Method and system for predicting wind resources based on project section anemometer tower combination

By considering the geographical location and terrain similarity between wind turbine points and wind tower sections at the junction of multiple wind tower sections, and using a weighted average optimization algorithm and confidence coefficient, the problem of discontinuous wind resource prediction is solved and the wind farm is realized Accurate and reliable estimates of power generation.

CN118735035AInactive Publication Date: 2024-10-01DATANG RENEWABLE ENERGY RES INST CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410715105.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology has discontinuities in wind resource prediction at the junction of multiple wind tower sections, and lacks effective combination methods and optimization algorithms, resulting in blind spots and inaccuracies in wind farm power generation estimates.

Method used

By obtaining the geographical location, altitude difference and terrain similarity between wind turbine points and wind measurement towers, the project area is divided into multiple sections, and a weighted average optimization algorithm and confidence coefficient are used to extrapolate wind resources and calculate electricity to ensure that the wind at the junction is Continuity and accuracy of resource forecasts.

Benefits of technology

It achieves the continuity and accuracy of multi-tower combination forecasting of wind resources, improves the reliability and accuracy of wind farm power generation estimation, and allows engineers to quickly estimate the power calculation at wind turbine points based on the optimization algorithm and combination method of project terrain characteristics. result.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735035A_ABST
    Figure CN118735035A_ABST
Patent Text Reader

Abstract

The invention relates to a method and system for predicting wind resources based on a project section anemometer tower combination, and the method comprises the steps: obtaining the altitude difference of a fan position and the surface roughness information of a project, and judging the terrain type of the project; establishing a wind flow field model to obtain a wind resource grid; a project area is divided into a plurality of sections, each section uses one anemometer tower, and section anemometer towers are selected; the wind flow field model is adopted, wind resources are extrapolated to the position of the wind generating set from the single anemometer tower according to the section anemometer tower division scheme, and all electric quantity indexes at the hub height of all draught fan point positions are obtained; and setting a confidence coefficient of the section representative tower, and synthesizing wind resource parameters at the fan point positions obtained by different single anemometer towers by adopting a weighted average optimization algorithm to obtain a normalized electric quantity calculation result. According to the method, the confidence coefficient and the combination mode of the section representative tower are reasonably set by integrating the terrain similarity and the like, so that the electric quantity calculation result at the fan point location can be quickly estimated, and mutual-pushing verification and checking are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind power, and in particular relates to a method and system for predicting wind resources based on a combination of wind towers in a project section. Background Art

[0002] The main purpose of wind flow field modeling for wind power projects is to estimate the wind energy resources at each point of the wind turbine layout plan, so as to calculate the power generation of the wind farm and related power indicators, and optimize the design. Usually, wind resource engineers comprehensively consider the project terrain, climate conditions, previous observation data and the completeness of related information to determine the use of a certain numerical wind flow field model, and further extrapolate the wind resources measured by one or more wind towers to each pre-discharge wind turbine site. Most wind power projects use multiple wind towers for preliminary wind energy resource measurements, which brings challenges to combining information from multiple wind towers for the estimation of full-field power generation.

[0003] There are many types of numerical wind flow field models at home and abroad, including CFD wind energy calculation software for fluid mechanics, such as Meteodyn WT, WindSim, etc.; linear model wind energy calculation software, such as WAsP, WindPRO and WindFarmer, etc. When multiple wind towers are measured in and around the project site, most models usually divide the project area into multiple sub-sections according to the wind towers and wind turbine layout plan. Each section uses a wind tower, and the simulation of each wind tower is carried out independently. The wind energy resources of all pre-deployed wind turbines in a sub-section are extrapolated using the wind towers allocated in the section, and then multiple towers are integrated through different combinations to obtain a normalized power calculation result. There are also models that do not have a combined wind tower method, such as the linear model WAsP. There is a blind spot for the discontinuous predicted wind resources at the junction of two sub-sections. How to use the comprehensive results of a single tower to extrapolate through a reasonable combination of wind towers is particularly critical. The principles and methods of sub-segment division of each software are different, and the software that can realize multi-tower integration all adopt the mode of background encapsulation of built-in algorithms for users to estimate power. Engineers cannot comprehensively consider the data quality of wind measurement towers, terrain characteristics, etc. to objectively set weight adjustment combinations and optimization algorithms.

