Railway T-beam construction data processing method and device and electronic equipment

By classifying the data source, extracting features and cleaning the construction data of railway T-beams, and determining the data weight by combining comparative annotation, the integration of multi-source heterogeneous data was achieved, the problem of low data processing efficiency was solved, and the data accuracy and construction progress were improved. .

CN118733655APending Publication Date: 2024-10-01CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410852572.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

During the construction process of railway T-beams, due to the diverse data sources and the existence of information islands between different systems, the data processing efficiency is low and the construction progress is affected.

Method used

By performing data source classification, feature extraction, preset number of problem value cleaning, data integration and comparative annotation on the initial data, the data weight is determined and data fusion is performed to achieve the integration of multi-source heterogeneous data.

Benefits of technology

It improves the accuracy and credibility of data processing, reduces the risk of data distortion, highlights key information and important features, realizes production visualization, dispatch integration and decision-making digitization, and improves the accuracy of railway T-beam construction data acquisition and analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733655A_ABST
    Figure CN118733655A_ABST
Patent Text Reader

Abstract

The invention provides a railway T beam construction data processing method and device and electronic equipment, and relates to the technical field of data processing.The method comprises the steps that data source classification and feature extraction are conducted on obtained initial data, and data to be processed are obtained; performing problem value cleaning on the to-be-processed data for a preset number of times, and integrating the cleaned to-be-processed data to obtain a data set; and comparing and marking the data in the data set, determining a weight corresponding to each data in the data set based on a marking result, and fusing all the data according to the corresponding weight. According to the method, the to-be-processed data is subjected to problem value cleaning for preset times, so that the data credibility is effectively enhanced. A data set is obtained according to cleaned to-be-processed data, the data in the data set is compared and labeled, key information and important features in the data are highlighted, all the data are fused according to corresponding weights, and integration of multi-source heterogeneous data is achieved while the data processing precision is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a method, device and electronic equipment for processing railway T-beam construction data. Background Art

[0002] With the continuous development of intelligent railway T-beam construction, a large amount of data with complex sources and diverse structures is generated during the construction process. For example, data from BIM data, internal databases, external APIs, file systems, tooling equipment, etc. have different structural types. At present, when processing these data, they are divided into structured data, semi-structured data and unstructured data according to the characteristics of the data source, and then analyzed separately. However, due to the diversity of data collection methods and data sources, there are information islands between data from different systems or different data sources. Information islands will affect data processing efficiency and thus affect the construction progress of railway T-beams. Summary of the invention

[0003] The problem solved by the present invention is how to improve the data processing efficiency of railway T-beam construction.

[0004] In order to solve the above problems, the present invention provides a railway T-beam construction data processing method, device and electronic equipment.

[0005] In a first aspect, the present invention provides a railway T-beam construction data processing method, comprising:

[0006] Perform data source classification and feature extraction on the acquired initial data to obtain data to be processed;

[0007] Cleaning the data to be processed for a preset number of times, and integrating the cleaned data to be processed to obtain a data set;

[0008] The data in the data set are compared and annotated, the weight corresponding to each data in the data set is determined based on the annotation result, and all the data are merged according to the corresponding weight.

[0009] Optionally, the step of performing a preset number of problem value cleaning on the data to be processed includes:

[0010] Preprocessing the data to be processed to obtain first data;

[0011] Determine an abnormal factor value of each of the first data according to the position of each of the first data, and determine and eliminate outliers based on the abnormal factor value;

[0012] Using a KNN algorithm to interpolate the first data after elimination to obtain second data;

[0013] Determine and eliminate abnormal second data using a statistical algorithm;

[0014] The KNN algorithm is used to interpolate the second data after elimination to obtain third data.

[0015] Optionally, determining an abnormal factor value of each first data according to the position of each first data, and determining and eliminating outliers based on the abnormal factor value includes:

[0016] Convert the first data into data points, obtain the distance between each data point and other data points, and extract neighboring points of each data point, wherein the neighboring point is a data point whose distance to a data point is less than a preset distance threshold;

[0017] Determine the abnormal factor value of each data point according to the distance from the neighboring point to the corresponding data point;

[0018] The data points whose abnormal factor values ​​are greater than the preset factor values ​​are determined as the outliers, and the outliers are eliminated.

