Offshore wind power single pile foundation design evaluation method and related device
Through the combination of the rapid evaluation model and the digital twin system, the problem of low accuracy in offshore wind power monopile foundation design evaluation is solved, a more efficient and accurate design evaluation is achieved, the workload is reduced and the accuracy of the results is improved.
Patent Information
- Application Number
- CN202410916169.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-01
AI Technical Summary
The design evaluation accuracy of offshore wind power monopile foundations in the existing technology is low, resulting in a large amount of time spent in the early feasibility study phase and unsatisfactory results. The main reason is that the adjacent sea areas are quite different and there is a lack of effective rapid evaluation methods.
The rapid evaluation model and digital twin system are used to evaluate the single pile foundation design by collecting environmental parameters and tower bottom diameter data. If the design conditions are not met, iterative optimization is performed to ensure that the design meets the conditions and provide the optimal single pile foundation design.
It greatly reduces the workload, avoids duplication of work, improves the accuracy of single pile foundation design results, ensures that the design meets the design conditions, and improves the accuracy of assessment.
Smart Images

Figure CN118734589A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of offshore wind power, and in particular relates to an offshore wind power single pile foundation design evaluation method and related devices. Background Art
[0002] At present, offshore wind power single pile foundation accounts for 80% of all foundation types and is widely used. It is the key research object of offshore wind power parity. The diameter of single pile foundation is 5m to 10m. With the emergence of large megawatt units, the diameter of single pile foundation will exceed 10m. At present, a wind farm may have 50 machine sites or even more. In the early feasibility study stage, it is difficult to design a single pile for each machine site, and it is difficult to support it in terms of manpower and material resources.
[0003] In the existing technology, the early stage rapid assessment is often done by searching the database, and the preliminary work is replaced by the offshore wind power foundation plan in the adjacent sea area. This often takes a lot of time and work in the early stage, but the results are not ideal. The main reason is that the adjacent sea areas are quite different. If there is no offshore wind power foundation plan in the adjacent sea area, engineers will design it based on experience, but this is also very different from the actual situation, and it is difficult to ensure the accuracy of the early feasibility study. Summary of the invention
[0004] The purpose of the present invention is to provide a design evaluation method for an offshore wind power monopile foundation to solve the problem of low evaluation accuracy in the prior art.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] First, as Figure 6 As shown, a design and evaluation method for an offshore wind power monopile foundation comprises the following steps:
[0007] Collecting environmental parameters and tower bottom diameter data of the tower frame, and performing single pile foundation design according to the environmental parameters and tower bottom diameter data;
[0008] The monopile foundation design is evaluated based on the rapid evaluation model. If the monopile foundation design meets the design conditions, the optimal monopile foundation design is obtained. If the monopile foundation design does not meet the design conditions, the monopile foundation design is iterated through the digital twin system, and re-evaluated after the iteration is completed;
[0009] The rapid assessment model is established through a digital twin system.
[0010] In some embodiments, the rapid assessment model comprises:
[0011] W 总 =W 上部直段 +W 变径段 +W 下部直段
[0012] W 上部直段 =f(D 上 , t 上 , L 上 )
[0013] W 变径段 =f(D 上 , D 下 , t 变 , L 变 )
[0014] W 下部直段 =f(D 下 , t 下 , L 下 )
[0015] Where W 总 is the total weight of the single pile foundation, W 上部直段 is the weight of the upper straight section structure of the single pile foundation, W 变径段 is the weight of the variable diameter section of the single pile foundation, W 下部直段 is the weight of the lower straight section of the single pile foundation, D 上 is the diameter of the upper straight section of the pile, t 上 is the wall thickness of the upper straight section, t 变 is the wall thickness of the reducing section, D 下 is the diameter of the lower straight section of the pile, t 下 is the wall thickness of the lower straight section, L 上 is the length of the upper straight section of the pile, L 变 is the length of the variable diameter section pile, L 下 It is the length of the lower straight section of the pile.
[0016] In some embodiments, the L 上 Obtained by the following formula:
[0017]
[0018] In the formula, H 高 For extremely high water level, H max is the extreme wave height; a is the distance below the water surface, 2m to 4m is recommended. 变 Obtained by the following formula:
[0019] L 变 =f(d)=dl a -l b
[0020] Where d is the water depth, l is a The distance below the water surface is 2m to 4m. b It is the distance from the upper part of the mud surface, 0m to 2m is recommended.