[0004] In summary, commonly used linear models and fluid mechanics CFD models generally adopt a mode in which a multi-tower combination algorithm is encapsulated in the background or only provides a single wind tower estimation mode. Wind resource assessment engineers are unable to adjust the combination mode and optimize the algorithm according to the actual situation of the project to solve the problem of discontinuous wind resource prediction for wind turbines at the junction of two or more sections and the existence of blind spot mutations. Summary of the invention

[0005] The purpose of the present invention is to provide a method and system for predicting wind resources based on a combination of wind towers in a project section. A plurality of wind towers are set up within and around the project site. For the scenario where there is a blind spot phenomenon in the discontinuity of predicted wind resources at the junction of multiple sub-sections, the horizontal distance between the geographical location of the wind turbine point and the wind tower, the altitude difference, and the terrain similarity are comprehensively considered to determine the representative tower of the sub-section of the site. By setting different confidence coefficients, the combination of wind towers in the section is selected to compare and verify the normalized power calculation result.

[0006] The present invention provides a method for predicting wind resources based on a combination of wind towers in a project section, comprising:

[0007] Step 1: Obtain the height difference of the wind turbine site and the project surface roughness information to determine the project terrain type;

[0008] Step 2: Establish a wind flow field model based on wind resource data, geographic information vector data, wind turbine model parameters and wind turbine arrangement mode to obtain a wind resource grid;

[0009] Step 3: For multiple wind tower projects, divide the project area into multiple sections, use one wind tower in each section, obtain the distance between the wind tower and the wind turbine location, the altitude difference, and select the section wind tower;

[0010] Step 4: Using the wind flow field model of step 2, according to the wind tower division scheme of step 3, the wind resources are extrapolated from a single wind tower to the location of the wind turbine generator set, and the power indicators at the hub height of each wind turbine point are obtained;

[0011] Step 5: Set the confidence coefficient of the representative tower of the section and use the weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

[0012] Furthermore, the electricity index in step 4 includes average wind speed, average wind speed considering wake, theoretical power generation, and power generation after considering wake.

[0013] Furthermore, the calculation formula in step 5 is as follows:

[0014]

[0015] Where:

[0016] X: comprehensive variable value pointed out by the result;

[0017] Xi: The i-th integrated variable value at the result point obtained from the j wind tower, that is, the calculation result of a single wind tower;

[0018] di: the distance from the result point to the i-th comprehensive reference point, taking into account the altitude difference;

[0019] ei: confidence coefficient for the i-th comprehensive result, which is usually set to 1 and can be modified according to the quality of wind tower data and terrain similarity;

[0020] p: distance weighted index, generally the square of the distance is recommended, and the corresponding value is 2;

[0021] C: Smoothing constant to avoid the equation being undefined very close to a wind mast, usually 1.

[0022] The present invention also provides a system for predicting wind resources based on a combination of wind towers in a project section, comprising:

[0023] The terrain category judgment module is used to obtain the altitude difference of the wind turbine position and the project surface roughness information to determine the project terrain category;

[0024] The wind flow field modeling module is used to establish a wind flow field model based on wind resource data, geographic information vector data, wind turbine model parameters and wind turbine layout to obtain a wind resource grid;

[0025] The section wind tower division module is used to divide the project area into multiple sections for multiple wind tower projects. Each section uses a wind tower to obtain the distance between the wind tower and the wind turbine location, the altitude difference, and select the section wind tower.

[0026] The wind resource extrapolation module is used to use the wind flow field model to extrapolate the wind resources from a single wind tower to the location of the wind turbine generator set according to the section wind tower division plan, and obtain the power indicators at the hub height of each wind turbine point;

[0027] The power calculation module is used to set the confidence coefficient of the section representative tower and use the weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

[0028] Furthermore, the electricity indicators include average wind speed, average wind speed considering wake, theoretical power generation, and power generation after considering wake.