[0019] Optionally, the determining and eliminating abnormal second data by using a statistical algorithm includes:

[0020] Obtaining a difference between each of the second data and the mean, squaring the difference, summing up multiple square values, and comparing the summation result with the number of the second data to obtain a variance;

[0021] Taking the square root of the variance to obtain the standard deviation;

[0022] The second data whose standard deviation is greater than a preset difference is determined as the outlier, and the outlier is eliminated.

[0023] Optionally, the problem value includes a missing value; and the step of cleaning the problem value of the to-be-processed data for a preset number of times includes:

[0024] Determine the structure, format and field meaning of each of the data to be processed, and analyze the data to be processed to obtain the missing value;

[0025] Standardizing the analyzed data to be processed;

[0026] Analyze the missing values ​​of the data to be processed, determine the importance of the missing values, and fill the missing values ​​according to the importance of the missing values.

[0027] Optionally, the problem value includes a repeated value; and the step of cleaning the problem value of the to-be-processed data a preset number of times includes:

[0028] Matching similar data to be processed to obtain duplicate values, and deleting or merging the duplicate values;

[0029] The data to be processed after processing the repeated values ​​are converted into a unified format, and the converted data to be processed are verified.

[0030] Optionally, comparing and annotating the data in the data set, determining a weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, includes:

[0031] Compare and annotate the data in the data set in pairs, and generate a comparison matrix according to the annotated results;

[0032] Performing a consistency check on the comparison matrix, and when the check passes, obtaining the weight of each data in the data set according to the order of the comparison matrix and the labeling result;

[0033] Based on the weighted average method, all data are fused according to the weight of each data in the data set.

[0034] Optionally, before comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method further includes:

[0035] Matching and mapping data from different data sources in the data set;

[0036] After comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method further includes:

[0037] Verify and test the fused data.

[0038] In a second aspect, the present invention provides a railway T-beam construction data processing device, comprising:

[0039] The extraction module is used to classify the data source and extract the features of the acquired initial data to obtain the data to be processed;

[0040] A processing module, used for performing a preset number of problem value processing on the data to be processed, and integrating the processed data to be processed to obtain a data set;

[0041] The fusion module is used to compare and annotate the data in the data set, determine the weight corresponding to each data in the data set based on the annotation result, and fuse all the data according to the corresponding weight.

[0042] In a third aspect, the present invention provides an electronic device, including a memory and a processor;

[0043] The memory is used to store computer programs;

[0044] The processor is used to implement the railway T-beam construction data processing method as described in the first aspect when executing the computer program.

[0045] The beneficial effects of the railway T-beam construction data processing method of the present invention are: preliminary processing is performed on the acquired initial data, that is, data source classification and feature extraction are performed to obtain the data to be processed, and then the problem value cleaning of the data to be processed is performed for a preset number of times, so as to effectively discover and solve data quality problems, avoid the influence of bad data on subsequent analysis and decision-making, reduce the risk of data distortion, and enhance data processing accuracy and credibility. The data to be processed after the preset number of cleanings are integrated to obtain a data set, the data in the data set are compared and labeled, and the weight corresponding to the data in each data set is determined based on the labeling result, so that the differences or similarities between different data can be intuitively presented, the key information and important features in the data are highlighted, all data are merged according to the corresponding weights, and the integration of multi-source heterogeneous data is realized, which is convenient for analyzing the production situation and making decisions, realizing production visualization, scheduling integration, and decision digitization, and at the same time, the key information and important features required in the railway T-beam construction analysis process play their important role, so as to improve the railway T-beam construction data acquisition and analysis accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 A schematic diagram of a process flow of a railway T-beam construction data processing method according to an embodiment of the present invention;

[0047] Figure 2 It is a structural schematic diagram of a railway T-beam construction data processing device according to an embodiment of the present invention;

[0048] Figure 3 Schematic diagram of the structure of an electronic device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0049] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. Although certain embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be interpreted as being limited to the embodiments described herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present invention. It should be understood that the drawings and embodiments of the present invention are only for exemplary purposes and are not intended to limit the scope of protection of the present invention.

[0050] It should be understood that the various steps described in the method embodiments of the present invention may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present invention is not limited in this respect.

[0051] The term "including" and its variations used in this document are open inclusions, that is, "including but not limited to"; the term "based on" means "based at least in part on"; the term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments"; the term "optionally" means "optional embodiments". The relevant definitions of other terms will be given in the following description. It should be noted that the concepts of "first", "second", etc. mentioned in the present invention are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0052] It should be noted that the modifications of "one" and "plurality" mentioned in the present invention are illustrative rather than restrictive, and those skilled in the art should understand that, unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0053] The names of the messages or information exchanged between multiple devices in the embodiments of the present invention are only used for illustrative purposes, and are not used to limit the scope of these messages or information.