[0021] In some embodiments, the L 下 Obtained by the following formula:
[0022] L 下 =f(D, F, M)
[0023] D=2E-25M 5 -1E-19M 4 +4E-14M 3 -7E-09M 2 +0.0005M-6.0957
[0024] Where D is the pile diameter of the single pile foundation, F is the horizontal force, and M is the bending moment load.
[0025] In some embodiments, the environmental parameters include: water level, wave height, wind parameters and wave and current parameters.
[0026] In some embodiments, the design conditions include:
[0027] D of the upper straight section of the single pile foundation 上 / t 上 100~110;
[0028] D of the variable diameter section of the single pile foundation 下 / t 变 100~110;
[0029] D for the straight section of the lower part of the single pile foundation that is 20m to 30m into the mud 下 / t 下 The D value of the lower straight section of the single pile foundation below 20m to 30m into the mud is 100 to 110. 下 / t 下 120~140;
[0030] L 变 Meet the distance range of 2m to 4m below the water surface to 2m above the mud surface;
[0031] L 上 The distance from the top of the foundation to the bottom of the water surface should be within the range of 2m to 4m;
[0032] L 下 Meet the distance range from 0m to 2m from the upper part of the mud surface to the bottom of the mud pile.
[0033] In the second aspect, a design and evaluation system for an offshore wind power monopile foundation includes:
[0034] A data acquisition module is used to collect environmental parameters and tower bottom diameter data;
[0035] A single pile foundation design module, used for designing a single pile foundation according to the environmental parameters and tower bottom diameter data;
[0036] The digital twin evaluation module is used to evaluate the single pile foundation design based on the rapid evaluation model. If the single pile foundation design meets the design conditions, the optimal single pile foundation design is obtained. If the single pile foundation design does not meet the design conditions, the single pile foundation design is iterated through the digital twin system. After the iteration is completed, the design is re-evaluated. The rapid evaluation model is established through the digital twin system.
[0037] In a third aspect, an electronic device comprises a memory, a processor, and a computer program stored in the memory and executable in the processor, wherein the processor implements the steps of the offshore wind power single pile foundation design and evaluation method when executing the computer program.
[0038] In a fourth aspect, a computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the offshore wind power single pile foundation design and evaluation method are implemented.
[0039] Compared with the prior art, the present invention has the following beneficial effects:
[0040] The present invention provides an offshore wind power monopile foundation design evaluation method, which evaluates the monopile foundation design through a rapid evaluation model. If the monopile foundation design meets the design conditions, the optimal monopile foundation design is obtained. If the monopile foundation design does not meet the design conditions, the monopile foundation design is iterated through a digital twin system. After the iteration is completed, the evaluation is performed again, which can greatly reduce the workload and avoid duplication of work. In addition, the present invention evaluates the monopile foundation design based on the rapid evaluation model, which can solve the problem of low evaluation accuracy in the prior art and improve the accuracy of the monopile foundation design results.
[0041] Furthermore, the present invention is based on a digital twin system and performs evaluation according to design conditions, and limits the pile length, pile diameter and wall thickness of the upper straight section, the variable diameter section and the lower straight section, thereby providing a guarantee for the rapid evaluation of the single pile foundation and improving the accuracy of the results. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A schematic diagram of a single pile foundation segment provided in Example 1;
[0043] Figure 2 An evaluation block diagram of the rapid evaluation model provided in Example 1;
[0044] Figure 3 This is a block diagram for evaluating the upper straight section of a monopile foundation in the rapid evaluation model provided in the first embodiment;
[0045] Figure 4 Evaluation block diagram of the lower straight section of a single pile foundation in the rapid evaluation model provided in Example 1
[0046] Figure 5 An iterative flow chart of the digital twin system for evaluating the design and evaluation method of the offshore wind power monopile foundation provided in Example 1;
[0047] Figure 6 A flow chart of the offshore wind power monopile foundation design and evaluation method provided by the present invention;
[0048] Figure 7 This is a structural diagram of the offshore wind power single pile foundation design and evaluation system provided by the present invention. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the solution of the present invention, the technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings, and the described content is intended to explain the present invention rather than to limit it.
[0050] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present invention are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units that are not explicitly listed or are inherent to these processes, methods, systems, products or apparatus.
[0051] Embodiment 1
[0052] The problems currently faced by offshore wind power monopile foundations are as follows: (1) Monopile foundations are widely used and require a large amount of work. Currently, monopile foundations account for 80% of offshore wind power projects. (2) The design process of monopile foundations is highly repetitive and the design method is fixed. (3) There are many design locations for monopile foundations, and the designs are similar, which makes it easy for design errors to occur. (4) The existing rapid assessment method searches through the database. When the data is insufficient, it is replaced by data from adjacent sea areas, or the monopile foundation is designed based on engineering experience. Therefore, the existing rapid assessment accuracy is not high. (5) The results of the existing assessment method have huge errors in the detailed design stage and are not sufficient to support parity.