[0029] Furthermore, the power calculation module calculates by the following formula:

[0030]

[0031] Where:

[0032] X: comprehensive variable value pointed out by the result;

[0033] Xi: The i-th integrated variable value at the result point obtained from the j wind tower, that is, the calculation result of a single wind tower;

[0034] di: the distance from the result point to the i-th comprehensive reference point, taking into account the altitude difference;

[0035] ei: confidence coefficient for the i-th comprehensive result, which is usually set to 1 and can be modified according to the quality of wind tower data and terrain similarity;

[0036] p: distance weighted index, generally the square of the distance is recommended, and the corresponding value is 2;

[0037] C: Smoothing constant to avoid the equation being undefined very close to a wind mast, usually 1.

[0038] The present invention also provides a non-transitory computer-readable storage medium, which stores computer instructions. When the computer instructions are executed by a processor, the method for predicting wind resources based on a combination of wind towers in a project section is implemented.

[0039] 8. An electronic device, comprising:

[0040] A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for predicting wind resources based on a combination of wind towers in a project section by executing the computer instructions.

[0041] Through the above scheme, through the method and system for predicting wind resources based on the combination of wind towers in the project section, multiple wind towers are set up within and around the project site, and the predicted wind resources at the junction of multiple sub-sections are discontinuous and there is a blind spot phenomenon. The horizontal distance between the wind turbine point and the wind tower, the altitude difference, and the terrain similarity are comprehensively considered to determine the representative tower of the sub-section of the site, and by setting different confidence coefficients, the combination of wind towers in the section is compared and verified to obtain a normalized power calculation result. With the present invention, engineers can optimize the algorithm based on the selection of applicable wind energy calculation software according to the terrain characteristics of the project, and reasonably set the confidence coefficient and combination method of the section representative tower based on the terrain similarity to quickly estimate the power calculation result at the wind turbine point, and realize mutual promotion and verification.

[0042] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a flow chart of a method for predicting wind resources based on a combination of wind towers in a project section according to the present invention;

[0044] Figure 2 It is a schematic diagram of an electronic device of the present invention. DETAILED DESCRIPTION

[0045] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0046] Ginseng Figure 1 As shown, this embodiment provides a method for predicting wind resources based on a combination of wind towers in a project section, including:

[0047] Step S1, obtaining the altitude difference of the wind turbine site and the project surface roughness information to determine the project terrain type.

[0048] Select the appropriate wind energy calculation software according to the terrain of the project site. Linear models such as WAsP, WindPRO and WindFarmer should be used for flat terrain, simple hills and low mountains, and fluid mechanics CFD models such as Meteodyn WT and WindSim should be used for complex mountainous terrain. Generally speaking, qualitative methods can be used to classify terrain based on altitude difference, slope and surface roughness.

[0049] Table 1 Qualitative classification of terrain

[0050]

[0051] Step S2: Establish a wind flow field model based on wind resource data, geographic information vector data (file), wind turbine model parameters and wind turbine layout to obtain a wind resource grid.

[0052] Wind resource data: geographical location information of representative wind towers in and around the project site, and representative annual time series data. The time dimension is h or 10 minutes, and the elements include wind speed, wind direction, SD, etc.

[0053] Geographic information vector file: contains small-scale topographic maps and roughness element files measured within the site and slightly larger-scale topographic maps of large areas within the calculated expansion range.

[0054] Wind resource grid modeling: Select appropriate wind energy calculation software according to the terrain classification method, and create a wind resource grid (WRG) through the corresponding numerical wind flow field model.

[0055] Wind turbine selection and layout: Select appropriate wind turbines based on the wind parameter analysis results of representative wind towers. Determine single or mixed layout based on resource distribution, available layout area, etc. Considering aspects such as wind farm operation and maintenance management, it is recommended to reasonably select two types.

[0056] Step S3: For multiple wind tower projects, divide the project area into multiple sections, use a wind tower in each section, obtain the distance between the wind tower and the wind turbine location, and the altitude difference, and recommend the use of section wind towers. In principle, refer to the nearest wind tower to "control" the area and the terrain similarity definition, such as the ridge section data ridge wind tower, to avoid the closest distance and large terrain differences.