[0054] In view of the problems existing in the above-mentioned related technologies, this embodiment provides a railway T-beam construction data processing method, device and electronic equipment.

[0055] Before implementing the railway T-beam construction data processing method, it is necessary to determine the data requirements and goals according to the railway T-beam construction plan. Through business research and field surveys, the key data information objects involved in the prefabricated beam yard construction process are determined, and the production business and equipment operation data are collected for the on-site intelligent production equipment.

[0056] However, in the construction process of railway T-beams, a large number of equipment types are involved, that is, there are many data sources, resulting in different formats and types of data obtained, making it impossible to perform unified analysis. Therefore, in order to facilitate the analysis and detection of the railway construction process, it is necessary to fuse the data obtained from different data sources.

[0057] like Figure 1 As shown, a railway T-beam construction data processing method provided by an embodiment of the present invention includes:

[0058] Step S1: classify the data source and extract the features of the acquired initial data to obtain the data to be processed.

[0059] Specifically, in the existing railway T-beam construction process, data sources are usually divided into three categories according to their characteristics. The first category is structured data, which is data from tooling equipment, such as steel bar processing equipment, concrete mixing station equipment, concrete pouring equipment, maintenance equipment, tensioning equipment, grouting equipment, gantry crane and other equipment operation data; the second category is semi-structured data, which is data from BIM models, such as streamlining and optimizing BIM models, removing unnecessary details and data, and further producing three-dimensional model file data to simplify the model structure and improve performance; the third category is unstructured data, which is business data from third-party platforms, such as the docking mechanism with third-party platforms to obtain business data such as people, machines, materials, methods, and environment in the railway T-beam prefabrication production process.

[0060] According to the type of data source and the data format generated, choose the collection tool. For the first type of structured data, such as system relational database, you can use ETL tools; for the second type of semi-structured data, such as XML and JSON connected to the business system, you can use crawler tools such as Scrapy and Apache Nutch; for the third type of unstructured data, such as engineering quality control specification documents, you can use natural language processing tools to convert unstructured data into unified structured data, such as NLTK, Stanford NLP, etc.

[0061] The acquired data is classified according to the data source to obtain structured data, semi-structured data and unstructured data, and then feature extraction is performed on the data, that is, information valuable for specific tasks or analysis is screened out from the original data. For example, features that have an important impact on tasks such as classification or regression are selected from the original data, or dimensionality reduction techniques (such as principal component analysis and factor analysis) are used to reduce the dimension and complexity of the data to obtain the data to be processed, so as to improve the accuracy of subsequent data processing.

[0062] Step S2: performing a preset number of problem value processing on the data to be processed, and integrating the processed data to be processed to obtain a data set.

[0063] Specifically, after obtaining the data to be processed, there may be many redundancies and problem values ​​in the data to be processed, such as duplicate values, missing values, and abnormal values. In this case, it is necessary to understand and analyze the data to be processed, that is, to define the structure, format, field meaning, etc. of each data source, and analyze the possible problem values ​​in the data. In order not to affect the accuracy of subsequent data fusion, the data to be processed needs to be cleaned. However, in the railway T-beam construction data, the types of problem values ​​are different. If the problem values ​​are only processed once, the data cleaning will be incomplete. In this embodiment, different means (such as using the mean, mode, or median to fill missing values, etc.) are used to process the problem values ​​for a preset number of times, which can effectively process different types of problem values ​​and effectively improve the efficiency of data cleaning. The cleaned data to be processed are integrated to obtain a data set.

[0064] Step S3: Compare and annotate the data in the data set, determine the weight corresponding to each data in the data set based on the annotation result, and merge all the data according to the corresponding weight.

[0065] Specifically, every two data in the data set are compared and annotated to indicate the relative importance of the data. The comparison and annotation process can be processed using a pre-trained neural network model. Based on the corresponding annotation results, the weight of each data is determined, and the data is fused according to the corresponding weight using, for example, a weighted average method, a multi-attribute decision method, or a principal component analysis method to obtain fused data.