[0053] Therefore, this embodiment provides a design and evaluation method for an offshore wind power monopile foundation, comprising the following steps:
[0054] Step 1: Establish a digital twin system, including single pile foundation design data, data acquisition mechanism, calculation and analysis platform and digital twin model. A test system is built based on the single pile foundation, data acquisition mechanism and calculation and analysis platform to obtain the single pile foundation design; the digital twin model includes soil database, load database and wave and current database, etc.
[0055] Step 2: The data collection mechanism collects environmental parameters and tower bottom diameter data, and performs single pile foundation design according to the single pile design requirements through the calculation and analysis platform. The main analysis contents of the calculation and analysis platform include: static strength, deformation, bearing capacity, pile buckling, pile fatigue, in-situ buckling and in-situ fatigue, etc. The bearing capacity includes: compressive bearing capacity, tensile bearing capacity and horizontal bearing capacity;
[0056] Environmental parameters mainly include water level, wave height, wind parameters and wave and current parameters;
[0057] Step 3: Design the single pile foundation based on environmental parameters and tower bottom diameter data, and calculate the parameters such as the foundation top elevation, D / t on the mud surface, variable diameter section range, D / t below the mud surface, pile length below the mud surface, and load at the mud surface.
[0058] Step 4: According to the parameters of the single pile foundation counted in step 3, improve the single pile foundation simulation model and establish a database. Through the database, a rapid evaluation model is established, such as Figure 2 , Figure 3 and Figure 4 As shown;
[0059] The rapid assessment model includes:
[0060] W 总 =W 上部直段 +W 变径段 +W 下部直段
[0061] W 上部直段 =f(D 上 , t 上 , L 上 )
[0062] W 变径段 =f(D 上 , D 下 , t 变 , L 变 )
[0063] W 下部直段 =f(D 下 , t 下 , L 下 )
[0064] Where W 总 is the total weight of the single pile foundation, W 上部直段 is the weight of the upper straight section structure of the single pile foundation, W 变径段 is the weight of the variable diameter section of the single pile foundation, W 下部直段 is the weight of the lower straight section of the single pile foundation, D 上 is the diameter of the upper straight section of the pile, t 上is the wall thickness of the upper straight section, t 变 is the wall thickness of the reducing section, D 下 is the diameter of the lower straight section of the pile, t 下 is the wall thickness of the lower straight section, L 上 is the length of the upper straight section of the pile, L 变 is the length of the variable diameter section pile, L 下 is the length of the lower straight section of the pile;
[0065] The L 上 Obtained by the following formula:
[0066]
[0067] In the formula, H 高 For extremely high water level, H max is the extreme wave height, l a The distance below the water surface is recommended to be 2m to 4m.
[0068] The L 变 Obtained by the following formula:
[0069] L 变 =f(d)=dl a -l b
[0070] Where d is the water depth, l is a The distance below the water surface is 2m to 4m. b It is the distance from the upper part of the mud surface, 0m to 2m is recommended.
[0071] The L 下 Obtained by the following formula:
[0072] L 下 =f(D, F, M)
[0073] D=2E-25M 5 -1E-19M 4 +4E-14M 3 -7E-09M 2 +0.0005M-6.0957
[0074] Where D is the pile diameter of the single pile foundation, F is the horizontal force, and M is the bending moment load.
[0075] In addition, the digital twin system can also analyze the relationship between mud surface bending moment and pile diameter in other sea areas, and establish the relationship between mud surface bending moment, mud surface horizontal force and pile diameter, that is, the multivariate polynomial relationship curve.
[0076] Step 5: Evaluate the monopile foundation design based on the rapid evaluation model. If the monopile foundation design meets the design conditions, the optimal monopile foundation design is obtained. If the monopile foundation design does not meet the design conditions, the monopile foundation design is iterated through the digital twin system and re-evaluated after the iteration is completed. Finally, the design scheme with the lightest overall structure is selected through the optimal monopile foundation design and combined with the overall situation of the tower foundation.
