Portable particulate matter settling performance detection device
Through the portable particle sedimentation performance detection device and the series design of multiple sedimentation columns and vacuum columns, the problem of particle sedimentation performance detection in field scenes is solved, fast and accurate detection results are achieved, and the influence of changes in water sample properties is avoided. Improved detection efficiency and accuracy.
Patent Information
- Application Number
- CN202310321454.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-01
AI Technical Summary
It is difficult to comprehensively analyze the sedimentation performance of particulate matter in sewage in a field scene with existing technology, and the properties of particulate matter are prone to change during water sample transportation, affecting the accuracy of detection results.
A portable particulate matter sedimentation performance testing device is designed, including multiple sedimentation columns and vacuum columns. The sedimentation columns are arranged from large to small according to the sedimentation performance and connected in series. The vacuum columns and sedimentation columns are connected in series, equipped with opening and closing equipment and emptying pipes. On-site testing can be performed in the testing box to avoid water sample transfer.
It achieves rapid and accurate detection of the sedimentation performance of particulate matter in sewage in field scenes, avoids the impact of changes in water sample properties on detection results, improves detection efficiency, and enables the selection of appropriate sedimentation column combinations based on the characteristics of sewage properties for in-depth research. Threats from particles with different pollution characteristics.
Smart Images

Figure CN118730831A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of sewage treatment, and in particular to a portable particle sedimentation performance detection device. Background Art
[0002] Particulate matter is the main source of pollution in rivers caused by drainage pipe networks. For this reason, designers design regulating and storage tanks to reduce the particulate matter in sewage by settling. Surface load is an important parameter in the design of regulating and storage tanks, and it also determines the minimum settling rate of particulate matter that can be intercepted by the regulating and storage tanks. Usually, designers or researchers collect target water samples to the laboratory and conduct a comprehensive analysis of the settling performance of particulate matter in the water through a single sedimentation column. This process can only identify the comprehensive settling performance of particulate matter in the water, and thus ignores the potential threat to the water body caused by the different pollution characteristics of particles with different settling performances. At the same time, in the process of transporting water samples to the laboratory, the properties of the particulate matter in the sewage are very likely to change, causing a change in the sedimentation performance, affecting the accuracy of the test results.
[0003] Therefore, finding a comprehensive sedimentation performance analysis device that can be applied to field scenarios is an urgent problem that needs to be solved by technical personnel in this field. Summary of the invention
[0004] The main purpose of the present invention is to provide a portable particle settling performance detection device, aiming to solve the problems mentioned in the above background technology.
[0005] In order to solve the above problems, the present invention proposes a portable particle sedimentation performance detection device, comprising a detection box and a mounting plate arranged in the detection box, wherein the mounting plate divides the detection box into two parts, an upper part and an lower part, and a plurality of sedimentation columns and vacuum columns are inserted and connected through the mounting plate, each sedimentation column has a different sedimentation performance, and the plurality of sedimentation columns are arranged from large to small according to the sedimentation performance and are connected in series with each other, and the plurality of vacuum columns are connected in series with each other, and along the liquid flow direction, the sedimentation column at the end of the series connection is connected in series with the vacuum column at the head end of the series connection, and the vacuum column at the end of the series connection is connected in series with a vacuum pump;
[0006] The bottom of each sedimentation column and vacuum column is connected to a drain pipe, and an opening and closing device is installed on the drain pipe to control the opening or closing of the drain pipe.
[0007] In one embodiment, the tops of the sedimentation column and the vacuum column are both provided with a water inlet pipe and a water outlet pipe, the water inlet pipe of the downstream sedimentation column is connected to the water outlet pipe of the upstream sedimentation column, and the water inlet pipe of the downstream vacuum column is connected to the water outlet pipe of the upstream vacuum column.
[0008] In one embodiment, the water outlet of the water inlet pipe is located at the bottom of the sedimentation column and the vacuum column.
[0009] In one embodiment, the water inlet of the water inlet pipe of the sedimentation column located at the head end of the series connection is connected to the inlet pipe, and the inlet pipe extends out of the detection box.
[0010] In one embodiment, sealing plugs are provided on the tops of the sedimentation column and the vacuum column, and the water inlet pipe tightly passes through the sealing plugs.