[0066] In this embodiment, the acquired initial data is preliminarily processed, that is, data source classification and feature extraction are performed to obtain the data to be processed, and then the problem value cleaning of the data to be processed is performed for a preset number of times, so as to effectively discover and solve data quality problems, avoid the influence of bad data on subsequent analysis and decision-making, reduce the risk of data distortion, and enhance data processing accuracy and credibility. The data to be processed after the preset number of cleanings are integrated to obtain a data set, and the data in the data set are compared and labeled. The weight corresponding to the data in each data set is determined based on the labeling results, so that the differences or similarities between different data can be intuitively presented, highlighting the key information and important features in the data, and all data are fused according to the corresponding weights to realize the integration of multi-source heterogeneous data, which is convenient for analyzing the production situation and making decisions, realizing production visualization, scheduling integration, and decision digitization, and at the same time, the key information and important features required in the railway T-beam construction analysis process play their important role, so as to improve the railway T-beam construction data acquisition and analysis accuracy.

[0067] Optionally, the processing of the problem value for a preset number of times on the data to be processed includes:

[0068] The data to be processed is preprocessed to obtain first data.

[0069] Specifically, the problem values ​​in the data to be processed include outliers, and the railway T-beam construction data usually includes noise outliers and signal outliers. The noise outliers come from the influence of on-site noise or electronic pulses on sensors or data acquisition devices, and the signal outliers come from the mutual influence between vibration signals, which makes the collected data have statistical outliers. If a conventional general outlier processing method is used for one-time processing in order to increase the processing speed, it may lead to incomplete outlier processing, affecting the subsequent data comparison and annotation results, weight distribution, fusion results, etc. Therefore, this embodiment proposes two processing methods for two types of outliers. Before processing the outliers, the data brought out must first be preprocessed. For example, in order to facilitate data processing, the data to be processed is standardized to obtain the first data that can be processed uniformly.

[0070] An abnormal factor value of each of the first data is determined according to the position of each of the first data, and outliers are determined and eliminated based on the abnormal factor value.

[0071] The KNN algorithm is used to interpolate the first data after elimination to obtain second data.

[0072] Specifically, for the noise anomalies unique to the railway T-beam construction data, this embodiment uses the abnormal factor value of each first data to determine the noise anomaly value of the data. For example, the data points to be detected are constructed into a forest. For each tree, the data points are assigned to different branches using a random cutting method to form a binary tree structure. For each data point, the path length in the tree can be quickly calculated through the tree structure of the isolated forest. The shorter the path length, the more likely the data point is an outlier. Then, according to the abnormal factor value of each first data, the first data that does not meet the requirements is determined as an outlier, and the outlier is eliminated. Finally, the KNN algorithm is used to interpolate the eliminated first data to obtain the second data. Through this method, the noise anomalies in the first data are eliminated and the data accuracy is improved.

[0073] It should be noted that the method of determining outliers using outlier factor values ​​can be combined with smoothing methods, filtering algorithms, feature selection algorithms, etc., to perform multiple problem value processing to improve the efficiency of noise outlier cleaning.

[0074] A statistical algorithm is used to determine and eliminate abnormal second data.

[0075] Specifically, the signal outliers unique to the railway T-beam construction data are usually outliers in a statistical sense. Therefore, the outliers in the second data can be determined and eliminated by methods such as Z-score and box plot based on statistical methods. Through this method, the structural outliers in the second data are eliminated, reducing the impact of structural outliers on data fusion efficiency.

[0076] The KNN algorithm is used to interpolate the second data after elimination to obtain third data.

[0077] Optionally, determining an abnormal factor value of each first data according to the position of each first data, and determining and eliminating outliers based on the abnormal factor value includes:

[0078] Convert the first data into data points, obtain the distance between each data point and other data points, and extract neighboring points of each data point, wherein the neighboring point is a data point whose distance to a data point is less than a preset distance threshold;

[0079] Determine the abnormal factor value of each data point according to the distance from the neighboring point to the corresponding data point;

[0080] The data points whose abnormal factor values ​​are greater than the preset factor values ​​are determined as the outliers, and the outliers are eliminated.

[0081] Specifically, in this embodiment, the outlier is determined according to the abnormal factor value. First, the first data is sorted and standardized according to the characteristics or attributes of the first data, converted into data points, and the distance between each data point is determined according to the following formula:

[0082] d k (P) = d(P,O),

[0083] Among them, d k (P) represents the distance between the kth data point and data point P among the points closest to data point P. Data point O is the kth point closest to data point P, and k is a positive integer.