[0057] Step S4, using the wind flow field model of step S2, according to the wind tower division scheme of step S3, the wind resources are extrapolated from a single wind tower to the location of the wind turbine, and the power indicators at the hub height of each wind turbine point are obtained. The power indicators include average wind speed, average wind speed considering wake, theoretical power generation, power generation after considering wake, etc. Each wind tower simulation is carried out independently, and the wind resources of all wind turbines in a certain section are extrapolated using the wind tower allocated to the section.

[0058] Step S5, setting the confidence coefficient of the section representative tower, and using a weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

[0059] For the discontinuous wind resource prediction scenario of wind turbines at the junction of two or more sections, that is, when the wind turbine generator set moves from one side of the dividing line to the other side, the power generation results change suddenly, the weighted average method is used to synthesize the wind resource parameters at the wind turbine point obtained by different single wind towers (multi-tower combination). The calculation formula is as follows:

[0060]

[0061] Where:

[0062] X: comprehensive variable value pointed out by the result;

[0063] Xi: The i-th integrated variable value at the result point obtained from the j wind tower, that is, the calculation result of a single wind tower;

[0064] di: the distance from the result point to the i-th comprehensive reference point, taking into account the altitude difference;

[0065] ei: confidence coefficient for the i-th comprehensive result, which is usually set to 1 and can be modified according to the quality of wind tower data and terrain similarity;

[0066] p: distance weighted index, generally the square of the distance is recommended, and the corresponding value is 2;

[0067] C: Smoothing constant to avoid the equation being undefined very close to a wind mast, usually 1.

[0068] The method for predicting wind resources based on the combination of wind towers in the project section sets up multiple wind towers within and around the project site. In the case of blind spots in the discontinuity of predicted wind resources at the junction of multiple sub-segments, the horizontal distance between the wind turbine location and the wind tower, the altitude difference, and the terrain similarity are comprehensively considered to determine the representative tower of the sub-segment of the site, and by setting different confidence coefficients, the combination of wind towers in the section is compared and verified to obtain a normalized power calculation result. With the present invention, engineers can optimize the algorithm based on the selection of applicable wind energy calculation software according to the terrain characteristics of the project, reasonably set the confidence coefficient of the section representative tower and the combination method based on the terrain similarity, etc. to quickly estimate the power calculation result at the wind turbine location, and realize mutual promotion and verification.

[0069] This embodiment also provides a method for predicting wind resources based on a combination of wind towers in a project section, including:

[0070] The terrain category judgment module is used to obtain the altitude difference of the wind turbine position and the project surface roughness information to determine the project terrain category;

[0071] The wind flow field modeling module is used to establish a wind flow field model based on wind resource data, geographic information vector data, wind turbine model parameters and wind turbine layout to obtain a wind resource grid;

[0072] The section wind tower division module is used to divide the project area into multiple sections for multiple wind tower projects. Each section uses a wind tower to obtain the distance between the wind tower and the wind turbine location, the altitude difference, and select the section wind tower.

[0073] The wind resource extrapolation module is used to use the wind flow field model to extrapolate the wind resources from a single wind tower to the location of the wind turbine generator set according to the section wind tower division plan, and obtain the power indicators at the hub height of each wind turbine point;

[0074] The power calculation module is used to set the confidence coefficient of the section representative tower and use the weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

[0075] This embodiment also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and when the computer instructions are executed by a processor, the method of predicting wind resources based on a combination of wind towers in a project section is implemented.