[0011] In one embodiment, the water inlet of the water inlet pipe of the vacuum column located at the head end of the series connection is connected to the water outlet pipe of the sedimentation column located at the end of the series connection.
[0012] In one embodiment, the water outlet pipe of the vacuum column at the end of the series connection is connected to the vacuum pump.
[0013] In one embodiment, the detection box includes a box body and a box cover, the box body and the box cover are detachably sealed and fixedly connected, and a plurality of sedimentation columns and vacuum columns are located in the box cover and the box body.
[0014] In one embodiment, the sedimentation column and the vacuum column are provided with adhesive tapes, and the adhesive tapes are adhesively connected to the box body and the inner wall of the box cover.
[0015] Beneficial effects: The portable particle settling performance detection device of the present invention can be carried to the field scene for on-site detection operations, without the need to collect water samples and transfer them to the laboratory for detection, which saves time and effort, saves time, improves detection efficiency, and avoids the influence of changes in the properties of water samples during the transfer process on the accuracy of the detection results;
[0016] The portable particle sedimentation performance detection device of the present invention has multiple sedimentation columns, which is convenient for selecting a suitable sedimentation column combination according to the property characteristics of the sewage to obtain the sedimentation performance distribution of particles with different pollution characteristics, thereby facilitating in-depth research on the pollution threat of these particles with different pollution characteristics to the water body. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of a portable particle settling performance detection device of the present invention when the detection box is closed;
[0019] Figure 2 It is a schematic diagram of a portable particle settling performance detection device of the present invention when a detection box is opened. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0022] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0023] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0024] The invention provides a portable particle sedimentation performance detection device.
[0025] In a specific embodiment of the invention, Figure 1 and Figure 2 As shown, the portable particle settling performance detection device includes a detection box and a plurality of settling columns (such as Figure 2 The 7 sedimentation columns tu1-tu7) and 1 vacuum column (such as Figure 2Of course, it should be noted that in other embodiments, the specific number of sedimentation columns and vacuum columns may not be 7 and 1, and the specific number should be flexibly designed according to the properties of the sewage. However, in order to ensure that the portable particle sedimentation performance detection device of this embodiment can meet the needs of most sewage particle sedimentation performance detection operations, the number of sedimentation columns should not be less than 5, and the number of vacuum columns should not be more than 3.
[0026] In this embodiment, preferably, Figure 1 and Figure 2 As shown, the detection box includes a box body H2 and a box cover H1, and the box body H2 and the box cover H1 are detachably sealed and fixedly connected. For example, one end of H2 and the box cover H1 is hinged by hinges H6 and H7, and the other end is buckled and connected by locks H4 and H5. The box body H2 is also provided with a handle H3, which is convenient for carrying the detection box to the field scene for on-site detection operations.
[0027] In this embodiment, if Figure 1 and Figure 2 As shown, 5 sedimentation columns (such as Figure 2 The five sedimentation columns tu1-tu5 shown in FIG. 1 are located in the box cover H1, and two sedimentation columns and one vacuum column (eg Figure 2 The two sedimentation columns tu6 and tu7 and one vacuum column A2) shown in the figure are located in the box H2.
[0028] In this embodiment, in order to facilitate the operation of the portable particle settling performance detection device of the present invention, as shown in FIG. Figure 2 As shown, after the detection box is opened, the unfolding angle between the box body H2 and the box cover H1 is not less than 90°. This design makes it easy to operate the opening and closing equipment to control the opening or closing of the exhaust pipe.
[0029] In this embodiment, the sedimentation performance of each sedimentation column is different, and the sedimentation performance of the sedimentation column = the flow rate Q of the sedimentation column i The maximum cross-sectional area S of the sedimentation column i The ratio of the flow rate Q of the sedimentation column i is based on the volume V of the sedimentation column i and the time t of liquid flowing through the sedimentation column, calculated from Figure 2 It can be seen that the thickness and length of the multiple sedimentation columns are different, so the sedimentation performance of the multiple sedimentation columns is different. Specifically, Figure 2 From left to right, the settling performance of each sedimentation column gradually decreases, that is, the settling rate v of the particles in each sedimentation column i Gradually decrease.