[0084] With data point P as the center, d k (P) is the radius (i.e., the preset distance), and this range is the neighborhood of the data point P, which is expressed by the following formula:

[0085] N k (P)={d(P,O)≤d k (P)},

[0086] Among them, N k (P) represents the neighborhood. All points within this range are neighbors of the data point P.

[0087] Then calculate the reach-dist distance from data point P to its neighboring data point O k (O, P), expressed as follows:

[0088] reach_dist k (O,P)=max{d k (O),d(O,P)}.

[0089] According to the neighborhood N k (P) and reach-dist k (O, P) Calculate the reachable density lrd within this range k (P), which is the reciprocal of the average distance from data point P to the data points in its neighborhood, and is expressed by the following formula:

[0090]

[0091] According to the relative density of data point P and its surrounding points, the outlier factor value LOF of data point P is obtained. k (P), that is, the ratio of the average reachable density of data points in the neighborhood of data point P to the reachable density of data point P, is expressed by the formula:

[0092]

[0093] Where lrd(O) represents the reachable density of points O around data point P.

[0094] Generally, the larger the anomaly factor value, the more abnormal the data point is. Conversely, the smaller the anomaly factor value, the more normal the data point is.

[0095] Finally, the preset factor value is set according to the actual situation. When the abnormal factor value of the data point P is greater than the preset factor value, the first data corresponding to the data point P is determined to be an outlier, and the outlier is removed.

[0096] In this embodiment, by calculating the distance between each data point and determining the neighboring points within a preset distance of the corresponding data point, the density deviation of each data point relative to its neighborhood can be obtained to obtain outliers and improve the accuracy of outlier determination.

[0097] Optionally, the determining and eliminating abnormal second data by using a statistical algorithm includes:

[0098] Obtaining a difference between each of the second data and the mean, squaring the difference, summing up multiple square values, and comparing the summation result with the number of the second data to obtain a variance;

[0099] Taking the square root of the variance to obtain the standard deviation;

[0100] Determine that the second data whose standard deviation is greater than a preset difference is the abnormal value, and eliminate the abnormal value.

[0101] Specifically, before determining the outlier based on the second data, the BOX-COX transformation is first used to make the second data approximately obey the normal distribution for subsequent processing. The standard deviation is obtained according to the above method, and the Laida criterion is used to determine whether the second data is an outlier, that is, to determine the preset difference. If it is necessary to explain, the preset difference can be determined according to the actual situation, and is not specifically limited in this embodiment. For example, in this embodiment, the Laida criterion includes:

[0102] P(|x-μ|>3σ)≤0.003,

[0103] P(|x-μ|>2σ)≤0.046,

[0104] P(|x-μ|>σ)≤0.317,

[0105] Wherein, P represents probability, x represents the second data, μ represents mean, and σ represents standard deviation. The probability of being distributed around three times the standard deviation (3σ) of the mean is 0.997 (1-0.003); the probability of being distributed around the mean 2σ is 0.954 (1-0.046); the probability of being distributed around the mean σ is 0.683 (1-0.317). In this embodiment, the preset difference values ​​are σ, 2σ and 3σ. When the standard deviation of the second data is greater than the preset difference, it is determined that the second data is abnormal and is an outlier, and the outlier is eliminated.

[0106] Optionally, the problem value includes a missing value; and the performing a preset number of abnormal value processing on the data to be processed includes:

[0107] Determine the structure, format and field meaning of each of the data to be processed, and analyze the data to be processed to obtain the missing value;

[0108] The analyzed data to be processed is standardized, that is, according to the construction requirements of railway T-beams, data cleaning rules and clear standards are formulated, and field names, data types, data formats, etc. are unified and standardized.

[0109] Analyze the missing values ​​of the data to be processed, determine the importance of the missing values, and fill the missing values ​​according to the importance of the missing values.

[0110] Specifically, analyze the causes of missing values ​​and determine appropriate filling strategies, such as mean filling, median filling, mode filling, or using machine learning models to predict and fill. If necessary, missing values ​​of low importance can be deleted or ignored.

[0111] Optionally, the problem value includes a repeated value; and the performing abnormal value processing on the to-be-processed data a preset number of times includes:

[0112] The similar data to be processed are matched to obtain the repeated values, and the repeated values ​​are deleted or merged.