[0077] The design conditions include: the straight section of the upper part of the single pile foundation is 100 to 110;
[0078] D of the variable diameter section of the single pile foundation 下 / t 变 100~110;
[0079] D for the straight section of the lower part of the single pile foundation that is 20m to 30m into the mud 下 / t 下 The D value of the lower straight section of the single pile foundation below 20m to 30m into the mud is 100 to 110. 下 / t 下 120~140;
[0080] L 变 The distance range from 2m to 4m below the water surface to 2m above the mud surface must be met. In addition, the diameter-changing section must also meet the cone angle requirements, such as Figure 1 The tanα shown satisfies the requirement.
[0081] L 上 The distance from the top of the foundation to the bottom of the water surface should be within the range of 2m to 4m;
[0082] L 下 Meet the distance range from 0m to 2m from the upper part of the mud surface to the bottom of the mud pile.
[0083] like Figure 5 As shown, in the above steps, the base diameter of the tower involved is also difficult to determine initially. Therefore, the digital twin system can provide three different base diameters at the same time, and design the single pile foundation according to the environmental parameters and base diameter. Then, the initial design of the single pile foundation is completed through iteration to determine the base diameter and the single pile diameter.
[0084] like Figure 7 As shown, this embodiment provides an offshore wind power monopile foundation design and evaluation system, including:
[0085] The data acquisition module is used to collect environmental parameters and tower bottom diameter data; the environmental parameters include water level, wave height, wind parameters, wave and current parameters, etc.
[0086] A single pile foundation design module, used for designing a single pile foundation according to the environmental parameters and tower bottom diameter data;
[0087] A digital twin evaluation module is used to evaluate the monopile foundation design based on a rapid evaluation model. If the monopile foundation design meets the design conditions, an optimal monopile foundation design is obtained. If the monopile foundation design does not meet the design conditions, the monopile foundation design is iterated through a digital twin system. After the iteration is completed, the design is re-evaluated. The rapid evaluation model is established through the digital twin system.
[0088] The rapid assessment model includes:
[0089] W 总 =W 上部直段 +W 变径段 +W 下部直段
[0090] W 上部直段 =f(D 上 , t 上 , L 上 )
[0091] W 变径段 =f(D 上 , D 下 , t 变 , L 变 )
[0092] W 下部直段 =f(D 下 , t 下 , L 下 )
[0093] Where W 总 is the total weight of the single pile foundation, W 上部直段 is the weight of the upper straight section structure of the single pile foundation, W 变径段 is the weight of the variable diameter section of the single pile foundation, W 下部直段 is the weight of the lower straight section of the single pile foundation, D 上 is the diameter of the upper straight section of the pile, t 上 is the wall thickness of the upper straight section, t 变 is the wall thickness of the reducing section, D 下 is the diameter of the lower straight section of the pile, t 下 is the wall thickness of the lower straight section, L 上 is the length of the upper straight section of the pile, L 变 is the length of the variable diameter section pile, L 下 It is the length of the lower straight section of the pile.
[0094] The division of modules in the embodiments of the present invention is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional module in each embodiment of the present invention may be integrated into one processor, or may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated modules may be implemented in the form of hardware or in the form of software functional modules.
[0095] In this embodiment, a computer device is also provided, which includes a processor and a memory, the memory is used to store a computer program (in this embodiment, the computer program includes a computing component and an iterative component, which can perform model calculation and model update), the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of a method for designing and evaluating a single pile foundation for offshore wind power.
[0096] This embodiment also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It is understandable that the computer-readable storage medium here can include both built-in storage media in a computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the corresponding steps of a method for designing and evaluating a single pile foundation for offshore wind power in the above embodiment.
[0097] In this embodiment, the digital twin system is used to quickly evaluate the design of the single pile foundation, which can greatly reduce the workload and avoid duplication of work. In addition, the digital twin system is simple to operate and easy to calculate, which can facilitate designers to complete iterative calculations. Based on the digital twin system, this embodiment obtains the range of the variable diameter section, the relationship between the lower straight section pile diameter and the mud surface load, and the relationship between the lower straight section pile diameter and the pile length through measured data and simulation data, which provides a guarantee for the rapid evaluation of the single pile foundation and ensures the accuracy of the evaluation results. Based on the rapid evaluation model, this embodiment realizes high-precision rapid evaluation of the single pile foundation design, provides a solution for subsequent detailed design, and avoids waste of preliminary work. This embodiment can also make an overall design plan based on multiple tower bottom diameters, and finally screen out the single pile foundation design plan that is closest to the overall structure of the tower foundation.
[0098] Embodiment 2
[0099] The difference from the first embodiment is that the design of the single pile foundation does not include the variable diameter section, and only the upper straight section and the lower straight section need to be designed. That is to say, the single pile foundation in the second embodiment consists of the upper straight section and the lower straight section, wherein the D of the upper straight section is 上 / t 上 It is 80 to 120.