[0030] In this embodiment, a plurality of sedimentation columns are connected in series with each other and are also connected in series with the vacuum columns, for example Figure 2As shown, the tops of the sedimentation columns and vacuum columns are both provided with water inlet pipes and water outlet pipes. The water inlet pipe of the downstream sedimentation column is connected to the water outlet pipe of the upstream sedimentation column, and the water inlet pipe of the downstream vacuum column is connected to the water outlet pipe of the upstream vacuum column. The so-called downstream sedimentation column and upstream sedimentation column are upstream and downstream in the direction of liquid flow. The liquid enters through the water inlet pipe g2. Figure 2 The leftmost sedimentation column tu1 flows out from the outlet pipe g3 of the sedimentation column tu1 and enters Figure 2 The second sedimentation column tu2 from the left in the middle, and then flows out from the outlet pipe g5 of the sedimentation column tu2 into Figure 2 In the third sedimentation column tu3 from the left, multiple sedimentation columns are connected in series, and the same is true for the vacuum column. Figure 2 The liquid in the middle sedimentation column tu7 flows out of its outlet pipe g 15 Enter Figure 2 In the vacuum column A2, the sedimentation column and the vacuum column are connected in series.
[0031] Specifically, Figure 2 As shown, a water inlet pipe g2 and a water outlet pipe g3 are provided on the top of the sedimentation column tu1. The water inlet of the water inlet pipe g2 is connected to the flow inlet pipe g1 through the guide pipe l1. The flow inlet pipe g1 extends out of the detection box and is used for external detection of water source connection, such as Figure 2 In the figure, the external test water source is located in the sample pool A1. A pipe joint g0 is provided at the bottom of the sample pool A1. The pipe joint g0 is connected to the inlet pipe g1 through the connecting pipe l0. After the vacuum pump is started, the sewage in the sample pool A1 enters the sedimentation column tu1 through the connecting pipe l0, the inlet pipe g1, the guide pipe l1 and the water inlet pipe g2.
[0032] In this embodiment, if Figure 2 As shown, a water inlet pipe g4 and a water outlet pipe g5 are provided at the top of the sedimentation column tu2. The water inlet of the water inlet pipe g4 is connected to the water outlet pipe g3 through the guide pipe l2. The sewage in the sedimentation column tu1 enters the sedimentation column tu2 through the guide pipe l2 and the water inlet pipe g4.
[0033] In this embodiment, if Figure 2 As shown, a water inlet pipe g6 and a water outlet pipe g7 are provided at the top of the sedimentation column tu3. The water inlet of the water inlet pipe g6 is connected to the water outlet pipe g5 through the guide pipe l3. The sewage in the sedimentation column tu2 enters the sedimentation column tu3 through the guide pipe l3 and the water inlet pipe g6.
[0034] In this embodiment, if Figure 2 As shown, a water inlet pipe g8 and a water outlet pipe g9 are provided at the top of the sedimentation column tu4. The water inlet of the water inlet pipe g8 is connected to the water outlet pipe g7 through the guide pipe l4. The sewage in the sedimentation column tu3 enters the sedimentation column tu4 through the guide pipe l4 and the water inlet pipe g8.
[0035] In this embodiment, if Figure 2 As shown, the top of the sedimentation column tu5 is provided with a water inlet pipe g 10 and outlet pipe 11 , water inlet pipe g 10 The water inlet is connected to the outlet pipe g9 through the guide pipe l5, and the sewage in the sedimentation column tu4 is connected to the outlet pipe g9 through the guide pipe l5 and the water inlet pipe g9. 10 Enter the sedimentation column tu5.
[0036] In this embodiment, if Figure 2 As shown, the top of the sedimentation column tu6 is provided with a water inlet pipe g 12 and outlet pipe 13 , water inlet pipe g 12 The water inlet is connected to the water outlet g through the guide pipe l6 11 The sewage in the sedimentation column tu5 passes through the diversion pipe l6 and the water inlet pipe g 12 Enter the sedimentation column tu6.