[0113] Specifically, firstly, the similarity of each data to be processed is compared two by two, and the data to be processed are sorted in descending order according to the similarity. According to this order, two corresponding data to be processed are matched in turn, and duplicate values ​​are identified and deleted, or data with slight differences that may be caused by different sources can be merged through fuzzy matching or algorithms.

[0114] The data to be processed after processing the repeated values ​​are converted into a unified format, and the converted data to be processed are verified.

[0115] Specifically, convert data in non-standard formats into standard formats, such as unifying date formats, converting text into numeric values, etc. Then use sampling or full data to verify the cleaned data to ensure data accuracy and consistency. Statistical tests or visualization methods can be used to assist the verification process.

[0116] In addition, if necessary, the entire data cleaning process is recorded, including the tools, methods, rules, etc. used, to help others understand the data cleaning process and retrieve it when needed. The data is then integrated, that is, the cleaned data is associated and integrated through data relationships to form a unified data set for the construction of each railway T-beam, involving AI process identification, personnel, machinery, steel bar specifications and quantity, concrete quality, automatic tensioning, grouting, static load, spray maintenance and other full construction process data, and finally an electronic file of T-beam construction is formed to provide a decision-making basis for quality control, progress control, and cost control in the construction process.

[0117] Optionally, comparing and annotating the data in the data set, determining the weight corresponding to the data of each data source based on the annotation result, and fusing all the data according to the corresponding weight, includes:

[0118] The data in the data set are compared and labeled in pairs, and a comparison matrix is ​​generated according to the labeling results.

[0119] Specifically, the data in the data set are compared and scored pairwise using, for example, an expert evaluation method or a big data evaluation method, to establish a comparison matrix A:

[0120]

[0121] Among them, element a ij It indicates the importance of the i-th influencing factor compared to the j-th influencing factor. The importance level evaluation criteria are shown in Table 1.

[0122] Table 1- Importance level of influencing factors

[0123]

[0124] A consistency check is performed on the comparison matrix, and when the check passes, a weight of each data in the data set is obtained according to the order of the comparison matrix and the labeling result.

[0125] Specifically, in order to avoid contradictory evaluations in the comparison matrix, it is necessary to use a consistency test method to test the comparison matrix A. When the consistency CR < 0.1, the consistency of the comparison matrix can be considered acceptable, otherwise the comparison matrix A needs to be corrected. First, the consistency index CI of the data is calculated, which is expressed as follows:

[0126]

[0127] Among them, λ max represents the maximum eigenvalue of the contrast matrix A, and n represents the order of the contrast matrix A.

[0128] Find the corresponding average random consistency index RI, and the index value is shown in Table 2.

[0129] Table 2 - Average random consistency index values

[0130]

[0131] Then the consistency ratio CR is calculated by CI and RI.

[0132] Right now

[0133] When the comparison matrix A passes the consistency test, the weight wi of the i-th data is calculated using the following formula:

[0134]

[0135] Based on the weighted average method, all data are fused according to the weight of each data in the data set.

[0136] Optionally, before comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method further includes:

[0137] Match and map data from different data sources in the data set.

[0138] Specifically, in the data fusion process, data from different data sources are compared, classified, and matched to identify the same or similar data, thereby achieving data integration and matching. In the matching process, factors such as the semantics, format, and structure of the data need to be considered. A common method is to use specific matching algorithms, such as rule-based matching and similarity-based matching, which can help identify and integrate the same or similar data from different data sources. In addition, for complex heterogeneous data, it may be necessary to use machine learning or deep learning techniques to improve the accuracy and efficiency of matching. For example, the characteristics of the data can be learned by training the model and these characteristics can be used for matching.

[0139] Since there are different data formats, local data structures and semantics among multi-source heterogeneous data, multi-source heterogeneous data are mapped to a common data model or standard by using methods such as ontology mapping, metadata mapping, and semantic mapping to achieve data integration across data sources.

[0140] Data matching is used to find out the same and different parts of data from different sources for subsequent integration. Data mapping is used to convert data with different semantics into unified semantics to ensure that the data has consistent meaning and interpretation after integration.

[0141] After comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method includes:

[0142] Verify and test the fused data.

[0143] Specifically, after data fusion is completed, data verification and testing are performed to ensure the integrity and accuracy of the data, as well as the effectiveness and reliability of the integration.