[0076] Ginseng Figure 2 As shown, this embodiment also provides an electronic device, including:

[0077] A memory 201 and a processor 202, wherein the memory 201 and the processor 202 are communicatively connected to each other, the memory 201 stores computer instructions, and the processor 202 executes the computer instructions to perform the wind resource prediction based on the combination of wind towers in the project section.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principles of the present invention, and these improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A method for predicting wind resources based on a combination of wind towers in a project area, characterized in that: include: Step 1: Obtain the height difference of the wind turbine site and the project surface roughness information to determine the project terrain type; Step 2: Establish a wind flow field model based on wind resource data, geographic information vector data, wind turbine model parameters and wind turbine arrangement mode to obtain a wind resource grid; Step 3: For multiple wind tower projects, divide the project area into multiple sections, use one wind tower in each section, obtain the distance between the wind tower and the wind turbine location, the altitude difference, and select the section wind tower; Step 4: Using the wind flow field model of step 2, according to the wind tower division scheme of step 3, the wind resources are extrapolated from a single wind tower to the location of the wind turbine generator set, and the power indicators at the hub height of each wind turbine point are obtained; Step 5: Set the confidence coefficient of the representative tower of the section and use the weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

2. The method for predicting wind resources based on the combination of wind towers in the project section according to claim 1 is characterized in that: The electricity indicators in step 4 include average wind speed, average wind speed considering wake, theoretical power generation, and power generation after considering wake.

3. The method for predicting wind resources based on the combination of wind towers in project sections according to claim 2 is characterized in that: The calculation formula in step 5 is as follows: Where: X: comprehensive variable value pointed out by the result; Xi: The i-th integrated variable value at the result point obtained from the j wind tower, that is, the calculation result of a single wind tower; di: the distance from the result point to the i-th comprehensive reference point, taking into account the altitude difference; ei: confidence coefficient for the i-th comprehensive result, which is usually set to 1 and can be modified according to the quality of wind tower data and terrain similarity; p: distance weighted index, generally the square of the distance is recommended, and the corresponding value is 2; C: Smoothing constant to avoid the equation being undefined very close to a wind mast, usually 1.

4. A system for predicting wind resources based on a combination of wind towers in a project area, characterized in that: include: The terrain category judgment module is used to obtain the altitude difference of the wind turbine position and the project surface roughness information to determine the project terrain category; The wind flow field modeling module is used to establish a wind flow field model based on wind resource data, geographic information vector data, wind turbine model parameters and wind turbine layout to obtain a wind resource grid; The section wind tower division module is used to divide the project area into multiple sections for multiple wind tower projects. Each section uses a wind tower to obtain the distance between the wind tower and the wind turbine location, the altitude difference, and select the section wind tower. The wind resource extrapolation module is used to use the wind flow field model to extrapolate the wind resources from a single wind tower to the location of the wind turbine generator set according to the section wind tower division plan, and obtain the power indicators at the hub height of each wind turbine point; The power calculation module is used to set the confidence coefficient of the section representative tower and use the weighted average optimization algorithm to synthesize the wind resource parameters at the wind turbine locations obtained from different single wind measurement towers to obtain a normalized power calculation result.

5. The system for predicting wind resources based on the combination of wind towers in project sections according to claim 1 is characterized in that: The electricity indicators include average wind speed, average wind speed considering wake turbulence, theoretical power generation, and power generation after considering wake turbulence.

6. The method for predicting wind resources based on the combination of wind towers in the project section according to claim 4 is characterized in that: The power calculation module calculates by the following formula: Where: X: comprehensive variable value pointed out by the result; Xi: The i-th integrated variable value at the result point obtained from the j wind tower, that is, the calculation result of a single wind tower; di: the distance from the result point to the i-th comprehensive reference point, taking into account the altitude difference; ei: confidence coefficient for the i-th comprehensive result, which is usually set to 1 and can be modified according to the quality of wind tower data and terrain similarity; p: distance weighted index, generally the square of the distance is recommended, and the corresponding value is 2; C: Smoothing constant to avoid the equation being undefined very close to a wind mast, usually 1.

7. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores computer instructions, and when the computer instructions are executed by a processor, a method for predicting wind resources based on a combination of wind towers in a project section is implemented as described in any one of claims 1 to 3.

8. An electronic device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for predicting wind resources based on a combination of wind towers in a project section as described in any one of claims 1 to 3 by executing the computer instructions.

Citation Information

Patent Citations

  • Wind power plant on-grid energy deviation computing method based on anemometer tower mutual verification

    CN104794259A

  • Wind and light resource integrated management system