[0037] In this embodiment, if Figure 2 As shown, the top of the sedimentation column tu7 is provided with a water inlet pipe g 14 and outlet pipe 15 , water inlet pipe g 14 The water inlet is connected to the water outlet g through the guide pipe l7 13 The sewage in the sedimentation column tu6 passes through the diversion pipe l7 and the water inlet pipe g 14 Enter sedimentation column tu7.
[0038] In this embodiment, along the liquid flow direction, the sedimentation column tu7 at the end of the series connection is connected in series with the vacuum column A2. With this design, the liquid in the sedimentation column tu7 at the end of the series connection can flow smoothly into the vacuum column A2. Figure 2 As shown, the liquid in the seventh sedimentation column tu7 from the left flows out of its outlet pipe g 15 Flow out of the water inlet pipe g entering the vacuum column A2 16 Inside.
[0039] Specifically, Figure 2 As shown, the top of the vacuum column A2 is provided with a water inlet pipe g 16 and outlet pipe 17 , water inlet pipe g 16 The water inlet is connected to the water outlet g through the guide pipe l8 15 The sewage in the sedimentation column tu7 passes through the diversion pipe l8 and the water inlet pipe g 16 Enter the vacuum column A2.
[0040] In this embodiment, along the liquid flow direction, the vacuum column A2 is connected in series with the vacuum pump Pu, such as Figure 2 As shown, the outlet pipe g of vacuum column A2 17It is connected to the vacuum pump Pu. With this design, external liquid can be drawn into the test box through the vacuum pump Pu and pass through multiple sedimentation columns and multiple vacuum columns in sequence to perform particle sedimentation performance testing operations. The design of the vacuum pump Pu is convenient for regulating the liquid flow rate.
[0041] Specifically, Figure 2 As shown, the vacuum pump Pu is connected to the water outlet pipe g through the guide pipe l9. 17 Connectivity.
[0042] Furthermore, in this embodiment, the water outlet of the water inlet pipe is located at the bottom of the sedimentation column and the vacuum column, such as Figure 2 As shown, the outlet of the water inlet pipe g2 is located at the bottom of the sedimentation column tu1, the outlet of the water inlet pipe g4 is located at the bottom of the sedimentation column tu2, the outlet of the water inlet pipe g6 is located at the bottom of the sedimentation column tu3, the outlet of the water inlet pipe g8 is located at the bottom of the sedimentation column tu4, and the outlet of the water inlet pipe g 10 The outlet is located at the bottom of the sedimentation column tu5, and the water inlet pipe g 12 The outlet is located at the bottom of the sedimentation column tu6, and the water inlet pipe g 14 The outlet is located at the bottom of the sedimentation column tu7, and the water inlet pipe g 16 The water outlet is located at the bottom of the vacuum column A2.
[0043] In this embodiment, sealing plugs are provided on the tops of the sedimentation column and the vacuum column, and the water inlet pipe tightly passes through the sealing plugs. This design can seal the connection between the water inlet pipe and the sedimentation column or the vacuum column, thereby preventing air leakage at the water inlet pipe of the sedimentation column and the vacuum column from affecting the vacuum pump Pu in regulating the liquid flow rate.
[0044] Specifically, Figure 2 As shown, the water inlet pipe g2 is sealed and plugged into the sedimentation column tu1 through the sealing plug s1, the water inlet pipe g4 is sealed and plugged into the sedimentation column tu2 through the sealing plug s2, the water inlet pipe g6 is sealed and plugged into the sedimentation column tu3 through the sealing plug s3, the water inlet pipe g8 is sealed and plugged into the sedimentation column tu4 through the sealing plug s4, and the water inlet pipe g 10 The water inlet pipe g is sealed and plugged into the sedimentation column tu5 through the sealing plug s5. 12 The water inlet pipe g is sealed and plugged into the sedimentation column tu6 through the sealing plug s6. 14 The water inlet pipe g is sealed and plugged into the sedimentation column tu7 through the sealing plug s7. 16 It is sealed and plugged into the vacuum column A2 through the sealing plug s8.
[0045] In this embodiment, if Figure 2As shown, the bottom of each sedimentation column and vacuum column is connected to a drain pipe, and the drain pipe is used to drain the sewage and sediment particles in the sedimentation column and the vacuum column. The drain pipe is installed with an opening and closing device to control the opening or closing of the drain pipe to complete the particle sedimentation performance detection operation in the sewage. Common opening and closing devices include switches or control valves.