[0144] The main purpose of data validation is to ensure the accuracy, completeness and consistency of data. In the context of multi-source heterogeneous data, the validation process is particularly complex because the data that needs to be processed has various types, formats and structures.

[0145] Verification methods may include:

[0146] Data integrity check: ensure that there are no missing values ​​or outliers in the data, and that all required fields are correctly filled in; data accuracy verification: verify the accuracy of the data by comparing different data sources or using known standard data; data consistency check: check whether the data is consistent across different data sources or at different time points to avoid data conflicts or contradictions; for multi-source heterogeneous data, semantic verification may also be required to ensure that the meaning and purpose of the data are still accurate after integration. In addition, considering the sensitivity and security of the data, the verification process also needs to ensure that the data is not tampered with or leaked.

[0147] The purpose of data testing is to evaluate the quality, performance, and reliability of data to ensure that the data can meet the requirements in actual applications. For multi-source heterogeneous data, testing may include:

[0148] Data quality testing: Evaluate the accuracy, completeness and consistency of data through sampling inspection, comparative analysis and other methods; Data performance testing: Measure indicators such as data transmission speed, throughput and latency to evaluate the performance of data communication; Exception handling testing: Simulate errors or abnormal situations (such as network interruption, data corruption, etc.) during data transmission or processing to verify the fault tolerance and recovery capabilities of the system; Security testing: Check whether security measures such as data encryption and permission control are effective to ensure that data is not accessed or leaked without authorization. During the testing process, various testing tools and technologies may need to be used, such as automated test scripts, performance testing tools, etc., to improve testing efficiency and accuracy.

[0149] In addition, after completing data verification and testing, the integrated data is stored in a suitable data warehouse or database, and a corresponding data management mechanism is established for subsequent data analysis and utilization. It should be noted that since multi-source heterogeneous data has different formats and structures, it is necessary to select a suitable storage format based on the characteristics and requirements of the data. Common storage formats include relational databases, NoSQL databases, data warehouses, etc. Each format has its advantages and disadvantages, and needs to be selected based on actual conditions.

[0150] like Figure 2 As shown, an embodiment of the present invention provides a railway T-beam construction data processing device, comprising:

[0151] The extraction module is used to classify the data source and extract the features of the acquired initial data to obtain the data to be processed;

[0152] A processing module, used for performing a preset number of problem value processing on the data to be processed, and integrating the processed data to be processed to obtain a data set;

[0153] The fusion module is used to compare and annotate the data in the data set, determine the weight corresponding to each data in the data set based on the annotation result, and fuse all the data according to the corresponding weight.

[0154] like Figure 3 As shown, an electronic device 300 provided by an embodiment of the present invention includes a memory 310 and a processor 320; the memory 310 is used to store a computer program; the processor 320 is used to implement the railway T-beam construction data processing method as described above when executing the computer program.

[0155] In other words, an electronic device 300 includes a memory 310 and a processor 320 coupled to the memory 310; the memory 310 is configured to store a computer program; and the processor 320 is configured to perform the following operations when executing the computer program:

[0156] Perform data source classification and feature extraction on the acquired initial data to obtain data to be processed;

[0157] Cleaning the data to be processed for a preset number of times, and integrating the cleaned data to be processed to obtain a data set;

[0158] The data in the data set are compared and annotated, the weight corresponding to each data in the data set is determined based on the annotation result, and all the data are merged according to the corresponding weight.

[0159] An embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the railway T-beam construction data processing method as described above is implemented.

[0160] In other words, a non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor performs the following operations:

[0161] Perform data source classification and feature extraction on the acquired initial data to obtain data to be processed;

[0162] Cleaning the data to be processed for a preset number of times, and integrating the cleaned data to be processed to obtain a data set;

[0163] The data in the data set are compared and annotated, the weight corresponding to each data in the data set is determined based on the annotation result, and all the data are merged according to the corresponding weight.

[0164] An electronic device 300 that can be used as a server or client of the present invention will now be described, which is an example of a hardware device that can be applied to various aspects of the present invention. The electronic device 300 is intended to represent various forms of digital electronic computer equipment, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device 300 can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples, and are not intended to limit the implementation of the present invention described and / or required herein.

[0165] The electronic device 300 includes a computing unit, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) or a computer program loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for the operation of the device can also be stored. The computing unit, ROM, and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0166] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc. In the present application, the unit described as a separate component may or may not be physically separated, and the component displayed as a unit may or may not be a physical unit, that is, it may be located in one place, or it may be distributed on multiple network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the embodiment of the present invention. In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of a software functional unit.