[0100] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0101] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0102] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0103] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0104] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A design and evaluation method for an offshore wind power monopile foundation, characterized in that: The following steps are involved: Collecting environmental parameters and tower bottom diameter data of the tower frame, and performing single pile foundation design according to the environmental parameters and tower bottom diameter data; The monopile foundation design is evaluated based on the rapid evaluation model. If the monopile foundation design meets the design conditions, the optimal monopile foundation design is obtained. If the monopile foundation design does not meet the design conditions, the monopile foundation design is iterated through the digital twin system, and re-evaluated after the iteration is completed; The rapid assessment model is established through a digital twin system.
2. The offshore wind power monopile foundation design and evaluation method according to claim 1, characterized in that: The rapid assessment model includes: IN 总 =In 上部直段 +W 变径段 +W 下部直段 W upper straight section = f(D upper, t 上 , L 上 ) W variable diameter section = f(Dup, D 下 , t 变 , L 变 ) W lower straight section = f(D lower, t 下 , L 下 ) Where W 总 is the total weight of the single pile foundation, W 上部直段 is the weight of the upper straight section of the single pile foundation, W 变径段 is the weight of the variable diameter section of the single pile foundation, W 下部直段 is the weight of the lower straight section structure of the single pile foundation, D 上 is the diameter of the upper straight section of the pile, t 上 is the wall thickness of the upper straight section, t 变 is the wall thickness of the reducing section, D 下 is the diameter of the lower straight section of the pile, t 下 is the wall thickness of the lower straight section, L 上 is the length of the upper straight section of the pile, L 变 is the length of the variable diameter section pile, L 下 It is the length of the lower straight section of the pile.
3. The offshore wind power monopile foundation design and evaluation method according to claim 2 is characterized in that: The L 上 It is obtained by the following formula: In the formula, H 高 For extremely high water level, H max is the extreme wave height, l a is the distance below the water surface.
4. The offshore wind power monopile foundation design and evaluation method according to claim 2, characterized in that: The L 变 Obtained by the following formula: L = f(d) = dl a -l b Where d is the water depth, l is a is the distance below the water surface, l b The distance to the upper part of the mud surface.
5. The offshore wind power monopile foundation design and evaluation method according to claim 2, characterized in that: The L 下 Obtained by the following formula: L 下 =f(D,F,M) D=2E-25M 5 -1E-19M 4 +4E-14M 3 -7E-09M 2 +0.0005M-6.0957 Where D is the pile diameter of the single pile foundation, F is the horizontal force, and M is the bending moment load.
6. The offshore wind power monopile foundation design and evaluation method according to claim 1, characterized in that: The environmental parameters include: water level, wave height, wind parameters and wave current parameters.
7. The offshore wind power monopile foundation design and evaluation method according to claim 2, characterized in that: The design conditions include: D of the upper straight section of the single pile foundation 上 / t 上 100~110; D of the variable diameter section of the single pile foundation 下 / t 变 100~110; D for the straight section of the lower part of the single pile foundation that is 20m to 30m into the mud 下 / t 下 The D value of the lower straight section of the single pile foundation below 20m to 30m into the mud is 100 to 110. 下 / t 下 120~140; L 变 Meet the distance range of 2m to 4m below the water surface to 2m above the mud surface; L 上 The distance from the top of the foundation to the bottom of the water surface should be within the range of 2m to 4m; L 下 Meet the distance range from 0m to 2m from the upper part of the mud surface to the bottom of the mud pile.
8. An offshore wind power monopile foundation design and evaluation system, characterized in that: include: A data acquisition module is used to collect environmental parameters and tower bottom diameter data; A single pile foundation design module, used for designing a single pile foundation according to the environmental parameters and tower bottom diameter data; The digital twin evaluation module is used to evaluate the single pile foundation design based on the rapid evaluation model. If the single pile foundation design meets the design conditions, the optimal single pile foundation design is obtained. If the single pile foundation design does not meet the design conditions, the single pile foundation design is iterated through the digital twin system. After the iteration is completed, the design is re-evaluated. The rapid evaluation model is established through the digital twin system.
9. An electronic device, characterized in that: The invention comprises a memory, a processor and a computer program stored in the memory and executable in the processor, wherein the processor implements the steps of a method for designing and evaluating an offshore wind power single pile foundation as claimed in any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the offshore wind power monopile foundation design and evaluation method according to any one of claims 1 to 7 are implemented.