[0046] Specifically, Figure 2 As shown, the bottom of the sedimentation column tu1 is connected to the drain pipe O1, and the opening and closing device k1 is installed on the drain pipe O1; the bottom of the sedimentation column tu2 is connected to the drain pipe O2, and the opening and closing device k2 is installed on the drain pipe O2; the bottom of the sedimentation column tu3 is connected to the drain pipe O3, and the opening and closing device k3 is installed on the drain pipe O3; the bottom of the sedimentation column tu4 is connected to the drain pipe O4, and the opening and closing device k4 is installed on the drain pipe O4; the bottom of the sedimentation column tu5 is connected to the drain pipe O5, and the opening and closing device k5 is installed on the drain pipe O5; the bottom of the sedimentation column tu6 is connected to the drain pipe O6, and the opening and closing device k6 is installed on the drain pipe O6; the bottom of the sedimentation column tu7 is connected to the drain pipe O7, and the opening and closing device k7 is installed on the drain pipe O7; the bottom of the vacuum column A2 is connected to the drain pipe O8, and the opening and closing device k8 is installed on the drain pipe O8. Preferably, the drain pipe O8 extends out of the detection box.
[0047] When working, first select a suitable combination of sedimentation column and vacuum column according to the characteristics of the sewage sample, and connect them with a diversion pipe to complete the following steps: Figure 2 The preparation work shown in the figure; then close all the opening and closing devices, turn on the vacuum pump Pu, the vacuum pump Pu draws sewage samples through the connecting pipe l0, the inlet pipe g1, the guide pipe l1 and the water inlet pipe g2 into the sedimentation column tu1, and then the sewage enters the sedimentation column tu2, the sedimentation column tu3, the sedimentation column tu4, the sedimentation column tu5, the sedimentation column tu6, the sedimentation column tu7, and the vacuum column A2 in turn. During this process, the particles with different sedimentation properties are precipitated in each sedimentation column. When the water flows into the vacuum column A2, the timing starts, and when the vacuum columns are almost full of water and the vacuum pump Pu is turned off, the timing ends. Then, the opening and closing devices at the bottom of each sedimentation column are opened, and the sedimented particles discharged from the drain pipe of each sedimentation column are collected with a beaker or other container, and then the sedimented particles are dried and weighed to quantify the mass m of the particles in each sedimentation column. i and the total mass of sediment particles collected by all sedimentation columns i is the i-th sedimentation column, the same below, and then through R i =m i / M calculates the sedimentation velocity v of each sedimentation column at its own i The proportion of particles under the condition of R i, thereby obtaining the sedimentation performance distribution of particles with different pollution characteristics in sewage, providing a reference for staff to further study the pollution threat of these particles with different pollution characteristics to water bodies; after sampling the emptying pipe of each sedimentation column, open the opening and closing device at the bottom of the vacuum column to empty the sewage in the vacuum column.
[0048] The portable particle sedimentation performance detection device of this embodiment can be carried with you to the field for on-site detection operations. There is no need to collect water samples and transfer them to the laboratory for testing. This saves time and effort, saves time, improves detection efficiency, and avoids the impact of changes in water sample properties during the transfer process on the accuracy of the test results.
[0049] In this embodiment, if Figure 2 As shown, the sedimentation column and the vacuum column are provided with adhesive tapes, and the adhesive tapes are bonded to the inner walls of the box body H2 and the box cover H1. This design makes it convenient to quickly remove the sedimentation column and the vacuum column from or install them into the box body H2 and the box cover H1.
[0050] Specifically, Figure 2 As shown, the sedimentation column tu1 is bonded to the inner wall of the box cover H1 by the adhesive tape t1, the sedimentation column tu2 is bonded to the inner wall of the box cover H1 by the adhesive tape t2, the sedimentation column tu3 is bonded to the inner wall of the box cover H1 by the adhesive tape t3, the sedimentation column tu4 is bonded to the inner wall of the box cover H1 by the adhesive tape t4, the sedimentation column tu5 is bonded to the inner wall of the box cover H1 by the adhesive tape t5, the sedimentation column tu6 is bonded to the inner wall of the box body H2 by the adhesive tape t6, the sedimentation column tu7 is bonded to the inner wall of the box body H2 by the adhesive tape t7, and the vacuum column A2 is bonded to the inner wall of the box body H2 by the adhesive tape t8.