[0167] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.

Claims

1. A railway T-beam construction data processing method, characterized in that: include: Perform data source classification and feature extraction on the acquired initial data to obtain data to be processed; Cleaning the data to be processed for a preset number of times, and integrating the cleaned data to be processed to obtain a data set; The data in the data set are compared and annotated, the weight corresponding to each data in the data set is determined based on the annotation result, and all the data are merged according to the corresponding weight.

2. The railway T-beam construction data processing method according to claim 1 is characterized in that: The step of performing a preset number of problem value cleaning on the data to be processed includes: Preprocessing the data to be processed to obtain first data; Determine an abnormal factor value of each of the first data according to the position of each of the first data, and determine and eliminate outliers based on the abnormal factor value; Using a KNN algorithm to interpolate the first data after elimination to obtain second data; Determine and eliminate abnormal second data using a statistical algorithm; The KNN algorithm is used to interpolate the second data after elimination to obtain third data.

3. The railway T-beam construction data processing method according to claim 2 is characterized in that: The step of determining the abnormal factor value of each of the first data according to the position of each of the first data, and determining and eliminating outliers based on the abnormal factor value includes: Convert the first data into data points, obtain the distance between each of the data points and other data points, and extract neighboring points of each of the data points, wherein the neighboring point is a data point whose distance to a data point is less than a preset distance threshold; Determine the abnormal factor value of each data point according to the distance from the neighboring point to the corresponding data point; The data points whose abnormal factor values ​​are greater than the preset factor values ​​are determined as the outliers, and the outliers are eliminated.

4. The railway T-beam construction data processing method according to claim 2 is characterized in that: The method of determining and eliminating abnormal second data by using a statistical algorithm includes: Obtaining a difference between each of the second data and the mean, squaring the difference, summing up multiple square values, and comparing the summation result with the number of the second data to obtain a variance; Taking the square root of the variance yields the standard deviation; The second data whose standard deviation is greater than a preset difference is determined as the outlier, and the outlier is eliminated.

5. The railway T-beam construction data processing method according to claim 1, characterized in that: The problem value includes a missing value; and the cleaning of the problem value of the to-be-processed data for a preset number of times includes: Determine the structure, format and field meaning of each of the data to be processed, and analyze the data to be processed to obtain the missing value; Standardizing the analyzed data to be processed; Analyze the missing values ​​of the data to be processed, determine the importance of the missing values, and fill the missing values ​​according to the importance of the missing values.

6. The railway T-beam construction data processing method according to claim 1, characterized in that: The problem value includes a repeated value; and the cleaning of the problem value of the to-be-processed data for a preset number of times includes: Matching similar data to be processed to obtain duplicate values, and deleting or merging the duplicate values; The data to be processed after processing the repeated values ​​are converted into a unified format, and the converted data to be processed are verified.

7. The railway T-beam construction data processing method according to claim 1, characterized in that: The comparing and labeling the data in the data set, determining the weight corresponding to each data in the data set based on the labeling result, and fusing all the data according to the corresponding weight, includes: Compare and annotate the data in the data set in pairs, and generate a comparison matrix according to the annotated results; Performing a consistency check on the comparison matrix, and when the check passes, obtaining the weight of each data in the data set according to the order of the comparison matrix and the labeling result; Based on the weighted average method, all data are fused according to the weight of each data in the data set.

8. The railway T-beam construction data processing method according to claim 1, characterized in that: Before comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method further includes: Matching and mapping data from different data sources in the data set; After comparing and annotating the data in the data set, determining the weight corresponding to each data in the data set based on the annotation result, and fusing all the data according to the corresponding weight, the method further includes: Verify and test the fused data.

9. A railway T-beam construction data processing device, characterized in that: include: The extraction module is used to classify the data source and extract the features of the acquired initial data to obtain the data to be processed; A processing module, used for performing a preset number of problem value processing on the data to be processed, and integrating the processed data to be processed to obtain a data set; The fusion module is used to compare and annotate the data in the data set, determine the weight corresponding to each data in the data set based on the annotation result, and fuse all the data according to the corresponding weight.

10. An electronic device, characterized in that: including memory and processor; The memory is used to store computer programs; The processor is used to implement the railway T-beam construction data processing method as described in any one of claims 1 to 8 when executing the computer program.