amount in the sedimentation tank; The volume of sludge in the sedimentation tank is calculated by double integral. The length and width of the sedimentation tank can be obtained by measurement. Assuming that the length of the sedimentation tank is a1 and the width is b1, the volume of sludge in the sedimentation tank is, In the integration area The double integral of , that is, The total height of the sludge + circulating mud in the sedimentation tank can be measured and assumed to be c1. The volume of the sedimentation tank water can be calculated as V. 沉水 =a1b1c1-V 沉淤 ; The density of sludge and circulating mud measured by sampling is ρ 沉淤 , 沉水 , then the mass m of each sedimentation tank can be obtained 沉 =m 沉淤 +m 沉水 =ρ 沉淤 V 沉淤 +ρ 沉水 V 沉水 In this embodiment, there are 4 sedimentation tanks, and the total mass of the sedimentation tanks is the sum of the 4 sedimentation tanks, which is m 沉总 ; (2) Slurry mixing tank; Assume that there are two connection ports in the slurry mixing tank connected to the sedimentation tank, and establish a coordinate system with one of the connection ports A as the origin; The amount of sludge sedimentation generated by the flow from the connection port A into the slurry mixing tank is: Through measurement, it can be obtained that the length of the slurry mixing tank is a2, and the slurry injected into the slurry mixing tank through the connection port B is the same, the injection position is also the same, the parameters σ1, σ2, ρ are the same, and the amount of sludge precipitation generated by the connection port B flowing into the slurry mixing tank is: Therefore, the amount of silt sediment in the sizing vat is as follows: The silt sediment coordinates at 5 positions are obtained through sampling. After substituting 3 coordinates for solution and using 2 coordinates for verification, the formula for the silt sediment amount in the sizing vat is obtained. The double integral is used to calculate the silt volume in the sizing vat. The width of the sizing vat can be measured. Assuming the width of the sizing vat is b2, the silt volume in the sizing vat is: The double integral over the integral region D = {(x, y) | 0 ≤ x ≤ a2, 0 ≤ y ≤ b2}, that is The total height of the sludge in the slurry mixing pool + circulating slurry can be obtained by measurement. Assuming it is c2, the volume of the slurry mixing pool water can be calculated as V. 调水 =a2b2c2-V 调淤 ; The density of the sludge in the mixing tank and the circulating sludge were measured by sampling and were ρ 调淤 , 调水 , then the mass m of each slurry mixing tank can be obtained 调 =m 调淤 +m 调水 =ρ 调淤 V 调淤 +ρ 调水 V 调水 ; (3) Waste pulp tank Taking the connection port between the sedimentation tank and the waste pulp tank as the coordinate origin to establish a coordinate system. The sedimented silt amount in the entire waste pulp tank follows a normal distribution. Through measurement, it can be obtained that the distance between one end of the waste pulp tank and the coordinate origin is d1, the distance between the other end and the coordinate origin is d2, and the length of the waste pulp tank is a3, with d1 + d2 = a3. When establishing the coordinate system, taking the slurry penetration position as the coordinate origin, so the center position coordinate is (0, 0). The silt sediment coordinates at 5 positions are obtained through sampling. After substituting 3 coordinates for solution and using 2 coordinates for verification, the formula for the silt sediment amount in the waste pulp tank is obtained. The double integral is used to calculate the silt volume in the waste pulp tank. The width of the waste pulp tank can be measured. Assuming the width of the waste pulp tank is b3, the silt volume in the waste pulp tank is: The double integral over the integral region D = {(x, y) | 0 ≤ x ≤ b3, -d1 ≤ y ≤ d2} The total height of the sludge in the waste slurry pool + circulating slurry can be measured and assumed to be c3. The volume of the waste slurry pool water can be calculated as V. 费水 =a3b3c3-V 费淤 The density of silt and circulating mud were measured by sampling and were ρ 费淤 , 费水 , then the mass m of each waste pulp pool can be obtained 费 =m 费淤 +m 费水 =ρ 费淤 V 费淤 +ρ 费水 V 费水 ; (4) Calculate the total mass at the current stage Before shield construction, the total mass of the sedimentation tank, slurry mixing tank, and waste slurry tank is m 总 =m 沉总 +m 调 +m 废 ; After the shield construction is completed, first remove the diversion pipe fixing frame 5, repeat the above steps 1 to 15, and measure and calculate the total mass of the sedimentation tank, slurry mixing tank, and waste slurry tank after the construction is completed. 总 ′, the mass of the clean water tank is m 清 ′, the mass of clean water used is m 清 -m 清 ′, according to the law of conservation of mass, the mass of waste pulp is m 废浆 =m 总 ′-m 总 -(m 清 -m 清 ′).
2. The method for measuring the quality of waste slurry of a slurry shield according to claim 1 is characterized by: When sampling the slurry and the liquid slurry, an adjustable test tube gripper is used to simultaneously carry and position an array of sampling test tubes, and the adjustable test tube gripper is hoisted based on a lifting crane.
3. The method for measuring the quality of waste slurry of a slurry shield according to claim 2 is characterized in that: Each group of sampling test tubes consists of a group of adjustable-length test tubes and an array of fixed-length test tubes connected end to end and screwed together, with a closed knob at the bottom and a closed knob at the top of the test tube connected at both ends.
4. The method for measuring the quality of waste slurry of a slurry shield according to claim 2 is characterized in that: The adjustable test tube gripper includes an array of test tube adjustment slides for vertically inserting the sampling test tubes. A test tube insertion hole is provided in each group of test tube adjustment slides, and a test tube slide fixing knob for laterally squeezing to fix the test tube is provided on one side of the test tube insertion hole.
5. The method for measuring the quality of waste slurry of a slurry shield according to claim 4 is characterized in that: A circular spirit level is provided on the adjustable test tube gripper. During the test tube sampling process, the overall adjustable test tube gripper is observed and adjusted to be kept horizontal through this circular spirit level.
6. The method for measuring the quality of waste slurry of a slurry shield according to claim 2, characterized in that: For the lifting crane, the free end of its rope is connected to a crane hook for hanging the adjustable test tube gripper. A verticality control housing is sleeved on the rope. After the rope passes through the verticality control housing, the crane hook can always be lifted and lowered vertically to assist in keeping the adjustable test tube gripper horizontal and maintaining the stability of the test tube insertion.