[0051] In this embodiment, if Figure 2As shown, a mounting plate H9 is fixedly installed in the box body H2, and a mounting plate H8 is fixedly installed in the box cover H1. The mounting plate H9 divides the box body H2 into two parts, the mounting plate H8 divides the box cover H1 into two parts, a plurality of sedimentation columns penetrate the mounting plate H8, and the sedimentation columns are fixedly installed by supporting the mounting plate H8. A plurality of sedimentation columns and vacuum columns penetrate the mounting plate H9, and the vacuum columns are fixedly installed by supporting the mounting plate H9. This design facilitates the rapid fixing and installation of the sedimentation columns and the vacuum columns into the detection box. The bottom of the sedimentation columns The bottom of the vacuum column and the emptying pipe and the opening and closing device installed at the bottom of the sedimentation column are located below the mounting plate H8 in the box cover H1; the bottom of the vacuum column and the emptying pipe and the opening and closing device installed at the bottom of the vacuum column are located below the mounting plate H9 in the box body H2; the upper part of the sedimentation column and the water inlet pipe, water outlet pipe and adhesive tape installed thereon are located above the mounting plate H8 in the box cover H1; the upper part of the vacuum column and the water inlet pipe, water outlet pipe and adhesive tape installed thereon are located above the mounting plate H9 in the box body H2. This design does not affect the operation of the opening and closing device.
[0052] In this embodiment, the vacuum pump Pu is powered by an external battery.
[0053] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A portable particle settling performance detection device, characterized in that: It comprises a detection box and a mounting plate arranged in the detection box, wherein the mounting plate divides the detection box into two parts, an upper part and an lower part, and a plurality of sedimentation columns and vacuum columns are inserted and connected through the mounting plate, each sedimentation column has different sedimentation performance, and the plurality of sedimentation columns are arranged from large to small according to the sedimentation performance and are connected in series with each other, and the plurality of vacuum columns are connected in series with each other, and along the liquid flow direction, the sedimentation column at the end of the series connection is connected in series with the vacuum column at the head end of the series connection, and the vacuum column at the end of the series connection is connected in series with a vacuum pump; The bottom of each sedimentation column and vacuum column is connected to a drain pipe, and an opening and closing device is installed on the drain pipe to control the opening or closing of the drain pipe.
2. A portable particle settling performance detection device as claimed in claim 1, characterized in that: The tops of the sedimentation column and the vacuum column are both provided with a water inlet pipe and a water outlet pipe. The water inlet pipe of the downstream sedimentation column is connected to the water outlet pipe of the upstream sedimentation column, and the water inlet pipe of the downstream vacuum column is connected to the water outlet pipe of the upstream vacuum column.
3. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The water outlet of the water inlet pipe is located at the bottom of the sedimentation column and the vacuum column.
4. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The water inlet of the water inlet pipe of the sedimentation column located at the head end of the series connection is connected to the inlet pipe, and the inlet pipe extends out of the detection box.
5. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The tops of the sedimentation column and the vacuum column are provided with sealing plugs, and the water inlet pipe passes through the sealing plugs tightly.
6. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The water inlet of the water inlet pipe of the vacuum column located at the first end of the series connection is connected to the water outlet pipe of the sedimentation column located at the end of the series connection.
7. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The water outlet pipe of the vacuum column at the end of the series connection is connected to the vacuum pump.
8. A portable particle settling performance detection device as claimed in claim 2, characterized in that: The detection box comprises a box body and a box cover, wherein the box body and the box cover are detachably sealed and fixedly connected, and a plurality of sedimentation columns and vacuum columns are located in the box cover and the box body.
9. A portable particle settling performance detection device as claimed in claim 8, characterized in that: The sedimentation column and the vacuum column are provided with adhesive tapes, and the adhesive tapes are adhesively connected to the box body and the inner wall of the box cover.